15
Premium AEROTEC GmbH Aerostructures for the Future I t ti l A Q lit G International Aerospace Quality Group Munich, 16.10.09 Hans Lonsinger CEO & President 1

Premium AEROTEC GmbH - SAE · PDF filePremium AEROTEC GmbH Aerostructures for the Future Inttilternational Aerospace Qualitlity Group Munich, 16.10.09 Hans Lonsinger CEO & President

Embed Size (px)

Citation preview

Premium AEROTEC GmbH

Aerostructures for the Future

I t ti l A Q lit GInternational Aerospace Quality Group

Munich, 16.10.09

Hans LonsingerCEO & President

1

WELCOME

2

Contents

Creation of the Company

The Airbus Power 8 / Zephyr ProjectThe Airbus Power 8 / Zephyr Project

Quality Approval Route

Premium AEROTEC GmbH

Sites

Market

Programs

The EADS / Airbus „Zephyr“ sites

Beside the six Airbus sites, the EADS-Military Air Systems (MAS) site in Augsburg became part of the „Zephyr“ carve out process.

The Carve Out Process – Overall schedule

The Carve Out of Nordenham Varel and Augsburg and the integration intoThe Carve Out of Nordenham, Varel and Augsburg and the integration into the NewCo had to be done in three main steps:

Step:NewCo set up &

operational ManagementNOR/VAR/AUG legal

Transfer into the NewCoFull ERP

Separationp g p

Date: 01/09/2008 01/01/2009 11/04/2009

Foundation of NewCoNewCo takes over

Full ERP separation

Activity:

operational management of NOR/VAR/AUG (Betriebsführung)

NOR/VAR/AUG will be transferred into NewCo All carve out Projects

pProcess changes depending on ERP are implemented(Betriebsführung)

Augsburg is still part of Military Air SystemsNOR/VAR are still part

f Ai b G

All carve out Projects are implemented (e.g. TSA’s, WPA’s)

implementedProjects depending on ERP are i l t dof Airbus Germany implemented

NewCo NOR/VAR/AUG

01/09/08 01/01/09 11/04/09

NewCo Operational

Management

NOR/VAR/AUG legal transfer

into the NewCoFull ERP

Separation

The Carve Out Process – Change of Ownership on 01 January 2009

With effect as of 1 January 2009, EADS D and Airbus D sell and transfer the NOR/VAR/AUG sites (assets and employees) to NewCo; purchase price to be financed by contribution of EADS N.V. to NewCo [and/or by shareholder loan].

EADS N.V.

EADS D NewCoAirbus SAS

Contribution [/ loan]Purchase

Price Purchase PriceS NewCo

AUGAssets

Airbus DNOR/VAR

Assets

AUGStaff

NOR/VARStaff

Quality Approval Route

At Project start the Plants in Nordenham and Varel were covered by AIRBUS Deutschland GmbH, EASA PO Approval EASA.21G.0001.

The Plant in Augsburg was part of Military Air Systems, under EADS Deutschland GmbH, LBA PO Approval LBA.21G.0003.

Major Task was to develop, establish, approve and certify a new common QM-System effective by January 1st 2009 in accordance to the EN9100 standard.

Approval situation at project start in 2008

Quality Approval Route

Requirements for approvals in case of transfer into new legal entityRequirements for approvals in case of transfer into new legal entity.

Nomination and appointment of the Accountable Manager

Appointment of the Head of Quality Management

Preparation of the company organizational breakdownPreparation of the company organizational breakdown

Trade Register must exist (Handelsregister - Auszug)

Existence of lease contracts for land and buildings and proof of asset transfer into the NewCo

Activity plan / schedule for submission and approval by LBA Braunschweig /Activity plan / schedule for submission and approval by LBA, Braunschweig / BWB, Koblenz office must be established

First concepts for Route to Approval

Quality Approval Route

Schedule to Approvals in case of new legal entity of sites AUG/NOR/VARSchedule to Approvals in case of new legal entity of sites AUG/NOR/VAR

stom

ers Preparation of the company’s self-portrayal

(Quality Management Handbook)

otie

s

Objective: Production/

MaintenanceOrganisation

Prerequisites:1. Accountable Manager2. Quality Manager3 Company Organisation

tion

of c

us

Harmonisation and standardisation of Quality Management Procedures

n to

Aut

horo

A / B

WB

)

Organisation Approval:

EASA Part 21 GEASA Part 145

3. Company Organisation4. Abstract of trade

register5. Lease Contract /

Asset Transfer

Info

rmat

Info

rmat

ion

( LB

A EASA Part 145

Military Approvalby BWB

Planning, preparation and execution of the certification process (EN9001 & EN9100)

Asset Transfer6. Activity schedule:

Agreement with LBA, BWB

tt0 = Project Start t2= t1 + 6 monthst1 = “Go Ahead”

Quality Approval Route – Challenges

A dedicated team was formed by Airbus and EADS Quality members:A dedicated team was formed by Airbus and EADS Quality members:

Develop an approval route to separate plants from existing organisations for civil (EASA Part21G / Part145) and military (BWB) products.(EASA Part21G / Part145) and military (BWB) products.

Design of a common new QM systems based on drafted EN9100:2009 standard.

Consideration of requirements for the Production Organisation Approval in accordance to EASA Part21G and Maintenance Organisation Approval EASA Part145Part145.

Additional Focus on BWB Approval for Production/Maintenance of Military Products.

Development of approval route with authorities

Quality Approval Route – Key success factors

A balanced and integrated team out of both „mother“ organisations (Airbus and Military Air Systems) and early publication of the approval route to customers and authoritiesand authorities.

Regular process reviews with participation of EASA, LBA and BWB.

Intensive management consultation to track the progress of contractual and legal issues, e.g. Asset Transfer, Master Supply Agreement (MSA), etc.

Key point: Open discussions with an atmosphere of trust and reliability!

Open discussions and transparency to customers and authorities

Quality Approval Route – Quality Audits

In total 9 audits by LBA, BWB and Germanischer Lloyd as certification body had to be performed at the plants / HQ before Day One.

/ fUpcoming issues / findings have been closed by immediate action.

Clear definition of responsible persons acc. to regulations:p p g

CEO Hans Lonsinger as Manager Accountable

COO Dr Dieter Meiners as Manager Production & MaintenanceCOO Dr. Dieter Meiners as Manager Production & Maintenance

Head of Quality Management Johannes Haberer as direct report to the CEO.

Intensive auditing and implementation of corrective action

Quality Approval Route – Military and Civil Certification

BWB-3482N-P05/08/01 DE.21G.0230 DE.145.0438 QS-6136 HHBWB 3482N P05/08/01

Approval of the “Bundesamt für Wehrtechnik und B h ff (BWB)” f

DE.21G.0230

Approval of the German authority “Luftfahrt-Bundesamt” as

d ti i ti

DE.145.0438

Approval of the German authority “Luftfahrt-Bundesamt” as

i t

QS 6136 HH

Certification by “Germanischer Lloyd Zertifizierungs-GmbH” f th Q litBeschaffung (BWB)” for

manufacturing and repair of military aircraft systems

production organization acc. to EASA part 21GG

maintenance organization acc. to EASA part 145

for the Quality Management System acc. to EN 9100(Civil And Military)

We are approved by German civil and military authorities

Premium AEROTEC GmbH – Inside the EADS Group

EADS M i P ti i ti

EADS N.V. Foundation: July 10th2000

EADS Main ParticipationsElbe

Flugzeugw.

EADS SOGERMA

Eurocopter EADS AstriumAirbus/

Airbus MilitaryEADS Defence

& Security

ATR

AEROLIA

EADS N.V.is a 100% Share Holder of

Premium AEROTECG bH

4 Divisions

is a 100% Share Holder ofPremium AEROTEC

GmbH

Premium AEROTEC is a 100% subsidiary of EADS

Premium AEROTEC GmbH – History

Augsburg1905 - 2000 2000 - 2008

EADS01. 01. 2009

PremiumAugsburg1916 Bayerische Rumpler Werke

N d h

EADS Deutschland GmbH

Ai b

AEROTECGmbH

Nordenham1905 DeutscheSchiffs- und Maschinenbau AG

AirbusDeutschland GmbH

AUG 2650 MA

NOR 2350 MA

Varel1936Motorenwerk Varel

AirbusDeutschland GmbH

Varel 1300 MA

Together almost 300 years of experience in aerostructures