ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO: TP – 41 / 08 – 09 IN RE THE APPLICATION FILED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR RE- DETERMINATION OF TARIFF FOR THE YEAR 2010-11 PURSUANT TO THE DIRECTION OF THE HON’BLE APPELLATE TRIBUNAL FOR ELECTRICITY GIVEN IN THE ORDER DATED 04.04.2011 IN IA NO.62 OF 2011 IN APPEAL NO.173 OF 2010 DATE: 30.12.2011

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Embed Size (px)

Citation preview

Page 1: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

ORDER

OF THE

WEST BENGAL ELECTRICITY REGULATORY COMMISSION

IN

CASE NO: TP – 41 / 08 – 09

IN RE THE APPLICATION FILED BY WEST BENGAL STATE

ELECTRICITY DISTRIBUTION COMPANY LIMITED FOR RE-

DETERMINATION OF TARIFF FOR THE YEAR 2010-11

PURSUANT TO THE DIRECTION OF THE HON’BLE APPELLATE

TRIBUNAL FOR ELECTRICITY GIVEN IN THE ORDER DATED

04.04.2011 IN IA NO.62 OF 2011 IN APPEAL NO.173 OF 2010

DATE: 30.12.2011

Page 2: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

CHAPTER - 1 INTRODUCTION

West Bengal Electricity Regulatory Commission 2

1.1 The West Bengal Electricity Regulatory Commission (hereinafter referred to as the

‘Commission’) was constituted by the Government of West Bengal in the year 1999 in

terms of section 17 of the Electricity Regulatory Commissions Act, 1998, now repealed by

section 185 of the Electricity Act, 2003 (hereinafter referred to as the ‘Act’) which came

into force with effect from 10 June, 2003. The first proviso to section 82(1) of the Act

ensured continuity of the Commission – along with that of all other State Electricity

Regulatory Commissions – by laying down that the State Electricity Regulatory

Commission, established by a State Government under section 17 of the 1998 Act (and

some other enactments) and functioning as such immediately before coming into force of

the Act, shall be the State Commission for the purposes of the Act.

1.2 The functions of a State Commission are laid down in section 86 of the Act. Of its many

functions, a State Commission has to discharge the function of determination of tariff for

generation, supply, transmission and wheeling of electricity, wholesale, bulk or retail, as

the case may be, within the State. Further, section 62(1) of the Act also requires the

Appropriate Commission to determine the tariff in accordance with the provisions of the

Act for supply of electricity by a generating company to a distribution licensee, for

transmission of electricity, for wheeling of electricity as well as for retail sale of electricity.

1.3 In accordance with the provisions of Part XIII of the Act, the Government of West Bengal

reorganized West Bengal State Electricity Board (in short ‘WBSEB’), a State Electricity

Board constituted under section 5 of the Electricity (Supply) Act, 1948 (since repealed),

and replaced it by two Government companies viz. West Bengal State Electricity

Distribution Company Limited (in short ‘WBSEDCL’) and West Bengal State Electricity

Transmission Company Limited (in short ‘WBSETCL’) with effect from 1.4.2007. As

WBSEDCL is a successor entity of erstwhile WBSEB for distribution of electricity

throughout the State of West Bengal except in the areas of supply of other distribution

licensees in the State, WBSEDCL is a deemed distribution licensee in terms of the fifth

proviso to section 14 of the Act.

1.4 In terms of the provisions of the Act, therefore, the Commission is fully empowered to

determine the tariff of WBSEDCL.

Page 3: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 3

1.5 The Commission had, in the past, passed tariff orders determining the tariffs of erstwhile

WBSEB for seven consecutive years starting from 2000 - 2001. The Commission also

passed tariff orders determining the tariffs of WBSEDCL for 2007 – 2008, 2008 – 2009,

2009 – 2010 and 2010-11.

1.6 A generating company or a licensee, whose tariff is needed to be determined by the

Commission as per the provisions of the Act, is required to prepare the application for

determination of tariffs for each year of a control period under the multi-year tariff

framework complying with the provisions of the regulations framed by West Bengal

Electricity Regulatory Commission on Terms and Conditions of Tariff and submit the

same to the Commission within the specified date.

1.7 Accordingly, WBSEDCL, complying with the provisions of the West Bengal Electricity

Regulatory Commission (Terms and Conditions of Tariff) Regulations,2007, as amended

(hereinafter to be referred as old Tariff Regulation), prepared the application for the

determination of its tariffs for each year of the second control period and submitted the

same to the Commission on 2 June, 2008. This tariff application was admitted by the

Commission and numbered as TP-41/08-09.

1.8 The old Tariff Regulation has now been repealed and replaced by West Bengal Electricity

Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2011(hereinafter to

be referred as New Tariff Regulations) published on 29.04.2011. The New Tariff

Regulations have come into effect from 29.04.2011 i.e. the date of publication of it in

official gazette in supersession of the old Tariff Regulation. Thus from 29.04.2011 all

matters relating to tariff determination are to be dealt under the New Tariff Regulations.

1.9 WBSEDCL was, after admission of their tariff application as at 1.7 above, directed to

publish, as required under section 64(2) of the Act, the gist of the tariff application, as

approved by the Commission, in at least four daily newspapers having wide circulation in

the area of supply of WBSEDCL, at least 1 (one) each of such newspapers being in

Bengali and English. The gist was, accordingly, published simultaneously on 16 June,

2008 in Ananda Bazar Patrika, Bartaman, Ganasakti, The Times of India and Sanmarg.

The publication invited the attention of all interested parties, stake holders and the

Page 4: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 4

members of the public to the application for determination of tariffs of WBSEDCL for

each year of the second control period and requested for submission of objections,

comments etc., if any, on the tariff application to the Commission by 18 July, 2008 at the

latest. Opportunities were also afforded to all to inspect the tariff application and take

copies thereof.

1.10 By 18 July, 2008 i.e., the due date, the Commission received objections, comments, etc.

from Jayashree Textiles, Exide Industries Ltd., Hooghly Chamber of Commerce &

Industry, Eastern India Textile Mills’ Association, Manoranjan Roy Energy Education

Centre, CESC Limited, West Bengal Cold Storage Association, EPCOS India Pvt. Ltd.,

West Bengal Cold Chain & Cold Storage Owners’ Welfare Association, Indian Tea

Association, Sri Vasavi Industries Ltd., Eastern Railway, South Eastern Railway, Bharat

Chamber of Commerce, Rohit Ferro – Tech Limited. The Commission also received

objection from All Bengal Electricity Consumers’ Association and identical printed

objections, comments etc. signed by one Shri Pijush Kanti Sharma and 8490 others and

by one Shri Satyen Bhattacharyya by 18 July, 2008. As required under the Act, the

Commission duly considered the objections, comments, etc. of the persons from whom

such objections, comments, etc. were received while dealing with the case.

1.11 The Commission thereafter, in accordance with the provisions of the Act and Tariff

Regulations then in force, passed the tariff order of WBSEDCL for 2008 – 2009

determining the Aggregate Revenue Requirement (in short ‘ARR’) of WBSEDCL for each

year of the second control period, revenue recoverable through tariff by WBSEDCL

during 2008 – 2009 after carrying out negative adjustment of the refundable amount to

the consumers and other distribution licensees (hereinafter referred to as ‘other

licensees’) in the State who had purchased power from erstwhile WBSEB in 2006 – 2007

and now purchase power from WBSEDCL as determined in the Annual Performance

Review (in short ‘APR’) of erstwhile WBSEB for the year 2006 – 2007 with the determined

ARR of WBSEDCL for 2008 – 2009 and also the tariffs of WBSEDCL for 2008 – 2009.

The analyses and findings for determination of the aforesaid ARR and tariffs of

WBSEDCL were recorded in the tariff order of WBSEDCL for 2008 – 2009. The amount

recoverable through tariff during 2009 – 2010 by WBSEDCL had also been determined

Page 5: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 5

subsequently in the tariff order for 2009-10 after carrying out adjustments as were found

necessary on APR relating to the year 2007 – 2008 with the amount of ARR determined

earlier for the year 2009 – 2010 and accordingly tariff for 2009-10 was amended also.

The analyses and findings in that regard were recorded by the Commission in its orders

in Cases No. APR-11/08-09 and TP-41/08-09 dated 28 May, 2009 and 28 July, 2009

respectively.

1.12 The Commission thereafter determined the revenue recoverable through tariff by

WBSEDCL during the year 2010 – 2011 carrying out the adjustment as were found

necessary on APR relating to the year 2008-09 as per order dated 26.7.2010 in Case No.

APR-16/09-10 with the amount of ARR determined earlier for the year 2010-11 in the

tariff order for 2008-09. The Commission also considered the following orders passed by

the Commission and carried out adjustments, as deemed necessary with the ARR for

2010-11 as determined earlier in the tariff order for 2008-09 and passed an order dated

29.07.2010 in Case No.TP-41/08-09 determining the revised ARR of WBSEDCL for the

year 2010-11 and amended tariff for the year 2010-11 in respect of WBSEDCL :-

i) Order dated 30.6.2010 in Case No.OA-73/09-10

ii) Order dated 16.07.2010 In Case No. OA-97/10-11

iii) Order dated 13.02.2009 in Case No.OA-53/08-09

iv) Order dated 16.07.2010 read with corrigendum dated 27.07.2010 in case No.OA-

95/10-11

v) APR order dated 28.05.2009 for 2007-08 in Case No.APR-11/08-09

1.13 The Tariff Order passed by the Commission on 29.07.2010 was challenged in an appeal

before the Hon’ble Appellate Tribunal for Electricity (hereinafter referred to as the Hon’ble

Tribunal) in Appeal No. 173 of 2010. The Hon’ble Tribunal in IA No.62 of 2011 in Appeal

No. 173 of 2010 has passed an order dated 04.04.2011. While passing order Hon’ble

Commission did not go into the merits of the matter and did not incline to express any

Page 6: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 6

opinion with regard to merit of those grounds. Hon’ble Tribunal has remanded the matter

to the Commission for redetermination of tariff with the following directions :

“1) The State Commission shall direct West Bengal discom to file composite tariff in

accordance with the Tariff Regulations and to publish the same inviting objections

and suggestions from the public.

2) The State Commission shall give reasonable time to public to file their objections

and suggestions.

3) State Commission shall consider the pleadings and documents and pass a revised

tariff order for West Bengal discom within the stipulated time as prescribed under

Section 64 of the Act”.

In their order Hon’ble Tribunal also made it clear that the Commission is required to

follow the procedure contemplated under Section 64 of the Act and pass the order in

accordance with law by invoking the power conferred under Section 86 of the Act.

Hon’ble Tribunal also clarified that it is open to the DISCOM to place further particular

with reference to the subsequent developments on various claims, and in that event the

State Commission shall follow the procedure and decide the said claim in accordance

with law. The Hon’ble Tribunal also set aside the order dated 29.7.2010 passed by the

Commission.

1.14 The order of the Hon’ble Tribunal dated 4.4.2011 was received at the Commission’s

Office on 21.04.2011. Accordingly, WBSEDCL was directed under letter No. WBERC/AT-

32/0069 dated 21.04.2011 to take necessary action regarding the direction of the Hon’ble

Appellate Tribunal at (1) above as expeditiously as possible so that the Commission can

take necessary action as per direction of the Hon’ble Appellate Tribunal.

1.15 WBSEDCL submitted the application on 06.05.2011 for re-determination of tariff for 2010-

11 in pursuance of direction given by Hon’ble Tribunal. The application has been admitted

by the Commission on 12.05.2011 in Case No. TP-41/08-09.

Page 7: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 7

1.16 In terms of the provisions of the New Tariff Regulations the application for re-

determination of tariff for 2010-11 is to be dealt with in terms of the provision of the New

Tariff Regulations. According to New Tariff regulations steps to be followed for disposal

of the applications for re-determination of tariff for 2010-11 are as follows :-

i) Disposal of the application dated 6.5.2011 for re-determination of tariff for 2010-11 is

to be done under the New Tariff Regulations.

ii) As per directions of the Hon’ble Tribunal while undertaking the re-determination of

tariff in accordance with the New Tariff Regulations the normative parameters, the

method of calculation and principles of calculations will remain as had been

considered in the concerned tariff order and the old Tariff Regulation.

iiii) Since the year 2010-11 for which tariff is to be re-determined is over, the

Commission in accordance with the New Tariff Regulations may ask WBSEDCL to

submit the updated expenditure on different head of uncontrollable ARR items, so

that tariff can be re-determined with better accuracy to reduce the impact of FPPCA

and APR of 2010-11 in future tariff.

1.17 After admission of the application, WBSEDCL was directed to publish the gist of the

application as approved by the Commission in Newspapers and also in their website.

Accordingly, the gist of the application was published simultaneously in Anandabazar

Patrika, Times of India, Aajkal and Sakalbela on 14.05.2011 inviting suggestion, and

objection from all interested parties and members of the public and all stake holders. A

copy of the gist was also posted in the website of WBSEDCL. They were also offered

opportunities for inspection of the application and to take certified copies of the same in

terms of the relevant provision of the West Bengal Electricity Regulatory Commission

(Conduct of Business) Regulations,2003, as amended and West Bengal Electricity

Regulatory Commission (Fees) Regulations,2003. A copy of the application was also

posted in the website of WBSEDCL.

Page 8: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 8

1.18 Objections and suggestions on the aforementioned application of WBSEDCL for re-

determination of tariff for the year 2010-11 were received by the Commission from the

following persons within the stipulated time i.e. 10.06.2011:-

1) Eastern Railway

2) Hooghly Chamber of Commerce & Industries

3) All Bengal Electricity Consumer’s Association

4) West Bengal Cold Storage Association.

1.19 Objections and suggestions on the applications in question received by the Commission

within the stipulated period i.e. 10.06.2011 have been dealt with in Chapter-3.

Page 9: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

CHAPTER – 2 THE CASE OF WBSEDCL FOR 2010-11

West Bengal Electricity Regulatory Commission 9

2.1 West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) has

submitted their application for re-determination of tariff for 2010-11 as per

direction of the Commission in pursuance to the order dated 04.04.2011 of the

Hon’ble Appellate Tribunal for Electricity in IA No. 62 of 2011 in Appeal No. 173 of

2010 .

2.2 In their application, WBSEDCL has stated that their application for determination

of tariff for the 2nd control period i.e. for the years 2008-09, 2009-10, 2010-11 was

submitted on 02.06.2008 under the Multi-Year Tariff approach under old Tariff

Regulation. On the basis of such application, the Commission issued an order

dated 30.09.2008 in Case No. TP-41/08-09 (hereinafter to be referred as first year

tariff order) determining Aggregated Revenue Requirement (ARR) for 2008-09,

2009-10 and 2010-11 separately and determining the tariff for 2008-09.

2.3 In their application, WBSEDCL has also stated that the Commission had

subsequently issued Tariff Order dated 29.07.2010 for the year 2010-11 giving

effect to various interim orders viz. order dated 16.07.2010 in case no. OA-97/10-

11, order dated 16.07.2010 in Case No.OA-95/10-11 (including corrigendum

order dated 27.07.2010), order dated 30.06.2010 in case no. OA-76/09-10, order

dated 13.02.2009 in case no. OA-53/08-09 and the APR order for 2008-09 dated

26.07.2010 in case no. APR-16/09-10 for adjustment with the ARR for 2010-11

and thereby fixed the tariff of WBSEDCL for 2010-11. The Tariff Order dated

29.07.2010 was challenged in an appeal before the Appellate Tribunal for

Electricity. Hon’ble Tribunal has been pleased to remand the matter to this

Commission for re-determination of tariff for 2010-11.

2.4 In pursuance of the penultimate paragraph of the order dated 04.04.2011 of the

Hon’ble Appellate Tribunal, WBSEDCL has requested for pass through different

elements on different heads by placing further particulars with reference to the

subsequent developments on various claims in their application in addition to the

ARR already determined in the tariff order of first ensuing year of the second

Page 10: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011 ______________________________________________________________________________________

West Bengal Electricity Regulatory Commission 10

control period i.e the tariff order for 2008-09. While submitting such further

particulars, as permitted by the Hon’ble Tribunal , WBSEDCL has also submitted

a certificate from a Chartered Accountant engaged by them in favour of their

claim in support of their submission. Such further particulars relate to following

additional claims:

a) In the first year tariff order i.e. the tariff order for 2008-09, the first ensuing

year of the 2nd control period, the Commission approved the Power Purchase

Cost of Rs. 556921.38 lakh against purchase of 31890.79 MU for the year

2010-11. WBSEDCL has submitted that actual power purchase cost for

2010-11 as per audited report comes to Rs. 720161.34 lakh against

purchase of 29281.64 MU. Agencywise power purchase cost has been given

by WBSEDCL along with their application. So the additional claim on account

of power purchase cost of Rs.163239.96 lakh has been made by WBSEDCL.

In this context WBSEDCL has mentioned that they have submitted an

application on 01.07.2010 for additional power purchase claim due to

imposition of clean energy cess which was considered by the Commission

vide order dated 16.07.2011 in case no. OA-97/10-11. Now in view of the

audited data WBSEDCL has prayed to consider the figure of Rs. 720161.34

lakh as reflected in the certificate of the Chartered Accountant for the

purpose of allowing this power purchase cost.

b) Beside the above claim, WBSEDCL has stated that there is an additional

expense of Rs.25201.99 lakh incurred by WBSEDCL during 2010-11 on

account of Fuel Cost Adjustment (FCA) payable to WBPDCL for the year

2008-09 as per order of the Commission dated 16.07.2010 in case no. OA-

95/10-11 and subsequent corrigendum order dated 27.02.2010. WBSEDCL

has prayed to include this amount to the ARR of 2010-11 as this amount has

already been paid to WBPDCL in ten monthly equal instalments commencing

form the month of June, 2010.

c) WBSEDCL has mentioned that in the first year tariff order charges for Central

Transmission Utility (CTU) had not been considered and in the tariff order for

2009-10 the Commission admitted Rs. 14000.00 lakh for the year 2010-11 on

Page 11: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011 ______________________________________________________________________________________

West Bengal Electricity Regulatory Commission 11

account of CTU charges. WBSEDCL has stated that the actual CTU charges

paid during the year 2010-11 as per the certificate of Chartered Accountant

comes to Rs. 11621.56 lakh and prayed to consider Rs. 11621.56 lakh only.

Since no amount was considered on account of CTU charges in the ARR for

2010-11 in the first year tariff order so entire amount of Rs. 11621.56 lakh is to

be considered in the ARR for 2010-11.

d) In the first year tariff order, the Commission approved the transmission

charges payable to State Transmission Utility (STU) for 2010-11 at Rs.

62052.75 lakh. WBSEDCL has mentioned that actual STU charge paid to

WBSETCL during the year 2010-11 as per tariff order of WBSETCL for the

year 2010-11 is Rs. 65938.66 lakh after availing the timely payment rebate. A

computation in this regard has been annexed by WBSEDCL with their

application. So an additional amount of Rs. 3885.91 lakh has been claimed by

WBSEDCL on account of STU charge.

e) WBSEDCL has mentioned that in the first year tariff order the employee cost

was approved at Rs. 53195.42 lakh for the year 2010-11. Subsequently

through order dated 30.06.2010 in case no. OA-73/09-10 the Commission

allowed the employee cost for 2010-11 at Rs.79795.42 lakh on projection

basis against the application submitted by WBSEDCL on 20.03.2010.

WBSEDCL has now stated that the actual employee cost (including terminal

benefit) net of capitalization as per audited data comes to Rs. 85544.59 lakh

and prayed for considering the same in the ARR for 2010-11 alongwith a

certificate from Chartered Accountant in favour of their claim.

f) WBSEDCL has stated that in the first year tariff order, the Commission

approved the fuel cost for 2010-11 at Rs. 122.84 lakh but the actual fuel cost

for 2010-11 against which a certificate of Chartered Accountant has been

given comes to Rs. 113.87 lakh. Such reduced amount may be considered.

g) WBSEDCL has stated that in the first year tariff order, the Commission

approved the interest on loan for 2010-11 at Rs. 31348.19 lakh whereas

actual interest on loan (net of capitalization) for 2010-11 as per the certificate

Page 12: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011 ______________________________________________________________________________________

West Bengal Electricity Regulatory Commission 12

of Chartered Accountant comes to Rs. 25690.71 lakh. A detailed computation

in this regard has been annexed to their application.

h) It is also stated that in the first year tariff order, the Commission approved the

finance charge for 2010-11 at Rs. 1140.00 lakh. But the actual finance charge

for 2010-11 as per the certificate of Chartered Accountant comes to Rs.

569.78 lakh which may be considered.

i) It is also stated that the actual interest on working capital for 2010-11 comes

to Rs. 2436.07 lakh. But in the first year tariff order the Commission did not

allow any interest on working capital for the year 2010-11. WBSEDCL has

claimed the actual amount of working capital of Rs. 2436.00 lakh to be

included in the ARR for 2010-11 and in support of such claim WBSEDCL have

submitted a certificate of Chartered Accountant.

j) WBSEDCL has further stated that Commission allowed interest on Consumer

Security Deposit at Rs. 5594.00 lakh. But the actual interest on Consumer

Security Deposit for 2010-11 as per the certificate of Chartered Accountant

comes to Rs. 2392.03 lakh and WBSEDCL prayed for to consider the same in

the ARR for 2010-11.

2.5 WBSEDCL in their application has claimed an additional expenditure of

Rs.229296.03 lakh over and above the gross Aggregate Revenue Requirement

(ARR) as determined for the year 2010-11 in the first year tariff order of the

second control period. As a result the revised gross ARR as claimed by

WBSEDCL for 2010-11 comes to Rs. 1073624.90 lakh which is proposed by

WBSEDCL to be recovered through tariff for 2010-11 in accordance with the

paragraph 5.3(h)(4) of National Tariff Policy published on 06.01.2006.

2.6 Regarding the revenue from sale of power to licensees and Government of

Sikkim, gain from sale to persons other than consumer and licensee and income

from Unscheduled Interchange (UI) which will be deducted from the gross ARR

to arrive at the net ARR and the revenue to be recovered through tariff,

WBSEDCL has stated the following:

Page 13: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011 ______________________________________________________________________________________

West Bengal Electricity Regulatory Commission 13

a) The actual revenue earned from sale to other licensee during the year 2010-

11 is Rs. 71450.79 lakh.

b) In the tariff order for 2008-09 the Commission deducted the expenses for sale

to persons other than licensee and consumers for the year 2010-11 as Rs.

109611.53 lakh whereas the actual amount on this account has come to Rs.

59416.92 lakh.

c) The actual amount received on account of Un-scheduled Interchange (UI)

charge during the year 2010-11 is Rs. 15561.39 lakh.

d) In the tariff order 2008-09 a presumptive gain from sale to person other than

consumer and licensee during the year 2010-11 was considered as Rs.

15806.74 lakh against sale of 6270.96 MU and kept as Regulatory Asset to

maintain the tariff at a reasonable level. Now the actual amount on account of

the same comes to Rs. 9178.07 lakh, WBSEDCL has prayed for passing this

amount of share of gain to the consumer instead of creating the Regulatory

Asset in the tariff order for 2010-11.

2.7 WBSEDCL has claimed to release Rs. 12723.77 lakh or part thereof on account

of adjustment of short recovery during the year 2007-08 as per APR order dated

28.05.2009.

2.8 WBSEDCL has prayed for release of Regulatory Asset of Rs. 176383.00 lakh

created in terms of order dated 24.09.2009 in not more than five installments.

Accordingly, WBSEDCL has claimed Rs. 35276.60 lakh i.e. 1/5 of Rs. 176383.00

lakh in the ARR for 2010-11. This regulatory assets of Rs. 176383.00 lakh

consists of arrear payment of salary to the employee and accrued terminal

benefit to be deposited to the Terminal Benefit Fund by WBSEDCL due to

revision of pay and allowance of WBSEDCL as per ROPA, 2009. WBSEDCL has

mentioned that there was a cash outflow of Rs. 19450.00 lakh during 2009-10

being the 50% of arrear payment of salary during 2009-10. There was also cash

outflow of Rs. 19450.00 lakh during 2010-11 being the balance 50% of arrear

payment of salary which was not considered in the ARR for 2010-11 determined

in the first year tariff order.

Page 14: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011 ______________________________________________________________________________________

West Bengal Electricity Regulatory Commission 14

2.9 The actual distribution loss experienced by WBSEDCL during 2010-11 is

25.24%. WBSEDCL has stated that excess power purchase due to higher level

of distribution loss is to be disallowed and they have deducted Rs. 54778.98 lakh

from the ARR for 2010-11 to arrive at the revenue to be recovered from own

consumer and licensee.

2.10 WBSEDCL has also prayed to release through the ARR for 2010-11 the withheld

amount of Rs. 4589.76 lakh for the year 2009-10 on account of non-submission

of Performance Guarantee Test Report of PPSP in the tariff order of 2009-10

since such report had subsequently been submitted by them. WBSEDCL has

also prayed not to withhold in the tariff order for 2010-11 the amount of Rs.

4645.71 lakh as was decided to withhold in the first year Tariff Order.

2.11 After considering all these total revenue to be recovered from their own

consumers and licensees for the year 2010-11 as claimed by WBSEDCL comes

to Rs. 957148.58 lakh and the average tariff of consumer for 2010-11 comes to

503.41 P/kWh.

2.12 WBSEDCL has prayed that the applicable average tariff for consumers at 349.48

P/kWh as per tariff order for 2009-10 along with adhoc increase of power

purchase cost @ 78 P/kWh to be considered as base tariff and amend the tariff

of 2010-11 in line with the guide line of paragraph 8.3(1), 8.3(2) and 8.3(3) of the

National Tariff Policy.

Page 15: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

CHAPTER - 3 OBJECTIONS

West Bengal Electricity Regulatory Commission 15

Objections against the application for re-determination of tariff of WBSEDCL for

the year 2010-11 as per directions of the Hon’ble Appellate Tribunal for Electricity

in its order dated 04.04.2011 in IA 62 of 2011 in Appeal No. 173 of 2010

3.0 Paragraph 1.19 of Chapter-1 contains the list of persons from whom suggestions

and objections on the application for re-determination of tariff of WBSEDCL for

the year 2010-11 have been received within the stipulated date of 10.06.2011.

These objections and suggestions are summarized in subsequent paragraphs of

this Chapter against the respective names of such objectors along with the view

of this Commission on this aspect.

3.1 Hooghly Chamber of Commerce and Industries (HCC)

Hooghly Chamber of Commerce and Industries (hereinafter to be referred as

‘HCC’) have submitted their objections and suggestions on the application

submitted by WBSEDCL for re-determination of tariff for 2010-11. The objections

and suggestions submitted by HCC are broadly divided into two parts. While in

the first part some general issues were raised by HCC, in the second part they

submitted point wise suggestions/ objections.

3.1.1 In paragraph 3 of the objection the HCC had requested for oral hearing to assist

the Commission to adjudicate upon the matter. In this context HCC relied on

different sections of the Act to show that Sections 64 and 86(3) warrant grant of

hearing before deciding upon the objection and determining the tariff.

In this context the Commission finds that in the order of the Hon’ble Appellate

Tribunal the State Commission has been directed to direct WBSEDCL to file

composite tariff in accordance with Tariff Regulations and to publish the same

inviting objections and suggestions from the public. Even in Paragraph (2) of their

direction it is specifically mentioned that the State Commission shall give

reasonable time to public to file their objections and suggestions.

3.1.2 In this context it is also to be noted that nowhere in the order, Hon’ble Appellate

Tribunal has directed for taking any hearing. In fact the conjoint reading of

Sections 64 and 86(3) of the Act clearly establishes that hearing can only be

Page 16: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 16

allowed to the applicant of the application specifically in case of rejection of any

application that is being filed under Section 64 of the Act. But in case of inviting

suggestions and objections as per Section 64 of the Act, there is no such

requirement. Section 86(3) of the Act in particular speaks of ensuring

transparency while discharging its functions but not anything on point of hearing.

3.1.3 As per regulation 2.1.13 of the New Tariff Regulations, the re-determination of

tariff shall be done under the New Tariff Regulations which clearly speaks that

such re-determination shall consider the normative parameters, method of

calculation and principles of calculation in a manner as had been considered in

the concerned tariff order and related repealed regulations to the extent it is not

affected by the order of the Court of Law. In no circumstances it has referred that

the procedural part in disposing the application for re-determination of tariff is to

be relied on the repealed regulations. Thus the procedural aspect for disposing

the application for re-determination of Tariff is to be done in accordance with New

Tariff Regulations in order to fulfill the directives of the Hon’ble Appellate Tribunal

dated 04.04.2011 where Hon’ble Appellate Tribunal directed that “The State

Commission is required to deal with the matter and decide the issues by

observing the required procedure as expeditiously as possible ” .In regulation 2.4

of the New Tariff Regulations it is clearly spelt out that suggestions and

objections shall always mean as submitted in written form only and it has also

been clearly spelt out that hearing on invitation of suggestions and objections

shall be always in a manner and at a stage which is only specifically provided in

the Act and the Regulations made thereunder. Accordingly, any application for

re-determination of tariff can be dealt with through invitation of objections and

suggestions as directed by the Hon’ble Appellate Tribunal. Thus the prayer of

HCC for hearing is not maintainable.

3.1.4 The Commission feels that natural justice has been adequately provided through

invitation of suggestions and objections in written form and consideration of

those. Even on this question of hearing we may refer to the judgment passed by

the Hon’ble Justice Pinaki Chandra Ghose on 04.10.2011 on the Writ Petition

being W.P.No. 16166 (W) of 2004 filed before the Hon’ble High Court,Calcutta in

which West Bengal Electricity Regulatory Commission was one of the

Page 17: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 17

respondents. The Hon’ble Justice Pinaki Chandra Ghosh in his order dated

04.10.2004 having considered the judgment of the Hon’ble Supreme Court

reported in (2002) 8 SCC 715, inter alia held that :

“After going through the said Regulations it appears to me that hearing

was not contemplated under the said Section 64 of the said Act and the

Regulations framed thereunder. Therefore, in my opinion, not granting of

a hearing to the petitioner cannot be said to be violation of natural justice

after construing the said Act and the Regulations framed thereunder.

Therefore, in my opinion, it cannot be said that at this stage the said order

has been made arbitrarily or any violation of natural justice ….”

The aforesaid order dated 4th October,2004 of the Hon’ble Justice Pinaki

Chandra Ghosh was challenged before the Hon’ble Division Bench of the Hon’ble

High Court at Calcutta in an appeal being MAT No. 596 of 2005. The Hon’ble

Division Bench comprising of the Hon’ble Justice Aloke Chakrabarti and the

hon’ble Justice S.P.Talukdar affirmed the order of the Ld. Single Judge by an

order dated 25th February,2005 and, inter alia held that :

“…………… After due consideration of the relevant provisions of the

Act,2003 and having regard to the submission made by the Learned

Counsel for the parties, we think that what is required at the stage of

determination of tariff is consideration and not ‘hearing’…………”

3.1.5 Regarding maintainability of the application the objector HCC has raised their

objection on the ground that the application filed by WBSEDCL is not under the

procedure for filing of Tariff Application in MYT framework. On this issue

Commission feels that such application was filed in accordance with the direction

of State Commission in pursuance to order of the Hon’ble Appellate Tribunal

which is covered under regulation 2.1.13 of the New Tariff Regulations and not

as a tariff application in the first ensuing year of a control period under MYT

framework. In fact in no part of the order Hon’ble Appellate Tribunal has directed

to file any application for tariff determination. Hon’ble Appellate Tribunal has

remanded the matter for re-determination of Tariff where it directs that State

Commission shall direct DISCOM to file Composite Tariff in accordance with the

Page 18: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 18

Tariff Regulations and to publish the same inviting objections and suggestions

from the public. In fact, under the New Tariff Regulations in case of

redetermination of tariff due to order of any Court of Law the relevant particular

regulation is regulation 2.1.13 only and the normal procedure of Tariff

Application filing under MYT is not required though HCC referred to regulation

2.7(ii) of Tariff Regulations. But there is no such regulation 2.7(ii) in the Tariff

Regulations as mentioned by HCC. However in the regulation 2.7.2 the same

content as referred by the objector exists which is not applicable to this case as it

falls under the case of re-determination. Moreover, Hon’ble Appellate Tribunal

remanded the matter to the State Commission for re-determination of tariff in

accordance with the Tariff Regulations. Thus, according to the New Tariff

Regulation, Commission considered the tariff application filed at the start of the

2nd control period for all the three ensuing years 2008-09, 2009-10, 2010-11 as

the tariff application.

According to the Appellate Tribunal’s order dated 4.4.2011 this Commission

directed WBSEDCL to invite suggestions and objections on their application for

re-determination of tariff for 2010-11. Accordingly, WBSEDCL published the gist

of their application approved by the Commission inviting suggestions and

objections in the newspapers and also in the website of WBSEDCL in line with

the direction of the Appellate Tribunal. The said application of WBSEDCL for re-

determination of tariff for 2010-11 provides all the information which is required

for determination of composite tariff arising out of following elements:

i) ARR determined for 2010-11 in the tariff order for 2008-09 i.e. the first

ensuing year of the 2nd control period.

ii) Adjustable amount to ARR under (i) arising out of APR of 2008-09.

iii) Other adjustable amount to ARR under Sl. No. (i) arising out of the further

particulars with reference to the subsequent developments on various

claims which has been put under the application for re-determination of

tariff for 2010-11 in line with direction in the order dated 4.4.2011 of the

Hon’ble Appellate Tribunal.

Page 19: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 19

3.1.6 In paragraph 10(d) of the objection HCC has claimed that Hon’ble Appellate

Tribunal has directed to file a composite application. In fact the Commission on

scrutiny found that in the order of the Hon’ble Appellate Tribunal the Commission

is required to direct WBSEDCL to file “Composite Tariff” in accordance with the

Tariff Regulations. The conjoint reading of the direction above referred and the

penultimate paragraph of the order of the Appellate Tribunal dated 4.4.2011

make it clear that during re-determination process WBSEDCL has been required

to file composite Tariff consisting of the elements as already explained in

Paragraph 3.1.5 of this order.

3.1.7 In fact the original Tariff Application under Multi Year Tariff (MYT) for 2nd control

period and tariff order of 2008-09 are available in public domain and the objector

has access to it. Similarly the order dated 28.05.2009, 24.09.2009, 30.06.2010

and 16.07.2010 are available in public domain and the objector has also access

to it. Therefore the objector had sufficient chance to provide his objection on the

basis of original application of tariff for 2nd control period, tariff order for 2008-09

and the applications under orders dated 28.05.2009, 24.09.2009, 30.06.2010 and

16.07.2010. In this context it is to be mentioned that regulation 2.6(i), as referred

by HCC, does not exist in the New Tariff Regulations. However, regulation 2.6.1

makes it abundantly clear that the Annual Performance Review (in short ‘APR’)

shall provide related information as required for the content of the APR as per the

format of the Tariff Application. In that context the objector had not provided any

evidence by which it is established that any deviation has taken place in

submission of relevant information as per the format of the Tariff Application. The

Commission also feels that the relevant information are duly supplied in desired

format as required under Tariff Application.

In fact, on scrutiny the Commission finds that the APR application for 2008-09

has been duly placed and thus admitted. In view of the above the Commission

feels that the application is quite maintainable.

3.1.8 In paragraph 11 of the objection HCC has mentioned that in para 5(a), 5(e) and

5(g) of the application WBSEDCL has claimed additional cost towards power

purchase cost, employees cost and interest on loan. But it is observed that there

is no claim on account of interest on loan in para 5(g) of the application submitted

Page 20: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 20

by WBSEDCL. Moreover, there is negative adjustment on account of refundable

amount of Rs 5657.48 lakh towards interest on loan.

The last proviso of regulation 2.1.13 of New Tariff Regulations has empowered

the Commission to ask “ the licensee or generating company to resubmit the

updated expenditures on different heads of uncontrollable ARR item, so that tariff

can be re-determined with better accuracy to reduce the impact of FPPCA and

APR of the ensuing year in future tariff” and in this instant application the

applicant WBSEDCL have claimed that they have submitted their updated

expenditures with an audited report by Chartered Accountant. The licensee in

this case has submitted their claim with a certification from a Chartered

Accountant which is mentioned as audited report. In fact the audited accounts will

be required during determination of APR for 2010-11. In view of above

submission of claim by WBSEDCL with a certification from a Chartered

Accountant, Commission feels prudent to accept such value subject to final

adjustment in the FPPCA and APR for 2010-11 on the basis of audited annual

accounts in future and in order to reduce the burden of consumer from recovery

of additional ARR requirement of 2010-11 in future years.

Moreover, it is to be noted in the same application under Para 5(c), 5(h) and 5(j)

the licensee has proposed for refund on the basis of actual expenditure as

envisaged under the last proviso of regulation 2.1.13. On those issues there is no

comment of the objectors. Thus, the above claim under paragraph 5(a), 5(c),

5(e), 5(g), 5(h) and 5(j) in the application by WBSEDCL is in accordance with the

penultimate paragraph of the order of Hon’ble Appellate Tribunal and also as per

regulation 2.1.13 of the New Tariff Regulations. Thus the application is

maintainable.

3.1.9 In point-wise objection HCC has raised their objection regarding the power

purchase cost as claimed by WBSEDCL on the ground that WBSEDCL have not

provided the station-wise power procurement details regarding quantum, price

and cost duly supported by audited accounts and there is lack of credibility in the

filing made by WBSEDCL.

Page 21: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 21

In paragraph 13 of the objection HCC has also raised his objection to pass on the

excess power purchase cost of Rs. 162339 lakh over the amount as approved as

power purchase cost by the Commission in the Tariff Order for 2008-09 on the

ground that the Annexure-1 is unaudited accounts. The Commission feels that

the audited account is required for APR but not at the stage of tariff determination

or re-determination. Thus if WBSEDCL claims such expenditure with a

certification from their engaged Chartered Accountant then there is no harm.

However, Commission will make further due diligence on submission of FPPCA

application in future. Moreover, the order of the Hon’ble Appellate Tribunal has

allowed the applicant to place further particulars in regard to subsequent

development and asked the State Commission to decide on such claim following

the procedure in accordance with the law. As under regulation 2.5.3 of New Tariff

Regulations, it is permissible to change the already determined ARR for any

ensuing year due to increase in power purchase cost. Thus, the Commission

feels that the above claim by WBSEDCL is permissible in accordance with the

law and feels it prudent to accept the power purchase cost as claimed by

WBSEDCL subject to final adjustment in the FPPCA and APR for 2010-11 on the

basis of audited annual accounts in future and in order to reduce the burden of

consumer from recovery of the additional ARR requirement of 2010-11 in future

years.

3.1.10 The HCC has objected on the ground of lack of due diligence by the DISCOM as

the energy purchase by DISCOM is reduced by 8% from the figure that appeared

in the Tariff Order for 2008-09, the power purchase cost has increased by nearly

29%. In this context the Commission feels that conjoint reading of the para 35 of

the application of Annual Performance Review of 2008-09 submitted by

WBSEDCL and the supplementary application dated 24 July, 2010 to the

application of APR for 2008-09 and Para 5(a) of the application dated 06.05.2011

for re-determination of tariff of WBSEDCL for 2010-11 give all the explanation of

increase in power purchase cost as this power purchase cost is permissible

under regulation 2.5.3 of the New Tariff Regulations. Thus Commission admits

the additional power purchase cost.

Page 22: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 22

3.1.11 The objector in paragraph 15 has raised their objection on the ground that the

power purchase cost should be allowed only after considering the disallowance

of the power purchase quantum on account of under-achievement of distribution

loss level in line with the Tariff Policy 2006. In this context it is to be mentioned

that WBSEDCL has already adjusted the disallowed power purchase cost due to

excess distribution loss over the normative level in the application for re-

determination of tariff for 2010-11 submitted on 06.05.2011.

3.1.12 In Paragraph 16 of their objection HCC has mentioned that DISCOM has applied

for disallowance of power purchase cost due to higher distribution loss level but

they have not applied the same principle for the transmission charges, CTU and

STU charges incurred for procuring the said additional power, thereby burdening

the consumers by additional cost. In this context it is to be mentioned that CTU

& STU charges are the fixed charges in nature in case of WBSEDCL.

WBSEDCL has to pay CTU charges for purchase of inter state power as per

allocated share irrespective of quantum of energy drawn. WBSEDCL has to pay

the entire STU charge to West Bengal State Electricity Transmission Company

Limited (in short ‘WBSETCL’), the State Transmission Utility (in short ‘STU’) as

they are the only long term user of the STU system. Therefore, the proposal for

disallowance due to higher distribution loss over normative level with respect to

the losses arising out of CTU & STU system for any disallowed portion of the

power purchase due to higher level of distribution loss cannot be accepted.

3.1.13 HCC has also proposed that the principle of Merit Order Dispatch shall be

considered for disallowance cost of excess power purchase for higher distribution

loss. In this context the Commission feels that this is not logical as this is

tantamount to saying that high cost energy only contributes towards distribution

losses. In fact, the power purchased at different rates are sourced at different

instant of time throughout the year and more or less distributed over the year

according to demand pattern and loss occurs at all instant of time under the

same law of physics. Thus it cannot be said that the power procured at the higher

cost will be considered for disallowance portion due to high distribution loss.

Thus the Commission feels it prudent that the weighted average price of the

pooled power purchase cost shall only be considered as a most reasonable and

Page 23: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 23

rational approach for disallowance of excess power purchase cost for excess

distribution loss over the normative loss.

3.1.14 In Paragraph 17 of their objection HCC has mentioned that WBSEDCL’s claim of

Rs. 85544.59 lakh on account of employee cost are not as per audited report ,as

stated by the DISCOM, and hence the revenue realization against the same is

liable to be rejected. HCC in their point wise objection has also challenged the

Employees cost on the ground of absence of rationale for incidence of

employees cost and reasons of such deviation from the projected expenses. In

this context the objector has not mentioned clearly by what they mean by

projected expenses. However, the Commission feels that WBSEDCL has already

explained in their application dated 20.3.2010 in Case No.OA-73/09-10 the

reason of increase in employees cost. In the application for redetermination of

tariff for 2010-11 WBSEDCL has only claimed the final actual expenditure under

the same head which was previously considered on the projection base in the

OA-73/09-10. As the order has already been referred under the application for

redetermination of tariff for 2010-11 it was known to the objector as it is available

in this Commission for any public scrutiny. Thus the contention of the objector

could not be accepted.

As the claim under head ‘Employees Cost’ is in accordance with the direction of

the Appellate Tribunal in their order dated 4.4.2011 and also in accordance with

regulation 2.1.13, the Commission feels it prudent to admit such amount for

consideration in the ARR for 2010-11 to make the tariff more realistic and to

reduce the impact of APR in future years. Moreover audited accounts are only

necessary during APR.

HCC has also raised their objection regarding the employee cost claimed by

WBSEDCL on the ground that WBSEDCL has not furnished any accounting

statement for 2010-11 in absence of which no prudence check may be possible.

HCC has also questioned that though WBSEDCL has booked significant liability

under Employees cost and has claimed such expenses in tariff but there has

been no matching cash outflow on account of the employees cost.

Page 24: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 24

In this context it is mentioned that audited accounts is required in case of APR of

any year. The tariff to be re-determined in this order for 2010-11 is subject to

truing up through APR of 2010-11 based on audited accounts. Regarding liability

on staff related matter, it may be mentioned that the employees cost includes the

liability on account of terminal benefit fund also. A large portion of such

employees cost is on account of accrual valuation due to revision of pay and

allowances of the employees under ROPA 2009 for which no cash flow has

taken place. This amount is payable to terminal benefit fund subject to release of

Regulatory asset created in the order dated 24.09.2009. As such amount is not

yet released from regulatory asset, the cash flow statement cannot reflect it

3.1.15 In relation to the objection raised in paragraphs 18 and 19 of the objections, the

objector has not given any reference to which portion of the Tariff Application it is

related. On scrutiny, it seems to the Commission that such objection is related to

Para 8 of the application for redetermination of tariff. In this context it is to be

noted that referred regulatory asset of Rs.1763.83 crore as per order dated

24.09.2009 is net of capitalization. The Commission in its order dated 24.09.2009

admitted the expenditure of Rs.1763.83 crore after due prudence and kept the

amount as regulatory asset. In the application of tariff re-determination,

WBSEDCL has claimed to release a part of the regulatory asset. While claiming

such amount WBSEDCL has also mentioned the fact of cash outflow of

Rs.194.50 crore during 2010-11 on account of arrear payment which is a part of

the said regulatory asset of Rs. 1763.83 crore. In fact there is no additional claim

over and above the regulatory asset of Rs. 1763.83 crore.

3.1.16 In paragraph 20 of their objection HCC has submitted that DISCOM is seeking

true-up of power purchase cost from West Bengal Power Development

Corporation Limited (in short ‘WBPDCL’) in turn whose true-up for the

corresponding period has not been conducted. In this context it is to be noted

that impact of truing up under APR for any Generating Company or licensee from

where WBSEDCL is purchasing power is always considered in the APR or in

Tariff order of any future year in which payment due to such impact is given.

Moreover, power purchase cost from WBPDCL as claimed by WBSEDCL is in

accordance with Regulation 2.5.3 (vi) of the New Tariff Regulations.

Page 25: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 25

3.1.17 Transmission charge to CTU.

Regarding Transmission Charge payable to CTU, HCC has raised their objection

on the ground that the claim of WBSEDCL is not backed by audited accounts

statement, financial statement as purported by the Tariff Regulation. In this

context it is mentioned that Audited Accounts is required in case of APR as per

provision of the New Tariff Regulations. Tariff for any year is being determined on

the basis of projected cost only. Thus, the CTU charges as claimed by

WBSEDCL is admitted by the Commission.

3.1.18 Interest on Working Capital

HCC has raised their objection on the ground that the claim of WBSEDCL on

account of interest on Working Capital is not backed by audited accounting

statement and has submitted that claim towards interest on Working Capital can

be allowed after completion of audit of accounting statement of WBSEDCL for

2010-11. Commission admits the same as it is always passed through APR of

the relevant year.

3.1.19 Interest on Consumer Security Deposit

HCC has submitted that WBSEDCL has not provided the figure of actual

consumer security deposit for FY 2010-11 on which interest has been claimed.

Commission agreed with the views of HCC.

3.1.20 Other issues

Other issues as raised by HCC in respect of fuel cost adjustment payable to

WBPDCL for 2008-09, amount payable as per APR 2007-08, release of withheld

amount due to non-submission of P.G.Test report of Purulia Pumped Storage

Project, presumptive gain from sale of electricity to persons other than licensee

and consumers and release of regulatory asset are dealt with in Chapter 4.

Page 26: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 26

3.2 All Bengal Electricity Consumers’ Association (ABECA)

All Bengal Electricity Consumers’ Association (ABECA) has submitted their

objection and suggestions on the application submitted by WBSEDCL for re-

determination of tariff for 2010-11. The objection and suggestion submitted by

ABECA are broadly divided into two parts while in the first part some general

issues have been raised by ABECA, in the second part they have submitted point

wise suggestions/ objections.

3.2.1 In the general discussion the objector ABECA have raised their objection without

any specific reasons regarding the Aggregate Revenue Requirement (ARR)

claimed by WBSEDCL for the year 2010-11 amounting to Rs. 957148.58 lakhs

which is in excess of Rs. 9203.61 lakh over the ARR determined by the

Commission in the impugned order dated 29.07.2010 and they opposed the

same.

In this context it may mentioned that WBSEDCL has claimed expenditure under

different heads for determination of ARR on the basis of actual expenditure

incurred under some heads during the year 2010-11 in line with the direction

given by the Hon’ble Appellate Tribunal in the penultimate paragraph of their

order dated 04.04.2011. Thus the objection is not accepted.

3.2.2 In paragraph 3 of their objection, ABECA have raised their objection regarding

adjustment of 1/5 of the Regulatory Assets of Rs. 176383.00 lakh as claimed by

WBSEDCL and the existing adhoc increase of Power Purchase Cost of 78

p/kWh. In this context it is to be mentioned that additional burden of Rs.

176383.00 lakh on account of additional Employee Cost due to revision of pay

under “ROPA-2009” of WBSEDCL has been approved by the Commission vide

its order dated 24.09.2009 against the application submitted by WBSEDCL in

case no. OA-63/09-10. In absence of any appropriate reasoning from ABECA for

not allowing of such claim, the objection is not accepted by the Commission.

3.2.3 In paragraph 4 of their objection, ABECA have mentioned that WBSEDCL has

tried to justify their claim of ARR for 2010-11 and enhanced average cost of

Page 27: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 27

supply at 503.41 p/kWh supported with audited report. It is stated by ABECA that

audited report is not infallible and the audited report may be accepted subject to

prudence check and the Commission in its earlier regulation mandated that

audited report of the licensee needs to have a prudence check before accepting

it. They have suggested to follow this principle in this case also. They have also

mentioned that as per the Auditor Certificate the Power Purchase Cost has been

booked by WBSEDCL for the period April 2010 to March 2011 and the same has

not been checked by the auditor with the records as available at the Corporate

Office. It is also mentioned by ABECA that WBSEDCL has purchased lesser

quantum of power than the quantum as allowed in the impugned tariff order for

2010-11 while the power purchase cost is more than what was allowed in the

impugned tariff order. ABECA has suggested to allow the power purchase cost

as allowed in the impugned tariff order for 2010-11. In this context it is to be

mentioned that WBSEDCL has claimed the expenses on account of Power

Purchase Cost on the basis of actual quantum of Power Purchase and Cost

thereof during the year 2010-11 with the certification from a Chartered

Accountant engaged by them. The Commission feels that as actual power

purchase cost is now available, thus it is prudent to pass the expenditure on

actual basis to reflect more realistic ARR subject to final scrutiny at the stage of

FPPCA on the basis of audited annual accounts.

3.2.4 ABECA have also raised their objection regarding additional expenditure of Rs.

25201.99 lakh during 2010-11 on account of FCA payable to West Bengal Power

Development Corporation Limited (in short “WBPDCL”) for the year 2008-09 as

per Commission’s order in case no. OA-95/10-11 as according to ABECA this

claim is contrary to the Act and the terms and conditions of the Tariff

Regulations. They have also mentioned that this contradicts the provisions in

section 61(4) of the Act which says that the tariff will be fixed once in a year and

if the cost of fuel and power purchase cost changes in the mid year of the tariff

fixation then that may be considered on the basis of actual in accordance with

supporting document in the next year tariff fixation. They have also stated that

this increase is for the year 2008-09 and should be considered in the tariff

determination of 2009-10. They have suggested for not taking into account this

expenditure in the tariff determination for the year 2010-11. In this regard it is

Page 28: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 28

mentioned that there is no such section 61(4) in the Act as mentioned by

ABECA. However, the FCA for the year 2008-09 in respect of the power stations

of WBPDCL has been determined by the Commission vide its order dated

01.06.2010 on the basis of application submitted by WBPDCL as per their

audited accounts as per provision made, in the Tariff Regulations then in force, in

accordance with the provision of section 62(4) of the Act, 2003. The Commission

in its order dated 16.07.2010 read with corrigendum dated 27.07.2010 in case

no. OA-95/10-11 has admitted this amount of Rs. 25201.99 lakh on account of

FCA of WBPDCL of 2008-09 and payable by WBSEDCL during the year 2010-11

as an additional expenditure of WBSEDCL during the year 2010-11 and decided

to include this amount in the ARR of WBSEDCL for the year 2010-11. WBSEDCL

have also claimed this amount in line with the direction given by the Hon’ble

Appellate Tribunal in the penultimate paragraph of the order dated 04.04.2011.

3.2.5 In paragraph 3 of point wise suggestion and objection, ABECA have mentioned

that in the Tariff Order for 2009-10 the Commission admitted Rs. 14000.00 lakh

for the year 2010-11 on account of transmission charge payable to CTU but as

per the audited report this comes to Rs. 11621.56 lakh and accordingly

WBSEDCL has claimed Rs. 11621.56 lakh under the head of CTU charge.

ABECA has mentioned that the projection made by WBSEDCL of Rs. 14000.00

lakh was not proper and they suggested to consider the charges paid to CTU on

the basis of production of payment documents after proper verification of such

documents. In this context it is mentioned that determination of tariff for any year

has been done on the basis of projection of expenditure given by the licensee

under different heads. There is a provision in the New Tariff Regulations for

truing up of the expenditure through APR of the concerned year on the basis of

the audited accounts. So any difference in projection and actual expenditure

under this head will be adjusted in the APR for the concerned year. If the CTU

charges are allowed on the basis of submission of payment documents by

WBSEDCL and not any amount is allowed at this stage at all then WBSEDCL

may have to take loan to make the payment in time and the interest on this score

is to be borne by the consumer which will be extra burden to the consumer. Thus

the claim of WBSEDCL on actual CTU charges is admitted by the Commission

Page 29: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 29

which is less than their projected amount in the tariff application for first ensuing

year of the control period.

3.2.6 In paragraph 4 of the point wise suggestion and objection ABECA have opposed

without any appropriate reason the additional claim of Rs. 3885.91 lakh on

account of STU charges. In this context it may be mentioned that the

Commission has allowed the STU charges of Rs. 65938.66 lakh to be recovered

by WBSETCL in the tariff order of WBSETCL for 2010-11. The expenditure on

account of STU charge as allowed in the ARR of WBSEDCL for the year 2010-11

in the tariff order for 2008-09 was Rs. 62052.75 lakh. So WBSEDCL had to pay

Rs. 3885.91 lakh (Rs.65938.66 lakh - Rs. 62052.75 lakh) extra during the year

2010-11 and WBSEDCL has claimed the same. In this regard WBSEDCL has

also submitted a statement with a certificate from a Chartered Accountant

engaged by them. However, such claim will be subject to truing up during APR of

2010-11.

3.2.7 At paragraph 5 of their point wise suggestion and objection on employee cost

ABECA has mentioned that WBSEDCL in their petition made additional claim of

Rs. 32349.17 lakh on account of employee cost on the plea stated in the

application. ABECA have stated that it is revealed from the impugned order of

WBERC in respect of WBSEDCL for the year 2010-11 that WBEDCL had made

an application dated 20.03.2010 registered in case no OA-73/09-10 stating

therein that WBSEDCL had revised the pay and allowances of the employees

including retired employees with effect from 1st January, 2006 and the

Commission felt it necessary to revise the employee cost in said impugned order

to Rs. 79795.42 lakh from 53195.42 lakh as admitted earlier. Now WBSEDL has

claimed additional employee cost of Rs. 32349.17 lakh in the application dated

06.05.2011 for re-determination of tariff of WBSEDCL for 2010-11. ABECA has

also objected that no paper notification was made for that application. ABECA

has also raised their objection wanting to know how many times WBSEDCL

would enhance their employee cost in a financial year. In this context it is to be

mentioned that WBSEDCL had made their application on 20.03.2010 for

enhanced employee cost on the basis of projection. Now WBSEDCL in their

application dated 06.05.2011 for re-determination of tariff for 2010-11 have

Page 30: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 30

claimed the actual employee cost with a certificate from a Chartered Accountant

engaged by them for the purpose. They have also mentioned in the said

application not to consider the employee cost of Rs. 79795.42 lakh claimed

earlier in their application dated 21.03.2010 and admitted in the order dated

30.06.2010 in case no OA-73/09-10 which was on projection basis. The objection

raised by ABECA has not been considered as WBSEDCL has already mentioned

in their application not to consider the amount of employee cost as admitted in

the order in case no OA-73/09-10.

3.2.8 At paragraph 6 of their point wise suggestion and objection ABECA have raised

their objection on the interest on working capital for the year 2010-11 as claimed

by WBSEDCL. The Commission has accepted it at this stage and will consider

the same in the APR for 2010-11 as per provision of the New Tariff Regulations.

3.2.9 In paragraph 8 of their point wise suggestion and objection ABECA have

mentioned that the revenue from sale of power to licensee and Government of

Sikkim during the year 2010-11 for an amount of Rs. 71450.79 lakh as projected

and claimed by WBSEDCL in their application are as per audited report which is

to be considered in the ARR of WBSEDCL for 2010-11 instead of the amount of

Rs.58963.30 lakh as considered earlier in the ARR of WBSEDCL for 2010-11 in

the Tariff Order for 2008-09. The Commission considers the same.

3.2.10 In paragraph 9 of their point wise suggestion and objection ABECA have raised

their objection on the issues regarding the expenses for sale to persons other

than licensee and consumers during the year 2010-11 and have suggested to

consider the same for an amount of Rs, 109611.53 lakh as considered earlier in

determination of ARR for 2010-11 in the Tariff Order for 2008-09. WBSEDCL has

submitted their claim under this head for an amount of Rs. 59416.92 lakh on the

basis of actual sale to persons other than licensee and consumers as per audited

data. The Commission considers the same computed as per claims supported by

certificate of Chartered Accountant.

3.2.11 In paragraph 10 of their point wise suggestion and objection ABECA have raised

their objection on the issues regarding the revenue from sale of power to persons

other than licensee and consumers during the year 2010-11 and the benefit to be

Page 31: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 31

passed on to the consumers on this account. They have suggested to consider

the gain from sale as Rs. 15806.74 lakh as considered earlier for 2010-11 in the

Tariff Order for 2008-09 whereas WBSEDCL has submitted to consider the gain

of Rs. 9178.00 lakh on the basis of actual sale to persons other than licensee

and consumers supported with certificate of Chartered Accountant. The

Commission considers such gain computed as per such data.

3.2.12 ABECA has also opposed the positive adjustment of entire amount of Rs.

12723.77 lakh with the ARR for the year 2010-11 as this is related to APR for

2007-08 and to be adjusted in the tariff order for 2009-10. In the tariff order for

2009-10 the amount was not considered by the Commission and kept as

Regulatory Assets to contain the tariff at a reasonable level and the same is to be

passed on to the tariff in future year as per provision of the Tariff Regulations. So

this Regulatory Asset is required to be released in the tariff order for 2010-11.

ABECA has also opposed that the APR order for 2007-08 was issued without

publishing notice and without public hearing. The APR order for 2007-08 was

issued on 28.05.2009 as per provision of the then prevailing regulation of the

Commission without any challenge at any stage.

3.2.13 In paragraph 12 of their point wise suggestion and objection ABECA have raised

their objection regarding the claim of WBSEDCL for release of 1/5th of the

regulatory asset of Rs.176383.00 lakh created in the order dated 24.09.2009 in

case No OA-63/09-10 and suggested for resubmission of copies of all relevant

documents by WBSEDCL with the APR application for 2008-09. In this regard it

is to be mentioned that a copy of the APR application of WBSEDCL for 2008-09

along with the copy of the petition for approval of additional amount in employee

cost due to revision of pay of the employees of WBSEDCL as per ROPA, 2009

along with the relevant documents as suggested by ABECA was annexed with

the instant application for re-determination of tariff for 2010-11 submitted by

WBSEDCL. Thus they have already had access to it. In view of such the

objections of ABECA could not be accepted.

3.2.14 ABECA has also raised their objection regarding actual distribution loss of

25.24% as stated by WBSEDCL and suggested to consider the power purchase

Page 32: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 32

cost on the basis of 10% distribution loss. The year wise normative distribution

loss has been specified in the old Tariff Regulation and New Tariff Regulations.

Commission will consider the normative distribution loss as per those regulations

while determining the allowable power purchase cost of WBSEDCL for the year

2010-11 in the subsequent chapter.

3.2.15 ABECA has also raised their objection on the expenditure claimed by WBSEDCL

on other heads like bad debts, reserve for unforeseen exigencies, special

allocation , cost of outsourcing and interest on loan. The Commission will decide

those as per provisions of the relevant regulation while determining the expenses

under different heads in subsequent chapter.

3.2.16 ABECA has also raised their objection regarding adhoc power purchase cost of

78 paise per kwh which is not a subject matter of this petition.

3.3 West Bengal Cold Storage Association

West Bengal Cold Storage Association has made their objections and

suggestions regarding the tariff for cold storage. They have mentioned that uses

of electricity in Cold Storages are varying in nature in different parts of the year.

They have suggested to give seasonal effect in their tariff. Such seasonal

variation is already protected by :

I) Energy charge on drawal basis

II) Opportunity of contract demand reduction once in a year

The Association also raised their objections on the high distribution loss

experienced by WBSEDCL and suggested for examination of the same while

fixing tariff in respect of the consumers of WBSEDCL. The Association has also

suggested to consider the issue of giving Load Factor rebate and Power Factor

rebate for Cold Storages. The Association also suggested giving effect of the re-

determined tariff from a prospective date. It is to be noted that excess power

purchase cost on account of distribution loss over and above the normative

distribution loss have not been considered for ARR re-determination. As it is re-

Page 33: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 33

determination of tariff for the year 2010-11 and that to when the year 2010-11 is

over giving effect from prospective date for the year is not possible.

3.4 Eastern Railways

Eastern Railways has submitted their suggestions and objection mainly on the

rise in their tariff for Traction purpose. They have suggested not to increase the

tariff for traction purpose. They have also suggested for waiver of demand

charges for traction purpose. In this context, the Commission will consider the

provisions of National Tariff Policy while fixing the tariff for different classes of

consumers in subsequent chapter. The Commission also feels that if there is

increase in input cost of distribution licensee, then retail tariff at consumer end is

bound to increase.

3.5 While dealing with all the above observations of different stake-holders, the

Commission has kept in mind that revision of tariff appropriately is required in the

interest of improving the financial health and long term viability of electricity

sector in general and distribution utilities in particular, as has been observed by

the Hon’ble Appellate Tribunal for Electricity in their order dated 11.11.2011 in

OP No 1 of 2011.

In the context of above background the Commission has noted that already a

considerable amount of expenditure incurred by WBSEDCL has yet not been

passed through tariff for which some expenditure has already been admitted in

the Tariff Order and some expenditure is under scrutiny against different

applications. The amount of such expenditure as claimed stands as under:

a) Annual Performance Review for the year 2009-10 where the recoverable

amount of fixed charge, as claimed by WBSEDCL is Rs. 40765.89 lakh,

order on which is under process. Besides, the additional recoverable

amount on account of Fuel and Power Purchase Cost Adjustment

(FPPCA) for 2009-10 as per FPPCA order for 2009-10 as claimed by

WBSEDCL is Rs 39419.18 lakh.

b) Annual Performance Review for the year 2007-08 where the admitted net

recoverable amount is Rs. 12723.77 lakh.

Page 34: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 34

c) The enhanced cost of power purchase and other expenditure on above

as claimed in the application for re-determination of tariff.

If those amounts are not released, as may be determined against the above

claim, by the Commission, it will adversely affect the health of WBSEDCL and in

turn it will affect the interest of the consumers.

Page 35: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

CHAPTER – 4 SUMMARISED STATEMENT OF AGGREGATE REVENUE

REQUIREMENT & REVENUE RECOVERABLE THROUGH TARIFF FOR THE YEAR 2010 – 2011

West Bengal Electricity Regulatory Commission 35

4.1 As stated in the preceding chapters, the Commission determined the ARR of

WBSEDCL separately for each of the three years of the second control period

covering the years 2008 – 2009, 2009 – 2010 and 2010 – 2011 in the tariff order

for 2008 – 2009 based on the analyses and findings recorded in that order. Such

summarized statement of ARR for 2010 – 2011 is given in Annexure-4A.

4.2 Revision of the ARR for the year 2010 – 2011:

4.2.1 In terms of regulation 2.1.13 and 2.5.3 of the New Tariff Regulations, the

amounts of ARR of WBSEDCL, as were determined and shown for the ensuing

year 2010 – 2011 on Annexure-4A in the tariff order of 2008-09 under Multi Year

Tariff approach require to be re-determined on the basis of the application and

submitted claim of WBSEDCL in pursuance of the order dated 04.04.2011 of the

Hon’ble Appellate Tribunal to the extent it is found acceptable to the Commission

after taking into consideration the objections and suggestions as submitted by

different stake holders against the tariff re-determination application submitted

by WBSEDCL in terms of the Hon’ble Appellate Tribunal’s order dated

04.04.2011.

4.2.1.1 Fuel cost

In the tariff order of WBSEDCL for 2008 – 2009 Commission allowed an amount

of Rs. 122.84 lakh as fuel cost for the year 2010-11 for its Diesel generating

stations at Rudranagar. WBSEDCL has now submitted that actual fuel cost

during the year 2010-11 is Rs. 113.87 lakh. Commission considers the same in

terms of regulation 2.5.3 of the New Tariff Regulations.

4.2.1.2 Power purchase cost :

The regulation 2.1.13 of the New Tariff Regulations provides that, in case re-

determination of tariff due to order of Court of Law is to be undertaken by the

Commission and the concerned ensuing year for which tariff is to be re-

Page 36: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 36

determined is already passed over, then the Commission may ask the licensee

or generating company to resubmit the updated expenditures on different heads

of uncontrollable ARR item, so that tariff can be re-determined with better

accuracy to reduce the impact of FPPCA and APR of the ensuing year in future

tariff.

The regulation 2.5.3 of the New Tariff Regulations also provides that in case fuel

price or power purchase cost considered during ARR determination differs

significantly from the prevailing fuel price during the determination of tariff of any

ensuing year, the Commission may change the ARR accordingly as deemed fit

on that account of fuel price and its consequential impact on power purchase

cost as was considered while determining ARR for the ensuing years concerned.

The Commission allowed Rs. 556921.38 lakhs against purchase of 31890.79 MU

of energy for the year 2010-11 in the tariff order for 2008-09 i.e the tariff order for

the first year of the second control period. In their application for re-determination

of tariff for 2010-11 WBSEDCL has stated that the actual power purchase cost

during the year 2010-11 is Rs. 720161.34 lakh against purchase of 29281.64 MU

of energy. This means per unit power purchase cost may increase substantially

from 174.63 Paise/Unit to 245.94 Paise/Unit, i.e., 40.83%. WBSEDCL has

submitted a certificate from a Chartered Accountant engaged by them showing

the agency wise power purchased during the year 2010-11 and the cost thereof.

The power purchase cost as mentioned by WBSEDCL includes the cost of power

drawn through unscheduled interchange (UI). Out of such energy purchased

during the year 2010-11, total 26171.07 MU were sourced from the agencies

generating power from coal. The prices of different grades of coal increased

considerably after the determination of ARR for WBSEDCL for the year 2010 –

2011 in the tariff order for 2008-09 i.e the tariff order for the first year of the

second control period and WBSEDCL had to pay the additional cost due to

increased fuel cost to those agencies during the year through fuel cost

adjustment by those agencies as per the fuel surcharge formula applicable for

Page 37: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 37

the respective generating stations. The Commission thus admits the power

purchase cost submitted by WBSEDCL for the year 2010-11 for re-determination

of the ARR for 2010-11 vide regulation 2.5.3.(vi) and regulation 2.1.13 of the New

Tariff Regulations against the claim in the application for re-determination of

tariff. However, this power purchase cost will be reconciled with the data to be

submitted by WBSEDCL supported by audited annual accounts in their FPPCA

application for 2010-11.

4.2.1.3 Transmission Charges paid to CTU

The fixed charges totaling to an amount of Rs. 11621.56 lakh was paid by

WBSEDCL to Power Grid Corporation of India Limited (in short ‘PGCIL’), which

is the Central Transmission Utility (in short “CTU”) for the year 2010-11.

WBSEDCL has claimed this amount in their application for re-determination of

tariff for the year 2010-11.

In their application for determination of tariff for the second control period,

WBSEDCL had projected that it would have to pay to CTU Rs. 12000.00 lakh,

Rs. 13000.00 lakh and Rs. 14000.00 lakh in the years 2008-09, 2009-10 and

2010-11 respectively towards transmission charges to receive the allocated

share of power from the Central Sector Power Utilities during those years. It has

however, come to the notice of the Commission that during determination of ARR

of WBSEDCL for the years 2008-09, 2009-10 and 2010-11 inadvertently the

aforesaid charges were not considered by the Commission and therefore not

included in the ARR of WBSEDCL for those years. The Commission considers

the entire amount of Rs. 11621.56 lakh paid by WBSEDCL to CTU during the

year 2010-11, as claimed by WBSEDCL in their application, in the ARR for 2010-

11 in terms of regulation 2.5.3(v) and 2.1.13 of the New Tariff Regulations.

4.2.1.4 Transmission charges paid to STU

The Commission considered an amount of Rs. 62052.75 lakh under the head

transmission charge to STU (State Transmission Utility ) in the ARR for 2010-11

Page 38: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 38

in the tariff order for 2008-09. The transmission charge to STU for the year was

considered in accordance with the tariff order of West Bengal State Transmission

Company Limited (in short “WBSETCL”) functioning as State Transmission Utility

(STU). In the tariff order of WBSETCL for the year 2010-11, the Commission

revised the transmission charge to be recovered by WBSETCL during the year

2010-11 at Rs. 67284.35 lakh and WBSEDCL paid the transmission charges to

WBSETCL during the year 2010-11 accordingly. WBSEDCL paid Rs. 65938.66

lakh (net of rebate allowed for timely payment) to WBSETCL, the STU during the

year 2010-11. In support of their claim WBSEDCL has submitted a certificate

from the Chartered Account engaged by them. The Commission considers this

amount of Rs. 65938.66 lakh under the head transmission charge to STU, an

uncontrollable item, in the ARR of WBSEDCL for the year 2010-11 in terms of

regulation 2.1.13 of the New Tariff Regulations.

4.2.1.5 Employee Cost :

4.2.1.5.1 In the tariff order for 2008-09 i.e the tariff order for the first year of the second

control period the Commission considered the employee cost at Rs. 53195.42

laks in the ARR for the year 2010-11. Now WBSEDCL has submitted in their

application for re-determination of tariff for 2010-11 that the employee cost for the

year 2010-11 is Rs. 85544.59 lakh which includes terminal benefit expenses after

net of capitalization. In support of their claim WBSEDCL has submitted a

certificate from a Chartered Account engaged by them for this purpose.

4.2.1.5.2 WBSEDCL in their application dated 09.09.2009 registered in case no OA-63/09-

10 has submitted that the pay allowances including Gratuity and LTA of all the

employees including retired employees of WBSEDCL are revised as per West

Bengal State Electricity Distribution Company Limited “ Revision of Pay and

Allowances Rules, 2009” ( in short ‘ROPA 2009’) notified on 16.02.2009. The

increase in employees cost during the year 2010-11 over what was admitted in

the ARR for 2010-11 in the tariff order for 2008-09 is due to revision of pay and

Page 39: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 39

allowances of the employees of WBSEDCL including the retired employees as

per ROPA 2009.

4.2.1.5.3 The Commission considers the amount of Rs. 85544.59 lakh as claimed by

WBSEDCL under the head of employee cost in determination of ARR for 2010-

11 in terms of regulation 2.5.3 (x) and 2.1.13 of the New Tariff Regulations.

4.2.1.5.4 WBSEDCL has not submitted the segregation of the employee cost for

generation and distribution activity. The admitted employee cost has been

allocated for generation and distribution in the same proportion as admitted in

the ARR for 2010-11 determined in the tariff order for 2008-09.

4.2.1.6 Interest on loan

The Commission admitted Rs. 31348.19 lakh (net of capitalization) under the

head ‘Interest on loan‘ for borrowed capital for the year 2010-11 in the tariff order

for 2008-09. WBSEDCL has now claimed that the actual interest on loan for

borrowed capital during the year 2010-11 comes down to Rs. 25690.71 lakh after

capitalization. In support of their claim WBSEDCL has submitted a certificate

from a Chartered Account engaged by them for this purpose. The Commission

consider the amount of Rs. 25690.71 lakh as claimed by WBSEDCL under the

head ‘Interest on loan‘, which is a uncontrollable item, in the ARR for 2010-11 in

terms of regulation 2.1.13 of the New Tariff Regulations.

4.2.1.7 Other Finance Charges :

The Commission admitted Rs. 1140.00 lakh under the head ‘Other Finance

Charges‘ in the ARR for 2010-11 in the tariff order for 2008-09. WBSEDCL has

now claimed that the actual expenditure under this head during the year 2010-11

comes down to Rs. 569.78 lakhs. In support of their claim WBSEDCL has

submitted a certificate from a Chartered Account engaged by them for this

purpose. The Commission considers the amount of Rs. 569.78 lakh as claimed

by WBSEDCL under the head ‘Other Finance Charges‘, which is a uncontrollable

Page 40: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 40

item, in the ARR for 2010-11 in terms of regulation 2.1.13 of the New Tariff

Regulations.

4.2.1.8 Interest on consumer Security Deposit :

The Commission admitted Rs.5594.00 lakh under the head ‘Interest on

consumer Security Deposit’ in the ARR for 2010-11 in the tariff order for 2008-09.

WBSEDCL has now claimed that the actual expenditure under this head during

the year 2010-11 comes down to Rs. 2392.03 lakhs. In support of their claim

WBSEDCL has submitted a certificate from a Chartered Account engaged by

them for this purpose. The Commission consider the amount of Rs. 2392.03 lakh

as claimed by WBSEDCL under the head ‘Interest on consumer Security

Deposit‘, which is a uncontrollable item, in the ARR for 2010-11 in terms of

regulation 2.1.13 of the New Tariff Regulations.

4.2.1.9 Interest on consumer Security Deposit :

In the tariff order for 2008-09, the Commission did not considered any

expenditure for the year 2010-11 under the head ‘ Interest on working capital’

since there was no expenditure under that head during the previous years.

WBSEDCL has now claimed an expenditure of Rs. 2436.07 lakh under this head

during the year 2010-11. In support of their claim WBSEDCL has submitted a

certificate from a Chartered Account engaged by them for this purpose. Since no

amount was admitted under this head in the ARR for 2010-11 in the tariff order

for 2008-09, the Commission does not consider any amount under the head

‘Interest on working capital’ in this order in determination of ARR for the year

2010-11. However, WBSEDCL may claim the actual expenditure incurred by

them under this head with audited accounts data in their APR application for the

year 2010-11.

4.2.1.10 Expenditure on other heads

The Commission considers the expenditures on other heads as admitted in the

ARR for 2010-11 in the tariff order for 2008-09.

Page 41: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 41

4.2.1.11 Income from investment and income from non-tariff income :

Income from investment and income from non-tariff income have been

considered as admitted in the ARR for 2010-11 in the first year tariff order for

2008-09 and the same are deducted from the Gross ARR to arrive at the Net

ARR.

4.2.1.12 Receipt from UI charges :

In the ARR for 2010-11 in the first year tariff order for 2008-09 no amount was

considered to be receivable from Unscheduled Interchange (UI). No projection

can be made for UI receivables as it occurs depending on the real time

operation. It is submitted by WBSEDCL in their application that an amount of Rs.

15561.39 lakh has been received by them against UI receivable during the year

2010-11. The Commission considers the entire amount to be passed on to the

consumers and the same is to be deducted from the Gross ARR to arrive at the

Net ARR in accordance with the regulation 2.1.13 of the New Tariff Regulations.

4.2.1.13 Adjustments relating to expenses for sale to persons other than

Consumers and Licensees:

As per the energy balance for the year 2010–11 as admitted in the tariff order for

2008-09, vide paragraph 5.3 of the Commission’s Order dated 30 September,

2008 in Case No. TP-41/08-09, WBSEDCL is to sell 6270.96 MU of power to

persons other than consumers and licensees. The expenses for such sale were

deducted from the gross ARR of WBSEDCL. WBSEDCL has submitted a

statement of technical particulars certified by a Chartered Account engaged by

them which shows that 1207.329 MU has been sold to persons other than

consumers and licensees during the year 2010-11. Since cost of power

purchase and the quantum of energy sold to persons other than consumers and

licensees has been changed, expenses for sale to persons other than

consumers and licensees to be deducted from gross ARR is also revised and

works out at Rs. 59416.92 lakh. Commission considers the same for adjustment

Page 42: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 42

under the head ‘Expenses for sale to persons other than Consumers and

Licensees’ in pursuance to regulation 2.1.13 of the New Tariff Regulations.

4.2.1.14 Sharing of Benefits from sale to persons other than own consumers and

licensees of the Commission

In the first year tariff order for 2008-09, the Commission considered the amount

of share of presumptive gain from sale to person other than consumer and

licensee during the year 2010-11 at Rs. 15806.74 lakh against 6270.96 MU of

energy sold to such persons and kept as Regulatory Asset to maintain the tariff

at a reasonable level. The Commission also mentioned that liability of sharing

such gain with the consumers on the basis of actuals as per audited data would

be taken up at the time of APR for the concerned year. WBSEDCL has

submitted with a computation sheet showing the actual share of gain from sale

to persons other than consumer and licensee during the year 2010-11.

WBSEDCL has also submitted a certificate from a Chartered Account engaged

by them regarding the quantum of sale to persons other than consumer and

licensee and revenue earned therefrom. The share of gain to be passed on to

the consumers from such sale is computed below :

Sl No. Item Derivation Value

1 Sale to persons other than consumer

and licensee including notional sale

of power against Swap out ( MU )

A 2415.882

2 Revenue from Sale to persons other

than consumer and licensee

including notional sale of power

against Swap out (Rs. in lakh)

B 74713.70

3 Selling Rate (paise/unit) C= 309.26

Page 43: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 43

B/A *10

4 Expenses for sale to persons other

than consumer and licensee as

admitted in para 4.2.1.13 (Rs. in

Lakh

D 59416.92

5 Gain (Rs. lakh) E = B- D 15296.78

6 Share of gain (%) F 60%

7 Share of gain (Rs. lakh) G=ExF/100 9178.07

The amount of share of gain comes to Rs. 9178.07 lakh. The Commission

decides to consider for adjustment of this amount as share of gain to the

consumer instead of creating the Regulatory Asset in the ARR for 2010-11. This

is done in accordance with regulation 2.1.13 of the New Tariff Regulations.

4.2.1.15 Payments towards FPPCA to be made to WBPDCL:

An amount of Rs. 25201.99 lakh was found payable by WBSEDCL to WBPDCL

towards Fuel and Power Purchase Cost Adjustment (in short “FPPCA”) for the

year 2008 – 2009 in terms of Commission’s order dated 1 June, 2010 in Case

No. FPPCA-42/09-10. As this amount requires to be paid to WBPDCL in

installments during 2010 – 2011, the amount has been included in the ARR of

WBSEDCL for 2010-11 in terms of order dated 16 July, 2010 of the Commission

read with the Corrigendum dated 27 July, 2010 in Case No. OA-95/10-11.

4.2.1.16 Release of Amount withheld for Non-Submission of P.G. Test Reports:

The amount of Rs. 4392.85 lakh, Rs. 4589.76 lakh and Rs. 4645.71 lakh were

withheld from the ARRs for the year 2008 – 2009, 2009 – 2010 and 2010 – 2011

respectively for non-submission of Performance Guarantee Test Reports (P.G.

Test Reports) in regard to Purulia Pumped Storage Project. Since such reports

Page 44: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 44

were subsequently submitted, amount of Rs. 4392.85 lakh withheld in the ARR

for 2008-09 was released through APR for the year 2008 – 2009. Hence no

amount on this score is being withheld in the ARR for 2010-11. The amount of

Rs. 4589.76 lakh pertaining to the year 2009 – 2010 is also being released in the

ARR for the year 2010 – 2011 in terms of regulation 2.5.3(iv) of the New Tariff

Regulations.

4.2.1.17 The actual distribution loss experienced by WBSEDCL during 2010-11 is

25.24%. WBSEDCL has stated that excess power purchase due to higher level

of distribution loss is to be disallowed and they have deducted Rs. 54778.98 lakh

from the Gross ARR for 2010-11 to arrive at the revenue to be recovered from

own consumer and licensee.

4.2.1.18 WBSEDCL utilized Rs. 3498.00 lakh from the Power Purchaser Fund to meet a

portion of its increased cost of power purchase due to increase in power

purchase price. The amount of Rs. 3498.00 lakh is being deducted from the

gross ARR of WBSEDCL as that amount was available from the Power

Purchaser Fund. WBSEDCL is directed to submit the account of Power

Purchaser Fund duly audited along with the APR application for 2010-11.

4.2.1.19 The withheld amount of Rs. 100.00 lakh on account of non compliance of safety

audit and interest credit of Rs. 1824.00 lakh as considered and deducted from

the gross ARR for 2010-11 in the tariff order for 2008-09 are also considered to

be deducted from the gross ARR of 2010-11 in this order.

4.3 A revised statement of ARR for 2010-11 after giving effect of the adjustment as

stated in paragraph 4.2 is given in Annexure – 4B.

4.4 In terms of the New Tariff Regulations, the Commission is to ascertain the amount

of revenue recoverable through tariff by WBSEDCL for the year 2010 – 2011 after

carrying out, at its discretion, any positive or negative adjustment of the

recoverable or refundable amount determined in APR for the year 2008 – 2009

taking into consideration the admissible variable costs determined in FPPCA,

Page 45: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 45

admissible fixed costs determined in APR and the revenue realized by WBSEDCL

by selling electricity to its consumers and other licensees during that year with the

ARR of WBSEDCL for 2010 - 2011. The Commission in its order dated 26 July,

2010 in Case No. APR-16/09-10 has determined in the APR of WBSEDCL for

2008 – 2009 the net amount of Rs. 164403.86 lakh recoverable by WBSEDCL

from its consumers and other licensees for 2008 – 2009 after taking into

consideration the admissible variable costs (determined in FPPCA vide

Commission’s Order dated 30 June, 2010 in Case No. FPPCA-38/09-10), the

admissible fixed costs (determined in APR vide Commission’s Order dated 26

July, 2010 in Case No. APR-16/09-10) and the revenue realized by WBSEDCL by

selling electricity to its consumers and other licensees during that year. It is

revealed from the annual accounts for the year 2009-10 submitted by WBSEDCL

in the APR for 2009-10 that WBSEDCL has incurred only Rs. 18800.00 lakh

during the year 2009-10 on account of 50% of Arrear pay. The Commission

decides to make positive adjustment of Rs.18800.00 lakh from the net

recoverable amount of Rs. 164403.86 lakh, determined in APR for 2008 – 2009,

with the revised ARR of WBSEDCL for 2010 – 2011 to determine the revenue

recoverable through tariff by WBSEDCL for the year 2010 – 2011 and to keep the

balance amount of Rs. 145603.86 lakh as regulatory asset to contain abnormal

tariff hike. WBSEDCL is directed to submit the actual amount paid by them on

account of arrear pay during the years 2009-10 and 2010-11 with audited

accounts data. The Commission will re-assess the actual receivables on such

head of arrear pay on receipt of such information. Accordingly, balance regulatory

asset so assessed will be released in subsequent year / years in instalments or

otherwise as may be decided by the Commission.

4.5 An amount of Rs. 12723.77 lakh was found recoverable by WBSEDCL from its

own consumers and other licensees in APR for the year 2007 – 2008 in terms of

Commission’s order dated 28 May, 2009 in Case No. APR-11/08-09. The said

amount of Rs. 12723.77 lakh was kept as regulatory asset by the Commission in

Page 46: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 46

the Tariff Order for 2009-10 of WBSEDCL and was not passed on to WBSEDCL

for recovery during the year 2009-10. The Commission now decides to release

that amount in full and to consider the same to arrive at the amount to be

recovered through tariff for the year 2010-11, since the Commission has decided

to make a fresh regulatory asset of Rs. 145603.86 lakh this year as mentioned in

paragraph 4.4 above to contain the abnormal tariff hike.

4.6 Accordingly, the revenue recoverable through tariff, capacity charge and fixed

charge of WBSEDCL for the year 2010 – 2011 work out as under:-

Amount in Rupees in Lakh

REVENUE RECOVERABLE THROUGH TARIFF, CAPACITY CHARGE AND FIXED CHARGE IN 2010-11

Sl. No.

Particulars Generation Distribution Total

1

Revised Aggregate Revenue

Requirement for 2010 – 2011

(Annexure 4B)

47565.35 864358.08 911923.43

2(a) Positive Adjustment on account

of APR for 2008 – 2009 12731.92 151671.94 164403.86

2(b) Less: Amount withheld as

Regulatory Asset 11275.99 134327.87 145603.86

2

Net Positive Adjustment on

account of APR for 2008 –

2009 [2(a) – 2(b)]

1455.93 17344.07 18800.00

3

Adjustment on account of APR

for 2007 – 2008 kept as

regulatory asset in the Tariff

order for 2009 - 2010

2778.30 9945.47 12723.77

4

Total revenue to be recovered

through tariff in 2010-11 [4 =

sum (1 +2+ 3))

51799.58 891647.62 943447.20

Page 47: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 47

4.7 The Commission has also worked out the average tariff for the consumers of

WBSEDCL for 2010 – 2011 and the same is shown in the table below:

AVERAGE TARIFF FOR THE CONSUMERS OF WBSEDCL in 2010 – 2011

Sl.

No. Particulars Unit Total

1 Total Revenue to be recovered through

tariff Rs. in Lakh 943447.20

2 Revenue from sale of power to other

Licensees and Sikkim Rs. in Lakh 71450.79

3 Revenue recoverable from sale of power

to the consumers [(3 = (1-2)] Rs. in Lakh 871996.41

4 Quanta of energy sold to consumers MU 17593.812

5 Average tariff for the consumers for the

year 2010-11 [(5=(Sl.3x10/Sl.4)]

Paise /

kwh 495.63

Page 48: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company
Page 49: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

ANNEXURE 4A SUMMARISED STATEMENT OF AGGREGATE REVENUE

REQUIREMENT OF WBSEDCL FOR 2010 – 2011 (DETERMINED EARLIER UNDER MYT APPROACH)

______________________________________________________________________________________ West Bengal Electricity Regulatory Commission 48

Rs. in lakh

2010-11 Sl No ITEM

Generation Distribution Total 1 Generation charge(fuel) 122.84 0.00 122.84 2 Power purchase 0.00 556921.38 556921.38 3 Charges to STU 0.00 62052.75 62052.75 4 Fees / charges to SLDC 0.00 1300.00 1300.00 5 Employees cost 1474.59 51720.83 53195.42 6 Cost of out sourcing 0.00 523.70 523.70 7 Operation and Maintenance Charges 4181.78 20052.92 24234.70 8 Depreciation 10895.87 30090.87 40986.74 9 Bad Debt 0.00 3030.88 3030.88

10 Interest on bond for pension fund 390.15 12614.85 13005.00 11 Other finance charges 198.00 942.00 1140.00 12 Interest on consumers’ security deposit 0.00 5594.00 5594.00 13 Interest on loan 16614.54 14733.65 31348.19 14 Interest on working capital 0.00 0.00 0.00 15 Income tax 48.92 1582.08 1631.00 16 Reserve for unforeseen exigencies 972.66 2010.91 2983.57 17 Expenditure for SHRELCOP 0.00 350.00 350.00 18 Return on equity 11557.70 29396.00 40953.70 19 Special allocation 0.00 4955.00 4955.00 20 Gross aggregate revenue requirement 46457.05 797871.82 844328.87 21 Less: income from investment 285.00 690.00 975.00 22 Less: non-tariff income 0.00 18522.79 18522.79

23 Less: withhold amount for non compliance of safety audit

20.00 80.00 100.00

24 Less expenses for sale to persons other consumer & licensees

0.00 109611.53 109611.53

25 Less interest credit 966.72 857.28 1824.00 26 Less: Regulatory assets 0.00 15806.74 15806.74

27 Less: withhold of 10% ARR for non submission of PG test report of PPSP

4645.71 0.00 4645.71

28 Total amount deductable 5917.43 145568.34 151485.77 29 Net aggregate revenue requirement (20-28) 40539.62 652303.48 692843.10

Page 50: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

ANNEXURE 4B

SUMMARISED STATEMENT OF REVISED AGGREGATE REVENUE REQUIREMENT OF WBSEDCL FOR 2010 – 2011

West Bengal Electricity Regulatory Commission 49

2010-11 Sl No ITEM

Generation Distribution Total

1 Generation charge(fuel) 113.87 0.00 113.87

2 Power purchase 0.00 720161.34 720161.34

3 Charges to CTU 0.00 11621.56 11621.56

4 Charges to STU 0.00 65938.66 65938.66

5 Fees / charges to SLDC 0.00 1300.00 1300.00

6 Employees cost 2371.32 83173.27 85544.59

7 Cost of out sourcing 0.00 523.70 523.70

8 Operation and Maintenance Charges 4181.78 20052.92 24234.70

9 Depreciation 10895.87 30090.87 40986.74

10 Bad Debt 0.00 3030.88 3030.88

11 Interest on bond for pension fund 390.15 12614.85 13005.00

12 Other finance charges 98.96 470.82 569.78

13 Interest on consumers’ security deposit 0.00 2392.03 2392.03

14 Interest on loan 13616.08 12074.63 25690.71

15 Interest on working capital 0.00 0.00 0.00

16 Income tax 48.92 1582.08 1631.00

17 Reserve for unforeseen exigencies 972.66 2010.91 2983.57

18 Expenditure for SHRELCOP 0.00 350.00 350.00

19 Return on equity 11557.70 29396.00 40953.70

20 Special allocation 0.00 4955.00 4955.00

21 Amount of FPPCA payable to WBPDCL for the year 2008-09

0.00 25201.99 25201.99

22 Release of amount withheld in 2009-10 for non-submission of P.G. Test Report of PPSP 4589.76 0.00 4589.76

23 Gross aggregate revenue requirement (1 to 22)

48837.07 1026941.51 1075778.58

Page 51: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 50

Rs. in lakh

24 Less: income from investment 285.00 690.00 975.00

25 Less: non-tariff income 0.00 18522.79 18522.79

26 Less: withhold amount for non compliance of safety audit

20.00 80.00 100.00

27 Less: expenses for sale to persons other consumer and licensees

0.00 59416.92 59416.92

28 Less: UI charge received 0.00 15561.39 15561.39

29 Less: Share of gain from sale to person other than consumer & licensee

0.00 9178.07 9178.07

30 Less: interest credit 966.72 857.28 1824.00

31 Less: Regulatory assets as created against share of presumptive gain from sale to person other than consumer & licensee

0.00 0.00 0.00

32 Less: withhold of 10% ARR for non submission of PG test report of PPSP

0.00 0.00 0.00

33 Less: Amount available for utilization from Power Purchase Fund

0.00 3498.00 3498.00

34 Less : Excess power purchase cost due to higher distribution loss than normative distribution loss 54778.98 54778.98

35 Total Amount deductable (24 to 34) 1271.72 162583.43 163855.15

36 Net Aggregate Revenue Requirement (23-35) 47565.35 864358.08 911923.43

Page 52: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

CHAPTER – 5 TARIFF ORDER

West Bengal Electricity Regulatory Commission

51

5.1 In the previous chapter, the Commission has determined for WBSEDCL the revenue

recoverable through tariff during 2010 – 2011 and the average tariff for the consumers

of WBSEDCL for 2010 – 2011 as well. The Commission now proceeds to determine

the tariff schedule applicable to the consumers of WBSEDCL and also the associated

conditions of tariff of WBSEDCL for 2010 – 2011. The Commission is passing other

orders also as mentioned in subsequent paragraphs.

5.2 The tariff schedule as applicable to the consumers of WBSEDCL in the year 2010 –

2011 is given at Annexure – 5A1 for LV and MV consumers under quarterly billing

cycle, at Annexure – 5A2 for LV and MV consumers under monthly billing cycle and at

Annexure – 5A3 for HV and EHV consumers. Details of different tariff schemes of

different classes of consumers and various associated terms and conditions are

specified in various regulations and in Annexure – C1 and Annexure – C2 of the New

Tariff Regulations. Other associated conditions of tariff of WBSEDCL for 2010 – 2011

shall be as follows:

5.2.1 Load Factor Rebate/ Surcharge:

5.2.1.1 In order to reduce the overall system T&D loss and to flatten the load curve by

improving the existing system load factor of WBSEDCL, the voltage-wise graded load

factor rebate applicable for the EHV and HV industrial consumers and L&MV industrial

consumer under rate (B-ID) will be as per the following table:

LOAD FACTOR REBATE (Paise / kWh)

Supply Voltage Range of Load Factor (LF) Below 33 kV 33 kV Above 33 kV

Above 50% Up to 55% 1 2 3 Above 55% Up to 60% 4 5 6 Above 60% Up to 65% 7 8 9 Above 65% Up to 70% 10 14 18 Above 70% Up to 75% 15 20 25

Page 53: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 52

Supply Voltage Range of Load Factor (LF) Below 33 kV 33 kV Above 33 kV

Above 75% Up to 80% 20 30 35 Above 80% Up to 85% 25 35 45 Above 85% Up to 90% 35 45 55 Above 90% Up to 92% 37 50 60 Above 92% Up to 95% 40 55 65 Above 95% 45 60 70

5.2.1.2 The above load factor rebate shall be applicable on total quantum of energy

consumed in the billing period. (For example a 33 kV industrial consumer at 85% load

factor shall be eligible for a rebate @ 35 paise / kWh on the total quantum of energy

consumed in the billing period).

5.2.1.3 Load factor surcharge shall continue at the prevailing rate for those categories of

consumers to whom these are applicable at present. In addition, load factor surcharge

shall be applicable to the industrial consumers under Rate B-ID at the same rates.

5.2.1.4 Load factor rebate and load factor surcharge shall be computed in accordance with

the formula and associated principles given in regulations 3.9.2, 3.9.3 and 3.9.4 of the

New Tariff Regulations and at the rates mentioned in paragraphs 5.2.1.1 and 5.2.1.3

above.

5.2.2 Fixed / Demand Charge:

5.2.2.1 The fixed charge shall be applicable to those categories of consumers as specified in

regulation 4.2.1 of the New Tariff Regulations at the rates as shown in Annexure 5A1

and Annexure 5A2 of this tariff order subject to the conditions as specified in the New

Tariff Regulations including regulation 4.2.4 ibid.

5.2.2.2 The demand charge shall be applicable to those categories of consumers as

specified in regulation 4.3.1 of the New Tariff Regulation as per rates as shown in

Annexure – 5A1, Annexure – 5A2 and Annexure - 5A3 of this order on the basis of

Page 54: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 53

recorded demand as specified in regulation 4.3.3 ibid subject to the conditions as

specified in the New Tariff Regulations. Such demand charge shall be levied as per

relevant provisions of regulations 4.3.5, 4.3.6, 4.4, 4.5, 4.6.1, 4.7, 4.7.1, 4.7.2, 4.7.3,

4.8, 4.9, 4.10 and 4.11 of the New Tariff Regulations.

5.2.3 Subject to the condition as specified in regulation 4.13 of the New Tariff Regulations,

the minimum charge shall continue at the existing level for all consumers

5.2.4 The rate of energy charge applicable for temporary supply related to events, festivals,

marriage ceremony, etc. shall be at the highest rate of supply under non-TOD tariff

scheme applicable to that particular category of consumers to which the applicant

seeking such supply belongs. For such temporary supply, the fixed / demand charge

shall be the fixed / demand charge under non-TOD tariff applicable to that particular

category of consumers to which the applicant seeking such supply belongs. Such

temporary supply shall not have any load factor rebate and power factor rebate and

shall not be entitled to TOD tariff. However, other charges for such temporary supply

shall be the same as are applicable to that particular category of consumers to which

the applicant seeking such temporary supply belongs. If there is no appropriate rate

given in the tariff schedule for such temporary supply, the rate for such temporary

supply shall be @ Rs.6.00/kWh. For such temporary supply, the applicant shall apply

to the licensee at least 10 days in advance.

5.2.5 Rebate for Cold Storage or dairy with chilling plant shall be 3% of the energy charge

provided the payment is made within the due date.

5.2.6 For street lighting and public water works, a rebate of 15 paise/KWh on energy

charge will be given if the payment is made within the due date in case of normal or

normal-TOD meter only. It will not apply to such supply having pre-paid meter.

Page 55: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 54

5.2.7 For all consumers, excluding those covered by paragraphs 5.2.5 and 5.2.6 above

or consumers having pre-paid meters, rebate shall be given @ 2% of the amount of

the bill excluding meter rent, taxes, duties, levies and arrears (not being the arrears

due to revision of tariff) if the payment is made within the due date.

5.2.8 For industrial supply, rebate for 33 KV and 66 KV supply shall be 1% of the energy

charge and the rebate for 132 KV supply shall be 4% of the energy charge. This

rebate will be given before giving effect to rebate mentioned in paragraph 5.2.7.

5.2.9 Additional rebate of 15 paise per kWh on energy charge shall be allowed to an EHV

industrial consumer whose contract demand is 25 MVA or above and whose load

factor is not less than 75% in the billing period and whose recorded maximum

demand during the billing period is not less than 80% of the contract demand subject

to the condition that the payment is made within the due date. This rebate is in

addition to the rebates under paragraphs 5.2.1, 5.2.7 and 5.2.8. This rebate will be

given effect after giving effect to rebates mentioned in paragraphs 5.2.7 and 5.2.8.

5.2.10 Additional rebate of 5 paise per unit on energy charge shall be given to domestic and

commercial consumers under LV and MV categories covered by quarterly billing

cycle under normal or normal-TOD tariff scheme if the payment is made for the

quarter at a time within the due date stipulated for the first month of the quarter. This

rebate shall be in addition to rebate under paragraph 5.2.7 for normal meter or

normal TOD meter and will be given effect after giving effect to rebate under

paragraph 5.2.7.

5.2.11 Un-metered agricultural / irrigation consumers may make monthly payment for which

they shall be entitled to 2% rebate for timely payment within the due date in line with

the consumers of other categories as mentioned in paragraph 5.2.7. In case,

however, such agricultural/ irrigation consumers opt for advance payment of the full

annual amount, the consumers shall be allowed a rebate of 5% in addition to 2%

rebate mentioned in paragraph 5.2.7 and this additional rebate of 5% shall be given

effect after giving effect to rebate under paragraph 5.2.7.

Page 56: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 55

5.2.12 Power Factor Rebate/ Surcharge:

5.2.12.1 The power factor rebate and surcharge shall continue for those categories of

consumers to whom these are applicable at present. In addition, power factor rebate

and surcharge shall be applicable to the industrial consumers under Rate-B-ID. The

rate of rebate and surcharge and the methods of calculation of such rebate and

surcharge are given below:

Power Factor Rebate & Surcharge on Energy Charge in Percentage For Consumers under TOD Tariff

Normal Period (6.00 AM to 5.00

PM)

Peak Period (5.00 PM to 11.00

PM)

Off-peak Period (11.00 PM to 6.00

AM)

For Consumers under non-TOD

Tariff Power Factor (PF)

Range in %

Rebate in %

Surcharge in %

Rebate in %

Surcharge in %

Rebate in %

Surcharge in %

Rebate in %

Surcharge in %

PF > 97% 5.00 0.00 6.00 0.00 4.00 0.00 3.00 0.00

PF > 96% & PF < 97% 4.00 0.00 5.00 0.00 3.00 0.00 2.50 0.00

PF > 95% & PF < 96% 3.00 0.00 4.00 0.00 2.00 0.00 2.00 0.00

PF > 94% & PF < 95% 2.25 0.00 3.00 0.00 1.50 0.00 1.50 0.00

PF > 93% & PF < 94% 1.50 0.00 2.00 0.00 1.00 0.00 1.00 0.00

PF > 92% & PF < 93% 0.75 0.00 1.00 0.00 0.50 0.00 0.50 0.00

PF > 86% & PF < 92% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PF > 85% & PF < 86% 0.00 0.75 0.00 1.00 0.00 0.50 0.00 0.50

PF > 84% & PF < 85% 0.00 1.50 0.00 2.00 0.00 1.00 0.00 1.00

PF > 83% & PF < 84% 0.00 2.25 0.00 3.00 0.00 1.50 0.00 1.50

PF > 82% & PF < 83% 0.00 3.00 0.00 4.00 0.00 2.00 0.00 2.00

PF > 81% & PF < 82% 0.00 4.00 0.00 5.00 0.00 3.00 0.00 2.50

PF > 80% & PF < 81% 0.00 5.00 0.00 6.00 0.00 4.00 0.00 3.00

PF < 80% 0.00 6.00 0.00 7.00 0.00 5.00 0.00 3.50

5.2.12.2 The rebate and surcharge against different time periods shall be reflected in the bill

separately and shall be treated separately.

5.2.12.3 The power factor computation for different periods of the day shall be done subject to

regulation 3.12.5 of the New Tariff Regulations.

5.2.12.4 The above rate of power factor rebate and surcharge for different time periods under

TOD or non-TOD tariff shall be applicable from the consumption month of

Page 57: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 56

September, 2010. Prior to the consumption month of September, 2010, the rate and

method of calculation of power factor rebate and surcharge shall continue for the

consumers under TOD or non-TOD tariff, as the case may be, in accordance with the

tariff order for WBSEDCL for 2009 – 2010.

5.2.13 For short term supply, emergency supply and for supply of construction power, there

shall be no rebate or surcharge for load factor and power factor.

5.2.14 For pre-paid tariff scheme with pre-paid meter no rebate on energy charge is allowed

with effect from 01.08.2010 except for public water works. For public water-works, a

special discount of 16 paisa/KWh on energy charge is to be given in case the supply

is under pre-paid tariff scheme through prepaid meter.

5.2.15 Delayed payment surcharge shall be applicable as per regulation 4.14 of the New

Tariff Regulations.

5.2.16 For irrigation tariff under Rate-C(b), North Bengal stands for the districts of

Coochbehar, Jalpaiguri, Darjeeling, North Dinajpur, South Dinajpur and Malda.

5.2.17 All existing charges relating to meter rent, meter testing, meter replacement,

disconnection and reconnection etc. shall continue. For LT consumers, the meter

rents shall be as follows:

5.2.17.1 Meter Rent for LT consumer:

a) All types of LT single phase meter including single phase prepaid meter for domestic consumers

- Rs. 10/- per month

b) All types of LT single phase meter including single phase prepaid meter for commercial consumers

- Rs. 15/- per month

c) All types of LT single phase meter including single phase prepaid meter for irrigation consumers

- Rs. 10/- per month

d) LT single phase prepaid meter for all categories of consumers other than domestic, commercial and irrigation consumers

- Rs. 15/- per month

Page 58: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 57

e) All types of LT single phase meter (excluding prepaid meter) for all categories of consumers other than domestic, commercial and irrigation consumers

- Rs. 15/- per month

f) All types of LT three phase meter including three phase prepaid meter for domestic consumers

- Rs. 30/- per month

g) All types of LT three phase meter including three phase prepaid meter for irrigation consumers

- Rs. 25/- per month

h) LT three phase prepaid meter for all categories of consumers other than domestic and irrigation consumers

- Rs. 30/- per month

i) All types of LT three phase meter (excluding three phase prepaid meter) for all categories of consumers other than domestic and irrigation consumers

- Rs. 50/- per month

5.2.17.2 No meter rent shall be applicable for a consumer if the cost of the meter is paid by

the consumer to WBSEDCL.

5.2.17.3 A consumer opting for pre-paid meter shall not be required to make any security

deposit for the energy charge.

5.2.18 All statutory levies like Electricity Duty or any other taxes, duties etc. imposed by the

State Govt. / Central Govt. or any other competent authority shall be extra and shall

not be a part of the tariff as determined under this tariff order.

5.2.19 All the rates and conditions of tariff are effective from 1 April, 2010. However, for all

categories of consumers the tariff as per this order are applicable from the first meter

reading date on or after 1 April, 2010 and will continue till issue of further tariff order.

Adjustments, if any, for over recovery / under recovery from the energy recipients

shall be made in 6 (six) equal monthly instalments through subsequent energy bills

5.2.20 The Commission passed an order dated 25.11.2009 in Case No. FPPCA-37/09-10

allowing WBSEDCL to recover ad-hoc fuel and power purchase cost at the rate of

78.00 paise/ kWh from the consumers and other licensees from the billing month of /

Page 59: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 58

pertaining to November, 2009 till determination of tariff of WBSEDCL for 2010-11.

Now tariffs of WBSEDCL for the year 2010-11 have been determined and the same

are applicable from the first meter reading date on or after 1 April, 2010 and onwards.

The ad-hoc fuel and power purchase cost mentioned above shall not be applicable to

an energy recipient with effect from the date on which the tariff for 2010-11 comes

into effect in respect of that energy recipient.

5.2.21 In addition to the tariff determined under this tariff order, WBSEDCL would be further

entitled to additional sums towards enhanced cost of fuel and power purchase, if any,

after the date from which this tariff order takes effect. The fuel and power purchase

cost shall be subject to adjustment in accordance with the New Tariff Regulations.

5.2.22 Optional TOD tariff scheme for LT Commercial, LT Industrial and LT Public Water

Works categories of consumers having minimum contract demand of 30 KVA, which

was directed to be introduced in the Tariff Order for 2007-2008, shall continue and

energy charge under such scheme shall be computed according to regulation 4.12 of

the New Tariff Regulations, wherever applicable, if no tariff rates for such consumers

are mentioned in the tariff schedule.

5.2.23 For any pre-paid and TOD tariff scheme, other charges shall be the charges

applicable to the consumers under respective category of non-TOD tariff.

5.2.24 An applicant for short term supplies through pre-paid meter shall have to comply with

all necessary formalities for obtaining supply including payment in accordance with

the Regulations made by the Commission. The same will be subject to the following

conditions:

a) provision of space for installing weather-proof, safe and secure terminal services apparatus to protect sophisticated meter; and

b) availability of prepaid-meter of appropriate capacity

Page 60: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 59

5.2.25 A new rate namely Rate – D(2) for street lighting with metered supply and illuminated

with LED has been introduced. To avail of this rate for street lighting the supply

should be metered and all the street lights under the same meter shall be illuminated

with LED. For mixed type of street lights under one meter the Rate-D(1) shall be

applicable. The rebate for timely payment under such new Rate-D(2) shall be the

same as for street lighting as mentioned in paragraph 5.2.6.

5.2.26 A new rate namely Rate-B-ID has been introduced in Annexure 5A2. The Rate-B-ID

shall be applicable to all existing and new low and medium voltage industrial or

commercial consumers having contract demand of 50 KVA and above but not

exceeding 125 KVA. The Rate-B-ID is applicable from 1st October, 2010. Prior to

October, 2010 the tariff for these consumers shall be as per this tariff order.

5.2.27 For LT Domestic consumers with prepaid meters the tariff at uniform rate shall be

applicable from 01.08.2010. For a consumer with prepaid meter who has purchased

voucher prior to 01.08.2010, the existing voucher will continue till such voucher is

exhausted.

5.2.28 The tariffs determined under this order for different categories of consumers are the

maximum ceilings for supply of electricity at any agreed price to the consumers of

WBSEDCL only for those areas of supply of WBSEDCL where multiple licensees

exist. However, if supply is effected to a consumer at a price lesser than the upper

ceiling, and as a result the licensee incurs loss, such loss shall not be allowed to be

passed on to any other consumers or any other distribution licensees under purview

of the Commission.

5.2.29 The purchase price of electricity by WBSEDCL from other licensees shall be as per

Annexure-5A4.

Page 61: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 60

5.2.30 Where the billing cycle is quarterly, for determination of Life Line Domestic Consumer

the energy consumption of three months shall not exceed the three times of the

ceiling of monthly consumption as specified for a Life Line Domestic Consumer in the

New Tariff Regulations.

5.2.31 An un-metered Lokdeep / Kutirjyoti consumer shall be treated as a Life Line

Domestic Consumer as soon as he is provided with metered supply if his monthly

consumption and contract demand are such as specified in the New Tariff

Regulations for a Life Line Domestic Consumer. A metered Lokdeep / Kutirjyoti

consumer, who does not have the specified requirements to be considered as a Life

Line Domestic Consumer, shall be treated as a Domestic Consumer (Urban) or

Domestic Consumer (Rural), as the case may be. WBSEDCL is expected to bring all

un-metered Lokdeep / Kutirjyoti consumers under metered supply through installation

of meters within 31.03.2011 and thereafter treat those metered Lokdeep / Kutirjyoti

consumers as Life Line Domestic Consumers or Domestic Consumers under any

other category depending upon their consumptions and contract demands. The

Commission now directs WBSEDCL to inform the present status of the programme of

completion of conversion of the un-metered supply through installation of meters by

31.01.2012. However, such change of Lokdeep / Kutirjyoti consumers to any

category of the domestic consumers mentioned above shall be effective

prospectively from the first day of the next billing cycle applicable to those consumers

after such change.

5.2.32 All new consumers taking supply for the purpose of irrigation should be treated under

tariff rate of C(t) i.e. under class of consumers of “Irrigation pumping for Agriculture

(Metered).” The Commission directed WBSEDCL to shift all the existing consumers

under the category C(a) namely “Irrigation pumping for Agriculture (Metered supply

from mixed HV feeder)” to category C(t) in phases within 31.03.2011 and to keep the

Commission informed through quarterly progress report regarding such shifting. The

Page 62: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 61

Commission now directs WBSEDCL to inform the present status of the programme of

completion of this conversion by 31.01.2012.

5.2.33 The Commission directed WBSEDCL to complete the program of conversion of all

un-metered supply through installtion of metering within 31.03.2011. The

Commission now directs WBSEDCL to inform the present status of the programme of

completion of conversion of the un-metered supply through installation of meters by

31.01.2012.

5.2.34 HT domestic Rate may be applicable to private hospitals with facilities for research;

and to avail of this tariff, those hospitals are required to furnish to WBSEDCL

appropriate certificate on research undertaken by them along with other

data/information as may be required by WBSEDCL. WBSEDCL shall satisfy itself

about the veracity of the claim of such consumers and submit its report and

comments in this regard to the Commission along with its next application for APR.

After due consideration of the report and comments of WBSEDCL, the Commission

may modify the rate of such consumers in subsequent tariff order, if considered

necessary. Such consumers shall furnish every year an undertaking to WBSEDCL

stating that the power supply to their premises shall be used/ shall continue to be

used exclusively for the purpose for which the supply has been taken.

5.2.35 HT Public Utility Rate may be applicable to all non profit-making educational and

research institutions aided by the State/Central Government, charitable hospitals and

social welfare establishments owned and run by any charitable organization either

public or private; and to avail of this tariff, such consumers are to satisfy the following

conditions.

i) educational and research institutions aided by the State/Central Government

shall furnish necessary documents to indicate that they have been receiving

Page 63: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 62

from the State/Central Government such aid, which must be at least 50% of

their total annual income for the last three years consecutively;

ii) educational and research institutions aided by the State/Central Government

and the charitable hospitals and social welfare establishments owned and run

by charitable organizations either public or private shall be required to submit

their audited accounts of the last three years; and

iii) such consumers shall be required to furnish an undertaking stating that the

power supply to their institutions/ organizations shall be used and shall continue

to be used exclusively for the purpose for which the supply has been taken.

Such consumers shall apply to WBSEDCL along with the above documents and

WBSEDCL shall verify the same and shall give effect to such tariff to such

consumers, if the claim is found to be satisfactory, prospectively but not later than

three months from the date of receipt of the application with the required documents.

5.2.36 Any matter, which has not been explicitly mentioned in this order, shall be guided by

regulations 2.9.8 and 2.9.9 of the New Tariff Regulations.

5.3 It is directed that where there is any difference between the amounts appearing in the

audited annual accounts and the amounts appearing in the application for

determination of tariff or in the application for APR or in the application for FPPCA

under any head, due to adjustments, for any reason whatsoever, a reconciliation

statement is to be furnished along with such application for determination of tariff or

APR or FPPCA, as the case may be, in respect of each of such heads.

5.4 For merit order dispatch, SLDC / ALDC shall consider the energy charge of the

generating stations as determined in the prevailing tariff orders for the respective

generating companies / licensees.

Page 64: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 63

Monthly Fuel Cost Adjustment (MFCA) or Monthly Variable Cost Adjustment (MVCA)

as may be applicable shall be added to the above energy charge for merit order

dispatch as notified by WBPDCL for their respective generating stations and DPL for

the concerned month.

For power stations of NTPC or DVC, WBSEDCL shall provide on monthly basis to

SLDC / ALDC of WBSEDCL the average value of fuel related cost on the basis of last

three months which are available to WBSEDCL in order to consider such cost for

merit order dispatch. Such information shall be given to SLDC on each month for

each power station within three working days of receiving the power purchase bill for

that power station on the basis of the amount mentioned in the bill. For this purpose

for NTPC the summated amount of base energy charge and fuel price adjustment

(FPA) shall be considered as effective energy charge. Similarly for DVC the

summation of energy charge and fuel cost surcharge (FCS) shall be considered as

effective energy charge. Such effective energy charge shall then be considered by

SLDC / ALDC of WBSEDCL for merit order dispatch purpose only. In case of single

part tariff where fixed charge recovery through target availability is not done, the tariff

itself will be considered as energy charge for merit order dispatch.

5.5 The State Government has issued a letter dated 24.12.2011 citing their intention to

give subsidy to the consumers whose tariff is increased as per the modality stated in

their letter. It is mentioned in their letter that the State Government has decided to

provide subsidy to such class of consumers, for whom the re-determined tariff

structure in terms of energy charge and fixed charge/ demand charge only is higher

than the rate out of the following two rates of the following orders :

(a) tariff as per order of the Commission vide dated 29.07.2010 which was

remanded by the Appellate Tribunal for Electricity vide order dated

04.04.2011.

Page 65: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 64

(b) tariff of 2009-10 vide Commission’s order dated 28.07.2009 plus 78

paise/unit as adhoc power purchase cost vide order dated 25.11.2009.

The subsidy amount applicable for any class of consumer under any slab will

be limited to the lowest difference between the re-determined tariff rate at that

slab and any of the corresponding rate of that slab as was found as per rate in

the order as referred above under (a) and (b). The subsidy already paid by the

Sate Government in 2010-11 shall be included as already paid in the proposed

subsidy against such slab. In case if any class of consumer has already

received higher amount of subsidy in 2010-11 in accordance to the order No.

189-Power/II/1B-28/2009(Pt-II) dated 06.08.2010 than what is being now

mentioned in this letter then that extra amount shall not be recovered from

consumer and will be considered a subsidy for the year 2010-11 only. However,

the above subsidy will not be applicable to any consumer/ person who are

drawing part or full of its power requirement through open access for its power

related to backup or stand by power.

State Government has also decided that resultant shortfall in revenue

realization by WBSEDCL due to above decision under the new tariff structure

as per re-determination of tariff for 2010-11 shall be compensated by the State

Government through subsidy that is to be given by the State Govt. in the

following mechanism in order of merit.

i) Adjustment against Electricity Duty (E.D.) collected as first charge.

ii) Adjustment against interest due on State Government Loan to

WBSEDCL for the year concerned as second charge.

iii) Adjustment against principal due on State Government Loan to

WBSEDCL for the year concerned as third charge.

Page 66: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 65

iv) Payment in terms of regulation framed against section 65 of Electricity

Act, 2003 in case if all the above mechanisms do not permit to provide

the whole subsidy.

The above subsidy will be effective from 01.04.2010 till further order on the

tariff rate as per re-determination order on tariff of 2010-11. It is also

mentioned that at present Electricity duty to be collected at the present tariff

level will be around Rs. 385.00 Cr in 2011 – 12 and for principal loan

repayment due and interest payment due will be around Rs. 104.45 Cr and

Rs. 166.64 Cr respectively. According to the above principle, the Commission

may issue relevant orders.

Accordingly the Commission decides that :-

The subsidy will be effective from the date of effect of the tariff of 2010-11 under this

order of re-determined tariff and will be continued till further order by the State

Government. However, the subsidy mentioned above will not be applicable to any

consumer / person who are drawing part or full of its power requirement through open

access for its power related to back up or stand by power. The subsidy as proposed

by the State Government will be recovered by WBSEDCL through the mechanism as

stated in the letter of the State Government in order of merit.

WBSEDCL shall ensure the availability of fund from the State Government as per

proposed mechanism before giving subsidy to any class of consumers as per

provision of the Act and regulations made thereunder.

The tariff schedule as applicable to the consumers of WBSEDCL after giving the

subsidy as stated by the State Government are given at Annexure – 5B1 for LV and

MV consumers under quarterly billing cycle, at Annexure – 5B2 for LV and MV

Page 67: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 66

consumers under monthly billing cycle and at Annexure – 5B3 for HV and EHV

consumers.

WBSEDCL shall clearly indicate in the consumer/consumer’s bill (a) the amount

payable in terms of the tariff determined by the Commission (b) the amount of the

state government subsidy and (c) the net amount payable as per provisions of the

New Tariff Regulations.

5.6 In the tariff order of WBSEDCL for 2008 – 2009, issued on 30.09.2008, the

Commission had given certain directives to WBSEDCL. WBSEDCL submitted the

compliance report from time to time. Since the year 2010-11 is already over, the

Commission is not giving any further directive on those issues in this order. However,

the Commission will review those matters and will give further directives, if

necessary, in the tariff order for the third control period.

5.7 The Commission has also noticed that the Judgment order dated 11.11.2011 in OP

No 1 of 2011 of Hon’ble Appellate Tribunal for Electricity has elaborated that the fuel

and power purchase cost is uncontrollable and it has to be allowed as quickly as

possible according to the Tariff Policy. Hon’ble Appellate Tribunal has also given

directions that all the State Commissions has to ensure that Annual Performance

Review (APR) and Annual Revenue requirement and Tariff determination is

conducted year to year basis as per the time schedule specified in the Regulations.

5.8 The Commission has noticed that the Annual Accounts of WBSEDCL for the year

2010-11 has been completed and has duly been audited by the statutory auditor and

C&AG also. WBSEDCL is directed to submit their application for Fuel and Power

Purchase Cost adjustment (FPPCA) and Annual Performance Review (APR) for the

year 2010-11 immediately since the stipulated time period for submission of the

FPPCA and APR application for 2010-11 are over. WBSEDCL is also directed to

Page 68: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

West Bengal Electricity Regulatory Commission 67

submit their application for determination of tariff for the third control period

comprising of the years 2011-12, 2012-13 and 2013-14 which is already due.

5.9 In case WBSEDCL finds any discrepancy or faces any dispute regarding the amount

of subsidy for any particular category of consumers as at Annexure 5B1, 5B2 and

5B3, they may submit specific proposal through the State Government for approval of

the Commission.

5.10 WBSEDCL shall submit to the Commission a gist of this order along with the names

of at least four leading daily newspapers (at least one of which will be in English and

one in Bengali) within three working days from the date of receipt of this order for

approval of the Commission and on receipt of the approval, shall publish the

approved gist in those newspapers within four working days from the date of receipt

of the approval of the Commission.

Page 69: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A1

Energy Charge

P/kWh

1. Life Line

(Domestic )Rate

A(Dm-LL) 236 5

First 75 335Next 105 375Next 120 473Next 300 522Next 300 532

Above 900 699First 75 340Next 75 385Next 150 475Next 150 529Next 450 549

Above 900 699First 180 435Next 120 553Next 150 618Next 450 657

Above 900 699 All units 502 All units 492

First 180 440Next 120 558Next 150 618Next 450 657

Above 900 699 All units 502 All units 492

All units 454

All units

Rate A(Cm-U)t

70812 All units

23.00 hrs to 06.00 hrs.

590

17.00 hrs to 23.00 hrs.

590All units

Rate A(Cm-R)tpp

Name of the Tariff Scheme

Quarterly consumption in

KWH

06.00 hrs to 17.00 hrs

Consumer category

Prepaid- TOD

06.00 hrs to 17.00 hrs

Fixed Charge/ Demand Charge *

in Rs/KVA/mon

Fixed Charge/ Demand Charge *

in Rs/KVA/mon

06.00 hrs to 17.00 hrs

17.00 hrs to 23.00 hrs.

All units

Energy Charge

P/kWh

10

12

NOT APPLICABLE

All units

12

17.00 hrs to 23.00 hrs.

All units

17.00 hrs to 23.00 hrs.

NOT APPLICABLE

All units

578

694

23.00 hrs to 06.00 hrs.

12

23.00 hrs to 06.00 hrs.

Rate A(Cm-U)tpp 694

All units 578

Prepaid - TOD12

Sl No

Commercial (Urban)

Normal

Rate A(Dm-U)

Normal

Rate A(Dm-U)pp

12

10

Normal - TOD

Rate A(Cm-R)t

Prepaid

Normal - TOD 708

23.00 hrs to 06.00 hrs.

06.00 hrs to 17.00 hrs

2.

5.

NormalRate

A(Cm-R)

NormalRate

A(Cm-U)

Domestic (Rural)

Domestic (Urban)

Prepaid

Quarterly consumption in

KWH

Fixed Charge / Demand Charge *

in Rs/KVA/mon

Consumer category

NOT APPLICABLE

10

Energy Charge P/kWh

Rate A(Dm-R)pp

All units 454

LOW AND MEDIUM VOLTAGE CONSUMERS

10 NOT APPLICABLE

Optional tariff Scheme

Optional Tariff Scheme - IIOptional Tariff Scheme – I

3.

4.

Type of Consumer

Consumer category

Rate A(Dm-R)

Commercial (Rural)

Applicable Tariff Scheme

0 to 75

Name of the Tariff

Scheme

Normal

Quarterly consumption in KWH

Name of the Tariff

Scheme

West Bengal Electricity Regulatory Commission 68

Page 70: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A1

Energy Charge

P/kWh

Name of the Tariff Scheme

Quarterly consumption in

KWH

Consumer category

Fixed Charge/ Demand Charge *

in Rs/KVA/mon

Fixed Charge/ Demand Charge *

in Rs/KVA/mon

Energy Charge

P/kWh

Sl No

Quarterly consumption in

KWH

Fixed Charge / Demand Charge *

in Rs/KVA/mon

Consumer category

Energy Charge P/kWh

LOW AND MEDIUM VOLTAGE CONSUMERS

Optional tariff Scheme

Optional Tariff Scheme - IIOptional Tariff Scheme – I

Type of Consumer

Consumer category

Applicable Tariff Scheme

Name of the Tariff

Scheme

Quarterly consumption in KWH

Name of the Tariff

Scheme

On all units 473

On all units 520

In Municipal AreaOn all units 440

On all units 473

On all units 520

In Non Municipal Area

On all units 440

First 900 514

488 12

Rate A(Cm-PU) (Mun) pp

Prepaid

All units

On all Units

On all Units

478

First

12

above 600

412

555 17.00 hrs to 23.00 hrs.

All units

619

All units

17.00 hrs to 23.00 hrs.

All units

All units

23.00 hrs to 06.00 hrs.

All units

Rate A(Cm-II)

ppt

589

06.00 hrs to 17.00 hrs

NOT APPLICABLE

554

469

515

479

567

504

NOT APPLICABLE

12

23.00 hrs to 06.00 hrs

06.00 hrs. – 17.00 hrs. & 20.00 hrs - 23.00 hrs.

06.00 hrs. – 17.00 hrs. & 20.00 hrs - 23.00 hrs.

124786.

Public utility/ Specified Institution

Public Bodies

7. Rate

A(Cm-PU) (Non-Mun)

Rate A(Cm-PU)

(Mun)

Normal

Prepaid - TOD

Rate A(Cm-PU) (Mun) ppt

Prepaid - TOD

12

17.00 hrs to 20.00 hrs.

17.00 hrs to 20.00 hrs.

23.00 hrs to 06.00 hrs

8.

Normal

Cottage Industry / Artisan / Weavers / Small production

oriented establishment not

run by electricity as motive power

Rate A(Cm-II)

Normal

Public utility/ Specified Institution

Public Bodies

Rate A(Cm-PU) (Non-Mun)

ppt

12

On all Units 488 12

On all Units

Rate A(Cm-III)

Prepaid - TOD

Prepaid

Rate A(Cm-PU) (Non-Mun)

pp

12

300

Next 300

Above 900

9.

12

Note :- * Fixed Charge will be applicable for the Consumer having Contract Demand below 30 KVA and Demand Charge will be applicable for the consumer having Contract Demand of 30 KVA and above.

12Rate

A(Cm-III) ppt

Prepaid - TOD

23.00 hrs to 06.00 hrs.

06.00 hrs to 17.00 hrs

Normal

Poultry, Duckery, Horticulture, Tissue

culture, Floriculture, Herbal – Medicinal – Bio-

diesel Plant Farming, Food

Processing Unit

West Bengal Electricity Regulatory Commission 69

Page 71: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A2

Energy Charge

Energy Charge

P/kWh P/kWh

1. Lokdeep / KutirjyotiRate

A(Dm-K)

Rs. 46 per consumer per

month

2. Labour Line (Domestic )

Rate A(Dm-L) 429 10

06.00 hrs to 17.00 hrs All units 243 All

units 23317.00 hrs to 23.00 hrs. All units 618 All

units 59823.00 hrs to

06.00 hrs All units 176 All units 168

4.

Irrigation pumping for Agriculture (Metered

supply from mixed HV feeder )

Rate C(a) 273 20

Rs 8655 / consumer/

annum

Rs 11283/ consumer/

annumRs 10257/ consumer/

annum

Rs 13847/ consumer/

annum

STW in NB

NOT APPLICABLENOT APPLICABLE

Rate C(t)ppt

Prepaid - TOD

06.00 hrs to 17.00 hrs

17.00 hrs to 23.00 hrs.

23.00 hrs to 06.00 hrs

20

Consumer category

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Energy Charge P/kWh

Name of the Tariff Scheme

Monthly consumption in

KWH

NOT APPLICABLE

Normal All units

Rate C(b)

STW in Other District

Submersible in NB

NOT APPLICABLE

Sl No

Consumer category

3. Irrigation pumping for

Agriculture (Metered)

Consumer category

Name of the Tariff Scheme

Optional Tariff Scheme – IMonthly consumption

in KWHName of the

Tariff Scheme

NOT APPLICABLE

Rate C(t)

Normal TOD

Submersible in Other District

LOW AND MEDIUM VOLTAGE CONSUMERS

Optional tariff SchemeOptional Tariff Scheme - II

5.

Type of Consumer

Irrigation pumping for Agriculture (Un-

Metered)Normal

Applicable Tariff Scheme

Normal 0 to 25 NOT APPLICABLE NOT APPLICABLE

Normal All units NOT APPLICABLE

20

NOT APPLICABLE

Monthly consumption in

KWH

Fixed Charge/ Demand Charge* in Rs/KVA/mon

West Bengal Electricity Regulatory Commission 70

Page 72: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A2

Energy Charge

Energy Charge

P/kWh P/kWh

Consumer category

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Energy Charge P/kWh

Name of the Tariff Scheme

Monthly consumption in

KWH

Sl No

Consumer category

Consumer category

Name of the Tariff Scheme

Optional Tariff Scheme – IMonthly consumption

in KWHName of the

Tariff Scheme

LOW AND MEDIUM VOLTAGE CONSUMERS

Optional tariff SchemeOptional Tariff Scheme - II

Type of Consumer

Applicable Tariff Scheme

Monthly consumption in

KWH

Fixed Charge/ Demand Charge* in Rs/KVA/mon

06.00 hrs to 17.00 hrs

All units 550

17.00 hrs to 23.00 hrs.

All units 694

23.00 hrs to 06.00 hrs

All units 514

06.00 hrs to 17.00 hrs

All units 309

17.00 hrs to 23.00 hrs.

All units 671

23.00 hrs to 06.00 hrs All units 233

06.00 hrs to 17.00 hrs

All units 555

17.00 hrs to 23.00 hrs. All units 747

23.00 hrs to 06.00 hrs All units 517

06.00 hrs to 17.00 hrs

All units 565

17.00 hrs to 23.00 hrs. All units 622

23.00 hrs to 06.00 hrs All units 525

6.

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLERate A(ST)

Rate A(Cm)-STCP

Rate A(Cm) - CP

Prepaid- TOD

NOT APPLICABLE

12

24 NOT APPLICABLE

NOT APPLICABLE

9.

12 NOT APPLICABLE

Short-term Supply

NOT APPLICABLECommercial Plantation

Rate C(t) - STIS

Prepaid - TOD

Prepaid- TOD 20Short Term Irrigation Supply

Short Term supply for Commercial Plantation

7.

8. Prepaid- TOD

West Bengal Electricity Regulatory Commission 71

Page 73: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A2

Energy Charge

Energy Charge

P/kWh P/kWh

Consumer category

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Energy Charge P/kWh

Name of the Tariff Scheme

Monthly consumption in

KWH

Sl No

Consumer category

Consumer category

Name of the Tariff Scheme

Optional Tariff Scheme – IMonthly consumption

in KWHName of the

Tariff Scheme

LOW AND MEDIUM VOLTAGE CONSUMERS

Optional tariff SchemeOptional Tariff Scheme - II

Type of Consumer

Applicable Tariff Scheme

Monthly consumption in

KWH

Fixed Charge/ Demand Charge* in Rs/KVA/mon

All Units 471

All Units 707

All Units 325

Next 1500 566 All Units

AllAll

Units 330

Next 1500 581 All Units 714

Above 2000 607 All Units 337

13. Street LightingRate D(1) 445 18

14. Street Lighting with LEDRate D(2) 280 18

Normal On all Units NOT APPLICABLE NOT APPLICABLE

NOT APPLICABLENOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLENormal -

TOD

Rate B(I-U) t 18

All Units 500

70017.00 hrs to 23.00 hrs

18 Normal - TOD

23.00 hrs to 06.00 hrs

17.00 hrs to 23.00 hrs

2000

First 500

451

463

Above

1811. Industry (Rural)

12.

587

Rate B(I-U)

NormalRate

B(I-R)

First 500

Normal On all Units

NormalIndustry (Urban)

06.00 hrs. – 17.00 hrs. & 20.00 hrs -

23.00 hrs.

On all Units10.

23.00 hrs to 06.00 hrs

Public Water Works & Sewerage System 18 18Rate

B (II)Normal NOT APPLICABLE481 17.00 hrs to 20.00

hrs.

Rate B(I-R) t 18

All Units 510

23.00 hrs to 06.00 hrs

06.00 hrs to 17.00 hrs

06.00 hrs to 17.00 hrs

Rate B(II) tpp

Prepaid - TOD

West Bengal Electricity Regulatory Commission 72

Page 74: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A2

Energy Charge

Energy Charge

P/kWh P/kWh

Consumer category

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Energy Charge P/kWh

Name of the Tariff Scheme

Monthly consumption in

KWH

Sl No

Consumer category

Consumer category

Name of the Tariff Scheme

Optional Tariff Scheme – IMonthly consumption

in KWHName of the

Tariff Scheme

LOW AND MEDIUM VOLTAGE CONSUMERS

Optional tariff SchemeOptional Tariff Scheme - II

Type of Consumer

Applicable Tariff Scheme

Monthly consumption in

KWH

Fixed Charge/ Demand Charge* in Rs/KVA/mon

On all Units 497

On all Units 547On all Units 462

06.00 hrs to 17.00 hrs

On all Units 625

17.00 hrs to 23.00 hrs

On all Units 925

23.00 hrs to 06.00 hrs

On all Units 438

06.00 hrs. – 17.00 hrs. & 20 .00 hrs to

23.00 hrs

On all Units 555

17.00 hrs to 20.00 hrs.

On all Units 816

23.00 hrs to 06.00 hrs

On all Units 372

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

Rate D(4) t

NOT APPLICABLE

18

23.00 hrs to 06.00 hrs

Normal - TOD

06.00 hrs to 17.00 hrs & 20.00 hrs to

23.00 hrs

17.00 hrs to 20.00 hrs

Private Educational Institutions and Hospitals

Rate D(4)

24

18503On all Units15. Normal

Prepaid- TOD

Prepaid-TOD

Emergency Supply

Rate D(6)

16.

Construction Power Supply

17.

Rate D(5)

12

West Bengal Electricity Regulatory Commission 73

Page 75: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A2

Energy Charge

Energy Charge

P/kWh P/kWh

Consumer category

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Fixed Charge/ Demand Charge*

in Rs/KVA/mon

Energy Charge P/kWh

Name of the Tariff Scheme

Monthly consumption in

KWH

Sl No

Consumer category

Consumer category

Name of the Tariff Scheme

Optional Tariff Scheme – IMonthly consumption

in KWHName of the

Tariff Scheme

LOW AND MEDIUM VOLTAGE CONSUMERS

Optional tariff SchemeOptional Tariff Scheme - II

Type of Consumer

Applicable Tariff Scheme

Monthly consumption in

KWH

Fixed Charge/ Demand Charge* in Rs/KVA/mon

On all Units 484

On all Units 532

On all Units 442

06.00 hrs. – 17.00 hrs. & 20 .00 hrs to

23.00 hrs

On all Units 525

17.00 hrs to 20.00 hrs.

On all Units 735

23.00 hrs to 06.00 hrs

On all Units 352

On all Units 530

On all Units 682On all Units 393

537All units

NOT APPLICABLE

Rate B- IDt 264Normal TOD NOT APPLICABLE17.00 hrs to 23.00 hrs.

23.00 hrs to 06.00 hrs

1219. Common Services of

Industrial EstateRate D(8) Prepaid - TOD

NOT APPLICABLENormal -

TOD 18

23.00 hrs to 06.00 hrs

06.00 hrs to 17.00 hrs

17.00 hrs to 23.00 hrs

Rate D(7)t

06.00 hrs. – 17.00 hrs.

NOT APPLICABLE

489All units18. Normal

Normal

Bulk Supply at single point to Co-operative

Group Housing Society for providing power to its members or person for providing power to its employees in a single

premises

Commercial and Industrial consumers (50 KVA and above but upto

125 KVA)

20.

18

264Rate B- ID

Rate D(7)

Note :- * Fixed Charge will be applicable for the Consumer having Contract Demand below 30 KVA and Demand Charge will be applicable for the consumer having Contract Demand of 30 KVA and above.

West Bengal Electricity Regulatory Commission 74

Page 76: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A3

Demand Charge

Demand Charge

Summer Monsoon WinterSummer Monsoon Winter

06.00 hrs-17.00 hrs

&20.00 hrs-23.00 hrs

17.00 hrs-20.00 hrs

All Units 562 559 556

23.00 hrs-06.00 hrs

All Units 338 337 33606.00 hrs-17.00 hrs

&20.00 hrs-23.00 hrs

17.00 hrs-20.00 hrs

All Units 552 549 546

23.00 hrs-06.00 hrs

All Units 333 331 33006.00 hrs-17.00 hrs

All Units 531 530 52917.00 hrs-23.00 hrs

All Units 683 682 681

23.00 hrs- 06.00 hrs

All Units 394 393 392

06.00 hrs-17.00 hrs

All Units 503 501 49917.00 hrs-23.00 hrs

All Units 644 641 63823.00 hrs- 06.00 hrs

All Units 376 375 373

P/kWh

All Units

Normal - TOD

Rate E(b) Rate E(bt)

264

415

434 432

536

264

Normal - TOD

422 420 418

413

Rate F(bt)

264

HIGH & EXTRA HIGH VOLTAGE CONSUMERS

Industries (11 KV)

Industries (33 KV)

264

Normal - TOD 264

264

Rate F(at)

411

264

Normal - TOD

All Units

3 Normal All Units

5074 Rate F(b) Normal

Public Utility (11 KV) 439 437

Name of the Tariff

Scheme

Rate E(at)

All Units 509

Optional Tariff Scheme

Consumer category

Name of the Tariff

Scheme

Consumption per month in KWH

Energy Charge

P/kWh

Consumer category

Consumption per month in KWH

Energy Charge

(Rs./ KVA/ month)

Sl No

Type of Consumer Applicable Tariff Scheme

1 Normal All Units 441Rate E(a) 264

(Rs./ KVA/ month)

All Units 436

511

538 537

Public Utility (33 KV)

Rate F(a) Normal2

West Bengal Electricity Regulatory Commission 75

Page 77: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A3

Demand Charge

Demand Charge

Summer Monsoon WinterSummer Monsoon Winter

P/kWh

HIGH & EXTRA HIGH VOLTAGE CONSUMERS

Name of the Tariff

Scheme

Optional Tariff Scheme

Consumer category

Name of the Tariff

Scheme

Consumption per month in KWH

Energy Charge

P/kWh

Consumer category

Consumption per month in KWH

Energy Charge

(Rs./ KVA/ month)

Sl No

Type of Consumer Applicable Tariff Scheme

(Rs./ KVA/ month)

06.00 hrs-17.00 hrs

All Units 492 490 48817.00 hrs-23.00 hrs

All Units 629 626 62323.00 hrs- 06.00 hrs

All Units 369 367 36606.00 hrs-17.00 hrs

All Units 425 423 42117.00 hrs-23.00 hrs

All Units 548 545 54223.00 hrs- 06.00 hrs

All Units 319 318 31706.00 hrs-17.00 hrs

All Units 405 403 40117.00 hrs-23.00 hrs

All Units 522 519 51623.00 hrs- 06.00 hrs

All Units 304 303 30206.00 hrs-17.00 hrs

All Units 450 448 44917.00 hrs-23.00 hrs

All Units 600 597 59923.00 hrs- 06.00 hrs

All Units 300 298 29906.00 hrs-17.00 hrs

All Units 495 493 49117.00 hrs-23.00 hrs

All Units 634 631 62823.00 hrs- 06.00 hrs

All Units 371 370 369

NOT APPLICABLE

Industries (400 KV)

7

Commercial Plantation

Normal - TOD

Rate S(cpt)

8

All Units

9

5Industries (132 KV)

Community Irrigation/ Irrigation

264

NOT APPLICABLE

264

264 NOT APPLICABLE

264

264

Rate H(bt)

NOT APPLICABLE

Normal - TOD

Normal - TOD 24Rate S(gt)

503507 505

Normal - TOD

Rate J(bt)

6Industries (220KV)

Rate I(bt)Normal -

TOD

Rate H(b) Normal

West Bengal Electricity Regulatory Commission 76

Page 78: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A3

Demand Charge

Demand Charge

Summer Monsoon WinterSummer Monsoon Winter

P/kWh

HIGH & EXTRA HIGH VOLTAGE CONSUMERS

Name of the Tariff

Scheme

Optional Tariff Scheme

Consumer category

Name of the Tariff

Scheme

Consumption per month in KWH

Energy Charge

P/kWh

Consumer category

Consumption per month in KWH

Energy Charge

(Rs./ KVA/ month)

Sl No

Type of Consumer Applicable Tariff Scheme

(Rs./ KVA/ month)

06.00 hrs-17.00 hrs

All Units 490 486 48817.00 hrs-23.00 hrs

All Units 650 644 64723.00 hrs- 06.00 hrs

All Units 328 326 32706.00 hrs-17.00 hrs

All Units 505 503 50117.00 hrs-23.00 hrs

All Units 646 643 64023.00 hrs- 06.00 hrs

All Units 379 378 37706.00 hrs-17.00 hrs

All Units 543 541 53917.00 hrs-23.00 hrs

All Units 740 737 73423.00 hrs- 06.00 hrs

All Units 421 419 41706.00 hrs-17.00 hrs

All Units 521 520 51917.00 hrs-23.00 hrs

All Units 707 706 70423.00 hrs- 06.00 hrs

All Units 406 405 404

NOT APPLICABLE

Rate E( ct ) 264

264Normal - TOD

NOT APPLICABLE

Normal - TOD

Rate S(cpt-st) 264

533

558

537 264

556

Rate F(ct)

All Units

554

11

24

Commercial (33 KV)

Rate F( c )

Normal - TOD

535

Normal All Units 264

Short Term Supply for Commercial

Plantation

Rate S(gt-st)

Short Term Irrigation Supply

Normal - TOD

10

13 Normal

Commercial (11 KV)

Rate E( c )

12

West Bengal Electricity Regulatory Commission 77

Page 79: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A3

Demand Charge

Demand Charge

Summer Monsoon WinterSummer Monsoon Winter

P/kWh

HIGH & EXTRA HIGH VOLTAGE CONSUMERS

Name of the Tariff

Scheme

Optional Tariff Scheme

Consumer category

Name of the Tariff

Scheme

Consumption per month in KWH

Energy Charge

P/kWh

Consumer category

Consumption per month in KWH

Energy Charge

(Rs./ KVA/ month)

Sl No

Type of Consumer Applicable Tariff Scheme

(Rs./ KVA/ month)

06.00 hrs-17.00 hrs

All Units 505 503 50117.00 hrs-23.00 hrs

All Units 547 545 54323.00 hrs- 06.00 hrs

All Units 384 382 38006.00 hrs-17.00 hrs

All Units 505 503 50117.00 hrs-23.00 hrs

All Units 557 555 55323.00 hrs- 06.00 hrs

All Units 455 453 45206.00 hrs-

17.00 hrs &

20.00 hrs-23.00 hrs

17.00 hrs-20.00 hrs

All Units 567 564 56123.00 hrs-06.00 hrs

All Units 340 339 33806.00 hrs-

17.00 hrs &

&

20.00 hrs-23.00 hrs

17.00 hrs-20.00 hrs

All Units 560 557 55423.00 hrs-06.00 hrs

All Units 336 334 332

264Normal - TOD

24

445 Normal - TOD264

440 438

443 441 Rate E(pwt)

43617Rate F(pw)

Normal

Normal - TOD

Rate F(pwt)264

520 516 264518 Rate H(ct)

24 Rate S(dt)

All Units

All UnitsNormal

Normal All Units

Normal

528 526530

All UnitsPublic Water

Works & Sewerage (33 KV)

14

15

Public Water Works & Sewerage

(11 KV)

DomesticRate S(d)

Commercial (132 KV)

Rate H(c)

16Rate

E (pw)

420 418 416

All Units

264

425 423 421

264

All Units

Normal - TOD

West Bengal Electricity Regulatory Commission 78

Page 80: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A3

Demand Charge

Demand Charge

Summer Monsoon WinterSummer Monsoon Winter

P/kWh

HIGH & EXTRA HIGH VOLTAGE CONSUMERS

Name of the Tariff

Scheme

Optional Tariff Scheme

Consumer category

Name of the Tariff

Scheme

Consumption per month in KWH

Energy Charge

P/kWh

Consumer category

Consumption per month in KWH

Energy Charge

(Rs./ KVA/ month)

Sl No

Type of Consumer Applicable Tariff Scheme

(Rs./ KVA/ month)

06.00 hrs-17.00 hrs

All Units 402 401 40017.00 hrs-23.00 hrs

All Units 524 523 52123.00 hrs- 06.00 hrs

All Units 326 325 32406.00 hrs-17.00 hrs

All Units 535 533 53117.00 hrs-23.00 hrs

All Units 689 686 68323.00 hrs- 06.00 hrs

All Units 405 403 40106.00 hrs-

17.00 hrs & 20.00 hrs.- 23.00 hrs

All Units 550 548 546

17.00 hrs-20.00 hrs

All Units 710 707 70423.00 hrs-06.00 hrs

All Units 414 412 410

NOT APPLICABLE

NOT APPLICABLENormal-

TOD

21Construction Power Supply

Rate S(con)

Emergency SupplyRate S(es)

Normal-TOD

Sports Complex & Auditorium run by Govt./ local bodies for cultural affairs

Rate S(c )

Cold storage or Dairies with

Chilling Plant

Rate S(f)

19

526

408

20

Normal

Normal

18

Normal - TOD264 Rate

S(ft)

264

24

NOT APPLICABLE

264

264

528529

All Units

All Units

410 409

West Bengal Electricity Regulatory Commission 79

Page 81: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure-5A3

Demand Charge

Demand Charge

Summer Monsoon WinterSummer Monsoon Winter

P/kWh

HIGH & EXTRA HIGH VOLTAGE CONSUMERS

Name of the Tariff

Scheme

Optional Tariff Scheme

Consumer category

Name of the Tariff

Scheme

Consumption per month in KWH

Energy Charge

P/kWh

Consumer category

Consumption per month in KWH

Energy Charge

(Rs./ KVA/ month)

Sl No

Type of Consumer Applicable Tariff Scheme

(Rs./ KVA/ month)

06.00 hrs-17.00 hrs

All Units 480 478 476

17.00 hrs-23.00 hrs

All Units 530 528 526

23.00 hrs- 06.00 hrs

All Units 432 430 428

06.00 hrs-17.00 hrs & 20.00 hrs.- 23.00 hrs

All Units 525 523 521

17.00 hrs-20.00 hrs

All Units 675 672 66923.00 hrs-06.00 hrs

All Units 398 397 396

24Traction (25

KV)Rate T (a) Normal 507 505 502 264

25Traction (132

KV)Rate T (b) Normal 477 475 472 264

06.00 hrs-17.00 hrs

All Units 520 518 516

17.00 hrs-23.00 hrs

All Units 557 555 553

23.00 hrs- 06.00 hrs

All Units 494 492 490

06.00 hrs-17.00 hrs

All Units 530 528 526

17.00 hrs-23.00 hrs

All Units 568 566 564

23.00 hrs- 06.00 hrs

All Units 503 502 501

Rate E (ct-ei)

Normal - TOD264542 540 538

264

All Units27Private Educational

InstitutionsRate

E (c-ei)Normal

26 Short-term SupplyNormal -

TODRate S(st)

Rate S(cot)

Normal - TOD

Rate S(co)

All Units

All Units

Normal

23Common Services of Industrial Estate

Rate E (ct-cs)

22

Bulk Supply at single point to Co-operative Group Housing Society

for providing power to its members or person for

providing power to its employees in a single premises

264

510 506508 24All Units

264

NOT APPLICABLE

24Normal - TOD

NOT APPLICABLE

NOT APPLICABLE

NOT APPLICABLE

West Bengal Electricity Regulatory Commission 80

Page 82: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

Order for re-determination of tariff of WBSEDCL for the year 2010 – 2011

ANNEXURE-5A4

West Bengal Electricity Regulatory Commission 81

ENERGY PURCHASE RATE OF WBSEDCL FROM DPL IN

132 KV IN PAISA / KWH FOR 2010 – 2011

Period Summer Monsoon Winter Peak 281.50 276.50 273.50 Normal 276.50 271.50 266.50 Off Peak 271.50 266.50 262.50

ENERGY PURCHASE RATE OF WBSEDCL FROM LICENSEES OF WBERC IN RADIAL MODE IN PAISA / KWH FOR 2010 – 2011

Licensee Summer Monsoon Winter DPL – 11 & 33 KV 329 326 324 DPSCL 475 473 471 CESC 476 473 469 Note: In radial mode no separate tariff is provided for peak, normal and off-peak period.

Page 83: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

LOW AND MEDIUM VOLTAGE CONSUMERS

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure - 5B1

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Fixed Ch./ 

Demand Ch.Energy Ch.

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

1Life line 

(Domestic)

Rate A 

(Dm‐LL)Normal

Applicable 

Tariff Scheme5 236 2.5 0 2.5 236

First 75 335 30 305Next 105 375 30 345Next 120 473 13 460Next 300 522 17 505Next 300 532 17 515Above 900 699 14 685

Rate

A(Dm‐R)ppPrepaid

Optional 

Tariff Scheme10 454 5 54 5 400

First 75 340 30 310Next 75 385 36 349Next 150 475 13 462

Next 150 529 17 512Next 450 549 17 532Above 900 699 14 685

Rate

A(Dm‐U)ppPrepaid

Optional 

Tariff Scheme10 454 5 54 5 400

First 180 435 54 381Next 120 553 54 499Next 150 618 14 604Next 450 657 17 640Above 900 699 9 6906.00 hrs to 

17.00 hrsAll Units 590 105 485

17.00 hrs to 

23.00 hrsAll Units 708 174 534

23.00 hrs to 

6.00 hrsAll Units 502 45 457

6.00 hrs to 

17.00 hrsAll Units 578 101 477

17.00 hrs to 

23.00 hrsAll Units 694 171 523

23.00 hrs to 

6.00 hrsAll Units 492 43 449

First 180 440 54 386Next 120 558 54 504Next 150 618 14 604Next 450 657 17 640Above 900 699 9 6906.00 hrs to 

17.00 hrsAll Units 590 105 485

17.00 hrs to 

23.00 hrsAll Units 708 174 534

23.00 hrs to 

6.00 hrsAll Units 502 45 457

6.00 hrs to 

17.00 hrsAll Units 578 101 477

17.00 hrs to 

23.00 hrsAll Units 694 171 523

23.00 hrs to 

6.00 hrsAll Units 492 43 449

Sl 

No

Type of 

ConsumerConsumer categorty

Name of the Tariff 

Scheme

Quarterly consumptions 

in KWH

10

2

12

Normal

2 10

2 10

10

Optional 

Tariff Scheme

Rate A

(Cm‐U)t

Normal‐

TOD12 2

All units

All units

Domestic

(Urban)

Rate 

A(Cm‐R)t

Normal‐

TOD

Rate 

A (Cm‐R)Normal

Rate A 

(Dm‐U)Normal

212

Govt Subsidy

5

5

10

Net rate after subsidy

5

5

2

0‐75

Commercial 

(Urban)

Rate 

A(Cm‐U)tpp

Prepaid‐

TOD

Rate 

A (Cm‐U)

Prepaid‐

TOD

Rate 

A(Cm‐R)tpp

Commercial 

(Rural)

Domestic

(Rural)

Rate A 

(Dm‐R)

As per order of WBERC 

for re‐determination 

of tariff for 2010‐11

10

10

12

Normal

10

12

12

Applicable 

Tariff Scheme

Applicable 

Tariff Scheme

Applicable 

Tariff Scheme

Optional 

Tariff Scheme

Applicable 

Tariff Scheme

Optional 

Tariff Scheme

Optional 

Tariff Scheme

2

3

4

5

West Bengal Electricity Regulatory Commission 82

Page 84: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

LOW AND MEDIUM VOLTAGE CONSUMERS

Order for re-determination of tariff of WBSEDCL for the year 2010 - 2011

Annexure - 5B1

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Fixed Ch./ 

Demand Ch.Energy Ch.

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Sl 

No

Type of 

ConsumerConsumer categorty

Name of the Tariff 

Scheme

Quarterly consumptions 

in KWH

Govt Subsidy Net rate after subsidyAs per order of WBERC 

for re‐determination 

of tariff for 2010‐11

Rate 

A(Cm‐PU)(Mun)Normal

Applicable 

Tariff Scheme12 488 2 24 10 464

Rate

 A(Cm‐PU)(Mun)ppPrepaid

Optional 

Tariff Scheme12 478 2 23 10 455

6.00 hrs to 

17.00 hrs & 

20.00 hrs to 

23.00 hrs

All Units 473 23 450

17.00 hrs to 

20.00 hrsAll Units 520 25 495

in Municipal 

Area

23.00 hrs to 

6.00 hrsAll Units 440 22 418

Rate 

A(Cm‐PU)

(Non‐Mun)

NormalApplicable 

Tariff Scheme12 488 2 24 10 464

Rate 

A(Cm‐PU)(Mun)ppPrepaid

Optional 

Tariff Scheme12 478 2 23 10 455

6.00 hrs to 

17.00 hrs & 

20.00 hrs to 

23.00 hrs

All Units 473 23 450

17.00 hrs to 

20.00 hrsAll Units 520 25 495

in Non 

Municipal 

Area

23.00 hrs to 

6.00 hrsAll Units 440 22 418

First 300 412 0 412Next 300 555 0 555Above 600 589 0 5896.00 hrs to 

17.00 hrsAll Units 515 0 515

17.00 hrs to 

23.00 hrsAll Units 567 0 567

23.00 hrs to 

6.00 hrsAll Units 479 0 479

First 900 514 0 514Above 900 619 0 6196.00 hrs to 

17.00 hrsAll Units 504 0 504

17.00 hrs to 

23.00 hrsAll Units 554 0 554

23.00 hrs to 

6.00 hrsAll Units 469 0 469

10

Poultry,Ducke

ry,Hortycultur

e,floriculture,

Herbal‐

Medicinal/Bio‐

diesel plant 

Farming,Food 

Processing 

Unit

Optional 

Tariff Scheme

Rate

 A (Cm‐III)ppt

Prepaid‐

TOD12 2

10Cottage 

Industry/ 

Artisan/Weav

ers/Small 

Production 

oriented 

establishment 

in Non 

Municipal 

area & not 

run by 

electricity as 

motive power

Rate 

A (Cm‐II)ppt

Prepaid‐

TOD

Rate 

A (Cm‐II)Normal 12 2

10

Publicutility/ 

Specified 

Institution/ 

Public Bodies

All Units

All Units

Rate 

A(Cm‐PU)(Mun)ppt

Prepaid‐

TOD12 2

2 10Rate 

A(Cm‐PU)(Mun)ppt

Publicutility/ 

Specified 

Institution/ 

Public Bodies

All Units

All Units

Rate 

A (Cm‐III)Normal 12

12Optional 

Tariff Scheme

Applicable 

Tariff Scheme

Prepaid‐

TOD12

102

102

Optional 

Tariff Scheme

Applicable 

Tariff Scheme

Optional 

Tariff Scheme

7

8

9

6

West Bengal Electricity Regulatory Commission 83

Page 85: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

LOW AND MEDIUM VOLTAGE CONSUMERS

Order for re‐determination of Tariff of WBSEDCL for the year 2010 ‐ 2011

Annexure‐5B2

Fixed Ch./ 

Demand 

Ch.

Energy 

Ch.

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Fixed Ch./ 

Demand 

Ch.

Energy Ch.

Rs./KVA/m

onP/kwh

Rs./KVA/mo

nP/kwh

Rs./KVA/m

onP/kwh

1 Lokdeep Rate‐ A(Dm‐K) Normal

Applicable 

Tariff 

Scheme

Rs 46 per 

consumer 

per month

Rs 16 / 

Consumer/ 

Month

Rs 30per 

consumer 

per month

2 Labourline Rate A (Dm‐L) Normal

Applicable 

Tariff 

Scheme

10 429 5 15 5 414

First 500 451 0 451Next 1500 566 0 566Above 2000 587 0 587

6.00 hrs to 

17.00 hrsAll Units 500 0 500

17.00 hrs to 

23.00 hrsAll Units 700 0 700

23.00 hrs to 

6.00 hrsAll Units 330 0 330

First 500 463 0 463

Next 1500 581 0 581Above 2000 607 0 607

6.00 hrs to 

17.00 hrsAll Units 510 0 510

17.00 hrs to 

23.00 hrsAll Units 714 0 714

23.00 hrs to 

6.00 hrsAll Units 337 0 337

Rate B(II)  Normal

Applicable 

Tariff 

Scheme

18 481 3 24 15 457

6.00 hrs to 

17.00 hrs & 

20.00 hrs to 

23.00 hrs

All Units 471 23 448

17.00 hrs to 

20.00 hrsAll Units 707 35 672

23.00 hrs to 

6.00 hrsAll Units 325 16 309

6

Irrigation 

pumping for 

Agriculture 

(Metered 

supply from 

mixed HV 

feeder)

Rate C (a) Normal

Applicable 

Tariff 

Scheme

20 273 10 30 10 243

Applicable 

Tariff 

Scheme

8655per 

annum420

per 

annum8235

per 

annum

Applicable 

Tariff 

Scheme

11283per 

annum547

per 

annum10736

per 

annum

Applicable 

Tariff 

Scheme

10257per 

annum497

per 

annum9760

per 

annum

Applicable 

Tariff 

Scheme

13847per 

annum671

per 

annum13176

per 

annum

Sl NoType of 

Consumer

Consumer 

categorty

Prepaid‐TOD 18Rate B(II)tpp

Public Water 

Works

Net rate after subsidy

18

15

3 15

As per order of 

WBERC for re‐

determination of 

tariff for 2010‐11

Govt Subsidy

15

15

Monthly consumptions 

in KWH

Irrigation 

pumping for 

Agriculture(Un‐

Metered)

Rate C (b)

Industrial ( 

Urban)

Rate B (I‐U) Normal

Name of the Tariff 

Scheme

Rate B(I‐U)t Normal‐TOD

3

18

18

18

Normal

STW in NB

STW in other districts

Submersible pump in 

NB

Submersible pump in 

other districts

Industrial 

(Rural)

Rate B (I‐R) Normal

Rate B(I‐R)t Normal‐TOD

Optional 

Tariff 

Scheme

Optional 

Tariff 

Scheme

Optional 

Tariff 

Scheme

0 to 25

All unit

All Units

All Units

3

3

3

Applicable 

Tariff 

Scheme

15

Applicable 

Tariff 

Scheme

3

4

5

7

West Bengal Electricity Regulatory Commission 84

Page 86: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

LOW AND MEDIUM VOLTAGE CONSUMERS

Order for re‐determination of Tariff of WBSEDCL for the year 2010 ‐ 2011

Annexure‐5B2

Fixed Ch./ 

Demand 

Ch.

Energy 

Ch.

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Fixed Ch./ 

Demand 

Ch.

Energy Ch.

Rs./KVA/m

onP/kwh

Rs./KVA/mo

nP/kwh

Rs./KVA/m

onP/kwh

Sl NoType of 

Consumer

Consumer 

categorty

Net rate after subsidy

As per order of 

WBERC for re‐

determination of 

tariff for 2010‐11

Govt Subsidy

Monthly consumptions 

in KWH

Name of the Tariff 

Scheme

6.00 hrs to 

17.00 hrsAll Units 243 25 218

17.00 hrs to 

23.00 hrsAll Units 618 30 588

23.00 hrs to 

6.00 hrsAll Units 176 19 157

6.00 hrs to 

17.00 hrsAll Units 233 15 218

17.00 hrs to 

23.00 hrsAll Units 598 10 588

23.00 hrs to 

6.00 hrsAll Units 168 16 152

9 Street Lighting Rate ‐D(1) Normal

Applicable 

Tariff 

Scheme

18 445 3 24 15 421

10Street Lighting 

with LEDRate ‐D(2) Normal

Applicable 

Tariff 

Scheme

18 280 3 24 15 256

Rate‐D(4) Normal

Applicable 

Tariff 

Scheme

18 503 3 24 15 479

6.00 hrs to 

17.00 hrsAll Units 497 23 474

17.00 hrs to 

23.00 hrsAll Units 547 27 520

23.00 hrs to 

6.00 hrsAll Units 462 16 446

6.00 hrs to 

17.00 hrsAll Units 625 0 625

17.00 hrs to 

23.00 hrsAll Units 925 0 925

23.00 hrs to 

6.00 hrsAll Units 438 0 438

6.00 hrs to 

17.00 hrs & 

20.00 hrs to 

23.00 hrs

All Units 555 0 555

17.00 hrs to 

20.00 hrsAll Units 816 0 816

23.00 hrs to 

6.00 hrsAll Units 372 0 372

Rate‐D(7) Normal

Applicable 

Tariff 

Scheme

18 489 3 24 15 465

6.00 hrs to 

17.00 hrsAll Units 484 24 460

17.00 hrs to 

23.00 hrsAll Units 532 26 506

23.00 hrs to 

6.00 hrsAll Units 442 22 420

Irrigation 

pumping for 

Agriculture 

(Metered)

Rate C(t)

18

12

Prepaid‐TOD 20

All Units

All Units

All Units

24

18

4

Normal‐TOD 20

Emergency Rate D(5)

Rate C(t)ppt

Normal‐TOD

Bulk Supply at 

single point to 

Co‐operative 

Group Housing 

Society for 

providing 

power to its 

members or 

person for 

providing 

power to its 

employees in a 

single premises

Rate D(6) Prepaid‐TOD

Prepaid‐TOD

All Units

Rate‐ D(7)t Prepaid‐TOD

For private 

educational 

institutions and 

educational 

hospital Rate D(4)t

Construction 

Power Supply

10

3

2

3

10

Applicable 

Tariff 

Scheme

15

10

20

15

10

10

Optional 

Tariff 

Scheme

Optional 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

8

11

12

13

14

West Bengal Electricity Regulatory Commission 85

Page 87: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

LOW AND MEDIUM VOLTAGE CONSUMERS

Order for re‐determination of Tariff of WBSEDCL for the year 2010 ‐ 2011

Annexure‐5B2

Fixed Ch./ 

Demand 

Ch.

Energy 

Ch.

Fixed Ch./ 

Demand Ch.

Energy 

Ch.

Fixed Ch./ 

Demand 

Ch.

Energy Ch.

Rs./KVA/m

onP/kwh

Rs./KVA/mo

nP/kwh

Rs./KVA/m

onP/kwh

Sl NoType of 

Consumer

Consumer 

categorty

Net rate after subsidy

As per order of 

WBERC for re‐

determination of 

tariff for 2010‐11

Govt Subsidy

Monthly consumptions 

in KWH

Name of the Tariff 

Scheme

6.00 hrs to 

17.00 hrsAll Units 550 0 550

17.00 hrs to 

23.00 hrsAll Units 694 0 694

23.00 hrs to 

6.00 hrsAll Units 514 0 514

6.00 hrs to 

17.00 hrsAll Units 309 24 285

17.00 hrs to 

23.00 hrsAll Units 671 24 647

23.00 hrs to 

6.00 hrsAll Units 233 24 209

6.00 hrs to 

17.00 hrsAll Units 555 0 555

17.00 hrs to 

23.00 hrsAll Units 747 0 747

23.00 hrs to 

6.00 hrsAll Units 517 0 517

6.00 hrs to 

17.00 hrsAll Units 565 0 565

17.00 hrs to 

23.00 hrsAll Units 622 0 622

23.00 hrs to 

6.00 hrsAll Units 525 0 525

6.00 hrs to 

17.00 hrs & 

20.00 hrs to 

23.00 hrs

All Units 525 0 525

17.00 hrs to 

20.00 hrsAll Units 735 0 735

23.00 hrs to 

6.00 hrsAll Units 352 0 352

Rate B‐ID Normal

Applicable 

Tariff 

Scheme

264 537 44 0 220 537

6.00 hrs to 

17.00 hrsAll Units 530 0 530

17.00 hrs to 

23.00 hrsAll Units 682 0 682

23.00 hrs to 

6.00 hrsAll Units 393 0 393

12Rate A(Cm)‐CP Prepaid‐TOD

All Units

Rate B‐IDt Normal‐TOD

Prepaid‐TOD

Prepaid‐TOD

Common 

service of 

Industrial 

Estate

Rate D(8) Prepaid‐TOD

Short Term 

supply Prepaid‐TOD

Commercial 

and Industrial 

consumer (50 

KVA and above 

but upto 125 

KVA)

Rate A(ST)

Short Term 

supply for 

Commercial 

Plantation

Rate A(Cm)‐STCP

Commercial 

Plantation

Short Term 

irrigation 

Supply

Rate C(t)‐STIS 10

2

4

264

12

24

20

18

2

220

15

20

10

10

44

3

10

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

20

18

19

15

16

17

West Bengal Electricity Regulatory Commission 86

Page 88: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

HIGH AND EXTRA HIGH VOLTAGE CONSUMERS

Order for re‐determination of tariff of WBSEDCl for  the year 2010‐11

Annexure‐ 5B3

Demand 

Ch.

Energy 

Ch.

Demand 

Ch.

Energy 

Ch.Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

441 0 441439 0 439437 0 437

422 0 422420 0 420418 0 418562 0 562559 0 559556 0 556338 0 338337 0 337336 0 336436 0 436434 0 434432 0 432415 0 415413 0 413411 0 411552 0 552

549 0 549546 0 546333 0 333331 0 331330 0 330538 0 538537 0 537536 0 536531 0 531530 0 530529 0 529683 0 683682 0 682681 0 681394 0 394393 0 393392 0 392511 0 511509 0 509

507 0 507

503 0 503501 0 501499 0 499644 0 644641 0 641638 0 638376 0 376375 0 375373 0 373

44 220

44 220

44 220

44

44 220

44 220

44 220

44 220

Net rate after subsidy

4

Sl 

No

1

2

3

Customer 

categoryType of Consumer

264

23.00 hrs to 6.00 

hrsAll Units

6.00 hrs to 17.00 

hrs All Units

264

Industries 

(33 KV)

RateF(b) Normal All Units

Rate F(bt)Normal‐

TOD

17.00 hrs to 23.00 

hrsAll Units

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

264

264

Rate E(bt)Normal‐

TOD

6.00 hrs to 17.00 

hrs All Units

Industries 

(11 KV)

RateE(b) Normal All Units

17.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

6.00 hrs to 17.00 

hrs & 20.00 hrs to 

23.00 hrs

All Units

264

Public Utility 

(33 KV)

Rate F(a) Normal All Units

23.00 hrs to 6.00 

hrsAll Units

17.00 hrs to 20.00 

hrsAll UnitsRate F(at)

Normal‐

TOD

6.00 hrs to 17.00 

hrs & 20.00 hrs to 

23.00 hrs

All Units

264

As per order of 

WBERC for re‐

determination of tariff 

for 2010‐11

264

264

Govt Subsidy

Public Utility

 (11 KV)

Rate E(a) Normal All Units

17.00 hrs to 20.00 

hrsAll UnitsRate E(at)

Normal‐

TOD

23.00 hrs to 6.00 

hrsAll Units

220

Consumption slabName of the Tariff 

Scheme

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

West Bengal Electricity Regulatory Commission 87

Page 89: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

HIGH AND EXTRA HIGH VOLTAGE CONSUMERS

Order for re‐determination of tariff of WBSEDCl for  the year 2010‐11

Annexure‐ 5B3

Demand 

Ch.

Energy 

Ch.

Demand 

Ch.

Energy 

Ch.Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Net rate after subsidy

Sl 

No

Customer 

categoryType of Consumer

As per order of 

WBERC for re‐

determination of tariff 

for 2010‐11

Govt Subsidy

Consumption slabName of the Tariff 

Scheme

507 0 507

505 0 505

503 0 503

492 0 492490 0 490488 0 488629 0 629626 0 626623 0 623369 0 369367 0 367

366 0 366

425 0 425423 0 423

421 0 421548 0 548545 0 545542 0 542319 0 319318 0 318317 0 317405 0 405403 0 403401 0 401522 0 522519 0 519516 0 516304 0 304303 0 303302 0 302450 0 450448 0 448449 0 449600 0 600597 0 597599 0 599300 0 300298 0 298299 0 299495 0 495493 0 493491 0 491634 0 634631 0 631628 0 628371 0 371370 0 370369 0 369

44 220

44 220

44 220

44 220

4 20

44 220

5

6

7

8

9 26417.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

2417.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

Commercial 

PlantationRate S(cpt)

Normal‐

TOD

6.00 hrs to 17.00 

hrs 

Applicable 

Tariff 

Scheme

Community Irrigation 

/ IrrigationRate S(gt)

Normal‐

TOD

6.00 hrs to 17.00 

hrs 

Applicable 

Tariff 

Scheme

26417.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

26417.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

Industries (400KV) Rate J(bt)Normal‐

TOD

6.00 hrs to 17.00 

hrs 

Applicable 

Tariff 

Scheme

Industries (220KV) Rate I(bt)Normal‐

TOD

6.00 hrs to 17.00 

hrs 

Applicable 

Tariff 

Scheme

264

23.00 hrs to 6.00 

hrsAll Units

6.00 hrs to 17.00 

hrs All Units

264

Industries 

(132 KV)

RateH(b) Normal All Units

Rate H(bt)Normal‐

TOD

17.00 hrs to 23.00 

hrsAll Units

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

West Bengal Electricity Regulatory Commission 88

Page 90: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

HIGH AND EXTRA HIGH VOLTAGE CONSUMERS

Order for re‐determination of tariff of WBSEDCl for  the year 2010‐11

Annexure‐ 5B3

Demand 

Ch.

Energy 

Ch.

Demand 

Ch.

Energy 

Ch.Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Net rate after subsidy

Sl 

No

Customer 

categoryType of Consumer

As per order of 

WBERC for re‐

determination of tariff 

for 2010‐11

Govt Subsidy

Consumption slabName of the Tariff 

Scheme

490 0 490486 0 486488 0 488650 0 650644 0 644647 0 647328 0 328326 0 326327 0 327505 0 505503 0 503501 0 501646 0 646643 0 643640 0 640379 0 379378 0 378377 0 377558 0 558556 0 556554 0 554543 0 543541 0 541539 0 539740 0 740737 0 737734 0 734421 0 421419 0 419417 0 417537 0 537535 0 535533 0 533521 0 521520 0 520519 0 519707 0 707706 0 706704 0 704406 0 406405 0 405404 0 404520 0 520518 0 518516 0 516

44 220

4 20

12

13

10

11

264

Rate H(c) Normal All Units 264

Rate F(ct)Normal‐

TOD

6.00 hrs to 17.00 

hrs All Units

264

Commercial (33KV)

Rate F(c) Normal All Units

17.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

Rate E(ct)Normal‐

TOD

6.00 hrs to 17.00 

hrs All Units

264

23.00 hrs to 6.00 

hrsAll Units

264

Commercial

 (11 KV)

Rate E(c) Normal All Units

17.00 hrs to 23.00 

hrsAll Units

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

26417.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

24Short Term Irrigation 

Supply

Rate S(gt‐

st)

Normal‐

TOD

All Units6.00 hrs to 17.00 

hrs 

17.00 hrs to 23.00 

hrsAll Units

Short Term Supply for 

Commercial 

Plantation

Rate S(cpt‐

st)

Normal‐

TOD

6.00 hrs to 17.00 

hrs 

Applicable 

Tariff 

Scheme

23.00 hrs to 6.00 

hrsAll Units

44

44

44

44

44

220

220

220

220

220

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

West Bengal Electricity Regulatory Commission 89

Page 91: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

HIGH AND EXTRA HIGH VOLTAGE CONSUMERS

Order for re‐determination of tariff of WBSEDCl for  the year 2010‐11

Annexure‐ 5B3

Demand 

Ch.

Energy 

Ch.

Demand 

Ch.

Energy 

Ch.Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Net rate after subsidy

Sl 

No

Customer 

categoryType of Consumer

As per order of 

WBERC for re‐

determination of tariff 

for 2010‐11

Govt Subsidy

Consumption slabName of the Tariff 

Scheme

505 0 505503 0 503501 0 501547 0 547545 0 545543 0 543384 0 384382 0 382380 0 380530 0 530528 0 528526 0 526505 0 505503 0 503501 0 501557 0 557555 0 555553 0 553455 0 455453 0 453452 0 452445 0 445443 0 443441 0 441425 0 425423 0 423421 0 421567 0 567564 0 564561 0 561340 0 340339 0 339338 0 338440 0 440438 0 438436 0 436420 0 420418 0 418416 0 416560 0 560557 0 557554 0 554336 0 336334 0 334332 0 332529 0 529528 0 528

526 0 526

410 0 410409 0 409408 0 408

18

264

24

14

15

16

17

Rate S(f) Normal All Units

Applicable 

Tariff 

Scheme

Sports Complex & 

Auditorium run by 

Govt./Local bodies for 

cultural affairs

Rate S(c) Normal All Units

264

23.00 hrs to 6.00 

hrsAll Units

6.00 hrs to 17.00 

hrs All Units

264

Public Water Works & 

Sewerage

 (33 KV)

Rate F(pw) Normal All Units

Rate 

F(pw)t

Normal‐

TOD17.00 hrs to 23.00 

hrsAll Units

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

264

23.00 hrs to 6.00 

hrsAll Units

6.00 hrs to 17.00 

hrs All Units

264

Public Water Works & 

Sewerage 

(11 KV)

Rate E(pw) Normal All Units

Rate 

E(pw)t

Normal‐

TOD17.00 hrs to 23.00 

hrsAll Units

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

24

24

Rate S(dt)Normal‐

TOD

6.00 hrs to 17.00 

hrs All Units

264

Domestic 

Rate S(d) Normal All Units

17.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

Commercial (132KV)

23.00 hrs to 6.00 

hrsAll Units

17.00 hrs to 23.00 

hrsAll UnitsRate H(ct)

Normal‐

TOD

6.00 hrs to 17.00 

hrs All Units

44

44

44

4

4

44

44

4

44

220

220

220

220

220

20

220

20

20

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

West Bengal Electricity Regulatory Commission 90

Page 92: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

HIGH AND EXTRA HIGH VOLTAGE CONSUMERS

Order for re‐determination of tariff of WBSEDCl for  the year 2010‐11

Annexure‐ 5B3

Demand 

Ch.

Energy 

Ch.

Demand 

Ch.

Energy 

Ch.Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Net rate after subsidy

Sl 

No

Customer 

categoryType of Consumer

As per order of 

WBERC for re‐

determination of tariff 

for 2010‐11

Govt Subsidy

Consumption slabName of the Tariff 

Scheme

402 0 402401 0 401400 0 400524 0 524523 0 523521 0 521326 0 326325 0 325324 0 324535 0 535533 0 533531 0 531689 0 689686 0 686683 0 683405 0 405403 0 403401 0 401550 0 550548 0 548546 0 546710 0 710707 0 707704 0 704414 0 414412 0 412410 0 410510 0 510508 0 508506 0 506480 0 480478 0 478476 0 476530 0 530528 0 528

526 0 526

432 0 432

430 0 430

428 0 428

525 0 525523 0 523521 0 521675 0 675672 0 672669 0 669398 0 398397 0 397396 0 396

22

20

21

23

19

Cold storage for non 

perishable items  & 

Dairies with Chilling 

Plant

All Units

26417.00 hrs to 20.00 

hrsAll Units

23.00 hrs to 6.00 

hrs

All Units

Common Services of 

Industrial Estate

Rate E(ct‐

cs)

Normal‐

TOD

6.00 hrs to 17.00 

hrs & 20.00 hrs to 

23.00 hrs

Applicable 

Tariff 

Scheme

24

23.00 hrs to 6.00 

hrsAll Units

6.00 hrs to 17.00 

hrs All Units

24

Bulk Supply at single 

point to Co‐operative 

Group Housing 

Society for providing 

power to its members 

or person for 

providing power to its 

employees in a single 

premises

Rate S(co) Normal All Units

Rate S(cot)Normal‐

TOD

17.00 hrs to 23.00 

hrsAll Units

26417.00 hrs to 20.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

26417.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

Construction Power 

SupplyRate S(con)

Normal‐

TOD

6.00 hrs to 17.00 

hrs & 20.00 hrs to 

23.00 hrs

Applicable 

Tariff 

Scheme

Emergency Supply Rate S(es)Normal‐

TOD

6.00 hrs to 17.00 

hrs 

Applicable 

Tariff 

Scheme

Rate S(ft)Normal‐

TOD

6.00 hrs to 17.00 

hrs All Units

All Units

Optional 

Tariff 

Scheme264

17.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrs

44

44

44

4

4

44 220

220

20

20

220

220

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

West Bengal Electricity Regulatory Commission 91

Page 93: ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION ... · PDF filewest bengal electricity regulatory commission in ... filed by west bengal state electricity distribution company

HIGH AND EXTRA HIGH VOLTAGE CONSUMERS

Order for re‐determination of tariff of WBSEDCl for  the year 2010‐11

Annexure‐ 5B3

Demand 

Ch.

Energy 

Ch.

Demand 

Ch.

Energy 

Ch.Demand Ch.

Energy 

Ch.

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Rs./KVA/ 

monP/kwh

Net rate after subsidy

Sl 

No

Customer 

categoryType of Consumer

As per order of 

WBERC for re‐

determination of tariff 

for 2010‐11

Govt Subsidy

Consumption slabName of the Tariff 

Scheme

507 55 452505 55 450502 55 447477 55 422475 55 420472 55 417520 0 520518 0 518516 0 516557 0 557555 0 555553 0 553494 0 494492 0 492490 0 490542 0 542540 0 540538 0 538530 0 530528 0 528526 0 526568 0 568566 0 566564 0 564503 0 503502 0 502501 0 501

    Sd/‐ Sd/‐

SUJIT DASGUPTA                                                                                                      MEMBER

DATE: 30.12.2011

27

26

24

25

6.00 hrs to 17.00 

hrs All Units

264

Private Educational 

Institutions

Rate E(c‐ei) Normal All Units

17.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

Rate E(ct‐

ei)

Normal‐

TOD

264

264

Short‐term Supply Rate S(st)Normal‐

TOD

6.00 hrs to 17.00 

hrs 

17.00 hrs to 23.00 

hrsAll Units

23.00 hrs to 6.00 

hrsAll Units

All Units

Normal All Units

Normal All Units

Applicable 

Tariff 

Scheme264

264

Traction

(25 KV)Rate T(a)

Traction

(132 KV)Rate T(b)

44

44

44

44

44

220

220

220

220

220

Applicable 

Tariff 

Scheme

Optional 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

Applicable 

Tariff 

Scheme

 PRASADRANJAN RAYCHAIRPERSON