9
PERFORMER KO MEETING NICE -12 th & 13 th September 2013 WP1short presentation

PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation

  • Upload
    meris

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation. WP 1 content. PERFORMER concept WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment. WP 1 content. - PowerPoint PPT Presentation

Citation preview

Page 1: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

PERFORMER KO MEETINGNICE -12th & 13th September 2013

WP1short presentation

Page 2: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

WP 1 content

PERFORMER concept

WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment

Page 3: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

WP 1 content

OBJECTIVES : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment

Task 1.1 : Define a comprehensive and coherent framework for the global quality process of performance assessment

Definition of a quality process ensuring the monitoring of building energy consumptions and the achievement of targeted performances (based on commissioning)

Definition of appropriate indicators, characterization of the buildings properties, characterization of « in use » conditions

Task 1.2 : Develop methodologies as well simulation models and tools to assess the in situ intrinsic performance of the buildings envelops

Development of a methodology to assess intrinsic performance of the envelope at the end of the construction during a short period Development of a methodology to assess intrinsic performance of the envelope using long term monitoring during operation phase

Task 1.3 : Develop methodologies to propose a cost optimized measurement assessment plan

Specification for a tool aiming at providing cost-optimized energy performance measurement plan enable to support PERFORMER solutions

Task 1.4 : methodologies for energy management, fault detection and diagnosis Specifications for a set of relevant tools to manage energy consumption and ensure continuity of the performances during the

operation phase Fault detection and diagnosis, performance monitoring, real time management and optimized control, visualization and reporting tools

Page 4: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

4

WP 1 content

Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment

WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 months Lead: CSTB

Task / Deliverable Lead Contributors Deliver by

1.1 - Define a PERFORMER quality process that guarantees; Monitoring of all energy consumption in any building Achievement of building energy performance targets

CSTB ECG, UPL, GDF BRE, ASM, DRA CU & CEA

Month 12

1.2 - Specify tools for the measurement of the intrinsic energy performance of building envelopes.

- Subtask 1.2.1 : Quick assessment at the end of the construction phase Subtask leader : CSTB - Subtask 1.2.2 : Long term assessment during the operation phase Subtask leader : SG

CSTB SG, BRE, GDF, UPL, ECG & DRA

15

1. 3 - Define a robust method to identify a cost optimized performance measurement plan & produce specifications for tools to be developed on WP2 that will be applied to pilot buildings.

ECG CSTB, CEA, GDF, BRE & UPL

15

1.4 - Specify methodologies for energy consumption management and ensuring continuity of the performance during the operation phase

- Subtask 1.4.1 : Fault detection and diagnosis functionalities based on expert rules Subtask leader : GDF - Subtask 1.4.2 : Performance monitoring exploiting machine learning techniques Subtask leader : CEA - Subtask 1.4.3 : Real time energy management and optimized control Subtask leader : CU - Subtask 1.4.4 : Visualization and reporting tools Subtask leader : CSTB

CSTB BRE, CEA, CU, GDF & ECG

15

Page 5: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

5

WP 1 content

Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment

WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 months Lead: CSTB

Task / Deliverable Lead Contributors Deliver by

1.1 - Define a PERFORMER quality process that guarantees; Monitoring of all energy consumption in any building Achievement of building energy performance targets

CSTB ECG, UPL, GDF BRE, ASM, DRA CU & CEA

Month 12

1.2 - Specify tools for the measurement of the intrinsic energy performance of building envelopes. CSTB 15

- Subtask 1.2.1 : Quick assessment at the end of the construction phase

Subtask leader : CSTB

CSTB SG, BRE, DRA, UPL?

- Subtask 1.2.2 : Long term assessment during the operation phase Subtask leader : SG

SG CSTB, BRE, GDF, ECG UPL?

UPL CSTB CEA CU BRE DRA ECG GDF SG ASM

SIGMA

9 20 7 12 8 6 16 10 10 2 2

Person-months per participant

Page 6: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

6

WP 1 content

Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment

WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 months Lead: CSTB

Task / Deliverable Lead Contributors Deliver by

1. 3 - Define a robust method to identify a cost optimized performance measurement plan & produce specifications for tools to be developed on WP2 that will be applied to pilot buildings.

ECG CSTB, CEA, GDF, BRE & UPL?

Month 15

1.4 - Specify methodologies for energy consumption management and ensuring continuity of the performance during the operation phase

CSTB 15

- Subtask 1.4.1 : Fault detection and diagnosis functionalities based on expert rules Subtask leader : GDF

GDF CEA, CU, CSTB, UPL, GDF & ECG

- Subtask 1.4.2 : Performance monitoring exploiting machine learning techniques Subtask leader : CEA

CEA CEA, ?

- Subtask 1.4.3 : Real time energy management and optimized control Subtask leader : CU

CU CU, CSTB?

- Subtask 1.4.4 : Visualization and reporting tools Subtask leader : CSTB

CSTB CU, GDF & ECG, UPL?

UPL CSTB CEA CU BRE DRA ECG GDF SG ASM

SIGMA

9 20 7 12 8 6 16 10 10 2 2

Person-months per participant

Page 7: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

7

Dependencies & Dependents for WP1

WP1/WP2 A high level of interaction is required in order to ensure the transfer

of the methodologies to WP2 Proposition to provide intermediate deliverables for WP2

WP1/WP3&4 WP1 has to support WP3 for the deployment of the PERFORMER

methodologies on demonstrators(indicators for perfromance assessment, characterization of the building and « in

use » conditions and occupant’s behavior)

WP1/WP5 WP1 has to provide relevant inputs for WP5, in particular general

principles replicable for the development of a business model for the exploitation of the PERFORMER solution

Intermediate deliverable for WP2

Page 8: PERFORMER KO MEETING NICE - 12 th  & 13 th  September 2013 WP1short presentation

For the first 6 months, main stakes are :

Task 1.1 (Global Framework - T0 ->T0+12) : Interact with WP3 in order to ensure the consistency

with PERFORMER demonstrators Ensure to provide a « european view » required for a

replication strategy (WP5) Fist step : All participants send to CSTB contribution

about state of art

Task 1.2 (Intrinsic performance - T0 –> T0+15) : Develop the 2 PERFORMER methodologies for intrinsic

performance assessment Identify the way of validation (in situ experimentation

and/or mockup)

Task 1.3&1.4 (Cost optimized measurement plan and energy consumption management - T0+5 –> T0+15)

Set up dedicated work team for the 4 subtasks, Identify the PERFORMER scientific methods (state of art

required) Identify the better way of interaction with WP2 to transfer

the methodologies developped

WP1 implementation plan for first 6 months 

Asking for 3 months more in order to reinforce the link with WP2?

Interaction with other WPs: WP1/WP2 : asking for 3 months more for tasks 1.2,1.3&1.4 in order to reinforce the link with WP2