15
NZ TRANSPORT AGENCY EAST WEST LINK PACKAGE FOR BOARD OF INQUIRY Plot Date: Cad File No: 23 June 2017 - 7:54 AM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-001.dwg Plotted by: Raymond Tan No. App'd Issued Status Check'd Date DISCLAIMER This drawing is for the purpose of supporting applications under the RMA for resource consents and designations. All information shown is subject to final design. Areas and measurements are subject to survey. Where the designs conflict with conditions the conditions will prevail. This Drawing must not be used for construction Contract No PA4014 Scale (A1) Original Scale (A3) Reduced Drawn Designed Reviewed Design Manager Approved Alliance Manager Scale: Drawing Title Drawing Number Rev No. Drawn Drafting Check Design Check FOR BOI ISSUE EAST WEST LINK COVER SHEET Layout1 2 A RAM A RAM J MURAHIDY J MURAHIDY N NANCEKIVELL J CALDWELL AS SHOWN NOTE: THIS PLAN SET CONTAINS THE DESIGNATION AND ROAD ALIGNMENT PROVIDED TO THE BOARD OF INQUIRY AT THE TRANSPORT AGENCY CLOSING SUBMISSION 14 SEPTEMBER 2017 0 ISSUED FOR CONSENT AR NN* PK* 01.12.2016 1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.2016 2 BOARD OF INQUIRY RT NN* JC* 27.06.2017 3 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

NZ TRANSPORT AGENCY

EAST WEST LINK

PACKAGE FOR BOARD OF INQUIRY

Plot Date: Cad File No:23 June 2017 - 7:54 AM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-001.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKCOVER SHEET

Layout1 2

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN

NOTE: THIS PLAN SET CONTAINS THE DESIGNATION AND ROAD ALIGNMENTPROVIDED TO THE BOARD OF INQUIRY AT THE TRANSPORT AGENCY CLOSINGSUBMISSION 14 SEPTEMBER 2017

0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 BOARD OF INQUIRY RT NN* JC* 27.06.20173 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

Page 2: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

PLAN SET 1 - GENERAL DRAWINGS

AEE-G-001 EAST WEST LINK - COVER PAGE 2 1 2 2

AEE-G-011 EAST WEST LINK - DRAWING REGISTER - SHEET 1 4 2 3 4

AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4

AEE-G-013 EAST WEST LINK - DRAWING REGISTER - SHEET 3 4 2 3 4

AEE-G-014 EAST WEST LINK - DRAWING REGISTER - SHEET 4 4 2 3 4

AEE-G-015 EAST WEST LINK - DRAWING REGISTER - SHEET 5 4 2 3 4

AEE-G-021 EAST WEST LINK - OVERALL LEGEND - SHEET 1 2 1 2 2

AEE-G-022 EAST WEST LINK - OVERALL LEGEND - SHEET 2 3 1 2 3

AEE-G-100 EAST WEST LINK - OVERVIEW PLAN - SHEET LAYOUT 3 2 3 3

AEE-G-101 GENERAL ARRANGEMENT - EAST WEST LINK - NEILSON ST INTERCHANGE - SHEET 1 3 1 2 3

AEE-G-102 GENERAL ARRANGEMENT - EAST WEST LINK - EMBANKMENT - SHEET 2 3 1 2 3

AEE-G-103 GENERAL ARRANGEMENT - EAST WEST LINK - EMBANKMENT/ ANNS CREEK - SHEET 3 3 1 2 3

AEE-G-104 GENERAL ARRANGEMENT - EAST WEST LINK - ANNS CREEK/ SYLVIA PARK ROAD - SHEET 4 4 2 3 4

AEE-G-105 GENERAL ARRANGEMENT - EAST WEST LINK - SH 1/ SYLVIA PARK RAMPS - SHEET 5 3 1 2 3

AEE-G-106 GENERAL ARRANGEMENT- EAST WEST LINK - SH1/ PRINCES STREET INTERCHANGE - SHEET 6 3 1 2 3

PLAN SET 2 - SECTORS

AEE-SEC-001 SECTOR - EAST WEST LINK - DRAWING INDEX AND LEGEND 4 2 3 4

AEE-SEC-011 SECTOR - EAST WEST LINK - LAYOUT 3 2 3 3

PLAN SET 3 - ROAD ALIGNMENT

AEE-AL-001 ROAD ALIGNMENT - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 4 3 4 4

AEE-AL-100 ROAD ALIGNMENT - EAST WEST LINK - OVERVIEW PLAN 4 3 4 4

AEE-AL-101 ROAD ALIGNMENT - SH20/NEILSON STREET INTERCHANGE - SHEET 1 3 2 3 3

AEE-AL-102 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - SHEET 2 3 2 3 3

AEE-AL-103 ROAD ALIGNMENT - GALWAY STREET - SHEET 3 3 2 3 3

AEE-AL-104 ROAD ALIGNMENT - EMBANKMENT - SHEET 4 4 2 3 4 4

AEE-AL-105 ROAD ALIGNMENT - EMBANKMENT - SHEET 5 3 2 3 3

AEE-AL-106 ROAD ALIGNMENT - EMBANKMENT/ANNS CREEK - SHEET 6 3 2 3 3

AEE-AL-107 ROAD ALIGNMENT - ANNS CREEK - SHEET 7 4 3 4 4

AEE-AL-108 ROAD ALIGNMENT - ANNS CREEK/SYLVIA PARK ROAD - SHEET 8 4 3 4 4

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

AEE-AL-109 ROAD ALIGNMENT - SH1/SYLVIA PARK RAMPS - SHEET 9 4 3 4 4

AEE-AL-110 ROAD ALIGNMENT - SH1/SYLVIA PARK RAMPS - SHEET 10 3 2 3 3

AEE-AL-111 ROAD ALIGNMENT - SH1/PANAMA ROAD - SHEET 11 3 2 3 3

AEE-AL-112 ROAD ALIGNMENT - SH1/OTAHUHU CREEK - SHEET 12 2 2 2 2

AEE-AL-113 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - SHEET 13 3 2 3 3

AEE-AL-114 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - LOCAL ROADS - SHEET 14A AND 14B 3 2 3 3

AEE-AL-115 ROAD ALIGNMENT - CAPTAIN SPRINGS ROAD/ PORTS LINK - SHEET 15A AND 15B 3 2 3 3

AEE-AL-116 ROAD ALIGNMENT - EMBANKMENT - SHEET 16 2 2 2 2

PLAN SET 4 - LANDSCAPE

AEE-LA-001 LANDSCAPE - EAST WEST LINK - DRAWING INDEX AND LEGEND 3 2 3

AEE-LA-100 LANDSCAPE - EAST WEST LINK - OVERVIEW PLAN AND LEGEND 3 2 3

AEE-LA-101 LANDSCAPE - SH20/NEILSON STREET INTERCHANGE - SHEET 1 2 1 2

AEE-LA-102 LANDSCAPE - NEILSON STREET INTERCHANGE - SHEET 2 2 1 2

AEE-LA-103 LANDSCAPE - EAST WEST LINK / GALWAY STREET - SHEET 3 2 1 2

AEE-LA-104 LANDSCAPE - EMBANKMENT - SHEET 4 2 1 2

AEE-LA-105 LANDSCAPE - EMBANKMENT - SHEET 5 2 1 2

AEE-LA-106 LANDSCAPE - EMBANKMENT/ANNS CREEK - SHEET 6 2 1 2

AEE-LA-107 LANDSCAPE - ANNS CREEK - SHEET 7 2 1 2

AEE-LA-108 LANDSCAPE - ANNS CREEK/SYLVIA PARK ROAD - SHEET 8 3 2 3

AEE-LA-109 LANDSCAPE - SH1/SYLVIA PARK RAMPS - SHEET 9 3 2 3

AEE-LA-110 LANDSCAPE - SH1/SYLVIA PARK RAMPS - SHEET 10 2 1 2

AEE-LA-111 LANDSCAPE - SH1/PANAMA ROAD - SHEET 11 2 1 2

AEE-LA-112 LANDSCAPE - SH1/OTAHUHU CREEK - SHEET 12 2 1 2

AEE-LA-113 LANDSCAPE - PRINCES STREET INTERCHANGE - SHEET 13 2 1 2

AEE-LA-114 LANDSCAPE - NEILSON STREET INTERCHANGE - LOCAL ROADS - SHEET 14A AND 14B 2 1 2

AEE-LA-115 LANDSCAPE - CAPTAIN SPRINGS ROAD/ PORTS LINK - SHEET 15A AND 15B 2 1 2

AEE-LA-116 LANDSCAPE - EMBANKMENT - SHEET 16 2 1 2

AEE-LA-201 LANDSCAPE - 2D CROSS SECTIONS - SHEET 1 1 1 1

AEE-LA-202 LANDSCAPE - 2D CROSS SECTIONS - SHEET 2 1 1 1

AEE-LA-203 LANDSCAPE - 2D CROSS SECTIONS - SHEET 3 1 1 1

AEE-LA-204 LANDSCAPE - 2D CROSS SECTIONS - SHEET 4 1 1 1

FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDYN NANCEKIVELL1/12/16 P KELLY1/12/160ISSUED FOR CONSENT ARNN*PK* 01/12/2016 FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDYN NANCEKIVELL1/12/16 P KELLY1/12/160ISSUED FOR CONSENT ARNN*PK* 01/12/2016

Plot Date: Cad File No:21 September 2017 - 4:44 PM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-011.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKDRAWING REGISTERSHEET 01 OF 05

AEE-G-011 4

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 ISSUED FOR CONFERENCING TD NN* JC* 23.05.20173 BOARD OF INQUIRY RT NN* JC* 27.06.20174 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

Page 3: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

AEE-LA-205 LANDSCAPE - 2D CROSS SECTIONS - SHEET 5 1 1 1

AEE-LA-206 LANDSCAPE - 2D CROSS SECTIONS - SHEET 6 2 2 2

AEE-LA-207 LANDSCAPE - 2D CROSS SECTIONS - SHEET 7 1 1 1

AEE-LA-208 LANDSCAPE - 2D CROSS SECTIONS - SHEET 8 1 1 1

AEE-LA-209 LANDSCAPE - 2D CROSS SECTIONS - SHEET 9 1 1 1

AEE-LA-210 LANDSCAPE - 2D CROSS SECTIONS - SHEET 10 1 1 1

AEE-LA-211 LANDSCAPE - 2D CROSS SECTIONS - SHEET 11 1 1 1

AEE-LA-301 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 1 1 1 1

AEE-LA-302 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 2 1 1 1

AEE-LA-303 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 3 1 1 1

AEE-LA-304 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 4 1 1 1

AEE-LA-305 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 5 1 1 1

AEE-LA-306 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 6 1 1 1

AEE-LA-307 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 7 1 1 1

AEE-LA-308 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 8 1 1 1

AEE-LA-309 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 9 1 1 1

AEE-LA-310 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 10 1 1 1

AEE-LA-311 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 11 1 1 1

AEE-LA-312 LANDSCAPE - 3D SECTION PERSPECTIVES - SHEET 12 1 1 1

AEE-LA-401 LANDSCAPE - PLANTING PALETTE - SHEET 1 1 1 1

AEE-LA-402 LANDSCAPE - PLANTING PALETTE - SHEET 2 1 1 1

AEE-LA-403 LANDSCAPE - PLANTING PALETTE - SHEET 3 1 1 1

AEE-LA-404 LANDSCAPE - PLANTING PALETTE - SHEET 4 1 1 1

AEE-LA-405 LANDSCAPE - PLANTING PALETTE - SHEET 5 1 1 1

AEE-LA-406 LANDSCAPE - PLANTING PALETTE - SHEET 6 1 1 1

AEE-LA-407 LANDSCAPE - PLANTING PALETTE - SHEET 7 1 1 1

PLAN SET 5 - COASTAL OCCUPATION

AEE-CMA-001 COASTAL OCCUPATION - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 2 1 2

AEE-CMA-101 COASTAL OCCUPATION - EMBANKMENT - OVERVIEW 2 1 2

AEE-CMA-102 COASTAL OCCUPATION - EMBANKMENT - SHEET 1 2 1 2

AEE-CMA-103 COASTAL OCCUPATION - EMBANKMENT - SHEET 2 2 1 2

AEE-CMA-104 COASTAL OCCUPATION - EMBANKMENT - SHEET 3 2 1 2

AEE-CMA-111 COASTAL OCCUPATION - OTAHUHU CREEK 1 1 1

AEE-CMA-301 COASTAL OCCUPATION - EAST WEST LINK - TYPICAL SECTIONS 1 1 1

PLAN SET 6 - PLAN AND LONG SECTION

AEE-C-001 ROAD ALIGNMENT - EAST WEST LINK - PLAN AND LONG SECTION - DRAWING INDEX 3 2 3

AEE-C-201 ROAD ALIGNMENT - PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 1 1 1 1

AEE-C-202 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 2 2 1 2 2

AEE-C-203 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 3 1 1 1

AEE-C-204 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 4 1 1 1

AEE-C-205 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 5 1 1 1

AEE-C-206 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 6 1 1 1

AEE-C-207 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 7 1 1 1

AEE-C-208 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 8 1 1 1

AEE-C-209 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 9 1 1 1

AEE-C-210 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 10 1 1 1

AEE-C-211 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 11 1 1 1

AEE-C-212 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 12 1 1 1

AEE-C-213 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 13 1 1 1

AEE-C-214 ROAD ALIGNMENT- PLAN AND LONG SECTION - OVERALL ALIGNMENT - MC00 - SHEET 14 1 1 1

AEE-C-231 ROAD ALIGNMENT - CAPTAIN SPRINGS - PLAN AND LONG SECTION - MCP0 - SHEET 1 1 1 1

AEE-C-232 ROAD ALIGNMENT - CAPTAIN SPRINGS - PLAN AND LONG SECTION - MCP0 - SHEET 2 1 1 1

AEE-C-233 ROAD ALIGNMENT - PORTS LINK - PLAN AND LONG SECTION - MCR0 - SHEET 1 1 1 1

AEE-C-234 ROAD ALIGNMENT - PORTS LINK - PLAN AND LONG SECTION - MCR0 - SHEET 2 1 1 1

AEE-C-241 ROAD ALIGNMENT - SYLVIA PARK NB OFF RAMP - PLAN AND LONG SECTION - MC00 - SHEET 1 2 2 2

AEE-C-242 ROAD ALIGNMENT - SYLVIA PARK NB OFF RAMP - PLAN AND LONG SECTION - MC00 - SHEET 2 2 2 2

AEE-C-243 ROAD ALIGNMENT - SYLVIA PARK NB OFF RAMP - PLAN AND LONG SECTION - MC00 - SHEET 3 2 2 2

AEE-C-245 ROAD ALIGNMENT - MT WELLINGTON OFF RAMP - PLAN AND LONG SECTION - MCK0 - SHEET 1 1 1 1

AEE-C-246 ROAD ALIGNMENT - MT WELLINGTON OFF RAMP - PLAN AND LONG SECTION - MCK0 - SHEET 2 1 1 1

AEE-C-247 ROAD ALIGNMENT - MT WELLINGTON OFF RAMP - PLAN AND LONG SECTION - MCK0 - SHEET 3 1 1 1

AEE-C-251 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MC40 1 1 1

AEE-C-252 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MC50 - SHEET 1 1 1 1

AEE-C-253 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MC50 - SHEET 2 1 1 1

AEE-C-254 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MCA0 1 1 1

ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MCB0

Plot Date: Cad File No:21 September 2017 - 5:03 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-012.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKDRAWING REGISTERSHEET 02 OF 05

AEE-G-012 4

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 ISSUED FOR CONFERENCING TD NN* JC 23.05.20173 BOARD OF INQUIRY RT NN JC 27.06.20174 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.2017

Page 4: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MCA0

AEE-C-255 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MCB0 1 1 1

AEE-C-256 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MCE0 1 1 1

AEE-C-257 ROAD ALIGNMENT - PRINCES STREET INTERCHANGE - PLAN AND LONG SECTION - MCF0 1 1 1

AEE-C-261 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCA0 1 1 1

AEE-C-262 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCB0 - SHEET 1 1 1 1

AEE-C-263 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCB0 - SHEET 2 1 1 1

AEE-C-264 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCC0 1 1 1

AEE-C-266 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCD0 - SHEET 1 1 1 1

AEE-C-267 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCD0 - SHEET 2 1 1 1

AEE-C-268 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCE0 - SHEET 1 1 1 1

AEE-C-269 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCE0 - SHEET 2 1 1 1

AEE-C-270 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCH0 - SHEET 1 1 1 1

AEE-C-271 ROAD ALIGNMENT - NEILSON STREET INTERCHANGE - PLAN AND LONG SECTION - MCH0 - SHEET 2 1 1 1

AEE-C-272 ROAD ALIGNMENT - GALWAY LINK - PLAN AND LONG SECTION - MCJ0 1 1 1

AEE-C-277 ROAD ALIGNMENT - ONEHUNGA MALL - PLAN AND LONG SECTION - MC30 - SHEET 1 1 1 1

AEE-C-278 ROAD ALIGNMENT - ONEHUNGA HARBOUR ROAD - PLAN AND LONG SECTION - MC30 - SHEET 2 1 1 1

AEE-C-279 ROAD ALIGNMENT - ONEHUNGA HARBOUR ROAD - PLAN AND LONG SECTION - MC30 - SHEET 3 1 1 1

AEE-C-280 ROAD ALIGNMENT - ORPHEUS DRIVE - PLAN AND LONG SECTION - MC50 - SHEET 1 1 1 1

AEE-C-281 ROAD ALIGNMENT - ORPHEUS DRIVE - PLAN AND LONG SECTION - MC50 - SHEET 2 1 1 1

AEE-C-282 ROAD ALIGNMENT - ORPHEUS DRIVE - PLAN AND LONG SECTION - MC50 - SHEET 3 1 1 1

AEE-C-285 ROAD ALIGNMENT - EWL/GREAT SOUTH ROAD EB CONNECTION - PLAN AND LONG SECTION - MC30 -SHEET 1 1 1 1

AEE-C-286 ROAD ALIGNMENT - EWL/GREAT SOUTH ROAD EB CONNECTION - PLAN AND LONG SECTION - MC30 -SHEET 2 1 1 1

AEE-C-287 ROAD ALIGNMENT - EWL/GREAT SOUTH ROAD WB CONNECTION - PLAN AND LONG SECTION - MC40 -SHEET 1 1 1 1

AEE-C-288 ROAD ALIGNMENT - EWL/GREAT SOUTH ROAD WB CONNECTION - PLAN AND LONG SECTION - MC40 -SHEET 2 1 1 1

PLAN SET 7 - TYPICAL CROSS SECTION

AEE-C-002 ROAD ALIGNMENT - TYPICAL CROSS SECTION - DRAWING INDEX 2 2 2

AEE-C-300 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SECTION MARKER 2 2 2

AEE-C-301 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 1 1 1 1

AEE-C-302 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 2 1 1 1

AEE-C-303 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 3 1 1 1

AEE-C-304 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 4 1 1 1

AEE-C-305 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 5 1 1 1

ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 5

AEE-C-306 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 6 1 1 1

AEE-C-307 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 7 1 1 1

AEE-C-308 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 8 1 1 1

AEE-C-309 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 9 1 1 1

AEE-C-310 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 10 1 1 1

AEE-C-311 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 11 1 1 1

AEE-C-312 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 12 1 1 1

AEE-C-313 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 13 1 1 1

AEE-C-314 ROAD ALIGNMENT - TYPICAL CROSS SECTION - SHEET 14 1 1 1

AEE-C-315 ROAD ALIGNMENT - TYPICAL CROSS SECTION - CAPTAIN SPRINGS ROAD - SHEET 15 1 1 1

AEE-C-316 ROAD ALIGNMENT - TYPICAL CROSS SECTION - PORTS LINK - SHEET 16 1 1 1

AEE-C-317 ROAD ALIGNMENT - TYPICAL CROSS SECTION - GREAT SOUTH ROAD INTERSECTION - SHEET 17 1 1 1

AEE-C-321 GEOTECHNICAL - EMBANKMENT TYPICAL CROSS SECTION - SHEET 1 1 1 1

AEE-C-322 GEOTECHNICAL - EMBANKMENT TYPICAL CROSS SECTION - SHEET 2 1 1 1

AEE-C-323 GEOTECHNICAL - EMBANKMENT TYPICAL CROSS SECTION - SHEET 3 1 1 1

AEE-C-324 GEOTECHNICAL - EMBANKMENT TYPICAL CROSS SECTION - SHEET 4 1 1 1

PLAN SET 8 - STRUCTURAL

AEE-S-001 STRUCTURAL - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 2 2

AEE-S-010 STRUCTURAL - KEY PLAN 2 2

AEE-S-011 STRUCTURAL - SH20/ NEILSON ST INTERCHANGE OVERBRIDGE - PLAN AND LONG SECTION 1 1

AEE-S-012 STRUCTURAL - SH20/ NEILSON ST INTERCHANGE OVERBRIDGE - TYPICAL CROSS SECTION 1 1

AEE-S-014 STRUCTURAL - ONEHUNGA HARBOUR ROAD PEDESTRIAN/CYCLE BRIDGE - PLAN 1 1

AEE-S-015 STRUCTURAL - ALFRED STREET PEDESTRIAN/CYCLE BRIDGE - PLAN 1 1

AEE-S-016 STRUCTURAL - NEILSON STREET/ ONEHUNGA WHARF TRENCH - PLAN AND LONG SECTION 1 1

AEE-S-017 STRUCTURAL - NEILSON STREET/ ONEHUNGA WHARF TRENCH - TYPICAL CROSS SECTIONS - SHEET 1 1 1

AEE-S-018 STRUCTURAL - NEILSON STREET/ ONEHUNGA WHARF TRENCH - TYPICAL CROSS SECTIONS - SHEET 2 1 1

AEE-S-021 STRUCTURAL - ANNS CREEK VIADUCT - WEST - PLAN AND LONG SECTION - SHEET 1 1 1

AEE-S-022 STRUCTURAL - ANNS CREEK VIADUCT - WEST - PLAN AND LONG SECTION - SHEET 2 1 1

AEE-S-023 STRUCTURAL - ANNS CREEK VIADUCT - WEST - PLAN AND LONG SECTION - SHEET 3 1 1

AEE-S-024 STRUCTURAL - ANNS CREEK VIADUCT - EAST - PLAN AND LONG SECTION - SHEET 4 2 2

AEE-S-025 STRUCTURAL - ANNS CREEK VIADUCT - EAST - PLAN AND LONG SECTION - SHEET 5 2 2

AEE-S-031 STRUCTURAL - ANNS CREEK VIADUCT - TYPICAL CROSS SECTION - CONCRETE - SHEET 1 1 1

STRUCTURAL - ANNS CREEK VIADUCT - TYPICAL CROSS SECTION - CONCRETE - SHEET 2

FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDY N NANCEKIVELL1/12/16P KELLY1/12/160ISSUED FOR CONSENT AR NN*PK*01/12/2016 FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDY N NANCEKIVELL1/12/16P KELLY1/12/160ISSUED FOR CONSENT AR NN*PK*01/12/2016

Plot Date: Cad File No:21 September 2017 - 5:10 PM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-013.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKDRAWING REGISTERSHEET 03 OF 05

AEE-G-013 4

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 ISSUED FOR CONFERENCING TD NN* JC* 23.05.20173 BOARD OF INQUIRY RT NN* JC* 27.06.20174 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

Page 5: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION DATE AND REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

STRUCTURAL - ANNS CREEK VIADUCT - TYPICAL CROSS SECTION - CONCRETE - SHEET 1

AEE-S-032 STRUCTURAL - ANNS CREEK VIADUCT - TYPICAL CROSS SECTION - CONCRETE - SHEET 2 2 2

AEE-S-033 STRUCTURAL - ANNS CREEK VIADUCT - TYPICAL CROSS SECTION - STEEL 2 2

AEE-S-041 STRUCTURAL - EWLINK EB TO SH1 SB ON RAMP PLAN AND LONG SECTION - SHEET 1 2 2

AEE-S-042 STRUCTURAL - EWLINK EB TO SH1 SB ON RAMP PLAN AND LONG SECTION - SHEET 2 2 2

AEE-S-043 STRUCTURAL - EWLINK EB TO SH1 SB ON RAMP PLAN AND LONG SECTION - SHEET 3 2 2

AEE-S-045 STRUCTURAL - EWLINK EB TO SH1 SB ON RAMP TYPICAL CROSS SECTION - CONCRETE 2 2

AEE-S-046 STRUCTURAL - EWLINK EB TO SH1 SB ON RAMP TYPICAL CROSS SECTION - STEEL 2 2

AEE-S-051 STRUCTURAL - SH1 NB TO EWLINK WB OFF RAMP - PLAN AND LONG SECTION - SHEET 1 2 2

AEE-S-052 STRUCTURAL - SH1 NB TO EWLINK WB OFF RAMP - PLAN AND LONG SECTION - SHEET 2 2 2

AEE-S-055 STRUCTURAL - SH1 NB TO EWLINK WB OFF RAMP - TYPICAL CROSS SECTION - SHEET 1 2 2

AEE-S-056 STRUCTURAL - SH1 NB TO EWLINK WB OFF RAMP - TYPICAL CROSS SECTION - SHEET 2 2 2

AEE-S-061 STRUCTURAL - PANAMA ROAD OVERBRIDGE - PLAN AND LONG SECTION 1 1

AEE-S-062 STRUCTURAL - PANAMA ROAD OVERBRIDGE - TYPICAL CROSS SECTION 1 1

AEE-S-065 STRUCTURAL - OTAHUHU CREEK - PLAN AND LONG SECTION 1 1

AEE-S-066 STRUCTURAL - OTAHUHU CREEK - TYPICAL CROSS SECTION 1 1

AEE-S-071 STRUCTURAL - PRINCES STREET OVERBRIDGE - PLAN AND LONG SECTION 1 1

AEE-S-072 STRUCTURAL - PRINCES STREET OVERBRIDGE - TYPICAL CROSS SECTION 1 1

AEE-S-081 STRUCTURAL - GREAT SOUTH ROAD RAIL OVERBRIDGE WIDENING - PLAN AND CROSS SECTION 1 1

PLAN SET 9 - STORMWATER

AEE-SW-001 STORMWATER - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 4 3 4

AEE-SW-100 STORMWATER - EAST WEST LINK - OVERVIEW PLAN 4 3 4

AEE-SW-101 STORMWATER - SH20/NEILSON STREET INTERCHANGE - SHEET 1 3 2 3

AEE-SW-102 STORMWATER - NEILSON STREET INTERCHANGE - SHEET 2 3 2 3

AEE-SW-103 STORMWATER - GALWAY STREET - SHEET 3 3 2 3

AEE-SW-104 STORMWATER - EMBANKMENT - SHEET 4 3 2 3

AEE-SW-105 STORMWATER - EMBANKMENT - SHEET 5 3 2 3

AEE-SW-106 STORMWATER - EMBANKMENT/ANNS CREEK - SHEET 6 3 2 3

AEE-SW-107 STORMWATER - ANNS CREEK - SHEET 7 3 2 3

AEE-SW-108 STORMWATER - ANNS CREEK/SYLVIA PARK ROAD - SHEET 8 4 3 4

AEE-SW-109 STORMWATER - ANNS CREEK/SYLVIA PARK RAMPS - SHEET 9 4 3 4

AEE-SW-110 STORMWATER - SH1/SYLVIA PARK RAMPS - SHEET 10 4 3 4

AEE-SW-111 STORMWATER - SH1/PANAMA ROAD - SHEET 11 3 2 3

STORMWATER - SH1/PANAMA ROAD - SHEET 11

AEE-SW-112 STORMWATER - SH1/OTAHUHU CREEK - SHEET 12 2 2 2

AEE-SW-113 STORMWATER - PRINCES STREET INTERCHANGE - SHEET 13 3 2 3

AEE-SW-114 STORMWATER - NEILSON STREET INTERCHANGE - LOCAL ROADS - SHEET 14A AND 14B 3 2 3

AEE-SW-115 STORMWATER - CAPTAIN SPRINGS ROAD/ PORTS LINK - SHEET 15A AND 15B 3 2 3

AEE-SW-116 STORMWATER - EMBANKMENT - SHEET 16 2 2 2

AEE-SW-301 STORMWATER - TYPICAL WETLAND - PLAN AND SECTION 3 2 3

AEE-SW-311 STORMWATER - EMBANKMENT WETLAND - TYPICAL CROSS SECTION 3 2 3

AEE-SW-312 STORMWATER - FORESHORE TREATMENT AREA - TYPICAL SECTION 3 2 3

PLAN SET 10 - EROSION AND SEDIMENT CONTROL

AEE-ES-001 EROSION AND SEDIMENT CONTROL - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 4 2 3 4

AEE-ES-100 EROSION AND SEDIMENT CONTROL - EAST WEST LINK - OVERVIEW PLAN 4 2 3 4

AEE-ES-101 EROSION AND SEDIMENT CONTROL - SH20/NEILSON STREET INTERCHANGE - SHEET 1 3 1 2 3

AEE-ES-102 EROSION AND SEDIMENT CONTROL - NEILSON STREET INTERCHANGE - SHEET 2 3 1 2 3

AEE-ES-103 EROSION AND SEDIMENT CONTROL - GALWAY STREET - SHEET 3 3 1 2 3

AEE-ES-104 EROSION AND SEDIMENT CONTROL - EMBANKMENT - SHEET 4 3 1 2 3

AEE-ES-105 EROSION AND SEDIMENT CONTROL - EMBANKMENT - SHEET 5 3 1 2 3

AEE-ES-106 EROSION AND SEDIMENT CONTROL - EMBANKMENT/ANNS CREEK - SHEET 6 3 1 2 3

AEE-ES-107 EROSION AND SEDIMENT CONTROL - ANNS CREEK - SHEET 7 4 2 3 4

AEE-ES-108 EROSION AND SEDIMENT CONTROL - ANNS CREEK/SYLVIA PARK ROAD - SHEET 8 4 2 3 4

AEE-ES-109 EROSION AND SEDIMENT CONTROL - ANNS CREEK/SYLVIA PARK RAMPS - SHEET 9 4 2 3 4

AEE-ES-110 EROSION AND SEDIMENT CONTROL - SH1/SYLVIA PARK RAMPS - SHEET 10 3 1 2 3

AEE-ES-111 EROSION AND SEDIMENT CONTROL - SH1/PANAMA ROAD - SHEET 11 3 1 2 3

AEE-ES-112 EROSION AND SEDIMENT CONTROL - SH1/OTAHUHU CREEK - SHEET 12 2 1 2 2

AEE-ES-113 EROSION AND SEDIMENT CONTROL - PRINCES STREET INTERCHANGE - SHEET 13 3 1 2 3

AEE-ES-114 EROSION AND SEDIMENT CONTROL - NEILSON STREET INTERCHANGE - LOCAL ROADS - SHEET 14A AND14B 3 1 2 3

AEE-ES-115 EROSION AND SEDIMENT CONTROL - CAPTAIN SPRINGS ROAD/ PORTS LINK - SHEET 15A AND 15B 3 1 2 3

AEE-ES-116 EROSION AND SEDIMENT CONTROL - EMBANKMENT - SHEET 16 2 1 2 2

AEE-ES-301 EROSION AND SEDIMENT CONTROL - TYPICAL DETAIL - SHEET 1 2 1 2 2

AEE-ES-302 EROSION AND SEDIMENT CONTROL - TYPICAL DETAIL - SHEET 2 2 1 2 2

AEE-ES-303 EROSION AND SEDIMENT CONTROL - TYPICAL DETAIL - SHEET 3 2 1 2 2

AEE-ES-304 EROSION AND SEDIMENT CONTROL - TYPICAL DETAIL - SHEET 4 2 1 2 2

AEE-ES-305 EROSION AND SEDIMENT CONTROL - TYPICAL DETAIL - SHEET 5 2 1 2 2

FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDY N NANCEKIVELL1/12/16P KELLY1/12/160ISSUED FOR CONSENT AR NN*PK*01/12/2016 FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDY N NANCEKIVELL1/12/16P KELLY1/12/160ISSUED FOR CONSENT AR NN*PK*01/12/2016

Plot Date: Cad File No:21 September 2017 - 5:02 PM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-014.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKDRAWING REGISTERSHEET 04 OF 05

AEE-G-014 4

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 ISSUED FOR CONFERENCING TD NN* JC* 23.05.20173 BOARD OF INQUIRY RT NN* JC* 27.06.20174 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

Page 6: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION

DATEAND

REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

EAST WEST LINK DRAWING REGISTER

DWGNUMBER DRAWING TITLE CURRENT

REVISION

DATEAND

REVISION

23/05

/2017

27/06

/2017

3/07/2

017

13/09

/2017

22/09

/2017

PLAN SET 11 - CONSTRUCTION ACTIVITIES

AEE-CA-001 CONSTRUCTION ACTIVITIES - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 3 2 3

AEE-CA-100 CONSTRUCTION ACTIVITIES - EAST WEST LINK - OVERVIEW PLAN 2 2 2

AEE-CA-101 CONSTRUCTION ACTIVITIES - SH20/NEILSON STREET INTERCHANGE - SHEET 1 2 1 2

AEE-CA-102 CONSTRUCTION ACTIVITIES - NEILSON STREET INTERCHANGE - SHEET 2 2 1 2

AEE-CA-103 CONSTRUCTION ACTIVITIES - EAST WEST LINK/GALWAY STREET - SHEET 3 2 1 2

AEE-CA-104 CONSTRUCTION ACTIVITIES - EMBANKMENT - SHEET 4 2 1 2

AEE-CA-105 CONSTRUCTION ACTIVITIES - EMBANKMENT - SHEET 5 2 1 2

AEE-CA-106 CONSTRUCTION ACTIVITIES - EMBANKMENT/ANNS CREEK - SHEET 6 2 1 2

AEE-CA-107 CONSTRUCTION ACTIVITIES - ANNS CREEK - SHEET 7 3 2 3

AEE-CA-108 CONSTRUCTION ACTIVITIES - ANNS CREEK/SYLVIA PARK ROAD - SHEET 8 3 2 3

AEE-CA-109 CONSTRUCTION ACTIVITIES - ANNS CREEK/SYLVIA PARK RAMPS - SHEET 9 3 2 3

AEE-CA-110 CONSTRUCTION ACTIVITIES - SH1/SYLVIA PARK RAMPS - SHEET 10 2 1 2

AEE-CA-111 CONSTRUCTION ACTIVITIES - SH1/PANAMA ROAD - SHEET 11 2 1 2

AEE-CA-112 CONSTRUCTION ACTIVITIES - SH1/OTAHUHU CREEK - SHEET 12 1 1 1

AEE-CA-113 CONSTRUCTION ACTIVITIES - PRINCES STREET INTERCHANGE - SHEET 13 2 1 2

AEE-CA-114 CONSTRUCTION ACTIVITIES - NEILSON STREET INTERCHANGE - LOCAL ROADS - SHEET 14A AND 14B 2 1 2

AEE-CA-115 CONSTRUCTION ACTIVITIES - CAPTAIN SPRINGS ROAD/ PORTS LINK - SHEET 15A AND 15B 2 1 2

AEE-CA-116 CONSTRUCTION ACTIVITIES - EMBANKMENT - SHEET 16 1 1 1

AEE-CA-201 CONSTRUCTION ACTIVITIES - SH1/PANAMA ROAD - BRIDGE STAGING PLAN 1 1 1

AEE-CA-202 CONSTRUCTION ACTIVITIES - SH1/OTAHUHU CREEK - BRIDGE STAGING PLAN 1 1 1

AEE-CA-203 CONSTRUCTION ACTIVITIES - PRINCES STREET INTERCHANGE - BRIDGE STAGING PLAN 1 1 1

PLAN SET 12 - UTILITIES RELOCATION

AEE-U-001 UTILITIES RELOCATION - EAST WEST LINK - DRAWING INDEX, NOTES AND LEGEND 3 2 3

AEE-U-100 UTILITIES RELOCATION - EAST WEST LINK - OVERVIEW PLAN 3 2 3

AEE-U-101 UTILITIES RELOCATION - SH20/NEILSON STREET INTERCHANGE - SHEET 1 2 1 2

AEE-U-102 UTILITIES RELOCATION - NEILSON STREET INTERCHANGE - SHEET 2 2 1 2

AEE-U-103 UTILITIES RELOCATION/ GALWAY STREET - SHEET 3 2 1 2

AEE-U-104 UTILITIES RELOCATION - EMBANKMENT - SHEET 4 2 1 2

AEE-U-105 UTILITIES RELOCATION - EMBANKMENT - SHEET 5 2 1 2

AEE-U-106 UTILITIES RELOCATION - EMBANKMENT/ANNS CREEK - SHEET 6 2 1 2

AEE-U-107 UTILITIES RELOCATION - ANNS CREEK - SHEET 7 3 2 3

AEE-U-108 UTILITIES RELOCATION - ANNS CREEK/SYLVIA PARK ROAD - SHEET 8 3 2 3

AEE-U-109 UTILITIES RELOCATION - ANNS CREEK/SYLVIA PARK RAMPS - SHEET 9 3 2 3

UTILITIES RELOCATION - ANNS CREEK/SYLVIA PARK RAMPS - SHEET 9

AEE-U-110 UTILITIES RELOCATION - SH1/SYLVIA PARK RAMPS - SHEET 10 2 1 2

AEE-U-111 UTILITIES RELOCATION - SH1/PANAMA ROAD - SHEET 11 2 1 2

AEE-U-112 UTILITIES RELOCATION - SH1/OTAHUHU CREEK - SHEET 12 1 1 1

AEE-U-113 UTILITIES RELOCATION - PRINCES STREET INTERCHANGE - SHEET 13 2 1 2

AEE-U-114 UTILITIES RELOCATION - NEILSON STREET INTERCHANGE - LOCAL ROADS - SHEET 14A AND 14B 2 1 2

AEE-U-115 UTILITIES RELOCATION - CAPTAIN SPRINGS ROAD/ PORTS LINK - SHEET 15A AND 15B 2 1 2

AEE-U-116 UTILITIES RELOCATION - EMBANKMENT - SHEET 16 1 1 1

FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDY N NANCEKIVELL1/12/16P KELLY1/12/160ISSUED FOR CONSENT AR NN*PK*01/12/2016 FOR CONSENT0A RAMA RAMJ MURAHIDYJ MURAHIDY N NANCEKIVELL1/12/16P KELLY1/12/160ISSUED FOR CONSENT AR NN*PK*01/12/2016

Plot Date: Cad File No:21 September 2017 - 4:53 PM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-015.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKDRAWING REGISTERSHEET 05 OF 05

AEE-G-015 4

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 ISSUED FOR CONFERENCING TD NN* JC* 23.05.20173 BOARD OF INQUIRY RT NN* JC* 27.06.20174 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

Page 7: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

ALIGNMENT PLANS, REFER DRAWINGS TRS-G-101 TO TRS-G-106 & TRS-AL-101 TO TRS-AL-116

PROPERTY BOUNDARY

<----- ROAD ALIGNMENT

<---- CUT SLOPES

EXISTING PATH TO REMAIN

3.0m COMMUTER CYCLEWAYPLUS 1.8m FOOTPATH

<----- FILL SLOPES

4.0m BOARDWALK

TOE OF OUTER BUND

BRIDGE STRUCTURE

STORMWATER FOREBAY/ WETLANDAND BIOFILTRATION AREA

GUIDE SIGN/

LEGEND: ROAD ALIGNMENT

SHINGLE FORESHORE SLOPE

NOISE WALLRETAINING WALL

1.8m FOOTPATH3.0m SHARED PATH (TYPICAL)UNLESS OTHERWISE NOTED

DESIGNATION BOUNDARY

EXISTING COASTAL MARINEBOUNDARY

FORESHORE VEGETATION

3.0m GRAVEL PATH

TP-E TP-E TP-E TP-E TRANSPOWER OVERHEAD CABLES

PROPOSED FEATURES

EXISTING FEATURES

CMA CMA CMA CMA CMA

ROADWAY TRENCH

PLAN AND LONG SECTION, REFER DRAWINGS TRS-C-200 SERIES

PROPERTY BOUNDARY

<----- ROAD ALIGNMENT

<---- CUT SLOPES

<----- FILL SLOPES

BRIDGE STRUCTURE

STORMWATER FOREBAY/ WETLANDAND BIOFILTRATION AREA

LEGEND: PLAN AND LONG SECTION

NOISE WALLRETAINING WALL

DESIGNATION BOUNDARY

EXISTING COASTAL MARINEBOUNDARY

PROPOSED FEATURES

EXISTING FEATURES

CMA CMA CMA CMA CMA

AREA OF RECLAMATION

AREA OF OCCUPATION

COASTAL OCCUPATION PLANS, REFER DRAWINGS TRS-CMA-101 TO TRS-CMA-104 AND TRS-CMA-111

PROPERTY BOUNDARY

TOE OF OUTER BUND

LEGEND: COASTAL MARINE OCCUPATION

SHINGLE FORESHORE SLOPE

DESIGNATION BOUNDARY

EXISTING COASTAL MARINEBOUNDARY

CMA CMA CMA CMA CMA

FORESHORE VEGETATION

PROPOSED FEATURES

EXISTING FEATURES

AREA OF RECLAMATION

EXTENT OF PERMANENTOCCUPATIONAREA OF TEMPORARYOCCUPATION

DREDGING

EXISTING CHANNEL

STRUCTURAL PLANS, REFER DRAWINGS TRS-S-010 TO TRS-S-081

PROPERTY BOUNDARY

<----- ROAD ALIGNMENT

<---- CUT SLOPES

<----- FILL SLOPES

BRIDGE STRUCTURE

LEGEND: STRUCTURAL

RETAINING WALL

EXISTING COASTAL MARINEBOUNDARY

CMA CMA CMA CMA CMA

PROPOSED FEATURES

EXISTING FEATURES

DESIGNATION BOUNDARYOCCUPATION OF COASTALMARINE AREA (PERMANENT)

LEGEND: SECTORS

SECTOR 1

SECTOR 2

SECTOR 3

SECTOR PLAN, REFER DRAWINGS TRS-G-131

SECTOR 4

SECTOR 5

SECTOR 6

STORMWATER PLANS, REFER DRAWINGS AEE-SW-101 TO AEE-SW-116

SW SW SW SW

STORMWATER PIPE

STORMWATER MANHOLE

STORMWATER MANHOLE WITHSCRUFFY DOME

ONE WAY VALVE

CATCHPIT

OVERLAND FLOW CHANNEL

EXISTING CULVERT

PROPOSED FEATURES

EXISTING FEATURESPROPERTY BOUNDARY

EXISTING SHAREDPATH TO REMAIN

CYCLE/ PEDESTRIAN PATH

STORMWATER FOREBAY AREA

LEGEND: STORMWATER

EXISTING COASTAL MARINEBOUNDARY

EXISTING OPEN CHANNEL

EXISTING OPEN CHANNELTO BE REMOVED

CMA CMA CMA CMA CMA CMA CMA CMA

STORMWATER PIPE TO REMAIN

EXISTING SERVICES TO BEREMOVED/ABANDONED

STORMFILTER MANHOLE

<----- ROAD ALIGNMENT

<---- CUT SLOPES

<----- FILL SLOPES

ROCKBRIDGE STRUCTURE

SHINGLE FORESHORESLOPE

DESIGNATION BOUNDARY

FORESHORE VEGETATION

OPEN CHANNEL

EMERGENCY OVERFLOW

BOX CULVERT

RETAINING WALL

STORMFILTER VAULT

STORMWATER OUTLET

STORAGE TANK/ PUMP STATION

STORMWATER WETLAND AREA

STORMWATER BIOFILTRATIONAREA

PROPOSED LEACHATECOLLECTION PIPEPROPOSED LEACHATE WALLLEACHATE MANHOLE

ALIGNMENT PLANS, REFER DRAWINGS AEE-G-101 TO AEE-G-106 & AEE-AL-101 TO AEE-AL-116

PLAN AND LONG SECTIONS, REFER DRAWINGS AEE-C-200 SERIES

STRUCTURAL PLANS, REFER DRAWINGS AEE-S-010 TO AEE-S-081

SECTOR PLANS, REFER DRAWINGS AEE-G-131

COASTAL OCCUPATION PLANS, REFER DRAWINGS AEE-CMA-101 TO AEE-CMA-104 AND AEE-CMA-111

STORMWATER PLANS, REFER DRAWINGS AEE-SW-101 TO AEE-SW-116

Plot Date: Cad File No:24 June 2017 - 4:37 PM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-021.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKOVERALL LEGENDSHEET 01 OF 02

AEE-G-021 2

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 BOARD OF INQUIRY RT NN JC 27.06.17

Page 8: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

LANDSCAPE PLANS, REFER DRAWINGS AEE-LA-100 TO AEE-LA-116

UTILITIES RELOCATION PLANS, REFER DRAWINGS TRS-U-101 TO TRS-U-116

EXISTING SERVICESCOMMUNICATION LINE

CHORUSVODAFONEFX NETWORKVECTOR COMMUNICATION

ELECTRICITY CABLETRANSPOWER OVERHEAD CABLESVECTOR ELECTRICITY

GAS MAINTRANSMISSION (FIRST GAS)DISTRIBUTION (VECTOR)

PROPOSED SERVICESNEW SERVICES/DIVERSIONSEXISTING SERVICES TO BEREMOVED/ABANDONEDEXISTING SERVICES TO BEPROTECTED/MODIFIED

CH CH

VF VF

FX FX

VC VC

TP-E TP-E

V-E V-E

FG FG

VG VG

PROPOSED FEATURES

LEGEND: UTILITIES RELOCATION

EXISTING SHARED PATH TO REMAIN

<----- ROAD ALIGNMENT

<---- CUT SLOPES

<----- FILL SLOPESBOARDWALK

TOE OF OUTER BUND

BRIDGE STRUCTURE

STORMWATER FOREBAY/ WETLANDAND BIOFILTRATION AREA

SHINGLE FORESHORESLOPE

RETAINING WALL

CYCLE / SHARED FOOTPATH

DESIGNATION BOUNDARY

FORESHORE VEGETATION

GRAVEL PATH

AUCKLAND COUNCILSTORMWATER PIPE

WATERCAREWATER PIPEWASTEWATER PIPEHUNUA 1 BULK WATERMAINHUNUA 3 BULK WATERMAINHUNUA 4 BULK WATERMAIN

SW SW

W W

SS SS

W-H1 W-H1

W-H3 W-H3

W-H4 W-H4

EXISTING FEATURESPROPERTY BOUNDARY

EXISTING COASTAL MARINEBOUNDARY

CMA CMA CMA CMA CMA

CLEAN WATER DIVERSION (CWD)DIRTY WATER DIVERSION (DWD)SUPER SILT FENCE (SSF)DECANTING EARTH BUND (DEB)MAXIMUM CONTRIBUTING DISTURBEDAREA 3000m² WITH FLOCCULATIONSHEDS (INTERNAL COLOUR INDICATESCORRESPONDING CATCHMENTS)

SEDIMENT RETENTION POND (SRP)WITH FLOCCULATION SHEDS(INTERNAL COLOUR INDICATESCORRESPONDING CATCHMENTS)

STABILISEDCONSTRUCTION ACCESS

SRP / DEB CATCHMENTS(ALTERNATING COLOURSUSED FOR CLARITY ONLY)

DEB 1_1

EROSION SEDIMENT CONTROL, REFER DRAWINGS AEE-ES-101 TO AEE-ES-116

STORMWATER MANHOLE

PROPOSED FEATURES

LEGEND: EROSION SEDIMENT CONTROL

<----- ROAD ALIGNMENT

<---- CUT SLOPES

<----- FILL SLOPES

TOE OF OUTER BUNDBRIDGE STRUCTURE

SHINGLE FORESHORESLOPE

FORESHORE VEGETATION

DESIGNATION BOUNDARYCOASTAL RECLAMATION AREAOCCUPATION OF COASTALMARINE AREA (PERMANENT)

STORMWATER PIPE

DWD DWD

CWD CWD

EXISTING FEATURESPROPERTY BOUNDARY

EXISTING COASTAL MARINEBOUNDARY

CMA CMA CMA CMA CMA

RETAINING WALL

OVERLAND FLOW PATH

CONSTRUCTION YARDS

BUILDING TO BE REMOVED

TEMPORARY TRAFFIC DIVERSION

DREDGING TRENCH

BRIDGE STAGING

TEMPORARY TOWERS

CONSTRUCTION ACTIVITIES PLANS, REFER DRAWINGS TRS-CA-101 TO TRS-CA-116

PROPOSED FEATURES

EXISTING FEATURESPROPERTY BOUNDARYEXISTING SHAREDPATH TO REMAIN

CYCLE/ PEDESTRIAN PATH

LEGEND: CONSTRUCTION ACTIVITES

EXISTING COASTAL MARINEBOUNDARY

CMA CMA CMA CMA CMA CMA CMA CMA

<----- ROAD ALIGNMENT

<---- CUT SLOPES

<----- FILL SLOPES

TOE OF OUTER BUND

BRIDGE STRUCTURE

DESIGNATION BOUNDARY RETAINING WALL

TEMPORARY PATH

OCCUPATION OF COASTALMARINE AREA (PERMANENT)

TEMPORARY OCCUPATION AREA(WITHIN THE CMA)

AREA OF TEMPORARYOCCUPATIONOVERLAND FLOW CHANNELCONSTRUCTION RESTRICTIONAREA

CONSTRUCTION ACTIVITIES PLANS, REFER DRAWINGS AEE-CA-100 TO AEE-CA-116

EROSION SEDIMENT CONTROL PLANS, REFER DRAWINGS AEE-ES-100 TO AEE-ES-116

UTILITIES RELOCATION PLANS, REFER DRAWINGS AEE-U-100 TO AEE-U-116

Plot Date: Cad File No:21 September 2017 - 4:37 PM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-022.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKOVERALL LEGENDSHEET 02 OF 02

AEE-G-022 3

A RAM

A RAM

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 BOARD OF INQUIRY RT NN* JC* 27.06.20173 BOARD OF INQUIRY AMENDMENT RT NN* JC* 22.09.2017

Page 9: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

EXISTING BRIDGE

N

EXISTING BRIDGE

SHEET 2SHEET 3

SHEET 4

SHEET 5

SHEET 6

SHEET 1

Plot Date: Cad File No:23 June 2017 - 9:24 AM C:\pwwork\pwv8iss4ocxx\ratan\dms76145\AEE-G-100.dwgPlotted by: Raymond Tan

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEEAST WEST LINKOVERVIEW PLANSHEET LAYOUT

AEE-G-100 3

A RAM

RT/LN/RB

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20162 ISSUED FOR CONFERENCING TD NN JC 23.05.20173 BOARD OF INQUIRY RT NN JC 27.06.2017

SCALE 1:20,000 @ A3 SIZE

2001000 400 500m300

Page 10: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

JOIN

LINE

SHEE

T 1

SHEE

T 2

LAYOUT KEY - SCALE 1:4,000 @ A3 SIZE

1 2 3

45

6

N

SH 20 NORTHBOUND

SH 20 SOUTHBOUND

ORPHEUS DRIVE

NEILSON STREET

GLOUCESTERRESERVE

GLOUCESTERRESERVE

THE LANDING

ONEHUNGAWHARF

ORPHEUS DRIVE

SH 20

NORTHBOUND

SH 20

SOUTHBOUND

EAST WEST LINKEASTBOUND

VICTORIA STBASALT LAVA

FLOW

GLOU

CEST

ERPA

RK R

OAD

ONEH

UNGA

MAL

L

GALW

AY S

TREE

T

GALWAYLINK

ONEH

UNGA

HARB

OUR

ROAD

ONEH

UNGA

MAL

L

NEILSON STREET

ONEHUNGAFORESHORE

MĀNGERE INLET

VICT

ORIA

STR

EET

EAST WEST LINKWESTBOUND

LIMIT

OFWORK

S

LIMIT OFW

ORKS

LIMIT OFW

ORKS

LIMIT OFWORKS

LIMIT

OF

WOR

KS

LIMIT OFWORKS

LIMIT OFW

ORKS

LIMIT OFWORKS

LIMIT

OF

WOR

KS

Plot Date: Cad File No:21 September 2017 - 4:37 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-101.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEGENERAL ARRANGEMENTEAST WEST LINKNEILSON ST INTERCHANGE - SHEET 01

AEE-G-101 3

A RAM

R TAN

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN

SCALE 1:2,000 @ A1 SIZE

40200 80 100m60

3 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.20172 BOARD OF INQUIRY RT NN JC 27.06.20171 ISSUED FOR CONFERENCING TD NN JC 23.05.20170 ISSUED FOR CONSENT AR NN* PK* 01.12.2016

Page 11: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

JOIN

LINE

SHEE

T 1

SHEE

T 2

JOIN

LINE

SHEE

T 2

SHEE

T 3

LAYOUT KEY - SCALE 1:4,000 @ A3 SIZE

1 2 3

45

6

N

VICTORIA STBASALT LAVA

FLOW

MĀNGERE INLET

WAIKARAKACEMETERY

ALFR

ED S

TREE

T

EAST WEST LINKWESTBOUND

EAST WEST LINKEASTBOUND

NEILSON STREET

MIAM

I STR

EAM

WAIKARAKAPARK

NEILSON STREET

CAPT

AIN

SPRI

NGS

ROAD

VICT

ORIA

STR

EET

LIMIT OFW

ORKS

LIMIT OFWORKS

LIMIT

OF

WOR

KS

LIMIT

OF

WOR

KS

Plot Date: Cad File No:21 September 2017 - 4:18 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-102.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEGENERAL ARRANGEMENTEAST WEST LINKEMBANKMENT - SHEET 02

AEE-G-102 3

A RAM

R BAILEY

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONFERENCING TD NN JC 23.05.20172 BOARD OF INQUIRY RT NN JC 27.06.20173 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.2017

SCALE 1:2,000 @ A1 SIZE

40200 80 100m60

Page 12: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

JOIN

LINE

SHEE

T 2

SHEE

T 3

JOIN

LINE

SHEE

T 3

SHEE

T 4

LAYOUT KEY - SCALE 1:4,000 @ A3 SIZE

1 2 3

45

6

N

HUGO

JOHN

STON

DRIV

E

PORT

S LIN

K

PIKES POINTBASALT LAVA

FLOW

MĀNGERE INLET

ANNS CREEKESTUARY

KIWIRAIL CORRIDOR

EAST WEST LINKEASTBOUND

EAST WEST LINKWESTBOUND

LIMIT

OF

WOR

KS

LIMIT OF

WORKS

Plot Date: Cad File No:21 September 2017 - 4:19 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-103.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEGENERAL ARRANGEMENTEAST WEST LINKEMBANKMENT/ ANNS CREEK - SHEET 03

AEE-G-103 3

A RAM

R B/L NEL

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONFERENCING TD NN JC 23.05.20172 BOARD OF INQUIRY RT NN JC 27.06.20173 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.2017

SCALE 1:2,000 @ A1 SIZE

40200 80 100m60

Page 13: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

JOIN

LINE

SHEE

T 3

SHEE

T 4

JOIN

LINE

SHEE

T 4

SHEE

T 5

LAYOUT KEY - SCALE 1:4,000 @ A3 SIZE

1 2 3

45

6

N

EWL WESTBOUNDEWL EASTBOUND

SYLVIA PARK ROAD

WESTBOUND

SYLVIA PARK ROAD

EASTBOUND

SH1 NORTHBOUND

GREA

T SO

UTH

ROAD

HUGO

JOHN

STON

DRIV

E

KIWIRAIL CORRIDOR

KIWIRAIL CORRIDOR

KIW

IRAI

L COR

RIDO

R

PACI

FIC

RISE

GREA

T SOU

TH R

OAD

MT WELLINGTON HW

Y

LIMIT OF

WORKS

LIMIT OFWORKS

LIMIT OFWORKS

Plot Date: Cad File No:21 September 2017 - 4:38 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-104.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEGENERAL ARRANGEMENTEAST WEST LINKANNS CREEK/ SYLVIA PARK ROAD - SHEET 04

AEE-G-104 4

A RAM

L NEL

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN1 ISSUED FOR CONSENT - GSR GRADE SEPARATION AR NN* PK* 14.12.20182 ISSUED FOR CONFERENCING TD NN* JC* 23.05.20173 BOARD OF INQUIRY RT NN JC 27.06.20174 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.2017

SCALE 1:2,000 @ A1 SIZE

40200 80 100m60

Page 14: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

JOINLINE

SHEET 4SHEET 5

JOIN

LINE

SHEE

T 5

SHEE

T 6

LAYOUT KEY - SCALE 1:4,000 @ A3 SIZE

1 2 3

4 5

6

N

EWL E

ASTB

OUND

TO S

H1

SOUT

HBOU

ND R

AMP

SH1 NORTH

BOUND TO EWL

WESTBOUND RAMP

SH1 SOUTHBOUND

SH1 NORTHBOUND

MCLENNAN ROAD

HILLSIDE ROAD

PANA

MA R

OAD

SH 1SOUTHBOUND

SH 1NORTHBOUND

KIWIRAIL CORRIDOR

MT WELLINGTONHIGHWAY

CLEM

OW D

RIVE

MT WELLINGTON HWY

LIMIT OFWORKS

LIMIT OFWORKS

LIMIT OFW

ORKS

Plot Date: Cad File No:21 September 2017 - 4:37 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-105.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEGENERAL ARRANGEMENTEAST WEST LINKSH1/ SYLVIA PARK RAMPS - SHEET 05

AEE-G-105 3

A RAM

L NEL

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONFERENCING TD NN JC 23.05.20172 BOARD OF INQUIRY RT NN JC 27.06.20173 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.2017

SCALE 1:2,000 @ A1 SIZE

40200 80 100m60

Page 15: NZ TRANSPORT AGENCY EAST WEST LINK · aee-g-011 east west link - drawing register - sheet 1 4 2 3 4 AEE-G-012 EAST WEST LINK - DRAWING REGISTER - SHEET 2 4 2 3 4 AEE-G-013 EAST WEST

JOIN

LINE

SHEE

T 5

SHEE

T 6

LAYOUT KEY - SCALE 1:4,000 @ A3 SIZE

1 2 3

45

6

N

PRIN

CES

STRE

ET E

AST

PRIN

CES

STRE

ET

AVEN

UE R

OAD

FRANK GREY PLACE

ŌT ĀHUHUCREEK FRANK GREY PLACE

SH 1SOUTHBOUND

SH 1NORTHBOUND

LUKE

STR

EET

LUKE

STR

EET

EAST

ALBERT STREET

LIMIT OFW

ORKS

LIMIT OF

WORKS

LIMIT OFW

ORKS

LIMIT OFWORKS

LIMIT

OF

WOR

KS

Plot Date: Cad File No:21 September 2017 - 4:41 p.m. C:\pwwork\pwv8iss4ocxx\jlcatiil\dms76145\AEE-G-106.dwgPlotted by: Janesse Catiil

No. App'dIssued Status Check'd Date

DISCLAIMERThis drawing is for the purpose of supporting applicationsunder the RMA for resource consents and designations.All information shown is subject to final design. Areas and measurements are subject to survey.Where the designs conflict with conditions the conditions willprevail. This Drawing must not be used for construction

Contract No

PA4014Scale (A1)Original

Scale (A3)Reduced

Drawn

Designed

ReviewedDesign Manager

ApprovedAlliance Manager

Scale:

Drawing Title

Drawing Number Rev No.Drawn

Drafting Check

Design Check

FOR BOI ISSUEGENERAL ARRANGEMENTEAST WEST LINKSH1/ PRINCES ST INTERCHANGE - SHEET 06

AEE-G-106 3

A RAM

R TAN

J MURAHIDY

J MURAHIDYN NANCEKIVELL J CALDWELL

AS SHOWN0 ISSUED FOR CONSENT AR NN* PK* 01.12.20161 ISSUED FOR CONFERENCING TD NN JC 23.05.20172 BOARD OF INQUIRY RT NN JC 27.06.20173 BOARD OF INQUIRY AMENDMENT RT NN JC 22.09.2017

SCALE 1:2,000 @ A1 SIZE

40200 80 100m60