Upload
avice-phillips
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
Presentation
PBS 2007 and beyond
George Konstandakos
PBS – Stage 1 Operations
Stage 1 (2007-2012) – Administrative arrangements & Standards under the National Transport Commission:•Vehicle Certification Rules
•The Standards and Vehicle Assessment Rules
•Review Panel Business Rules
•Network Classification Guidelines
•Guidelines for Determining National Operating Conditions
•Assessor Accreditation Rules
•Mapping Portal
PBS – Stage 2 Operations
Stage 2 (2013+) – Heavy Vehicle National Law under the National Heavy Vehicle Regulator:•Operation of new scheme through the NHVR (one-stop-shop)
•Improved access arrangements for compliant vehicle designs
•Modular assessment for prime mover and trailer
•Business rule changes to allow for self certification
PBS – Applications
December 12
359 applications
PBS – Final Approvals
Over 1000 vehicles
approved
PBS – Growth
2 Assessors 13 Assessors(1 OEM)
No certifiers 7 certifiers
Handful of vehicles
Over 1000 vehicles
PBS – Growth
2009
PBS MapsPBS Review
2012
Improved PBS scheme
approved by Ministers
PBS – in Australia
No firm statistics on state by state at this stage.
Victoria has around 75% PBS vehicles operating currently
PBS – Vehicle types
PBS – The Panel (2012)Chair – David AndersonDeputy – Neil FindlayCW – Daniel LambertVIC – Ian MondTAS – Danny JohnsonACT – Rod PauleNSW – Michael WillsQLD – Russell HoelzlSA – Jennifer MartinWA – Kevin LoftusNT – Simon Saunders
PBS – The Panel
Buckles and width
• Operation improvements to expedite approval of applications.
• Highlights policy matters (eg width).
© http://www.trucknetuk.com
PBS – Blueprints - 2007
• Modular assessment and certification
Manufacturer can assess and certify prime mover
Manufacturer can assess and certify trailer
PBS compliant vehicle combination
PBS – Modularity – 2013+
PBS – Blueprints today
To be released by the end of March 2013
PBS – 2007 to 2012 ProcessBefore
• Applicant negotiates with each road authority for a permit• Single vehicle application made the process expensive• Combinations components were locked in (truck and trailer)• No certainty of access
• Applicant negotiates with each road authority for a permit• Single vehicle application made the process expensive• Combinations components were locked in (truck and trailer)• No certainty of access
PBS – 2013+ Process2013
• Manufacturers’ blueprints (reduced applications costs)• Manufacturers’ self assessment • Regulator becomes single point of contact• Combination modularity (mix and match trailers)• Certainty of access through gazetted routes.• Permits issued when non standard access is sought
• Manufacturers’ blueprints (reduced applications costs)• Manufacturers’ self assessment • Regulator becomes single point of contact• Combination modularity (mix and match trailers)• Certainty of access through gazetted routes.• Permits issued when non standard access is sought
PBS – Challenges• Bridge and Route assessments• Access conditions consistency• Local council last mile issues• Education and community
perception
State and Local Governments
State and Local Governments
NHVRNHVR• Route assessments • Systems and processes• Compliance and enforcement –
information and education
PBS – FuturePerformance Based Standards Level 1 Length Limit Review – FS1675
Potential 23 m*
*identified in this report has been based on an analysis of the network, and is indicative of its maximum potential from a risk-based perspective.
Performance Based Standards Review of level 3 & 4 limits – FS1804
In progress
Quantifying the benefits of HPV – FS1805
In progress
Braking standards
Tyres and other components
Route assessment tools
Future consideration
Under review
On trial by MAV
PBS – PBS and the NHVR (forecasts)
Increased number of applicationsIncreased productivityBetter (newer) HV fleet - Safer
Increased number of applicationsIncreased productivityBetter (newer) HV fleet - Safer
20120.1% of HV Fleet
By 2030 projected3.5% of HV Fleet
Improvements to PBS scheme implemented in 2013
Projected take-up