PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK PT. ANEKA JASA GRHADIKA Page | 1 Perhitungan Struktur Scrubber BEBAN SF BEBAN X SF BXS:4 2000 1.5 3000 750 900 225 11250 6 total beban pendistribusian beban 1875 468.75 dibagi 4 titik tiap frame jumlah frame 5 11250 2250 562.5 SF 1 2850 2850 712.5 1 900 1.5 1.5 1.5 1.5 berat(Kg) 7500 1900 600 7500 qw= k x 42.5 + 0.6 x h = 1.6 X 42.5 + 0.6 X 11.4 = 74.84 tiup qw= k x 42.5 + 0.6 x h = 1.2 X 42.5 + 0.6 X 11.4 = 57.84 hisap qw= k x 42.5 + 0.6 x h = 1.6 X 42.5 + 0.6 X 13.6 = 76.16 tiup PERHITUNGAN STRUKTUR SCRUBBER A. DATA PERENCANAAN 1. PEMBEBANAN Beban Mati Scrubber Stack Beban Hidup Beban Orang : 250 kg/m2 Beban Angin Elevasi 11.4 m Elevasi 13.6 m

Perhitungan Scrubber

Embed Size (px)

DESCRIPTION

perhitungan scrubber

Citation preview

Page 1: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 1 Perhitungan Struktur Scrubber

BEBAN SF BEBAN X SF BXS:4

2000 1.5 3000 750

900 225

112506

total beban pendistribusian beban

1875 468.75

dibagi 4 titik tiap framejumlah frame

5 11250 2250 562.5

SF

1 2850 2850 712.5

1 900

1.5

1.5

1.5

1.5

berat(Kg)

7500

1900

600

7500

qw= k x 42.5 + 0.6 x h

= 1.6 X 42.5 + 0.6 X 11.4

= 74.84

tiup

qw= k x 42.5 + 0.6 x h

= 1.2 X 42.5 + 0.6 X 11.4

= 57.84

hisap

qw= k x 42.5 + 0.6 x h

= 1.6 X 42.5 + 0.6 X 13.6

= 76.16

tiup

PERHITUNGAN STRUKTUR SCRUBBER

A. DATA PERENCANAAN

1. PEMBEBANAN

Beban Mati

Scrubber

Stack

Beban Hidup

Beban Orang : 250 kg/m2

Beban Angin Elevasi 11.4 m

Elevasi 13.6 m

Page 2: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 2 Perhitungan Struktur Scrubber

qw= k x 42.5 + 0.6 x h

= 1.2 X 42.5 + 0.6 X 13.6

= 59.16

hisap

2. MATERIAL

a. Struktur Baja : ASTM A36

minimum fy = 250 MPa

minimum fu = 400 Mpa

b. Structural bolt : High strength bolt ASTM A-325 & BS 1367 Gr.8.8

shear strength Fvb = 1470 kg/cm2

tension capacity Ftb = 3090 kg/cm2

c. Anchor Bolt : ASTM A-307

d. Welding connection : E70xx

KOMBINASI PEMBEBANAN

Konfigurasi kombinasi pembebanan berdasarkan SNI 1729-2002 dapat dilihat

sebagai berikut :

1. COMB 1 1,4D

2. COMB 2 1,2D + 1,6 L + 0,5 (La atau H)

3. COMB 3 1,2D + 1,6 (La atau H) + 0,8W

Page 3: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 3 Perhitungan Struktur Scrubber

4. COMB 4 1,2D + 1,3 W + L + 0,5 (La atau H)

5. COMB 5 1,2D ± 1,0E + L

6. COMB 6 0,9D ± 1,3W

7. COMB 7 0,9D ± 1,0E

8. COMB SERVICE (IJIN) 1D+1L+1W

Keterangan:

D : adalah beban mati yang diakibatkan oleh berat konstruksi permanen, termasuk

walkway,galery conveyor, dan peralatan layan tetap.

L : adalah beban hidup yang ditimbulkan oleh penggunaan gudang , tetapi tidak termasuk

beban lingkungan seperti angin, hujan, dan lain-lain.

La : adalah beban hidup di atap yang ditimbulkan selama perawatan oleh pekerja,

peralatan, dan material, atau selama penggunaan biasa oleh orang dan benda bergerak

H : adalah beban hujan

W: adalah beban angin

E: adalah beban gempa, yang ditentukan menurut SNI 03–1726–2002

Page 4: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 4 Perhitungan Struktur Scrubber

B. PEMODELAN

Dalam analisa balok struktur ini menggunakan program bantu SAP2000 sehingga

secara otomatis akan dihasilkan output berupa gaya-gaya dalam.

Gambar 1. Pemodelan Scrubber

Page 5: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 5 Perhitungan Struktur Scrubber

Gambar 2. Distribusi Beban Mati

Page 6: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 6 Perhitungan Struktur Scrubber

Gambar 3. Distribusi Beban hidup

Page 7: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 7 Perhitungan Struktur Scrubber

Gambar 4. Distribusi Beban Angin

Page 8: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 8 Perhitungan Struktur Scrubber

C. PENGECEKAN RATIO BERDASAR AISC LRFD 1999 (SNI 03 – 1729 – 2002)

Secara umum semua elemen struktur yang digunakan dalam perencanaan bangunan ini

telah memenuhi syarat desain sesuai AISC LRFD 1999 / SNI 03 – 1729 – 2002. Hal ini

ditunjukkan dengan tidak adanya ratio capacity/frame yang > 1. Adapaun detail dari design

ratio untuk tiap elemen struktur akan disampaikan dalam tabel berikut.

Gambar 5. Rasio Interaksi Hasil Analisa

Page 9: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 9 Perhitungan Struktur Scrubber

Gambar 6. Kesesuaian design profil dengan analisa

Page 10: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 10 Perhitungan Struktur Scrubber

Frame Station OutputCase CaseType P V2 V3 T M2 M3

Text m Text Text Kgf Kgf Kgf Kgf-m Kgf-m Kgf-m

125 0 DSTL1 Combination 17.38 -103.73 -0.25 0.000558 -0.00535 19.94

125 0.36667 DSTL1 Combination 17.38 -89.06 -0.25 0.000558 0.08505 55.28

125 0.73333 DSTL1 Combination 17.38 -74.38 -0.25 0.000558 0.18 85.25

125 1.1 DSTL1 Combination 17.38 -59.71 -0.25 0.000558 0.27 109.83

125 1.1 DSTL1 Combination 17.38 596.54 -0.25 0.000558 0.27 109.83

125 1.46667 DSTL1 Combination 17.38 611.22 -0.25 0.000558 0.36 -111.59

125 1.83333 DSTL1 Combination 17.38 625.89 -0.25 0.000558 0.45 -338.39

125 2.2 DSTL1 Combination 17.38 640.56 -0.25 0.000558 0.54 -570.58

381 0 DSTL1 Combination -6781.25 252.19 -78.65 -0.01343 -47.76 147.45

381 1 DSTL1 Combination -6849.46 252.19 -78.65 -0.01343 30.89 -104.74

381 2 DSTL1 Combination -6917.68 252.19 -78.65 -0.01343 109.54 -356.94

Tabel 1. Rasio Kolom dan Balok

Page 11: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 11 Perhitungan Struktur Scrubber

Data Perencanaan

Menggunakan Profil WF 250x125x6x9

W = 29.6 kg/m h = d - 2(tf+r) Sy = 47 cm3

A = 37.7 cm2 = 208 mm iy = 2.79 cm

d = 250 mm Ix = 4050 cm4 Zy = 104 cm3

tw = 6.0 mm Sx = 324 cm3 J = mm4

bf = 125 mm ix = 10.40 cm Iw = mm6

tf = 9.0 mm Zx = 351.9 cm3

r = 12 mm Iy = 294 cm4

Balok Yang ditinjau Frame 125

q = 40.0 kg/m

kg

kg.m

m

Mux = kg.m

Muy = kg.m

Hx = kg

Kontrol Lendutan

u Lendutan ijin

L 220

240 240

u Lendutan yang terjadi

5 . q L4

P x L3

384 E Ix 48 E Ix

5 x 0.400 x 220 4 3

384 x 2E+06 x 4050 48 2E+06

= +

= cm Ok

Kontrol Penampang Profil

u Kontrol sayap u Kontrol plat badan

bf h

2tf tw

bf 170 h 1680

2tf fy0.5

tw fy0.5

6.94 < 10.97 Ok 35 < 108.44 Ok

Jadi karena bf dan h maka tergolong

2tf tw

penampang kompak Mn = Mp

Mnx = Mp = 351.9 x 2400

= kg.cm = kg.m

Mux f . Mnx

kgm 0.9x kgm

kgm kgm Ok

Mny = Mp = 104.0 x 2400

= kg.cm = kg.m

Muy f . Mny

kgm 0.9x kgm

kgm kgm Ok

2,496.00

0.53700 2,246.40

570.58 8,444.66

570.58 7,600.20

Zy . fy =

Zx . fy =

844,466.40 8,444.66

0.0015

lp lp

74430.00

4.2690E+06

0.0

17.376

= +0.000 220

4050

f = = = 0.91667 cm

f = +

2.2

19.94 496.64

570.58

0.537

17.376

0.0015 0.0000

< lp

249,600.00

<

2,496.00

0.53700

lp

D. PERHITUNGAN BALOK

Page 12: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 12 Perhitungan Struktur Scrubber

Kontrol Lateral Buckling

Lb = 220 cm

Lp = 1.76 . iy . E/fy0.5

= 1.76 . 2.79 28.870.5

= cm

Lr = iy x1/fL 1 + (1 + x2.fL2)0,5 0.5

fL = fy - fr = 2400 - 700 = 1,700 kg/cm2

x1 = (p/Sx)((EGJA)/2)0,5

p 0.5

324

= kg/cm2

Sx2 Iw

G.J Iy2

8.E+05 .7.4430

= kg/cm2

Lr = 2.79 1,700 1 + 1 + 1,7000,5 0,5

= cm 4.92626

Lp L Bentang Menengah

Lr - L LRFD 8.3.2 hal 34

Lr - Lp

u Mencari faktor Cb

19.94

A

B

496.64

MA = 70.26 kgm x = 0.5500m

MB = 109.83 kgm x = 1.1000m

MC = 224.99 kgm x = 1.6500m

Mmax = 496.640 kgm x = 0.0000m

Cb = 12.5 Mmax 2.3

2.5 Mmax + 3 MA + 4 MB + 3 MC

= 12.5 x 496.64 2.3

2.5 x 496.64 + 3 x 70.26 + 4 x 109.83 + 3 x 224.99

= 2.419 ≥ 2.3 digunakan Cb = 2.3

u Mr = Sx ( fy - fr ) u Mr = Sy ( fy - fr )

= 324 2400 - 700 = 47 2400 - 700

= kgcm = kgcm

= kgm = kgm

550,800.00 79,900.00

5,508.00 799.00

x2 = 4324 4.2690E+06

294

1.720E-04

x 37.66

205,342.583

x2 = 4

141.75

= 2.E+06 x 8.E+05 x

Mn = Cb Mr +(Mp - Mr) Mp

7.4430

205,342.58/ 1.720E-04x

492.63

Page 13: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 13 Perhitungan Struktur Scrubber

u Mp = u Mp =

= 351.9 x 2400 = 104.0 x 2400

= kgcm = kgcm

= kgm = kgm

4.926 -2.20

4.926 -2.20

= kgm > kgm

sehingga dipakai Mnx = kgm

4.926 -2.20

4.926 -2.20

= kgm > kgm

sehingga dipakai Mnx = kgm

Lkx 2496

ix 10.40

lc = l fy = 240.00 2400 = 2.65

p E p 2.E+06

lc > 1.2 w = 8.75 LRFD 7,6,2 hal 28

fHn = 0.85 . Ag . fy

w

= 0.85 x 37.7 2400

8.75

= 8,776.00 kg

Hu + Mux + Muy < 1

2f Hn f Mnx f Mny

17.38 + 570.58 + 0.54 < 1

2.00 x 8,776.00 0.9 8,444.66 0.9 2,496.00

0.00049 + 0.0750741 + 0.0002 < 1

0.0758 < 1 Ok

SAP 2000 0.072

2,496.00

5,740.80 2,496.00

2,496.00

lx = = = 240.00 Menentukan

19,422.73 8,444.66

8,444.66

Mny = 2.30 799 + 2,496 - 799

Zx . fy Zy . fy

844,466.40 249,600.00

8,444.66 2,496.00

Mnx = 2.30 5,508 + 8,445 - 5,508 8,444.66

Page 14: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 14 Perhitungan Struktur Scrubber

Perhitungan kolom Frame 381

381

Data dari SAP2000

Mux = kg.m Mtump 1 = kg.m

Muy = kg.m Mtump 2 = kg.m

Hx = kg

Vux = kg

Vuy = kg

Data Perencanaan

Menggunakan Profil HB 200X200X8X12

W = 49.9 kg/m h = d - 2(tf+r) Sy = 160 cm3

A = 63.5 cm2 = 150 mm iy = 5.02 cm

d = 200.0 mm Ix = 4720 cm4 Zy = 243 cm3

tw = 8.0 mm Sx = 472 cm3 J = mm4

bf = 200.0 mm ix = 8.62 cm Iw = mm6

tf = 12.0 mm Zx = 513 cm3

r = 13.0 mm Iy = 1600 cm4

Faktor Tekuk

kc = 1.80 Dari nomogram kolom bergoyang

Faktor Kekuatan Kolom

kg

kgm

Lkx = kcx x L

= 1.80 x 200 = cm

kgm

Lkx 360

ix 8.62

l fy 41.76 2400

p E p 2.E+06

LRFD 7,6,2 hal 28

Menentukan

lc = = = 0.46

0,25 <lc<1,2 w = 1.11

331.71

x

lx = = = 41.76

6917.68

3.21

0.07

147.45

360.00

251904.00

1.4138E+07

6,917.68

356.94 147.45

109.94 331.71

E. PERHITUNGAN KOLOM

Page 15: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 15 Perhitungan Struktur Scrubber

fy

w

2400

1.11

= kg

Pu < f Pn

< Ok

f Pn

p2E Ag

l2

p22E+06 63.5

2

Kontrol Persamaan Interaksi Aksial Momen

Cm = 0.6 - 0.4 bm

= -0.300

-0.300

Pu

Ncrbx

= -0.303 < 1 dipakai dbx =1.00

1 Lk fy0.5

p iy E

1 360.0 24000.5

p 5.02 2E+06

= 0.791

Ag fy

63.53 2400

0.791 2

1

SNu

SNcr

= 1.029

Mux = dbx Mntx Muy = dby Mnty

= 1.00x = 1.03x

= kgm = kgm

Mnx = 2400 Mny = 2400

= kgcm = kgcm

= kgm = kgm

8 Mux 8 Muy

2f Pn 9f Mnx 9f Mny

8 8

2 x 9 0.9 12,315.65 9 0.9 5,827.58

+ + < 1

< 1 Ok0.076808

< 1117,045.33

0.029551 0.028625 0.018632

356.94 109.946,917.68+ +

1,231,564.80 582,758.40

12,315.65 5,827.58

Pu+ + <

356.94 113.15

Zx . fy = 513.2 x Zy . fy =

1

242.8 x

243,843.43

356.94 109.94

243,843.41 kg

dby =1

=

1 - 1 -6,917.68

lc =

=

Ncr =lc

2

= =

dbx =Cm

=

1 - 1 -6,917.68

718,982.18

= = 718,982.18 kg41.76

= 0.6 - 0.4331.71

Pu=

147.45

0.059 < 0.2

Ncrbx =

= 0.85 x 63.5

117,045.33

6,917.68 kg 117,045.33 kg

fPn = 0.85 . Ag .

Page 16: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 16 Perhitungan Struktur Scrubber

Kontrol Penampang Profil

u Kontrol sayap u Kontrol plat badan

bf h

2tf tw

bf 170 h 1680

2tf fy0.5 tw fy0.5

8.33 < 10.97 Ok 19 < 108.44 Ok

Jadi karena bf dan h maka tergolong

2tf tw

penampang kompak

Kontrol Lateral Buckling

Lb = 200 cm

Lp = 1.76 . iy . E/fy 0.5

= 1.76 . 5.02 9.13

= cm

Lr = iy x1/fL 1 + (1 + x2.fL2)0,5 0.5

fL = fy - fr = 2400 - 700 = 1,700 kg/cm2

x1 = (p/Sx)((EGJA)/2)0,5

p 0.5

472

= kg/cm2

Sx 2 Iw

G.J Iy2

8.E+05 .25

= kg/cm2

Lr = 5.02 1,700 1 + 1 + 1,7000,5 0,5

= cm

Lp L Lr Bentang Menengah

Lr - L LRFD 8.3.4 hal 38

Lr - Lp

336,802.13/ 1.939E-05x

1,412.25

Mn = Cb Mr + (Mp - Mr) Mp

x2 = 4472 1.4138E+07

1600

1.939E-05

25.1904 x 63.53

336,802.13

x2 = 4

< lp < lp

80.65

= 2.E+06 x 8.E+05 x

lp lp

Page 17: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 17 Perhitungan Struktur Scrubber

u Mencari faktor Cb

A x

A

B

C

B

MA = kgm x =

MB = kgm x =

MC = kgm x =

Mmax = kgm x =

12.5 Mmax

2.5 Mmax + 3 MA + 4 MB + 3 MC

12.5 x

2.5 x 331.71 + 3 x 21.35 + 4 x 104.74 + 3 x 230.84

= 2.07 2.3 2.3

u Mr = Sx ( fy - fr ) u Mr = Sy ( fy - fr )

= 472 2400 - 700 = 160 2400 - 700

= kgcm = kgcm

= kgm = kgm

u Mp = u Mp =

= 513.2 x 2400 = 242.8 x 2400

= kgcm = kgcm

= kgm = kgm

u Myx = u Myy =

= 472 x 2400 = 160 x 2400

= kgcm = kgcm

= kgm = kgm

1,412.3 -200.00

1 ,412.3 -80.65

= kgm > kgm

sehingga dipakai Mnx = kgm

1,412.3 -200.00

1 ,412.3 -80.65

= kgm > kgm

sehingga dipakai Mny = kgm

5,828 -

27,441.31 12,315.65

12,315.65

1,132,800.00 384,000.00

11,328.00 3,840.00

2,720 5,827.58

12,762.85 5,827.58

5,827.58

Mny = 2.30 2,720 +

Mnx = 2.30 8,024 + 12,316 -

1,231,564.80 582,758.40

12,315.65 5,827.58

Sx . fy Sy . fy

8,024 12,315.65

802,400.00 272,000.00

8,024.00 2,720.00

Zx . fy Zy . fy

Cb = 2.3

=331.71

2.3

104.74 1.0000m

230.84 1.5000m

331.71 0.0000m

147.45

331.71

21.35 0.5000m

Page 18: Perhitungan Scrubber

PROYEK SISTEM REAKTOR 36-R.101 PT. PETROKIMIA - GRESIK

PT. ANEKA JASA GRHADIKA Page | 18 Perhitungan Struktur Scrubber

Kontrol

f Pn Mnx Mny

1 1

1 x 1 0.9 12,315.65 1 0.9 5,827.58

+ + < 1

< 1 Ok

SAP2000 =

0.112267

0 .079

< 1117,045.33

0.059103 0.032203 0.020961

356.94 109.946,917.68+ +

Pu+

Mux+

Muy< 1