    The PhilippinePublic-Private

    PartnershipProgram

  • 7/30/2019 PPP Brochure May2012

    2/31

    Table of

    contents 1 Foreword by the President o the Philippines2 Message o the Socio-Economic Planning Secretary

    3 The Public-Private Partnership Program

    4 2012 PPP Projects

    5 LRT Line 1 South Extension and Operation & Maintenance

    6 LRT Line 2 East Extension and Operation & Maintenance

    7 Operation & Maintenance o the Laguindingan Airport

    8 New Bohol (Panglao) Airport Development

    9 Mactan-Cebu International Airport Passenger Terminal Building

    10 Operation & Maintenance o Puerto Princesa Airport

    11 Automatic Fare Collection System

    12 Integrated Transport System (ITS) Project

    13 Cebu Bus Rapid Transit Demonstration Project

    14 NLEX-SLEX Connector Road

    15 NAIA Expressway Project (Phase II)

    16 CALA Expressway (Cavite and Laguna Side)

    17 Improvement / Rehabilitation o the Quirino Highway

    18 New Centennial Water Supply Source Project

    19 Operation & Maintenance o Angat Hydro-Electric Power Plant

    (AHEPP) Auxiliary Turbines 4 and 5

    20 Balara Water Hub

    21 Vaccine Sel-Suciency Project (Phase II)

    22 Modernization o the Philippine Orthopedic Center

    23 Grains Central Project

    24 Establishment o Cold Chain Systems Covering Strategic Areas in

    the Philippines

    25 The PPP Center

    26 Project Development and Monitoring Facility (PDMF)

    27 PPP Capacity Building Program

    28 Doing Business in the Philippines

    29 Directory

  • 7/30/2019 PPP Brochure May2012

    3/311

    Foreword by thePresident of the Philippines

    The Philippines is undergoing an era o reorm. The Filipino people, whose inherent talent and

    productivity are crucial to the success o enterprise, have rearmed their participation in the pursuit o

    economic development and equitable progress. In turn, our government has set in place the conditionsnecessary or the realization o these aspirations. We have instituted various structural interventions and

    policy reorms that will acilitate and simpliy the conduct o business in the Philippines.

    We believe that good governance -- marked by transparency, accountability, and integrity -- is the

    bedrock o a robust economy.

    The overall objective o these thrusts is the revitalization o our country and the ulllment o its

    multiaceted potential. Foremost in our eorts is our engagement in Public-Private Partnerships, which

    will spur inclusive growth accross all industries and secure our countrys standing in the global economy.

    Our endeavors are bearing ruit, and we are heartened by your positive response. By the close o 2011,the Philippines jumped ten positions in the World Economic Forums Global Competitiveness Index --

    one o the handul to make a leap o this magnitude. In the Financial Development Index, we moved

    up to the 11th in the world, the rise in our ranking second only to Norway. These are among the many

    tangible maniestations o the increased conidence o investors like you.

    This is our momentum o development, and we can sustain this through our continuing partnerships.

    This volume identies areas o mutually benecial collaboration, possibilities or growth that we can

    explore and realize, and the advantages we can gain i we work as one. With this initiative, we can work

    closer towards our goal o restoring dynamism in the Philippine economy, or the lasting benet o all

    its stakeholders.

    BENIGNO S. AQUINO III

  • 7/30/2019 PPP Brochure May2012

    4/312

    Message of theSocio-Economic Planning Secretary

    The Philippines Public Private Partnership (PPP) plays

    an important role in the implementation o the nations

    inrastructure development programs.

    Under the leadership o His Excellency Benigno

    S. Aquino III, public-private partnerships seek to

    encourage greater participation o the private sector

    in the provision o basic public inrastructure through

    investments, construction, and operations and

    management.

    As the Philippine government pursues this

    development thrust, it has put into place a business

    environment characterized by broader emphasis on

    transparency, accountability and good governance.

    Ultimately, this environment should be able to create

    new jobs, improve delivery o basic socio-economic

    services, and positive economic growth.

    Investor condence in the Philippines has lately been improving, leading the international nancial

    community to rate the Philippines as the third most preerred market in the world or global und

    managers. This condence rom the international nance community is moored on the collectivearmation o the governments current reorm agenda.

    In this context, this document on the Philippine PPP program aims to help the user to navigate through

    an array o various PPP inrastructure packages that comprehensively cover various inrastructure

    arrangements in various investment areas o interest like roads, airports, and water, among others.

    The Philippine economy has remained robust and resilient despite the global economic turbulence that

    has rocked several economies elsewhere. We expect such steadast resilience, supported by initiatives

    in good governance, to help the country move orward in a sustained manner.

    We invite the reader, through this document, to consider the Philippines as a viable and strategic

    investment destination.

    We look orward to doing business with you.

    Mabuhay!

    CAYETANO W. PADERANGA JR.

  • 7/30/2019 PPP Brochure May2012

    5/313

    The Public-Private Partnership Program

    Under his social contract with the Filipino people, President Benigno S. Aquino III

    envisions a country that has achieved inclusive growth ueled by rapid, sustained,

    and broad-based economic maturity.

    Guided by the principles o transparency, accountability and sustained partnerships

    with the private sector, the Public-Private Partnership Program o the Philippines

    was established as a fagship program to realize the Philippine Public Investment

    Program that, in turn, supports the Philippine Development Plan 2011 to 2016.

    The program intends to provide the public with adequate, sae, ecient, reliable,

    and reasonably-priced inrastructure and development acilities while aording

    the private sector a level playing eld, reasonable returns and appropriate sharing

    o risks.

    Government sees this as a reliable and solid strategy to eciently deliver its

    services, create more job opportunities through a dynamic and solid inrastructure

    program.

    Participating in the Philippine PPP Program allows investorsto do business in a stable economic environment bolsteredby sound and consistent policies and processes as well as animproved governance that has reduced the time and cost odoing business.

    Under the PPP Agenda, implementing agencies and local government units will be

    continually enabled to undertake PPP projects through the provision o technical

    and capacity building support in all aspects o the PPP project development and

    implementation cycle.

    The Public-Private Partnership Center serves as the main agency tasked to pursue

    this PPP project acilitation, coordination, and monitoring mandate. It is envisioned

    to be the champion o PPPs or inclusive growth and sustainable development.

    3

  • 7/30/2019 PPP Brochure May2012

    6/314

    2012PPP PROJECTS

  • 7/30/2019 PPP Brochure May2012

    7/315

    LRT Line 1 South Extension andOperation & Maintenance

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    LRT Line

    1 SouthExtension andOperation &Maintenance

    The proposed alignment or

    the LRT 1 South Extensionhas an approximate lengtho 11.7km rom its tie inpoint at the terminus oLRT Line 1 at the BaclaranTerminal, to the NiyogStation at Bacoor, Cavite;o which, approximately10.5km will be elevatedand 1.2km will be at-grade.The total length o theintegrated LRT Line 1 will

    be approximately 32.4km.

    Department o

    TransportationandCommunications(DOTC)

    59.2B MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MR. JUAN

    ALBERTOMERCADO

    Project

    ManagerPPP Center+632 929-9251+632 990-0721loc. 6201

  • 7/30/2019 PPP Brochure May2012

    8/316

    LRT Line 2 East Extension andOperation & Maintenance

    Ortigas

    Shaw

    Magallanes Ayala

    Buendia

    Guadalupe

    Boni

    Balintawak

    Roosevelt

    North

    Quezon

    Kamuning

    Betty Go Belmonte

    GilmoreV. MapaLegarda

    RectoP ureza J. Ruiz SantolanSantolan

    Cubao

    Anonas Katipunan

    Monumento

    5th Avenue

    R.Papa

    Abad Santos

    Blumentritt

    Tayuman

    Bambang

    Doroteo Jose

    Carriedo

    Central

    United Nations Ave

    Pedro Gil

    Quirino Ave

    Vito Cruz

    Gil Puyat

    Libertad

    Edsa/Pasay

    Baclaran

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    LRT Line 2 East

    Extension andOperation andMaintenance

    The project will extend

    the elevated tracks o theexisting LRT Line 2 by4km rom Santolan, Pasigto Masinag, Antipolo. Theexisting 13.8km Line 2 runsalong the Recto Stationin Manila to the SantolanStation in Pasig, alongRecto Avenue, MagsaysayBoulevard and MarcosHighway.

    Department o

    TransportationandCommunications(DOTC)

    11.90B MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MR. JUAN

    ALBERTOMERCADO

    Project

    ManagerPPP Center+632 929-9251+632 990-0721loc. 6201

  • 7/30/2019 PPP Brochure May2012

    9/317

    Operation & Maintenance of theLaguindingan Airport

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Operation and

    Maintenanceo theLaguindinganAirport

    The project involves

    the operation andmaintenance o the newlyconstructed international-standard airport inLaguindingan, MisamisOriental.

    Department o

    TransportationandCommunications(DOTC)

    1.80B MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MR. JUAN

    ALBERTOMERCADO

    Project

    ManagerPPP Center+632 929-9251+632 990-0721loc. 6201

  • 7/30/2019 PPP Brochure May2012

    10/318

    New Bohol (Panglao) AirportDevelopment

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    New Bohol

    (Panglao)AirportDevelopment

    The project involves

    the construction o aninternational-standardairport to replace theexisting Tagbilaran Airportwithin a 230-hectarespread.

    Department o

    TransportationandCommunications(DOTC)

    8.0B MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MS. GERALDINE

    SANTOSProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6203

  • 7/30/2019 PPP Brochure May2012

    11/319

    Mactan-Cebu International AirportPassenger Terminal Building

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Mactan-Cebu

    InternationalAirportPassengerTerminalBuilding

    The project involves the

    construction o a newworld-class passengerterminal building inMactan, Cebu InternationalAirport with a capacity oabout 8 million passengersper year and Operation &Maintenance o the old andnew acilities.

    Department o

    TransportationandCommunications(DOTC)

    10.15B MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MR. JOHAN

    MARTINEZProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6106

  • 7/30/2019 PPP Brochure May2012

    12/3110

    Operation & Maintenance of thePuerto Princesa Airport

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Operation and

    Maintenanceo the PuertoPrincesaAirport

    The project involves

    the privatization othe operation andmaintenance o theexisting Puerto PrincesaAirport. It will be upgradedand improved into aninternational gateway,meeting the standardso the International CivilAviation Organization(ICAO).

    Department o

    TransportationandCommunications(DOTC)

    TBD MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MR. JUAN

    ALBERTOMERCADO

    Project

    ManagerPPP Center+632 929-9251+632 990-0721loc. 6201

  • 7/30/2019 PPP Brochure May2012

    13/3111

    Automatic Fare Collection System

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Automatic

    Fare CollectionSystem

    This project is about the

    decommissioning othe old magnetic-basedticketing system andreplacing the same withcontactless-based smartcard technology on LRTLines 1 and 2, and MRT Line3, with the introductiono a centralized backoce that will perormapportionment orevenues.

    Department o

    TransportationandCommunications(DOTC)

    1.80B MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MR. JOHAN

    MARTINEZProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6106

  • 7/30/2019 PPP Brochure May2012

    14/31

  • 7/30/2019 PPP Brochure May2012

    15/3113

    Cebu Bus Rapid TransitDemonstration Project

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Cebu Bus

    Rapid TransitDevelopmentProject

    The project will restructure

    the main urban transportcorridor rom Bulacao toAyala in Cebu City. Thisincludes a 16km BRTroute designed and builtollowing internationalbest practices and qualitystandards, two mixedtrac lanes per direction,integration o the drainagesystem installed along therestructured corridor, and

    BRT terminals.

    Department o

    TransportationandCommunications(DOTC)

    TBD MR. RENE

    LIMCAOCOUndersecretary

    DOTC+632 725-0204loc. 247

    ATTY. JAIME

    RAPHAEL

    FELICIANO

    Director

    DOTC+632 725-0013

    MS. GERALDINE

    SANTOSProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6203

  • 7/30/2019 PPP Brochure May2012

    16/3114

    NLEX - SLEX Connector Road

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    NLEX-SLEX

    ConnectorRoad

    The construction o a

    13.4km, 4-lane elevatedexpressway over thePhilippine National Railway(PNR) right o way, whichstarts in Caloocan Cityand ends in Buendia,Makati City. The projectwill connect North LuzonExpressway (NLEX) andSouth Luzon Expressway(SLEX) to decongest tracin Metro Manila.

    Department o

    Public Works andHighway(DPWH)

    20.18B MS. MARIA

    CATALINACABRAL

    Assistant

    Secretary

    DPWH+632 304-3268

    MS. REBECCA

    GARSUTA

    Director

    DPWH+632 304-3268

    MR. JUAN

    ALBERTOMERCADO

    Project

    ManagerPPP Center+632 929-9251+632 990-0721loc. 6201

  • 7/30/2019 PPP Brochure May2012

    17/3115

    NAIA Expressway Project(Phase II)

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    NAIA

    ExpresswayProject(Phase II)

    The proposed elevated

    expressway starts at theexisting Skyway thengenerally ollows theexisting road alignmentover Sales Avenue,Andrews Avenue,Domestic Road, and NAIARoad; and has entry/exitramps at Roxas Boulevard,Macapagal Boulevard,and PAGCOR City. Theproject provides access

    to NAIA Terminals I, II, andIII, and links two existingexpressways namely theSkyway and the Manila-Cavite Toll Expressway.

    Department o

    Public Works andHighway(DPWH)

    15.77B MS. MARIA

    CATALINACABRAL

    Assistant

    Secretary

    DPWH+632 304-3268

    MS. REBECCA

    GARSUTA

    Director

    DPWH+632 304-3268

    MS. GLADYS

    OCHOAProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6101

  • 7/30/2019 PPP Brochure May2012

    18/3116

    CALA Expressway(Cavite and Laguna Side)

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    CALA

    Expressway(Cavite andLaguna Side)

    The project involves

    the construction otwo expresswaystheCavite Side which is a27.5km, 4-lane highwayrom the terminus o R-1Expressway in Kawit, Caviteto Aguinaldo Highwayat Silang, Cavite; andthe Laguna Side whichis a 14.3km, 4-lane at-grade expressway. TheCALA Expressway will be

    connected to SLEX nearSta. Rosa, Laguna.

    Department o

    Public Works andHighway(DPWH)

    19.69B MS. MARIA

    CATALINACABRAL

    Assistant

    Secretary

    DPWH+632 304-3268

    MS. REBECCA

    GARSUTA

    Director

    DPWH+632 304-3268

    MS. GLADYS

    OCHOAProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6101

  • 7/30/2019 PPP Brochure May2012

    19/3117

    Improvement / Rehabilitationof the Quirino Highway

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Improvement /

    Rehabilitationo the QuirinoHighway

    The proposed project

    entails the improvement/rehabilitation, and theoperation and maintenanceo Quirino Highway, a93.45km, 2-lanenational road that traversesthree (3) provinces, namelyQuezon, Camarines Norteand Camarines Sur. Itstarts at the junction o thePan-Philippine Highwayin Tabugon, Sta. Elena,

    Camarines Norte, and endsat the junction o the Pan-Philippine Highway inSipocot, Camarines Sur.

    Department o

    Public Works andHighway(DPWH)

    TBD MS. MARIA

    CATALINACABRAL

    Assistant

    Secretary

    DPWH+632 304-3268

    MS. REBECCA

    GARSUTA

    Director

    DPWH+632 304-3268

    MS. JAN IRISH

    VILLEGASProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6105

  • 7/30/2019 PPP Brochure May2012

    20/3118

    New Centennial Water SupplySource Project

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    New

    CentennialWater SupplySource Project

    The project will involve

    the construction o a dam,a water treatment plant,and an associated mainpipeline to deliver waterrom the project location toMetro Manila. This projectwill provide water supplysecurity in the metropolis.

    Metropolitan

    Waterworks andSewerage System(MWSS)

    25B MR. GERARDO

    ESQUIVELAdministrator

    MWSS+632 922-3757

    MS. VANGIE

    DACANAY

    Project Manager

    MWSS+632 920-5413

    MS. MA.

    CRISTINACLEOFAS

    Project

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6104

  • 7/30/2019 PPP Brochure May2012

    21/3119

    Operation & Maintenance ofAngat Hydro-Electric Power Plant

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Operation and

    Maintenanceo AngatHydro-ElectricPower Plant(AHEPP)AuxiliaryTurbines 4and 5

    The project involves the

    rehabilitation, operation,and maintenance o theMWSS-owned auxiliaryturbines 4 and 5 installedin Angat Hydro-ElectricPower Plant.

    Metropolitan

    Waterworks andSewerage System(MWSS)

    1.6B MR. GERARDO

    ESQUIVELAdministrator

    MWSS+632 922-3757

    MR. JOJO

    DORADO

    Project Manager

    MWSS+632 920-5113

    MS. MA.

    CRISTINACLEOFAS

    Project

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6104

    (AHEPP) Auxiliary Turbines 4 & 5

  • 7/30/2019 PPP Brochure May2012

    22/3120

    Balara Water Hub

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Balara Water

    Hub

    The project is proposed to

    include the constructionand operationalization oan international center orwater excellence locatedwithin the MWSS BalaraCompound situatedalong Katipunan Avenue,opposite UP DilimanCampus in Quezon City.

    Metropolitan

    Waterworks andSewerage System(MWSS)

    20B MR. GERARDO

    ESQUIVELAdministrator

    MWSS+632 922-3757

    MS. CECILLE

    BAUTISTA

    Executive

    Assistant

    MWSS+632 922-2969

    MS. MA.

    CRISTINACLEOFAS

    Project

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6104

  • 7/30/2019 PPP Brochure May2012

    23/3121

    Vaccine Self-Suciency Project(Phase II)

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Vaccine Sel-

    SuciencyProject(Phase II)

    The project is envisioned

    to accelerate progress invaccine production andensure vaccine suciencyin the country. VSSP II isexpected to reduce overallvaccine procurementcosts o nished vaccinesthrough local ormulation,lling, labeling, andpackaging o the ollowingvaccines: Pentavalent(DPT-HepB-Hib, Diptheria,

    Pertussis, Tetanus-HepatitisB and Hemphylus InfuenzaB), Tetanus Toxoid (T T), andSingle HepB.

    Department o

    Health(DOH)

    453M MR. TEODOROHERBOSAUndersecretary

    DOH+632 711-6075

    DR. REMIGIO

    OLVEDA

    DOH+632 809-7599

    MR. JUAN

    PAULOFAJARDO

    Project

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6103

  • 7/30/2019 PPP Brochure May2012

    24/3123

    Grains Central Project

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Grains Central

    Project

    The project will establish

    grains bulk handlingsystems with corn grainsprocessing centers andtransshipment stationsin major corn producingareas and selected seaports by upgrading,expanding and enhancingthe existing operations inat least 15 corn postharvestprocessing and tradingcenters.

    Department o

    Agriculture(DA)

    1.25B MR. ANTONIO

    FLETAUndersecretary

    DA+632 920-4085

    MS. ZENAIDA

    VILLEGAS

    DA+632 920-1407

    MS. JAN IRISH

    VILLEGASProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6105

  • 7/30/2019 PPP Brochure May2012

    25/3124

    Establishment of Cold Chain SystemsCovering Strategic Areas in the Philippines

    PROJECT NAME DESCRIPTIONIMPLEMENTING

    AGENCY

    INDICATIVE

    COST (PHP)

    IA CONTACT PERSON /

    CONTACT DETAILS

    PPP CENTER

    CONTACT PERSON /

    CONTACT DETAILS

    Establishment

    o Cold ChainSystemsCoveringStrategicAreas in thePhilippines

    The project will involve

    the construction andoperationalization o ColdChain Centers to be locatedin major production andconsolidation areas oagri-shery products. TheCenters will be equippedwith the required acilitiesand machineries orminimal processing olivestock, sheries and highvalue crops.

    Department o

    Agriculture(DA)

    5.30B MR. ANTONIO

    FLETAUndersecretary

    DA+632 920-4085

    MS. ZENAIDA

    VILLEGAS

    DA+632 920-1407

    MS. JAN IRISH

    VILLEGASProject

    Manager

    PPP Center+632 929-9251+632 990-0721loc. 6105

  • 7/30/2019 PPP Brochure May2012

    26/3125

    The PPP Center

    VISION

    The champion o public-private partnerships or inclusive growth andsustainable development

    MISSION

    We acilitate and optimize public-private partnerships or the delivery opublic inrastructure and other development services.

    CORE VALUES

    Professionalism

    We provide ast, reliable, eective, and ecient services that areaccurate, competent, and transparent.

    Passionforexcellence

    We are dedicated to deliver the best quality o service and tocontinuously innovate the processes towards an ecient and eective

    PPP implementation.

    Pro-activeness

    As prime movers, we strive to achieve positive results through dynamicprocesses that are anchored on the principles o transparency and

    accountability.

    client-orientation

    We commit to create long-term partnerships by enabling clients to meetPPP targets, and by constantly delivering timely quality service.

    OUR SERVICES

    The Public-Private Partnership Center serves as the governments acilitator

    and catalyst in pursuing and delivering PPP projects. It champions thecountrys PPP program by enabling national agencies and local government

    units in all aspects o project preparation.

  • 7/30/2019 PPP Brochure May2012

    27/3126

    Project Development and Monitoring FacilityPromoting Inclusive Growth through Properly Prepared Projects

    What is the PDMF for?The Project Development and Monitoring Facility (PDMF) is a revolving und that supports pre-easibility studies, easibilitystudies, and other necessary pre-investment activities to ensure the high quality o potential PPP projects in inrastructure anddevelopment.

    With an initial contribution o P300 million rom the national government, the PDMF is also augmented by donor countries andmultilateral agencies in support o the PPP Program.

    Under the administration and management o the PPP Center, the PDMF provides government agencies with the requiredexpertise and strategies to prepare attractive projects that are selected to be undertaken with vital private sector participation.

    Policy and implementing guidelines on the use o PDMF are set by the PDMF Board. It is composed o the National Economic

    and Development Authority (NEDA) as Chair, the Department o Finance (DOF), the Department o Budget and Management(DBM) and the PPP Center.

    Who can avail of the PDMF support?

    The PDMF may be extended to any department, bureau, oce, commission, authority or agency o the national government,including government-owned or controlled corporation, government nancial institutions, state university and college; andlocal government unit authorized by law or their respective charters to contract or or undertake inrastructure or developmentprojects.

    What is the application process?

    The overall management o the PDMF,including the application process, is

    governed by the Project Developmentand Monitoring Facility Guidelines. Thediagram shows an overview o the PDMFapplication process.

    The application starts with the interestedagencys submission to the PPP Center ocomplete application requirements.

    Projects approved by the PDMF Board willbe provided with Transaction Advisers whoare selected under transparent processes

    and strict rules.

    The Panel of Transaction Advisers and their Role in the PDMF

    To enable implementing agencies (IAs) to undertake the required pre-investment studies under PDMF, the array o applicable

    expertise covers a broad range o PPP projects. From a list o national and international consulting frms, pre-selected by the PPP

    Center employing stringent standards, all the necessary transaction advisory services shall be provided to the IAs.

    Currently, a panel consisting o nine (9) consortia o frms has been engaged by the PPP Center under indefnite delivery contract

    (IDC) acility or a 3-year period.

    CPCS Transcom Ltd. |Deloitte Touche Tohmatsu India Pvt. Ltd. | Ernst & Young Australia Inrastructure Advisory|

    Hill International SA |ICRA Management Consulting Services Ltd. | ManabatSanagustin& Co., CPAs | PricewaterhouseCoopersServices LLPSingapore| Rebel Group International BV | SMEC International Pty Ltd. (SMEC), Australia

    The PPP Center, at its discretion, shall update the panel to possibly increase the number o the consulting frms. A consulting frm is

    competitively selected rom the frms in the IDCF panel to develop a specifc, well-structured bankable PPP project.

  • 7/30/2019 PPP Brochure May2012

    28/3127

    PPP Capacity Building Program

    CAPACITY BUILDING PROGRAM

    The PPP Centers Capacity Building Program is a comprehensive training service made available to nationalgovernment agencies and local government units (LGUs) aimed at building, enhancing and sustainingtheir institutional capabilities in all aspects o PPP project development and implementation throughoutthe whole PPP project cycle: inception, planning and identication, project structuring, review andappraisal, approvals and procurement, project implementation and management, and monitoring andevaluation.

    FEATURES OF THE TRAINING PROGRAM

    Learning-by-Doing Approach

    Lecture and Group-Based Methodologies

    Interactive and IT-Backed Delivery Techniques

    Output (actual PPP Project)-based Design

    Needs-based and customized content (topics/modules) and schedule

    Focused selection o Trainees (i.e. designated technical personnel or

    PPP committee / persons)

    Learning evaluation in the middle and/or ater actual training

    PRE-IMPLEMENTATION IMPLEMENTATION

    PPPAGREEMEN

    TSIGNED

    INTRODUCTION /

    INCEPTION

    PPP: What and Why

    Needs Analysis

    Options Analysis

    Economic Valuation

    Policy & InstitutionalSet-Up

    PLANNING / IDENTIFICATION /

    STRUCTURING / APPROVALS

    Project identication & Plan(Pre-FS/FS)

    Project Preparation /Structuring

    Review and AppraisalProcesses/Requirements

    Procurement DocumentsPreparation

    Procurement Plan

    PROCUREMENT AND

    AWARDInvitation andPrequalication

    Transparencyand CompetitiveRequirements

    Evaluation, Reviewand Selection

    Negotiation andAward Processes

    IMPLEMENTATION / MONITORING

    AND EVALUATION

    Construction and Commisioning

    Contractual Compliance, Monitoring

    and Evaluation

    Risk Monitoring and Mitigation

    Project Management

    Progress Reporting

    PHASE I PHASE II PHASE III DEVELOPMENT DELIVERY EXIT

  • 7/30/2019 PPP Brochure May2012

    29/3128

    Doing Business in the Philippines

    Who may invest?

    Regardless o nationality, anyone isencouraged to invest in the Philippines. Withthe liberalization o the oreign investmentlaw, 100% oreign equity may be allowed inall areas o investment except those reservedor Filipinos by mandate o the Philippineconstitution and existing laws.

    The economyAside rom tourism, the economy o thePhilippines is primarily composed o otherindustries such as Agriculture Industry, BPO,Energy, Mining, Electronics, Logistics andShipbuilding, among others.

    Workforce

    The country boasts a labor orce that is

    trainable, skilled, technology savvy, Englishprocient, and highly competitive.

    Telecommunication landscape

    Use o mobile phones and internet iswidespread in the country. Cell sites areavailable all over the country to caterto some 80 million mobile phone users.Wireless delity connectivity is available inmajor shopping malls, malls, coee shops.

    Internet caes with very aordable rentalsare also abundant.

    Transportation infrastructure

    There are about 10 international and 80domestic airports in the country and moreare being developed. There are Roll-On Roll-O Ferry ports in major islands, allowingland travel rom Luzon to Mindanao. Car

    rentals and taxis are widely available orconvenience. Rail transits are available inMetro Manila.

    Creating a company in the Philippines

    An investor may choose rom several types o businessenterprises to establish operations in the Philippinessuch as:

    Organized under Philippine laws Sole proprietorship Partnership Corporation

    Organized under oreign laws Branch oce Representative oce Regional headquarters/Regional operating

    headquarters

    Business enterprises must be registered with thePhilippine Securities and Exchange Commission(http://www.sec.gov.ph/) or the Department o Tradeand Industry (http://www.dti.gov.ph/).

    Fiscal incentives

    The PPP projects are entitled to scal incentivesunder the 2011 Investment Priorities Plan (IPP). OtherPreerred Activities in the IPP List includes: Agriculture/Agribusiness and Fishery; Creative Industries/KnowledgeBased Services; Shipbuilding; Mass Housing; Energy;Inrastructure; Research and Development; GreenProjects; Motor Vehicles; Tourism,; Strategic Projects andDisaster Prevention, Mitigation and Recovery Projects.

    The IPP has a Mandatory List which coversactivities as provided or under existing laws. Revised Forestry Code o the Philippines (PD No. 705 Philippine Mining Act o 1995 (RA No. 7942) Printing, Publication and Content Development o

    Books or Texbooks (RA No. 8047) Downstream Oil Industry Deregulation Act o 1998

    (RA No. 8479) Ecological Solid Waste Management (RA No. 9003)

    Philippine Clean Water Act o 2004 (RA No. 9275) Magna Carta or Disabled Persons (RA No. 7277) Renewable Energy Act o 2008 (RA No. 9513)

    http://www.sec.gov.ph/http://www.dti.gov.ph/http://www.dti.gov.ph/http://www.sec.gov.ph/
  • 7/30/2019 PPP Brochure May2012

    30/3129

    Directory

    COSETTE V. CANILAOExecutive DirectorPublic-Private Partnership CenterPhone: +632 929-5187

    Email: [email protected]

    ATTY. FERDINAND D. TOLENTINODeputy Executive DirectorPublic-Private Partnership CenterPhone: +632 929-4968Email: [email protected]

    RINA P. ALZATEDirector IVProject Development & Monitoring Facility ServicePhone: +632 929-592

    Email: [email protected]

    ATTY. SHERRY ANN N. AUSTRIAOcer-in-ChargePolicy Formulation & Evaluation ServicePhone: +632 929-0647

    Email: [email protected]

    FEROISA FRANCISCA T. CONCORDIADirector IIIProject Development ServicePhone: +632 929-9251Email: [email protected]

    ELEAZAR E. RICOTEDirector IVCapacity Building & Knowledge Management ServicePhone: +632 929-8630

    Email: [email protected]

    LELINA A. QUILATESDirector IVAdministrative ServicePhone: +632 929-3971

    Email: [email protected]

    ATTY. BRIAN C. VIRAYOcer-in-ChargeLegal ServicePhone: +632 929-8630Email: [email protected]

    PUBLIC-PRIVATE PARTNERSHIP CENTERNEDA sa Quezon City

    EDSA, Diliman, Quezon City 1101Phone: +632 990-0721

    Fax: +632 929-8593Email: [email protected]

    Website: www.ppp.gov.ph