Portfolio - Digital Viewing

Embed Size (px)

Citation preview

  • 8/11/2019 Portfolio - Digital Viewing

    1/16

  • 8/11/2019 Portfolio - Digital Viewing

    2/16

    I ni ti al c ur ve S ec on d cu rv e ro ta te d 90 N at ur al n ar ro wi ng i de nt if ie d C EL L en cl os ed C EL LS a rr ay ed t o fo rm C LU ST ER S EC TO RS e st ab li sh ed b y c lo si ng o ffsmallerareas intomore privatespace

    Centralwalls removedto allowaggregationof public space.

    Clusters aboveorbelowinitialplane

    r r

    r r r r rr r r r r rr

    Clusters branchoffvertically fromtransitcores toexpandthematrix

    Clusters continueoutwardexpansion- growth is limitedbyfarmlandaccess and explorationobjectives

    Matrixes seednewclusters instrategic locations beyondthereachofexistingfarmlands - distances nottoscale

    Clusters aboveorbelowinitialplane

    Transitcore

    I n it i al c e ll c l us t er a n d tr an s it c o re B ra n ch i ng c o rr i do r s to u t il i ty a r ea s A d di t io n al c lu s te r s fo r m in a l te r na t in gslots toforma cellMATRIX

    Clusters branchoffvertically fromtransitcores toexpandthematrix

    OBSERVATORY &LANDMARK TOWER

    SURFACELIFT/RAMP

    PRESSURIZEDFARMLAND

    LOWPRESSUREFARMLAND

    ROOFTOP GARDENS&GATHERING AREA.

    PRIMARYSTRUCTURE :CELLULARBEAMS ONMAGMA-BRICKPILLARS.

    125 -0ONCENTRE500 x 500 UNITS

    25 ONCENTRE DOUBLE LAYERGLAZINGSUPPORT

    SECONDARYSTRUCTURE: CELLULARBEAM 18

    MAX. MARS = approx. (MAX EARTHSPAN ) X 1.0EARTH GRAVITY SPAN 0.37EARTH GRAVITY

    CELLULAR BEAM |36Hx 64LB.MAX EARTHSPAN=86MAX MARS SPAN= 232

  • 8/11/2019 Portfolio - Digital Viewing

    3/16

    s

    s

    s T

    PP

    P P

    P P

    P

    P

    THIRD FLOOR PLAN 1:200

    Privateoffice

    GroupLivingAreaKitchen

    Womens Retreat

    Security + Reception

    Temporary

    Residences

    Security

    Residence

    OutdoorRitual Space

    PrivateBalcony

    q w

    V 1 | t ru t u r I I | r il 1 , 1 | i n n t | n n h r ry | K n r K u i | In t ru t r G K l l i t

    T r i r y s r c r c s is s fc c r c l s r s y c c r i r r s, i c ll s r r

    sting

    ( r ). T l l s r r i f rc y s l - l s i c r i r l s r l l s h er e

    r i r y s ir f i s r i , r i c lr ly l v l s i i y s rf c s . T - n el s l l s s r s l c k i c cr i . T s l lr s r i s l i ly i r y t he

    ri i s s i l c k. T r i s c s l r i r y c l s i c s r s c r y s r c r s of

    c r i l l l z i .

    P

    P

    Perimeterradiantheating

    HSS curtain wallstructure

    Kawneertriple glazedglass

    Kawneercustom mullions

    Perimeterplanter/bench

    Exteriorwooddecking

    Drainage pipe

    Poured concrete slabon

    steeldecking

    Glulam beam (C-Channelsrunning between beams)

    Concrete perimeterbeam

    Concrete Column

    e rPROUD SPIRIT

  • 8/11/2019 Portfolio - Digital Viewing

    4/16

    t yDIMENSIONAL DRIFT

  • 8/11/2019 Portfolio - Digital Viewing

    5/16

    |

    7m

    3 m

    2 m (above bar)

    6.25 m

    3.5 m (foor)

    6.75 m

    |

    Level 1 plan

    Section

    Level 2 plan

    u iJUNCTION

  • 8/11/2019 Portfolio - Digital Viewing

    6/16

    :

    :

    :

    o aCOMMUNALITY

    t

  • 8/11/2019 Portfolio - Digital Viewing

    7/16

    q wTEATRUM

    A

    A

    B

    B

    B

    C

    C

    C

    connectionsweldedto resistmome ntstypical

    slope 1:12

    l

    7.5

    15

    t.o.footing1500mmbelow grade

    grade

    grade

    600mm

    350mm

    375mm

    l l

    l i

    l

    l l

    l

    l

    Mezzanine +Stage Supports100mmx200mmbeamsonL-brackets

    Open Web J oists28K10Series(8m-16mspan)

    Composite Decking38mmspanning 1220mmto 2440mm

    Plannts

    Front Elevationnts

    Side Elevationnts

    Spread Footings+Columns Por ta l Framesbolted withsteelanchorplate to concrete c olumns

    Cross-bracingperpendicularbracing

    Cross-bracingperpendicularbracing

    r

    7.5m

    fi r l s s

    15m

    20m

    r

    t.o.mezzanine4200mm

    t.o.stage1200mm

    r

    r

    st lc l

    st ls cti s

    st l

    st lc l

    c c r t

    st l

    st l

    C c r t

    st l

    st l

    st l

    st l

    st l s

    PrimaryStructure

    r

    r

    r r

    r rr

    r rr

    st l

    c c r t

    t

    s dTEATRUM

  • 8/11/2019 Portfolio - Digital Viewing

    8/16

    CLUSTER LOGIC BREAKDOWN

    CLUSTER

    C1

    L-lg

    A

    B

    B -aba

    B -aba

    A-ab

    A-ab

    A-ab

    L-sm

    4 GenerationsLOBES2 Types

    METABRANCH2 Types

    f gSYNTHETIC DENDRITE

  • 8/11/2019 Portfolio - Digital Viewing

    9/16

    h jGROUP2 ARCHITECTURE

  • 8/11/2019 Portfolio - Digital Viewing

    10/16

    1& 1*BEYOND HOMES

  • 8/11/2019 Portfolio - Digital Viewing

    11/16

    1( 2)STUDIO WOLF DESIGNS

  • 8/11/2019 Portfolio - Digital Viewing

    12/16

    2! 2@GREENPLAN DESIGN

  • 8/11/2019 Portfolio - Digital Viewing

    13/16

    2# 2$GRAPHIC DESIGN

  • 8/11/2019 Portfolio - Digital Viewing

    14/16

    2% 2^SKETCHES

  • 8/11/2019 Portfolio - Digital Viewing

    15/16

    Painting of a Painted wall | Oil on Canvas the Scent that Lingers | tri-colour wood cut magnified foot of a house fly | four-colour lino cut THATS NO MOON! - an anachronistic copy of Drers Self portrait| oil on wood panel

    2& 2*ARTWORK

  • 8/11/2019 Portfolio - Digital Viewing

    16/16

    ART IS NEVER

    FINISHED,ONLYABANDONED.

    LEONARDO DA VINCI