24
Offshore Wind in Germany Status and Trends Trondheim, 14.2.2013

Offshore Wind in Germany Status and Trends - Sintef

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Offshore Wind in Germany Status and Trends - Sintef

Offshore Wind in GermanyStatus and Trends

Trondheim, 14.2.2013

Page 2: Offshore Wind in Germany Status and Trends - Sintef

Content

• Innovation Norway in Hamburg

• Transforming the Energy Sector

• Offshore Wind in Germany

• Outlook

Page 3: Offshore Wind in Germany Status and Trends - Sintef

The German »Energiewende« is ambitiousand based on renewables, tough savings and imports

Security of

Supply

� Back-up systems for volatile power generation

� Grid extension

� Storage capacity

� Phase out of Nuclear Energy

� Renwable Energy Power Production shares: 2020:

35% (2030: 50%, 2040: 65%, 2050: 80%)

� Energy Efficiency

� Technology Policy

� Feed-in Tariffs

Sustainability

Cost

Effectiveness

Page 4: Offshore Wind in Germany Status and Trends - Sintef

Renewable Energy Power Generation

Target

2020: 35%

Target

2020: 35%

Target

2050: 80%

Target

2050: 80%

Page 5: Offshore Wind in Germany Status and Trends - Sintef

Why Offshore Wind?

Onshore Offshore Source: Windreich

Page 6: Offshore Wind in Germany Status and Trends - Sintef

Political targets for offshore wind in Europe until 2020 , in MW

255

182

300

500

563

680

900

1.339

2.400

3.000

5.178

6.000

10.000

13.000

0 2.000 4.000 6.000 8.000 10.000 12.000 14.000

others

Sweden

Greece

Poland

Estonia

Belgium

Finland

Denmark

Irland

Spain

Netherlands

France

Germany

UK

Total 44 GW

Page 7: Offshore Wind in Germany Status and Trends - Sintef

Installed and planned capacity ofOffshore Wind

92 200 280

10.000

25.000

0

5.000

10.000

15.000

20.000

25.000

30.000

2010 2011 2012 2020 2030

MW Roadmap of the German Government

Page 8: Offshore Wind in Germany Status and Trends - Sintef

In Operation

alpha ventus (2009)

Size: 60 MW (12 x 5 MW)

Turbines: Repower, AREVA M5000

Operators: DOTI (E.ON, EWE, Vattenfall)

Baltic 1 (2011)

Size: 48,3 MW (21 x 2,3 MW)

Turbines: Siemens

Operator: EnBW 2012: 185 GWh

2011: 267 GWh

Page 9: Offshore Wind in Germany Status and Trends - Sintef

Under Construction 2012-2014

Bard Offshore 1Size: 90 MW (18 x 6 MW)

Turbines: Bard

Operator: Bard

Borkum West IISize: 400 MW (80 x 5 MW)

Turbines: AREVA

Operator: Trianel

MeerwindSize: 288 MW (80 x 3,6 MW)

Turbines: Siemens

Operator: Wind MV GmbH

Global Tech ISize: 400 MW (80 x 5 MW)

Turbines: AREVA

Operator: Global Tech I

Borkum RiffgatSize: 108 MW (30 x 3,6 MW)

Turbines: Siemens

Operator: ENOVA, EWE

DanTyskSize: 288 MW (80 x 3,6 MW)

Turbines: Siemens

Operator: Vattenfall/Utility Munich

Nordsee OstSize: 288 MW (48 x 6,15 MW)

Turbines: REpower

Operator: RWE Innogy

Total 1862 MW

Turbines: 416

Page 10: Offshore Wind in Germany Status and Trends - Sintef

Planned

Consented

• 29 offshore park projects

• 2081 wind turbines

Planned

• 97 projects9.000 MW

Page 11: Offshore Wind in Germany Status and Trends - Sintef

Status

• Delayed grid connection

• Financing

• Political framework

Page 12: Offshore Wind in Germany Status and Trends - Sintef

Developments & Risks

• Technology will develop further

• Cost have to go down

• Financing

• Cost of raw material

• Human resources

• Availability of vessels

Page 13: Offshore Wind in Germany Status and Trends - Sintef

Statements and insightsBased on a survey among suppliers in 2012

• Over capacity, cost pressure � need for closer cooperation and optimizing of supply chain

• No clear specification for product development, supplier shall take risk

• Quality assurance

• Willingness for testing is low

• Procurement: changing personnel

• No transparency – OEMs are not interested to participate in expert groups

• Financial situation of SMEs and risk

Young an inmature industry

Page 14: Offshore Wind in Germany Status and Trends - Sintef

The Industry is developing generated turnover of 5,9 billion € in 2010

Feasibility Study

Risk assessment

Financing

Location

Environmental impact assess.

Technology

Consenting

Foundations

Tower

Nacelle

Blades

1%

Project developmentTender and

ProcurementConstruction

15% 61%

Page 15: Offshore Wind in Germany Status and Trends - Sintef

Project DeveloperMarket Share in 2011 North Sea

Measured by

installed capacity

Source: Windreich

Page 16: Offshore Wind in Germany Status and Trends - Sintef

The Industry is developing

Transportation

&

Installation

Cable

connection

Operation and

Maintenance

4%11%8 %

Estimated turnover 2021: 22,4 billion €

Number of employees: 33.100

Page 17: Offshore Wind in Germany Status and Trends - Sintef

Process Competence

Management Competence International competence

Product Competence

� Process efficient

� Cooperation and communication

� Logistics

� Objectives, people, implementation

� Professional project management

� Knowledge management

� Culture

� Language

� Logistics

� Installation

� R&D

� Competitive product

� Quality management

� Integration

Key Comptences of Suppliers

Page 18: Offshore Wind in Germany Status and Trends - Sintef

Value Adding PartnerCompetence in production and

development as supplier of moduls or

systems

Development PartnerMaterial and enegineering know how

enables to develop solutions jointly

Productions SpecialistManufacturer partner of the OEM with

strong product know how and secure

processes

Manufacturer of

ComponentsWork bench

Cooperation between OEM and Supplier

Source: Lorenz Kommunikation

Page 19: Offshore Wind in Germany Status and Trends - Sintef

Offshore Wind Infrastructure

Page 20: Offshore Wind in Germany Status and Trends - Sintef

The time is right

• Problem solver

• Alliances and interplay

• Join established organisations and events

Page 21: Offshore Wind in Germany Status and Trends - Sintef

Network

1. Offshore-Basis Cuxhaven (www.offshore-basis.de)

2. WAB Windenergie Agentur (Bremerhaven/Bremen (www.wab.net))

3. HUSUM WindEnergy (http://community.husumwindenergy.com)windcomm schleswig-holstein (www.windcomm.de)

4. Erneuerbare Energien Hamburg (www.erneuerbare-energien-hamburg.de)

5. Wind Energy Network Rostock (www.wind-energy-network.de)

Page 22: Offshore Wind in Germany Status and Trends - Sintef

Opportunities

• Trade fairs and exhibitions

• Hannover Messe 08. - 12. April 2013

• Meeting Point Wind in Düsseldorf 18.-19.06.2013

• EWEA Offshore Frankfurt 19. – 21. 11.2013

• Conferences

• 9. WAB Offshore-Windforce Bremen/Bremerhaven 4-6 June 2013

• Study Tours

• B2b meetings

Page 23: Offshore Wind in Germany Status and Trends - Sintef

Who forgets to prepare, prepares to be forgotten

• 40% of sales pitches are too generic

• 57% of sales people are poorly prepared/ unprepared for an initial client meeting

• 50% of sales people need to be better informed about client specific requirements

• Use the internet

• Get to know the company

• Prepare 10-20 minutes

Who remembers to prepare, prepares to be remembered.

Source: IDC survey from 2011

Page 24: Offshore Wind in Germany Status and Trends - Sintef

Innovation Norway HamburgGerda GeyerEnergy & Environment

Caffamacherreihe 520355 HamburgGermanyT: +49 40 22 94 15 58M: +49 172 20 55 89 [email protected]