Evolution
1984 „Sunil Engineering Works‟
Promoter Ratnakar. M. Gutte
1994 major breakthrough by mega order
from BHEL at Chandrapur…
Followed by consecutive orders in
Madhya Pradesh and Rajasthan
1998 „Sunil Hitech Engineers Pvt Ltd‟
2004 Again a major break-through order
from NTPC
2006 2nd March 2006 company waslisted on Bombay Stock Exchange &National Stock Exchange with 9 timesover subscription of Initial PublicOffering (IPO).
Same year company declared adividend of 10% for the complete year.
3
Evolution
2007 Diversified in Hydro Project (4.5 MW
from AHPL at Sechi, HP) and T&D
segment.
2008 Received a First EPC Project in ICPP
for 6000 TCD Sugar Plant & 30 MW Co-
Generation Plant and 60 KLPD Distillery
with 1.8 MW Co Gen incineration Boiler at
Gangakhed (MS)
2009 Major breakthrough of “Civil,
Structural & Arch. Work” from BHEL-
PSWR for 2x250 MW Main Plant at
MPPGCL Sarni # 10 &11
Followed by consecutive orders from
- L&T at 3x660 MW MAHAGENCO - Koradi(MS) & 2X600 MW DB Power - Champa(CG) site
- Avantha Power at 2x600 MW Jahbua Power(MP) site
- BHEL at 1 x 600MW SCCL / Singreni (AP)site.
4
Evolution
Pan-India network with presence in
more than 13 states
2010 Breakthrough of 1 x 250MW
Balance of Plant (BOP) package on
EPC basis at Parli # 8, MSPGCL
- 2012 Foray in 800 MW Boiler erection
from DOOSAN at NTPC – Kudgi site.
- 2013 Diversified in Road project fromNHAI at Munger, Bihar and BuildingConstruction at PWD/Punjab
- 2014 Diversified in Atomic PowerProject from BHEL at NPCILKakrapar, Surat, Gujrat.Received order for complete Civil workincluding Fabrication & erection ofPiping of CW System & Makeup WaterSystem at 2x800MW NTPC/LARA.
5
Evolution
VISION
To contribute to the task of
development in power, process and
infrastructure area meeting the
benchmarks set by customers in terms
of quality, price and schedules and
satisfy them on consistent basis
6
History
Group Companies
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
7
Group
Companies Sunil Hitech Engineers Ltd
(Public Limited and Listed)
ISO 9001 and OHSAS 18001 Certified
VAG Buildtech Limited
(Infrastructure Development Company)
(formerly known as Sunil Hitech India Infra Private
Limited )
SEAM Industries Ltd
(Heavy Fabrication & Manufacturing Shop)
ISO 9001 and OHSAS 18001 Certified
Gangakhed Sugar & Energy Ltd
6000TCD Sugar Plant and
30 MW Co gen Plant
60 KLPD Distillery with 1.8 MW Co Gen
8
History
Group Companies
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
9
Business
Overview
SUNIL HITECH ENGINEERS LTD.
ROADS & BRIDGES
National Highways
Bridges
STEEL & METALS
Sinter plant
Steel Melting shop
Billet Storage
Shed
Castor Shop
BOF, CCP Plant
NUCLEAR
STG Work
THERMAL
Balance of Plant
BTGInstallation
O & M T&D
MANUFAC –TURING
Boiler
Pr. Parts
Piping IBR/NON
IBR
Tanks & Vessels
Technological
Structure
BUILDING CONSTN
Residential/ Commercial
Industrial
High rise Buildings
10
ISO and
Other
Certificates
11
OHSAS 18001 : 2007 ISO 9001 : 2008
Business
Overview
End to End Solutions
Design & Engineering
Planning & Scheduling
Project Management
12
Valued
Customer
•MORTH
• Solar Energy Corporation of India
• BUIDCO
• GAIL (India) Limited
•Mahadiscom
•Madhya Pradesh Power Gen. Co.Ltd
• Kanpur Development Authority
•Mahatransco
• Bharat Heavy Electricals Ltd
• MAHAGENCO
• NTPC Ltd.
• Larsen & Toubro Ltd
• Tata Projects Ltd
• Jindal Group & JSW Ltd.
• Avanta Power & Infrastructure Ltd.
• Kolhapur Municipal Corporation.
13
• Lanco infratech Ltd
• APGENCO
• Shandong Elect Power Costnstruction Corp. China
• RINL, Visakhapatnam.
• Sterlite Industries , BALCO
• Jayprakash Associates Ltd
• NBCC
• Thermax
• IOCL 14
• NCC Ltd.(NagarjunaConstn.Co Ltd)
• Steel Authority of India Ltd (SAIL)
• Chhattisgarh SPGCL
• Adani Power Ltd.,
• Gujrat Industries Power Co. Ltd
• BGR Energy System Ltd.
•National Highway Authority of India
•Alstom Bharat Forge Power Ltd.
Valued
Customer
QUALITY
Quality Assurance Aspects
• Prior approval of vendors
• Well formulated project specific quality plan
• Adherence to relevant standards & codes
• Empowered quality team
• Regular training of personnel
• Continuous up gradation of work methodology through state of -the-art techniques
Quality Control Measures
• Well equipped material testing laboratories at all sites
• Regular inspection & testing of incorporated materials
• Adherence to approved inspection procedures for various processes
• Minimizing ‘non-conformance’ by using statistical techniques
15
SAFETY
Safety Measures at our Construction Sites
• Trained safety officers at all sites
• On-site safety awareness programmes
• Motivating Workforce for ensuring safe working conditions
• Compulsory use of Personal Protective Equipments (PPE) & safetynet.
• Barricading open cut out areas & excavated pits
• Electrical Safety, Earthing etc.
• Proper scaffolding systems with adequate cross bracing
• Fire protective extinguishers
16
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
17
People power is the
secret of our growth
Our recognition and
rewards for achievement
begins at the workmen’s
level.
We have set up I-COM
an in-house training
institute that trains
around 150 students
every year. 18
Organization
19
Mr. Sunil. R. Gutte : Managing Director
Mr. C. Venkataramana : Director
Mr. Anupam Dhiman : Director
Mrs Sudhamatti Gutte : Whole Time Director
Mr. Vijay R. Gutte : : Director (Finance)
Mr. Dilip. Y. Ghanekar : Independent Director
Mr. Sajid Ali : Independent Director
Mr. Parag. A Sakalikar : Independent Director
Mr. Sonyabapu. S. Waghmare : Independent Director
Mr. Siddharth R. Mehta : Independent Director
Mr. Anil Aurangabadakar : Independent Director
Mr. B.K. Singh : Executive Director
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
20
POWER SECTOR
Product Profile - Projects
POWER SECTOR INDUSTRY SECTOR
1 Boilers & Aux 125~ 800 MW EPC work of Sugar & Co-Gen
Plant
2 Steam Turbine & Aux Oil Storage Tanks
3 BOP EPC works of 250~800MW Civil and Structural works
4 Civil works up to 800MW units Piping systems
5 Structures 125~ 800 MW Pre Engineering Building
6 Critical Piping Fabrication and Erection of
Structures in Steel Plant for
7 Large Dia. Piping & LP Piping • Sintering plant
8 Fuel Oil Systems • Technological Structures
9 Coal Handling Plant & Str. • Steel Melting Shop
10 Cooling Tower (IDCT) • Billet Storage shed
11 RCC Chimney & Its Steel Flue • Castor, BOF and CCP Plants
12 Mini Hydro Civil Works • Universal Rail Beam
13 33kv/66kv/132kv/220kv/ 400kv Sub Stations
• Shot Blasting & Painting
14 Large Storage Sheds • Material Handling Structures &
Eqpt. Erection21
Boilers and its Auxiliaries
Erection, Testing & Commissioning of Boiler
and its Auxiliaries up to 800 MW.
Boiler Auxiliaries like STG, ESP, Fans, Mills,
APH, Ducting, Critical Piping, LP Piping,
CW/Large Dia. Piping, Ash Slurry and Ash
Disposal Piping
Coal Handling & Ash Handling Plants.
Fabrication & Erection of Steel Chimney Flues.
22
Fabrication & Erection of Heavy / Super
& Technological Structures for Power
Stations (up to 800 MW units)
-Bunkers ( 10000 to 15000 MT)
-Turbine Generator Building ( 10000 to
12000 MT)
Steel and Metal Industry
-Fabrication & Erection of Technological
Structures
-Structural Steel Works for Castor Shop
-Structural Steel Works for Steel Melt
Shop
-Structural Steel Works for Blast Furnace
Complete installation of Sinter Plant
excluding equipment erection
Sand/Shot Blasting and Painting Works
Super Structures & Technological Structure
23
Civil Projects
Civil work (up to 800 MW)EPC – BOP package
• Foundations
Boiler, ESP, Mills, Fans, CHP,
Pumps PHB, Pipe Rack, Bunker etc
• Raw water reservoir & pump House
• APH composite bldg, Fly ash silo,
Ash slurry pump
• ESP Control room
• Main Plant Building
• Service Bldg, ETP & Time office Bldg.
• DG & Compressor House Bldg.
• CW Pump house
• Fuel Oil Handling Plant
• Ash Handling Plant
• Coal Handling PlantRaw Water Reservoir & Pump House
Ash Silo
L & T Koradi - Service Bldg.
DB Power –
Bunker foundations
24
Civil Projects
Civil work (upto 800 MW)EPC – BOP package
• Water treatment plant
a) Pre treatment plant
b) Post treatment plant
• Wagon Trippler, tunnel, control room
• Transformer Yard
• RCC Chimney
• TG Deck
Cooling Tower (IDCT)
HYDRO POWER PLANTS
Civil & Hydro Mechanical Works. Radial &
Vertical Gates, Fabrication of Penstock
25
Koradi (660MW) – TG Deck
Pre water treatment Plant
25
TRANSMISSION
EHV Transmission lines upto 132 kV , 220
kV , 400 kV
EHV Substations upto 132 kV , 220 kV ,
400 kV
Erection, Testing, Commissioning of Power
Transformers upto 200 MVA, C & R
Panels, SCADA System, PLCC
Equipments, HT Capacitors.
Construction of Control Room for EHV
Substation, Cable trenches.
Construction of Heavy consignment roads
for carrying out transformers and other
equipments upto 250 MT.
Earthing system for the entire substation.
TRANSMISSION & DISTRIBUTION
26
DISTRIBUTION
Sub-Transmission lines for 11, 22 & 33 kV.
Substations for 33/11 kV & 22/11 kV upto
10 MVA rating.
Erection, Testing & Commissioning of Pole
Mounted & Plinth Mounted Distribution
Transformers upto 630 kVA rating.
Distribution Network including UG cable
from 1.1 kV upto 33 kV.
TRANSMISSION & DISTRIBUTION
27
Product Profile - Manufacturing
BOILER PARTS ESP PARTS
1 Technological Structures Collecting Plates
2 Super heaters & Re Heaters Emitting Electrodes
3 Economizers & Fin Tubes GD Screens
4 High Pressure Bends Support Insulators & Housing
5 Short Radius Bends CERM & EERM System
6 Bunkers Supply of misc. ESP internals
7 Headers
8 Tanks & Vessels
9 Water Wall panels
10 HP & LP Piping
28
Fabrication Shop – Unit 1
Located at 5 Star Industrial Zone
Area, MIDC Butibori, Nagpur.
Just 30 KM away from
International Airport, Nagpur.
Total Area : 1, 56, 519 Sq. Mtr.
(In Acres: 39.12) including
residential land
Unit # 1
Total Area = 30,784 sq. m.
Closed Shed –
Shed-1 : 36 x 36 Meter
Shed-2 : 30x 100 Meter
Open Fabrication Area –
45 x 120 Meter29
29
Fabrication Shop – Unit 2
Unit# 2
Total Area = 75,138 sq. m.
Open Fabrication Area :
200 x 300 Meter.
Closed Shed – Shed-1 : 30 x 150 Meter
Closed Shed- Shed-2 & Shed-3 :
30 x 50 Meter (each) 30
30
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
31
300 T American 9310 01
230 T Manitowac 4100W 02
150 T Demag TC 500 01
150 T Link Belt LS 528 02
150 T Manitowac 4000 01
150 T Manitowac4000vicon 02
150 T Manitowac4000W 02
136 T LinkBeltLS 518 01
130 T Manitowac 3900W 01
125 T American 7530 01
120 T Lima 1200C 02
100 T American 7260 01
100 T American 998C 03
100 T Lima 1250SC 01
100 T LinkBelt LS 418 01
100 T LS 418J 01
100 T RB 61B 01
90 T Lorain-L790 01
90 T Manitowac3900 01
80 T Kobelco 880S 01
75T P&H 70TON 02
75 T ALC 955 01
75 T Lima700TC 01
75 T LinkBelt HC218 01
75 T LinkBelt LS 318 02
75 T Manitowac2900W 01
Major Cranes
32
75 T Tata P&H 955 01
75 T TFC-280 01
70 T Lima 7070 01
70 T Lima SC 75C 01
70 T ZoomlionQUY 70 12
65 T Kohering 665 01
65 T LORAIN Kohering655 01
60 T American7260 01
60 T FMC LinkBelt LS118 01
60 T Manitowac3500 01
55 T Lima 65C 01
55 T LORAIN Kohering455 01
55 T P&H 550 03
50 T Kohering550 01
50 T LS 108BS 01
45 T LinkBelt LS 108 01
45 T LS 108B 01
40 T American 4260 03
40 T Demag B410LC 01
40 T LS 108BJ 01
40 T LS108B 01
40 T NCK 450 01
40 T P&H 440 01
40 T P&H 5040 01
35 T Kobelco, P&H 335, Sumitommo 09
25T-18T TATA P&H 335,, PPN, Grove 04
30 T Hydra crane 02
16 T Hydra crane 01
14 T Hydra crane 09
12 T Hydra crane 72
10 T Hydra crane 87
8 T Hydra crane 06
Major Cranes
33
BATCHING PLANT 30M3 09
CRUSHER 150TPH 03
TRANSIST MIXERS 6M3 18
CONCRETE PUMP 14M3 10
BOOM PLACER 02
HIWA 16
Back hoe Loader (JCB) 03
Wheel Loader (JCB) 03
TIPPERS 05
EXCAVATORS 05
COMPACTORS 05
DEWATERING PUMP 14M3 15
VIBTO ROLLER 03
TOTAL STATION 09
LAB EQUIPMENT 5 SETS
BAR BENDING M/C 26
BAR CUTTING M/C 27
WEIGHT BRIDGE 07
Motor Grader 01
Civil
Equipments
34
Welding &
Quality
WELDING EQUIPMENTS
Welding Generators (K-320/45) 129
Welding Rectifier 450/600A 1951
Welding Inverter M/c 83
Submerged Arc Welding M/c 08
Co2/MIG Welding Machines 225
Argon Welding Sets 105
Diesel Power Generator 28
NDT EQUIPMENTS
Radiography Source Camera 04
MPT Equipments 01
S.R. Equipments 04
Ultrasonic Machines 02
Ultrasonic Thickness Gauge 08
35
• Can complete RCC work to the tune
of 3,00,000 Cum in a year
• Can achieve 8,000 to 10,000 Cum of
peak Concreting in a month per site.
• Can complete 250 MW Boiler works
in 16-18 months & 500 MW Boiler in
28-29 months
• Can fabricate and erect 1,25,000 MT
of Structures in a year.
• Can achieve 2,500 - 3,500 MT of peak
fabrication & erection in a month per
site.
• Can complete more than 60,000 high-
pressure joints in Overhauling &
Maintenance works in a year.
CAPABILITIES
36
CAPABILITIES
• Ability to complete 75,000 Non IBR
Field weld joints in a year.
• Have in-house capabilities for
Radiography, UT & MPT.
• Possess more than 80 Crawler Cranes
of capacity 8T to 300T & 175nos of
Hydra cranes
• Possess more than 2000nos. of
Welding Equipments.
• Engineering Drawing detailing by state
of the art software (Stru Cad of ACE
CAD Software system, UK) & dedicated
team for the same.
37
KEY
ACHIEVMNTS
• Breakthrough of Rs 4880M BOP EPC job
from MAHAGENCO of Parli 250mw unit
•Executed in 18months Rs.3500M Gangakhed
Sugar & energy Project on turnkey basis
• Achieved 2,18,500 Cum Concreting in 11-12
• Achieved 7nos. TG Deck casting in 10
months from 250MW to 660MW
• Exceeded 1,00,000MT of Boiler erection
and 1,00,000MT of Structure Fabrication and
Erection in the year 2008-09 & 2009-10
•Completed the tallest transfer point of CHP
& Bunker works of the country’s first 660mw
Super Critical Unit @ Sipat.
• Achieved 18500mt of Fabrication &
17500mt erection for Steel works of 2x600mw
Hissar in a year
38
KEY
ACHIEVMNTS
• Commissioned NTPC – Mauda, Rihand &
Vindhyachal 500MW units in 27to 28 months
• HT of 500mw Boilers done in a schedule of
9 to 12 months in 5 Units
• Achieved 3030MT Peak tonnage in a month
(April’15) at NTPC Mauda Boiler#3 (660MW)
• Achieved 13500mt of Boiler erection
(500MW) in a year @Mauda and Bhusawal and
16800MT @ Rihand
• Achieved 20,407 MT Boiler erection in a year
(2013-14) at 500MW Vindhyachal NTPC # 13
which creates new bench mark in BHEL-WR
• Won 6 safety awards in the year 2012-13 & 4
Safety awards in the year 2013-14.
• Has diversified into Boiler component
manufacturing of 3000mt / month
39
Human
Resources
Construction Manager 32
Resident Engineers 55
Engineers 305
Supervisors 204
Materials Management 115
Safety Officers 62
QA / QC Engineers 54
HR & Admin Officers 30
NDT Technicians 20
Operators & Technicians 460
Electricians 85
H.P. Welders 100
LP Welders 1000
Mill Wright Fitters 45
Pipe Fitters & Fabrication 100
Steel Fabricators 105
Mechanical Foremen 70
Skilled & Semiskilled 10,000
40
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
41
MAHARASHTRA
Parli # 6&7 Khaperkheda
Paras # 2 Chandrapur#7
Mauda #1 Bhusawal#3&4
Tiroda # 1,2,3,4&5 Butibori#1&2
Ratnagiri#1,2,3&4 Nagpur -MIHAN
Kalyan Pune
RAJASTHAN
Suratgarh Giral
Chhabra#1&2 Kota
Barsingsar#1&2
HARYANA
Panipat Hissar
Halluwas Dahina
Yamunanagar Gurgaon
MADHYA PRADESH
Vindhyachal # 7,8,9,10,11 &12
Bina Amarkantak
Malwa#1 & 2 Sarni #10&11
Jhabua #1
Network in 13 States
42
UTTAR PRADESH
Gailpata Rihand#4,5&6
Parichha Unchahar
Dadri # 5&6 Harduaganj# 8&9
CHATTISGARH
Korba Raigarh JPL
Tamnar#3 Sipat#1,2,3,4&5
Bhilai#1 Champa (DB Power)
Dongamahua/JSPL
Network in 13 States
GUJRAT
Dahej Ukai
Mangrol# 3&4
KARNATAKA
Bellary – JSW Bellary KPCL
ORISSA
Talcher
HIMACHAL PRADESH
Sechi
PUNJAB
Bhatinda
TAMILNADU
Neyveli
Vellor #1&2
ANDHRA PRADESH
Vizag – RINL
Simhandri#3&4
43
• Projects 37, 589 MW
• Structural (Fabrication / Erection) 6,22,908 MT
• Boiler & Equipment Erection 5,98,631 MT
• Critical Piping 17,500 MT
•Earthwork excavation 76,77,446 M3
•Concreting 7,97,316 M3
•Radiography Testing (RT) 21,18,750 CMS
•Magnetic particle testing (MPT) 2,35,833 CMS
•Ultrasonic Testing (UT) 4,06,250 CMS
13 States… 30 Projects
44
Projects Completed – Civil & Structural Work
Andhra Pradesh
•1X210 MW, VV Reddynagar/APGENCO,
Civil Foundation Work of Boiler and TG Deck
Chhattisgarh
• 2 x 600 MW Champa/DB Power # 1&2:
Civil, Structural and Architectural Works of
BTG, BOP Main Plant
• 2 x 500 MW NTPC-HSCL/Sipat # 4 & 5
Madhya Pradesh
• 1 x 600 MW Jhabua/Avanta Power # 1:
Civil, Structure and Architectural Works of
Main Plant, CHP work
• 2 x 250 MW Satpura /MPPGCL # 10 & 11:
Main Plant Civil, Structural and Architectural
Works
Odhisa
• 2 x 500 MW NTPC/Talchar
SECHI – Hydro project
DB Power / L&T site
BHEL Sarni - TG Deck 45
Projects Completed – Civil & Structural WORK
Parli Residential Bldg.Maharastra
• Gangakhed Sugar Plant & 30 MW Co Gen
plant
• Parli MSPGCL – Staff Quarter & School
Buildings
• Gangakhed - Staff Quarter Buildings
HIMACHAL PRADEAH
2 X2.5 MW Hydro Power Plants at Sechi
- Civil & Hydro Mechanical Works.
- Radial Gates, Vertical Gates
- Fabrication of Penstock
SECHI – Hydro project
46
Andhra Pradesh
• Visakhapatnam Steel Plant/RINL: 6.3
MTPA Steel plant Expansion Structural
Works of 99,100,101,35,15 Package
(60,000MT)
Chhattisgarh
• Sipat/NTPC #1,2&3:
3x660 MW SG Area structural steel Package
• 2x500 MW Sipat /NTPC#4&5:
SG & TG Area Civil & Structure work
• 4x250 MW Raigarh /JSPL#1,2,3,4:
Main Plant Structure
• 2x600 MW Tamnar /JSPL#3:
Main Plant Structure (Bolted Structure)
Gujarat
• 2x125 MW Mangrol/GIPCL#3&4:
Structural Steel Work, Lignite Storage Shed
Haryana
• 2x600 MW Hissar /HPGCL#1&2:
Main Plant Structural Work
• 2x300 MW Yamunanagar/Reliance#2 :
Main Plant Structure
Projects Completed – Structural sites
47
RINL / Vizag steel plant –
Billet Storage Sheds
Length : 3 x 600 Mtrs.
3X660 MW & 2X500 MW NTPC:
Sipat –I&II
• HPGCL, Panipat
Structure Steel Work for TG & Mill Bay,
Karnataka
• Bellary /JSW Steel Ltd:
Structure of Sinter Plant in 7 MTPA
• Bellary /KPCL#2 :
1x500 MW SG& TG Area Structural Works
• 4x300 MW Bellary /JSW Steel & Energy #
1,2,3,4 : General Structure steel & allied work
Maharashtra
• 3x660 MW Tiroda /ADANI # 1,2,3,4&5:
Main Plant Structure
• 2 x 500MW Bhusawal /MSPGCL# 4 & 5:
Main Plant Structure & Chumary Building
• 2 x 300 MW Butibori/Reliance# 1&2:,
Bunker & Main Plant Structure,
•2 X 250 MW Parli/MSPGCL:
SG ,TG structure & CHP of Unit# 6 and
Main Plant Structure, Bunker Belt Extn.
System, RCC Chimney Flue of Unit#7
• 2 x 210MW Khaparkheda/MSPGCL #3&4:
Main Plant Structures
Projects Completed – Structural sites
48
Bellary JSW Steel plant – Sinter plant
Reliance / Butibori # 1&2
•2X250 MW Paras/MSPGCL:
SG,TG Structure & Fuel Oil Handling
System of Unit#1 and Main Plant Structure,
RCC Chimney Flue of Unit# 2
• 4 x 300MW Ratnagiri/JSW #1,2,3&4 :
- Main Plant Structure
- Port Handling Structure (Jaigarh)
• Nagpur -MIHAN/MADC : Construction
of ware house Pre Engineering Building
Projects Completed – Structural sites
Madhya Pradesh
• 2x500 MW Vindhyachal/NTPC # 7&8:
Main Plant Structure
• 2x500 MW Vindhyachal/NTPC# 9&10:
Main Plant Structure and CW Piping
fabrication work
• 2x250 MW Bina /JAYPEE associate :
Main Plant Structure & CHP
• 1x210 MW Amarkantak/MPPGCL# 5:
Structure and CW Piping Work
49
5 x 660MW Adani,Tiroda# 1,2,3,4&5
Odisha
• 4x500 MW Talcher/NTPC:
SG and TG Area Civil Package,
Structure and Ash Piping
Punjab
• 2x250 MW Bhatinda/PSEB:
Bunker Structure
Rajasthan
• 3x250 MW Suratgarh/RRVUNL :
Main Plant Structure, Boiler and
Auxiliaries
• 2x250 MW Chhabra/RRVUNL#1&2:
Main Plant Structure
• 2x125 MW Giral/RRVUNL #2 :
Main Plant Structure
• 1x195 MW Kota /RRVUNL #7 :
Structural Work
Tamil Nadu
• 2x250 MW Neyveli Lignite Ltd-II:
Expansion Main plant structural works
• 3 x 500 MW Vallur/NTECL # 1&2:
Main Plant Structural
Projects Completed – Structural sites
MIHAND / MADC – Ware House
50
JSW Ratnagiri – Port Handling Str.
• Ennore/TNEB:
Renovation of Boiler Structure
Uttar Pradesh
• PATA/GAIL: (Structural Steel Works)
GCU Petrochemical Plant
• 2x80, TPH HRSG Pata/GAIL:
Structure work
• 2 x 500 MW Rihand/NTPC: Misc.
Structures and 250 Mtr. RCC Chimney flue
• 2x210 MW Parichha/UPRVUNL#3&4:,
Main Plant Structures
• 2x250 MW Parichha/UPRVUNL # 5&6:
Main Plant Structure
Projects Completed – Structural sites
51
Paras Fuel Oil System
Bellary KPCL
Andra Pradesh
• 2x500 MW Simhadri/NTPC # 4&5
Boiler # 5 and Rotating Parts# 4&5
Chhattisgarh
• 2 x 600 MW Malwa /MPPGCL # 1 & 2:
Boiler # 2 and Critical piping # 1
• 1 x 500 MW Sipat /NTPC # 5:
ESP work
•1 x 250 MW Raigarh /JSPL # 4:
ESP work
• 1 X 250 MW Bhilai/BESCPL # 1:
Boiler and Auxiliaries, Ash slurry Piping
• 2 x 135 MW Dongamahua/JSPL # 3 & 4:
Boiler & its Auxiliaries, STG & Mat. Mngmt
•1 x 275 TPH Korba:
Boiler Work
• 2 x 135 TPH BALCO # 2 & 3:
Boiler and its auxiliaries
Gujarat
•1 x 500MW Ukai /GSECL:
Boiler & its Auxiliaries
Projects Completed – Boiler & its Auxillaries sites
Simhadri / NTPC Site (500MW)
52
Ukai / GSECL (500MW)
• 2x125 MW Mangrol /GIPCL # 3 & 4:
CFBC Boiler #3 & CW Piping # 3&4
Haryana
• 2x300 MW Yamunanagar/Reliance#1&2 :,
Non-Pressure Parts & ESP#1&2
Maharastra
• 1 x 500MW Bhusawal /MSPGCL # 4:
Boiler & its Auxiliaries
• 1 x 500 MW Khaparkheda/MSPGCL:
Extension project, Boiler and its Auxiliaries
and Construction of Ash Bund
• 1X500 MW Chandrapur/MSPGCL:
Boiler Auxiliaries
• 2x300MW Ratnagiri/JSW # 1 & 3:
Boiler and its Auxiliaries, and Material
Handling work
• 1x300 MW Butibori /Reliance#1&2:
Boiler auxiliaries, and Critical Piping
• 1X250 MW Parli/MSPGCL #6:
Boiler & its Auxiliaries
1x250 MW Parli/MSPGCL #7: Boiler & its
Auxiliaries, LD Piping, and MS Pipeline
Projects Completed – Boiler & its Auxillaries sites
4X300 MW, JSW/Ratnagiri
Boiler, STG, ESP – 2 units
Structural work – 4 units
Port handling Structures &
Equipment
2x500 MW Bhusawal
Boiler # 4
Structure # 3 & 4
53
•1X250 MW Paras/MSPGCL#1:
Fuel Oil Handling System
• 1 x 250 MW Paras/MSPGCL # 2:
Boiler & its Auxiliaries and MS Pipeline
•1x210 MW Khaparkheda/MSPGCL:
Boiler # 3 Misc. Work
Madhya Pradesh
• 1 x 500 MW Vindyachal /NTPC # 11:
Boiler and its auxiliaries
•2 x 600 MW Malwa /MPPGCL # 1:
Critical Piping # 1
Rajasthan
• 2x125 MW Barsingsar/NLC # 1 & 2:
CFBC Boiler and its auxiliaries, Material
management
Uttar Pradesh
• 2 x 500 MW Rihand/ NTPC # 4&5:
Boiler & its auxiliaries
•1 x 210 MW Unchahar/ NTPC # 5:
Boiler auxiliaries
• 2 x 490 MW Dadri / NTPC # 5 & 6:
ESP Work
Projects Completed – Boiler & its Auxillaries sites
Khaparkheda (500MW) site
54
Barsingsar #1&2 (CFBC Boiler)
Uttar Prasesh
• 2 x 500 MW Rihand/ NTPC # 5&6
Maharastra
• 1 x 250 MW Parli/MSPGCL #7
• 2 x 300MW Ratnagiri/JSW # 1 & 3:
• 2 x 300 MW Butibori /Reliance#1 & 2:
Chhattisgarh
• 2 x 135 MW Dongamahua/JSPL # 3 & 4:
Projects Completed – STG WORK
2X300 MW, JSW/Ratnagiri STG # 1&3
2x300 MW Butibori RIL # 1&2
55
2X500 MW, NTPC/RIHAND -STG # 5&6
22 Kv Substation at MSEDCL,
Kalyan, Mumbai
Projects Completed – Transmission & Distribution WORK
220 KV Substation at MSETCL Magarpatta Pune
Maharastra:
• Kalyan /MSEDCL : 22 kV Lines & Sub-station of APDRP-Job
• Chandrapur /MSEDCL : Transmission, Distribution of button line and Sub-station
on turnkey
• Magarpatta /MSETCL : Erection and Construction of 220/822 kV Sub-station
• Bhandup /MSEDCL : Design, Supply, Construction, Erection & Testing of
22/11 kV and 22/22 kV Sub-station under Urban Zone,
Thane.
56
Projects Completed – Transmission & Distribution WORK
66 Kv Substation at HVPNL, Haryana.132 kV Substation, Bambawade
• Aurangabad /MSEDCL : Erection and Testing of Transmission line and Sub-station
of Single Phase DTC of under APDRP)
• Wathar & Bambawade/ : Erection and Construction of 220/33 kV and
(Pune) MSETCL 132/33 kV Sub-station
Haryana
• Halluwas, Dahina and Gurgaon/HVPNL
: 66 kV and 132 kV Sub-station
57
Projects Completed – Solar PV Project
58
5 MW Solar PV Project at Solapur (MS)Maharastra:
Solar Energy Corporation of India
(SECI)
• Develop, Own, Design, Finance,
Construct, Commission, Operate and
Maintain a 5 MW Solar Power Project in the
state of Maharashtra under JNNSM Phase
II batch I.
•Total Project Cost : 42.50 Cr
•Power Generation Capacity: 5.375 MW
• Commercial Operation Date: 29-Jun-2015
Live Photographs
Projects Completed – Solar PV Project
59
5 MW Solar PV Project at Solapur (MS)
Month (No of Days)
Power Generationin KWh
June - 2 days 45559
July - 31 days 612900
August - 31 days 621675
September - 30 Days 637875
October- 31 Days724275
November -30 Days 696250
Total Generation Till Date
3338534
Live Photographs
MAHARASHTRA
Parli-BOP #8 Mauda # 3
Chandrapur#9 Solapur # 1&2Koradi # 8,9&10 Nagpur –VNIT
Nagpur (T&D) Kolhapur(T&D)
Pune (T&D) Morshi (T&D)
MADHYA PRADESH
Vindhyachal#13
CHATTISGARH
Singhitarai#1&2 Tamnar # 4
Rajnandgaon LARA (NTPC)
Nawapara#1&2
ANDHRA PRADESH
Vizag – RINL & Thermax
Singreni – BHEL & SCCL
Bhawanpadu (ABIR)#1&2
Hyderabad –HGCL
GUJRAT
Kakrapar – NPCIL
JHARKHAND
North Karanpura
TAMILNADU
Vellor #3
KARNATAKA
Kudgi# 3 NH 234(MORTH)
ORISHA
Cuttak Dharliparli
BIHAR
Barauni Munger (NHI)
PUNJAB
Bhatinda Tarn Taran
UTTAR PRADESH
Meja# 1&2 Kanpur –KDA
WEST BENGAL
NH 60A – MORTH
Presence in 13 States… 34 Projects
60
Chhattisgarh
• 3 X 800MW LARA/NTPC/ DOOSAN :
Civil, Fabrication & Erection of CW System
and Make up Water System # 1, 2 & 3
(Order Value 56.23 Cr.)
Odisha
2x800 MW , Dharlipali /NTPC#1&2
Civil, Fabrication & Erection of CW System
and Make up Water System.
(Order Value: 81.06 Cr.)
Uttar Pradesh
2x660 MW , Meja /NTPC#1&2
Civil, Fabrication & Erection of CW System &
Make up Water System, also works associated
with Raw Water Pump House near reservoir
including maintenance bay, common sump and
connection with raw water reservoir outlet
pipes, switchgear room, control room including
battery room, transformer foundations, valve
pits,culvets etc. (Order Value: 174.9 Cr.)
Ongoing Project – Cooling Water Piping Work
NTPC/LARA (800MW) site
61
NTPC/LARA (800MW) site
Andhra Pradesh
• 1x600MW Singareni /BHEL #1:
- Civil, Structure & Architectural work of
Main plant, and Switch yard package
- Cooling Tower (IDCT)
Bihar
• IOCL Barauni Refinery
- Civil, Structural and Electrical works at
Barauni Refinery
Jharkhand
• 3X660 MW North Karanpura STPP,
Unit # 1 & 3
Package A ‐ Civil, Structural and
Architectural works etc. of BTG area.
Ongoing Project – Civil & Structural Work
62
Singreni (600MW) site- Main Plant
Singreni (600MW) site- Switch Yard
Singreni (600MW) site- Cooling Tower
Ongoing Project – Civil & Structural Work
Maharashtra
• 1 x 250 MW Parli /MSPGCL#8:
Engineering Procurement & Construction
(EPC) of Balance of Plant (BOP) Package
• 3x660 MW Koradi/MSPGCL # 8, 9 & 10:
Main Plant Civil, Structural and Architectural
Works
Parli (BOP) – Service Bldg ESP Control Bldg. Transformer Yard
63
3x660MW L&T/MSPGCL Koradi site.
Andhra Pradesh
• 6.3 MTPA Visakhapatnam Steel
Plant/RINL: Steel plant Expansion
Structural Works
Bihar
• 1 x 250MW Barauni/ BSEB # 9:
Structural steel work
Chhattisgarh
• 2x600 MW Tamnar /JSPL#4:
Main Plant Structure (Bolted Structure)
• 2x600 MW Singhitarai – ABIR # 1 & 2:
Bunker Structure, P.House Bldg. & CHP
• Rajnandgoan/Lanco :
Supply and Erection of Polysilicon shed of
1500 TPA Lanco Solar Manufacturing Plant
Maharastra
• 2x660MW NTPC Mauda TPP # 3&4,
Supply, Fabrication & Erection of Bunker &
Bunker Structure
Tamil Nadu
3 x 500 MW Vallur/NTECL # 3:
Main Plant Structural
Ongoing Project – Structural Work
2X600 MW Tamnar JSPL site
64
2X600 MW Singhitarai /ABIR Site
Power House Bldg.
Ongoing Project – Building Construction Work
WaterGreens - Nagpur
Green Acres - Goa
65
WaterGreens – Jaitala Nagpur
• G+7 , 4 Tower Buildings
• 1.5 lacks Sq. foot
Green Acres – Goa
• G+4 , 5 Tower Buildings
• 1.5 lacks Sq. foot
Royalty – Ramdaspeth, Nagpur
• 7 Bungalows on 7 Floors
Ongoing Project – Building Construction Work
WaterGreens - Nagpur
66
Andhra Pradesh
• 2 x 600 MW SCCL, Singrani TPP
Construction of Residential Buildings/
Staff Quarter (G+1 Type), GM
Bungalow .
Project Cost – 92.29 Crore
• Construction Administrative Building/
Canopies at Toll Plaza (Pkg 5&6) at
Hyderabad
Project Cost – 50.74 Crore
Maharastra
• 2 x 500 MW NTPC Mauda STPP
Civil work of Administrative &
Residential Buildings.
• CPWD/VNIT, Nagpur : Construction
of Class room complex
NTPC Mauda
Ongoing Project – Building Construction Work
67
Uttar Pradesh
• KDA Kanpur
Construction of EWS Houses 22 Bolcks
(G+3).
Project Cost – 89.38 Crore.
Bihar
Construction of 1054 Flats at Dalpatpur
dist. Aara (G+11).
Project Cost – 415.48 Crore.
Karnataka
Construction of Ash Dyke for NTPC
3 X 800 MW TPP at Kudgi.
Project Cost – 183.02 Crore.
Ash Dyke
Andhra Pradesh
• 2 x 660 MW Bhawanpadu/Abir Infra.
Ltd # 1&2 : Boiler & its auxiliaries and
Material Management
• Vishakahpatnam/Thermax :
120 MW BFC Boiler and piping work.
Chhattisgarh
• 1 X 800MW LARA/NTPC/ DOOSAN :
Boiler, Material Management Package
• 2 x 600 MW Singhitarai/Abir Infra. Ltd
# 1&2 : Boiler & its auxiliaries and
Material Management
• 2 x 300MW Nawapara/TRN Energy #
1&2: Boiler & its auxiliaries.
Ongoing Project – Boiler & its Aux
2 x 300 MW Nawapara # 1&2, TRN Energy
2 x 600 MW Singhitarai – ABIR # 1&2
68
Karnataka
• 1 X 800MW Kudgi/NTPC/ DOOSAN # 3:
Boiler and Material Management.
Maharashtra
• 1 x 500 MW Chandrapur/MSPGCL # 9:
Boiler Vertical Package
• 1 x 660 MW Mauda / NTPC # 3:
Boiler & its Auxiliaries Package
Madhya Pradesh
•1 x 500 MW Vindhyachal # 13
Boiler & its Auxiliaries
Orissa
1 x 350 MW Cuttack/KVK Nilanchal # 1:
Boiler and its auxiliaries
Tamil Nadu
1 x 500 MW Vallur/NTECL # 3:
ESP#3 Works
Ongoing Project – Boiler & its Aux.
DOOSAN/ NTPC, Kudgi # 3 (800MW)
69
ABIR, Singhitarai # 1&2 (600MW)
Gujrat
1 x 700 MWe Kakrapar Atomic Power
Project,Nuclear Power Corporation India
Ltd./BHEL # 3, STG & Piping work
Maharashtra
•2x660 MW Solapur-NTPC/Alstom#1&2
STG Work
Madhya Pradesh
• 1 x 500 MW Vindhyachal # 13
STG Package
Ongoing Project – STG Work
Malwa # 1 (600MW) – Critical piping Pkg
70
2x660MW ASLTOM/NTPC Solapur site
1x500MW NTPC Vindhyachal site
Nagpur RegionSupply, Testing, Transport, Construction, Erection, Testing
and Commissioning of Distribution Lines, Distribution
Transformers of Various Capacities & 33/11 KV Sub
Stations, Other Allied Works, Including Five Years
Guarantee Period for Power transformers, Distribution
Transformer with Allied Equipment and Two Years
Guarantee Period for Other Works in Nagpur (Rural) &
Nagpur (Urban) Zone for RAPDRP
Kolhapur RegionSupply, Test, Transport, Construction, Erection, Testing
and Commissioning of Distribution Lines, Distribution
Transformers of Various Capacities & 33/22/11 KV Sub
Stations, Other Allied Works, Including Five Years
Guarantee Period for Power transformers, Distribution
Transformer with Allied Equipment and Two Years
Guarantee Period for Other Works in Kolhapur Zone for
RAPDRP
Amravati RegionConstruction of 22/11 kv substation at Morshi, Amravati.
Pune Region
Construction of 132/33 kv substation at Kavathe, Yamai
TH Shirur, Pune
Ongoing Project – T&D
71
Bhatinda:
Public work Department (B & R)
Bhatinda
Construction of Central Sudhar Ghar at
Bhatinda
Total project Cost (In Cr): 176 INR
7272
Ongoing Project Central Sudhar Ghar
Live Photographs
Bhatinda:
Public work Department (B & R) Amritsar
Construction of Central Sudhar Ghar at
Goindwal Dist Tarn Taran.
Total project Cost (In Cr): 194 INR
7373
Ongoing Project Central Sudhar Ghar
Live Photographs
Dhanbad
Jharia Rehabilitation and Development
Authority
Construction of 2000 units G+3 (four Storey)
Visthapit Awas including planning, survey and
consultancy work at mouza Lipania (Phase-B),
Dhanbad.
Total project Cost (In Cr): 83 INR
7474
Ongoing Project Visthapit Awas
Live Photographs
Karnataka :
Ministry of Roads and Transport and
Highways – Madhugiri to Mulbagal
Rehabilitation and upgrading to 2-lanes / 2-
Lane with paved shoulders configuration and
Strengthening of Madhugiri to Mulbagal
section (km 343.800 to km 483.151) of NH-
234 under Phase –I of NHIIP [Pkg. No:
NHIIP- KA-234-10]- Information regarding
execution of agreement of Lot-I.
Total project Cost (In Cr): 122.02 INR
Total Length (In Km) : 56.53
7575
Ongoing Project Roads and Highways
West Bengal :
Ministry of Roads and Transport and
Highways – Bankura to Purulia
Rehabilitation and upgrading to 2-lanes / 2-
Lane with paved shoulders configuration and
Strengthening of Bankura – Purulia Road
Section (km 0.00 to 84.00) of NH-60A in the
State of West Bengal under Phase - I of
Natinal Highways Inter-connectivity
Improvement Projects (NHIIP).
Total project Cost (In Cr): 322 INR
Total Length (In Km) : 84.00
76
76
Ongoing Project Roads and Highways
Bihar :
Ministry of Roads Transport and
Highways - Sitamarhi-Jaynagar-Narahia
Rehabilitation and Upgrading to 2 lanes/2 lane
with Paved Shoulders Configuration and
Strengthening of Sitamarhi-Jaynagar-Narahia
Section (km40.00 to km219.945) of NH-104
in the State of Bihar (Package No. NHIIP-BR-
104-11) for Lot-I- km 40.00 to km 65.400 and
km 76.300 to km 79.400” under Phase-I of
National Highways Inter-connectivity
Improvement Projects (NHIIP).
Total project Cost (In Cr): 154.62 INR
Total Length (In Km) : 28.50
77
77
Ongoing Project Roads and Highways
Bihar :
Ministry of Roads Transport and
Highways - Sitamarhi-Jaynagar-Narahia
Rehabilitation and Upgrading to 2 lanes/2 lane
with Paved Shoulders Configuration and
Strengthening of Sitamarhi-Jaynagar-Narahia
Section (km79.400 to km156.500) of NH-104
in the State of Bihar (Package No. NHIIP-BR-
104-11) for Lot-II- km 79.400 to km 156.500
under Phase-I of National Highways Inter-
connectivity Improvement Projects (NHIIP)
Total project Cost (In Cr): 319.68 INR
Total Length (In Km) : 77.10
78
78
Ongoing Project Roads and Highways
Maharashtra :
National Highways Authority of India -
Bodhre-Dhule
Four / Six Laning of Bodhre (km 390.000) to
Dhule (km 452.800) section of NH-211 (new
NH No. 52); (Existing Length 62.800 km;
Design Length 67.231 km) under BOT (toll)
on DBFOT pattern in the state of
Maharashtra under phase NHDP-IV on
Hybrid Annuity Mode)
Total project Cost (In Cr): 982.00 INR
Total Length (In Km) : 67.23
79
79
Ongoing Project Roads and Highways
Maharashtra :
National Highways (PWD) - Parli-Pimpla
Dahiguda
Rehabilitation & Upgradation of Parli-Pimpla
Dahiguda Road, From Existing Chainage Km.
0+000 To 18+495 (SH-64) (Design Chainage
Km.0+000 To Km.18+440) To Two/Four
Lane with Paved Shoulder - Parali Vaijnath,
Ambajogai, Renapur Phata Section of NH
548B - in the state of Maharashtra on EPC
mode
Total project Cost (In Cr): 134.45 INR
Total Length (In Km) : 18.44
80
80
Ongoing Project Roads and Highways
Maharashtra :
Ministry of Roads Transport and
Highways - Nanded-Kinwat-Mahur-Arni
Up-gradation of Nanded-Kinwat-Mahur-Arni
Road Section from Sarsam Budruk to Kothari
(Design km. 33.000 to km. 90.000)
(Length=57.00 Kms) to Two lanes with Paved
Shoulder of NH 161 A (Starting from NH
548 C Aakot and terminate at junction of NH
161 near Wazar Aurada) in the state of
Maharashtra on Engineering, Procurement &
Construction (EPC) Basis Contract
Total Project Cost (In Cr): 308.16 INR
Total Length (In Km) : 57.00
81
81
Ongoing Project Roads and Highways
Maharashtra :
Maharashtra State Road Development
Corporation Ltd. (MSRDC)-
Mehkar-Ajispur
Rehabilitation and Up-gradation of Mehkar to
Ajispur from km 00+000 (Mehkar) to km
35+836 (Ajispur) to Two lane with paved
shoulders in the state of Maharashtra on
Engineering, Procurement & Construction
(EPC) Basis Contract
Total Project Cost (In Cr): 160.20 INR
Total Length (In Km) : 35.83
82
82
Ongoing Project Roads and Highways
Maharashtra :
National Highways (PWD) -
Ajanta-Buldhana
Rehabilitation & Up-gradation of Ajanta –
Buldhana section of National Highway –
753E (49.130 Km) to two lane with paved
shoulder configuration in the State of
Maharashtra on EPC Mode
Total Project Cost (In Cr): 257.40 INR
Total Length (In Km) : 49.13
83
83
Ongoing Project Roads and Highways
Jharkhand :
National Highways Authority of India-
Kutchery Chowk – Ranchi – Piska More-
Biju Para
4 Laning of Kutchery Chowk – Ranchi –
Piska More – Biju Para Section( From Km
0.000 To Km 34.000) in the State of
Jharkhand to be executed on EPC Mode
Total Project Cost (In Cr): 235.90 INR
Total Length (In Km) : 34.00
84
84
Ongoing Project Roads and Highways
Patna:
Bihar Urban Infrastructure Develoment
Corporation and Patna Municipal
Corporation
Design, Finance, Development, Construction,
Operation, Maintenance, Management and
transfer of a Regional Municipal Solid Waste
to Energy (Electricity) and land fill Facility at
Patna in Bihar
Total project Cost : INR 225 Cr
Capacity of Project : 1000 TPD
Power Generation : 11.5 MW
85
85
Ongoing Project – Municipal Solid Waste
Kolhapur:
Kolhapur Municipal Corporation
Develop a MSW Processing Facility for
treating the MSW collected from the city of
Kolhapur on Design, Build, Finance, Operate
and Transfer (the "DBFOT") basis.
Total project Cost : INR 25 Cr
Capacity of Project : 200 TPD
Power Generation : 2 MW
86
86
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
87
(Rs. In Millions) 2013-14 2014-15 2015-16
Sales 15844 18365 20213
Paid up Capital 136 153 173
Reserve & Surplus 3299 3897 4493
Book Value per Share (Amt. in Rs.) 255 268 270
Cash Accruals 575 841 901
Profit before Tax 481 695 850
Profit after Tax 292 532 534
Earnings per share 24 36 32
Gross Block 2036 2600 4126
Promoter’s Equity ( % ) 64.4% 62.45% 62.45%
88
UCO Bank, Nagpur
Union Bank of India, Nagpur
IDBI BANK, Nagpur
Lakshmi Vilas Bank, Mumbai
Oriental Bank of Commerce
Bank of India, Nagpur
ICICI Bank
OUR
BANKERS
Axis Bank
Punjab National Bank
Kotak Mahindra
Karur Vysyaya Bank
Canara Bank
Syndicate Bank
State Bank of Travancore
89
Existing
(Rs. In Millions)
Proposed
(Rs. In Millions)
Fund Based
Cash Credit 3250 3850
Term Loan 0 0
Total (A) 3250 3850
Non Fund Based
Letter of Credit 2750 3700
Bank Guarantee 7485 12500
Total (B) 10235 16200
Total (A+B) 13485 20050
Facilities we enjoy…
90
RECENT
GROWTH
91- All figures are in Million
9772
12617
15844
1854220213
22000
Consolidated Sales
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 (Plan)
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
92
• Competitive rates
• Timely execution capability
• High Quality & Safety Standard
• Financially Strong
• Highly diversified Product profile
• Largely owned construction equipment Bank
• Experience of more than 15 years
• Network in more than 13 States
•Strong detemined and efficient team
Preferred
Partner
93
94
History
Business Overview
People
Products & Services
Resources
Projects
Financial Overview
Sunil Hitech : Preferred Partner..
Contact Details
95
Thank
You !!
Contact Us
REGISTERED OFFICE:
Mumbai Educational Trust (MET)"C" Wing, 6th Floor, A.K. Vaidya Marg,Bandra Reclamation, Bandra (West) Mumbai-400050Maharashtra (India)PH No : 022 – 61872400Fax No : 022 – 61872455Email : [email protected]
HEAD OFFICE
97, East High Cort Road, Ramdaspeth,Nagpur, 440010PH- 91-712-6685200
96