Page 1: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

Page 2: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.1 Built up Beam - 1

Page 3: Ppt of j power work (desulferization units)

1.2 Built up Beam - 2

1. Prefab. Bottom Structure at Nasco

Page 4: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.3 Drilling - 1

Page 5: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.4 Drilling - 2

Page 6: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.5 Part Assembly

Page 7: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.6 Plate Mark & Cutting

Page 8: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.7 Trial assembling Partial - 1

Page 9: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.8 Trial assembling Partial - 2

Page 10: Ppt of j power work (desulferization units)

1. Prefab. Bottom Structure at Nasco

1.9 Trial assembling overall

Page 11: Ppt of j power work (desulferization units)

2. Prefab. Panel Structure of Emco

Page 12: Ppt of j power work (desulferization units)

2. Prefab. Panel Structure of Emco

2.1 Fab. Beam

Page 13: Ppt of j power work (desulferization units)

2. Prefab. Panel Structure of Emco

2.2 Fab. Panel

Page 14: Ppt of j power work (desulferization units)

2. Prefab. Panel Structure of Emco

2.3 Assembling with Accessory

Page 15: Ppt of j power work (desulferization units)

2. Prefab. Panel Structure of Emco

2.4 Manhole

Page 16: Ppt of j power work (desulferization units)

2. Prefab. Panel Structure of Emco

2.6 Structure Trial Assembling

Page 17: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

Page 18: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.1 Louver Support 11

Page 19: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.2 Assembling Louver

Page 20: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.3 Hopper Side

Page 21: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.4 Inside of Cartridge

Page 22: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.5 Flapper Adjust

Page 23: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.6 Bottom Hopper Side

Page 24: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.7 Top Pyramid

Page 25: Ppt of j power work (desulferization units)

3. Prefab. Cartridge R220A at Shi-Asia

3.8 Assembling Cartridge

Page 26: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

Page 27: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.1 Assembling Louver

Page 28: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.2 Assembling Hopper

Page 29: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.3 Clearance Check in Hopper

Page 30: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.4 Hopper and Louver Side

Page 31: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.5 Hopper and Punching Plate

Page 32: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.6 Welding between 2 segments

Page 33: Ppt of j power work (desulferization units)

4. Prefab. Cartridge R220B at BEC

4.7 Leak stop treatment

Page 34: Ppt of j power work (desulferization units)

5.1 Site Assembling

Page 35: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.1 Ceremony for Commencement

Page 36: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.2 Installation of First Column

Page 37: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.3 Assembling of BTM Str.-1

Page 38: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.4 Assembling of BTM Str.-2

Page 39: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.5 Assembling of BTM Str.-3

Page 40: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.6 Bolting

Page 41: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.7 Assembly of Scaffold

Page 42: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.7 Assembly of Scaffold

Page 43: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.9 Bottom shell plate assembly

Page 44: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.10 Arrival of Bottom Cartridge

Page 45: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.11 1st Lifting of BTM Cartridge

Page 46: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.12 Installed Bottom Cartridge

Page 47: Ppt of j power work (desulferization units)

5-1 Site Assembling

5-1.13 Installation of Mid. Cartridge

Page 48: Ppt of j power work (desulferization units)

5-2 Installation

Page 49: Ppt of j power work (desulferization units)

5-2 Installation

5-2.1 Bottom Cartridge for R220-B

Page 50: Ppt of j power work (desulferization units)

5-2 Installation

5-2.2 Haft way of Installation

Page 51: Ppt of j power work (desulferization units)

5-2 Installation

5-2.5 Installed Full Cartridges

Page 52: Ppt of j power work (desulferization units)

5-2 Installation

5-2.6 Installed Full Side Panel

Page 53: Ppt of j power work (desulferization units)

5-2 Installation

5-2.7 Three Fold Scaffolding

Page 54: Ppt of j power work (desulferization units)

5-2 Installation

5-2.8 Top View of Cartridge

Page 55: Ppt of j power work (desulferization units)

5-3 Desulfurizer R220-AB

Page 56: Ppt of j power work (desulferization units)

5-3 Desulfurizer R220-AB

5-3.1 Line SE Duct Connected Side

Page 57: Ppt of j power work (desulferization units)

5-3 Desulfurizer R220-AB

5-3.2 Side View of Desulfurizer

Page 58: Ppt of j power work (desulferization units)

5-3 Desulfurizer R220-AB

5-3.3 Inside of Desulfurizer

Page 59: Ppt of j power work (desulferization units)

5-3 Desulfurizer R220-AB

5-3.4 Leak Test of Desulfurizer-1

Page 60: Ppt of j power work (desulferization units)

5-3 Desulfurizer R220-AB

5-3.5 Leak Test of Desulfurizer-2

Page 61: Ppt of j power work (desulferization units)

6. Insulation

Page 62: Ppt of j power work (desulferization units)

6. Insulation

6.1 Side Wall

Page 63: Ppt of j power work (desulferization units)

6. Insulation

6.2 Top Part & Rain Gutter

Page 64: Ppt of j power work (desulferization units)

6. Insulation

6.3 Top Pyramid

Page 65: Ppt of j power work (desulferization units)

7. Completion of Desulfurizer

Page 66: Ppt of j power work (desulferization units)

7. Completion of Desulfurizer

7.1 Name plate of R220-A

Page 67: Ppt of j power work (desulferization units)

7. Completion of Desulfurizer

7.2 Name plate of R220-B

Page 68: Ppt of j power work (desulferization units)

7. Completion of Desulfurizer

7.3 Completion of Desulfurizer-1

Page 69: Ppt of j power work (desulferization units)

7. Completion of Desulfurizer

7.4 Completion of Desulfurizer-2

Page 70: Ppt of j power work (desulferization units)

8. Delivery

Page 71: Ppt of j power work (desulferization units)

8. Delivery

8.1 Land Adjustment under structure

Page 72: Ppt of j power work (desulferization units)

8. Delivery

8.2 Land Adjustment for slope

Page 73: Ppt of j power work (desulferization units)

8. Delivery

8.3 Ramp Preparation

Page 74: Ppt of j power work (desulferization units)

8. Delivery

8.4 Ramp Way Setting-1

Page 75: Ppt of j power work (desulferization units)

8. Delivery

8.5 Ramp Way Setting-2

Page 76: Ppt of j power work (desulferization units)

8. Delivery

8.6 Dolly Assembling

Page 77: Ppt of j power work (desulferization units)

8. Delivery

8.7 Lifting Test before moving

Page 78: Ppt of j power work (desulferization units)

8. Delivery

8.8 Ready to move R220A

Page 79: Ppt of j power work (desulferization units)

8. Delivery

8.9 Roll-on R220A

Page 80: Ppt of j power work (desulferization units)

8. Delivery

8.10 R220A on the ship already

Page 81: Ppt of j power work (desulferization units)

8. Delivery

8.11 Moving for R220B

Page 82: Ppt of j power work (desulferization units)

8. Delivery

8.12 Roll-on R220B

Page 83: Ppt of j power work (desulferization units)

8. Delivery

8.13 R220B on the ship already

Page 84: Ppt of j power work (desulferization units)

9. Departure

Page 85: Ppt of j power work (desulferization units)

9. Departure

9.1 The ship ready to go to Japan

Page 86: Ppt of j power work (desulferization units)

9. Departure

9.2 Departure on 12 July, 2007