S H O R T T E R M
NEW FRANCHISENEW FRANCHISE
NEW FRANCHISE
M E D I U M T E R M L O N G T E R M
Control Period 5 Control Period 6 Control Period 7 Control Period 8 Control Period 9
Improved resilience and reliability - completion of fl ood works, introduction of resilient Cross Country trains and start of works between Exeter and Newton AbbotFaster journey times - new Inter-City Express trainsIncreased capacity and connectivity - new and more frequent inter-city and regional rail servicesImproved passenger experience - new Inter-City trains with reliable mobile/wi-fi signals and on-board entertainment, upgraded sleeper service and programme of station improvementsTechnical work - development of resilience, journey time and capacity improvement schemes and new route proposals
Improved resilience and reliability - additional capacity on Exeter to Waterlooroute and further work at DawlishFaster journey times - through infrastructure improvements and partial electrifi cationIncreased capacity and connectivity - improved services to Bristol/Midlands, increased capacity between Exeter and Plymouth and between Castle Cary andExeter and phased opening of the Northern routeImproved passenger experience - continued programme of station improvements
Improved resilience and reliability - completion of critical resilience works between Exeter and Newton AbbotFaster journey times - through line speed improvements and delivery of Dawlish Additional LineIncreased capacity and connectivity - completion of the Northern route including North Cornwall Parkway Station and inclusion of South West peninsula in national rail electrifi cation programme
2017 SEPTEMBER OCTOBERMARCH APRIL MAY JUNE JULY AUGUSTJANUARY FEBRUARYSEPTEMBER OCTOBER NOVEMBER DECEMBER MARCH2018 2019 APRILSEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARYMARCH APRIL MAY JUNE JULY AUGUSTJANUARY FEBRUARYNOVEMBER DECEMBER 2020 2021 2022 2023 2024 2025MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
2017 SEPTEMBER OCTOBERMARCH APRIL MAY JUNE JULY AUGUSTJANUARY FEBRUARYSEPTEMBER OCTOBER NOVEMBER DECEMBER MARCH2018 2019 APRILSEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARYMARCH APRIL MAY JUNE JULY AUGUSTJANUARY FEBRUARYNOVEMBER DECEMBER 2020 2021 2022 2023 2024 2025MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
National rail improvements
Closing the Gap: The South West Peninsula Strategic Rail BlueprintNovember 2016
Resilience and reliabilityBreaching of the sea defences, cliff falls and fl ooding in 2014 cost business and communities around £1.2bn and the rail industry a further £91m.
The £621m of investment proposed will:
• create a more resilient rail service for businesses, communities and the tourism industry.
• increase business confi dence, boost potential inward investment and expansion in the South West peninsula.
• reduce the level of unplanned works and investment required.
3-Point Plan Priorities
Reduced journey times and improved connectivity£1.88bn investment proposed for journey time improvement will generate £7.2bn in GVA and £1.1bn in direct transport benefi ts for the UK economy by:
• improving access to markets, increasing productivity and unlocking growth in the South West peninsula.
• improving opportunities for education, employment, housing, leisure, tourism and increasing social inclusion.
• increasing modal shift to rail, reducing road congestion and pollution, improving air quality leading to a more effi cient use of our transport infrastructure.
Capacity and comfort£567m of investment is proposed to increase the availability, frequency and capacity of rail services, together with pioneering digital services which will:
• improve the productivity of business users travelling by train and support economic growth in the South West peninsula and maximise the benefi ts of Crossrail and the western access to Heathrow Airport.
• improve the journey experience for visitors and support the tourism industry which is worth £8.6bn a year to the South West economy.
• improve the opportunity for more travel to work journeys by rail.
Resilience scheme development: Teignmouth Cliff s and Dawlish Seawall
Consultation - critical resilience work between Exeter and Newton Abbot
Journey time scheme development: Paddington - Penzance
Timetable study and infrastructure development: Exeter - Waterloo
Development of diversionary route proposals: Exeter - Castle Cary via Yeovil
Capacity improvements:Castle Cary - Exeter
DfT/NR£15m
NR NR
NR£3.4m
£17m £5m
NR£150m
Flood resilience works: Cowley, Somerset Levels, Athelme and Bradninch
NR/EA
Enhanced maintenance facility: Penzance Depot
DfT/CC/NR/GWR£21m
Increased capacity and improved quality: Night Riviera Sleeper service
Report - Great Western Rail Franchise: Devon and Cornwall
The South West Peninsula Strategic Rail Blueprint
DfT/CC/GWRDfT
PRTF
£14m
DfT/CC/GWR£3.4m
New Night Riviera Sleeper lounges: Penzance and Truro stations
Upgraded Sleeper lounge: Paddington Station
Signalling enhancements: Penzance - Totnes (Phase 1)
Increased frequency: Penzance - Plymouth (2 trains per hour)
Signalling enhancements: Penzance - Totnes (Phase 2)
£31.3m
DfT/CC/NR DfT/GWR
DfT/CC/NR
£21m Franchise
£103m
Enhanced maintenance facility: Exeter Depot
DfT/NR/GWR
Improved wi-fi and on-board entertainment on new Inter-City Express trains.
Improved wi-fi at stations
Improved services and connections: South West - Bristol/Midlands
Service Improvement Study:South West - Bristol/Midlands Line development:
Plymouth - TavistockCommence service -Tavistock to Plymouth
£25m
New Inter-City Express Trains
DfT/GWR£350m£53m
DfT/GWR
DfTDfT/CC Franchise£0.5m DCC/NR/Franchise DCC/NR/Franchise£1.5m £48.5m
Introduce resilient trains on Cross
Country services capable of operating
on Dawlish mainline
Resilience works - Dawlish seawall and Teignmouth cliff s
Teignmouth - Parsons TunnelPrincipal risks - marine erosion, cliff failure and landslides
Kennaway Tunnel to Dawlish Warren - Phase 1
Franchise
Principal risks - marine erosion and cliff instability Principal risks - marine erosion and rockfall
Continuous rockfall barrier along stretch and cliff drainage improvements
New sea wall or revetment and pedestrian walkway
High-tensile wire meshRockfall
shelter at tunnel
mouth
Parsons Tunnel to Kennaway Tunnel
Beach management
Rockfall barrier
New sea wall and
revetment
High-tensile wire mesh
Rockfall shelter in vulnerable locations around tunnel portals
Beach management
Indicative drawing Indicative drawingIndicative drawingDfT/Cross Country
NR£270m
Improved journey times:
Exeter - Waterloo
Increased frequency: Plymouth
- Paddington (2 direct trains
per hour)
Electrifi cation: Newbury - Bedwyn
DfT/NR£100m
Journey time improvements: Great Bedwyn - Market Lavington
Electrifi cation: Deighton Bank, Aller Junction - Totnes
DfT/NR£29m DfT/NR£150m
Upgrade of Dartmoor Northern
Line (Phase 1b): Coleford Junction -
Okehampton
Completion of Dartmoor Northern Line
(Phase 3): Coleford Junction - Tavistock
(including North Cornwall Parkway
Station)
Capacity improvements:
Newbury - Westbury
DfT/NR DfT/NR DfT/NR£150m £50m
Additional train capacity:
Exeter - Plymouth
Kennaway Tunnel to Dawlish Warren - Phase 1Principal risks - marine erosion and cliff instability
Newton Abbot - TeignmouthDawlish Warren - Exeter Principal risks - estuarine and river flooding
Continuous rockfall barrier along stretch and cliff drainage improvements
New sea wall or revetment and pedestrian walkway
High-tensile wire mesh
Resilience works - Dawlish Warren and Teigh/Exe estuaries
Rockfall shelter
at tunnel mouth
Indicative drawing Indicative drawing
Beach management
Raise existing embankment
or provide new vertical defence
Improve drainage from land side under railway to river
NR
Journey time improvements: Southcote - Kintbury
DfT
Journey time improvements: Newton Abbot - Totnes
Journey time improvements - Westbury to Taunton
Franchise
DfT/NR£570m DfT/NR£513m
DfT/NR£231m
Journey time improvements: Exeter - Newton Abbot, Hunderfoot avoider and around Westbury
Journey time improvements:Totnes - Penzance
Dawlish additional line
Remaining infrastructure improvements from GRIP 2 study
DfT/NRDfT/NR
DfT/NRDfT/NR
Signalling enhancements: Castle Cary - Caglog Junction
Faster journey times and enhanced capacity: Exeter - Waterloo
DfT/NR£10m
DfT/NR/Franchise£150mDfT/EU/CC/NR/GWR/HE
Station improvement: St Erth Multi Modal Hub
Station improvements: Newbury, Castle Cary, Taunton, Tiverton Parkway, Exeter St Davids (Phase 1)
Improved access at other stations with 1,100 new parking spaces
DfT/GWR£15.3m
Major station improvements: Plymouth
(Phase 1) and Exeter St David’s (Phase 2)
Improved access at other stations with
600 new parking spaces
Train Operating Companies
Major regeneration and station
upgrades: completed at Exeter St
David’s and Plymouth providing a
further 300 new parking spacesNR/Franchise/LA
DfT/NR/FranchiseDfT/Franchise
NR/Franchise/LA
Western rail link: Improved
access to HeathrowCrossrail interchange at
Paddington Station: Improved
access to central London and
the City
Commence service: Exeter - Okehampton
DfTFranchise
Network Rail
DELIVERING THE 20 YEAR PLAN
Reclaimed foundation to realign track and
construct toe buttress
Rock revetment in front of existing structures to reduce overtopping
Option to increase operational capacity through provision of a passing loop
Option to provide toe buttress if track moved seawards
Cliff regrade
option to reduce
cliff slopes
Existing cliff slope