Nyu langone louver assembly reduced

  • View
    232

  • Download
    0

Embed Size (px)

DESCRIPTION

This is a foreshortened portion of a QA/QC Policy Manual I created for the construction of the new NYU Langone Medical Sciences Building for W & W Glass

Text of Nyu langone louver assembly reduced

  • SHEET:

    DWG BY:

    SCALE:

    DATE:

    JOB #:

    TITLE:

    PROJECT:

    CONTRACTOR:

    ARCHITECT:

    ISSUES AND REVISIONS:

    NOTES:

    W&W GLASS, LLC300 AIRPORT EXECUTIVE PARK

    NANUET, NY 10954 PHONE (845) 425-4000 FAX (845) 425-6156

    NLR 20150810

    5589AS NOTED

    ASSEMBLY NOTE:

    PART ASSEMBLY GUIDELINES

    NYU LANGONE MCSB

    W & W GLASS LLC

    ENNEAD ARCHITECTS LLC

    - W&W WILL NOT BE RESPONSABLE FOR ANY MEASUREMENTS OR DETAILS AFFECTING OTHER WORK EXCEPT OUR OWN OR ANY ERRORS OCCURRING DUE TO THE USE OF THESE DRAWINGS BY OTHER PARTIES. - NO PART OF THESE DRAWINGS MAY BE REPRODUCED IN ANY FORM WITHOUT THE EXPRESSED PREMISSION OF W&W.

    - GENERAL CONTRACTOR AND/OR ARCHITECT'S APPROVAL OF ALL DIMENSION AND DETAILS IS REQUIRED PRIOR TO FABRICATION

    REVISION 1 20151014REVISION 2 20151023REVISION 3 20160217REVISION 4 20160225

    OF 32

    REVISION 5 20160229

    REVISION 0 20150810

    00

    WWG 00

    TYPICAL LOUVER LAMINATED FT GLASS

    CORNER LOUVER - SOUTH SIDE - 30 TILT LAMINATED FT GLASS

    CORNER LOUVER - SOUTH SIDE - 45 TILT LAMINATED FT GLASS

    CORNER LOUVER - EAST SIDE - 30 TILT LAMINATED FT GLASS

    CORNER LOUVER - EAST SIDE - 45 TILT LAMINATED FT GLASS

    TYPICAL LEFT BRACKET 316 SST

    TYPICAL RIGHT BRACKET 316 SST

    LEFT CORNER BRACKET - 30 TILT 316 SST

    RIGHT CORNER BRACKET - 30 TILT 316 SST

    LEFT CORNER BRACKET - 45 TILT 316 SST

    RIGHT CORNER BRACKET - 45 TILT 316 SST

    TRIANGULAR BRACE / CENTRAL BRACKET 316 SST

    30 SHELF BLOCK 316 SST

    45 SHELF BLOCK 316 SST

    SHELF FASTENER HIGH STRENGTH 316 SST

    SHELF FASTENER - LONG HIGH STRENGTH 316 SST

    BRACKET FASTENER HIGH STRENGTH 316 SST

    PIN - BRACKET (PRESS FIT) HIGH STRENGTH 316 SST

    PIN - ROD HIGH STRENGTH 316 SST

    C-CLIP FOR PIN [PR] 316 SST

    TYPICAL ROD 316 SST

    CORNER ROD - SHORT SPAN 316 SST

    CORNER ROD - LONG SPAN 316 SST

    CUSTOM BEAUTY WASHER 316 SST

    WASHER 316 SST

    PAD 1 - 30 SHELF BLOCK SILICONE - 80 SHORE A

    PAD 1 - 45 SHELF BLOCK SILICONE - 80 SHORE A

    PAD 2 - TYPICAL END BRACKETS SILICONE - 80 SHORE A

    PAD 2 - CORNER END BRACKETS - 30 TILT SILICONE - 80 SHORE A

    PAD 2 - CORNER END BRACKETS - 45 TILT SILICONE - 80 SHORE A

    PAD 3 - CENTER BRACKET SILICONE - 80 SHORE A

    PLASTIC GROMMET NYLON

    PLASTIC BUSHING NYLON

    PLASTIC BUSHING ALTERNATE NYLON

    GLASS FASTENER HIGH STRENGTH 316 SST

    CUSTOM GLASS NUT 316 SST

    CUSTOM GLASS NUT ALTERNATE 316 SST

    GL01

    WWG KEYED NOTATIONSCALE: 8 POINTK01

    REFERENCE: (NOTES AND PIECE LIST ASM-100 [20150107])

    GL02

    GL03

    GL04

    GL05

    BTL

    BTR

    BCL30

    TB

    SB30

    SB45

    FS

    FSL

    FB

    PB

    PR

    CC

    RT

    RCS

    RCL

    W

    P130

    P145

    P2T

    P2C30

    P2C45

    P3

    G

    B-2

    FG-2

    NG

    BCR30

    BCL45

    BCR45

    B2-ALT

    NG-ALT

    GLASS LOUVER ASSEMBLY GUIDLINESSCALE: N.T.S.S00

    REFERENCE: (NOTES AND PIECE LIST ASM-100 -THRU- ASM-106 [20150107])

    SUPPLEMENTAL INSTALLATION INFORMENT SPECIFIC TO EACH INSTALLATION STEP WILL BE LOCATED IN UPPER-LEFT CORNER OF EACH PAGE.

    W2

  • SHEET:

    DWG BY:

    SCALE:

    DATE:

    JOB #:

    TITLE:

    PROJECT:

    CONTRACTOR:

    ARCHITECT:

    ISSUES AND REVISIONS:

    NOTES:

    W&W GLASS, LLC300 AIRPORT EXECUTIVE PARK

    NANUET, NY 10954 PHONE (845) 425-4000 FAX (845) 425-6156

    NLR 20150810

    5589AS NOTED

    ASSEMBLY NOTE:

    PART ASSEMBLY GUIDELINES

    NYU LANGONE MCSB

    W & W GLASS LLC

    ENNEAD ARCHITECTS LLC

    - W&W WILL NOT BE RESPONSABLE FOR ANY MEASUREMENTS OR DETAILS AFFECTING OTHER WORK EXCEPT OUR OWN OR ANY ERRORS OCCURRING DUE TO THE USE OF THESE DRAWINGS BY OTHER PARTIES. - NO PART OF THESE DRAWINGS MAY BE REPRODUCED IN ANY FORM WITHOUT THE EXPRESSED PREMISSION OF W&W.

    - GENERAL CONTRACTOR AND/OR ARCHITECT'S APPROVAL OF ALL DIMENSION AND DETAILS IS REQUIRED PRIOR TO FABRICATION

    REVISION 1 20151014REVISION 2 20151023REVISION 3 20160217REVISION 4 20160225

    OF 32

    REVISION 5 20160229

    REVISION 0 20150810

    01

    WWG 01

    ASSEMBLE ON FLAT LEVEL SURFACE. GLASS SHOULD OVERHANG AT BOTH ENDS OF TABLE. FOR PRODUCTION USE PADS AT EACH END OF THE TABLE AS DEFINED BY REVIEW OF FIRST OFF RESULTS.

    OVERVIEWSCALE: N.T.S.S01

    REFERENCE: (NOTES AND PIECE LIST ASM-100 -THRU- ASM-106 [20150107])

  • SHEET:

    DWG BY:

    SCALE:

    DATE:

    JOB #:

    TITLE:

    PROJECT:

    CONTRACTOR:

    ARCHITECT:

    ISSUES AND REVISIONS:

    NOTES:

    W&W GLASS, LLC300 AIRPORT EXECUTIVE PARK

    NANUET, NY 10954 PHONE (845) 425-4000 FAX (845) 425-6156

    NLR 20150810

    5589AS NOTED

    ASSEMBLY NOTE:

    PART ASSEMBLY GUIDELINES

    NYU LANGONE MCSB

    W & W GLASS LLC

    ENNEAD ARCHITECTS LLC

    - W&W WILL NOT BE RESPONSABLE FOR ANY MEASUREMENTS OR DETAILS AFFECTING OTHER WORK EXCEPT OUR OWN OR ANY ERRORS OCCURRING DUE TO THE USE OF THESE DRAWINGS BY OTHER PARTIES. - NO PART OF THESE DRAWINGS MAY BE REPRODUCED IN ANY FORM WITHOUT THE EXPRESSED PREMISSION OF W&W.

    - GENERAL CONTRACTOR AND/OR ARCHITECT'S APPROVAL OF ALL DIMENSION AND DETAILS IS REQUIRED PRIOR TO FABRICATION

    REVISION 1 20151014REVISION 2 20151023REVISION 3 20160217REVISION 4 20160225

    OF 32

    REVISION 5 20160229

    REVISION 0 20150810

    WWG 02

    PLACE GLASS FACE DOWN ON FLAT LEVEL SURFACE. VERIFY GLASS SIZE AND HOLE LOCATIONS. VERIFY ALIGNMENT OF ALL HOLES.

    G

    L

    0

    1

    GLASS PLACEMENTSCALE: N.T.S.S02

    REFERENCE: (NOTES AND PIECE LIST ASM-100 -THRU- ASM-106 [20150107])

    02

  • SHEET:

    DWG BY:

    SCALE:

    DATE:

    JOB #:

    TITLE:

    PROJECT:

    CONTRACTOR:

    ARCHITECT:

    ISSUES AND REVISIONS:

    NOTES:

    W&W GLASS, LLC300 AIRPORT EXECUTIVE PARK

    NANUET, NY 10954 PHONE (845) 425-4000 FAX (845) 425-6156

    NLR 20150810

    5589AS NOTED

    ASSEMBLY NOTE:

    PART ASSEMBLY GUIDELINES

    NYU LANGONE MCSB

    W & W GLASS LLC

    ENNEAD ARCHITECTS LLC

    - W&W WILL NOT BE RESPONSABLE FOR ANY MEASUREMENTS OR DETAILS AFFECTING OTHER WORK EXCEPT OUR OWN OR ANY ERRORS OCCURRING DUE TO THE USE OF THESE DRAWINGS BY OTHER PARTIES. - NO PART OF THESE DRAWINGS MAY BE REPRODUCED IN ANY FORM WITHOUT THE EXPRESSED PREMISSION OF W&W.

    - GENERAL CONTRACTOR AND/OR ARCHITECT'S APPROVAL OF ALL DIMENSION AND DETAILS IS REQUIRED PRIOR TO FABRICATION

    REVISION 1 20151014REVISION 2 20151023REVISION 3 20160217REVISION 4 20160225

    OF 32

    REVISION 5 20160229

    REVISION 0 20150810

    03

    WWG 03

    ATTACH LEFT AND RIGHT BRACKETS WITH PADS. USE TYPICAL GLASS HARDWARE ON RIGHT AND LEFT SIDE OF LOUVER. IF TOP AND BOTTOM HOLES ARE MISALIGNED, USE OFFSET BUSHING. DOUBLE CHECK LEFT AND RIGHT END BRACKETS TO ASSURE BOTH HAVE VERTICAL FLANGE SIDE WITH 45 ACUTE ANGLE FACING THE SAME DIRECTION. APPLY LOCTITE 242 (BLUE-SEMI-PERMANENT) TO THREADS OF FASTENERS. TIGHTEN NUTS TO 10-PSF USING TORQUE WRENCH. VERIFY BOLT IS FLUSH OR EXTENDS PAST TOP OF NUT

    EXTERIOR SIDE

    INTERIOR SIDE

    6

    0

    4

    5

    BTR

    P2T

    FG-2

    FG-2

    B2

    G

    NG

    END BRACKET INSTALLATIONSCALE: N.T.S.S03

    REFERENCE: (NOTES AND PIECE LIST ASM-100 -THRU- ASM-106 [20150107])

    W-2

    BTL

    P2T

    G

    B2

    FG-2

    NG G

    B2

    FG-2

    NG

    G

    L

    0

    1

    W2

  • GL

    0

    1

    SHEET:

    DWG BY:

    SCALE:

    DATE:

    JOB #:

    TITLE:

    PROJECT:

    CONTRACTOR:

    ARCHITECT:

    ISSUES AND REVISIONS:

    NOTES:

    W&W GLASS, LLC300 AIRPORT EXECUTIVE PARK

    NANUET, NY 10954 PHONE (845) 425-4000 FAX (845) 425-6156

    NLR 20150810

    5589AS NOTED

    ASSEMBLY NOTE:

    PART ASSEMBLY GUIDELINES

    NYU LANGONE MCSB

    W & W GLASS LLC

    ENNEAD ARCHITECTS LLC

    - W&W WILL NOT BE RESPONSABLE FOR ANY MEASUREMENTS OR DETAILS AFFECTING OTHER WORK EXCEPT OUR OWN OR ANY ERRORS OCCURRING DUE TO THE USE OF THESE DRAWINGS BY OTHER PARTIES. - NO PART OF THESE DRAWINGS MAY BE REPRODUCED IN ANY FORM WITHOUT THE EXPRESSED PREMISSION OF W&W.

    - GENERAL CONTRACTOR AND/OR ARCHITECT'S APPROVAL OF ALL DIMENSION AND DETAILS IS REQUIRED PRIOR TO FABRICATION

    REVISION 1 20151014REVISION 2 20151023REVISION 3 20160217REVISION 4 20160225

    OF 32

    REVISION 5 20160229

    REVISION 0 20150810

    04

    WWG 04

    ASSEMBLE TRUSS WITH RODS, PINS AND CENTRAL BRACKET PRIOR TO ATTACHING TO GLASS LOUVER END BRACKETS. NOTE USE THIN RUBBER OR PLASTIC SHEET TO SEPARATE THE TRIANGULAR BRACE FROM THE GLASS. DO NOT INSTALL CENTRAL PAD (P3) IN THIS STEP.

    TB

    CC

    RT

    RT

    P

    R

    CC

    PR

    TRUSS ASSEMBLYSCALE: N.T.S.S04

    REFERENCE: (NOTES AND PIECE LIST ASM-100 -THRU- ASM-106 [20150107])

  • SHEET:

    DWG BY:

    SCALE:

    DATE:

    JOB #:

    TITLE:

    PROJECT:

    CONTRA