    Suppl ier

    Product ion Part Approval Process

    PPAP GUIDELINES FORSUBMISSION

  • 8/22/2019 PPAP Guidline Cove

    2/33

    .2

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    PACKAGE WILL BE SUPPLIED FREE OF CHARGE

    DOCUMENTATION MUST BE IN ENGLISH

    PURCHASE ORDER # INCLUDED ON PACKING SLIP & PSW SHEET

    SAMPLES OF PARTS AS REQUIRED

    SIGNED WARRANT FROM SUPPLIER

    CORRECT SUBMISSION LEVEL PER HEC PURCHASING

  • 8/22/2019 PPAP Guidline Cove

    3/33

    .3

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    APPROVED METHOD OF SUBMISSION

    3 Ring Binder / Soft Side Binder

  • 8/22/2019 PPAP Guidline Cove

    4/33

    .4

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    CONDITIONS REQUIRING SUBMISSION:

    INITIAL PRODUCTION OF COMPONENT

    CHANGE IN PROCESS, TOOLING, DESIGN

    CHANGE IN SUPPLIERS LOCATION

    CHANGE IN SUB-SUPPLIER

  • 8/22/2019 PPAP Guidline Cove

    5/33

    .5

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    SHIPMENT OF PPAP PACKAGE:

    MUST BE PROTECTED TO PREVENT DAMAGED PARTS

    MUST CLEARLY IDENTIFY AS PPAP SUBMISSION WITH SAMPLES

    SAMPLES MUST BE LABELED, MARKED SO DATA CAN BE CORRELATED

    PPAP PACKAGE MUST BE SENT SEPARATELY FROM OTHER

    SHIPMENTS

  • 8/22/2019 PPAP Guidline Cove

    6/33

    .6

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    SHIPMENT OF INITIAL PRODUCTION:

    NO PARTS SHIPPED / ACCEPTED UNTIL PPAP IS APPROVED

    HEC PURCHASING WILL PROVIDE CONFIRMATION OF APPROVAL

    HEC WILL INITIATE ALLOWANCE IF PARTS MUST SHIP PRIOR TO

    ACCEPTANCE OF PPAP

  • 8/22/2019 PPAP Guidline Cove

    7/33.

    7

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    COMPLETION OF PPAP PACKAGE:

    PPAP CHECKLIST

    22 REQUIRED ITEMS TO COMPLETE PPAP PACKAGE

    LEVEL OF SUBMISSION WILL DETERMINE # OF REQUIRED ITEMS TO BECOMPLETED

  • 8/22/2019 PPAP Guidline Cove

    8/33.

    8

    PPAP

    CHECKLISTREQUIRED

    ITEMS

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    9/33.

    9

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 1 REQUIREMENTS

    SAMPLE PARTS WITH APPROPRIATE IDENTIFICATION

    MULTIPLE CAVITY TOOLING WILL REQUIRE SAMPLES FROM EACH

    CAVITY

  • 8/22/2019 PPAP Guidline Cove

    10/33.

    10

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 2 REQUIREMENTS

    CURRENT RELEASED XXXXX DRAWING NUMBERED TO

    CORRESPOND WITH DIMENSIONAL LAYOUT

  • 8/22/2019 PPAP Guidline Cove

    11/33

    .11

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 3 REQUIREMENTS

    LAYOUT RESULTS INCLUDING ALL BLUEPRINT NOTES

  • 8/22/2019 PPAP Guidline Cove

    12/33

    .12

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 4 REQUIREMENTS

    MATERIAL / FUNCTIONAL RESULTS

  • 8/22/2019 PPAP Guidline Cove

    13/33

    .13

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 5 REQUIREMENTS

    APPEARANCE APPROVAL FORM (IF APPLICABLE)

    SEE NEXT SLIDE FOR EXAMPLE

  • 8/22/2019 PPAP Guidline Cove

    14/33

    .14

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    15/33

    .15

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 6 REQUIREMENTS

    PROCESS CAPABILITY STUDIES / CPK REPORT (IF APPLICABLE)

    SEE NEXT SLIDE FOR EXAMPLE

  • 8/22/2019 PPAP Guidline Cove

    16/33

    .16

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    17/33

    .17

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 7 REQUIREMENTS

    PROCESS CONTROL PLAN (IF APPLICABLE)

    FORMAT PER AIAG MANUAL ADVANCED PRODUCT QUALITY PLANNING

    AND CONTROL PLAN (APQP)

  • 8/22/2019 PPAP Guidline Cove

    18/33

    .18

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 8 REQUIREMENTS

    PROCESS PFMEA (IF APPLICABLE)

    FORMAT PER AIAG MANUAL POTENTIAL FAILURE MODE AND EFFECTS

    ANALYSIS (FMEA THIRD EDITION)

  • 8/22/2019 PPAP Guidline Cove

    19/33

    .19

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 9 REQUIREMENTS

    DESIGN DFMEA (IF APPLICABLE)

    FORMAT PER AIAG MANUAL POTENTIAL FAILURE MODE AND EFFECTS

    ANALYSIS (FMEA THIRD EDITION)

  • 8/22/2019 PPAP Guidline Cove

    20/33

    .20

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 10 REQUIREMENTS

    GAGE STUDIES

    AS REQUIRED BY HEC QUALITY ENGINEERING

    PER AIAG MEASUREMENT SYSTEMS ANALYSIS (MSA)

  • 8/22/2019 PPAP Guidline Cove

    21/33

    .21

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 11 REQUIREMENTS

    FLOW CHART OF PROCESS

    PER AIAG ADVANCED PRODUCT QUALITY PLANNING AND CONTROL

    PLAN (APQP) MANUAL

  • 8/22/2019 PPAP Guidline Cove

    22/33

    .22

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 12 REQUIREMENTS

    PURCHASE ORDER NUMBER AND TOOL NUMBER (IF APPLICABLE)

  • 8/22/2019 PPAP Guidline Cove

    23/33

    .23

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 13 REQUIREMENTS

    AIAG PPAP WARRANT PAGE

    SEE NEXT SLIDE FOR EXAMPLE

  • 8/22/2019 PPAP Guidline Cove

    24/33

    .24

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    25/33

    .25

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 14 REQUIREMENTS

    SUPPLIER REQUEST FOR ENGINEERING APPROVAL (SREA)

    SEE NEXT SLIDE FOR EXAMPLE

  • 8/22/2019 PPAP Guidline Cove

    26/33

    .26

    MUST BE SUBMITTED AND APPROVEDPRIOR TO PPAP SUBMISSION

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    27/33

    .27

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 15 REQUIREMENTS

    CHANGE IN APPROVAL STATUS (CAS) IF APPLICABLE

    SEE NEXT SLIDE FOR EXAMPLE

  • 8/22/2019 PPAP Guidline Cove

    28/33

    .28

    MUST BE SUBMITTED PRIOR TO ANY CHANGE

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    29/33

    .29

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 16 & 17 REQUIREMENTS

    MATERIAL AND PLATING CERTIFICATIONS FROM ACCREDITED LAB

  • 8/22/2019 PPAP Guidline Cove

    30/33

    .30

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 18 REQUIREMENTS

    IMDS REGISTRATION REQUIREMENTS

    MUST BE APPROVED BY IMDS COORDINATOR

  • 8/22/2019 PPAP Guidline Cove

    31/33

    .31

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 19 REQUIREMENTS

    PACKAGING APPROVAL FORM (IF APPLICABLE)

    SEE NEXT SLIDE FOR EXAMPLE

  • 8/22/2019 PPAP Guidline Cove

    32/33

    .32

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

  • 8/22/2019 PPAP Guidline Cove

    33/33

    33

    PRODUCTION PART APPROVAL PROCESS REQUIREMENTS

    TAB 20 REQUIREMENTS

    SERIES TEST REPORT OR SPECIAL CHARACTERISTICS LIST