North Reading Public Schools Proposed Large Capital Plan Fiscal Years 2019-2023 September 11, 2017

North Reading Public Schools · North Reading Public Schools ... flooring at the other elementary schools The proposed floor would be a synthetic rubber athletic floor similar to

Embed Size (px)

Citation preview

North Reading Public Schools

Proposed Large Capital Plan Fiscal Years 2019-2023

September 11, 2017

Agenda

Review capital items approved for FY 18 Discuss FY 19 large capital requests Discuss future capital needs Review CIPC timeline and process Time for discussion and questions

FY 18 Approved Capital Projects

Computer Replacements - $60,000

Asst

FY 18 Approved Capital Projects

Elementary WIFI Upgrade -$107,357

FY 18 Approved Capital Projects

Batchelder Peabody Street Entrance Repair- $25,000

Three Major Categories:

VehiclesTechnology Facilities

Capital Summary Chart

CATEGORY FY’19 FY’20 FY’21 3-YEAR TOTAL

VEHICLES 35,000 42,000 50,000 127,000

TECHNOLOGY 105,000 60,000 105,000 270,000

FACILITIES 90,000 170,000 300,000 560,000

TOTAL 230,000 272,000 455,000 957,000

FY 19 Vehicle Request Multi-Function Activity Vehicle $35,000 (FY19)

• To be used for transportation to and from athletic and extra-curricular events.

• Anticipate vehicle could be used anywhere between 45 and 60 athletic runs through out the school year.

• The estimated annual savings is expected to range between $13,000-$16,000.

• Only a valid driver’s license is required to operate the vehicle• Total estimated cost is $50,000; Year 1 estimated savings would be

used to reduce the total request to $35,000.

Future Vehicle Requests

Special Education Van (Replacement) $42,000 (FY20) 2007 Van with over 121,000 miles; currently used as a spare van

Buildings & Grounds Ford F-350 Pick-Up Truck Replacement (FY21) This is a high usage vehicle which is used for snow removal and sanding

in the winter months

Technology Requests (FY 19)

Computer Devices $60,000 (FY19) Since 2013 the district has been able to increase the

number of mobile devices in the educational program. The need for on-going computer replacement and the

addition of devices is ever increasing as the school district strives to meet the demands of computer-based state standardized testing, advances a 1:1 initiative, and provide all students with a comprehensive 21st century learning experience.

Technology Requests (FY 19)

Instructional Equipment $45,000 (FY19) The district has a need to begin to replace the technology items

in the classrooms at all three elementary schools including, SMART boards, projectors, and iPads.

Many of these devices are over ten years old and are not functioning or functioning poorly and have reached the end of their useful life.

The District has identified the need to begin a long-term plan to support the replacement of these items that have become an essential component of the elementary classroom.

Facility Plan Requests (FY19)Little School Gym Floor $40,000 (FY19)

The Little School gymnasium floor was installed in 1997 and is showing signs of deterioration as it reaches the end of its useful life.

The current floor is a plastic sectional floor and is not of the same quality with flooring at the other elementary schools

The proposed floor would be a synthetic rubber athletic floor similar to the Batchelder and Hood Schools

Includes removal and disposal of existing floor and installation of game lines

Current Floor Proposed New Floor

Facility Plan Requests (FY19)Little School Paving Project $50,000 (FY19)

Paving of identified sections of the Little School parking lot is needed. This project would both expand and repair sections of the existing

parking lot. The old playground was removed in the summer of 2016, and gravel was

placed in this area as a temporarily solution. There are also other sections of the parking lot that are showing signs of

deterioration and are in need of repair.

Future Facility Plan Requests Little and Hood School Lighting Upgrades - $50,000 (FY20) Hood School Modular Demolition- $60,000 (FY20)

Removal of 4 modular classroom units due too their age and condition and restoring the area to its original condition

Little School Asbestos Mitigation (Two Phases) $120,000 (FY20 & FY23) Complete remaining asbestos mitigation projects

Hood School Boilers $300,000 (FY21) Replacement of Hood School boilers to high efficiency condensing boilers

3 Year Capital Summary Chart

CATEGORY FY’19 FY’20 FY’21 3-YEAR TOTAL

VEHICLES 35,000 42,000 50,000 127,000

TECHNOLOGY 105,000 60,000 105,000 270,000

FACILITIES 90,000 170,000 300,000 560,000

TOTAL 230,000 272,000 455,000 957,000

Includes Hood School Boiler Replacement

CATEGORY FY’16 FY’17 FY’18 3-YEAR TOTAL

VEHICLES 35,000 45,000 0 80,000

TECHNOLOGY 60,000 60,000 167,357 287,357

FACILITIES 50,000 50,000 25,000 125,000

TOTAL 145,000 155,000 192,357 492,357

3 Year Request Chart

3 Year Approval Chart

FY 19 Proposed Capital Requests* 1. Computer Devices $60,000 2. Replacement Technology Equipment $45,000 3. Little School Gym Floor $40,000 4. Little School Paving Project $50,000 5. Multi-Function Activity Bus $35,000 Total: $230,000

*Administration’s proposed list in priority order

Capital Improvement Planning Committee Timeline

Capital request sheets due from each department by October 13th;

School Committee vote to adopt on September 25th

CIPC will review requests and make field trips if necessary to gather all relevant information (November/December)

CIPC members will rank requests (January/February) Committee will review and come to a consensus of the ranking

order (March) CIPC will present plan to Board of Selectmen (April) CIPC will submit final plan and articles for June Town

Meeting (April/May)

Discussion & Questions