3
FACTS AT A GLANCE: Architect: WATG MEP Consulting Engineering Firm: JBA Consulting Engineers Sub contractor (Mechanical & Plumbing): Iron Mechanical Inc. Developer/Owner: Waterfront Hotels, C, LLC March, 2016 BIM START DATE: 212,720 Sq ft PROJECT AREA: TEAM SIZE: 5 Engineers Pinnacle Infotech Implemented Autodesk Building Suite for BIM of Hilton Waterfront Beach Resort, USA About Iron Mechanical: Pinnacle Infotech - the Global Leader in BIM Services Pinnacle believes “Construction is all about Preconstruction” The success of Iron Mechanical started with Pre-Construction department. The company with offices in Northern & Southern California has engineered and detailed every type of building including commercial, high-rise, multifamily, medical, educational facilities and more. Whether the project delivery method is design build, design assist or plan & spec, Iron Mechanical’s “build it before we get there” approach to Pre-Construction has made the company professionals fully prepared before a building breaks ground. Professional engineers & detailers offer the benefit of joining engineering technical expertise with years of practical, real world mechanical & plumbing system installation experience to produce practical, cost effective, energy efficient mechanical & plumbing systems. Pinnacle Infotech offers Building Information Modeling (BIM) solutions to Architecture, Engineering & Construction (AEC) firms worldwide. Clients use BIM services for construction projects to facilitate project coordination, collaboration, asset manage- ment, risk mitigation, logistic planning and cost optimization. Over 850 BIM professionals collaborate across different time zones with global delivery centers in India (Durgapur, Kolkata & Jaipur), USA (Houston), UK (London), UAE (Dubai), Italy (Calolziocorte) and Switzer- land (Zurich) for offering quick turnarounds on complex project management. BIM implemen- tation helps Pinnacle clients to assemble projects in a virtual environment for identify- ing and correcting potential problems before construction. One of the market leaders since 2003, provid- ing BIM solutions to the international market, Pinnacle team has successfully executed 4800+ landmark BIM projects in 34 countries across 6 continents. Few of the landmark BIM projects executed in USA, Asia, Middles East & Gulf Cooperation Council (GCC), Europe & Australia across industries include Airports, Hospitals, Medical Centers, Stadium, High Rise Towers, Infrastructure, University Campuses, Nanotechnology Research Centers, Industrial Plants, Retail Chains, Shopping Malls, Restau- rants, Dams, Bridges and more. Pinnacle has won accolades in the form of numerous awards and recognition from the Government, Industry and other prestigious Associations, which includes excellence awards, innovation awards, top exporter and highest job creator awards. The company has developed ISO 9001 for work process to enable seamless working. Project Summary – Hilton Waterfront Beach Resort (Hotel), Huntington Beach, California, USA Iron Mechanical & Pinnacle Infotech were respon- sible for creating the 3D Mechanical Models of Hilton Waterfront Beach Resort - a 10 Storey Hotel building consisting of 10 floors (basement to 9th floor, including parking, equipment room, 2 mechanical rooms and tower roof ). The purpose of creating the 3D Models for new construction of hotel and beach resort was for resolving clashes and preparation of BOM (Bill of Materials) for pipes. Architectural BIM Model Mechanical Room Model www.pinnaclecad.com Pinnacle Infotech Durgapur, India COMPANY LOCATION Pinnacle Customer Success Story Pinnacle Infotech

Pinnacle Infotech Pinnacle Infotech Implemented Autodesk ... › wp-content › uploads › 2018 › 03 › Hilt… · Pinnacle Infotech o˚ers Building Information Modeling (BIM)

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pinnacle Infotech Pinnacle Infotech Implemented Autodesk ... › wp-content › uploads › 2018 › 03 › Hilt… · Pinnacle Infotech o˚ers Building Information Modeling (BIM)

FACTS AT A GLANCE:Architect: WATGMEP Consulting Engineering Firm: JBA Consulting EngineersSub contractor (Mechanical & Plumbing): Iron Mechanical Inc.Developer/Owner: Waterfront Hotels, C, LLC

March, 2016BIM START DATE:

212,720 Sq ftPROJECT AREA: TEAM SIZE:

5 Engineers

Pinnacle Infotech Implemented Autodesk Building Suite for BIM of Hilton Waterfront Beach Resort, USAAbout Iron Mechanical: Pinnacle Infotech -

the Global Leader in BIM Services

Pinnacle believes “Construction is all about Preconstruction”

The success of Iron Mechanical started with Pre-Construction department. The company with o�ces in Northern & Southern California has engineered and detailed every type of building including commercial, high-rise, multifamily, medical, educational facilities and more. Whether the project delivery method is design build, design assist or plan & spec, Iron Mechanical’s “build it before we get there” approach to Pre-Construction has made the company professionals fully prepared before a building breaks ground. Professional engineers & detailers o�er the bene�t of joining engineering technical expertise with years of practical, real world mechanical & plumbing system installation experience to produce practical, cost e�ective, energy e�cient mechanical & plumbing systems.

Pinnacle Infotech o�ers Building Information Modeling (BIM) solutions to Architecture, Engineering & Construction (AEC) �rms worldwide. Clients use BIM services for construction projects to facilitate project coordination, collaboration, asset manage-ment, risk mitigation, logistic planning and cost optimization. Over 850 BIM professionals collaborate across di�erent time zones with global delivery centers in India (Durgapur, Kolkata & Jaipur), USA (Houston), UK (London), UAE (Dubai), Italy (Calolziocorte) and Switzer-land (Zurich) for o�ering quick turnarounds on complex project management. BIM implemen-tation helps Pinnacle clients to assemble projects in a virtual environment for identify-ing and correcting potential problems before construction.

One of the market leaders since 2003, provid-ing BIM solutions to the international market, Pinnacle team has successfully executed 4800+ landmark BIM projects in 34 countries across 6 continents. Few of the landmark BIM projects executed in USA, Asia, Middles East & Gulf Cooperation Council (GCC), Europe & Australia across industries include Airports, Hospitals, Medical Centers, Stadium, High Rise Towers, Infrastructure, University Campuses, Nanotechnology Research Centers, Industrial Plants, Retail Chains, Shopping Malls, Restau-rants, Dams, Bridges and more. Pinnacle has won accolades in the form of numerous awards and recognition from the Government, Industry and other prestigious Associations, which includes excellence awards, innovation awards, top exporter and highest job creator awards. The company has developed ISO 9001 for work process to enable seamless working.

Project Summary – Hilton Waterfront Beach Resort (Hotel), Huntington Beach, California, USA

Iron Mechanical & Pinnacle Infotech were respon-sible for creating the 3D Mechanical Models of Hilton Waterfront Beach Resort - a 10 Storey Hotel building consisting of 10 �oors (basement to 9th �oor, including parking, equipment room, 2 mechanical rooms and tower roof ). The purpose of creating the 3D Models for new construction of hotel and beach resort was for resolving clashes and preparation of BOM (Bill of Materials) for pipes.

Architectural BIM Model

Mechanical Room Model

www.pinnaclecad.com

Pinnacle Infotech

Durgapur, India

COMPANY

LOCATION

Pinnacle Customer Success Story Pinnacle Infotech

Page 2: Pinnacle Infotech Pinnacle Infotech Implemented Autodesk ... › wp-content › uploads › 2018 › 03 › Hilt… · Pinnacle Infotech o˚ers Building Information Modeling (BIM)

BIM Scope of Work for PinnaclePinnacle’s scope of work was to create 3D BIM Model, Shop Drawing & Spool Drawing of Mechanical components (including associated accessories, �ttings & equipment).

Sheet Metal, Mechanical PipingTRADES COVERED:

400LOD:

SOFTWARE USED:

Fabrication CADMep 2014 & AutoCAD MEP 2014

Fundamental Challenges and how BIM helped?

1. Design Issues Faced - BIM coordination identified the clash and raised it to consultants which resulted in revision of design. Multiple issues were identified in single drawing and resolved through drawing validation such as civil design mismatch with MEP plan, missing ceiling height information and MEP services clashing with each other and also with structure due to space constraint.

2. Maintenance Issues - BIM ensured ease of access for maintenance provisions and facility management. There was not enough space for maintenance inside Shaft and corridors. Conse-quently, re-sizing of duct was made and equipment and services were relocated to facilitate maintenance.

3. Missing/Incomplete Information - Duct sizes and grill dimensions were missing. BIM identified the need for providing revised di�user & lighting layout on the ceiling. Besides, there were incom-plete information related to material types and MEP design layout for all three levels. RFI’s were raised to resolve these issues. Weekly project meeting were conducted with Iron Mechanical for speedy resolution.

Detailed Modeling Stages:

BIM Work Flow

Model Crea on

from Design

Document

CoordinationMeeting

discussing Clashes

Clash Mitigation &

Final Coordination

Model Preparation

Shop Drawing

Preparation

Shop Drawing

Submission

Mechanical Pipe Spool

Drawing Preparation

Mechanical Room Model

www.pinnaclecad.com

Pinnacle Customer Success Story Pinnacle Infotech

Project Input

Kick Off with IM

Delivery Schedule

Specificationchick list

For ApprovalApproved

BIM ExecutionProcess

3D Model(Mechanical)

Coordination(With other services)

RFIs

Clash viewpointsfor IM's advise

Iron Mechanical

Project reviewBy Pinnacle

For IM's review& advise

Coordinated models

IM's response& advise

Quality Checking(Phase 1)

Shop drawing Shop drawing

Quality Checking(Phase 2)

Weekly projectprogress meeting

Submission

Project FeedbackFrom IM

Page 3: Pinnacle Infotech Pinnacle Infotech Implemented Autodesk ... › wp-content › uploads › 2018 › 03 › Hilt… · Pinnacle Infotech o˚ers Building Information Modeling (BIM)

Value Addition:

Rerouted pipes, ducts & piping Layouts to reduce �ttings and cost

Provided RFIs with appropriate snap to understand the issues with proposed solution like design con�ict, �xture location mismatch, pipe continuation missing or mismatch

Re-routed pipes, ducts & piping for coordination with architecture, structure & other MEP services

Raised 5 RFIs & resolved 1000+ clashes including 200 critical clashes in the BIM Model (for example clash between Mechanical Pipe & Plumbing Pipe, Clash between pipes and structure)

SUMMARY:

Autodesk BIM helped Iron Mechanical Inc. & Pinnacle Infotech to plan using intelligent models and allowed the team to anticipate, plan, and coordinate every aspect of the project design, detailing, construction, and maintenance. It helped to identify constructa-bility issues prior to construction by detecting the number of clashes, thus avoiding work stoppages, rework and wastage of time, material, and manpower.

Mr. Pradip Bandyopadhyay, Senior Manager, Pinnacle Infotech said - “Autodesk BIM software helped us to identify constructability issues prior to tender stage and progress through each phase of the project, starting from �oor setup to structural and MEP clash detection. Pinnacle has reviewed critical areas in 3D for any changes made and evaluated space constraint successfully. BIM facilitated various design disciplines to collaborate in a �awless manner as single information platform,

enhancing work e�ciency, reducing errors, verifying aesthetic looks and improving building performance.”

“Using Autodesk BIM software, we could easily produce the models with various cutaways and complex geometry. We combined Revit design and fabrication models in Navisworks for project coordination and thus could avoid the cost of rework from the existence of clashes.” – added Mr. Soumitra Maity , Assistant Manager, Pinnacle Infotech.

“Autodesk BIM Software has automated our work�ow pertaining to RFIs, submittals, mark-ups, document approvals and general communication and has made our team productive.” – said Mr. Bimal Kumar Patwari, President, Pinnacle Infotech.

“Autodesk Fabrication has slashed the time consumed and helped the project to move

forward. I am satis�ed that by managing project info though Fabrication, my team is able to complete the modeling within the strict deadline, focusing more on better engineering, construc-tion oversight and client satisfaction.” - concluded Mr. Biswaroop Todi, Vice President, Pinnacle Infotech.

Drawing Name: MP-B1-MECH ROOM.dwg

System Name: Mechanical Piping

Bill of Materials - PipeJob No: 1098

Level : Basement

Fittings: Description Size (inch) Weight (lb) QtyBlk CS Nipple Std Wt CW TExTE x3 1 1/2" 1.36 2Blk CS Nipple Std Wt CW TExTE x3 3/4" 5.65 20Blk CS Nipple Std Wt CW TExTE x3 1/2" 0.43 2CS 22_5 Trimmed Elbow STD 6" 48 2CS 45 Elbow STD 6" 81.9 7CS 90 LR Elbow STD 8" 717 15CS 90 LR Elbow STD 6" 744 31CS 90 LR Elbow STD 4" 71.2 8CS 90 LR Elbow STD 3" 38.4 8CS 150# FF WN Flange STD 8" 84 2CS 150# FF WN Flange STD 6" 208 8CS 150# FF WN Flange STD 4" 33 2CS 150# FF WN Flange STD 2" 12 2CS 150# RF WN Flange STD 8" 1428 34CS 150# RF WN Flange STD 6" 1300 50CS 150# RF WN Flange STD 5" 42 2CS 150# RF WN Flange STD 4" 396 24

Coordinated BIM Model

Bill of Material Clash coordination

www.pinnaclecad.com

Pinnacle Customer Success Story Pinnacle Infotech