PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations • Permitting • Inspection Arizona Solar Power Society www.meetup.com/arizona-solar-power- society/

PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Embed Size (px)

Citation preview

Page 1: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

PowerPoint® PresentationPowerPoint® Presentation

Photovoltaic SystemsPhotovoltaic SystemsSolar Permitting and InspectionsSolar Permitting and Inspections

Building Codes and Regulations • Permitting • Inspection

Arizona Solar Power Societywww.meetup.com/arizona-solar-power-society/

Building Codes and Regulations • Permitting • Inspection

Arizona Solar Power Societywww.meetup.com/arizona-solar-power-society/

Page 2: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Product standards, installation codes, and code enforcement are separate but related functions that result in higher-quality and safer installations.

Product standards, installation codes, and code enforcement are separate but related functions that result in higher-quality and safer installations.

Page 3: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

The UL Listing Mark indicates if the product is listed for both the United States and Canada.

The UL Listing Mark indicates if the product is listed for both the United States and Canada.

Page 4: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

PV equipment may bear the marks of listing and certification organizations other than Underwriters Laboratories.

PV equipment may bear the marks of listing and certification organizations other than Underwriters Laboratories.

Page 5: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Site drawings should be provided with permit applications indicating locations and providing descriptions of major components.

Site drawings should be provided with permit applications indicating locations and providing descriptions of major components.

Page 6: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Permit applications usually require either a one-line or a three-line electrical diagram. Additional electrical information may be included as a separate document.

Permit applications usually require either a one-line or a three-line electrical diagram. Additional electrical information may be included as a separate document.

Page 7: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Specifications for PV modules, inverters, and other equipment are required for code calculations and compliance.

Specifications for PV modules, inverters, and other equipment are required for code calculations and compliance.

Page 8: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Descriptions and drawings of the array mounting design and materials are used to analyze the structural integrity of the structure and the array.

Descriptions and drawings of the array mounting design and materials are used to analyze the structural integrity of the structure and the array.

Page 9: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Building permits include information about the construction project and inspections, and must be posted in a conspicuous location on the job site.

Building permits include information about the construction project and inspections, and must be posted in a conspicuous location on the job site.

Page 10: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Quality workmanship results in a neat and efficient electrical installation.

Quality workmanship results in a neat and efficient electrical installation.

Page 11: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Dedicated space is the clear space reserved around electrical equipment for the existing equipment and potential future additions.

Dedicated space is the clear space reserved around electrical equipment for the existing equipment and potential future additions.

Page 12: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Working space is the clear space reserved around electrical equipment so that workers can install, inspect, operate, and maintain the equipment safely and efficiently.

Working space is the clear space reserved around electrical equipment so that workers can install, inspect, operate, and maintain the equipment safely and efficiently.

Page 13: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Rubber or plastic terminal covers are used to prevent shorts across battery terminals during maintenance.

Rubber or plastic terminal covers are used to prevent shorts across battery terminals during maintenance.

Page 14: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

PV module labels must include terminal polarity information and ratings for voltage, current, and power.

PV module labels must include terminal polarity information and ratings for voltage, current, and power.

Page 15: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

A label indicating the operating current, operating voltage, maximum system voltage, and short-circuit current must be displayed at the DC disconnect of a PV array.

A label indicating the operating current, operating voltage, maximum system voltage, and short-circuit current must be displayed at the DC disconnect of a PV array.

Page 16: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Labels identifying the PV system as a power source and including its maximum output operating current must be posted at the AC disconnect of a PV system.

Labels identifying the PV system as a power source and including its maximum output operating current must be posted at the AC disconnect of a PV system.

Page 17: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

PV systems with batteries must have labels indicating the battery maximum operating voltage, equalization voltage, and polarity of the grounded circuit conductor.

PV systems with batteries must have labels indicating the battery maximum operating voltage, equalization voltage, and polarity of the grounded circuit conductor.

Page 18: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Single 120 V supply panelboards must be marked to prohibit connection of multiwire or 240 V branch circuit loads.

Single 120 V supply panelboards must be marked to prohibit connection of multiwire or 240 V branch circuit loads.

Page 19: PowerPoint ® Presentation Photovoltaic Systems Solar Permitting and Inspections Building Codes and Regulations Permitting Inspection Arizona Solar Power

Chapter 13 — Permitting and InspectionChapter 13 — Permitting and Inspection

Maintenance or operation labels are recommended for detailing nominal equipment settings and adjustment procedures.

Maintenance or operation labels are recommended for detailing nominal equipment settings and adjustment procedures.