Preparing a Proposal Budget - PHYSICS ILLINOISphysics.illinois.edu/people/celia/btep/presentations/budget.pdf · Preparing a Proposal Budget Celia M. Elliott University of Illinois

Embed Size (px)

Citation preview

  • 1

    Preparing a Proposal Preparing a Proposal BudgetBudget

    Celia M. ElliottUniversity of Illinois

    [email protected]

    Copyright 2004 The Board of Trustees of the University of Illinois

    2

    Goals for this sessionGoals for this sessionLearn how to develop a proposal budgetUnderstand the difference between

    eligible and ineligible costsLearn how to use budget worksheetsLearn what institutional overhead is

    and how it is calculatedLearn to prepare a budget narrative

  • 2

    3

    Your budget must conform to your Your budget must conform to your technical descriptiontechnical descriptionGo through the narrative and highlight

    every activity that has financial implicationsmake a list of everything that will have to be paid for

    Assign each one of those costs to an appropriate budget categorypersonnel, equipment, materials and supplies, telecommunications, travel, services, publications

    4

    Make a note, too, of the nonMake a note, too, of the non--monetary monetary contributions your institution will contributions your institution will make to the projectmake to the project

    You will want to emphasize these contributions in your budget narrative

    Look at it from the funders point of viewyour prior investment in facilities and equipment lowers the cost of doing this project for the funder, putting you at an advantage over competing proposals

  • 3

    5

    Your budget must be realistic Your budget must be realistic Reviewers and program officers know

    what things cost; if your budget is not realistic they will think you are either dishonest or stupid

    A budget that is too low may make it impossible to complete the project, which will jeopardize your chances for future funding

    Estimate costs as accurately as possible; get written price quotations for equip-ment and binding agreements for subcontracts

    6

    The RFP sets the budget rulesThe RFP sets the budget rules Average grants are expected to be

    ~$65,000 over two years; no proposal requesting more than $100,000 will be considered

    The FSU teams expenses may account for no less than 80% of the total budget

    The US teams expenses may account for no more than 20% of the total budget

    Projects may last no longer than 24 months

    Eligible expenses are personnel, equip-ment and supplies, travel, subcontracts, and institutional overhead

  • 4

    7

    Budgets must conform to the RFP Budgets must conform to the RFP and include only and include only eligibleeligible costscosts

    Personnel

    Travel

    Equipment and Supplies

    Other Eligible Costs

    Institutional Overhead

    8

    The RFP will also tell you what The RFP will also tell you what costs are not costs are not eligibleeligiblePayments to individuals who do no

    work on the projectTravel that is not connected to the

    research projectEquipment and supplies that will not

    be used in the research projectEntertainmentConstruction, repair, or remodeling of

    facilities

  • 5

    9

    Calculate your personnel costsCalculate your personnel costsIndividual Financial Support FSU Team US Team

    Name Amount per Month

    No. of Months

    A. Ivanov, Head of Lab. $650 24 $15,600 T. Bobrovski, PI $650 24 $15,600 A. Nikolaev, Co-PI $600 24 $14,400 V. Baranov, Sr. Scientist $400 24 $9,600 R. Vodolaga, Student $50 24 $1,200 K. Chupronova, Engineer $150 24 $3,600 R. Kukushkin, Researcher $150 24 $3,600 J. Martindale, U.S. PI $2,000 24 $48,000 S. Ellis, Student $1,000 9 $9,000

    TOTAL INDIVIDUAL FINANCIAL SUPPORT

    $63,600 $57,000

    10

    Review the RFP budget rulesReview the RFP budget rules No salary is permitted for US researchers Up to $10,000 (for the entire award period)

    may be used to support a US student No support for admin. superiors of PI Minimum and maximum salaries set

    $200$75Admin/Clerical Support Staff

    $300$100Student

    $300$200Technical/Scientific Support Staff

    $500$300Researcher/Engineer

    $600$500PI/Project Director

    MaximumMo. Rate

    MinimumMo. RatePosition

  • 6

    11

    Individual Financial Support FSU Team US Team Name Amount

    per Month No. of Months

    A. Ivanov, Head of Lab. $650 24 $15,600 T. Bobrovski, PI $600 24 $14,400 A. Nikolaev, Co-PI $550 24 $13,200 V. Baranov, Sr. Scientist $400 24 $9,600 R. Vodolaga, Student $100 24 $2,400 K. Chupronova, Engineer $200 24 $4,800 R. Kukushkin, Researcher $200 6 $1,200 J. Martindale, U.S. PI $2,000 24 $48,000 S. Ellis, Student $300 9 $2,700

    TOTAL INDIVIDUAL FINANCIAL SUPPORT

    Revise your personnel costsRevise your personnel costs

    $36,000 $2,700

    12

    Individual Financial Support FSU Team US Team Name Amount

    per Month No. of Months

    A. Ivanov, Head of Lab. $650 24 $15,600 T. Bobrovski, PI $500 24 $12,000 A. Nikolaev, Co-PI $400 24 $9,600 V. Baranov, Sr. Scientist $400 24 $9,600 R. Vodolaga, Student $100 22 $2,200 K. Chupronova, Engineer $200 18 $3,600 R. Kukushkin, Researcher $200 6 $1,200 J. Martindale, U.S. PI $2,000 24 $48,000 S. Ellis, Student $300 9 $2,700

    TOTAL INDIVIDUAL FINANCIAL SUPPORT

    Revise your personnel costs, Revise your personnel costs, againagain

    $28,600 $2,700

  • 7

    13

    Itemize the equipment and Itemize the equipment and supplies youll needsupplies youll need

    N.B. The temperature-controlled cuvette holder, which is desperately needed in your laboratory, is to replace a broken cuvette holder that cannot be repaired. It will not be used in the proposed project.

    Equipment and Supplies (Please list. All items over $1,000 must be justified in the Budget Narrative. If more space is needed, please list on separate page.)

    FSU Team US Team

    Personal computer, monitor, printer, internal fax modem, Ethernet card

    $1,400

    Television set for staff lounge $300 Repair/remodeling of fluorescence laboratory $4,000 CUV-TLC-FLKIT#77 Temperature-controlled cuvette holder, fluorescence kit

    $4.834

    Zeiss Axiovert 35 inverted microscope $4,875 Bandit industrial capture board, NT54-834, for scope $795 Chemical reagents $200 $200 JAI CV-S3200N Color CCD Camera $795 MJ Research : PTC-160 Thermal Cycler $4,000

    TOTAL EQUIPMENT AND SUPPLIES

    $16,404 $4,995

    14

    Consult the RFP for allowable Consult the RFP for allowable equipment and supplies costsequipment and supplies costs Research equipment to be used in the

    project Reagents, materials, and consumables

    to be used in the project US team may request only expendable

    materials and supplies and small pieces of equipmentno capital equipment

    No funds may be used for facilities construction, remodeling, or repair

  • 8

    15

    Some funders define suppliesSome funders define suppliesbroadly and some do notbroadly and some do notcheck the RFP check the RFP If a computer is part of a DAQ for an

    experiment, it probably is equipment; if it is to be used to access the Internet or to write manuscripts, it may not be

    Telecommunications equipment (phone, fax, ethernet card, satellite link) and services (phone bills, ISP)

    Books, subscriptions to journalswww.addall.com=used books

    Registration fees for conferences Office supplies, photocopying, printing

    16

    Revised Equipment BudgetRevised Equipment BudgetEquipment and Supplies (Please list. All items over $1,000 must be justified in the Budget Narrative. If more space is needed, please list on separate page.)

    FSU Team

    US Team

    Personal computer, monitor, printer, internal fax modem, Ethernet card

    $1,400

    Television set for staff lounge $300 Repair/remodeling of fluorescence laboratory $4,000 CUV-TLC-FLKIT#77 Temperature-controlled Cuvette Holder, Fluorescence Kit

    $4,834

    Zeiss Stemi 2000-C Stereo Microscope Video System $4,875 Bandit Industrial Capture Board, NT54-834 $795 Chemical reagents $200 $200 JAI CV-S3200N Color CCD Camera $795 MJResearch : PTC-100 Thermal Cycler $,4000

    TOTAL EQUIPMENT AND SUPPLIES

    $2,175

    $11,745 $995

    Photomultiplier Flow-through Detection System $6,485

    2-yr subscription to 11 Am Microbio Soc Jrnls $690

  • 9

    17

    Estimate your travel expensesEstimate your travel expensesTravel (Please describe in Budget Narrative.) FSU

    Team US

    Team Domestic Transportation Sochi, Russia

    $600

    $0

    Domestic Per Diem $30/day 14 days

    $420

    $0

    International Transportation Moscow/Boston (Aeroflot)

    $900

    $0

    International Living Allowance/Per Diem $2000/month 1 month

    $2,000

    $0

    Other Travel Expenses Visa fee Conference Registration (Biophysical Society) Per Diem for BS meeting ($140 day 4 days) Health Insurance for PI while in U.S.

    $60

    $395 $560 $340

    $0

    TOTAL TRAVEL $0

    $5,275

    18

    Check the RFPCheck the RFP Transportation and per diem support for

    scientific travel in connection with the project Travel must be on US carriers where available

    and is mandatory on transoceanic flights Agency has a strong preference for projects

    that include a three- to four-month visit by FSU team member to US PIs laboratory

    International living allowance in US is $2,000/month for all costs, including required health insurance

    Maximum total stay abroad of all FSU personnel is five months per 12-month period

  • 10

    19

    Revised Travel BudgetRevised Travel Budget

    Travel (Please describe in Budget Narrative.) FSU Team

    US Team

    Domestic Transportation Sochi, Russia

    $600

    $0

    Domestic Per Diem $30/day 14 days

    $420

    $0

    International Transportation Moscow/Boston (Aeroflot)

    $900

    $0

    International Living Allowance/Per Diem $2000/month 1 month

    $2,000 $0

    Other Travel Expenses Visa fee Conference Registration (Biophysical Society) Per Diem for BS meeting ($140 day 4 days) Health Insurance for PI while in U.S.

    $60

    $395 $560 $340

    $0

    TOTAL TRAVEL $0

    Delta $1,600

    3 months $6,000

    $1,600$8,055

    $1,600

    20

    Subcontracts* may also be Subcontracts* may also be allowable expensesallowable expenses

    Subcontracts (All subcontracting institutions must be identified and subcontracts described in detail in the Budget Narrative.)

    FSU Team

    US Team

    Subcontract: Individual Financial Support Name Amount

    /Month # Months

    A. Sirunian, Technician

    $100 6 $600 $0

    Subcontract: Equipment and Supplies 1. AFM characterization of virus samples 40 hours at $30/hour

    $1,200 $0

    2. Subcontract: Travel (Please describe in Budget Narrative.)

    -------- $0

    Subcontract: Overhead $180 $0 TOTAL SUBCONTRACTS $1,980 $0

    *In the CRDF RFP, theyre called secondary collaborations

  • 11

    21

    Check the RFP to be sureCheck the RFP to be sure

    Subcontracts may include all allowable costs previously described

    The same minimum and maximum levels of salary support apply to subcontracts

    Institutional support of 10% of the total FSU team expenses is allowed

    22

    Revise the subcontract budgetRevise the subcontract budget

    Subcontracts (All subcontracting institutions must be identified and subcontracts described in detail in the Budget Narrative.)

    FSU Team

    US Team

    Subcontract: Individual Financial Support Name Amount

    /Month # Months

    A. Sirunian, Technician

    $100 6 $600 N/A

    Subcontract: Equipment and Supplies 1. AFM characterization of virus samples 40 hours at $30/hour

    $1,200 N/A

    2. Subcontract: Travel (Please describe in Budget Narrative.)

    -------- N/A

    Subcontract: Overhead $180 N/A TOTAL SUBCONTRACTS $1,980 N/A

    $1,200

    $240$2,640

    $200

  • 12

    23

    Calculate institutional costsCalculate institutional costs

    10% of the total FSU Team expenses

    Total amount of institutional support for the entire award period may not exceed $10,000 $5,295Total US Team

    5,10410% InstitutionalSupport

    $51,040Sub-Total FSU Team

    2,640SecondaryCollaboration

    8,055Travel11,745Equipment &

    Supplies

    $28,600FSU Personnel

    $61,439

    24

    Review general budgetary Review general budgetary requirementsrequirements FSU team not less than 80% of total US team not more than 20% of total

    $5,295Total US

    $56,144Total FSU

    $5,104FSU Overhead

    $51,040FSU Research

    $61,439Total Requested from CRDF

    91%

    9%

  • 13

    25

    Finally, review the rules and Finally, review the rules and doubledouble--check check everythingeverything

    Check your arithmetic is everything added correctly?

    Have you included all required information?

    Has every line and every box been completed?

    26

    The budget narrative should The budget narrative should answer all the questions a answer all the questions a skeptical reviewer would askskeptical reviewer would askExplain how all costs were determinedExplain what each person will do to

    contribute to the projectExplain why equipment is needed and

    how it will be used in the projectProvide written price quotations for

    expensive items of equipmentEnsure that your costs are realistic

    and in line with the scope of work to be done

  • 14

    27

    The budget narrative should The budget narrative should make a persuasive case for make a persuasive case for investing in you and your teaminvesting in you and your teamDemonstrate that project is cost-

    effective, that it will have a significant impact for a reasonable cost

    Remind the reviewer again why your project is importantwhat new knowledge you will create, what important problem you will solve, what useful applications you will enable

    28

    Organize your narrative so that Organize your narrative so that it corresponds to the formal it corresponds to the formal budget pagesbudget pages

    Budget NarrativeA. Summary B. Ind. Financial SupportC. Materials and ServicesD. TravelE. Secondary CollaborationF. Institutional Support

  • 15

    29

    Example of a wellExample of a well--organized, clear organized, clear budget summarybudget summary

    Section F. Budget Justification An itemized budget for the one-year proposed project and a cumulative budget are pre-sented on NSF Forms 1030, pages 12 of this section. A total of $99,942 is requested from the National Science Foundation (NSF). In this section, we provide detailed justifi-cation for each line item. Section headings used below correspond to the respective sec-tions of Form 1030.

    A. Senior Personnel Funds are requested for summer salary (1.5 months) for the PI, A. Bezryadin.

    B. Other Personnel Funds are requested for a graduate student (50-percent time for 11 months). Graduate stu-dent tuition remission of $5841 is included as other direct costs on line G.6 of thebudget.

    C. Fringe Benefits Fringe benefits have been calculated in accordance with the rates published in the Urbana-Champaign Campus and Central Administration FY04 Facilities/Administrative, Tuition Remission, and Fringe Benefit Rates schedule (rev. 8/25/03).

    D. Equipment Funds are requested to purchase an Osmium Plasma Coater Model OPC-60 metal deposi-tion system ($36,000). This is an essential piece of equipment, which will allow the for-mation of a uniform metallic film on single molecules and molecular assemblies. More information on this system and a written quotation are included in Section I, Supplemen-tary Documentation, of this proposal. Should a contract be awarded by NSF, competitive bids would be solicited on this equipment, in conformance with standard University prac-tices.

    12

    30

    Use the budget narrative to Use the budget narrative to show institutional support of show institutional support of and commitment to your projectand commitment to your projectTo make your proposal more

    attractive, identify existing special equipment or unique facilities that your institution owns which will be used in the project

    If your institution is contributing in-kind goods or services to the project, be sure to emphasize it

  • 16

    31

    Lets review what weve learnedLets review what weve learnedHow to develop a research budgetWhy it is critical to understand the RFP

    and adhere to it exactlyWhy it always takes longer than you

    expect to develop a budget What are eligible costsand what are

    notWhat institutional overhead is and how

    it is calculatedA budget isnt finished until it has been

    double-checked and the budget narrative written