PORTS AND HARBORS
Citation preview
ports
The road accesses project is part of the
project of the New Containers Terminal
of the Barcelona Port.
The study compiles all the existing
information of the different works carried
out till the date and related to the
accessibility to the south extension of the
port. Once all the information was
compiled, all the future actions were
analyzed and a proposal to incorporate
them was developed. It was chosen the
solution considered the most adequate
from a technical, economic and
operational point of view.
The new roads will allow the access to
the future Tercat Terminal. Two road
junctions, connected through the Prat
Road, are designed. The section is
formed by a rail yard that provides
service to the Tercat Terminal and a 3+3
rail axis and a rail service branch line for
Decathlon.
The complexity of this project is the
execution of the different phases of the
road and rail layout, taking into account
the structures that have to be designed
to serve the future containers terminal of
the Barcelona Port.
The final purpose is the drafting of the
detailed phase 1 design of the new
accesses works to the south extension
of the Barcelona Port, in accordance
with the specifications of the existing
documents.
• View of the south interchange, Prat road,
access to Tercat terminal.
• View of the north interchange, access to the
lorries and inflammable goods motorway.
ACCESSES TO THE NEW CONTAINERS TERMINAL OF
THE BARCELONA PORT
PRELIMINARY STUDY. CONSTRUCTION PROJECT PHASE 1
Barcelona, 2009. 2010-2012
SANTA MARTA HARBOR RAILWAY ACCESS
REVIOUS FEASIBILITY STUDYColombia, 2011-2012
Previous feasibility study of theinfrastructure construction for thereactivation of the railway freighttransport between Santa Marta harborand the Maritime Terminal in Colombia.Special importance is given to coaltransportation, stressing in a qualityloading, stocking and unloadingprocesses. The study includes:
• Legal basis for the Public-PrivateAssociation.
• Permeability study of the Santa Martaneighborhoods and identification ofthe critical points of the Mamatoco-Puerto railway stretch.
• Demand and supply study on theprevious feasibility stage.
• Estimated cost and financing sources.
• Project exploitation and operationalstudy.
• Aerial photograph of the work area.
• Proposed plan for Santa Marta Harbor access.
MARINA IN THE AREA OF ARRAJAINAL
PREVIOUS PROJECT
Malaga, 1997-2002
• Photomontage of the marina with an aerial
picture.
• Photograph of the model.
The Arraijanal Marina implies the
construction of a large complex of
residential developments, sports and
commerce buildings and hospitality
constructions in a coastal parcel of
approximately 50 Ha, close to Malaga
airport. The complex includes 1,500
homes and 200 commercial premises
associated to what will be the biggest
sport harbor of Costa del Sol, with
almost 1000 berths.
The whole complex represents a global
investment of 120.2 million euros, out of
which 24 are direct for the docks work,
the accesses creation and building
constructions, which constitute the
Esteyco designs for the project.
Some of the more complicated areas for
the design are the diversions and the
connections with the national road, due
to the proximity of the Guadalhorce
estuary, as the Marina’s groin could be a
barrier for the sediment (carried by the
river) distribution, in such a manner that
the adjacent beaches would suffer a
regression.
ESPLANADE AND SEVERAL INTERVENTIONS IN FORUM
2004, BARCELONA
CONSTRUCTION PROJECTS
Barcelona, 2000-2002
The interventions related to the Universal
Forum of Cultures 2004 have supposed
a great reconstruction process in an
area of Barcelona which has been
derelict until recent times. The area
comprises 214 Ha, and it includes the
renovation of important urban
infrastructures, the restructuring of the
Besos Water Treatment Plant, the
creation of a new Besos marina and the
implementation of a new area of
centrality with hotels, centres for
congresses, shopping centres, offices
and dwellings. The designs took up part
of the sea by means of rectifying the
coastline. The final goal was to recover a
territory which was of little use by making
a spotlight with potential activity, due to
its excellent and strategic location, where
the most important infrastructures and
roads of the city join together.
Esteyco worked actively in several
projects related to the main area where
the acts of Forum 2004 took place: the
development of the Esplanade, the
Coastal Ring Road coverage, the Sailing
School, the Auditorium and the
Photovoltaic Pergola.
The project of development was carried out with the collaboration of the Architects Elias Torres and Jose Antonio Martinez Lapeña, and it covered an area of 90 Ha. The main characteristic was the existence of a technical floor over the cover structures of the Water Treatment Plan and the Coastal Ring Road, where a complex network of services is lodged, permitting
the maximum flexibility for its future
exploitation. Over the technical floor,
some coloured asphalt and flowerbeds
were spread, conferring the last finish to
the esplanade.
Cost of works: 18.069.906 eur.
• Sketch showing the plan of the Esplanade
designed by the Architect Elias Torres.
• General plan showing the facilities and
development services.
• Aerial photograph showing Forum 2004
during construction.
• Images of the Forum Esplanade. The
network of services designed made
possible having intakes of water,
electricity, telecommunications and
irrigation in any point of the
esplanade.
The zoo is located in the Forum area, one
of the most architecturally developed
areas in the city. The infraestucture
required for housing the numerous
species of the new marine zoo will be
created on a 100.000 m2 platform that will
be built over the sea.
The project includes several phases; from
earthwork and deep foundation study to
the definition of all the structures.
It consists of five unique buildings with
large swimming pools where there will be
vision areas conceived as large
methacrylates and an aquatic vision tunnel
that crosses the larger tank. Platforms with
aviaries and areas for pubic use will also
be designed.
We can stand out both the singularity of
every building that will require a different
treatment and structural type, and the
large tanks that are integrated in each of
the buildins.
MARINE ZOO
FORUM AREA, BARCELONA
DETAILED DESIGN
Barcelona, 2008
FOTO AÉREA tomada desde Edificio próximo de Vallehermoso
(si fuera posible pedir a Bilbao Ría 2000)
•Sección transversal del viaducto.
•Plano de situación.
•Vista general del viaducto.
•Alzado del viaducto, según proyecto .
•Vista frontal del viaducto construido.
•Perspective of the future zoo in 3D.
•Plans of the topographical map, earthworks,
definition of areas and future pile work of the
zoo.
•Aerial photo where the location of the future
zoo can be seen.
• Birdseye photo of the current state of the
area.
• Images of the scale model of the urban
planning proposal.
Competition of Ideas for the urban
planning project of the Sector Grao in
Valencia, next to the old Turia River bed,
developed in collaboration with the
architect Carlos Meri
.
Proposal information summary:
A total surface area of 50,70 hectares
and an above ground, buildable area of
688.577 m2, for residential and tertiary
uses.
THE SECTOR GRAO PLANNING - VALENCIA
TENDER
Valencia, 2005
NEW HEADQUARTERS OF THE PORT AUTHORITY OF
BILBAO IN SANTURTZI
RECTRICTED COMPETITION OF IDEAS
Bilbao, 2003
•View at night from the Bilbao Estuary
•Section, ground floor and elevations
The proposal is based on the idea of
developing and enhancing the possible
relations that will be established between
the site and the future buildings, with
regard to their definition and distribution
on the plot and the interpretation of the
site. The characteristics of the plot were
integrated in a solution that develops a
new topography, seeking to exploit,
enhance and foster the relationship with
the environment, characterized in
general by a port and industrial
landscape that meets a border of green
mosaic descending from the hills to the
docks in what could be considered to be
the typical landscape of the estuary.
The need for the New Headquarters to
be representative and emblematic is
addressed through the introduction of an
isolated main volume, free of additions
and superfluous elements, which attains
its character through its interaction with
the site. The plot is converted into a
topography that concentrates the
relations with the environment and then
serves as a basis/framework of reference
for the building. This aims to unify and
simplify the formal reading of the
building to achieve a more conceptual
vision of greater scale, with a clear
reference to the emblematic character—
a truly differentiating feature in
comparison with the rest of the buildings
and port installations in the vicinity.
MOVABLE BRIDGE IN THE DOCK ATTACHED TO THE
PORT OF BARCELONA
PROJECT COMPETITION
Barcelona, 1997
• Aerial view.
• Night image of the bridge.
• Several images showing the bridge raising
process.
• Cross section and plan.