Prefeasibility ReportFor Environment Clearance from MOEF under EIA
Notification Dated 14th September, 2006 as Amended
1. SUMMARY
-
-
Location:
Village - Gangapur
--
-
1. -
2. Geographical Co-ordinates LATITUDE
23° 2'25.70"N 23° 2'24.75"N 23° 2'28.99"N 23° 2'29.32"N 23° 2'31.03"N 23° 2'32.27"N 23° 2'30.01"N 23° 2'29.47"N 23° 2'27.56"N 23° 2'26.46"N
River -
Nalla - 300 mTanks - 800 mCanal - 2.80 km
Reservoir - 2.40 km
4. -
-
6. -
7. -
-
Nalla towards southPond towards eastCanal towards south-east near Kot
village area
Reservoir towards south-east near
Kot village area
-Name of River/ Nallahs /Tanks /Spring
/ Lakes etc.
3. 500 m (Gagar river at east)
Name of Mineral Mined
Rate of Production (in tons)
Production of saleable brick - max. 1171151 nos/year
LONGITUDE
83°20'12.91"E 83°20'15.32"E 83°20'16.69"E 83°20'16.31"E 83°20'17.22"E 83°20'14.67"E 83°20'13.58"E 83°20'14.91"E 83°20'14.52"E 83°20'13.21"E
Brick Earth Clay
Mining of Earth clay - maximum 1846.16 cum/year
-
BL9BL10
District
BOUNDARY POINT
BL1BL2BL3BL4BL5BL6
Gangapur Brick Earthclay Quarry Mine & Fixed Chimney
Brick Plant
Vishal Shukla
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
5.
Mining of earth clay at the rate of maximum 1846.16 cum
per year and production of saleable red brick by fix chimney
plant at the rate of maximum 1171151 nos. per year.
Project Proposal
Flat Land devoid of vegitation
Altitude - Max. 717 AMSL and Min. 715 AMSL
Surface slope - Towards East
Toposheet No.- 64 M/8
Topography of the area
8.
LundraSurguja
Name of Company/Mine/Lessee
Project
Tehsil/Taluka
BL7BL8
Pre - Feasibility Report
Chhattisgarh
1.307 hect. / Private Land
No such area within 10 km from applied landName of Reserve Forest(s), Wild Life
Sanctuary/National Park
Mining Lease Area & Type of Land
State
For Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
Signature of Project Proponent
_________________________________________________________________________________________________
__
2
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
9. -
10. -
11. -
12. -
13. -
14. -
15. 1. 1.307 Hect.
2. 1.056 Hect.
3. 0.051 Hect.
4. 0.2 Hect.
5. 0 Hect.
6. 0 Hect.
1.307 Hect.
7. 0.051 Hect.
8. 0.051 Hect.
16. -
17. -
18. -
19. -
20. -
Vishal Shukla
Registered office Vishal Shukla
S/o. Shri Girija Prasad Shukla
Village/Post - Bramhpara
Tehsil - Ambikapur
District - Surguja
State - Chhattisgarh
Mine Office Village - Gangapur
Prospecting Agency
Basant Lal Marg, Bramh ward-34, Bramhpara
Name and Address of the company /
Proponent
Total Lease Area
Area proposed under mining pits
Area covered by statuary/mine boundary
Area covered by Fixed Chimney/kiln
Area Kept for storage
Unused Area within Lease area
Dumping Area proposed within proposed
Statutory/mine BoundaryPlantation Area proposed over the dump
on obove dumping area
Break-up of Land Utilization Pattern
Total Area (2+3+4+5+6) =
Geological Reserve (till 2m depth) - 26140 cum. Recoverable
Reserve (till 2m depth) - 18461.57 cum.
Mineral Reserve (in tons)
Life of Mine
Mining Method
Below 30 meter from surface level
Natural drainage towards East
Any Other (Specify)
Not Applicable
Cost of Project (Rs. Lacs)
Open Cast Manual
Rs. 20 lacs
Solid waste/Tailings
NIL
Water Requirement & Source Requirement - 8 kilo litre per day, Source - Mine pit/Setting
tank, dug well and tube well of nearby village within
permited limits.
Mine loss/waste/OB - 10% i.e. 2051.3 cum in total.
Rejected or Broken Bricks - 5% i.e. 1849.2 MT in total.
IBM approval: Date
Ground Water table Intersection
Drilling/Blasting
Drainage Pattern/ Water Courses
10 years for the excavation of recoverable reserve of
18461.57 MT
Not Applicable
-
Nil
Not Applicable
Signature of Project Proponent
_________________________________________________________________________________________________
__
3
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
Type of Activity
Utilities (Power, Water Requirement)
Manpower requirement
2. INTRODUCTION OF PROJECT/BACK INFORMATION
Vishal Shukla
S/o. Shri Girija Prasad Shukla
Basant Lal Marg, Bramh ward-34, Bramhpara
Village/Post - Bramhpara
Tehsil - Ambikapur
District - Surguja
State - Chhattisgarh
(ii) Brief Description of Nature of the Project
(i)
Proposed Brick Earth Clay Deposit is located at village Gangapur, Tehsil Lundra, District Surguja and
state Chhattisgarh over an area of 1.307 ha. The proposed capacity of the project is clay generation of
maximum 1846.16 cum/annum and production of saleable red brick by fix chimney plant at the rate of
maximum 1171151 nos. per year along with the aid of 25% of fly ash. Proposed land is Private non
forest revenue land. Open Cast Manual method of mining is the most suitable mining procedure for
this mine. This method of mining is used for highest productivity and the lowest cost of any of the
broadly used mining methods. Brief description of the project is described below –
Open Cast Manual Brick Earth Clay Quarry Mining
Identification of Project and Project Proponent
(a) Name of the Project: Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant
(b) Project Proponent : Vishal Shukla
(c) Postal /Correspondence Address of Project Proponent:
The proposed project is mining activity of Brick Earth Clay with the name of 'Gangapur Brick
Earthclay Quarry Mine & Fixed Chimney Brick Plant' which is situated at Khasra no. 240, 246 at
village Gangapur, tehsil Lundra and district Surguja (C.G.). This site is 19.00 km away from district
office Surguja. The LOI for quarry lease of Brick Earth Clay mining has been sanctioned for Lease
period will be of 30 years from first commencement of lease as per rule 38A of MMR 2015 as
ammended to the project proponent Vishal Shukla resident of Bramhpara district Surguja (C.G.).
The LOI is granted for 1.307 hectare land and the proposed maximum production capacity is
1846.16 cum. per annum of clay mining and production of red brick by fix chimney plant at the
rate of maximum 1171151 nos. per annum. The excavation of Brick Earth Clay will be done by
Open Cast Manual method of mining and manufacturing of bricks will be done by fix chimney
brick plant.
Power- 2 HP
Water – 8 KLD for Domestic, Dust Suppression & Plantation
Purpose
25 workers per day
Signature of Project Proponent
_________________________________________________________________________________________________
__
4
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(iii)
(iv)
For compliance of Rule 24 and 63 to 66 of MMR 2015 proponent was submitted quarry plan
before mining authorities and the plan so submitted has been duly approved by the sanctioning
authority vide letter no. 574 / Khanij / 2017 Balrampur, Dated 25/04/2017.
Mineral resources of any country are the “TREASURE-TROVE” of its national economy;
Chhattisgarh is one of the richest states in the country with its sparkling mineral wealth. The
Chhattisgarh State has enormous reserves of soil spread over the state. Bricks is basic material of
civil construction works likes building etc. for construction of walls. Chhattisgarh is a new state in
map of India. Considering the growth, State Government has divided the state in 27 districts out
of which 9 are recently declared districts. State Government, is carrying on various new township
and building projects in all districts. In addition to these various civil constructions, building &
colony development projects are coming in Private sectors and are under implementations, all
above civil works require bricks which are in huge in demand.
Demand - Supply Gap
Letter of Intent for sanction of quarry lease has been granted by collectorate mining branch vide
letter is enclosed.
Therefore application is being filed before jurisdictional DEIAA of district Surguja for getting
permanent environmental clearance before starting of mining activity on granted lease area.
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as
“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th
September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi
by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.
All the other necessary permission and noc’s has been taken by the proponent. Consent to
establish & operate/Air/Water clearances from CGCECB will also be taken if instructed by
jurisdictional DEIAA.
Bricks are basic raw material of civil construction works likes civil constructions, building & colony
development projects etc.
Chhattisgarh is a developing state in map of India. Considering the growth, State Government has
divided the state in 27 districts out of which 9 are recently declared districts. State Government is
carrying on various new township and building projects in all districts. In addition to these various
civil constructions, Building & Colony development projects are coming in Private sectors and are
under implementations, all above civil works require Bricks which is in huge in demand.
Need for the Project and its Importance to the Country and/or Region
Signature of Project Proponent
_________________________________________________________________________________________________
__
5
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(v)
(vi)
a) Direct Employment
S.N.
1
2
3 Extra Skilled Labours
4
5
b)
3. PROJECT DESCRIPTION
(i)
The mining establishment presents opportunities of employment to various posts under various
cedars viz. supervisory, skilled workmen, semiskilled workmen and unskilled workmen beside
casual workmen. However the maximum required labors at the site to justify the manufacturing
of bricks at applied land are detailed below-
Taking standard O.M.S. to be one the strength of labour for 250 nos. of brick production per day
and working 240 days a year 25 labours per day will be required.
Indirect employment - Driver, cleaner for loader & dumper are the points were labors are
required. Moreover, manager, accountants will also be appointed as per need.
Employment Generation (direct and indirect) due to the Project
Particulars
Skilled labours 21
The proposed project is < 5 hect. Minor mineral and non-coal mining project thus it is classified as
“CATEGORY – B2” project under activity 1(a) of the schedule of EIA notification dated 14th
September 2006 as amended by Ministry of Environment, Forests and Climate Change, New Delhi
by S.O. 141(E) dated 15 January 2016, hence it comes under jurisdiction of DEIAA.
1
1
25
No of Workers
Demand - Supply Analysis
Exploiting this bricks earth is important for the country’s long term economic growth and regional
growth. By mining the deposit and producing red bricks, the lessee acts as bridge and fills the gap
between demand and supply of Bricks in the market surrounding the area.
Therefore, a ready market is available for the proposed unit hence looking to the use and
demand of bricks which exist a good scope for the proposed project.
Labors will be required for various purposes like excavation of clay, loading and unloading of clay,
clay molding, brick making and loading of bricks in various vehicle, management, maintenance &
development of mine, making & maintenance of ramp, transportation of material and book
keeping. Experienced personals will be employed as per the requirement.
Type of Project (Including interlinked and interdependent projects, if any):
as per needSemi - Skilled labours
Mining mate (Qualified)
Chowkidars (Experienced)
Total
Mining will generate employment opportunity to local inhabitants directly and indirectly in
mining as well as in consequent related activity.
2
Signature of Project Proponent
_________________________________________________________________________________________________
__
6
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(ii)
The details of the lease area are as under:
The Coordinates of the area are:
BOUNDARY
POINT
LATITUDE
BL6 23° 2'32.27"N
BL7 23° 2'30.01"N
BL8 23° 2'29.47"N
BL9 23° 2'27.56"N
BL10 23° 2'26.46"N
(iii)
(iv)
District / State Surguja / Chhattisgarh
Village
Area(ha)
BL1
83°20'13.21"E
83°20'16.31"E
83°20'17.22"E
83°20'14.67"E
LATITUDE
BL4
BL5
83°20'13.58"E
83°20'14.91"E
83°20'14.52"E
BOUNDARY
POINT
83°20'12.91"E
83°20'15.32"E
83°20'16.69"EBL3
Lundra
The brick earth clay is exposed throughout the applied area. It is naturally site specific due to its
geological origin. Mining is site specific project. This lease granted/is being granted by the state
govt., hence alternative site is not applicable.
LONGITUDE LONGITUDE
Location (map showing general location, specific location, and project boundary & project site
layout) with coordinates.
Gangapur
1.307 hect.
Tehsil
23° 2'25.70"N
23° 2'24.75"N
23° 2'28.99"N
23° 2'29.32"N
23° 2'31.03"N
The total applied lease area is 1.307 hectare and total proposed maximum clay production
capacity will be 1846.16 cum per annum and production of finished saleable red brick is 1171151
nos/year through Open Cast Manual method of mining. Proposed production details during lease
period are shown in below -
Size or Magnitude of Operation:
The site can be depicted in the toposheet number 64 M/8 of Survey of India. Study area map in
Khasra map, toposheet and site specific surface map is attached as Plate-1, Plate -2 and Plate -4
of enclosed mine plan respectively.
Details of alternate sites considered and the basis of selecting the proposed site, particularly
the environmental considerations gone into should be highlighted:
BL2
Signature of Project Proponent
_________________________________________________________________________________________________
__
7
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
Rejected Bricks
in MT
(5% of Brick
Production)
184.92
184.92
184.92
184.92
184.92
184.92
184.92184.92184.92
184.92
1849.2 MT
(v)
-
-
-
-
-
-
-
-
The excavation activity will be carried out till the depth of 2 m below general ground level or 2
meter above from water table intersection which ever is earlier.
1171151
1171151
1171151
205.13
205.13
205.13
Total 11711510 Nos.
The Mining of clay will be carried out manually with The help of simple instrument like, crowbars,
spades, chisels and hammers.
205.13117115111711511171151
1171151
205.13
8th Year
1171151
2051.3 cum
1.00 m boundary will be left from the lease boundary around 4 sides (N, E, S, W) as barrier for
safety provisions, dumping of OB and afforestation.
Year
1171151
Project description with process details (a schematic diagram/flow chart showing the project
layout, components of the project etc. should be given)-
It is proposed to carry out Open Cast Manual mining of clay and fix chimney brick manufacturing
process.
7th Year
Mine Loss/Waste/OB
in CUM (10%
of Clay Excavation)
Production During Plan Period
205.13
205.139th Year
10th Year
3rd Year
4th Year
5th Year
6th Year 205.13
205.13
1st Year
2nd Year
1171151
205.13
Total Estimated
Production of
Finish Red Bricks in
No’s.
Produced clay will be shifted to stacking yard for production of Bricks.
33 meter heighted fix chimney Killen will be used/installed for production of bricks.
Loading will be done manually and the transporting will be done by Tractor.
The process of brick making is explained in below chart:
Signature of Project Proponent
_________________________________________________________________________________________________
__
8
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(vi)
S.N. Detail
1 100000 no’s
2 3.00 kg
3 300.00 MT
4 25%
5 75MT
6 1.5
7 50 cum/1 lac no's.
of brick
Drilling & Blasting : Not Applicable
Drilling : Not Applicable
In the proposed process Fly Ash will be added minimum of 25% of the total volume of material
used for brick manufacturing. The requirement of fly ash has been computed below –
Fly Ash plays a big role in manufacturing of bricks in fix chimney Brick. The utilization of Fly Ash
adds various benefits as-
• It Increases the volume of material for production of bricks.
• It reduces the use of Earth Clay to save earth.
• It reduces the requirement of fuel as it works as fuel in the brick itself
• Decreased amount of coal burn reduces the pollution in the environment.
Raw material/consumables required along with estimated quantity, likely source, marketing
area of final products/s, Mode of transport of raw Material and Finished Product.
Blasting : Not Applicable
Fly Ash required to be added for 1 lac nos. of
Bricks production
The above requirement will be mitigate by Korba Industrial Area.
Fly Ash required to be added in MT
Density of Loose Fly Ash
Requirement of Fly Ash:
Particulars
Number of brick
Weight of One Brick
Total Weight
Ratio of Addition of Fly Ash
Marketing area: Bricks will be used building material in civil constructions activity around the
vicinity of Surguja.
The Bricks will be transported to the destination by trucks/tractors.
Signature of Project Proponent
_________________________________________________________________________________________________
__
9
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(vii)
Drinking &
Washing
Other
1st 1.5 -
2nd 1.5 -
3rd 1.5 -
4th 1.5 -
5th 1.5 -
6th 1.5 -
7th 1.5 -
8th 1.5 -
9th 1.5 -
10th 1.5 -
I)
II)
A)
2
For Clay Mounding, Green belt and dust suppression: Water will be made available from quarry
mine pit which is accumulated during the rainy season and shall be collected in settling tank for
utilization in green belt and dust suppression.However, if required, water might be supplied from
tube well within lease area or from nearby pond or nalla also.
Domestic usage: Drinking water is available from dug well and tube well in villages near the
applied area which is portable, pure and clean.However, if required, water might be supplied
from tube well within lease area .
Nil
Clay
Molding
Water Requirement:
Sources of water:
Energy & Power Requirement and Source
Fixed Chimney Plant requires burning of raw bricks in kiln which requires fuel. Fuel can be used in
form of burning wood, agriculture wastage or coal. It is feasible to burn coal as wood &
agriculture wastage are neither available as per need nor burning them is feasible. Diesel is also
required for mining operations and running of tractors and other transportation vehicles.
2
Fossil Fuels :
2
It is expected that the total water need is about 8 kilo litter per day in the mine. The details of
water balance of existing / proposed mining project are given below:
Availability of Water, its source, Energy/power requirement and source should be given -
Nil
Nil
2 Nil
Nil
Annual Requirement of Coal:
The average annual requirement of coal for the process will be estimated in table below-
Domestic (in KLD) Total Water
Requirement in
KLD
8
8
8
Nil
Nil
Nil
Green Belt Clay
Mining
1.28
1.28
1.283.22
3.22
3.22
3.22
3.22 Nil
Dust
Suppression
Nil
Coal Requirement :
8
8
8
8
3.22
3.22
3.22
Year
2
2
2
2
2
2
Mine Site (in KLD) Bricks Molding (in
KLD)
1.28
1.28
1.28
1.28
1.28
1.28
3.22
3.22 1.28
8
8
8
Signature of Project Proponent
_________________________________________________________________________________________________
__
10
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
S.N. Coal Need per
1 lac of Brick
(in MT)
Maximum Annual
Coal Requirement
(in MT)
1 12 147.930
2 12 147.930
3 12 147.930
4 12 147.930
5 12 147.930
6 12 147.930
7 12 147.930
8 12 147.930
9 12 147.930
10 12 147.930
B)
S.N. Power
requirement
1 2 HP
C)
(viii)
a)
b)
Domestic Purpose
Source of Electricity:
Total Estimated
Production of Raw
Bricks in No’s.
1232791
1232791
1232791
1232791
1232791
Solid Waste:
Quantity for diesel will depend upon the usage of transportation vehicle and other machineries
and level of achievement of estimated production. Diesel will be outsourced from nearby diesel
pumps.
Electricity will be required for Pumping of water and for administrative building & rest shelters.
The requirement of Power is estimated as under-
In the fix chimney brick manufacturing process some broken/ rejected brick may arises.
Moreover, ash gets generated due to burning of coal. Further mine waste may also get generated
in few quantity. These items requires their due management. Quantity of generation of
broken/rejected bricks and its manner of management has explained below-
Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal –
The power requirement for the project will be met by electricity lines of Chhattisgarh State Power
Distribution Company Limited available at village or nearby site area.
Electricity :
Particulars
1232791
1232791
1232791
1232791
2nd
Year
3rd
Year
Top Soil & overburden: Not Applicable
Mining Loss or OB or Useful Waste Material:
1232791
4th Year
5th
Year
6th Year
1st
Year
Year
Coal may be obtained from Surajpur or Gevra Dipka coal Project at Korba through coal auction
proceedings of S.E.C.L.
7th Year
8th Year
9th
Year
10th Year
Source of Coal
Signature of Project Proponent
_________________________________________________________________________________________________
__
11
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
Scheme for management/disposal –
c)
7th
Year
8thYear
9thYear
205.13
1849.2 MT
184.92
184.92
184.92
6th
Year
10thYear
205.13
205.13
205.13
2nd Year
3rd Year
4th
Year
5th
Year
ii) Non-saleable rejected or broken bricks, generated during operations have to be stored
separately in an open ground within lease area and will be disposed by using it to create haul
roads or for filling of pits at or around the proposed lease land.
iii) Generated ash from the plant will be reutilized for manufacturing of bricks by mixing it with
brick clay mix.
i) Mine wastage will be gathered on suitable area with in lease area for reclamation purpose.
Total
Sub grade material:
184.92
Mining loss/OB/
Waste in CUM
(10% of Clay
Excavation)
Rejected Bricks
in MT
(5% of Brick
Production)
205.13
205.13
205.13
205.13
205.13
205.13
184.92
184.92
184.92
184.92
184.92
184.92
No sub-grade mineral will be generated during excavation of clay. All ROM mineral will be used.
Only domestic effluent is expected to be generated which will be treated through septic tank
followed by soak pits.
Liquid Effluent:
Quantity of wastes and reject material expected to be generate
Year
1st Year
2051.3 CUM
Signature of Project Proponent
_________________________________________________________________________________________________
__
12
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
4. SITE ANALYSIS
Connectivity
(i)
Form & Use : Flat, Non Forest, Revenue land.
Ownership : Private land.
Forest - Nil Area (ha)- Nil 1.307 Hect. Area
Nil
Nil
Nil
(ii)
(iii) Social Infrastructure Available
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. at or from
Lundra.
Land form, Land Use & Land Ownership
The climate of Surguja district in general and the Lundra in particular is characterized by a hot
summer and a well-distributed rainfall during the southwestern monsoon season extending from
end of June to October. The area has 4 well-defined seasons in a year. The winter season
commences from early December and continues up to the end of February, summer season
extends from March to early June, rainy season generally from mid-June to September and the
post-monsoon season from October to November.
The study area consists of essentially Flat land . Gentle slope towards East, Maximum elevation of
the lease area is 717 meters above MSL towards West while the lowest elevation is 715 m in the
Eastern part of lease area.
Existing land use pattern: Existing land use pattern of the proposed mining area is given in below
table.
(i) waste land (Private),
(ii) grazing land,
(iii) Agriculture land,
(iv) others (specify)
The area is approachable from district office Surguja by fair weather road. The area is 19.00 km
from Surguja. The applied area is 1.00 KM away from Lamgaon bus stand. Hospital is available at
Gangapur at 700 m/Raghunathpur at 3.25 km distance. The nearest railway station is at
Ambikapur (22.50 km) (S.E.C.RLY) and Nearest active airport is Raipur (263.00 km).
Forest Area Non-forest Area
Climate Data from Secondary Sources:
Topography:
The road facility is already available which shall be used and properly maintained. Preference will
be given to local labor from nearby villages. Other requisite infrastructure as transport of mine
labors is available by way of jeep, two-wheeler. Medical facility is available for first aid at project
site.
Signature of Project Proponent
_________________________________________________________________________________________________
__
13
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
5. PLANNING BRIEF
(i)
(ii)
Proposed Land Use Pattern of Proposed Quarry Lease Area
1. 1.307 Hect.
2. 1.056 Hect.
3. 0.051 Hect.
4. 0.2 Hect.
5. 0 Hect.
6. 0 Hect.
1.307 Hect.
7. 0.051 Hect.
8. 0.051 Hect.
(iii)
Impact of the brick earth quarry mine will be positive, as it will upgrade the socio-economic status
of local inhabitants in the nearby areas by giving employments to poor people of nearby villages.
Due to this positive impact the living standard will increase and will lead to Educational
upliftment.
Assessment of infrastructure demand (physical and social)
Proposed Land Use Planning
Planning concept: It is a Brick Earth Clay mining project, for safe, scientific & systematic working
to follow the principles of safety & conservation of human health & mineral the planning for
mining of earth clay shall be governed by the approved Quarry Plan under Chhattisgarh Minor
Mineral Rules, 2015 vide letter no. 574 / Khanij / 2017 Balrampur, Dated 25/04/2017.
Population projection:
The project is very small in magnitude. The project will employ most of the workers from nearby
villages. There will not be any increase in population of the area due to the establishment of
project. However, few people from other area may migrate in this area for business
opportunities.
Unused Area within Lease area
Dumping Area proposed within proposed
Statutory/mine Boundary
Plantation Area proposed over the dump on obove
dumping area
Total Area (2+3+4+5+6) =
Total Lease Area
Area proposed under mining pits
Area covered by statuary/mine boundary
Area covered by Fixed Chimney/kiln
Area Kept for storage
Site services are required per the statutory provisions i.e. rest shelters, toilets, drinking water
facilities, safety appliances, and regular medical checkup facilities are suitably needs to be
provided for labors and their families. The health and safety of the employees is required to be
given first priority during the mining operation. Training program organize for first aid.
Planning concept (type of industries, facilities, transportation etc.) Town and country
Planning/Development authority Classification-
Site Services:
Signature of Project Proponent
_________________________________________________________________________________________________
__
14
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
6. PROPOSED INFRASTRUCTURE
(i) Industrial Area (Processing Area)
(ii)
(iii) Green belt
First aid:
Office and stores:
Amenities / Facilities:
The road facility is already available around 630 m from the site which shall be used and properly
maintained.
Apart from indirect manpower requirement for Driver, cleaner for loader & dumper, manager,
accountants; approx. 25 labours will be required directly for mining operation.
Other requisite infrastructure: Transport of mine labors is available by way of jeep, two-wheeler.
Medical facility is available for first aid at project site.
Power line, telephone line, school, bank, govt. office, Hospital, Police station etc. are the other
requisites needed for mine operation and social facilitation.
Residential Area (Non Processing Area)
No residential area is proposed for the project except temporary rest shelters proposed for
labors.
Under the afforestation plan, plantation in nearby villages and connecting roads be undertaken.
The implementation for development of greenbelt will be of paramount importance as it will not
only add up as an aesthetic feature but will also act as a pollution sink. The species to be grown in
the areas should be dust tolerant and fast growing species so that a permanent greenbelt is
created. Plantation in the barrier zone and roads is necessary as these areas will contain fine
particulates resulting from mining operation and vehicle movement Plantation will also be carried
out as social forestry programme in village, school and the areas allocated by the Panchayat/State
authorities. Native plants like Neem, Peepal, Khejri and other local species will be planted. A
suitable combination of trees that can grow fast and also have good leaf cover shall be adopted
to develop the greenbelt.
Fix Chimney Brick plant is proposed to be installed within the lease area. 2000 sqm area will be
occupied by chimney killen with on the lease area. This area will be sufficient for brick making
process.
Specified first Aid station is needed to be maintained at the site office and the rest shelter as per
applicable statutory provision.
Office and stores is needed to be provided as per applicable statutory provision.
Specific amenities / facilities are not required in this mining project. However the same can be
provided as per prescribed instructions.
Road & Connectivity:
Manpower Requirement:
Signature of Project Proponent
_________________________________________________________________________________________________
__
15
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
No. OF SAPLING
(iv)
OCCUPATIONAL HEALTH AND SAFETY
Occupational Health and Safety works as follow-
1)
2)
3)
4)
(v)
Seesam, Bargad, Neem, Aam,
Pipal, etc.
For the social developmental program on the need base assessment some development program
will be undertaken by the project proponent i.e. development of or maintenance of urinals,
toilets, safety appliances & training program, confirming availability of pure and clean drinking
water, periodic health checkup program, transportation facility to labors and their children’s to
schools etc.
Drinking water is available in dug well and tube well at nearby village of the applied area which is
portable, pure and clean. It is also proposed to provide hand pump if needed in the lease area for
mitigating of drinking water, such hand pump will be arranged after taking statutory permission.
Social infrastructure
Year
1st Year
PROPOSED SITE
Along boundary of quarry area 100
Develop and implement training sessions for management, supervisors and workers on
health and safety practices and legislation;
Awareness program be conducted about likely occupational health hazards so as to have
preventive action in place.
Promote occupational health and safety within workers in mine and develop safer and
healthier ways of working;
Occupational Health and Safety are important. Periodic assessment of it will be useful. Identifying
workplace hazards, assessing risks to employee health and safety, are important. Health and
Safety points are also important in many of the environmental aspects of the workplace.
Except dust generation there is no source which can show a probability for health related
diseases and proper dust suppression will control dust generation and dispersion.
Drinking Water Management (source & supply of water):
Afforestation program shall be started with the commencement of mining operation with
simultaneous clearing of land by spreading of clay lumps along 1.0 m outer barrier of lease
boundary. 2.5m X 2.5m spacing with 0.6m depth have been suggested for sapling pits on which
local species i.e. Pipal, Neen, Aam, Arjun, Jamun, Imli, Sirus, Sisu, Karanj will be planted as the
following manner-
SPECIES
If/Where no plantation is possible within the mine due to rocky nature of lease area then
plantation on transportation road side or on the Government waste land as suggested/demarked
by Gram Panchayat/Nagar Panchayat/ local body will be done as per above plantation program.
Signature of Project Proponent
_________________________________________________________________________________________________
__
16
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(vi)
(vii)
(viii)
A)
S.N.
1
2
3
4
5
6
7
8
9
10
B)
S.N. Power
requirement1 2 HP
C)
Fossil Fuels :
Electricity :
Particulars
Domestic Purpose
Source of Electricity:
Fuel is to be used in form of Fuel is to be used in form coal for burning of Raw brick in Killen and
diesel for mining operations and running of tractors and other transportation vehicles. Quantity
for fuel will depend upon the usage of transportation vehicle and other machineries and level of
achievement of estimated production. Diesel will be outsourced from nearby diesel pumps.
Electricity will be required for Pumping of water and for administrative building & rest shelters.
The requirement of Power is estimated as under-
The power requirement for the project will be met by electricity lines of Chhattisgarh State Power
Distribution Company Limited available at village or nearby site area.
2nd Year 147.93
3rd Year 147.93
4th
Year 147.93
5th
Year 147.93
Industrial waste management: No industrial waste will be generated.
Power requirement & supply/source:
Sewerage System: No construction or sewage waste is expected from the mining process.
However the domestic waste from the toilets shall be given treatment through septic tank and
soak pit arrangement.
Annual Requirement of Coal:
The average annual requirement of coal for the process will be estimated in table below-
Year Maximum Annual
Coal Requirement
(in MT)
1st Year 147.93
Source of Coal
Coal may be obtained from Surajpur or Gevra Dipka coal Project at Korba through coal auction
proceedings of S.E.C.L.
6th Year 147.93
7th
Year 147.93
8th Year 147.93
9th Year 147.93
10th Year 147.93
Signature of Project Proponent
_________________________________________________________________________________________________
__
17
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
7. REHABILITATION AND RESETTLEMENT (R&R) PLAN:
8. PROJECT SCHEDULE AND COST ESTIMATES
A)
B) Estimated project cost of the project -
S.N. Amount in Lacs
1 8.00
2 0.50
3 10.00
4 0.50
5 1.00
20.00
9. RECOMMENDATIONS
Likely date of start construction and likely date of completion (time schedule for project) –
Particulars
Land Cost (market value)
Administrative Building & Rest Shelters
No R&R plan is required as the mine area does not cover any habitation. Hence the mining
activity does not involve any displacement of human settlement. No public buildings, places,
monuments etc. exist within the lease area or in the vicinity of the mine lease area. The mining
operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is
anticipated.
Impact of the clay mining will be positive, as it will upgrade the socio-economic status of local
inhabitants in the nearby areas by giving employments to poor people of nearby villages. Due to
this positive impact the living standard will increase and will lead to educational upliftment.
The proposed mining project will be started after obtaining Environmental Clearance of quarry
lease and order to enter in lease area by District Collector (Mining Branch). Consent to establish &
operate from CGCECB will also be taken if instructed by DEIAA.
Effect on Flora & Fauna: Nil
Mining is restricted to very small area. No study have been conducted or record found on effect
on Floora & Fauna for mine area. However mining activity causes impact on flora and fauna due
to land degradation/deforestation etc.,
Chimney Killen, Mining Machineries & Equipment’s
Land Development & Establishment cost
Others
Total Cost of Project :
In any human activity there are always possibilities of finding various options. Project proponent has
decided to examine and adopt one such option that will be both environment friendly and best suited
for clay production. Various alternatives in terms of site, technology, and equipment are considered. A
final selection is thus arrived–
Signature of Project Proponent
_________________________________________________________________________________________________
__
18
Tehsil- Lundra & District- Surguja, State- Chhattisgarh.
Pre - Feasibility ReportFor Gangapur Brick Earthclay Quarry Mine & Fixed Chimney Brick Plant, at Village - Gangapur
(a)
(b)
(c)
(d)
(e)
Vishal Shukla
Date : / /2017
Place : Bramhpara
The Project is viable and environmental friendly as it’s a development project for the State &
Country.
Increased financial benefits accruing to state and central agencies by ways of taxes, royalties,
cesses etc.
Signature of the applicant
The Proposal is for the Environment Clearance of the Proposed Mine.
The quarry project will create local employment to the villagers and they will get employment
in nonagricultural season.
The Proposal does not require further Infrastructure facilities other than few Mining
Machineries.
Signature of Project Proponent
_________________________________________________________________________________________________