The PhilippinePublic-Private
PartnershipProgram
7/30/2019 PPP Brochure May2012
2/31
Table of
contents 1 Foreword by the President o the Philippines2 Message o the Socio-Economic Planning Secretary
3 The Public-Private Partnership Program
4 2012 PPP Projects
5 LRT Line 1 South Extension and Operation & Maintenance
6 LRT Line 2 East Extension and Operation & Maintenance
7 Operation & Maintenance o the Laguindingan Airport
8 New Bohol (Panglao) Airport Development
9 Mactan-Cebu International Airport Passenger Terminal Building
10 Operation & Maintenance o Puerto Princesa Airport
11 Automatic Fare Collection System
12 Integrated Transport System (ITS) Project
13 Cebu Bus Rapid Transit Demonstration Project
14 NLEX-SLEX Connector Road
15 NAIA Expressway Project (Phase II)
16 CALA Expressway (Cavite and Laguna Side)
17 Improvement / Rehabilitation o the Quirino Highway
18 New Centennial Water Supply Source Project
19 Operation & Maintenance o Angat Hydro-Electric Power Plant
(AHEPP) Auxiliary Turbines 4 and 5
20 Balara Water Hub
21 Vaccine Sel-Suciency Project (Phase II)
22 Modernization o the Philippine Orthopedic Center
23 Grains Central Project
24 Establishment o Cold Chain Systems Covering Strategic Areas in
the Philippines
25 The PPP Center
26 Project Development and Monitoring Facility (PDMF)
27 PPP Capacity Building Program
28 Doing Business in the Philippines
29 Directory
7/30/2019 PPP Brochure May2012
3/311
Foreword by thePresident of the Philippines
The Philippines is undergoing an era o reorm. The Filipino people, whose inherent talent and
productivity are crucial to the success o enterprise, have rearmed their participation in the pursuit o
economic development and equitable progress. In turn, our government has set in place the conditionsnecessary or the realization o these aspirations. We have instituted various structural interventions and
policy reorms that will acilitate and simpliy the conduct o business in the Philippines.
We believe that good governance -- marked by transparency, accountability, and integrity -- is the
bedrock o a robust economy.
The overall objective o these thrusts is the revitalization o our country and the ulllment o its
multiaceted potential. Foremost in our eorts is our engagement in Public-Private Partnerships, which
will spur inclusive growth accross all industries and secure our countrys standing in the global economy.
Our endeavors are bearing ruit, and we are heartened by your positive response. By the close o 2011,the Philippines jumped ten positions in the World Economic Forums Global Competitiveness Index --
one o the handul to make a leap o this magnitude. In the Financial Development Index, we moved
up to the 11th in the world, the rise in our ranking second only to Norway. These are among the many
tangible maniestations o the increased conidence o investors like you.
This is our momentum o development, and we can sustain this through our continuing partnerships.
This volume identies areas o mutually benecial collaboration, possibilities or growth that we can
explore and realize, and the advantages we can gain i we work as one. With this initiative, we can work
closer towards our goal o restoring dynamism in the Philippine economy, or the lasting benet o all
its stakeholders.
BENIGNO S. AQUINO III
7/30/2019 PPP Brochure May2012
4/312
Message of theSocio-Economic Planning Secretary
The Philippines Public Private Partnership (PPP) plays
an important role in the implementation o the nations
inrastructure development programs.
Under the leadership o His Excellency Benigno
S. Aquino III, public-private partnerships seek to
encourage greater participation o the private sector
in the provision o basic public inrastructure through
investments, construction, and operations and
management.
As the Philippine government pursues this
development thrust, it has put into place a business
environment characterized by broader emphasis on
transparency, accountability and good governance.
Ultimately, this environment should be able to create
new jobs, improve delivery o basic socio-economic
services, and positive economic growth.
Investor condence in the Philippines has lately been improving, leading the international nancial
community to rate the Philippines as the third most preerred market in the world or global und
managers. This condence rom the international nance community is moored on the collectivearmation o the governments current reorm agenda.
In this context, this document on the Philippine PPP program aims to help the user to navigate through
an array o various PPP inrastructure packages that comprehensively cover various inrastructure
arrangements in various investment areas o interest like roads, airports, and water, among others.
The Philippine economy has remained robust and resilient despite the global economic turbulence that
has rocked several economies elsewhere. We expect such steadast resilience, supported by initiatives
in good governance, to help the country move orward in a sustained manner.
We invite the reader, through this document, to consider the Philippines as a viable and strategic
investment destination.
We look orward to doing business with you.
Mabuhay!
CAYETANO W. PADERANGA JR.
7/30/2019 PPP Brochure May2012
5/313
The Public-Private Partnership Program
Under his social contract with the Filipino people, President Benigno S. Aquino III
envisions a country that has achieved inclusive growth ueled by rapid, sustained,
and broad-based economic maturity.
Guided by the principles o transparency, accountability and sustained partnerships
with the private sector, the Public-Private Partnership Program o the Philippines
was established as a fagship program to realize the Philippine Public Investment
Program that, in turn, supports the Philippine Development Plan 2011 to 2016.
The program intends to provide the public with adequate, sae, ecient, reliable,
and reasonably-priced inrastructure and development acilities while aording
the private sector a level playing eld, reasonable returns and appropriate sharing
o risks.
Government sees this as a reliable and solid strategy to eciently deliver its
services, create more job opportunities through a dynamic and solid inrastructure
program.
Participating in the Philippine PPP Program allows investorsto do business in a stable economic environment bolsteredby sound and consistent policies and processes as well as animproved governance that has reduced the time and cost odoing business.
Under the PPP Agenda, implementing agencies and local government units will be
continually enabled to undertake PPP projects through the provision o technical
and capacity building support in all aspects o the PPP project development and
implementation cycle.
The Public-Private Partnership Center serves as the main agency tasked to pursue
this PPP project acilitation, coordination, and monitoring mandate. It is envisioned
to be the champion o PPPs or inclusive growth and sustainable development.
3
7/30/2019 PPP Brochure May2012
6/314
2012PPP PROJECTS
7/30/2019 PPP Brochure May2012
7/315
LRT Line 1 South Extension andOperation & Maintenance
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
LRT Line
1 SouthExtension andOperation &Maintenance
The proposed alignment or
the LRT 1 South Extensionhas an approximate lengtho 11.7km rom its tie inpoint at the terminus oLRT Line 1 at the BaclaranTerminal, to the NiyogStation at Bacoor, Cavite;o which, approximately10.5km will be elevatedand 1.2km will be at-grade.The total length o theintegrated LRT Line 1 will
be approximately 32.4km.
Department o
TransportationandCommunications(DOTC)
59.2B MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MR. JUAN
ALBERTOMERCADO
Project
ManagerPPP Center+632 929-9251+632 990-0721loc. 6201
7/30/2019 PPP Brochure May2012
8/316
LRT Line 2 East Extension andOperation & Maintenance
Ortigas
Shaw
Magallanes Ayala
Buendia
Guadalupe
Boni
Balintawak
Roosevelt
North
Quezon
Kamuning
Betty Go Belmonte
GilmoreV. MapaLegarda
RectoP ureza J. Ruiz SantolanSantolan
Cubao
Anonas Katipunan
Monumento
5th Avenue
R.Papa
Abad Santos
Blumentritt
Tayuman
Bambang
Doroteo Jose
Carriedo
Central
United Nations Ave
Pedro Gil
Quirino Ave
Vito Cruz
Gil Puyat
Libertad
Edsa/Pasay
Baclaran
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
LRT Line 2 East
Extension andOperation andMaintenance
The project will extend
the elevated tracks o theexisting LRT Line 2 by4km rom Santolan, Pasigto Masinag, Antipolo. Theexisting 13.8km Line 2 runsalong the Recto Stationin Manila to the SantolanStation in Pasig, alongRecto Avenue, MagsaysayBoulevard and MarcosHighway.
Department o
TransportationandCommunications(DOTC)
11.90B MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MR. JUAN
ALBERTOMERCADO
Project
ManagerPPP Center+632 929-9251+632 990-0721loc. 6201
7/30/2019 PPP Brochure May2012
9/317
Operation & Maintenance of theLaguindingan Airport
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Operation and
Maintenanceo theLaguindinganAirport
The project involves
the operation andmaintenance o the newlyconstructed international-standard airport inLaguindingan, MisamisOriental.
Department o
TransportationandCommunications(DOTC)
1.80B MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MR. JUAN
ALBERTOMERCADO
Project
ManagerPPP Center+632 929-9251+632 990-0721loc. 6201
7/30/2019 PPP Brochure May2012
10/318
New Bohol (Panglao) AirportDevelopment
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
New Bohol
(Panglao)AirportDevelopment
The project involves
the construction o aninternational-standardairport to replace theexisting Tagbilaran Airportwithin a 230-hectarespread.
Department o
TransportationandCommunications(DOTC)
8.0B MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MS. GERALDINE
SANTOSProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6203
7/30/2019 PPP Brochure May2012
11/319
Mactan-Cebu International AirportPassenger Terminal Building
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Mactan-Cebu
InternationalAirportPassengerTerminalBuilding
The project involves the
construction o a newworld-class passengerterminal building inMactan, Cebu InternationalAirport with a capacity oabout 8 million passengersper year and Operation &Maintenance o the old andnew acilities.
Department o
TransportationandCommunications(DOTC)
10.15B MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MR. JOHAN
MARTINEZProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6106
7/30/2019 PPP Brochure May2012
12/3110
Operation & Maintenance of thePuerto Princesa Airport
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Operation and
Maintenanceo the PuertoPrincesaAirport
The project involves
the privatization othe operation andmaintenance o theexisting Puerto PrincesaAirport. It will be upgradedand improved into aninternational gateway,meeting the standardso the International CivilAviation Organization(ICAO).
Department o
TransportationandCommunications(DOTC)
TBD MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MR. JUAN
ALBERTOMERCADO
Project
ManagerPPP Center+632 929-9251+632 990-0721loc. 6201
7/30/2019 PPP Brochure May2012
13/3111
Automatic Fare Collection System
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Automatic
Fare CollectionSystem
This project is about the
decommissioning othe old magnetic-basedticketing system andreplacing the same withcontactless-based smartcard technology on LRTLines 1 and 2, and MRT Line3, with the introductiono a centralized backoce that will perormapportionment orevenues.
Department o
TransportationandCommunications(DOTC)
1.80B MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MR. JOHAN
MARTINEZProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6106
7/30/2019 PPP Brochure May2012
14/31
7/30/2019 PPP Brochure May2012
15/3113
Cebu Bus Rapid TransitDemonstration Project
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Cebu Bus
Rapid TransitDevelopmentProject
The project will restructure
the main urban transportcorridor rom Bulacao toAyala in Cebu City. Thisincludes a 16km BRTroute designed and builtollowing internationalbest practices and qualitystandards, two mixedtrac lanes per direction,integration o the drainagesystem installed along therestructured corridor, and
BRT terminals.
Department o
TransportationandCommunications(DOTC)
TBD MR. RENE
LIMCAOCOUndersecretary
DOTC+632 725-0204loc. 247
ATTY. JAIME
RAPHAEL
FELICIANO
Director
DOTC+632 725-0013
MS. GERALDINE
SANTOSProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6203
7/30/2019 PPP Brochure May2012
16/3114
NLEX - SLEX Connector Road
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
NLEX-SLEX
ConnectorRoad
The construction o a
13.4km, 4-lane elevatedexpressway over thePhilippine National Railway(PNR) right o way, whichstarts in Caloocan Cityand ends in Buendia,Makati City. The projectwill connect North LuzonExpressway (NLEX) andSouth Luzon Expressway(SLEX) to decongest tracin Metro Manila.
Department o
Public Works andHighway(DPWH)
20.18B MS. MARIA
CATALINACABRAL
Assistant
Secretary
DPWH+632 304-3268
MS. REBECCA
GARSUTA
Director
DPWH+632 304-3268
MR. JUAN
ALBERTOMERCADO
Project
ManagerPPP Center+632 929-9251+632 990-0721loc. 6201
7/30/2019 PPP Brochure May2012
17/3115
NAIA Expressway Project(Phase II)
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
NAIA
ExpresswayProject(Phase II)
The proposed elevated
expressway starts at theexisting Skyway thengenerally ollows theexisting road alignmentover Sales Avenue,Andrews Avenue,Domestic Road, and NAIARoad; and has entry/exitramps at Roxas Boulevard,Macapagal Boulevard,and PAGCOR City. Theproject provides access
to NAIA Terminals I, II, andIII, and links two existingexpressways namely theSkyway and the Manila-Cavite Toll Expressway.
Department o
Public Works andHighway(DPWH)
15.77B MS. MARIA
CATALINACABRAL
Assistant
Secretary
DPWH+632 304-3268
MS. REBECCA
GARSUTA
Director
DPWH+632 304-3268
MS. GLADYS
OCHOAProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6101
7/30/2019 PPP Brochure May2012
18/3116
CALA Expressway(Cavite and Laguna Side)
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
CALA
Expressway(Cavite andLaguna Side)
The project involves
the construction otwo expresswaystheCavite Side which is a27.5km, 4-lane highwayrom the terminus o R-1Expressway in Kawit, Caviteto Aguinaldo Highwayat Silang, Cavite; andthe Laguna Side whichis a 14.3km, 4-lane at-grade expressway. TheCALA Expressway will be
connected to SLEX nearSta. Rosa, Laguna.
Department o
Public Works andHighway(DPWH)
19.69B MS. MARIA
CATALINACABRAL
Assistant
Secretary
DPWH+632 304-3268
MS. REBECCA
GARSUTA
Director
DPWH+632 304-3268
MS. GLADYS
OCHOAProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6101
7/30/2019 PPP Brochure May2012
19/3117
Improvement / Rehabilitationof the Quirino Highway
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Improvement /
Rehabilitationo the QuirinoHighway
The proposed project
entails the improvement/rehabilitation, and theoperation and maintenanceo Quirino Highway, a93.45km, 2-lanenational road that traversesthree (3) provinces, namelyQuezon, Camarines Norteand Camarines Sur. Itstarts at the junction o thePan-Philippine Highwayin Tabugon, Sta. Elena,
Camarines Norte, and endsat the junction o the Pan-Philippine Highway inSipocot, Camarines Sur.
Department o
Public Works andHighway(DPWH)
TBD MS. MARIA
CATALINACABRAL
Assistant
Secretary
DPWH+632 304-3268
MS. REBECCA
GARSUTA
Director
DPWH+632 304-3268
MS. JAN IRISH
VILLEGASProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6105
7/30/2019 PPP Brochure May2012
20/3118
New Centennial Water SupplySource Project
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
New
CentennialWater SupplySource Project
The project will involve
the construction o a dam,a water treatment plant,and an associated mainpipeline to deliver waterrom the project location toMetro Manila. This projectwill provide water supplysecurity in the metropolis.
Metropolitan
Waterworks andSewerage System(MWSS)
25B MR. GERARDO
ESQUIVELAdministrator
MWSS+632 922-3757
MS. VANGIE
DACANAY
Project Manager
MWSS+632 920-5413
MS. MA.
CRISTINACLEOFAS
Project
Manager
PPP Center+632 929-9251+632 990-0721loc. 6104
7/30/2019 PPP Brochure May2012
21/3119
Operation & Maintenance ofAngat Hydro-Electric Power Plant
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Operation and
Maintenanceo AngatHydro-ElectricPower Plant(AHEPP)AuxiliaryTurbines 4and 5
The project involves the
rehabilitation, operation,and maintenance o theMWSS-owned auxiliaryturbines 4 and 5 installedin Angat Hydro-ElectricPower Plant.
Metropolitan
Waterworks andSewerage System(MWSS)
1.6B MR. GERARDO
ESQUIVELAdministrator
MWSS+632 922-3757
MR. JOJO
DORADO
Project Manager
MWSS+632 920-5113
MS. MA.
CRISTINACLEOFAS
Project
Manager
PPP Center+632 929-9251+632 990-0721loc. 6104
(AHEPP) Auxiliary Turbines 4 & 5
7/30/2019 PPP Brochure May2012
22/3120
Balara Water Hub
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Balara Water
Hub
The project is proposed to
include the constructionand operationalization oan international center orwater excellence locatedwithin the MWSS BalaraCompound situatedalong Katipunan Avenue,opposite UP DilimanCampus in Quezon City.
Metropolitan
Waterworks andSewerage System(MWSS)
20B MR. GERARDO
ESQUIVELAdministrator
MWSS+632 922-3757
MS. CECILLE
BAUTISTA
Executive
Assistant
MWSS+632 922-2969
MS. MA.
CRISTINACLEOFAS
Project
Manager
PPP Center+632 929-9251+632 990-0721loc. 6104
7/30/2019 PPP Brochure May2012
23/3121
Vaccine Self-Suciency Project(Phase II)
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Vaccine Sel-
SuciencyProject(Phase II)
The project is envisioned
to accelerate progress invaccine production andensure vaccine suciencyin the country. VSSP II isexpected to reduce overallvaccine procurementcosts o nished vaccinesthrough local ormulation,lling, labeling, andpackaging o the ollowingvaccines: Pentavalent(DPT-HepB-Hib, Diptheria,
Pertussis, Tetanus-HepatitisB and Hemphylus InfuenzaB), Tetanus Toxoid (T T), andSingle HepB.
Department o
Health(DOH)
453M MR. TEODOROHERBOSAUndersecretary
DOH+632 711-6075
DR. REMIGIO
OLVEDA
DOH+632 809-7599
MR. JUAN
PAULOFAJARDO
Project
Manager
PPP Center+632 929-9251+632 990-0721loc. 6103
7/30/2019 PPP Brochure May2012
24/3123
Grains Central Project
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Grains Central
Project
The project will establish
grains bulk handlingsystems with corn grainsprocessing centers andtransshipment stationsin major corn producingareas and selected seaports by upgrading,expanding and enhancingthe existing operations inat least 15 corn postharvestprocessing and tradingcenters.
Department o
Agriculture(DA)
1.25B MR. ANTONIO
FLETAUndersecretary
DA+632 920-4085
MS. ZENAIDA
VILLEGAS
DA+632 920-1407
MS. JAN IRISH
VILLEGASProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6105
7/30/2019 PPP Brochure May2012
25/3124
Establishment of Cold Chain SystemsCovering Strategic Areas in the Philippines
PROJECT NAME DESCRIPTIONIMPLEMENTING
AGENCY
INDICATIVE
COST (PHP)
IA CONTACT PERSON /
CONTACT DETAILS
PPP CENTER
CONTACT PERSON /
CONTACT DETAILS
Establishment
o Cold ChainSystemsCoveringStrategicAreas in thePhilippines
The project will involve
the construction andoperationalization o ColdChain Centers to be locatedin major production andconsolidation areas oagri-shery products. TheCenters will be equippedwith the required acilitiesand machineries orminimal processing olivestock, sheries and highvalue crops.
Department o
Agriculture(DA)
5.30B MR. ANTONIO
FLETAUndersecretary
DA+632 920-4085
MS. ZENAIDA
VILLEGAS
DA+632 920-1407
MS. JAN IRISH
VILLEGASProject
Manager
PPP Center+632 929-9251+632 990-0721loc. 6105
7/30/2019 PPP Brochure May2012
26/3125
The PPP Center
VISION
The champion o public-private partnerships or inclusive growth andsustainable development
MISSION
We acilitate and optimize public-private partnerships or the delivery opublic inrastructure and other development services.
CORE VALUES
Professionalism
We provide ast, reliable, eective, and ecient services that areaccurate, competent, and transparent.
Passionforexcellence
We are dedicated to deliver the best quality o service and tocontinuously innovate the processes towards an ecient and eective
PPP implementation.
Pro-activeness
As prime movers, we strive to achieve positive results through dynamicprocesses that are anchored on the principles o transparency and
accountability.
client-orientation
We commit to create long-term partnerships by enabling clients to meetPPP targets, and by constantly delivering timely quality service.
OUR SERVICES
The Public-Private Partnership Center serves as the governments acilitator
and catalyst in pursuing and delivering PPP projects. It champions thecountrys PPP program by enabling national agencies and local government
units in all aspects o project preparation.
7/30/2019 PPP Brochure May2012
27/3126
Project Development and Monitoring FacilityPromoting Inclusive Growth through Properly Prepared Projects
What is the PDMF for?The Project Development and Monitoring Facility (PDMF) is a revolving und that supports pre-easibility studies, easibilitystudies, and other necessary pre-investment activities to ensure the high quality o potential PPP projects in inrastructure anddevelopment.
With an initial contribution o P300 million rom the national government, the PDMF is also augmented by donor countries andmultilateral agencies in support o the PPP Program.
Under the administration and management o the PPP Center, the PDMF provides government agencies with the requiredexpertise and strategies to prepare attractive projects that are selected to be undertaken with vital private sector participation.
Policy and implementing guidelines on the use o PDMF are set by the PDMF Board. It is composed o the National Economic
and Development Authority (NEDA) as Chair, the Department o Finance (DOF), the Department o Budget and Management(DBM) and the PPP Center.
Who can avail of the PDMF support?
The PDMF may be extended to any department, bureau, oce, commission, authority or agency o the national government,including government-owned or controlled corporation, government nancial institutions, state university and college; andlocal government unit authorized by law or their respective charters to contract or or undertake inrastructure or developmentprojects.
What is the application process?
The overall management o the PDMF,including the application process, is
governed by the Project Developmentand Monitoring Facility Guidelines. Thediagram shows an overview o the PDMFapplication process.
The application starts with the interestedagencys submission to the PPP Center ocomplete application requirements.
Projects approved by the PDMF Board willbe provided with Transaction Advisers whoare selected under transparent processes
and strict rules.
The Panel of Transaction Advisers and their Role in the PDMF
To enable implementing agencies (IAs) to undertake the required pre-investment studies under PDMF, the array o applicable
expertise covers a broad range o PPP projects. From a list o national and international consulting frms, pre-selected by the PPP
Center employing stringent standards, all the necessary transaction advisory services shall be provided to the IAs.
Currently, a panel consisting o nine (9) consortia o frms has been engaged by the PPP Center under indefnite delivery contract
(IDC) acility or a 3-year period.
CPCS Transcom Ltd. |Deloitte Touche Tohmatsu India Pvt. Ltd. | Ernst & Young Australia Inrastructure Advisory|
Hill International SA |ICRA Management Consulting Services Ltd. | ManabatSanagustin& Co., CPAs | PricewaterhouseCoopersServices LLPSingapore| Rebel Group International BV | SMEC International Pty Ltd. (SMEC), Australia
The PPP Center, at its discretion, shall update the panel to possibly increase the number o the consulting frms. A consulting frm is
competitively selected rom the frms in the IDCF panel to develop a specifc, well-structured bankable PPP project.
7/30/2019 PPP Brochure May2012
28/3127
PPP Capacity Building Program
CAPACITY BUILDING PROGRAM
The PPP Centers Capacity Building Program is a comprehensive training service made available to nationalgovernment agencies and local government units (LGUs) aimed at building, enhancing and sustainingtheir institutional capabilities in all aspects o PPP project development and implementation throughoutthe whole PPP project cycle: inception, planning and identication, project structuring, review andappraisal, approvals and procurement, project implementation and management, and monitoring andevaluation.
FEATURES OF THE TRAINING PROGRAM
Learning-by-Doing Approach
Lecture and Group-Based Methodologies
Interactive and IT-Backed Delivery Techniques
Output (actual PPP Project)-based Design
Needs-based and customized content (topics/modules) and schedule
Focused selection o Trainees (i.e. designated technical personnel or
PPP committee / persons)
Learning evaluation in the middle and/or ater actual training
PRE-IMPLEMENTATION IMPLEMENTATION
PPPAGREEMEN
TSIGNED
INTRODUCTION /
INCEPTION
PPP: What and Why
Needs Analysis
Options Analysis
Economic Valuation
Policy & InstitutionalSet-Up
PLANNING / IDENTIFICATION /
STRUCTURING / APPROVALS
Project identication & Plan(Pre-FS/FS)
Project Preparation /Structuring
Review and AppraisalProcesses/Requirements
Procurement DocumentsPreparation
Procurement Plan
PROCUREMENT AND
AWARDInvitation andPrequalication
Transparencyand CompetitiveRequirements
Evaluation, Reviewand Selection
Negotiation andAward Processes
IMPLEMENTATION / MONITORING
AND EVALUATION
Construction and Commisioning
Contractual Compliance, Monitoring
and Evaluation
Risk Monitoring and Mitigation
Project Management
Progress Reporting
PHASE I PHASE II PHASE III DEVELOPMENT DELIVERY EXIT
7/30/2019 PPP Brochure May2012
29/3128
Doing Business in the Philippines
Who may invest?
Regardless o nationality, anyone isencouraged to invest in the Philippines. Withthe liberalization o the oreign investmentlaw, 100% oreign equity may be allowed inall areas o investment except those reservedor Filipinos by mandate o the Philippineconstitution and existing laws.
The economyAside rom tourism, the economy o thePhilippines is primarily composed o otherindustries such as Agriculture Industry, BPO,Energy, Mining, Electronics, Logistics andShipbuilding, among others.
Workforce
The country boasts a labor orce that is
trainable, skilled, technology savvy, Englishprocient, and highly competitive.
Telecommunication landscape
Use o mobile phones and internet iswidespread in the country. Cell sites areavailable all over the country to caterto some 80 million mobile phone users.Wireless delity connectivity is available inmajor shopping malls, malls, coee shops.
Internet caes with very aordable rentalsare also abundant.
Transportation infrastructure
There are about 10 international and 80domestic airports in the country and moreare being developed. There are Roll-On Roll-O Ferry ports in major islands, allowingland travel rom Luzon to Mindanao. Car
rentals and taxis are widely available orconvenience. Rail transits are available inMetro Manila.
Creating a company in the Philippines
An investor may choose rom several types o businessenterprises to establish operations in the Philippinessuch as:
Organized under Philippine laws Sole proprietorship Partnership Corporation
Organized under oreign laws Branch oce Representative oce Regional headquarters/Regional operating
headquarters
Business enterprises must be registered with thePhilippine Securities and Exchange Commission(http://www.sec.gov.ph/) or the Department o Tradeand Industry (http://www.dti.gov.ph/).
Fiscal incentives
The PPP projects are entitled to scal incentivesunder the 2011 Investment Priorities Plan (IPP). OtherPreerred Activities in the IPP List includes: Agriculture/Agribusiness and Fishery; Creative Industries/KnowledgeBased Services; Shipbuilding; Mass Housing; Energy;Inrastructure; Research and Development; GreenProjects; Motor Vehicles; Tourism,; Strategic Projects andDisaster Prevention, Mitigation and Recovery Projects.
The IPP has a Mandatory List which coversactivities as provided or under existing laws. Revised Forestry Code o the Philippines (PD No. 705 Philippine Mining Act o 1995 (RA No. 7942) Printing, Publication and Content Development o
Books or Texbooks (RA No. 8047) Downstream Oil Industry Deregulation Act o 1998
(RA No. 8479) Ecological Solid Waste Management (RA No. 9003)
Philippine Clean Water Act o 2004 (RA No. 9275) Magna Carta or Disabled Persons (RA No. 7277) Renewable Energy Act o 2008 (RA No. 9513)
http://www.sec.gov.ph/http://www.dti.gov.ph/http://www.dti.gov.ph/http://www.sec.gov.ph/7/30/2019 PPP Brochure May2012
30/3129
Directory
COSETTE V. CANILAOExecutive DirectorPublic-Private Partnership CenterPhone: +632 929-5187
Email: [email protected]
ATTY. FERDINAND D. TOLENTINODeputy Executive DirectorPublic-Private Partnership CenterPhone: +632 929-4968Email: [email protected]
RINA P. ALZATEDirector IVProject Development & Monitoring Facility ServicePhone: +632 929-592
Email: [email protected]
ATTY. SHERRY ANN N. AUSTRIAOcer-in-ChargePolicy Formulation & Evaluation ServicePhone: +632 929-0647
Email: [email protected]
FEROISA FRANCISCA T. CONCORDIADirector IIIProject Development ServicePhone: +632 929-9251Email: [email protected]
ELEAZAR E. RICOTEDirector IVCapacity Building & Knowledge Management ServicePhone: +632 929-8630
Email: [email protected]
LELINA A. QUILATESDirector IVAdministrative ServicePhone: +632 929-3971
Email: [email protected]
ATTY. BRIAN C. VIRAYOcer-in-ChargeLegal ServicePhone: +632 929-8630Email: [email protected]
PUBLIC-PRIVATE PARTNERSHIP CENTERNEDA sa Quezon City
EDSA, Diliman, Quezon City 1101Phone: +632 990-0721
Fax: +632 929-8593Email: [email protected]
Website: www.ppp.gov.ph