Multi-use path Safe Routes to School Neighborhood Greenway Crossing improvements Protected bike lanes Sidewalk Pedestrian pathway North Seattle Neighborhood Greenway (west to Crown Hill) Northgate Neighborhood Greenway – Maple Leaf connection Northgate Neighborhood Greenway – Pinehurst connection Street concept plan (improvements to be built by private development) Existing protected bike lanes 1ST AVE NE 5 NORTHGATE MALL NORTH SEATTLE COLLEGE NE NORTHGATE WAY 8TH AVE NE 5TH AVE NE NE 102ND ST NE 100TH ST NE 98TH ST NE 97TH ST ROOSEVELT WAY NE 3RD AVE NE 4TH AVE NE NE 94TH ST NE 95TH ST NE 92ND ST N 106TH ST WALLINGFORD AVE N COLLEGE WAY N MERIDIAN AVE N N 107TH ST CORLISS AVE N NE 104TH ST NE 105TH ST NE 103RD ST LINK STATION IF YOU NEED THIS INFORMATION TRANSLATED, please call (206) 615-0925. Si necesita traducir esta información al español, llame al (206) 615-0925. Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi (206) 615-0925. 당신이 번역이 정보를 필요로하는 경우에, (206) 615-0925로 전화 해주십시오. NORTHGATE TODAY The Northgate neighborhood is a major residential and employment destination that continues to grow. With the completion of Sound Transit’s Link light rail station in 2021, the neighborhood is poised to become one of the region’s most active transit hubs. Today, a 10-lane interstate divides the neighborhood, and to walk between North Seattle College and the existing transit center takes 25 minutes or more. PROJECT OVERVIEW We’re designing a new accessible, all ages and abilities pedestrian and bike bridge over Interstate 5 (I-5) in Northgate. The Northgate Ped/Bike Bridge will improve access to communities, services, and opportunities on the east and west sides of I-5 in Northgate and Licton Springs, helping knit together a historically divided area. It’ll also reduce travel time for people walking and biking between the east and west sides of I-5. When complete, the bridge will help connect the neighborhood’s thriving job and retail centers with the rest of the city and region. The new bridge will span roughly 1,900 feet over I-5, landing at North Seattle College on the west side and at 1st Ave NE and NE 100th St, near the future light rail station, on the east side. WHAT’S HAPPENING NOW? We’ve refined the design for the west approach. See more information inside! You can expect to see the project team in the community in spring 2018 sharing updates on design and environmental review. PROJECT INFORMATION & CONTACT [email protected], (206) 615-0925 www.seattle.gov/transportation/northgatepedbridge.htm PROJECT INFORMATION & CONTACT [email protected], (206) 615-0925 www.seattle.gov/transportation/northgatepedbridge.htm OTHER WALKING AND BIKING INVESTMENTS The Northgate Ped/Bike Bridge is one of many improvements planned for the area. We will create a more walkable and bikeable Northgate through investments that benefit all ages and abilities. This map highlights improvements for people walking and biking in the area. Northgate Ped/Bike Bridge NORTHGATE PED/BIKE BRIDGE PROJECT Connecting communities east and west of I-5 in North Seattle WINTER 2018 PROJECT SCHEDULE 2018 2019 2020 2021 Planning and design Environmental review and approval Bridge construction Bridge opens! Sound Transit Link light rail station opens

NORTHGATE PED/BIKE BRIDGE PROJECT - seattle.gov€¦ · Bridge project. The refined west-side ... Reducing the bridge slope to improve accessibility Moving the landing away from the

Embed Size (px)

Citation preview

Northgate ped/bike bridge

Multi-use path

Safe Routes to School Neighborhood Greenway

Crossing improvements

Protected bike lanes

Sidewalk

Pedestrian pathway

North Seattle Neighborhood Greenway (west to Crown Hill)

Northgate Neighborhood Greenway – Maple Leaf connection

Northgate Neighborhood Greenway – Pinehurst connection

Street concept plan (improvements to be built by private development)

Existing protected bike lanes

1ST AVE NE

5NORTHGATE MALL

NORTH SEATTLE COLLEGE

NE NORTHGATE WAY

8TH AVE N

E

5TH AVE N

E

NE 102ND ST

NE 100TH ST

NE 98TH ST

NE 97TH ST

ROOSEVELT WAY N

E

3RD AVE NE

4TH AVE N

E

NE 94TH ST

NE 95TH ST

NE 92ND ST

N 106TH ST

WALLIN

GFORD AVE N

COLLEGE WAY N

MERIDIAN

AVE N

N 107TH ST

CORLISS AVE N

NE 104TH ST

NE 105TH ST

NE 103RD ST

LINKSTATION

IF YOU NEED THIS INFORMATION TRANSLATED, please call (206) 615-0925. Si necesita traducir esta información al español, llame al (206) 615-0925.

Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi (206) 615-0925. 당신이 번역이 정보를 필요로하는 경우에, (206) 615-0925 로 전화 해주십시오.

NORTHGATE TODAYThe Northgate neighborhood is a major residential and employment destination that continues to grow. With the completion of Sound Transit’s Link light rail station in 2021, the neighborhood is poised to become one of the region’s most active transit hubs. Today, a 10-lane interstate divides the neighborhood, and to walk between North Seattle College and the existing transit center takes 25 minutes or more.

PROJECT OVERVIEWWe’re designing a new accessible, all ages and abilities pedestrian and bike bridge over Interstate 5 (I-5) in Northgate. The Northgate Ped/Bike Bridge will improve access to communities, services, and opportunities on the east and west sides of I-5 in Northgate and Licton Springs, helping knit together a historically divided area. It’ll also reduce travel time for people walking

and biking between the east and west sides of I-5. When complete, the bridge will help connect the neighborhood’s thriving job and retail centers with the rest of the city and region.

The new bridge will span roughly 1,900 feet over I-5, landing at North Seattle College on the west side and at 1st Ave NE and NE 100th St, near the future light rail station, on the east side.

WHAT’S HAPPENING NOW?

■ We’ve refined the design for the west approach. See more information inside!

■ You can expect to see the project team in the community in spring 2018 sharing updates on design and environmental review.

PROJECT INFORMATION & [email protected], (206) 615-0925 www.seattle.gov/transportation/northgatepedbridge.htm

PROJECT INFORMATION & [email protected], (206) 615-0925 www.seattle.gov/transportation/northgatepedbridge.htm

OTHER WALKING AND BIKING INVESTMENTS

The Northgate Ped/Bike Bridge is one of many improvements planned for the area. We will create a more walkable and bikeable Northgate through investments that benefit all ages and abilities. This map highlights improvements for people walking and biking in the area.

Northgate Ped/Bike Bridge

NORTHGATE PED/BIKE BRIDGE PROJECTConnecting communities east and west of I-5 in North Seattle WINTER 2018

PROJECT SCHEDULE 2018 2019 2020 2021Planning and design

Environmental review and approval

Bridge construction

Bridge opens!

Sound Transit Link light rail station opens

I-5N

2 | SEATTLE DEPARTMENT OF TRANSPORTATION NORTHGATE PED/BIKE BRIDGE PROJECT | WINTER 2018 SEATTLE DEPARTMENT OF TRANSPORTATION NORTHGATE PED/BIKE BRIDGE PROJECT | WINTER 2018 | 3

Northgate Ped/Bike Bridge design

Environmental reviewIn 2018, we’re examining the environmental impacts of building and operating the Northgate Ped/Bike Bridge.

We’re conducting environmental review under the National and State Environmental Policy Acts (NEPA and SEPA). These important environmental review processes

require agencies to consider environmental impacts during planning and decision making. This spring, we’ll hold a 14-day comment period for SEPA review.

We’ve been working closely with our project partners at North Seattle College (NSC). The west side of the bridge touches down at NSC’s campus and will be a substantial amenity for several North Seattle neighborhoods and will directly serve the College’s students, faculty, and staff. NSC has invested significant time and effort in collaborating with us to ensure the success of the Northgate Ped/Bike Bridge project. The refined west-side design includes:

■ Making the alignment as straight as possible to preserve valuable college land

■ Reducing the bridge slope to improve accessibility

■ Moving the landing away from the NSC parking lot

Of the alignments we’ve considered to date, the latest design will have the least impact on natural habitat on the west side of the bridge and will maintain direct public access to College Way N. It’s also the most feasible option, given the project’s budget and the need to complete construction in advance of Sound Transit’s Northgate light rail station opening in 2021.

Refining the west approach design

1 NEIGHBORHOOD CONNECTION 2 WILDLIFE

OVERLOOK

3 NEIGHBORHOOD GATEWAY

STATIONSPUR

NORTHGATE ARRIVAL

4 NE 100TH ST AND NORTHGATE STATION OVERLOOK

1 | NEIGHBORHOOD CONNECTION 3 | NEIGHBORHOOD GATEWAY

Direct connection at grade allows for open sightlines across the bridge

The sweeping lines of the bridge where it crosses over southbound I-5 create a memorable point of passage between communities

2 | WILDLIFE OVERLOOK 4 | NE 100TH ST AND NORTHGATE STATION OVERLOOK

The wildlife overlook offers bridge users a resting spot and a view of the pond and wetland

From the sloping eastern approach, the NE 100th St overlook provides views of arriving and departing trains at the light rail station

PREVIOUS DESIGN — AUGUST 2017

CURRENT DESIGN — NOVEMBER 2017

COLL

EGE W

AY N

I-5

1ST AVE NE

NE 100TH ST

NORTH SEATTLECOLLEGE

COLL

EGE W

AY N

I-5

1ST AVE NE

NE 100TH ST

NORTH SEATTLECOLLEGE