Page 1: PPA Details

Year S. No. State Type

2007

2007

2007

2007

June

2010

Jun-10

Jun-10

Nov 2007

Nov 2007

Feb-08

Feb-08

Feb-08

Sep-09

Sep-09

Sep-09

Dec-09

4 Rajasthan Case I

Oct-095 Bihar Case I

3 Maharashtra Case I

1 Gujarat Case I

Case I2 Haryana

Page 2: PPA Details

Foot notes:-

*Adani Power PPA with

GUVNL

**

Total

***

M/s.KSK Mahanadi Power

Company Ltd.

Kamalang Thermal Power

Project, Orissa (for PTC

India Ltd ‐ GMR Project)

6 Karnataka Case 1

Page 3: PPA Details

**** Adani Power

Therefore, longterm PPA contracted capacity for Stage 1 is 1445 MW.

#JSW ENERGY Ratnagiri

Power Plant

Page 4: PPA Details

Seller/Project Name Procurer

Adani Enterprises Ltd. Mundra Phase I and IIAryan Coal Benefaciaries Pvt. Ltd. Kasaipalli Korba

district Chhattisgarh

Adani Power Pvt. Ltd. Mundra Phase IIIEssar Power Ltd. Khajurda village at Khambalia

taluka in Jamnagar

M/s.KSK Mahanadi Power Company Ltd.

Shapoorji Pallonji Energy Gujarat Pvt. Ltd.

M/s.Essar Power Gujarat Ltd. Salaya II

Mundra TPS, Phase‐IV, Gujarat ‐ Adani Power Ltd.

Kamalang Thermal Power Project, Orissa - PTC India

Ltd ‐ GMR Project

Adani Power Tiroda Power Project (Phase 1 and Phase

2)

JSW Energy (Ratnagiri) Limited (JSWERL)

M/s Lanco Mahanadi Power Project Ltd. Now

Lanco Vidarbha Thermal Power Ltd

Adani Power - Tiroda Power project Phase I and III

India Bulls Amravati Power Project (Phase II)

GMR EMCO Warora Power Plant Phase 1

Adani Power - Kawai Thermal Power Project, Rajasthan

Rajasthan State Electricity Board Jaipur

Vidyut Vitran Nigam Ltd, Ajmer Vidyut

Vitran Nigam Ltd, Jodhpur Vidyut Vitran

Nigam Ltd.

ESSAR (Tori) - Thermal Power Project Bihar State Electricity Board

Maharashtra State electricity Distribution

Co. Ltd (MAHADISCOM)

Maharashtra State electricity Distribution

Co. Ltd (MAHADISCOM)

Haryana Power Purchase Centre UHBVNL

and DHBVNL

Gujarat Urja Vikas Nigam Ltd.

Gujarat Urja Vikas Nigam Ltd.

Page 5: PPA Details

PTC-Thermal Powertech JV (Phase 1) Power plant at

Painapuram, Krishnapatnam district AP.

PTC-East Coast Energy JV, Power Plant at Kakarapalli

village, Santhabommali, AP

PTC-Nagarjuna Construction Company JV Sompeta in

Srikakulam district of Andhra Pradesh,

PTC-Monnet Power JV Power Plant at Angul, Orissa

PTC- Meenakshi Power JV, Coastal thermal Power

Project Thamminapatnam near Krishnapatnam in

Nellore district, Andhra Pradesh.

JSW Energy’s Toranagallu Thermal Power Station in

Bellary district of Karnataka (JSWEL-SBU II )

Long term PPA for 1,000 MW entered with

GUVNL Agreement for merchant sale

of up to 221 MW of surplus power entered

with AEL

PPA Details:

1010 MW - GUVNL

450 MW - Goa

270 MW - CSEB

1730 MW

PPA Details:

263 MW to Govt of Orissa – cost plus

300 MW tied up with UHBVNL and DHBVNL

POWER COMPANY OF

KARNATAKA LTD.

Page 6: PPA Details

Stage 1 : signed PPA of 1320 MW with MAHADISCOM

from Tiroda Phase 1 and 2

Stage 2 : Signed PPA of 1200 MW of Tiroda Phase 3

with MAHADISCOM and an additional 125 MW from

Tiroda Phase 1

Therefore, longterm PPA contracted capacity for Stage 1 is 1445 MW.

Long-term PPA with Maharashtra State Electricity

Distribution Company Limited (“MSEDCL”) for 300

MW;

Long‐term PPA with Adani Enterprises Limited (“AEL”)

for 270 MW of net capacity out of 300 MW

Long term PPA of 600 MW with Karnataka under

process.

Balance power to JSWPTC through short term PPA.

Page 7: PPA Details

Capacity in PPA

(MW) Fuel Type Levelized tariff (Rs/kwh)

1000 MW Coal Supply Agmt with AEL 2.890

200 MW Washery rejects/coal based2.2498

1000 MW Coal Supply Agmt with AEL 2.3495

1000 MWImported Coal - Indonesia/ South Africa

2.4006

1010 MW Coal (Gujarat Mineral Development Corporation) 2.345

800 MW Imported Coal - Expected from Indonesia/ South Africa2.800

800 MW Imported Coal - Indonesia/ South Africa 2.800

1424 MW Coal supply Agreement with AEL 2.940

300 MW Talcher Mahanadi coal fields 2.860

1320 MW

Captive mines allocated by Ministry of Coal for

generating up to 1,000 MW of power; Coal linkage of

1,180 MW recommended

2.642

300 MWChina National Mineral Company Limited and PT.

Sungai Belati Coal, Indonesia.2.716

680 MWCoal Mines from Chhattisgarh & Coal Linkage

allotment letter is procured2.700

1200 MW (P III) +

125 MW(P I)

• Captive Coal Blocks (800 MW)‐ coal blocks at Lohara

West and Lohara Extension

• South Eastern Coal Fields Limited/Western Coal

Fields Limited (1180 MW)

• Imported Coal Supply FSA for 5 years and Long Term

Coal Linkage (1320 MW)

3.280

450 MW + 750

MW

Domestic Coal (CIL) South Eastern Coal Fields Ltd and

Western Coal Fields Ltd3.260

200 MWCoal India Linkage,Western Coal Fields and South

Eastern Coal fields 2.879

1000 MW +

Additional 200

MW

Domestic Coal (CIL) South Eastern Coal Fields Ltd and

Western Coal Fields Ltd3.2483

450 MWCaptive pit-head coal-fired, Chakla and Ashok Karkata

coal blocks.3.057

Page 8: PPA Details

430 MWBlended Coal ratio of 3:1 (Indigenous-Coal India Orissa

to imported)3.770

400 MWMCL Coal (Talcher valley coal mines) and imported coal

from Indonesia and others.3.890

400 MW Mahanadi Coalfields and South Eastern Coalfields;

Import about 30% of the coal3.890

150 MWUtkal B2 and Mandakini coal block in Angul, Orissa-

Captive coal blocks of Monnet.3.760

200 MW

Power Tolling Arrangement of 160 MW with PTC

(purchase the coal from the Indonesian coal mines)

Mahanadi Coal Fields Ltd for domestic coal supply.

3.800

600 MW PT Sungai Belati Coal, Indonesia. 3.810

## Adani Power kawai Power Project PPA details:

Long term PPA of 1200 MW

with RRVPNL

Short term PPA of 120

MW

### Essar Tori I Power Project Bihar60% -PPA (inc 450 MW

signed with BSEB) ,

13% –Jharkhand

Government,

ROFR: 12.0% on VC basis to

SEB,

15% –Merchant Power

####

Long term PPA signed with

PTC for phase 1 of

70 % Long term

PTC-Thermal Powertech JV (Phase 1) Power plant at

Painapuram, Krishnapatnam district AP. (Details of

Phase 1 available)

Page 9: PPA Details

30 % merchant sale

Only 430 MW tied for long term with Karnataka

• PTC-East Coast Energy JV, Power Plant at Kakarapalli

village, Santhabommali, AP

Long term PPA signed with PTC for entire 1320 MW of

Phase 1.

1320 MW of Phase 2 for

merchant sale

• • PTC-Monnet Power JV Power

Plant at Angul, OrissaPPA details

Longterm PPA with GRIDCO Orissa (@ Rs

2.85/unit)250 MW

PTC (Min rate - 2.3 per Kwh + 90% share of incremental

revenue)400 MW

PTC (Min rate - 2.55 per Kwh + 90% share of

incremental revenue)200 MW

Merchant sale in Open Market 200 MW

PTC-Thermal Powertech JV (Phase 1) Power plant at

Painapuram, Krishnapatnam district AP. (Details of

Phase 1 available)

Page 10: PPA Details

Total Capacity % for Longterm PPAContracted Capacity

for longterm PPA

% for Merchant

Power Sale

(2*330) *2 = 1320 MW 75.75% 1000 MW 24.25%

270 MW 74.07% 200 MW 25.93%

2*660 = 1320 MW 83.26% 1000 MW 16.74%

2*600 = 1200 MW 83.33% 1000 MW 16.67%

3*660 = 1800 MW 96.11% 1730 MW 3.89%

2*660 = 1320 MW60.61%

800 MW 39.39%

2*660 = 1320 MW 60.61% 800 MW 39.39%

3*660 = 1980 MW 71.92% 1424 MW 28.08%

3*350 = 1050 MW *** 28.57% 300 MW 46.38%

P 1 = 2*660 MW

P 2 = 1*660 MW

1980 MW

72.98% ****1445 MW 27.02%

4*300 = 1200 MW 100% # 1200 MW 0%

2*660 = 1320 MW

2*660 = 1320 MW 90.91% 1200 MW 9.09%

2*660 = 1320 MW 90.91% 1200 MW 9.09%

1*300 = 300 MW 66.67% 200 MW 33.33%

2*660 = 1320 MW 90.010% 1200 MW ## 0%

2*600 = 1200 MW 60% 450 MW ### 15%

PPA for balance power to be signed in future (under process)

Page 11: PPA Details

Phase 1 = 2*660 MW Phase

2 = 1*660 MW

1980 MW

70% 924 MW #### 30%

Phase 1 = 2*660 MW Phase

2 = 2*660 MW

2640 MW

50% 1320 MW • 50%

4 * 660 = 2640 MW 85% 2244 MW 15%

2*525 = 1050 MW 80.95% 850 MW • • 19.05 %

Phase 1 = 1* 600 MW Phase 2

= 1* 300 MW 900

MW

300 *2 = 600 MW 100% 600 MW 0%

PPA details of the given power plant not available.

Page 12: PPA Details
Page 13: PPA Details

Merchant Power

Capacity in MW

320 MW

70 MW

221 MW *

200 MW

70 MW **

520 MW

520 MW

556 MW

487 MW

535 MW

0 MW

120 MW

120 MW

100 MW

0 MW

180 MW

PPA for balance power to be signed in future (under process)

Page 14: PPA Details

396 MW

1320 MW

396 MW

200 MW

0 MW

PPA details of the given power plant not available.