Production Flowchart: Inputs
Inputs
Client Parts List
Customer Requirements: Which Product do they
want?
Customer Feedback: How did they like the last
batch?
What materials and components
are needed?
Receiving
Prepare, approve & process
purchase orders
Inspection
Confirm that the purchases are as
ordered and meet the quality
requirements
Storage
Accept
NCR
Issue the non conforming report and hold rejected
material until disposition is determined
To FC-2 Flowchart
Reject
A B
C
Purchase
Production Batches
All the material is available in the storage areas and is ready as required by our procedures
From previous FC1
Parts list or Bill of
Materials
Assemble Install the components and sub-
assemblies. Identify the different models
In process inspection & test
Ready for the finishing department
FC3
NCR
Process NCR and dispose of
rejected product
C B
D
Inspect
Accept
Reject
Stage the Components
Sub assemblies Models A, B, C, D
Move the required materials and components to preparation area.
Prepare the components
D B
From previous FC2
Finish Paint
C
Reject
Accept
Deliver
Storage
Remove from paint racks. Segregate by product model and place in
storage drying-hold area
Final inspection and product validation upon salt spray results.
Back to Customer feedback loop and
FC-1 flow chart A
Assemblies are ready for the finishing department. Painting of the product is considered to be a validated process because deficiencies may only be apparent after they have been delivered and before a salt
spray test is completed.
Maintain product identification. Control the paint process temperature,
pressure and time
Bill of Materials or Parts List
Inspect NCR
Process the NCR. Dispose rejected product
Provide the best quality at the best price and on time