1 Presentation To By Date:

Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

1

Presentation

To

By

Date:

Page 2: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Group Companies

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact details

2

Page 3: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Evolution

1984 „Sunil Engineering Works‟

Promoter Ratnakar. M. Gutte

1994 major breakthrough by mega order

from BHEL at Chandrapur…

Followed by consecutive orders in

Madhya Pradesh and Rajasthan

1998 „Sunil Hitech Engineers Pvt Ltd‟

2004 Again a major break-through order

from NTPC

2006 2nd March 2006 company waslisted on Bombay Stock Exchange &National Stock Exchange with 9 timesover subscription of Initial PublicOffering (IPO).

Same year company declared adividend of 10% for the complete year.

3

Page 4: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Evolution

2007 Diversified in Hydro Project (4.5 MW

from AHPL at Sechi, HP) and T&D

segment.

2008 Received a First EPC Project in ICPP

for 6000 TCD Sugar Plant & 30 MW Co-

Generation Plant and 60 KLPD Distillery

with 1.8 MW Co Gen incineration Boiler at

Gangakhed (MS)

2009 Major breakthrough of “Civil,

Structural & Arch. Work” from BHEL-

PSWR for 2x250 MW Main Plant at

MPPGCL Sarni # 10 &11

Followed by consecutive orders from

- L&T at 3x660 MW MAHAGENCO - Koradi(MS) & 2X600 MW DB Power - Champa(CG) site

- Avantha Power at 2x600 MW Jahbua Power(MP) site

- BHEL at 1 x 600MW SCCL / Singreni (AP)site.

4

Page 5: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Evolution

Pan-India network with presence in

more than 13 states

2010 Breakthrough of 1 x 250MW

Balance of Plant (BOP) package on

EPC basis at Parli # 8, MSPGCL

- 2012 Foray in 800 MW Boiler erection

from DOOSAN at NTPC – Kudgi site.

- 2013 Diversified in Road project fromNHAI at Munger, Bihar and BuildingConstruction at PWD/Punjab

- 2014 Diversified in Atomic PowerProject from BHEL at NPCILKakrapar, Surat, Gujrat.Received order for complete Civil workincluding Fabrication & erection ofPiping of CW System & Makeup WaterSystem at 2x800MW NTPC/LARA.

5

Page 6: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Evolution

VISION

To contribute to the task of

development in power, process and

infrastructure area meeting the

benchmarks set by customers in terms

of quality, price and schedules and

satisfy them on consistent basis

6

Page 7: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Group Companies

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

7

Page 8: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Group

Companies Sunil Hitech Engineers Ltd

(Public Limited and Listed)

ISO 9001 and OHSAS 18001 Certified

VAG Buildtech Limited

(Infrastructure Development Company)

(formerly known as Sunil Hitech India Infra Private

Limited )

SEAM Industries Ltd

(Heavy Fabrication & Manufacturing Shop)

ISO 9001 and OHSAS 18001 Certified

Gangakhed Sugar & Energy Ltd

6000TCD Sugar Plant and

30 MW Co gen Plant

60 KLPD Distillery with 1.8 MW Co Gen

8

Page 9: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Group Companies

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

9

Page 10: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Business

Overview

SUNIL HITECH ENGINEERS LTD.

ROADS & BRIDGES

National Highways

Bridges

STEEL & METALS

Sinter plant

Steel Melting shop

Billet Storage

Shed

Castor Shop

BOF, CCP Plant

NUCLEAR

STG Work

THERMAL

Balance of Plant

BTGInstallation

O & M T&D

MANUFAC –TURING

Boiler

Pr. Parts

Piping IBR/NON

IBR

Tanks & Vessels

Technological

Structure

BUILDING CONSTN

Residential/ Commercial

Industrial

High rise Buildings

10

Page 11: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

ISO and

Other

Certificates

11

OHSAS 18001 : 2007 ISO 9001 : 2008

Page 12: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Business

Overview

End to End Solutions

Design & Engineering

Planning & Scheduling

Project Management

12

Page 13: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Valued

Customer

•MORTH

• Solar Energy Corporation of India

• BUIDCO

• GAIL (India) Limited

•Mahadiscom

•Madhya Pradesh Power Gen. Co.Ltd

• Kanpur Development Authority

•Mahatransco

• Bharat Heavy Electricals Ltd

• MAHAGENCO

• NTPC Ltd.

• Larsen & Toubro Ltd

• Tata Projects Ltd

• Jindal Group & JSW Ltd.

• Avanta Power & Infrastructure Ltd.

• Kolhapur Municipal Corporation.

13

Page 14: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• Lanco infratech Ltd

• APGENCO

• Shandong Elect Power Costnstruction Corp. China

• RINL, Visakhapatnam.

• Sterlite Industries , BALCO

• Jayprakash Associates Ltd

• NBCC

• Thermax

• IOCL 14

• NCC Ltd.(NagarjunaConstn.Co Ltd)

• Steel Authority of India Ltd (SAIL)

• Chhattisgarh SPGCL

• Adani Power Ltd.,

• Gujrat Industries Power Co. Ltd

• BGR Energy System Ltd.

•National Highway Authority of India

•Alstom Bharat Forge Power Ltd.

Valued

Customer

Page 15: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

QUALITY

Quality Assurance Aspects

• Prior approval of vendors

• Well formulated project specific quality plan

• Adherence to relevant standards & codes

• Empowered quality team

• Regular training of personnel

• Continuous up gradation of work methodology through state of -the-art techniques

Quality Control Measures

• Well equipped material testing laboratories at all sites

• Regular inspection & testing of incorporated materials

• Adherence to approved inspection procedures for various processes

• Minimizing ‘non-conformance’ by using statistical techniques

15

Page 16: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

SAFETY

Safety Measures at our Construction Sites

• Trained safety officers at all sites

• On-site safety awareness programmes

• Motivating Workforce for ensuring safe working conditions

• Compulsory use of Personal Protective Equipments (PPE) & safetynet.

• Barricading open cut out areas & excavated pits

• Electrical Safety, Earthing etc.

• Proper scaffolding systems with adequate cross bracing

• Fire protective extinguishers

16

Page 17: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

17

Page 18: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

People power is the

secret of our growth

Our recognition and

rewards for achievement

begins at the workmen’s

level.

We have set up I-COM

an in-house training

institute that trains

around 150 students

every year. 18

Page 19: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Organization

19

Mr. Sunil. R. Gutte : Managing Director

Mr. C. Venkataramana : Director

Mr. Anupam Dhiman : Director

Mrs Sudhamatti Gutte : Whole Time Director

Mr. Vijay R. Gutte : : Director (Finance)

Mr. Dilip. Y. Ghanekar : Independent Director

Mr. Sajid Ali : Independent Director

Mr. Parag. A Sakalikar : Independent Director

Mr. Sonyabapu. S. Waghmare : Independent Director

Mr. Siddharth R. Mehta : Independent Director

Mr. Anil Aurangabadakar : Independent Director

Mr. B.K. Singh : Executive Director

Page 20: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

20

Page 21: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

POWER SECTOR

Product Profile - Projects

POWER SECTOR INDUSTRY SECTOR

1 Boilers & Aux 125~ 800 MW EPC work of Sugar & Co-Gen

Plant

2 Steam Turbine & Aux Oil Storage Tanks

3 BOP EPC works of 250~800MW Civil and Structural works

4 Civil works up to 800MW units Piping systems

5 Structures 125~ 800 MW Pre Engineering Building

6 Critical Piping Fabrication and Erection of

Structures in Steel Plant for

7 Large Dia. Piping & LP Piping • Sintering plant

8 Fuel Oil Systems • Technological Structures

9 Coal Handling Plant & Str. • Steel Melting Shop

10 Cooling Tower (IDCT) • Billet Storage shed

11 RCC Chimney & Its Steel Flue • Castor, BOF and CCP Plants

12 Mini Hydro Civil Works • Universal Rail Beam

13 33kv/66kv/132kv/220kv/ 400kv Sub Stations

• Shot Blasting & Painting

14 Large Storage Sheds • Material Handling Structures &

Eqpt. Erection21

Page 22: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Boilers and its Auxiliaries

Erection, Testing & Commissioning of Boiler

and its Auxiliaries up to 800 MW.

Boiler Auxiliaries like STG, ESP, Fans, Mills,

APH, Ducting, Critical Piping, LP Piping,

CW/Large Dia. Piping, Ash Slurry and Ash

Disposal Piping

Coal Handling & Ash Handling Plants.

Fabrication & Erection of Steel Chimney Flues.

22

Page 23: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Fabrication & Erection of Heavy / Super

& Technological Structures for Power

Stations (up to 800 MW units)

-Bunkers ( 10000 to 15000 MT)

-Turbine Generator Building ( 10000 to

12000 MT)

Steel and Metal Industry

-Fabrication & Erection of Technological

Structures

-Structural Steel Works for Castor Shop

-Structural Steel Works for Steel Melt

Shop

-Structural Steel Works for Blast Furnace

Complete installation of Sinter Plant

excluding equipment erection

Sand/Shot Blasting and Painting Works

Super Structures & Technological Structure

23

Page 24: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Civil Projects

Civil work (up to 800 MW)EPC – BOP package

• Foundations

Boiler, ESP, Mills, Fans, CHP,

Pumps PHB, Pipe Rack, Bunker etc

• Raw water reservoir & pump House

• APH composite bldg, Fly ash silo,

Ash slurry pump

• ESP Control room

• Main Plant Building

• Service Bldg, ETP & Time office Bldg.

• DG & Compressor House Bldg.

• CW Pump house

• Fuel Oil Handling Plant

• Ash Handling Plant

• Coal Handling PlantRaw Water Reservoir & Pump House

Ash Silo

L & T Koradi - Service Bldg.

DB Power –

Bunker foundations

24

Page 25: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Civil Projects

Civil work (upto 800 MW)EPC – BOP package

• Water treatment plant

a) Pre treatment plant

b) Post treatment plant

• Wagon Trippler, tunnel, control room

• Transformer Yard

• RCC Chimney

• TG Deck

Cooling Tower (IDCT)

HYDRO POWER PLANTS

Civil & Hydro Mechanical Works. Radial &

Vertical Gates, Fabrication of Penstock

25

Koradi (660MW) – TG Deck

Pre water treatment Plant

25

Page 26: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

TRANSMISSION

EHV Transmission lines upto 132 kV , 220

kV , 400 kV

EHV Substations upto 132 kV , 220 kV ,

400 kV

Erection, Testing, Commissioning of Power

Transformers upto 200 MVA, C & R

Panels, SCADA System, PLCC

Equipments, HT Capacitors.

Construction of Control Room for EHV

Substation, Cable trenches.

Construction of Heavy consignment roads

for carrying out transformers and other

equipments upto 250 MT.

Earthing system for the entire substation.

TRANSMISSION & DISTRIBUTION

26

Page 27: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

DISTRIBUTION

Sub-Transmission lines for 11, 22 & 33 kV.

Substations for 33/11 kV & 22/11 kV upto

10 MVA rating.

Erection, Testing & Commissioning of Pole

Mounted & Plinth Mounted Distribution

Transformers upto 630 kVA rating.

Distribution Network including UG cable

from 1.1 kV upto 33 kV.

TRANSMISSION & DISTRIBUTION

27

Page 28: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Product Profile - Manufacturing

BOILER PARTS ESP PARTS

1 Technological Structures Collecting Plates

2 Super heaters & Re Heaters Emitting Electrodes

3 Economizers & Fin Tubes GD Screens

4 High Pressure Bends Support Insulators & Housing

5 Short Radius Bends CERM & EERM System

6 Bunkers Supply of misc. ESP internals

7 Headers

8 Tanks & Vessels

9 Water Wall panels

10 HP & LP Piping

28

Page 29: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Fabrication Shop – Unit 1

Located at 5 Star Industrial Zone

Area, MIDC Butibori, Nagpur.

Just 30 KM away from

International Airport, Nagpur.

Total Area : 1, 56, 519 Sq. Mtr.

(In Acres: 39.12) including

residential land

Unit # 1

Total Area = 30,784 sq. m.

Closed Shed –

Shed-1 : 36 x 36 Meter

Shed-2 : 30x 100 Meter

Open Fabrication Area –

45 x 120 Meter29

29

Page 30: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Fabrication Shop – Unit 2

Unit# 2

Total Area = 75,138 sq. m.

Open Fabrication Area :

200 x 300 Meter.

Closed Shed – Shed-1 : 30 x 150 Meter

Closed Shed- Shed-2 & Shed-3 :

30 x 50 Meter (each) 30

30

Page 31: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

31

Page 32: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

300 T American 9310 01

230 T Manitowac 4100W 02

150 T Demag TC 500 01

150 T Link Belt LS 528 02

150 T Manitowac 4000 01

150 T Manitowac4000vicon 02

150 T Manitowac4000W 02

136 T LinkBeltLS 518 01

130 T Manitowac 3900W 01

125 T American 7530 01

120 T Lima 1200C 02

100 T American 7260 01

100 T American 998C 03

100 T Lima 1250SC 01

100 T LinkBelt LS 418 01

100 T LS 418J 01

100 T RB 61B 01

90 T Lorain-L790 01

90 T Manitowac3900 01

80 T Kobelco 880S 01

75T P&H 70TON 02

75 T ALC 955 01

75 T Lima700TC 01

75 T LinkBelt HC218 01

75 T LinkBelt LS 318 02

75 T Manitowac2900W 01

Major Cranes

32

Page 33: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

75 T Tata P&H 955 01

75 T TFC-280 01

70 T Lima 7070 01

70 T Lima SC 75C 01

70 T ZoomlionQUY 70 12

65 T Kohering 665 01

65 T LORAIN Kohering655 01

60 T American7260 01

60 T FMC LinkBelt LS118 01

60 T Manitowac3500 01

55 T Lima 65C 01

55 T LORAIN Kohering455 01

55 T P&H 550 03

50 T Kohering550 01

50 T LS 108BS 01

45 T LinkBelt LS 108 01

45 T LS 108B 01

40 T American 4260 03

40 T Demag B410LC 01

40 T LS 108BJ 01

40 T LS108B 01

40 T NCK 450 01

40 T P&H 440 01

40 T P&H 5040 01

35 T Kobelco, P&H 335, Sumitommo 09

25T-18T TATA P&H 335,, PPN, Grove 04

30 T Hydra crane 02

16 T Hydra crane 01

14 T Hydra crane 09

12 T Hydra crane 72

10 T Hydra crane 87

8 T Hydra crane 06

Major Cranes

33

Page 34: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

BATCHING PLANT 30M3 09

CRUSHER 150TPH 03

TRANSIST MIXERS 6M3 18

CONCRETE PUMP 14M3 10

BOOM PLACER 02

HIWA 16

Back hoe Loader (JCB) 03

Wheel Loader (JCB) 03

TIPPERS 05

EXCAVATORS 05

COMPACTORS 05

DEWATERING PUMP 14M3 15

VIBTO ROLLER 03

TOTAL STATION 09

LAB EQUIPMENT 5 SETS

BAR BENDING M/C 26

BAR CUTTING M/C 27

WEIGHT BRIDGE 07

Motor Grader 01

Civil

Equipments

34

Page 35: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Welding &

Quality

WELDING EQUIPMENTS

Welding Generators (K-320/45) 129

Welding Rectifier 450/600A 1951

Welding Inverter M/c 83

Submerged Arc Welding M/c 08

Co2/MIG Welding Machines 225

Argon Welding Sets 105

Diesel Power Generator 28

NDT EQUIPMENTS

Radiography Source Camera 04

MPT Equipments 01

S.R. Equipments 04

Ultrasonic Machines 02

Ultrasonic Thickness Gauge 08

35

Page 36: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• Can complete RCC work to the tune

of 3,00,000 Cum in a year

• Can achieve 8,000 to 10,000 Cum of

peak Concreting in a month per site.

• Can complete 250 MW Boiler works

in 16-18 months & 500 MW Boiler in

28-29 months

• Can fabricate and erect 1,25,000 MT

of Structures in a year.

• Can achieve 2,500 - 3,500 MT of peak

fabrication & erection in a month per

site.

• Can complete more than 60,000 high-

pressure joints in Overhauling &

Maintenance works in a year.

CAPABILITIES

36

Page 37: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

CAPABILITIES

• Ability to complete 75,000 Non IBR

Field weld joints in a year.

• Have in-house capabilities for

Radiography, UT & MPT.

• Possess more than 80 Crawler Cranes

of capacity 8T to 300T & 175nos of

Hydra cranes

• Possess more than 2000nos. of

Welding Equipments.

• Engineering Drawing detailing by state

of the art software (Stru Cad of ACE

CAD Software system, UK) & dedicated

team for the same.

37

Page 38: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

KEY

ACHIEVMNTS

• Breakthrough of Rs 4880M BOP EPC job

from MAHAGENCO of Parli 250mw unit

•Executed in 18months Rs.3500M Gangakhed

Sugar & energy Project on turnkey basis

• Achieved 2,18,500 Cum Concreting in 11-12

• Achieved 7nos. TG Deck casting in 10

months from 250MW to 660MW

• Exceeded 1,00,000MT of Boiler erection

and 1,00,000MT of Structure Fabrication and

Erection in the year 2008-09 & 2009-10

•Completed the tallest transfer point of CHP

& Bunker works of the country’s first 660mw

Super Critical Unit @ Sipat.

• Achieved 18500mt of Fabrication &

17500mt erection for Steel works of 2x600mw

Hissar in a year

38

Page 39: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

KEY

ACHIEVMNTS

• Commissioned NTPC – Mauda, Rihand &

Vindhyachal 500MW units in 27to 28 months

• HT of 500mw Boilers done in a schedule of

9 to 12 months in 5 Units

• Achieved 3030MT Peak tonnage in a month

(April’15) at NTPC Mauda Boiler#3 (660MW)

• Achieved 13500mt of Boiler erection

(500MW) in a year @Mauda and Bhusawal and

16800MT @ Rihand

• Achieved 20,407 MT Boiler erection in a year

(2013-14) at 500MW Vindhyachal NTPC # 13

which creates new bench mark in BHEL-WR

• Won 6 safety awards in the year 2012-13 & 4

Safety awards in the year 2013-14.

• Has diversified into Boiler component

manufacturing of 3000mt / month

39

Page 40: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Human

Resources

Construction Manager 32

Resident Engineers 55

Engineers 305

Supervisors 204

Materials Management 115

Safety Officers 62

QA / QC Engineers 54

HR & Admin Officers 30

NDT Technicians 20

Operators & Technicians 460

Electricians 85

H.P. Welders 100

LP Welders 1000

Mill Wright Fitters 45

Pipe Fitters & Fabrication 100

Steel Fabricators 105

Mechanical Foremen 70

Skilled & Semiskilled 10,000

40

Page 41: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

41

Page 42: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

MAHARASHTRA

Parli # 6&7 Khaperkheda

Paras # 2 Chandrapur#7

Mauda #1 Bhusawal#3&4

Tiroda # 1,2,3,4&5 Butibori#1&2

Ratnagiri#1,2,3&4 Nagpur -MIHAN

Kalyan Pune

RAJASTHAN

Suratgarh Giral

Chhabra#1&2 Kota

Barsingsar#1&2

HARYANA

Panipat Hissar

Halluwas Dahina

Yamunanagar Gurgaon

MADHYA PRADESH

Vindhyachal # 7,8,9,10,11 &12

Bina Amarkantak

Malwa#1 & 2 Sarni #10&11

Jhabua #1

Network in 13 States

42

Page 43: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

UTTAR PRADESH

Gailpata Rihand#4,5&6

Parichha Unchahar

Dadri # 5&6 Harduaganj# 8&9

CHATTISGARH

Korba Raigarh JPL

Tamnar#3 Sipat#1,2,3,4&5

Bhilai#1 Champa (DB Power)

Dongamahua/JSPL

Network in 13 States

GUJRAT

Dahej Ukai

Mangrol# 3&4

KARNATAKA

Bellary – JSW Bellary KPCL

ORISSA

Talcher

HIMACHAL PRADESH

Sechi

PUNJAB

Bhatinda

TAMILNADU

Neyveli

Vellor #1&2

ANDHRA PRADESH

Vizag – RINL

Simhandri#3&4

43

Page 44: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• Projects 37, 589 MW

• Structural (Fabrication / Erection) 6,22,908 MT

• Boiler & Equipment Erection 5,98,631 MT

• Critical Piping 17,500 MT

•Earthwork excavation 76,77,446 M3

•Concreting 7,97,316 M3

•Radiography Testing (RT) 21,18,750 CMS

•Magnetic particle testing (MPT) 2,35,833 CMS

•Ultrasonic Testing (UT) 4,06,250 CMS

13 States… 30 Projects

44

Page 45: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Projects Completed – Civil & Structural Work

Andhra Pradesh

•1X210 MW, VV Reddynagar/APGENCO,

Civil Foundation Work of Boiler and TG Deck

Chhattisgarh

• 2 x 600 MW Champa/DB Power # 1&2:

Civil, Structural and Architectural Works of

BTG, BOP Main Plant

• 2 x 500 MW NTPC-HSCL/Sipat # 4 & 5

Madhya Pradesh

• 1 x 600 MW Jhabua/Avanta Power # 1:

Civil, Structure and Architectural Works of

Main Plant, CHP work

• 2 x 250 MW Satpura /MPPGCL # 10 & 11:

Main Plant Civil, Structural and Architectural

Works

Odhisa

• 2 x 500 MW NTPC/Talchar

SECHI – Hydro project

DB Power / L&T site

BHEL Sarni - TG Deck 45

Page 46: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Projects Completed – Civil & Structural WORK

Parli Residential Bldg.Maharastra

• Gangakhed Sugar Plant & 30 MW Co Gen

plant

• Parli MSPGCL – Staff Quarter & School

Buildings

• Gangakhed - Staff Quarter Buildings

HIMACHAL PRADEAH

2 X2.5 MW Hydro Power Plants at Sechi

- Civil & Hydro Mechanical Works.

- Radial Gates, Vertical Gates

- Fabrication of Penstock

SECHI – Hydro project

46

Page 47: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Andhra Pradesh

• Visakhapatnam Steel Plant/RINL: 6.3

MTPA Steel plant Expansion Structural

Works of 99,100,101,35,15 Package

(60,000MT)

Chhattisgarh

• Sipat/NTPC #1,2&3:

3x660 MW SG Area structural steel Package

• 2x500 MW Sipat /NTPC#4&5:

SG & TG Area Civil & Structure work

• 4x250 MW Raigarh /JSPL#1,2,3,4:

Main Plant Structure

• 2x600 MW Tamnar /JSPL#3:

Main Plant Structure (Bolted Structure)

Gujarat

• 2x125 MW Mangrol/GIPCL#3&4:

Structural Steel Work, Lignite Storage Shed

Haryana

• 2x600 MW Hissar /HPGCL#1&2:

Main Plant Structural Work

• 2x300 MW Yamunanagar/Reliance#2 :

Main Plant Structure

Projects Completed – Structural sites

47

RINL / Vizag steel plant –

Billet Storage Sheds

Length : 3 x 600 Mtrs.

3X660 MW & 2X500 MW NTPC:

Sipat –I&II

Page 48: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• HPGCL, Panipat

Structure Steel Work for TG & Mill Bay,

Karnataka

• Bellary /JSW Steel Ltd:

Structure of Sinter Plant in 7 MTPA

• Bellary /KPCL#2 :

1x500 MW SG& TG Area Structural Works

• 4x300 MW Bellary /JSW Steel & Energy #

1,2,3,4 : General Structure steel & allied work

Maharashtra

• 3x660 MW Tiroda /ADANI # 1,2,3,4&5:

Main Plant Structure

• 2 x 500MW Bhusawal /MSPGCL# 4 & 5:

Main Plant Structure & Chumary Building

• 2 x 300 MW Butibori/Reliance# 1&2:,

Bunker & Main Plant Structure,

•2 X 250 MW Parli/MSPGCL:

SG ,TG structure & CHP of Unit# 6 and

Main Plant Structure, Bunker Belt Extn.

System, RCC Chimney Flue of Unit#7

• 2 x 210MW Khaparkheda/MSPGCL #3&4:

Main Plant Structures

Projects Completed – Structural sites

48

Bellary JSW Steel plant – Sinter plant

Reliance / Butibori # 1&2

Page 49: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

•2X250 MW Paras/MSPGCL:

SG,TG Structure & Fuel Oil Handling

System of Unit#1 and Main Plant Structure,

RCC Chimney Flue of Unit# 2

• 4 x 300MW Ratnagiri/JSW #1,2,3&4 :

- Main Plant Structure

- Port Handling Structure (Jaigarh)

• Nagpur -MIHAN/MADC : Construction

of ware house Pre Engineering Building

Projects Completed – Structural sites

Madhya Pradesh

• 2x500 MW Vindhyachal/NTPC # 7&8:

Main Plant Structure

• 2x500 MW Vindhyachal/NTPC# 9&10:

Main Plant Structure and CW Piping

fabrication work

• 2x250 MW Bina /JAYPEE associate :

Main Plant Structure & CHP

• 1x210 MW Amarkantak/MPPGCL# 5:

Structure and CW Piping Work

49

5 x 660MW Adani,Tiroda# 1,2,3,4&5

Page 50: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Odisha

• 4x500 MW Talcher/NTPC:

SG and TG Area Civil Package,

Structure and Ash Piping

Punjab

• 2x250 MW Bhatinda/PSEB:

Bunker Structure

Rajasthan

• 3x250 MW Suratgarh/RRVUNL :

Main Plant Structure, Boiler and

Auxiliaries

• 2x250 MW Chhabra/RRVUNL#1&2:

Main Plant Structure

• 2x125 MW Giral/RRVUNL #2 :

Main Plant Structure

• 1x195 MW Kota /RRVUNL #7 :

Structural Work

Tamil Nadu

• 2x250 MW Neyveli Lignite Ltd-II:

Expansion Main plant structural works

• 3 x 500 MW Vallur/NTECL # 1&2:

Main Plant Structural

Projects Completed – Structural sites

MIHAND / MADC – Ware House

50

JSW Ratnagiri – Port Handling Str.

Page 51: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• Ennore/TNEB:

Renovation of Boiler Structure

Uttar Pradesh

• PATA/GAIL: (Structural Steel Works)

GCU Petrochemical Plant

• 2x80, TPH HRSG Pata/GAIL:

Structure work

• 2 x 500 MW Rihand/NTPC: Misc.

Structures and 250 Mtr. RCC Chimney flue

• 2x210 MW Parichha/UPRVUNL#3&4:,

Main Plant Structures

• 2x250 MW Parichha/UPRVUNL # 5&6:

Main Plant Structure

Projects Completed – Structural sites

51

Paras Fuel Oil System

Bellary KPCL

Page 52: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Andra Pradesh

• 2x500 MW Simhadri/NTPC # 4&5

Boiler # 5 and Rotating Parts# 4&5

Chhattisgarh

• 2 x 600 MW Malwa /MPPGCL # 1 & 2:

Boiler # 2 and Critical piping # 1

• 1 x 500 MW Sipat /NTPC # 5:

ESP work

•1 x 250 MW Raigarh /JSPL # 4:

ESP work

• 1 X 250 MW Bhilai/BESCPL # 1:

Boiler and Auxiliaries, Ash slurry Piping

• 2 x 135 MW Dongamahua/JSPL # 3 & 4:

Boiler & its Auxiliaries, STG & Mat. Mngmt

•1 x 275 TPH Korba:

Boiler Work

• 2 x 135 TPH BALCO # 2 & 3:

Boiler and its auxiliaries

Gujarat

•1 x 500MW Ukai /GSECL:

Boiler & its Auxiliaries

Projects Completed – Boiler & its Auxillaries sites

Simhadri / NTPC Site (500MW)

52

Ukai / GSECL (500MW)

Page 53: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• 2x125 MW Mangrol /GIPCL # 3 & 4:

CFBC Boiler #3 & CW Piping # 3&4

Haryana

• 2x300 MW Yamunanagar/Reliance#1&2 :,

Non-Pressure Parts & ESP#1&2

Maharastra

• 1 x 500MW Bhusawal /MSPGCL # 4:

Boiler & its Auxiliaries

• 1 x 500 MW Khaparkheda/MSPGCL:

Extension project, Boiler and its Auxiliaries

and Construction of Ash Bund

• 1X500 MW Chandrapur/MSPGCL:

Boiler Auxiliaries

• 2x300MW Ratnagiri/JSW # 1 & 3:

Boiler and its Auxiliaries, and Material

Handling work

• 1x300 MW Butibori /Reliance#1&2:

Boiler auxiliaries, and Critical Piping

• 1X250 MW Parli/MSPGCL #6:

Boiler & its Auxiliaries

1x250 MW Parli/MSPGCL #7: Boiler & its

Auxiliaries, LD Piping, and MS Pipeline

Projects Completed – Boiler & its Auxillaries sites

4X300 MW, JSW/Ratnagiri

Boiler, STG, ESP – 2 units

Structural work – 4 units

Port handling Structures &

Equipment

2x500 MW Bhusawal

Boiler # 4

Structure # 3 & 4

53

Page 54: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

•1X250 MW Paras/MSPGCL#1:

Fuel Oil Handling System

• 1 x 250 MW Paras/MSPGCL # 2:

Boiler & its Auxiliaries and MS Pipeline

•1x210 MW Khaparkheda/MSPGCL:

Boiler # 3 Misc. Work

Madhya Pradesh

• 1 x 500 MW Vindyachal /NTPC # 11:

Boiler and its auxiliaries

•2 x 600 MW Malwa /MPPGCL # 1:

Critical Piping # 1

Rajasthan

• 2x125 MW Barsingsar/NLC # 1 & 2:

CFBC Boiler and its auxiliaries, Material

management

Uttar Pradesh

• 2 x 500 MW Rihand/ NTPC # 4&5:

Boiler & its auxiliaries

•1 x 210 MW Unchahar/ NTPC # 5:

Boiler auxiliaries

• 2 x 490 MW Dadri / NTPC # 5 & 6:

ESP Work

Projects Completed – Boiler & its Auxillaries sites

Khaparkheda (500MW) site

54

Barsingsar #1&2 (CFBC Boiler)

Page 55: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Uttar Prasesh

• 2 x 500 MW Rihand/ NTPC # 5&6

Maharastra

• 1 x 250 MW Parli/MSPGCL #7

• 2 x 300MW Ratnagiri/JSW # 1 & 3:

• 2 x 300 MW Butibori /Reliance#1 & 2:

Chhattisgarh

• 2 x 135 MW Dongamahua/JSPL # 3 & 4:

Projects Completed – STG WORK

2X300 MW, JSW/Ratnagiri STG # 1&3

2x300 MW Butibori RIL # 1&2

55

2X500 MW, NTPC/RIHAND -STG # 5&6

Page 56: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

22 Kv Substation at MSEDCL,

Kalyan, Mumbai

Projects Completed – Transmission & Distribution WORK

220 KV Substation at MSETCL Magarpatta Pune

Maharastra:

• Kalyan /MSEDCL : 22 kV Lines & Sub-station of APDRP-Job

• Chandrapur /MSEDCL : Transmission, Distribution of button line and Sub-station

on turnkey

• Magarpatta /MSETCL : Erection and Construction of 220/822 kV Sub-station

• Bhandup /MSEDCL : Design, Supply, Construction, Erection & Testing of

22/11 kV and 22/22 kV Sub-station under Urban Zone,

Thane.

56

Page 57: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Projects Completed – Transmission & Distribution WORK

66 Kv Substation at HVPNL, Haryana.132 kV Substation, Bambawade

• Aurangabad /MSEDCL : Erection and Testing of Transmission line and Sub-station

of Single Phase DTC of under APDRP)

• Wathar & Bambawade/ : Erection and Construction of 220/33 kV and

(Pune) MSETCL 132/33 kV Sub-station

Haryana

• Halluwas, Dahina and Gurgaon/HVPNL

: 66 kV and 132 kV Sub-station

57

Page 58: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Projects Completed – Solar PV Project

58

5 MW Solar PV Project at Solapur (MS)Maharastra:

Solar Energy Corporation of India

(SECI)

• Develop, Own, Design, Finance,

Construct, Commission, Operate and

Maintain a 5 MW Solar Power Project in the

state of Maharashtra under JNNSM Phase

II batch I.

•Total Project Cost : 42.50 Cr

•Power Generation Capacity: 5.375 MW

• Commercial Operation Date: 29-Jun-2015

Live Photographs

Page 59: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Projects Completed – Solar PV Project

59

5 MW Solar PV Project at Solapur (MS)

Month (No of Days)

Power Generationin KWh

June - 2 days 45559

July - 31 days 612900

August - 31 days 621675

September - 30 Days 637875

October- 31 Days724275

November -30 Days 696250

Total Generation Till Date

3338534

Live Photographs

Page 60: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

MAHARASHTRA

Parli-BOP #8 Mauda # 3

Chandrapur#9 Solapur # 1&2Koradi # 8,9&10 Nagpur –VNIT

Nagpur (T&D) Kolhapur(T&D)

Pune (T&D) Morshi (T&D)

MADHYA PRADESH

Vindhyachal#13

CHATTISGARH

Singhitarai#1&2 Tamnar # 4

Rajnandgaon LARA (NTPC)

Nawapara#1&2

ANDHRA PRADESH

Vizag – RINL & Thermax

Singreni – BHEL & SCCL

Bhawanpadu (ABIR)#1&2

Hyderabad –HGCL

GUJRAT

Kakrapar – NPCIL

JHARKHAND

North Karanpura

TAMILNADU

Vellor #3

KARNATAKA

Kudgi# 3 NH 234(MORTH)

ORISHA

Cuttak Dharliparli

BIHAR

Barauni Munger (NHI)

PUNJAB

Bhatinda Tarn Taran

UTTAR PRADESH

Meja# 1&2 Kanpur –KDA

WEST BENGAL

NH 60A – MORTH

Presence in 13 States… 34 Projects

60

Page 61: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Chhattisgarh

• 3 X 800MW LARA/NTPC/ DOOSAN :

Civil, Fabrication & Erection of CW System

and Make up Water System # 1, 2 & 3

(Order Value 56.23 Cr.)

Odisha

2x800 MW , Dharlipali /NTPC#1&2

Civil, Fabrication & Erection of CW System

and Make up Water System.

(Order Value: 81.06 Cr.)

Uttar Pradesh

2x660 MW , Meja /NTPC#1&2

Civil, Fabrication & Erection of CW System &

Make up Water System, also works associated

with Raw Water Pump House near reservoir

including maintenance bay, common sump and

connection with raw water reservoir outlet

pipes, switchgear room, control room including

battery room, transformer foundations, valve

pits,culvets etc. (Order Value: 174.9 Cr.)

Ongoing Project – Cooling Water Piping Work

NTPC/LARA (800MW) site

61

NTPC/LARA (800MW) site

Page 62: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Andhra Pradesh

• 1x600MW Singareni /BHEL #1:

- Civil, Structure & Architectural work of

Main plant, and Switch yard package

- Cooling Tower (IDCT)

Bihar

• IOCL Barauni Refinery

- Civil, Structural and Electrical works at

Barauni Refinery

Jharkhand

• 3X660 MW North Karanpura STPP,

Unit # 1 & 3

Package A ‐ Civil, Structural and

Architectural works etc. of BTG area.

Ongoing Project – Civil & Structural Work

62

Singreni (600MW) site- Main Plant

Singreni (600MW) site- Switch Yard

Singreni (600MW) site- Cooling Tower

Page 63: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Ongoing Project – Civil & Structural Work

Maharashtra

• 1 x 250 MW Parli /MSPGCL#8:

Engineering Procurement & Construction

(EPC) of Balance of Plant (BOP) Package

• 3x660 MW Koradi/MSPGCL # 8, 9 & 10:

Main Plant Civil, Structural and Architectural

Works

Parli (BOP) – Service Bldg ESP Control Bldg. Transformer Yard

63

3x660MW L&T/MSPGCL Koradi site.

Page 64: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Andhra Pradesh

• 6.3 MTPA Visakhapatnam Steel

Plant/RINL: Steel plant Expansion

Structural Works

Bihar

• 1 x 250MW Barauni/ BSEB # 9:

Structural steel work

Chhattisgarh

• 2x600 MW Tamnar /JSPL#4:

Main Plant Structure (Bolted Structure)

• 2x600 MW Singhitarai – ABIR # 1 & 2:

Bunker Structure, P.House Bldg. & CHP

• Rajnandgoan/Lanco :

Supply and Erection of Polysilicon shed of

1500 TPA Lanco Solar Manufacturing Plant

Maharastra

• 2x660MW NTPC Mauda TPP # 3&4,

Supply, Fabrication & Erection of Bunker &

Bunker Structure

Tamil Nadu

3 x 500 MW Vallur/NTECL # 3:

Main Plant Structural

Ongoing Project – Structural Work

2X600 MW Tamnar JSPL site

64

2X600 MW Singhitarai /ABIR Site

Power House Bldg.

Page 65: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Ongoing Project – Building Construction Work

WaterGreens - Nagpur

Green Acres - Goa

65

WaterGreens – Jaitala Nagpur

• G+7 , 4 Tower Buildings

• 1.5 lacks Sq. foot

Green Acres – Goa

• G+4 , 5 Tower Buildings

• 1.5 lacks Sq. foot

Royalty – Ramdaspeth, Nagpur

• 7 Bungalows on 7 Floors

Page 66: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Ongoing Project – Building Construction Work

WaterGreens - Nagpur

66

Andhra Pradesh

• 2 x 600 MW SCCL, Singrani TPP

Construction of Residential Buildings/

Staff Quarter (G+1 Type), GM

Bungalow .

Project Cost – 92.29 Crore

• Construction Administrative Building/

Canopies at Toll Plaza (Pkg 5&6) at

Hyderabad

Project Cost – 50.74 Crore

Maharastra

• 2 x 500 MW NTPC Mauda STPP

Civil work of Administrative &

Residential Buildings.

• CPWD/VNIT, Nagpur : Construction

of Class room complex

NTPC Mauda

Page 67: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Ongoing Project – Building Construction Work

67

Uttar Pradesh

• KDA Kanpur

Construction of EWS Houses 22 Bolcks

(G+3).

Project Cost – 89.38 Crore.

Bihar

Construction of 1054 Flats at Dalpatpur

dist. Aara (G+11).

Project Cost – 415.48 Crore.

Karnataka

Construction of Ash Dyke for NTPC

3 X 800 MW TPP at Kudgi.

Project Cost – 183.02 Crore.

Ash Dyke

Page 68: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Andhra Pradesh

• 2 x 660 MW Bhawanpadu/Abir Infra.

Ltd # 1&2 : Boiler & its auxiliaries and

Material Management

• Vishakahpatnam/Thermax :

120 MW BFC Boiler and piping work.

Chhattisgarh

• 1 X 800MW LARA/NTPC/ DOOSAN :

Boiler, Material Management Package

• 2 x 600 MW Singhitarai/Abir Infra. Ltd

# 1&2 : Boiler & its auxiliaries and

Material Management

• 2 x 300MW Nawapara/TRN Energy #

1&2: Boiler & its auxiliaries.

Ongoing Project – Boiler & its Aux

2 x 300 MW Nawapara # 1&2, TRN Energy

2 x 600 MW Singhitarai – ABIR # 1&2

68

Page 69: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Karnataka

• 1 X 800MW Kudgi/NTPC/ DOOSAN # 3:

Boiler and Material Management.

Maharashtra

• 1 x 500 MW Chandrapur/MSPGCL # 9:

Boiler Vertical Package

• 1 x 660 MW Mauda / NTPC # 3:

Boiler & its Auxiliaries Package

Madhya Pradesh

•1 x 500 MW Vindhyachal # 13

Boiler & its Auxiliaries

Orissa

1 x 350 MW Cuttack/KVK Nilanchal # 1:

Boiler and its auxiliaries

Tamil Nadu

1 x 500 MW Vallur/NTECL # 3:

ESP#3 Works

Ongoing Project – Boiler & its Aux.

DOOSAN/ NTPC, Kudgi # 3 (800MW)

69

ABIR, Singhitarai # 1&2 (600MW)

Page 70: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Gujrat

1 x 700 MWe Kakrapar Atomic Power

Project,Nuclear Power Corporation India

Ltd./BHEL # 3, STG & Piping work

Maharashtra

•2x660 MW Solapur-NTPC/Alstom#1&2

STG Work

Madhya Pradesh

• 1 x 500 MW Vindhyachal # 13

STG Package

Ongoing Project – STG Work

Malwa # 1 (600MW) – Critical piping Pkg

70

2x660MW ASLTOM/NTPC Solapur site

1x500MW NTPC Vindhyachal site

Page 71: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Nagpur RegionSupply, Testing, Transport, Construction, Erection, Testing

and Commissioning of Distribution Lines, Distribution

Transformers of Various Capacities & 33/11 KV Sub

Stations, Other Allied Works, Including Five Years

Guarantee Period for Power transformers, Distribution

Transformer with Allied Equipment and Two Years

Guarantee Period for Other Works in Nagpur (Rural) &

Nagpur (Urban) Zone for RAPDRP

Kolhapur RegionSupply, Test, Transport, Construction, Erection, Testing

and Commissioning of Distribution Lines, Distribution

Transformers of Various Capacities & 33/22/11 KV Sub

Stations, Other Allied Works, Including Five Years

Guarantee Period for Power transformers, Distribution

Transformer with Allied Equipment and Two Years

Guarantee Period for Other Works in Kolhapur Zone for

RAPDRP

Amravati RegionConstruction of 22/11 kv substation at Morshi, Amravati.

Pune Region

Construction of 132/33 kv substation at Kavathe, Yamai

TH Shirur, Pune

Ongoing Project – T&D

71

Page 72: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Bhatinda:

Public work Department (B & R)

Bhatinda

Construction of Central Sudhar Ghar at

Bhatinda

Total project Cost (In Cr): 176 INR

7272

Ongoing Project Central Sudhar Ghar

Live Photographs

Page 73: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Bhatinda:

Public work Department (B & R) Amritsar

Construction of Central Sudhar Ghar at

Goindwal Dist Tarn Taran.

Total project Cost (In Cr): 194 INR

7373

Ongoing Project Central Sudhar Ghar

Live Photographs

Page 74: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Dhanbad

Jharia Rehabilitation and Development

Authority

Construction of 2000 units G+3 (four Storey)

Visthapit Awas including planning, survey and

consultancy work at mouza Lipania (Phase-B),

Dhanbad.

Total project Cost (In Cr): 83 INR

7474

Ongoing Project Visthapit Awas

Live Photographs

Page 75: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Karnataka :

Ministry of Roads and Transport and

Highways – Madhugiri to Mulbagal

Rehabilitation and upgrading to 2-lanes / 2-

Lane with paved shoulders configuration and

Strengthening of Madhugiri to Mulbagal

section (km 343.800 to km 483.151) of NH-

234 under Phase –I of NHIIP [Pkg. No:

NHIIP- KA-234-10]- Information regarding

execution of agreement of Lot-I.

Total project Cost (In Cr): 122.02 INR

Total Length (In Km) : 56.53

7575

Ongoing Project Roads and Highways

Page 76: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

West Bengal :

Ministry of Roads and Transport and

Highways – Bankura to Purulia

Rehabilitation and upgrading to 2-lanes / 2-

Lane with paved shoulders configuration and

Strengthening of Bankura – Purulia Road

Section (km 0.00 to 84.00) of NH-60A in the

State of West Bengal under Phase - I of

Natinal Highways Inter-connectivity

Improvement Projects (NHIIP).

Total project Cost (In Cr): 322 INR

Total Length (In Km) : 84.00

76

76

Ongoing Project Roads and Highways

Page 77: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Bihar :

Ministry of Roads Transport and

Highways - Sitamarhi-Jaynagar-Narahia

Rehabilitation and Upgrading to 2 lanes/2 lane

with Paved Shoulders Configuration and

Strengthening of Sitamarhi-Jaynagar-Narahia

Section (km40.00 to km219.945) of NH-104

in the State of Bihar (Package No. NHIIP-BR-

104-11) for Lot-I- km 40.00 to km 65.400 and

km 76.300 to km 79.400” under Phase-I of

National Highways Inter-connectivity

Improvement Projects (NHIIP).

Total project Cost (In Cr): 154.62 INR

Total Length (In Km) : 28.50

77

77

Ongoing Project Roads and Highways

Page 78: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Bihar :

Ministry of Roads Transport and

Highways - Sitamarhi-Jaynagar-Narahia

Rehabilitation and Upgrading to 2 lanes/2 lane

with Paved Shoulders Configuration and

Strengthening of Sitamarhi-Jaynagar-Narahia

Section (km79.400 to km156.500) of NH-104

in the State of Bihar (Package No. NHIIP-BR-

104-11) for Lot-II- km 79.400 to km 156.500

under Phase-I of National Highways Inter-

connectivity Improvement Projects (NHIIP)

Total project Cost (In Cr): 319.68 INR

Total Length (In Km) : 77.10

78

78

Ongoing Project Roads and Highways

Page 79: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Maharashtra :

National Highways Authority of India -

Bodhre-Dhule

Four / Six Laning of Bodhre (km 390.000) to

Dhule (km 452.800) section of NH-211 (new

NH No. 52); (Existing Length 62.800 km;

Design Length 67.231 km) under BOT (toll)

on DBFOT pattern in the state of

Maharashtra under phase NHDP-IV on

Hybrid Annuity Mode)

Total project Cost (In Cr): 982.00 INR

Total Length (In Km) : 67.23

79

79

Ongoing Project Roads and Highways

Page 80: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Maharashtra :

National Highways (PWD) - Parli-Pimpla

Dahiguda

Rehabilitation & Upgradation of Parli-Pimpla

Dahiguda Road, From Existing Chainage Km.

0+000 To 18+495 (SH-64) (Design Chainage

Km.0+000 To Km.18+440) To Two/Four

Lane with Paved Shoulder - Parali Vaijnath,

Ambajogai, Renapur Phata Section of NH

548B - in the state of Maharashtra on EPC

mode

Total project Cost (In Cr): 134.45 INR

Total Length (In Km) : 18.44

80

80

Ongoing Project Roads and Highways

Page 81: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Maharashtra :

Ministry of Roads Transport and

Highways - Nanded-Kinwat-Mahur-Arni

Up-gradation of Nanded-Kinwat-Mahur-Arni

Road Section from Sarsam Budruk to Kothari

(Design km. 33.000 to km. 90.000)

(Length=57.00 Kms) to Two lanes with Paved

Shoulder of NH 161 A (Starting from NH

548 C Aakot and terminate at junction of NH

161 near Wazar Aurada) in the state of

Maharashtra on Engineering, Procurement &

Construction (EPC) Basis Contract

Total Project Cost (In Cr): 308.16 INR

Total Length (In Km) : 57.00

81

81

Ongoing Project Roads and Highways

Page 82: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Maharashtra :

Maharashtra State Road Development

Corporation Ltd. (MSRDC)-

Mehkar-Ajispur

Rehabilitation and Up-gradation of Mehkar to

Ajispur from km 00+000 (Mehkar) to km

35+836 (Ajispur) to Two lane with paved

shoulders in the state of Maharashtra on

Engineering, Procurement & Construction

(EPC) Basis Contract

Total Project Cost (In Cr): 160.20 INR

Total Length (In Km) : 35.83

82

82

Ongoing Project Roads and Highways

Page 83: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Maharashtra :

National Highways (PWD) -

Ajanta-Buldhana

Rehabilitation & Up-gradation of Ajanta –

Buldhana section of National Highway –

753E (49.130 Km) to two lane with paved

shoulder configuration in the State of

Maharashtra on EPC Mode

Total Project Cost (In Cr): 257.40 INR

Total Length (In Km) : 49.13

83

83

Ongoing Project Roads and Highways

Page 84: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Jharkhand :

National Highways Authority of India-

Kutchery Chowk – Ranchi – Piska More-

Biju Para

4 Laning of Kutchery Chowk – Ranchi –

Piska More – Biju Para Section( From Km

0.000 To Km 34.000) in the State of

Jharkhand to be executed on EPC Mode

Total Project Cost (In Cr): 235.90 INR

Total Length (In Km) : 34.00

84

84

Ongoing Project Roads and Highways

Page 85: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Patna:

Bihar Urban Infrastructure Develoment

Corporation and Patna Municipal

Corporation

Design, Finance, Development, Construction,

Operation, Maintenance, Management and

transfer of a Regional Municipal Solid Waste

to Energy (Electricity) and land fill Facility at

Patna in Bihar

Total project Cost : INR 225 Cr

Capacity of Project : 1000 TPD

Power Generation : 11.5 MW

85

85

Ongoing Project – Municipal Solid Waste

Page 86: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Kolhapur:

Kolhapur Municipal Corporation

Develop a MSW Processing Facility for

treating the MSW collected from the city of

Kolhapur on Design, Build, Finance, Operate

and Transfer (the "DBFOT") basis.

Total project Cost : INR 25 Cr

Capacity of Project : 200 TPD

Power Generation : 2 MW

86

86

Page 87: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

87

Page 88: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

(Rs. In Millions) 2013-14 2014-15 2015-16

Sales 15844 18365 20213

Paid up Capital 136 153 173

Reserve & Surplus 3299 3897 4493

Book Value per Share (Amt. in Rs.) 255 268 270

Cash Accruals 575 841 901

Profit before Tax 481 695 850

Profit after Tax 292 532 534

Earnings per share 24 36 32

Gross Block 2036 2600 4126

Promoter’s Equity ( % ) 64.4% 62.45% 62.45%

88

Page 89: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

UCO Bank, Nagpur

Union Bank of India, Nagpur

IDBI BANK, Nagpur

Lakshmi Vilas Bank, Mumbai

Oriental Bank of Commerce

Bank of India, Nagpur

ICICI Bank

OUR

BANKERS

Axis Bank

Punjab National Bank

Kotak Mahindra

Karur Vysyaya Bank

Canara Bank

Syndicate Bank

State Bank of Travancore

89

Page 90: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Existing

(Rs. In Millions)

Proposed

(Rs. In Millions)

Fund Based

Cash Credit 3250 3850

Term Loan 0 0

Total (A) 3250 3850

Non Fund Based

Letter of Credit 2750 3700

Bank Guarantee 7485 12500

Total (B) 10235 16200

Total (A+B) 13485 20050

Facilities we enjoy…

90

Page 91: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

RECENT

GROWTH

91- All figures are in Million

9772

12617

15844

1854220213

22000

Consolidated Sales

2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 (Plan)

Page 92: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

92

Page 93: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

• Competitive rates

• Timely execution capability

• High Quality & Safety Standard

• Financially Strong

• Highly diversified Product profile

• Largely owned construction equipment Bank

• Experience of more than 15 years

• Network in more than 13 States

•Strong detemined and efficient team

Preferred

Partner

93

Page 94: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

94

Page 95: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

History

Business Overview

People

Products & Services

Resources

Projects

Financial Overview

Sunil Hitech : Preferred Partner..

Contact Details

95

Page 96: Presentation To By - Sunil Hitech · 2019. 12. 20. · 11 RCC Chimney & Its Steel Flue •Castor, BOF and CCP Plants 12 Mini Hydro Civil Works •Universal Rail Beam 13 33kv/66kv/132kv/220kv

Thank

You !!

Contact Us