163
Project : Location : Owner : document.xls Page 1 of 163 DESCRIPTION OF ITEM U/I QTY DIV-010 SECONDARY WALL 2X3X8' C STUDS PCS. 185.00 16.00 12MMX4'X8' GYPSUM BOARD PCS. 330.00 6.00 GYPSUM BLACK SCREW PCS. 0.65 200.00 LATEX SEMI GLOSS GALS. 550.00 2.00 DIV-020 PLATFORM & FLOORING 1.2MM THK. X 2X3X20' C FLOOR JOISTS PCS. 1,030.00 8.00 20MM THK. X4'X8' PLYWOOD PCS. 800.00 4.00 BLACK SCREW PCS. 0.65 150.00 WOOD LAMINATE FLOORING SQM 850.00 9.00 DIV-030 REFLECTED CEILING 2X2X20' TUBULAR PCS. 1,030.00 5.00 1X2X20' TUBULAR JOISTS PCS. 500.00 4.00 12MM THK.. X4'X8' FICEM BOARD STO. FLRG. PCS. 565.00 4.00 BLACK SCREW PCS. 0.65 150.00 3MM TH. X4'X8'FICEM CEILING PCS. 250.00 4.00 BLIND RIVETS PCS. 0.65 300.00 DIV-050 METALS Steel Roof Framing System Sq.m 600.00 93.00 Cee Floor joists pcs 650.00 24.00 Stair & Balcony Railing lin.m. 1,200.00 13.00 DIV-060 WOOD & PLASTICS lumber, tangile, 1" x 10 x 4' ceiling vent PC 400.00 6.00 lumber, 2" x 2" BF 25.00 320.00 nail, finishing, 1" KG 45.00 2.00 nails, C.W., finishing 2" KG 45.00 5.00 plyboard, 3/4" x 4' x 8' SHT 865.00 12.00 hardiflex, 1/8" x 4' x 8' PC 160.00 22.00 wood glue, stikwell 1 kg can CN 95.00 1.00 Lentrek soil treatment LT 1,000.00 1.00 Solignum wood preservative (4-liter) CN 633.00 1.00 MT 60.00 3.00 DIV-070 THERMAL & MOISTURE PROTECTION PC 529.00 6.00 RO 2,300.00 1.00 PC 288.00 4.00 PC 380.00 10.00 steel tile, Tilespan 0.4mm x 1220mm x L.S. PC 260.00 94.00 MASTER FORMAT NO U/P wire mesh screen, '1/8" x 1/8" x W4' (circulation vents) insulation, polyethylene with aluminum backing 2 sides, 6mm x 1m x 50m roll Plain g.i. sheet, # 26 x 4' x 8' (fascia & firewall flashing) plain stainless stl sht. gutter, rectangular shape, # 26 x L2.4m

Productivity Rates

Embed Size (px)

Citation preview

Page 1: Productivity Rates

Project : Location : Owner :

document.xls Page 1 of 100

DESCRIPTION OF ITEM U/I U/P QTY SUB T/P

DIV-010 SECONDARY WALL2X3X8' C STUDS PCS. 185.00 16.00 2,960.00

12MMX4'X8' GYPSUM BOARD PCS. 330.00 6.00 1,980.00

GYPSUM BLACK SCREW PCS. 0.65 200.00 130.00

LATEX SEMI GLOSS GALS. 550.00 2.00 1,100.00

6,170.00

DIV-020 PLATFORM & FLOORING1.2MM THK. X 2X3X20' C FLOOR JOISTS PCS. 1,030.00 8.00 8,240.00

20MM THK. X4'X8' PLYWOOD PCS. 800.00 4.00 3,200.00

BLACK SCREW PCS. 0.65 150.00 97.50

WOOD LAMINATE FLOORING SQM 850.00 9.00 7,650.00

19,187.50

DIV-030 REFLECTED CEILING2X2X20' TUBULAR PCS. 1,030.00 5.00 5,150.00

1X2X20' TUBULAR JOISTS PCS. 500.00 4.00 2,000.00

12MM THK.. X4'X8' FICEM BOARD STO. FLRG. PCS. 565.00 4.00 2,260.00

BLACK SCREW PCS. 0.65 150.00 97.50

3MM TH. X4'X8'FICEM CEILING PCS. 250.00 4.00 1,000.00

BLIND RIVETS PCS. 0.65 300.00 195.00

10,702.50

DIV-050 METALSSteel Roof Framing System Sq.m 600.00 93.00 55,800.00

Cee Floor joists pcs 650.00 24.00 15,600.00

Stair & Balcony Railing lin.m. 1,200.00 13.00 15,600.00

87,000.00

DIV-060 WOOD & PLASTICSlumber, tangile, 1" x 10 x 4' ceiling vent PC 400.00 6.00 2,400.00

lumber, 2" x 2" BF 25.00 320.00 8,000.00

nail, finishing, 1" KG 45.00 2.00 90.00

nails, C.W., finishing 2" KG 45.00 5.00 225.00

plyboard, 3/4" x 4' x 8' SHT 865.00 12.00 10,380.00

hardiflex, 1/8" x 4' x 8' PC 160.00 22.00 3,520.00

wood glue, stikwell 1 kg can CN 95.00 1.00 95.00

Lentrek soil treatment LT 1,000.00 1.00 1,000.00

Solignum wood preservative (4-liter) CN 633.00 1.00 633.00

wire mesh screen, '1/8" x 1/8" x W4' (circulation vents) MT 60.00 3.00 180.00

26,523.00

DIV-070 THERMAL & MOISTURE PROTECTIONfascia board, Hardisenepa, 1" x 12" x 12' PC 529.00 6.00 3,174.00

RO 2,300.00 1.00 2,300.00

Plain g.i. sheet, # 26 x 4' x 8' (fascia & firewall flashing) PC 288.00 4.00 1,152.00

PC 380.00 10.00 3,800.00

steel tile, Tilespan 0.4mm x 1220mm x L.S. PC 260.00 94.00 24,440.00

MASTER FORMAT

NO

insulation, polyethylene with aluminum backing 2 sides, 6mm x 1m x 50m roll

plain stainless stl sht. gutter, rectangular shape, # 26 x L2.4m

Page 2: Productivity Rates

Project : Location : Owner :

document.xls Page 2 of 100

DESCRIPTION OF ITEM U/I U/P QTY SUB T/P MASTER FORMAT

NO

PC 136.00 12.00 1,632.00

aluminum rivets PC 0.60 200.00 120.00

g.i. wire ball strainer, # 16 PC 11.15 6.00 66.90

S- type screw PC 1.15 250.00 287.50

36,972.40

DIV-080 DOORS & WINDOWSWood Panel Type Doors Std. size SE 3,000.00 2.00 6,000.00

Wood Flush Type Doors Std. size SE 1,800.00 3.00 5,400.00

D-7 PVC flush door SE 1,500.00 2.00 3,000.00

hinges, loose pin, (Taiwan) brass, 3" x 3" PCS 27.00 15.00 405.00

SE 500.00 7.00 3,500.00

W-1 Steel casement window, French type SF 125.00 114.00 14,250.00

32,555.00

DIV-090 FINISHES

ceramic tiles, Mariwasa vitrified, 12.5mm x 200mm x 200mm PC 16.00 240.00 3,840.00

Painting lot 20,000.00 1.00 20,000.00

23,840.00

DIV-100 SPECIALTIESkitchen sink, double basin, stainless steel SE 3,500.00 1.00 3,500.00

3,500.00

DIV-150 MECHANICAL/SANITARYA. HOUSE DRAIN

75mm cleanout pcs. 22.00 1.00 22.00

75mm long sweep elbow pcs. 22.00 3.00 66.00

75mm x 50mm Tee pcs. 22.00 2.00 44.00

75mm x 75mm Tee-Wye pcs. 22.00 2.00 44.00

75mm P-trap pcs. 22.00 1.00 22.00

75mm x 3000mm Pvc soil pipe pcs. 300.00 1.00 300.00

75mm floor drain pcs. 50.00 1.00 50.00

B. SOIL STACK

75MM X 3000MM Pvc soil pipe pcs. 300.00 2.00 600.00

75mm x 1/8bend elbow pcs. 22.00 2.00 44.00

75mm x 75mm Tee pcs. 22.00 2.00 44.00

75mm cleanout pcs. 22.00 1.00 22.00

75mm x 50mm Tee-Wye pcs. 22.00 2.00 44.00

75mm x 50mm cross-tee pcs. 22.00 1.00 22.00

75mm floor drain pcs. 22.00 1.00 22.00

C. WASTE & VENT PIPE

50mm x 3000mm Pvc pipe pcs. 200.00 4.00 800.00

50mm x 50mm elbpw pcs. 22.00 2.00 44.00

steel tile Spanish type ridge cap, Tilespan 0.8mm x 1220mm x 1.21m

lockset, Yale door knob , keyed on one side, US5 brass #5237

Page 3: Productivity Rates

Project : Location : Owner :

document.xls Page 3 of 100

DESCRIPTION OF ITEM U/I U/P QTY SUB T/P MASTER FORMAT

NO

50mm x 50mm Tee pcs. 22.00 3.00 66.00

D. WATER SUPPLY

20mm x 3000mm Pvc pipe pcs. 45.00 2.00 90.00

20mm tee pcs. 8.00 1.00 8.00

20mm elbow pcs. 8.00 1.00 8.00

20mm x 12mm reducer bushing pcs. 8.00 2.00 16.00

12mm tee pcs. 8.00 4.00 32.00

12mm plain elbow pcs. 8.00 2.00 16.00

12mm elbow one face threaded pcs. 8.00 6.00 48.00

12mm shower control valve pcs. 120.00 2.00 240.00

12mm shower heads pcs. 150.00 2.00 300.00

12mm faucet pcs. 45.00 2.00 90.00

Teflon tape rolls 10.00 4.00 40.00

Solvent cement 220gms/can can 45.00 1.00 45.00

E. FIXTURES & ACCESSORIES

Water closet with tank and accessories sets 2,200.00 2.00 4,400.00

10mm water supply control valve pcs. 35.00 2.00 70.00

12mm x 10mm reducer bushing pcs. 8.00 2.00 16.00

10mm x 50mm nipple pcs. 8.00 2.00 16.00

plastic water supply hose pcs. 25.00 2.00 50.00

lavatory with P-trap, faucet and accessories sets 1,500.00 2.00 3,000.00

10mm water supply control valve pcs. 35.00 2.00 70.00

10mm water supply hose pcs. 25.00 2.00 50.00

soap holder pcs. 100.00 2.00 200.00

paper holder pcs. 100.00 2.00 200.00

towel bar pcs. 200.00 4.00 800.00

100mm x 100mm floor drain pcs. 45.00 2.00 90.00

g.i. ball valve, 12mm dia PC 250.00 4.00 1,000.00

g.i. hose bibb, 12mm dia PC 70.00 2.00 140.00

13,291.00

DIV-160 ELECTRICAL

PR 115.00 1.00 115.00

PR 220.00 5.00 1,100.00

PR 2.00 2.00 4.00

MT 5.33 112.00 596.96

MT 5.33 90.00 479.70

MT 8.95 10.00 89.50

circuit breaker, Class CTL branch, Westinghouse/ GE, 40A 220V

circuit breaker, Class CTL main, Westinghouse/ GE, 20A 220V

circuit breaker, Class CTL main, Westinghouse/ GE, 15A 220V

conductor, 'copper AWG, Phelp Dodge (#12) Thhn stranded (power)

conductor, copper AWG, Phelp Dodge (#14) Thhn solid (lighting)

conductor, copper AWG, Phelp Dodge (#10) Thhn stranded

Page 4: Productivity Rates

Project : Location : Owner :

document.xls Page 4 of 100

DESCRIPTION OF ITEM U/I U/P QTY SUB T/P MASTER FORMAT

NO

conductor, copper AWG, Phelp Dodge (#8) Thhn stranded MT 12.57 10.00 125.70

conductor, copper AWG, Phelps Dodge (#6) Thhn stranded MT 40.00 30.00 1,200.00

electrical tape, 20-m RO 20.00 5.00 100.00

fixture: bulb receptacle, porcelain, 4" x 4" PC 35.00 18.00 630.00

EA 350.00 1.00 350.00

pipe, PVC moldplex, 20mm dia x 50m- roll MT 10.75 100.00 1,075.00

pipe, RSC conduit, 1" dia (25mm) x 3m PC 340.00 5.00 1,700.00

pipe, RSC entrance cap, 1" dia (25mm) PC 75.00 1.00 75.00

pipe, RSC long sweep elbow, 1" dia (25mm) PC 125.00 1.00 125.00

plate, 1-device space, telephone, Toshiba PC 65.00 2.00 130.00

plate, 1-device space, Toshiba PC 65.00 2.00 130.00

plate, 2-devices space, Toshiba PC 65.00 7.00 455.00

plate, 3-devices space, Toshiba PC 65.00 1.00 65.00

PC 73.00 14.00 1,022.00

PC 260.00 1.00 260.00

receptacle, weatherproofed, 10A 250V, Eagle PC 65.00 1.00 65.00

telephone modular wall flush jack with plate, TEC SE 66.25 2.00 132.50

telephone wire, Paciflex jacketed 22/3C or AT&T 4C/24 MT 9.33 20.00 186.60

telephone wiring block (entrance bridge) SE 392.00 1.00 392.00

telephone, outdoor wiring box, hinged door, 4-terminal SE 392.00 1.00 392.00

PC 15.00 35.00 525.00

PC 15.00 14.00 210.00

11,730.96

DIVISION S U M M A R Y

DIV-020 SITE WORK 6,170.00 DIV-030 CONCRETE 19,187.50 DIV-040 MASONRY 10,702.50 DIV-050 METALS 87,000.00 DIV-060 WOOD & PLASTICS 26,523.00 DIV-070 THERMAL & MOISTURE PROTECTION 36,972.40 DIV-080 DOORS & WINDOWS 32,555.00 DIV-090 FINISHES 23,840.00 DIV-100 SPECIALTIES 3,500.00 DIV-150 MECHANICAL/SANITARY 13,291.00 DIV-160 ELECTRICAL 11,730.96

TOTAL DIRECT COST OF MATERIALS 271,472.36 TOTAL DIRECT COST OF LABOR 25% OF MATERIALS 67,868.09 TOTAL DIRECT COST OF LABOR & MATERIALS 339,340.45

panel box, 'Lighting/power main lug, Ever/NEMA 8 - 1" spaces (8max)

conveniece outlet, grounding type 10A 250V, Toshiba DG3951

outlet, tandem type (range), 40A 250V, with plate,Toshiba DC2583

box, junction utility, rectangular flush mounted pvc, Neltex orange, 2" x 4" ***

box, 'junction, octagonal flush mounted pvc, Neltex orange, 4" x 4"

SUB-TOTAL AMOUNT

Page 5: Productivity Rates

Project : Location : Owner :

document.xls Page 5 of 100

DESCRIPTION OF ITEM U/I U/P QTY SUB T/P MASTER FORMAT

NO

Prepared by: Conforme:

FEDERICO "BOB" D. DAVID EDGARDO M. BONDOCA R C H I T E C T O W N E R

Page 6: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 6 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR EQUIPMENT

OUTPUT HOURS COST COST COST

DIV-010 GENERAL REQUIREMENTS 0 0.00 0.00 0.00

010 Overhead & Miscellaneous Data 0 0.00 0.00 0.00

010-000 Overhead 0 0.00 0.00 0.00

0200 0 Job 1.00 0.00 0.00 0.00

0600 Public Liability 0 Job 1.00 0.00 0.00 0.00

0010 PERMITS 0 Job 1.00 0.00 0.00 0.00

013 Submittals 0 0.00 0.00 0.00

013-300 Survey Data 0 0.00 0.00 0.00

1200 Crew for building layout, 3 man crew A-7 1 3 Day 1.00 0.00 2,887.50 0.00

014 Quality Control 0 0.00 0.00 0.00

014-100 Testing Services 0 0.00 0.00 0.00

1800 TESTING, Compressive strength, cylinders, delivered to lab 0 Ea. 5.00 0.00 770.00 0.00

015 Construction Facilities & Temporary Controls 0 0.00 0.00 0.00

015-100 Temporary Utilities 0 0.00 0.00 0.00

0350 Lighting, incl. service lamps, wiring & outlets 1-Elec 34 0.05875 CSF Flr 2.00 9.39 24.26 0.00

0400 Power for temporary lighting only, per month, minimum per month 0 CSF Flr 2.00 0.00 0.00 0.00

015-250 Construction Aids 0 0.00 0.00 0.00

0014 STEEL SCAFFOLDING, Rent, 1 use per mo., no plank 0 0.00 0.00 0.00

0090 Building exterior 3 Carp 16.8 15.897625 CSF 89.00 2,227.23 5,739.39 0.00

0460 Building interior walls, (area) up to 16' high 3 Carp 22.7 2.774625 CSF 21.00 505.31 990.41 0.00

0800 Building interior floor area, up to 30' high 3 Carp 90 0.9345 CCF 28.00 210.21 336.88 0.00

015-400 Security 0 0.00 0.00 0.00

0010 WATCHMAN Service, monthly basis, uniformed man 0 Hr. 1.00 0.00 0.00 0.00

INSURANCE, All risk type

Page 7: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 7 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

016 Material & Equipment 0 0.00 0.00 0.00

016-400 Equipment Rental 0 0.00 0.00 0.00

0010 0 0.00 0.00 0.00

1300 Finisher, concrete floor, gas, manual, 3 blade, 36" trowel 4.75 Ea. 1.00 1.44 102.99 308.00

1800 Mixer, powered, mortar & concrete, gas 4.825 Ea. 1.00 1.83 99.14 298.38

2120 Pump, concrete, truck mounted, 4" line, 80' boom 67.825 Ea. 1.00 17.71 1,501.50 4,514.13

2700 Vibrators, concrete, Gas engine, 5H.P. 1.40625 Ea. 1.00 0.54 28.88 86.63

0010 0 0.00 0.00 0.00

1300 Vibratory plate compactor, gas, 24" plate, 5000 lb. blow 5.65 Ea. 1.00 3.18 102.99 308.00

0010 GENERAL EQUIPMENT RENTAL 0 0.00 0.00 0.00

7800 Welding Machine, electric, 300 amp 17.175 Ea. 3.00 10.68 297.41 895.13

8100 Wheelbarrow, any size 2.05 Ea. 4.00 0.00 52.75 157.85

CONCRETE EQUIPMENT RENTAL without operators

EARTHWORK EQUIPMENT RENTAL without operators

Page 8: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 8 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

017 Contract Closeout 0 0.00 0.00 0.00

017-100 Final Cleaning 0 0.00 0.00 0.00

0011 CLEANING UP After job completion 0 Project 1.00 0.00 0.00 0.00

0100 Cleanup of floor area, Final A-5 11.5 2.80135 MSF 14.32 47.41 799.41 91.79

Page 9: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 9 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

022 Earthwork 0 0.00 0.00 0.00

022-200 Excavation/Backfill/Compact 0 0.00 0.00 0.00

0010 BACKFILL by hand, no compaction, light soil 1 Clab 14 23.55375 C.Y. 330.00 0.00 6,733.65 0.00

0300 COMPACTION in 6" layers, hand tamp 1 Clab 20.6 5.723 C.Y. 118.00 0.00 1,635.48 0.00

0600 COMPACTION in 6" layers, Vibrating plate A-1 60 1.96175 C.Y. 118.00 0.00 561.06 222.61

0010 EXCAVATING, STRUCTURAL Hand, pits to 6' deep, sandy soil 1 Clab 8 25.25 C.Y. 202.00 0.00 7,213.17 0.00

1400 EXCAVATING, TRENCH or continuous footing, common earth 0 0.00 0.00 0.00

By hand with pick & shovel to 6' deep, light soil 1 Clab 8 16 C.Y. 128.00 0.00 4,570.72 0.00

022-800 Soil Treatment 0 0.00 0.00 0.00

0020 TERMITE PRETREATMENT, Slab & Walls, residential 1 Skwk 1508 4.030625 SF Flr. 6,449.00 1,489.72 1,613.86 3,103.58

0400 Insecticides for termite control 1 Skwk 14.2 0.14075 Gal. 2.00 36.58 52.36 0.00

025 Paving & Surfacing 0 0.00 0.00 0.00

025-100 Walk/Road/Parking Paving 0 0.00 0.00 0.00

0310 SIDEWALKS, DRIVEWAYS & PARKING, concrete 3,000psi, 0 0.00 0.00 0.00

cast in place with 6 x 6 - W1.4 x W1.4 mesh, broomed finish, 0 0.00 0.00 0.00

no base, 4" thick B-24 600 8.02 S.F. 1,604.00 2,840.68 2,686.30 0.00

025-150 Unit Pavers 0 0.00 0.00 0.00

1500 PAVING BLOCKS on 4" thick sand bed laid flat, 4.5 per S.F. D-1 110 37.645625 S.F. 2,077.00 10,275.44 12,474.46 0.00

025-800 Pavement Marking 0 0.00 0.00 0.00

0010 PAINTING LINES On pavement, reflectorized white, 4" wide B-78 20000 0.033 L.F. 132.00 12.71 12.71 5.08

026 Piped Utilities 0 0.00 0.00 0.00

026-010 Piped Utilities 0 0.00 0.00 0.00

0200 BEDDING For pipe and conduits, not incl. compaction, sand B-6 150 0.14 C.Y. 7.00 46.49 43.25 18.06

0500 Compacting bedding in trench A-1 90 0.02225 C.Y. 2.00 0.00 6.35 2.50

0200 EXCAVATION & BACKFILL hand excavate & trim for pipe 8" dia. 1 Clab 155 2.08 L.F. 320.00 0.00 591.36 0.00

027 Sewerage & Drainage 0 0.00 0.00 0.00

027-100 Subdrainage System 0 0.00 0.00 0.00

1020 PIPING, DRAINAGE & SEWAGE, CONCRETE, non- reinforced pipe, 0 0.00 0.00 0.00

Extra strength, T&G joints, 8" diameter B-21 200 1.8725 L.F. 107.00 669.42 624.10 115.35

027-400 Septic Systems 0 0.00 0.00 0.00

0100 SEPTIC TANKS Not incl. excav. Or piping, precast, 2,000 gallon B-21 5 1.4 Ea. 2.00 3,118.50 465.85 86.63

2200 Excavation for septic tank, 3/4 C.Y. backhoe B-12F 145 0.275 C.Y. 20.00 0.00 95.87 120.51

028 Site Improvements 0 0.00 0.00 0.00

028-100 Irrigation Systems 0 0.00 0.00 0.00

0800 SPRINKLER IRRIGATION SYSTEM for lawns, residential system, 0 0.00 0.00 0.00

custom, 1" diameter supply B-20 2619 4.33125 S.F. 3,850.00 1,630.48 1,408.14 0.00

028-300 Fences & Gates 0 0.00 0.00 0.00

1400 Gate for 6' High fence, 1-5/8" frame, 3' wide, galvanized steel B-80 10 0.4 Ea. 1.00 122.24 125.13 81.81

1401 Gate for 6' High fence, 1-5/8" frame, 5' wide, galvanized steel B-81 17 2.7 Ea. 4.00 816.20 831.60 546.70

0600 Fence Grill,Open rail, rustic, 3 rails, 3' high B-1 160 1.425 L.F. 76.00 437.44 421.34 0.00

029 Landscaping 0 0.00 0.00 0.00

(see sub-con details) 0 0.00 0.00 0.00

Page 10: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 10 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

DIV-030 CONCRETE 0 0.00 0.00 0.00

031 Concrete Formwork 0 0.00 0.00 0.00

031-100 Struct C.I.P. Formwork 0 0.00 0.00 0.00

0650 FORMS IN PLACE, BEAMS & GIRDERS, 12" wide, 4 use C-2 310 97.61125 SFCA 5,038.00 7,370.59 34,331.45 1,066.80

6150 FORMS IN PLACE, COLUMNS 16" X 16" plywood, 4 use C-1 235 63.665 SFCA 3,745.00 4,109.20 21,771.56 720.91

1150 FORMS IN PLACE, ELEVATED SLABS, flat plate to 15' high, 4 use C-2 560 22.446 S.F. 2,088.00 2,451.83 7,878.02 241.16

0150 FORMS IN PLACE, GRADE BEAM, 4 use C-2 605 31.8765 SFCA 3,228.00 2,982.67 11,309.30 310.70

1050 SHORES, Erect & strip, by hand, Vertical members to 13' high 2 Carp 50 5.76 Ea. 144.00 0.00 2,065.14 0.00

0010 WATERSTOP, PVC 1-1/2" diameter 1 Carp 155 0.6955 L.F. 107.00 273.95 249.23 0.00

032 Concrete Reinforcement 0 0.00 0.00 0.00

032-100 Reinforcing Steel 0 0.00 0.00 0.00

0102 REINFORCING IN PLACE, Beams & Girders, #3 to #7 4 Rodm 3200 13.385 Lb. 10,708.00 5,153.23 5,359.35 0.00

0202 REINFORCING IN PLACE, Columns, #3 to #7 4 Rodm 3000 12.31725 Lb. 8,958.00 4,311.04 4,828.36 0.00

0402 REINFORCING IN PLACE, Elevated Slabs, #4 to #7 4 Rodm 5800 6.24375 Lb. 8,325.00 4,166.66 2,243.59 0.00

0502 REINFORCING IN PLACE, Footings, #4 to #7 4 Rodm 4200 11.004 Lb. 11,004.00 4,872.02 4,236.54 0.00

0602 REINFORCING IN PLACE, Slab on grade, #3 to #7 4 Rodm 4200 0.684 Lb. 684.00 329.18 263.34 0.00

033 Cast-In-Place Concrete 0 0.00 0.00 0.00

033-100 Structural Concrete 0 0.00 0.00 0.00

0150 CONCRETE, READY MIX Regular weight, 3000 psi 0 C.Y. 245.00 22,638.00 0.00 0.00

6800 CONCRETE IN PLACE Incl. forms & reinforcing steel, 0 0.00 0.00 0.00

Stairs, Free standing C-15 120 5.55 LF Nose 74.00 712.25 1,894.59 62.68

7000 CONCRETE IN PLACE Incl. forms & reinforcing steel, 0 0.00 0.00 0.00

Stair landings, free standing C-15 285 3.4155 S.F. 108.00 436.59 1,164.24 39.50

0050 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Beams & girders, Roof beams, elevated, pumped C-20 40 9.8 C.Y. 49.00 0.00 3,018.40 1,433.74

0400 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Columns, square or round, pumped C-20 45 7.4655 C.Y. 42.00 0.00 2,304.23 1,091.48

1400 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Elevated slabs, less than 6" thick, pumped C-20 110 2.7645 C.Y. 38.00 0.00 852.20 402.33

1900 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Footings, continuous, shallow, direct chute C-6 120 0 C.Y. 0.00 0.00 0.00 0.00

2400 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Footings, spread, under 1 C.Y., direct chute C-6 55 5.565375 C.Y. 51.00 0.00 1,683.70 115.85

3200 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Footing Tie Beams & Grade beams, direct chute C-6 150 2.52 C.Y. 63.00 0.00 764.03 52.15

4300 PLACING CONCRETE and vibrating, incl. labor & equipment 0 0.00 0.00 0.00

Slab on grade, 4" direct chute C-6 110 4.3055 C.Y. 79.00 0.00 1,300.24 89.72

033-450 Concrete Finishing 0 0.00 0.00 0.00

0200 Steel trowel finish, for resilient tiles C-9 625 13.882375 S.F. 8,543.00 0.00 4,933.58 986.72

0950 Cement topping, laid after, 1:1:1-1/2 mix, 2" thick C-10 500 51.258 S.F. 8,543.00 8,387.09 16,938.63 2,466.79

034 Precast Concrete 0 0.00 0.00 0.00

034-500 Architectural Precast 0 0.00 0.00 0.00

0010 WALL MOLDINGS, Fiberglass reinforced cement D-1 175 22.659 L.F. 1,992.00 18,022.62 7,515.82 0.00

034-800 Precast Specialties 0 0.00 0.00 0.00

1050 LINTELS, Precast concrete, 6" wide, 8" high, stock units to 12' long D-4 190 56.07 L.F. 2,670.00 45,229.80 18,348.91 3,700.62

Page 11: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 11 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-040 MASONRY 0 0.00 0.00 0.00

041 Mortar & Masonry Accessories 0 0.00 0.00 0.00

041-000 Mortar 0 0.00 0.00 0.00

0010 CEMENT 40 kg. bag 0 Bag 1,070.00 21,730.36 0.00 0.00

042 Unit Masonry 0 0.00 0.00 0.00

042-200 Concrete Unit Masonry 0 0.00 0.00 0.00

4100 CONCRETE HOLLOW BLOCKS, 4" thick, tooled joints D-8 430 53.289 S.F. 4,584.00 7,412.33 18,001.37 0.00

4150 CONCRETE HOLLOW BLOCKS, 6" thick, tooled joints D-8 400 78.4125 S.F. 6,273.00 12,800.06 26,566.16 0.00

044 Stone 0 0.00 0.00 0.00

044-550 Marble 0 0.00 0.00 0.00

2510 Flooring, polished tiles, 12" x 12" x 3/8" thick, Thin set, average D-11 0 9.2115 S.F. 276.00 4,064.45 3,267.50 0.00

3550 Thresholds, 3' long, 7/8" thick, 5" wide, Beveled D-12 24 0.99975 Ea. 6.00 160.55 340.73 0.00

044-650 Granite 0 0.00 0.00 0.00

0220 GRANITE Cut to size, polished face, 3/4" thick, counter top D-10 130 32.3785 S.F. 841.00 27,197.94 10,523.01 5,488.16

044-750 Slate 0 0.00 0.00 0.00

3100 SLATE Stair landings, 1" thick, clear D-1 65 1.0455 S.F. 34.00 647.96 346.89 0.00

3600 SLATE Stair treads, sand finish, 1" thick x 12" wide, 3 L.F. to 6 L.F. D-10 120 3.08025 L.F. 74.00 2,222.22 1,068.38 524.22

Page 12: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 12 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-050 METALS 0 0.00 0.00 0.00

050 Metal Materials, Coatings & Fastenings 0 0.00 0.00 0.00

051-200 Structural Steel 0 0.00 0.00 0.00

1300 STRUCTURAL STEEL ROOF FRAMING, 1 storey, complete system E-5 12.9 7.7525 Ton 10.00 18,768.75 3,080.00 1,694.00

1600 STRUCTURAL STEEL ROOF FRAMING, 2 storey, complete system E-5 10.6 11.3205 Ton 12.00 26,565.00 4,481.40 2,471.70

055 Metal Fabrications 0 0.00 0.00 0.00

055-200 Handrails & Railings 0 0.00 0.00 0.00

0780 RAILING, PIPE Stainless steel, 3 Rail, 1-1/2" diameter, Mirror finish E-4 120 3.13725 L.F. 94.00 12,485.55 1,275.70 110.38

0400 RAILING, ORNAMENTAL, Hand forged wrought iron 1-Sswk 12 7.6705 L.F. 92.00 13,282.50 3,072.69 0.00

055-400 Castings 0 0.00 0.00 0.00

0100 CONSTRUCTION CASTINGS Manhole covers 16" x 16", cast iron E-4 46 2.436 Ea. 28.00 3,234.00 994.46 85.70

Page 13: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 13 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-060 WOOD & PLASTICS 0 0.00 0.00 0.00

060 Fasteners & Adhesives 0 0.00 0.00 0.00

060-500 Fasteners & Adhesives 0 0.00 0.00 0.00

0700 NAILS Common, 3d to 60d, plain, Galvanized, material only 0 Lb. 1,000.00 1,732.50 0.00 0.00

2000 NAILS Finish nails, 4d to 10d, plain, Galvanized, material only 0 Lb. 100.00 173.25 0.00 0.00

2700 NAILS Concrete nails, hardened steel, 3/4" to 3" long, plain, Galvanized 0 Lb. 100.00 221.38 0.00 0.00

061 Rough Carpentry 0 0.00 0.00 0.00

061-100 Wood Framing 0 0.00 0.00 0.00

6002 FRAMING, CEILINGS Suspended, 2" x 3" F-2 1000 0 L.F. 0.00 0.00 0.00 0.00

6082 FRAMING, ROOFS Fascia boards, 2" x 10" F-2 180 6.675 L.F. 600.00 1,051.05 2,402.40 103.95

0602 GROUNDS for casework, 1" x 1-1/2" wood strips, on masonry for plaster 1 Carp 225 2.25 L.F. 500.00 105.88 1,029.88 0.00

061-150 Sheathing 0 0.00 0.00 0.00

0102 SHEATHING Plywood on roof, 1/2" thick F-2 1400 6.070625 S.F. 4,415.00 3,059.60 2,294.70 84.99

061-280 Mineral Fiber Cement Panel 0 0.00 0.00 0.00

2100 MINERAL FIBER CEMENT PANEL Hardiflex, incl.panels, fasteners, 0 0.00 0.00 0.00

accessories, trim & sealants, 1/4" thick, flat sheets G-3 1020 30.938 S.F. 7,984.00 87,604.44 10,912.13 307.38

062 Finish Carpentry 0 0.00 0.00 0.00

062-200 Millworks Moldings 0 0.00 0.00 0.00

0550 MOLDINGS, BASE Baseboard, Wood, 1" x 4" 1 Carp 200 9.96 L.F. 1,992.00 3,067.68 3,566.18 0.00

0110 MOLDINGS, CASINGS Wood, 1" x 3-1/2" 1 Carp 220 5.5035 L.F. 1,223.00 3,201.81 2,001.13 0.00

1300 MOLDINGS, CEILINGS Wood, 1" x 3" 1 Carp 300 6.723 L.F. 1,992.00 2,799.26 2,377.45 0.00

3170 MOLDINGS, WINDOW & DOOR Door trim set, 1 head 2 sides, 4-1/2"wide 1 Carp 5.3 6.224625 Opng. 33.00 2,541.00 2,255.14 0.00

228-5950 MOLDINGS, WINDOW & DOOR Window trim sets,incl. casings, 0 0.00 0.00 0.00

header, stops, stool & apron, 2-1/2" wide, average 1 Carp 10 4.2 Opng. 42.00 1,536.15 1,511.90 0.00

062-300 Shelving 0 0.00 0.00 0.00

0700 SHELVING Plywood, 3/4" thick with lumber edge, 24" wide F-1 70 1.539 L.F. 108.00 426.20 555.09 24.95

064 Architectural Woodwork 0 0.00 0.00 0.00

064-100 Custom Casework 0 0.00 0.00 0.00

0840 CABINETS Kitchen base cabinets, hardwoodn not incl. counter top 0 0.00 0.00 0.00

24" deep, 35" high, prefinished, one top drawer, one door below, 18" wide 2 Carp 23.3 0.687 Ea. 8.00 1,617.00 247.17 0.00

1540 CABINETS Range or sink base, two doors below, 36" wide 2 Carp 20.3 0.0985 Ea. 1.00 259.88 35.42 0.00

4720 CABINETS Kitchen wall cabinets, hardwood, 12" deep with two doors 0 0.00 0.00 0.00

24" high, 36" wide 2 Carp 22.7 0.616875 Ea. 7.00 1,684.38 221.66 0.00

0100 CASEWORK, FRAMES Base cabinets, counter storage, 36" high, one bay 0 0.00 0.00 0.00

18" wide 1 Carp 2.7 2.963 Ea. 8.00 1,232.00 1,062.60 0.00

9800 CASEWORK, FRAMES Wardrobe, 7' high, single, 24" wide 1 Carp 2.7 19.629875 Ea. 53.00 10,712.63 7,039.73 0.00

5600 CABINET DOORS Hardwood raised panel, 18" wide, 30" high 1 Carp 14 0.571 Ea. 8.00 438.90 205.59 0.00

1040 CABINET HARDWARE Catches, maximum 1 Carp 80 1.0625 Ea. 85.00 589.05 382.88 0.00

2340 CABINET HARDWARE Door handles & pulls, projecting, wood, maximum 1 Carp 68 1.25375 Ea. 85.00 523.60 449.97 0.00

3040 CABINET HARDWARE Drawer tracks/glides, maximum 1 Carp 24 0.333 Pr. 8.00 246.40 120.12 0.00

4042 CABINET HARDWARE Cabinet hinges, maximum 1 Carp 68 1.25375 Pr. 85.00 981.75 449.97 0.00

8100 VANITIES Vanity bases, 2 doors, 30" high, 21" deep, 36" wide 2 Carp 13.33 1.65 Ea. 11.00 5,187.88 592.90 0.00

Page 14: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 14 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-070 THERMAL & MOISTURE PROTECTION 0 0.00 0.00 0.00

071 Waterproofing & Dampproofing 0 0.00 0.00 0.00

071-100 Sheet Waterproofing 0 0.00 0.00 0.00

2100 ELASTOMERIC WATERPROOFING Fiberglass reinforced, fluid applied 2 Rofc 500 6.996 S.F. 1,749.00 3,838.18 2,289.44 0.00

0600 MEMBRANE WATERPROOFING On slabs, 3 ply, felt G-1 2100 1.589625 S.F. 471.00 371.74 480.54 63.47

072 Insulation & Fireproofing 0 0.00 0.00 0.00

072-200 Roof & Deck Insulation 0 0.00 0.00 0.00

0460 ROOF INSULATION Fibergalss in 4' x 8' sheets, 1-1/16" thick, R3.8 1 Rofc 1000 7.786 S.F. 7,786.00 7,494.03 2,547.97 0.00

073 Shingles & Roof Tiles 0 0.00 0.00 0.00

073-100 Shingles 0 0.00 0.00 0.00

0150 ASPHALT SHINGLES Standard strip shingles, Inorganic, class A 1 Rofc 5.5 800.61375 Sq. 4,402.00 237,267.80 262,689.35 0.00

0700 ASPHALT SHINGLES Hip & Ridge roll shingles 1 Rofc 400 0.65 L.F. 260.00 225.23 215.22 0.00

074 Preformed Roofing & Siding 0 0.00 0.00 0.00

074-100 Preformed Panels 0 0.00 0.00 0.00

0700 STEEL ROOFING Coloured, ribbed, on steel frame, 26 gauge G-3 1000 13.536 S.F. 3,384.00 5,211.36 4,690.22 130.28

076 Flashing & Sheet Metal 0 0.00 0.00 0.00

076-200 Sheet Metal Flash & Trim 0 0.00 0.00 0.00

0010 FLASHING Gauge 24, colored, wall type, 24" wide 1 Shee 145 3.2175 S.F. 468.00 234.23 1,324.32 0.00

2800 GUTTERS 26 gauge galvanized steel, colored, S-type, 36" wide 1 Shee 120 4.815625 L.F. 575.00 1,051.53 1,970.24 0.00

0010 GUTTER GUARD 6" wide strip, aluminum mesh 1 Carp 500 1.15 L.F. 575.00 431.68 409.54 0.00

Page 15: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 15 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-080 DOORS & WINDOWS 0 0.00 0.00 0.00

081 Metal Doors & Frames 0 0.00 0.00 0.00

081-100 Steel Doors & Frames 0 0.00 0.00 0.00

0600 RESIDENTIAL STEEL DOOR Prehung, insulated, exterior, 0 0.00 0.00 0.00

Embossed, full panel, 3'-0" wide x 7'-0" high F-2 15 0.133375 Ea. 1.00 356.13 48.13 2.12

0100 STEEL FRAMES, KNOCK DOWN 18 gauge, up to 5-3/4" deep 0 0.00 0.00 0.00

7'-0" high, 3'-0" wide, single F-2 16 0.875 Ea. 7.00 882.61 316.66 13.88

082 Wood & Platic Doors 0 0.00 0.00 0.00

082-050 Wood & Plastic Doors 0 0.00 0.00 0.00

0440 WOOD FRAMES Exterior frame, incl. ext. trim, 2" x 6" deep F-2 375 1.187875 L.F. 221.00 1,565.56 425.43 17.02

3040 WOOD FRAMES Interior frame, 2" x 5" deep F-2 375 1.8275 L.F. 340.00 2,238.39 654.50 26.18

0380 WOOD DOOR, ARCHITECTURAL Flush, interior, 7 ply, hollow core 0 0.00 0.00 0.00

Walnut face, 3'-0" wide x 7'-0" high F-2 17 0.23525 Ea. 2.00 431.20 84.70 3.73

1720 WOOD DOOR, ARCHITECTURAL Flush, interior, 7 ply, 0 0.00 0.00 0.00

H.P. plastic laminate, 2'-0" wide x 7'-0" high F-2 16 1.25 Ea. 10.00 1,905.75 452.38 19.83

4020 WOOD DOORS, DECORATOR Hand curved door 0 0.00 0.00 0.00

Mahogany, 3'-0" wide x 7'-0" high F-2 14 0.714375 Ea. 5.00 4,908.75 255.06 11.36

1780 WOOD DOORS, PANELED Interior, six panel, hollow core, 1-3/8" thick 0 0.00 0.00 0.00

Molded hardboard, 3'-0" wide x 7'-0" high F-2 13 1.384875 Ea. 9.00 3,170.48 493.76 22.00

1020 WOOD DOORS Entrance door, 1-3/4" x 3'-0" x 7'-0", six panel F-2 15 0.26675 Ea. 2.00 1,174.25 96.25 4.24

3280 WOOD DOORS Interior closet, bi-fold, with hardware, no frame or trim 0 0.00 0.00 0.00

Louvered, pine, 6'-8" x 6'-0" wide F-2 10 3.6 Ea. 18.00 5,024.25 1,299.38 57.17

083-100 Sliding Doors 0 0.00 0.00 0.00

0100 GLASS, SLIDING Wood, 1/2" tempered insul. Glass, 6'-0" wide 2 Carp 4 0.5 Ea. 1.00 1,309.00 179.99 0.00

0450 GLASS, SLIDING Aluminum, 1/2" tempered insul. Glass, 6'-0" wide 2 Carp 4 0.5 Ea. 1.00 558.25 179.99 0.00

083-800 Sound Retardant Doors 0 0.00 0.00 0.00

0010 ACOUSTICAL Incl. framed seals, 3'-0" x 7'-0", wood, 27 STC rating F-2 1.5 0 Ea. 0.00 0.00 0.00 0.00

085 Metal Windows 0 0.00 0.00 0.00

085-100 Steel Windows 0 0.00 0.00 0.00

0100 STEEL SASH Custom units, glazing & trim not included, 0 0.00 0.00 0.00

Casement, 100% vented, 2 Sswk 200 6.45 S.F. 645.00 33,523.88 2,582.58 0.00

2500 STEEL SASH Picture window, glazing & trim not included, 2 Sswk 200 0.49 S.F. 49.00 1,013.99 196.20 0.00

085-200 Aluminum Windows 0 0.00 0.00 0.00

0300 ALUMINUM SASH Stock, grade C, glazed & trim not incl., Sliding 2 Sswk 200 0 S.F. 0.00 0.00 0.00 0.00

087 Hardware 0 0.00 0.00 0.00

087-100 Finish Hardware 0 0.00 0.00 0.00

0020 DEADLOCKS Mortise, heavy duty, double cylinder 1 Carp 9 0.333375 Ea. 3.00 600.60 121.28 0.00

1200 DEADLOCKS Night latch, outside key 1 Carp 10 0.1 Ea. 1.00 96.25 36.00 0.00

1900 DOORSTOPS Holder & bumper, plunger type, door mounted 1 Carp 24 1.08225 Ea. 26.00 1,101.10 390.39 0.00

0010 ENTRANCE LOCKS Cylinder, grip handle, deadlocking latch 1 Carp 9 0.4445 Ea. 4.00 685.30 161.70 0.00

0400 HINGES Full mortise, avg.freq., brass base, 4-1/2" x 4-1/2" US10 0 Pr. 66.00 3,811.50 0.00 0.00

0010 KICKPLATE 6" high, for 3' door, stainless steel 1 Carp 15 0.13325 Ea. 2.00 64.68 47.93 0.00

1700 LOCKSET Standard duty, cylindrical, with sectional trim, 0 0.00 0.00 0.00

residential, interior door 1 Carp. 16 1 Ea. 16.00 338.80 360.36 0.00

0020 MORTISE LOCKSET Comm., wrought knobs & full escutheon trim 0 0.00 0.00 0.00

Non-keyed, passage 1 Carp 9 1.11125 Ea. 10.00 2,310.00 404.25 0.00

087-200 Operators 0 0.00 0.00 0.00

0010 AUTOMATIC OPENERS Double simultaneous doors, one way 2 Skwk 1.7 9.4445 Pr. 2.00 9,201.50 3,503.50 0.00

2400 DOOR CLOSER Rack & pinion, Top jamb mount, regular arm 1 Carp 6 0.33325 Ea. 2.00 415.80 119.35 0.00

087-500 Door/Window Accessories 0 0.00 0.00 0.00

1000 DOOR ACCESSORIES Knockers, brass, standard 1 Carp 16 0.125 Ea. 2.00 128.98 45.05 0.00

088 Glazing 0 0.00 0.00 0.00

088-100 Glass 0 0.00 0.00 0.00

0010 REFLECTIVE GLASS 1/4" float with fused metallic oxide, tinted 2 Glaz 115 3.09275 S.F. 178.00 2,569.88 1,120.47 0.00

0010 WINDOW GLASS Clear Float, stops, putty bed, 1/8" thick 2 Glaz 480 2.660625 S.F. 645.00 2,483.25 968.47 0.00

089 Glazed Curtain Wallls 0 0.00 0.00 0.00

089-200 Glazed Curtain Walll 0 0.00 0.00 0.00

0010 WINDOW WALLS Aluminum, stock, including glazing H-2 160 3.3375 S.F. 178.00 7,024.33 1,123.89 0.00

Page 16: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 16 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-090 FINISHES 0 0.00 0.00 0.00

01 Metal Support Sytems 0 0.00 0.00 0.00

092-050 Furring & Lathing 0 0.00 0.00 0.00

8720 FURRING Suspended ceilings, including, 2" carriers, 24" O.C., with 0 0.00 0.00 0.00

3/4" channels,24" O.C. 1 Lath 190 30.67575 S.F. 5,843.00 3,936.72 11,022.82 0.00

092 Lath, Plaster & Gypsum Board 0 0.00 0.00 0.00

092-100 Gypsum/Cement Plaster 0 0.00 0.00 0.00

0310 CEMENT PLASTER 3/4" thick, troweled finish, on walls J-1 105 120.9675 S.Y. 2,540.00 15,108.56 39,604.95 1,809.12

092-600 Gypsum/Plywood/Cement Board System 0 0.00 0.00 0.00

0150 DRYWALL Plywood, nailed or screwed to studs, on ceilings, 1/4" thick 2 Carp 2000 5.829 S.F. 5,829.00 1,683.12 2,131.96 0.00

093 Tile 0 0.00 0.00 0.00

093-100 Ceramic Tile 0 0.00 0.00 0.00

5110 CERAMIC TILE Floors, unglazed or glazed, set with tile adhesive D-7 470 11.79 S.F. 655.00 4,350.02 3,833.06 0.00

5800 CERAMIC TILE Walls, unglazed or glazed, set with tile adhesive D-7 490 34.425 S.F. 2,040.00 9,306.99 11,191.95 0.00

093-300 Quarry Tile 0 0.00 0.00 0.00

2800 QUARRY TILE Base, stair tred & riser, 3/4" thick, abrasive D-7 47 12.835 S.F. 302.00 2,046.35 4,185.72 0.00

094 Terrazzo 0 0.00 0.00 0.00

094-200 Precast Terrazzo 0 0.00 0.00 0.00

1600 TERRAZZO, PRECAST Floor tiles, non-slip, 1-1/2" thick, 16" x 16" D-1 21 17.24025 S.F. 181.00 4,790.84 5,696.75 0.00

095 Accoustical Trearment & Wood Flooring 0 0.00 0.00 0.00

095-250 Acoustical Space Units 0 0.00 0.00 0.00

0100 SOUND ABSORBING PANELS Perforated Steel facing, painted, with 0 0.00 0.00 0.00

fiberglass or mineral fiber, no backs, 2-1/4" thick, modular 0 0.00 0.00 0.00

space units, ceiling or wall hung, white or colored 1 Carp 100 0 S.F. 0.00 0.00 0.00 0.00

095-600 Wood Strip Flooring 0 0.00 0.00 0.00

5600 WOOD FLOOR Parquetry, standard, 5/16" thick, not incl. finish, Teak 1 Carp 100 12.93 S.F. 1,293.00 15,307.50 4,654.48 0.00

7800 WOOD FLOOR Sanding & finishing, fill, polyurethane,wax A-1A 295 4.363875 S.F. 1,293.00 1,294.29 1,244.51 273.79

096 Flooring & Carpet 0 0.00 0.00 0.00

096-150 Marble Flooring 0 0.00 0.00 0.00

0200 MARBLE Thin gauge tile, thin set, on floors D-7 60 9.2115 S.F. 276.00 3,108.11 3,001.85 0.00

0300 MARBLE Thin gauge tile, thin set, on walls D-7 52 0 S.F. 0.00 0.00 0.00 0.00

096-350 Brick Flooring 0 0.00 0.00 0.00

0600 FLOORING Sidewalk or Patios, on sand bed, laid flat no mortar, 0 0.00 0.00 0.00

Paving blocks, 4.5 per S.F., herringbone pattern D-1 110 37.645625 S.F. 2,077.00 9,715.69 14,969.35 0.00

096-900 Carpet Tile 0 0.00 0.00 0.00

1100 CARPET TILE Tufted, 24" x 24", 24 oz. nylon 1 Tilf 80 1.175 S.Y. 94.00 3,799.95 425.23 0.00

099 Painting & Wall Covering 0 0.00 0.00 0.00

099-100 Exterior Painting 0 0.00 0.00 0.00

0100 SIDING Exterior, oil base, primer or sealer coat, brushwork 2 Pord 2800 0 S.F. 0.00 0.00 0.00 0.00

0800 SIDING Exterior, oil base paint, two coats, brushwork 2 Pord 1850 0 S.F. 0.00 0.00 0.00 0.00

8100 SIDING Exterior, water base, primer or sealer coat, brushwork 2 Pord 2800 4.70475 S.F. 6,273.00 718.49 1,449.06 0.00

8800 SIDING Exterior, water base paint, two coats, brushwork 2 Pord 1850 7.057125 S.F. 6,273.00 1,328.31 2,294.35 0.00

099-200 Interior Painting 0 0.00 0.00 0.00

1000 CABINETS & CASEWORK Primer coat, oil base, brushwork 1 Pord 680 3.597 S.F. 2,398.00 276.97 1,200.20 0.00

2000 CABINETS & CASEWORK Paint per 1 coat, oil base, brushwork 1 Pord 600 3.89675 S.F. 2,398.00 276.97 1,338.68 0.00

0500 DOORS & WINDOWS Flush door & frame, 3'x7', per side, 0 0.00 0.00 0.00

oil, primer coat, brushwork 1 Pord 17 0.7065 Ea. 12.00 29.57 236.78 0.00

1000 DOORS & WINDOWS Flush door & frame, 3'x7', per side, 0 0.00 0.00 0.00

oil, paint 1 coat, brushwork 1 Pord 16 0.75 Ea. 12.00 28.64 251.79 0.00

2000 DOORS & WINDOWS Panel door & frame, 3'x7', per side, 0 0.00 0.00 0.00

oil, primer coat, brushwork 1 Pord 15 0.599625 Ea. 9.00 19.40 200.97 0.00

2200 DOORS & WINDOWS Panel door & frame, 3'x7', per side, 0 0.00 0.00 0.00

oil, paint 1 coat, brushwork 1 Pord 14 0.642375 Ea. 9.00 18.71 215.70 0.00

6800 DOORS & WINDOWS Windows, incl. frame & trim, 4'x8'opening, 0 0.00 0.00 0.00

per side,oil, primer coat, brushwork 1 Pord 10 4.2 Ea. 42.00 124.51 1,406.79 0.00

7000 DOORS & WINDOWS Windows, incl. frame & trim, 4'x8'opening, 0 0.00 0.00 0.00

per side,oil, paint 1 coat, brushwork 1 Pord 10 4.2 Ea. 42.00 119.66 1,406.79 0.00

3800 MISCELLANEOUS Grilles, per side, oil base, primer coat, brushwork 1 Pord 550 0.465 S.F. 248.00 23.87 152.77 0.00

3920 MISCELLANEOUS Grilles, per side, oil base, paint 2 coats, brushwork 1 Pord 340 0.744 S.F. 248.00 33.42 243.47 0.00

7000 MISCELLANEOUS Trim, wood, incl. puttying under 6" wide 0 0.00 0.00 0.00

Primer coat, oil base, brushwork 1 Pord 900 2.241 L.F. 1,992.00 153.38 728.57 0.00

7450 MISCELLANEOUS Trim, wood, incl. puttying under 6" wide 0 0.00 0.00 0.00

Paint 3 coats, oil base, brushwork 1 Pord 370 5.478 L.F. 1,992.00 383.46 1,802.26 0.00

8000 MISCELLANEOUS Cornice, simple design, wood, 0 0.00 0.00 0.00

Primer coat, oil base, brushwork 1 Pord 550 0.93375 S.F. 498.00 47.93 306.77 0.00

8250 MISCELLANEOUS Cornice, simple design, wood, 0 0.00 0.00 0.00

Paint 1 coat, oil base, brushwork 1 Pord 500 0.996 S.F. 498.00 57.52 335.53 0.00

0240 WALLS & CEILINGS Concrete, drywall or plaster, oil base, primer coat 0 0.00 0.00 0.00

Smooth finish, Roller 1 Pord 2040 2.9145 S.F. 5,829.00 561.04 1,009.87 0.00

0840 WALLS & CEILINGS Concrete, drywall or plaster, oil base, 0 0.00 0.00 0.00

Paint 2 coats, Smooth finish, Roller 1 Pord 1190 5.100375 S.F. 5,829.00 1,122.08 1,683.12 0.00

2000 WALLS & CEILINGS Masonry or concrete block, oil base, primer coat, 0 0.00 0.00 0.00

Smooth finish, brushwork 1 Pord 1224 13.51 S.F. 15,440.00 2,674.98 4,161.08 0.00

2800 WALLS & CEILINGS Masonry or concrete block, oil base, 0 0.00 0.00 0.00

Paint 2 coats, Smooth finish, brushwork 1 Pord 756 21.23 S.F. 15,440.00 3,863.86 6,836.06 0.00

4100 WALLS & CEILINGS Silicone, water repellent, 2 coats, spray 1 Pord 2000 0.8745 S.F. 1,749.00 437.69 0.00 0.00

0010 VARNISH 1 coat + sealer, on wood trim, no sanding included 1 Pord 400 0 S.F. 0.00 0.00 0.00 0.00

0100 VARNISH Harwood floors, 1 coat, no sanding included, brushwork 1 Pord 2380 0 S.F. 0.00 0.00 0.00 0.00

099-700 Wallpaper 0 0.00 0.00 0.00

3600 WALL COVERING Adhesive, 5 gal. lot 0 Gal. 0.00 0.00 0.00 0.00

3700 WALL COVERING Wall paper 1 Pape 640 0 S.F. 0.00 0.00 0.00 0.00

Page 17: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 17 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-100 SPECIALTIES 0 0.00 0.00 0.00

105 Lockers, Protective Covers & Postal Specialties 0 0.00 0.00 0.00

105-520 Mail Boxes 0 0.00 0.00 0.00

0100 MAIL BOXES Horiz., key lock, 5"H x 6"W x 15"D, alum., Front loading 1 Carp 34 0.029375 Ea. 1.00 85.66 10.59 0.00

108 Toilet & Bath Accessories & Scales 0 0.00 0.00 0.00

108-200 Bath Accessories 0 0.00 0.00 0.00

0200 BATHROOM ACCESSORIES Curtain rod, stainless steel, 5' long,1"dia. 1 Carp 13 0.076875 Ea. 1.00 44.28 27.62 0.00

0500 BATHROOM ACCESSORIES Dispenser units, combined soap & towel 0 0.00 0.00 0.00

dispensers, mirror & shelf, flush mounted 1 Carp 10 1 Ea. 10.00 4,908.75 359.98 0.00

1100 BATHROOM ACCESSORIES Grab bar, straight, 1-1/4" dia., 36" long 1 Carp 20 0.5 Ea. 10.00 808.50 179.99 0.00

3500 BATHROOM ACCESSORIES Mirror with 5" stainless steel shelf, 0 0.00 0.00 0.00

3/4" sq. frame, 18" x 24" 1 Carp 20 0.5 Ea. 10.00 1,299.38 179.99 0.00

4200 BATHROOM ACCESSORIES Napkin/Tampon dispenser, recessed 1 Carp 15 0.66625 Ea. 10.00 6,930.00 239.66 0.00

4300 BATHROOM ACCESSORIES Robe hook, single, regular 1 Carp 36 0.2775 Ea. 10.00 175.18 100.10 0.00

4600 BATHROOM ACCESSORIES Soap dispenser, chrome, 0 0.00 0.00 0.00

surface mounted, liquid 1 Carp 20 0.5 Ea. 10.00 741.13 179.99 0.00

6100 BATHROOM ACCESSORIES Toilet tissue dispenser, 0 0.00 0.00 0.00

surface mounted, stainless steel, single roll 1 Carp 30 0.33375 Ea. 10.00 184.80 120.31 0.00

6290 BATHROOM ACCESSORIES Toilet seat 1 Plum 40 0.25 Ea. 10.00 281.05 105.88 0.00

6500 BATHROOM ACCESSORIES Towel bar, stailess steel, 30" long 1 Carp 21 0.47625 Ea. 10.00 452.38 171.33 0.00

0400 MEDICINE CABINETS Sliding mirror doors, 24" x 19" x 8-1/2" 0 0.00 0.00 0.00

unlighted 1 Carp 5 2 Ea. 10.00 2,387.00 721.88 0.00

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-110 EQUIPMENT 0 0.00 0.00 0.00

110 Equipment 0 0.00 0.00 0.00

110-500 Library Equipment 0 0.00 0.00 0.00

0300 LIBRARY EQUIPMENT Bookshelf, metal, 90" high, 10" shelf, 0 0.00 0.00 0.00

single face 1 Carp 12 9.0045 L.F. 108.00 12,474.00 3,232.85 0.00

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-150 MECHANICAL/SANITARY 0 0.00 0.00 0.00

920 Plumbing -Two Fixture Bathroom incl. WC, lav., acc., pipe & fittings 0 System 1.00 1,631.65 2,017.50 0.00

931 Plumbing -Three Fixture Bathroom incl. Bathtub, WC, lav., acc., pipe & fittings 0 System 0.00 0.00 0.00 0.00

933 Plumbing -Three Fixture Bathroom incl. Shower, WC, lav., acc., pipe & fittings 0 System 8.00 19,725.71 24,549.14 0.00

940 Plumbing -Four Fixture Bathroom incl. Shower, Bathtub, WC, lav., acc., pipe & fittings 0 System 0.00 0.00 0.00 0.00

950 Plumbing -Five Fixture Bathroom incl. Shower, Bathtub,WC, 2 lav., acc., pipe & fittings 0 System 1.00 4,966.02 4,241.55 0.00

910 Fire Sprinkler Systems, Wet, ordinary hazard, 2,000S.F. on 1 floor 0 System 2.00 12,696.11 18,928.14 0.00

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT QUANTITY

BARE COSTS

MATERIAL LABOR TOTAL L&M

OUTPUT HOURS COST COST COST

0 0.00 0.00 0.00

DIV-160 ELECTRICAL 0 0.00 0.00 0.00

230 Residential Service-Single Phase, 200 amperes 0 System 2.00 3,016.48 4,573.42 0.00

900 Lighting, Flourescent, incl. fixture, lamp, outlet box & wiring 0 System 0.00 0.00 0.00

910 Lighting, Incandescent, incl. fixture, lamp, outlet box, conduit & wiring 0 System 0.00 0.00 0.00

Page 18: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 18 of 100

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-010 GENERAL REQUIREMENTS 0.00 0.00

010 Overhead & Miscellaneous Data 0.00 0.00

010-000 Overhead 0.00 0.00

0200 Job 0.00 0.00

0600 Public Liability Job 0.00 0.00

0010 PERMITS Job 0.00 0.00

013 Submittals 0.00 0.00

013-300 Survey Data 0.00 0.00

1200 Crew for building layout, 3 man crew A-7 1 24 Day 0.00 0.00 1,500.00 2,887.50

014 Quality Control 0.00 0.00

014-100 Testing Services 0.00 0.00

1800 TESTING, Compressive strength, cylinders, delivered to lab Ea. 0.00 80.00 154.00

015 Construction Facilities & Temporary Controls 0.00 0.00

015-100 Temporary Utilities 0.00 0.00

0350 Lighting, incl. service lamps, wiring & outlets 1-Elec 34 0.235 CSF Flr 2.44 4.70 6.30 12.13

0400 Power for temporary lighting only, per month, minimum per month CSF Flr 0.00 0.00

015-250 Construction Aids 0.00 0.00

0014 STEEL SCAFFOLDING, Rent, 1 use per mo., no plank 0.00 0.00

0090 Building exterior 3 Carp 16.8 1.429 CSF 13.00 25.03 33.50 64.49

0460 Building interior walls, (area) up to 16' high 3 Carp 22.7 1.057 CSF 12.50 24.06 24.50 47.16

0800 Building interior floor area, up to 30' high 3 Carp 90 0.267 CCF 3.90 7.51 6.25 12.03

015-400 Security 0.00 0.00

0010 WATCHMAN Service, monthly basis, uniformed man Hr. 0.00 0.00

ITEM NO. ITEM DESCRIPTION

CREW

UNIT

HOURLY RENT

EQUIP. OPERATOR PER DAY

FACTOR FACTOR COST FACTOR COST

016 Material & Equipment 0.00 0.00

016-400 Equipment Rental 0.00 0.00

0010 0.00 0.00

1300 Finisher, concrete floor, gas, manual, 3 blade, 36" trowel 38.00 Ea. 0.75 1.44 53.50 102.99

1800 Mixer, powered, mortar & concrete, gas 38.60 Ea. 0.95 1.83 51.50 99.14

2120 Pump, concrete, truck mounted, 4" line, 80' boom 542.60 Ea. 9.20 17.71 780.00 1,501.50

2700 Vibrators, concrete, Gas engine, 5H.P. 11.25 Ea. 0.28 0.54 15.00 28.88

0010 0.00 0.00

INSURANCE, All risk type

CONCRETE EQUIPMENT RENTAL without operators

EARTHWORK EQUIPMENT RENTAL without operators

Page 19: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 19 of 100

1300 Vibratory plate compactor, gas, 24" plate, 5000 lb. blow 45.20 Ea. 1.65 3.18 53.50 102.99

0010 GENERAL EQUIPMENT RENTAL 0.00 0.00

7800 Welding Machine, electric, 300 amp 45.80 Ea. 1.85 3.56 51.50 99.14

8100 Wheelbarrow, any size 4.10 Ea. 0.00 6.85 13.19

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

017 Contract Closeout 0.00 0.00

017-100 Final Cleaning 0.00 0.00

0011 CLEANING UP After job completion Project 0.00 0.00

0100 Cleanup of floor area, Final A-5 11.5 1.565 MSF 1.72 3.31 29.00 55.83

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

022 Earthwork 0.00 0.00

022-200 Excavation/Backfill/Compact 0.00 0.00

0010 BACKFILL by hand, no compaction, light soil 1 Clab 14 0.571 C.Y. 0.00 10.60 20.41

0300 COMPACTION in 6" layers, hand tamp 1 Clab 20.6 0.388 C.Y. 0.00 7.20 13.86

0600 COMPACTION in 6" layers, Vibrating plate A-1 60 0.133 C.Y. 0.00 2.47 4.75

0010 EXCAVATING, STRUCTURAL Hand, pits to 6' deep, sandy soil 1 Clab 8 1 C.Y. 0.00 18.55 35.71

1400 EXCAVATING, TRENCH or continuous footing, common earth 0.00 0.00

By hand with pick & shovel to 6' deep, light soil 1 Clab 8 1 C.Y. 0.00 18.55 35.71

022-800 Soil Treatment 0.00 0.00

0020 TERMITE PRETREATMENT, Slab & Walls, residential 1 Skwk 1508 0.005 SF Flr. 0.12 0.23 0.13 0.25

0400 Insecticides for termite control 1 Skwk 14.2 0.563 Gal. 9.50 18.29 13.60 26.18

025 Paving & Surfacing 0.00 0.00

025-100 Walk/Road/Parking Paving 0.00 0.00

0310 SIDEWALKS, DRIVEWAYS & PARKING, concrete 3,000psi, 0.00 0.00

cast in place with 6 x 6 - W1.4 x W1.4 mesh, broomed finish, 0.00 0.00

no base, 4" thick B-24 600 0.04 S.F. 0.92 1.77 0.87 1.67

025-150 Unit Pavers 0.00 0.00

1500 PAVING BLOCKS on 4" thick sand bed laid flat, 4.5 per S.F. D-1 110 0.145 S.F. 2.57 4.95 3.12 6.01

025-800 Pavement Marking 0.00 0.00

0010 PAINTING LINES On pavement, reflectorized white, 4" wide B-78 20000 0.002 L.F. 0.05 0.10 0.05 0.10

026 Piped Utilities 0.00 0.00

026-010 Piped Utilities 0.00 0.00

0200 BEDDING For pipe and conduits, not incl. compaction, sand B-6 150 0.16 C.Y. 3.45 6.64 3.21 6.18

Page 20: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 20 of 100

0500 Compacting bedding in trench A-1 90 0.089 C.Y. 0.00 1.65 3.18

0200 EXCAVATION & BACKFILL hand excavate & trim for pipe 8" dia. 1 Clab 155 0.052 L.F. 0.00 0.96 1.85

027 Sewerage & Drainage 0.00 0.00

027-100 Subdrainage System 0.00 0.00

1020 PIPING, DRAINAGE & SEWAGE, CONCRETE, non- reinforced pipe, 0.00 0.00

Extra strength, T&G joints, 8" diameter B-21 200 0.14 L.F. 3.25 6.26 3.03 5.83

027-400 Septic Systems 0.00 0.00

0100 SEPTIC TANKS Not incl. excav. Or piping, precast, 2,000 gallon B-21 5 5.6 Ea. 810.00 1,559.25 121.00 232.93

2200 Excavation for septic tank, 3/4 C.Y. backhoe B-12F 145 0.11 C.Y. 0.00 2.49 4.79

028 Site Improvements 0.00 0.00

028-100 Irrigation Systems 0.00 0.00

0800 SPRINKLER IRRIGATION SYSTEM for lawns, residential system, 0.00 0.00

custom, 1" diameter supply B-20 2619 0.009 S.F. 0.22 0.42 0.19 0.37

028-300 Fences & Gates 0.00 0.00

1400 Gate for 6' High fence, 1-5/8" frame, 3' wide, galvanized steel B-80 10 3.2 Ea. 63.50 122.24 65.00 125.13

1401 Gate for 6' High fence, 1-5/8" frame, 5' wide, galvanized steel B-81 17 5.4 Ea. 106.00 204.05 108.00 207.90

0600 Fence Grill,Open rail, rustic, 3 rails, 3' high B-1 160 0.15 L.F. 2.99 5.76 2.88 5.54

029 Landscaping 0.00 0.00

(see sub-con details) 0.00 0.00

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-030 CONCRETE 0.00 0.00

031 Concrete Formwork 0.00 0.00

031-100 Struct C.I.P. Formwork 0.00 0.00

0650 FORMS IN PLACE, BEAMS & GIRDERS, 12" wide, 4 use C-2 310 0.155 SFCA 0.76 1.46 3.54 6.81

6150 FORMS IN PLACE, COLUMNS 16" X 16" plywood, 4 use C-1 235 0.136 SFCA 0.57 1.10 3.02 5.81

1150 FORMS IN PLACE, ELEVATED SLABS, flat plate to 15' high, 4 use C-2 560 0.086 S.F. 0.61 1.17 1.96 3.77

0150 FORMS IN PLACE, GRADE BEAM, 4 use C-2 605 0.079 SFCA 0.48 0.92 1.82 3.50

1050 SHORES, Erect & strip, by hand, Vertical members to 13' high 2 Carp 50 0.32 Ea. 0.00 7.45 14.34

0010 WATERSTOP, PVC 1-1/2" diameter 1 Carp 155 0.052 L.F. 1.33 2.56 1.21 2.33

032 Concrete Reinforcement 0.00 0.00

032-100 Reinforcing Steel 0.00 0.00

0102 REINFORCING IN PLACE, Beams & Girders, #3 to #7 4 Rodm 3200 0.01 Lb. 0.25 0.48 0.26 0.50

0202 REINFORCING IN PLACE, Columns, #3 to #7 4 Rodm 3000 0.011 Lb. 0.25 0.48 0.28 0.54

0402 REINFORCING IN PLACE, Elevated Slabs, #4 to #7 4 Rodm 5800 0.006 Lb. 0.26 0.50 0.14 0.27

0502 REINFORCING IN PLACE, Footings, #4 to #7 4 Rodm 4200 0.008 Lb. 0.23 0.44 0.20 0.39

Page 21: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 21 of 100

0602 REINFORCING IN PLACE, Slab on grade, #3 to #7 4 Rodm 4200 0.008 Lb. 0.25 0.48 0.20 0.39

033 Cast-In-Place Concrete 0.00 0.00

033-100 Structural Concrete 0.00 0.00

0150 CONCRETE, READY MIX Regular weight, 3000 psi C.Y. 48.00 92.40 0.00

6800 CONCRETE IN PLACE Incl. forms & reinforcing steel, 0.00 0.00

Stairs, Free standing C-15 120 0.6 LF Nose 5.00 9.63 13.30 25.60

7000 CONCRETE IN PLACE Incl. forms & reinforcing steel, 0.00 0.00

Stair landings, free standing C-15 285 0.253 S.F. 2.10 4.04 5.60 10.78

0050 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Beams & girders, Roof beams, elevated, pumped C-20 40 1.6 C.Y. 0.00 32.00 61.60

0400 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Columns, square or round, pumped C-20 45 1.422 C.Y. 0.00 28.50 54.86

1400 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Elevated slabs, less than 6" thick, pumped C-20 110 0.582 C.Y. 0.00 11.65 22.43

1900 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Footings, continuous, shallow, direct chute C-6 120 0.4 C.Y. 0.00 7.85 15.11

2400 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Footings, spread, under 1 C.Y., direct chute C-6 55 0.873 C.Y. 0.00 17.15 33.01

3200 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Footing Tie Beams & Grade beams, direct chute C-6 150 0.32 C.Y. 0.00 6.30 12.13

4300 PLACING CONCRETE and vibrating, incl. labor & equipment 0.00 0.00

Slab on grade, 4"direct chute C-6 110 0.436 C.Y. 0.00 8.55 16.46

033-450 Concrete Finishing 0.00 0.00

0200 Steel trowel finish, for resilient tiles C-9 625 0.013 S.F. 0.00 0.30 0.58

0950 Cement topping, laid after, 1:1:1-1/2 mix, 2" thick C-10 500 0.048 S.F. 0.51 0.98 1.03 1.98

034 Precast Concrete 0.00 0.00

034-500 Architectural Precast 0.00 0.00

0010 WALL MOLDINGS, Fiberglass reinforced cement D-1 175 0.091 L.F. 4.70 9.05 1.96 3.77

034-800 Precast Specialties 0.00 0.00

1050 LINTELS, Precast concrete, 6" wide, 8" high, stock units to 12' long D-4 190 0.168 L.F. 8.80 16.94 3.57 6.87

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-040 MASONRY 0.00 0.00

041 Mortar & Masonry Accessories 0.00 0.00

041-000 Mortar 0.00 0.00

Page 22: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 22 of 100

0010 CEMENT 40 kg. bag Bag 10.55 20.31 0.00

042 Unit Masonry 0.00 0.00

042-200 Concrete Unit Masonry 0.00 0.00

4100 CONCRETE HOLLOW BLOCKS, 4" thick, tooled joints D-8 430 0.093 S.F. 0.84 1.62 2.04 3.93

4150 CONCRETE HOLLOW BLOCKS, 6" thick, tooled joints D-8 400 0.1 S.F. 1.06 2.04 2.20 4.24

044 Stone 0.00 0.00

044-550 Marble 0.00 0.00

2510 Flooring, polished tiles, 12" x 12" x 3/8" thick, Thin set, average D-11 0 0.267 S.F. 7.65 14.73 6.15 11.84

3550 Thresholds, 3' long, 7/8" thick, 5" wide, Beveled D-12 24 1.333 Ea. 13.90 26.76 29.50 56.79

044-650 Granite 0.00 0.00

0220 GRANITE Cut to size, polished face, 3/4" thick, counter top D-10 130 0.308 S.F. 16.80 32.34 6.50 12.51

044-750 Slate 0.00 0.00

3100 SLATE Stair landings, 1" thick, clear D-1 65 0.246 S.F. 9.90 19.06 5.30 10.20

3600 SLATE Stair treads, sand finish, 1" thick x 12" wide, 3 L.F. to 6 L.F. D-10 120 0.333 L.F. 15.60 30.03 7.50 14.44

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-050 METALS 0.00 0.00

050 Metal Materials, Coatings & Fastenings 0.00 0.00

051-200 Structural Steel 0.00 0.00

1300 STRUCTURAL STEEL ROOF FRAMING, 1 storey, complete system E-5 12.9 6.202 Ton 975.00 1,876.88 160.00 308.00

1600 STRUCTURAL STEEL ROOF FRAMING, 2 storey, complete system E-5 10.6 7.547 Ton 1,150.00 2,213.75 194.00 373.45

055 Metal Fabrications 0.00 0.00

055-200 Handrails & Railings 0.00 0.00

0780 RAILING, PIPE Stainless steel, 3 Rail, 1-1/2" diameter, Mirror finish E-4 120 0.267 L.F. 69.00 132.83 7.05 13.57

0400 RAILING, ORNAMENTAL, Hand forged wrought iron 1-Sswk 12 0.667 L.F. 75.00 144.38 17.35 33.40

055-400 Castings 0.00 0.00

0100 CONSTRUCTION CASTINGS Manhole covers 16" x 16", cast iron E-4 46 0.696 Ea. 60.00 115.50 18.45 35.52

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-060 WOOD & PLASTICS 0.00 0.00

060 Fasteners & Adhesives 0.00 0.00

060-500 Fasteners & Adhesives 0.00 0.00

0700 NAILS Common, 3d to 60d, plain, Galvanized, material only Lb. 0.90 1.73 0.00

Page 23: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 23 of 100

2000 NAILS Finish nails, 4d to 10d, plain, Galvanized, material only Lb. 0.90 1.73 0.00

2700 NAILS Concrete nails, hardened steel, 3/4" to 3" long, plain, Galvanized Lb. 1.15 2.21 0.00

061 Rough Carpentry 0.00 0.00

061-100 Wood Framing 0.00 0.00

6002 FRAMING, CEILINGS Suspended, 2" x 3" F-2 1000 0.016 L.F. 0.22 0.42 0.37 0.71

6082 FRAMING, ROOFS Fascia boards, 2" x 10" F-2 180 0.089 L.F. 0.91 1.75 2.08 4.00

0602 GROUNDS for casework, 1" x 1-1/2" wood strips, on masonry for plaster 1 Carp 225 0.036 L.F. 0.11 0.21 1.07 2.06

061-150 Sheathing 0.00 0.00

0102 SHEATHING Plywood on roof, 1/2" thick F-2 1400 0.011 S.F. 0.36 0.69 0.27 0.52

061-280 Mineral Fiber Cement Panel 0.00 0.00

2100 MINERAL FIBER CEMENT PANEL Hardiflex, incl.panels, fasteners, 0.00 0.00

accessories, trim & sealants, 1/4" thick, flat sheets G-3 1020 0.031 S.F. 5.70 10.97 0.71 1.37

062 Finish Carpentry 0.00 0.00

062-200 Millworks Moldings 0.00 0.00

0550 MOLDINGS, BASE Baseboard, Wood, 1" x 4" 1 Carp 200 0.04 L.F. 0.80 1.54 0.93 1.79

0110 MOLDINGS, CASINGS Wood, 1" x 3-1/2" 1 Carp 220 0.036 L.F. 1.36 2.62 0.85 1.64

1300 MOLDINGS, CEILINGS Wood, 1" x 3" 1 Carp 300 0.027 L.F. 0.73 1.41 0.62 1.19

3170 MOLDINGS, WINDOW & DOOR Door trim set, 1 head 2 sides, 4-1/2"wide 1 Carp 5.3 1.509 Opng. 40.00 77.00 35.50 68.34

228-5950 MOLDINGS, WINDOW & DOOR Window trim sets,incl. casings, 0.00 0.00

header, stops, stool & apron, 2-1/2" wide, average 1 Carp 10 0.8 Opng. 19.00 36.58 18.70 36.00

062-300 Shelving 0.00 0.00

0700 SHELVING Plywood, 3/4" thick with lumber edge, 24" wide F-1 70 0.114 L.F. 2.05 3.95 2.67 5.14

064 Architectural Woodwork 0.00 0.00

064-100 Custom Casework 0.00 0.00

0840 CABINETS Kitchen base cabinets, hardwoodn not incl. counter top 0.00 0.00

24" deep, 35" high, prefinished, one top drawer, one door below, 18" wide 2 Carp 23.3 0.687 Ea. 105.00 202.13 16.05 30.90

1540 CABINETS Range or sink base, two doors below, 36" wide 2 Carp 20.3 0.788 Ea. 135.00 259.88 18.40 35.42

4720 CABINETS Kitchen wall cabinets, hardwood, 12" deep with two doors 0.00 0.00

24" high, 36" wide 2 Carp 22.7 0.705 Ea. 125.00 240.63 16.45 31.67

0100 CASEWORK, FRAMES Base cabinets, counter storage, 36" high, one bay 0.00 0.00

18" wide 1 Carp 2.7 2.963 Ea. 80.00 154.00 69.00 132.83

9800 CASEWORK, FRAMES Wardrobe, 7' high, single, 24" wide 1 Carp 2.7 2.963 Ea. 105.00 202.13 69.00 132.83

5600 CABINET DOORS Hardwood raised panel, 18" wide, 30" high 1 Carp 14 0.571 Ea. 28.50 54.86 13.35 25.70

1040 CABINET HARDWARE Catches, maximum 1 Carp 80 0.1 Ea. 3.60 6.93 2.34 4.50

2340 CABINET HARDWARE Door handles & pulls, projecting, wood, maximum 1 Carp 68 0.118 Ea. 3.20 6.16 2.75 5.29

3040 CABINET HARDWARE Drawer tracks/glides, maximum 1 Carp 24 0.333 Pr. 16.00 30.80 7.80 15.02

4042 CABINET HARDWARE Cabinet hinges, maximum 1 Carp 68 0.118 Pr. 6.00 11.55 2.75 5.29

Page 24: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 24 of 100

8100 VANITIES Vanity bases, 2 doors, 30" high, 21" deep, 36" wide 2 Carp 13.33 1.2 Ea. 245.00 471.63 28.00 53.90

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-070 THERMAL & MOISTURE PROTECTION 0.00 0.00

071 Waterproofing & Dampproofing 0.00 0.00

071-100 Sheet Waterproofing 0.00 0.00

2100 ELASTOMERIC WATERPROOFING Fiberglass reinforced, fluid applied 2 Rofc 500 0.032 S.F. 1.14 2.19 0.68 1.31

0600 MEMBRANE WATERPROOFING On slabs, 3 ply, felt G-1 2100 0.027 S.F. 0.41 0.79 0.53 1.02

072 Insulation & Fireproofing 0.00 0.00

072-200 Roof & Deck Insulation 0.00 0.00

0460 ROOF INSULATION Fibergalss in 4' x 8' sheets, 1-1/16" thick, R3.8 1 Rofc 1000 0.008 S.F. 0.50 0.96 0.17 0.33

073 Shingles & Roof Tiles 0.00 0.00

073-100 Shingles 0.00 0.00

0150 ASPHALT SHINGLES Standard strip shingles, Inorganic, class A 1 Rofc 5.5 1.455 Sq. 28.00 53.90 31.00 59.68

0700 ASPHALT SHINGLES Hip & Ridge roll shingles 1 Rofc 400 0.02 L.F. 0.45 0.87 0.43 0.83

074 Preformed Roofing & Siding 0.00 0.00

074-100 Preformed Panels 0.00 0.00

0700 STEEL ROOFING Coloured, ribbed, on steel frame, 26 gauge G-3 1000 0.032 S.F. 0.80 1.54 0.72 1.39

076 Flashing & Sheet Metal 0.00 0.00

076-200 Sheet Metal Flash & Trim 0.00 0.00

0010 FLASHING Gauge 24, colored, wall type, 24" wide 1 Shee 145 0.055 S.F. 0.26 0.50 1.47 2.83

2800 GUTTERS 26 gauge galvanized steel, colored, S-type, 36" wide 1 Shee 120 0.067 L.F. 0.95 1.83 1.78 3.43

0010 GUTTER GUARD 6" wide strip, aluminum mesh 1 Carp 500 0.016 L.F. 0.39 0.75 0.37 0.71

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-080 DOORS & WINDOWS 0.00 0.00

081 Metal Doors & Frames 0.00 0.00

081-100 Steel Doors & Frames 0.00 0.00

0600 RESIDENTIAL STEEL DOOR Prehung, insulated, exterior, 0.00 0.00

Embossed, full panel, 3'-0" wide x 7'-0" high F-2 15 1.067 Ea. 185.00 356.13 25.00 48.13

0100 STEEL FRAMES, KNOCK DOWN 18 gauge, up to 5-3/4" deep 0.00 0.00

7'-0" high, 3'-0" wide, single F-2 16 1 Ea. 65.50 126.09 23.50 45.24

082 Wood & Platic Doors 0.00 0.00

Page 25: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 25 of 100

082-050 Wood & Plastic Doors 0.00 0.00

0440 WOOD FRAMES Exterior frame, incl. ext. trim, 2" x 6" deep F-2 375 0.043 L.F. 3.68 7.08 1.00 1.93

3040 WOOD FRAMES Interior frame, 2" x 5" deep F-2 375 0.043 L.F. 3.42 6.58 1.00 1.93

0380 WOOD DOOR, ARCHITECTURAL Flush, interior, 7 ply, hollow core 0.00 0.00

Walnut face, 3'-0" wide x 7'-0" high F-2 17 0.941 Ea. 112.00 215.60 22.00 42.35

1720 WOOD DOOR, ARCHITECTURAL Flush, interior, 7 ply, 0.00 0.00

H.P. plastic laminate, 2'-0" wide x 7'-0" high F-2 16 1 Ea. 99.00 190.58 23.50 45.24

4020 WOOD DOORS, DECORATOR Hand curved door 0.00 0.00

Mahogany, 3'-0" wide x 7'-0" high F-2 14 1.143 Ea. 510.00 981.75 26.50 51.01

1780 WOOD DOORS, PANELED Interior, six panel, hollow core, 1-3/8" thick 0.00 0.00

Molded hardboard, 3'-0" wide x 7'-0" high F-2 13 1.231 Ea. 183.00 352.28 28.50 54.86

1020 WOOD DOORS Entrance door, 1-3/4" x 3'-0" x 7'-0", six panel F-2 15 1.067 Ea. 305.00 587.13 25.00 48.13

3280 WOOD DOORS Interior closet, bi-fold, with hardware, no frame or trim 0.00 0.00

Louvered, pine, 6'-8" x 6'-0" wide F-2 10 1.6 Ea. 145.00 279.13 37.50 72.19

083-100 Sliding Doors 0.00 0.00

0100 GLASS, SLIDING Wood, 1/2" tempered insul. Glass, 6'-0" wide 2 Carp 4 4 Ea. 680.00 1,309.00 93.50 179.99

0450 GLASS, SLIDING Aluminum, 1/2" tempered insul. Glass, 6'-0" wide 2 Carp 4 4 Ea. 290.00 558.25 93.50 179.99

083-800 Sound Retardant Doors 0.00 0.00

0010 ACOUSTICAL Incl. framed seals, 3'-0" x 7'-0", wood, 27 STC rating F-2 1.5 10.667 Ea. 485.00 933.63 249.00 479.33

085 Metal Windows 0.00 0.00

085-100 Steel Windows 0.00 0.00

0100 STEEL SASH Custom units, glazing & trim not included, 0.00 0.00

Casement, 100% vented, 2 Sswk 200 0.08 S.F. 27.00 51.98 2.08 4.00

2500 STEEL SASH Picture window, glazing & trim not included, 2 Sswk 200 0.08 S.F. 10.75 20.69 2.08 4.00

085-200 Aluminum Windows 0.00 0.00

0300 ALUMINUM SASH Stock, grade C, glazed & trim not incl., Sliding 2 Sswk 200 0.08 S.F. 11.20 21.56 2.08 4.00

087 Hardware 0.00 0.00

087-100 Finish Hardware 0.00 0.00

0020 DEADLOCKS Mortise, heavy duty, double cylinder 1 Carp 9 0.889 Ea. 104.00 200.20 21.00 40.43

1200 DEADLOCKS Night latch, outside key 1 Carp 10 0.8 Ea. 50.00 96.25 18.70 36.00

1900 DOORSTOPS Holder & bumper, plunger type, door mounted 1 Carp 24 0.333 Ea. 22.00 42.35 7.80 15.02

0010 ENTRANCE LOCKS Cylinder, grip handle, deadlocking latch 1 Carp 9 0.889 Ea. 89.00 171.33 21.00 40.43

0400 HINGES Full mortise, avg.freq., brass base, 4-1/2" x 4-1/2" US10 Pr. 30.00 57.75 0.00

0010 KICKPLATE 6" high, for 3' door, stainless steel 1 Carp 15 0.533 Ea. 16.80 32.34 12.45 23.97

1700 LOCKSET Standard duty, cylindrical, with sectional trim, 0.00 0.00

residential, interior door 1 Carp. 16 0.5 Ea. 11.00 21.18 11.70 22.52

0020 MORTISE LOCKSET Comm., wrought knobs & full escutheon trim 0.00 0.00

Page 26: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 26 of 100

Non-keyed, passage 1 Carp 9 0.889 Ea. 120.00 231.00 21.00 40.43

087-200 Operators 0.00 0.00

0010 AUTOMATIC OPENERS Double simultaneous doors, one way 2 Skwk 1.7 37.778 Pr. 2,390.00 4,600.75 910.00 1,751.75

2400 DOOR CLOSER Rack & pinion, Top jamb mount, regular arm 1 Carp 6 1.333 Ea. 108.00 207.90 31.00 59.68

087-500 Door/Window Accessories 0.00 0.00

1000 DOOR ACCESSORIES Knockers, brass, standard 1 Carp 16 0.5 Ea. 33.50 64.49 11.70 22.52

088 Glazing 0.00 0.00

088-100 Glass 0.00 0.00

0010 REFLECTIVE GLASS 1/4" float with fused metallic oxide, tinted 2 Glaz 115 0.139 S.F. 7.50 14.44 3.27 6.29

0010 WINDOW GLASS Clear Float, stops, putty bed, 1/8" thick 2 Glaz 480 0.033 S.F. 2.00 3.85 0.78 1.50

089 Glazed Curtain Wallls 0.00 0.00

089-200 Glazed Curtain Walll 0.00 0.00

0010 WINDOW WALLS Aluminum, stock, including glazing H-2 160 0.15 S.F. 20.50 39.46 3.28 6.31

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-090 FINISHES 0.00 0.00

01 Metal Support Sytems 0.00 0.00

092-050 Furring & Lathing 0.00 0.00

8720 FURRING Suspended ceilings, including, 2" carriers, 24" O.C., with 0.00 0.00

3/4" channels,24" O.C. 1 Lath 190 0.042 S.F. 0.35 0.67 0.98 1.89

092 Lath, Plaster & Gypsum Board 0.00 0.00

092-100 Gypsum/Cement Plaster 0.00 0.00

0310 CEMENT PLASTER 3/4" thick, troweled finish, on walls J-1 105 0.381 S.Y. 3.09 5.95 8.10 15.59

092-600 Gypsum/Plywood/Cement Board System 0.00 0.00

0150 DRYWALL Plywood, nailed or screwed to studs, on ceilings, 1/4" thick 2 Carp 2000 0.008 S.F. 0.15 0.29 0.19 0.37

093 Tile 0.00 0.00

093-100 Ceramic Tile 0.00 0.00

5110 CERAMIC TILE Floors, unglazed or glazed, set with tile adhesive D-7 470 0.144 S.F. 3.45 6.64 3.04 5.85

5800 CERAMIC TILE Walls, unglazed or glazed, set with tile adhesive D-7 490 0.135 S.F. 2.37 4.56 2.85 5.49

093-300 Quarry Tile 0.00 0.00

2800 QUARRY TILE Base, stair tred & riser, 3/4" thick, abrasive D-7 47 0.34 S.F. 3.52 6.78 7.20 13.86

094 Terrazzo 0.00 0.00

094-200 Precast Terrazzo 0.00 0.00

1600 TERRAZZO, PRECAST Floor tiles, non-slip, 1-1/2" thick, 16" x 16" D-1 21 0.762 S.F. 13.75 26.47 16.35 31.47

095 Accoustical Trearment & Wood Flooring 0.00 0.00

Page 27: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 27 of 100

095-250 Acoustical Space Units 0.00 0.00

0100 SOUND ABSORBING PANELS Perforated Steel facing, painted, with 0.00 0.00

fiberglass or mineral fiber, no backs, 2-1/4" thick, modular 0.00 0.00

space units, ceiling or wall hung, white or colored 1 Carp 100 0.08 S.F. 4.40 8.47 1.87 3.60

095-600 Wood Strip Flooring 0.00 0.00

5600 WOOD FLOOR Parquetry, standard, 5/16" thick, not incl. finish, Teak 1 Carp 100 0.08 S.F. 6.15 11.84 1.87 3.60

7800 WOOD FLOOR Sanding & finishing, fill, polyurethane,wax A-1A 295 0.027 S.F. 0.52 1.00 0.50 0.96

096 Flooring & Carpet 0.00 0.00

096-150 Marble Flooring 0.00 0.00

0200 MARBLE Thin gauge tile, thin set, on floors D-7 60 0.267 S.F. 5.85 11.26 5.65 10.88

0300 MARBLE Thin gauge tile, thin set, on walls D-7 52 0.308 S.F. 5.85 11.26 6.50 12.51

096-350 Brick Flooring 0.00 0.00

0600 FLOORING Sidewalk or Patios, on sand bed, laid flat no mortar, 0.00 0.00

Paving blocks, 4.5 per S.F., herringbone pattern D-1 110 0.145 S.F. 2.43 4.68 3.74 7.21

096-900 Carpet Tile 0.00 0.00

1100 CARPET TILE Tufted, 24" x 24", 24 oz. nylon 1 Tilf 80 0.1 S.Y. 21.00 40.43 2.35 4.52

099 Painting & Wall Covering 0.00 0.00

099-100 Exterior Painting 0.00 0.00

0100 SIDING Exterior, oil base, primer or sealer coat, brushwork 2 Pord 2800 0.006 S.F. 0.07 0.13 0.12 0.23

0800 SIDING Exterior, oil base paint, two coats, brushwork 2 Pord 1850 0.009 S.F. 0.13 0.25 0.19 0.37

8100 SIDING Exterior, water base, primer or sealer coat, brushwork 2 Pord 2800 0.006 S.F. 0.06 0.11 0.12 0.23

8800 SIDING Exterior, water base paint, two coats, brushwork 2 Pord 1850 0.009 S.F. 0.11 0.21 0.19 0.37

099-200 Interior Painting 0.00 0.00

1000 CABINETS & CASEWORK Primer coat, oil base, brushwork 1 Pord 680 0.012 S.F. 0.06 0.12 0.26 0.50

2000 CABINETS & CASEWORK Paint per 1 coat, oil base, brushwork 1 Pord 600 0.013 S.F. 0.06 0.12 0.29 0.56

0500 DOORS & WINDOWS Flush door & frame, 3'x7', per side, 0.00 0.00

oil, primer coat, brushwork 1 Pord 17 0.471 Ea. 1.28 2.46 10.25 19.73

1000 DOORS & WINDOWS Flush door & frame, 3'x7', per side, 0.00 0.00

oil, paint 1 coat, brushwork 1 Pord 16 0.5 Ea. 1.24 2.39 10.90 20.98

2000 DOORS & WINDOWS Panel door & frame, 3'x7', per side, 0.00 0.00

oil, primer coat, brushwork 1 Pord 15 0.533 Ea. 1.12 2.16 11.60 22.33

2200 DOORS & WINDOWS Panel door & frame, 3'x7', per side, 0.00 0.00

oil, paint 1 coat, brushwork 1 Pord 14 0.571 Ea. 1.08 2.08 12.45 23.97

6800 DOORS & WINDOWS Windows, incl. frame & trim, 4'x8'opening, 0.00 0.00

per side,oil, primer coat, brushwork 1 Pord 10 0.8 Ea. 1.54 2.96 17.40 33.50

7000 DOORS & WINDOWS Windows, incl. frame & trim, 4'x8'opening, 0.00 0.00

per side,oil, paint 1 coat, brushwork 1 Pord 10 0.8 Ea. 1.48 2.85 17.40 33.50

Page 28: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 28 of 100

3800 MISCELLANEOUS Grilles, per side, oil base, primer coat, brushwork 1 Pord 550 0.015 S.F. 0.05 0.10 0.32 0.62

3920 MISCELLANEOUS Grilles, per side, oil base, paint 2 coats, brushwork 1 Pord 340 0.024 S.F. 0.07 0.13 0.51 0.98

7000 MISCELLANEOUS Trim, wood, incl. puttying under 6" wide 0.00 0.00

Primer coat, oil base, brushwork 1 Pord 900 0.009 L.F. 0.04 0.08 0.19 0.37

7450 MISCELLANEOUS Trim, wood, incl. puttying under 6" wide 0.00 0.00

Paint 3 coats, oil base, brushwork 1 Pord 370 0.022 L.F. 0.10 0.19 0.47 0.90

8000 MISCELLANEOUS Cornice, simple design, wood, 0.00 0.00

Primer coat, oil base, brushwork 1 Pord 550 0.015 S.F. 0.05 0.10 0.32 0.62

8250 MISCELLANEOUS Cornice, simple design, wood, 0.00 0.00

Paint 1 coat, oil base, brushwork 1 Pord 500 0.016 S.F. 0.06 0.12 0.35 0.67

0240 WALLS & CEILINGS Concrete, drywall or plaster, oil base, primer coat 0.00 0.00

Smooth finish, Roller 1 Pord 2040 0.004 S.F. 0.05 0.10 0.09 0.17

0840 WALLS & CEILINGS Concrete, drywall or plaster, oil base, 0.00 0.00

Paint 2 coats, Smooth finish, Roller 1 Pord 1190 0.007 S.F. 0.10 0.19 0.15 0.29

2000 WALLS & CEILINGS Masonry or concrete block, oil base, primer coat, 0.00 0.00

Smooth finish, brushwork 1 Pord 1224 0.007 S.F. 0.09 0.17 0.14 0.27

2800 WALLS & CEILINGS Masonry or concrete block, oil base, 0.00 0.00

Paint 2 coats, Smooth finish, brushwork 1 Pord 756 0.011 S.F. 0.13 0.25 0.23 0.44

4100 WALLS & CEILINGS Silicone, water repellent, 2 coats, spray 1 Pord 2000 0.004 S.F. 0.13 0.25 0.00 0.00

0010 VARNISH 1 coat + sealer, on wood trim, no sanding included 1 Pord 400 0.02 S.F. 0.08 0.15 0.43 0.83

0100 VARNISH Harwood floors, 1 coat, no sanding included, brushwork 1 Pord 2380 0.003 S.F. 0.08 0.15 0.07 0.13

099-700 Wallpaper 0.00 0.00

3600 WALL COVERING Adhesive, 5 gal. lot Gal. 6.95 13.38 0.00

3700 WALL COVERING Wall paper 1 Pape 640 0.013 S.F. 0.22 0.42 0.27 0.52

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-100 SPECIALTIES 0.00 0.00

105 Lockers, Protective Covers & Postal Specialties 0.00 0.00

105-520 Mail Boxes 0.00 0.00

0100 MAIL BOXES Horiz., key lock, 5"H x 6"W x 15"D, alum., Front loading 1 Carp 34 0.235 Ea. 44.50 85.66 5.50 10.59

108 Toilet & Bath Accessories & Scales 0.00 0.00

108-200 Bath Accessories 0.00 0.00

0200 BATHROOM ACCESSORIES Curtain rod, stainless steel, 5' long,1"dia. 1 Carp 13 0.615 Ea. 23.00 44.28 14.35 27.62

0500 BATHROOM ACCESSORIES Dispenser units, combined soap & towel 0.00 0.00

dispensers, mirror & shelf, flush mounted 1 Carp 10 0.8 Ea. 255.00 490.88 18.70 36.00

1100 BATHROOM ACCESSORIES Grab bar, straight, 1-1/4" dia., 36" long 1 Carp 20 0.4 Ea. 42.00 80.85 9.35 18.00

Page 29: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 29 of 100

3500 BATHROOM ACCESSORIES Mirror with 5" stainless steel shelf, 0.00 0.00

3/4" sq. frame, 18" x 24" 1 Carp 20 0.4 Ea. 67.50 129.94 9.35 18.00

4200 BATHROOM ACCESSORIES Napkin/Tampon dispenser, recessed 1 Carp 15 0.533 Ea. 360.00 693.00 12.45 23.97

4300 BATHROOM ACCESSORIES Robe hook, single, regular 1 Carp 36 0.222 Ea. 9.10 17.52 5.20 10.01

4600 BATHROOM ACCESSORIES Soap dispenser, chrome, 0.00 0.00

surface mounted, liquid 1 Carp 20 0.4 Ea. 38.50 74.11 9.35 18.00

6100 BATHROOM ACCESSORIES Toilet tissue dispenser, 0.00 0.00

surface mounted, stainless steel, single roll 1 Carp 30 0.267 Ea. 9.60 18.48 6.25 12.03

6290 BATHROOM ACCESSORIES Toilet seat 1 Plum 40 0.2 Ea. 14.60 28.11 5.50 10.59

6500 BATHROOM ACCESSORIES Towel bar, stailess steel, 30" long 1 Carp 21 0.381 Ea. 23.50 45.24 8.90 17.13

0400 MEDICINE CABINETS Sliding mirror doors, 24" x 19" x 8-1/2" 0.00 0.00

unlighted 1 Carp 5 1.6 Ea. 124.00 238.70 37.50 72.19

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-110 EQUIPMENT 0.00 0.00

110 Equipment 0.00 0.00

110-500 Library Equipment 0.00 0.00

0300 LIBRARY EQUIPMENT Bookshelf, metal, 90" high, 10" shelf, 0.00 0.00

single face 1 Carp 12 0.667 L.F. 60.00 115.50 15.55 29.93

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-150 MECHANICAL/SANITARY 0.00 0.00

920 Plumbing -Two Fixture Bathroom incl. WC, lav., acc., pipe & fittings System 847.61 1,631.65 1,048.05 2,017.50

931 Plumbing -Three Fixture Bathroom incl. Bathtub, WC, lav., acc., pipe & fittings System 1,205.00 2,319.63 1,233.96 2,375.37

933 Plumbing -Three Fixture Bathroom incl. Shower, WC, lav., acc., pipe & fittings System 1,280.89 2,465.71 1,594.10 3,068.64

940 Plumbing -Four Fixture Bathroom incl. Shower, Bathtub, WC, lav., acc., pipe & fittings System 1,650.55 3,177.31 1,873.00 3,605.53

950 Plumbing -Five Fixture Bathroom incl. Shower, Bathtub,WC, 2 lav., acc., pipe & fittings System 2,579.75 4,966.02 2,203.40 4,241.55

910 Fire Sprinkler Systems, Wet, ordinary hazard, 2,000S.F. on 1 floor System 3,297.69 6,348.05 4,916.40 9,464.07

ITEM NO. ITEM DESCRIPTION CREW

DAILY MAN

UNIT

BARE COSTS

MATERIAL LABOR

OUTPUT HOURS FACTOR COST FACTOR COST

DIV-160 ELECTRICAL 0.00 0.00

230 Residential Service-Single Phase, 200 amperes System 783.50 1,508.24 1,187.90 2,286.71

Page 30: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 30 of 100

900 Lighting, Flourescent, incl. fixture, lamp, outlet box & wiring System 90.91 175.00 152.90 294.33

910 Lighting, Incandescent, incl. fixture, lamp, outlet box, conduit & wiring System 21.97 42.29 95.35 183.55

Page 31: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 31 of 100

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.25 percent 0.00

0.00 1.55 percent 0.00

0.00 0.50 percent 0.00

0.00 0.00

0.00 0.00

0.00 0.00 4,387.50 2,887.50

0.00 0.00

0.00 0.00

0.00 234.00 154.00

0.00 0.00

0.00 0.00

0.00 0.00 25.56 16.82

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 136.01 89.51

0.00 0.00 108.23 71.23

0.00 0.00 29.69 19.54

0.00 0.00

0.00 6.90 0.00

RENT CREW

PER WEEK PER MONTH EQUIP.

FACTOR COST FACTOR COST COST

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

160.00 308.00 480.00 924.00 73.15

155.00 298.38 465.00 895.13 74.31

2,345.00 4,514.13 7,025.00 13,523.13 1,044.51

45.00 86.63 135.00 259.88 21.66

0.00 0.00 0.00

Page 32: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 32 of 100

160.00 308.00 480.00 924.00 87.01

0.00 0.00 0.00

155.00 298.38 465.00 895.13 88.17

20.50 39.46 61.50 118.39 7.89

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.30 percent #VALUE!

3.33 6.41 34.05 65.55

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 10.60 20.41

0.00 7.20 13.86

0.98 1.89 3.45 6.64

0.00 18.55 35.71

0.00 0.00

0.00 18.55 35.71

0.00 0.00

0.25 0.48 0.34 0.65

0.00 23.10 44.47

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 1.79 3.45

0.00 0.00

0.00 5.69 10.95

0.00 0.00

0.02 0.04 0.12 0.23

0.00 0.00

0.00 0.00

1.34 2.58 8.00 15.40

Page 33: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 33 of 100

0.65 1.25 2.30 4.43

0.00 0.60 1.16

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.56 1.08 6.84 13.17

0.00 0.00

22.50 43.31 953.50 1,835.49

3.13 6.03 5.62 10.82

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.41 0.79

0.00 0.00

42.50 81.81 171.00 329.18

71.00 136.68 285.00 548.63

0.00 5.87 11.30

0.00 0.00

0.00 0.00

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.11 0.21 4.41 8.49

0.10 0.19 3.69 7.10

0.06 0.12 2.63 5.06

0.05 0.10 2.35 4.52

0.00 7.45 14.34

0.00 2.54 4.89

0.00 0.00

0.00 0.00

0.00 0.51 0.98

0.00 0.53 1.02

0.00 0.40 0.77

0.00 0.43 0.83

Page 34: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 34 of 100

0.00 0.45 0.87

0.00 0.00

0.00 0.00

0.00 48.00 92.40

0.00 0.00

0.44 0.85 18.74 36.07

0.00 0.00

0.19 0.37 7.89 15.19

0.00 0.00

15.20 29.26 47.20 90.86

0.00 0.00

13.50 25.99 42.00 80.85

0.00 0.00

5.50 10.59 17.15 33.01

0.00 0.00

0.54 1.04 8.39 16.15

0.00 0.00

1.18 2.27 18.33 35.29

0.00 0.00

0.43 0.83 6.73 12.96

0.00 0.00

0.59 1.14 9.14 17.59

0.00 0.00

0.06 0.12 0.36 0.69

0.15 0.29 1.69 3.25

0.00 0.00

0.00 0.00

0.00 6.66 12.82

0.00 0.00

0.72 1.39 13.09 25.20

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

Page 35: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 35 of 100

0.00 10.55 20.31

0.00 0.00

0.00 0.00

0.00 2.88 5.54

0.00 3.26 6.28

0.00 0.00

0.00 0.00

0.00 13.80 26.57

0.00 43.40 83.55

0.00 0.00

3.39 6.53 27.14 52.24

0.00 0.00

0.00 15.20 29.26

3.68 7.08 26.78 51.55

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

88.00 169.40 1,223.00 2,354.28

107.00 205.98 1,451.00 2,793.18

0.00 0.00

0.00 0.00

0.61 1.17 76.66 147.57

0.00 92.35 177.77

0.00 0.00

1.59 3.06 80.04 154.08

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.90 1.73

Page 36: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 36 of 100

0.00 0.90 1.73

0.00 1.15 2.21

0.00 0.00

0.00 0.00

0.02 0.04 0.61 1.17

0.09 0.17 3.08 5.93

0.00 1.18 2.27

0.00 0.00 0.00

0.01 0.02 0.64 1.23

0.00 0.00

0.00 0.00

0.02 0.04 6.43 12.38

0.00 0.00

0.00 0.00

0.00 1.91 3.68

0.00 2.21 4.25

0.00 1.35 2.60

0.00 75.50 145.34

0.00 0.00

0.00 37.70 72.57

0.00 0.00

0.12 0.23 4.84 9.32

0.00 0.00

0.00 0.00

0.00 0.00

0.00 121.05 233.02

0.00 153.40 295.30

0.00 0.00

0.00 141.45 272.29

0.00 0.00

0.00 149.00 286.83

0.00 174.00 334.95

0.00 41.85 80.56

0.00 5.94 11.43

0.00 5.50 10.59

0.00 23.80 45.82

0.00 8.75 16.84

Page 37: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 37 of 100

0.00 273.00 525.53

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 1.82 3.50

0.07 0.13 1.01 1.94

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.67 1.29

0.00 0.00

0.00 0.00

0.00 59.00 113.58

0.00 0.88 1.69

0.00 0.00

0.00 0.00

0.02 0.04 1.54 2.96

0.00 0.00

0.00 0.00

0.00 1.73 3.33

0.00 2.73 5.26

0.00 0.76 1.46

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

1.10 2.12 211.10 406.37

0.00 0.00

1.03 1.98 90.03 173.31

0.00 0.00

Page 38: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 38 of 100

0.00 0.00

0.04 0.08 4.72 9.09

0.04 0.08 4.46 8.59

0.00 0.00

0.97 1.87 134.97 259.82

0.00 0.00

1.03 1.98 123.53 237.80

0.00 0.00

1.18 2.27 537.68 1,035.03

0.00 0.00

1.27 2.44 212.77 409.58

1.10 2.12 331.10 637.37

0.00 0.00

1.65 3.18 184.15 354.49

0.00 0.00

0.00 773.50 1,488.99

0.00 383.50 738.24

0.00 0.00

11.00 21.18 745.00 1,434.13

0.00 0.00

0.00 0.00

0.00 0.00

0.00 29.08 55.98

0.00 12.83 24.70

0.00 0.00

0.00 13.28 25.56

0.00 0.00

0.00 0.00

0.00 125.00 240.63

0.00 68.70 132.25

0.00 29.80 57.37

0.00 110.00 211.75

0.00 30.00 57.75

0.00 29.25 56.31

0.00 0.00

0.00 22.70 43.70

0.00 0.00

Page 39: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 39 of 100

0.00 141.00 271.43

0.00 0.00

0.00 3,300.00 6,352.50

0.00 139.00 267.58

0.00 0.00

0.00 45.20 87.01

0.00 0.00

0.00 0.00

0.00 10.77 20.73

0.00 2.78 5.35

0.00 0.00

0.00 0.00

0.00 23.78 45.78

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 1.33 2.56

0.00 0.00

0.00 0.00

0.37 0.71 11.56 22.25

0.00 0.00

0.00 0.34 0.65

0.00 0.00

0.00 0.00

0.00 6.49 12.49

0.00 5.22 10.05

0.00 0.00

0.00 10.72 20.64

0.00 0.00

0.00 0.00

0.00 30.10 57.94

0.00 0.00

Page 40: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 40 of 100

0.00 0.00

0.00 0.00

0.00 0.00

0.00 6.27 12.07

0.00 0.00

0.00 8.02 15.44

0.11 0.21 1.13 2.18

0.00 0.00

0.00 0.00

0.00 11.50 22.14

0.00 12.35 23.77

0.00 0.00

0.00 0.00

0.00 6.17 11.88

0.00 0.00

0.00 23.35 44.95

0.00 0.00

0.00 0.00

0.00 0.19 0.37

0.00 0.32 0.62

0.00 0.18 0.35

0.00 0.30 0.58

0.00 0.00

0.00 0.32 0.62

0.00 0.35 0.67

0.00 0.00

0.00 11.53 22.20

0.00 0.00

0.00 12.14 23.37

0.00 0.00

0.00 12.72 24.49

0.00 0.00

0.00 13.53 26.05

0.00 0.00

0.00 18.94 36.46

0.00 0.00

0.00 18.88 36.34

Page 41: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 41 of 100

0.00 0.37 0.71

0.00 0.58 1.12

0.00 0.00

0.00 0.23 0.44

0.00 0.00

0.00 0.57 1.10

0.00 0.00

0.00 0.37 0.71

0.00 0.00

0.00 0.41 0.79

0.00 0.00

0.00 0.14 0.27

0.00 0.00

0.00 0.25 0.48

0.00 0.00

0.00 0.23 0.44

0.00 0.00

0.00 0.36 0.69

0.00 0.22 0.42

0.00 0.51 0.98

0.00 0.15 0.29

0.00 0.00

0.00 6.95 13.38

0.00 0.49 0.94

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 50.00 96.25

0.00 0.00

0.00 0.00

0.00 37.35 71.90

0.00 0.00

0.00 273.70 526.87

0.00 51.35 98.85

Page 42: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 42 of 100

0.00 0.00

0.00 76.85 147.94

0.00 372.45 716.97

0.00 14.30 27.53

0.00 0.00

0.00 47.85 92.11

0.00 0.00

0.00 15.85 30.51

0.00 20.10 38.69

0.00 32.40 62.37

0.00 0.00

0.00 161.50 310.89

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 75.55 145.43

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 1,895.66 3,649.15

0.00 2,438.96 4,695.00

0.00 2,874.99 5,534.36

0.00 3,523.55 6,782.83

0.00 4,783.15 9,207.56

0.00 8,214.09 15,812.12

BARE COSTS

EQUIPMENT TOTAL REMARKS

FACTOR COST FACTOR COST

0.00 0.00

0.00 1,971.40 3,794.95

Page 43: Productivity Rates

PROJECT: PROPOSED 8-BEDROOMS TWO STOREY RESIDENTIALLOCATION: LOTS 7, BLK.26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO, PAMPANGA OWNER: VILMA H. MANALO

SUBJECT: BILL OF MATERIALS

PREPARED BY: ARCH. FEDERICO D. DAVID Page 43 of 100

0.00 243.81 469.33

0.00 117.32 225.84

Page 44: Productivity Rates

PROJECT TITLE : PROPOSED 8 BEDROOMS TWO STOREY RESIDENTIALLOCATION : LOTS 7&8 BLOCK 26 DIZON ESTATE, SAN AGUSTIN, CITY OF SAN FERNANDO PAMPANGAOWNER : MS. VILMA H. MANALOARCHITECT : FEDERICO "BHOB" D. DAVIDSUBJECT : BILL OF MATERIALS

SYSTEM COMPONENTS QUANTITY UNITCOST EACH

MAT. INST. TOTALInterior column footing, 1.00m square, 0.30m thick, 3,000psi concrete,Including forms, reinforcing, and dowels.

Concrete 3,000psi-1:2:4 mixture using 88lbs. Portland cement 0.30 504.60Cement 8.20 130.00 2.46 bags 319.80

Sand 0.44 300.00 0.13 39.60

Gravel 0.88 550.00 0.26 145.20

Placing Concrete 0.30Forms, Footing, 4 uses 1.20Reinforcing 5.00 kgs.G.I.Wire #16 kgs.

TABLE 1 FOUNDATIONS1.1-124 Spread Footing1.1-144 Strip Footing1.1-214 Concrete Wall1.1-242 Concrete Block Wall

TABLE 2 SUBSTRUCTURES2.1-104 Interior Slab on Grade

TABLE 3 SUPERSTRUCTURES3.5-154 Floor-Ceiling Concrete Slab3.5-212 Floor-Ceiling Concrete Panel3.5-214 Floor-Ceiling Concrete Plank3.5-314 Floor-Ceiling Structural Steel3.5-414 Floor-Ceiling Steel Joists

m3

m3

m3

m3

m2

Page 45: Productivity Rates

3.5-714 Floor-Ceiling Wood Joists3.9-104 Stairs3.9-900 Selective Price Sheet

TABLE 4 EXTERIOR CLOSURE4.1-208 Masonry Wall, Concrete Block4.1-258 Masonry Wall, Brick Stone4.1-288 Parapet Wall4.1-289 Masonry Restoration Cleaning4.1-416 Wood Frame Exterior Wall4.6-142 Doors, Metal-Commercial4.6-144 Doors, Residential Exterior4.6-152 Doors, Sliding-Patio4.6-702 Doors, Overhead4.7-142 Windows-Aluminum4.7-144 Windows-Wood4.7-145 Windows-Wood4.7-152 Storm Windows and Doors4.7-700 Aluminum Frame, Window Wall4.9-200 Selective Price Sheet4.9-500 Selective Price Sheet

TABLE 5 ROOFING5.1-192 Steel Joists Roof & Ceiling5.1-492 Wood Frame Roof & Ceiling5.8-104 Roof Hatches, Skylights5.9-300 Selective Price Sheet5.9-500 Selective Price Sheet

TABLE 6 INTERIOR CONSTRUCTION6.1-222 Partitions, Concrete Blocks6.1-592 Partitions, Wood Studs6.1-594 Partitions, Metal Stud, NLB6.1-595 Partitions, Drywall6.1-596 Partitions, Metal Stud, LB6.1-692 Partitions, Plaster & Lath6.1-842 Partitions, Movable Office6.4-142 Doors, Interior Flush, Wood

Page 46: Productivity Rates

6.4-144 Doors, Interior Solid and Louvered6.4-146 Doors, Interior Flush, Metal6.4-148 Doors, Closet6.7-242 Ceiling, Suspended Plaster6.7-342 Ceiling, Suspended Accoustical6.7-442 Ceiling, Suspended Gypsum Board6.9-100 Selective Price Sheet6.9-300 Selective Price Sheet6.9-500 Selective Price Sheet6.9-600 Selective Price Sheet6.9-700 Selective Price Sheet6.9-800 Selective Price Sheet

TABLE 7 CONVEYING SYSTEMS7.1-142 Oil Hydraulic Elevators

TABLE 8 MECHANICAL8.1-710 Plumbing-Public Restroom8.1-720 Plumbing-Public Restroom8.1-920 Plumbing-Two Fixture Bathroom8.1-931 Plumbing-Three Fixture Bathroom8.1-932 Plumbing-Three Fixture Bathroom8.1-933 Plumbing-Three Fixture Bathroom8.1-940 Plumbing-Four Fixture Bathroom8.1-950 Plumbing-Five Fixture Bathroom8.2-910 Fire Sprinkler Systems, Wet8.2-920 Fire Sprinkler Systems, Dry8.3-270 Heating-Oil Fired Hot Water8.3-280 Heating-Gas Fired Hot Water8.3-310 Heating-Cooling, Oil, Forced Air8.3-320 Heating-Cooling, Gas, Forced Air

TABLE 9 ELECTRICAL9.1-220 Commercial Service-3 Phase9.1-230 Residential Service-1 Phase9.2-900 Lighting, Flourescent9.2-910 Lighting, Incandescent9.2-920 Lighting, High Intensity

Page 47: Productivity Rates

9.4-910 Heat, Baseboard9.9-500 Selective Price Sheet

TABLE 11 SPECIAL11.1-242 Kitchens11.1-742 Wood Burning Stoves11.1-744 Masonry Fireplace11.9-100 Selective Price Sheet

TABLE 12 SITE WORK12.1-116 Excavation, Utility Trench12.1-462 Excavation, Footings or Trench12.1-464 Excavation, Foundation12.3-940 Septic Systems12.5-404 Driveways12.5-514 Parking Lots, Asphalt12.5-524 Parking Lots, Concrete12.7-104 Sidewalks12.7-604 Landscaping-Lawn Establishment12.9-300 Selective Price Sheet12.9-700 Selective Price Sheet

Page 48: Productivity Rates

Crew A-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 18.55 311 Gas Eng. Power Tool 58.6 64.45 7.33 8.068 M.H. Daily Totals 207 312.45 25.88 39.06

Crew A-1ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Laborer 18.55 148.4 31 248 18.55 311 Power Equipment 31.2 34.3 3.9 4.298 M.H. Daily Totals 179.6 282.3 22.45 35.29

Crew A-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Building Laborers 18.55 296.8 31 496 18.75 31.071 Truck Driver (light) 153.2 249.68 Light Truck, 1.5 Ton 153.4 168.75 6.39 7.03

24 M.H. Daily Totals 603.4 914.35 25.14 38.1

Crew A-2ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Laborer 18.55 296.8 31 496 18.75 31.071 Truck Driver (light) 19.15 153.2 31.2 249.61 Light Truck, 1.5 Ton 153.4 168.751 Concrete Saw 98.8 108.7 10.51 11.56

24 M.H. Daily Totals 702.2 1023.05 29.26 42.63

Crew A-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (light) 19.45 155.6 31.7 253.6 19.45 31.71 Dump Truck, 12 Ton 315.6 347.15 39.45 43.48 M.H. Daily Totals 471.2 600.75 58.9 75.1

Crew A-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 22.82 37.81 Painter, Ordinary 21.75 174 35.4 283.2

24 M.H. Daily Totals 547.6 907.2 22.82 37.8

Crew A-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Building Laborers 18.55 296.8 31 496 18.62 31.02

0.25 Truck Driver (light) 19.15 38.3 31.2 62.40.25 Light Truck, 1.5 Ton 38.35 42.2 2.13 2.34

18 M.H. Daily Totals 373.45 600.6 20.75 33.36

Crew A-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Chief of Party 23.1 184.8 36.85 294.8 21.68 34.581 Instrument Man 20.25 162 32.3 258.4

16 M.H. Daily Totals 346.8 553.2 21.68 34.58

Crew A-7Bare Costs Incl. Subs O&P Cost per Manhour

Page 49: Productivity Rates

Crew A-7 Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Chief of Party 23.1 184.8 36.85 294.8 20.48 33.11 Instrument Man 20.25 162 32.3 258.41 Rodman/Chainmen 18.1 144.8 30.15 241.2

24 M.H. Daily Totals 491.6 794.4 20.48 33.1

Crew A-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Chief of Party 23.1 184.8 36.85 294.8 19.89 32.361 Instrument Man 20.25 162 32.3 258.42 Rodman/Chainmen 18.1 289.6 30.15 482.4

32 M.H. Daily Totals 636.4 1035.6 19.89 32.36

Crew A-9Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Asbestos Foreman 26.65 213.2 43.85 350.8 26.21 43.117 Asbestos Workers 26.15 1464.4 43 24084 Airless Sprayers 109.6 120.553 HEPA Vacs., 16 Gal. 93.6 102.95 3.18 3.49

64 M.H. Daily Totals 1880.8 2982.3 29.39 46.6

Crew A-10Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Asbestos Foreman 26.65 213.2 43.85 350.8 26.21 43.117 Asbestos Workers 26.15 1464.4 43 24082 HEPA Vacs., 16 Gal. 62.4 68.65 0.98 3.29

64 M.H. Daily Totals 1740 2827.45 27.19 46.4

Crew A-11Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Asbestos Foreman 26.65 213.2 43.85 350.8 26.21 43.117 Asbestos Workers 26.15 1464.4 43 24084 Airless Sprayers 109.6 120.552 HEPA Vacs., 16 Gal. 62.4 68.652 Chipping Hammers 19.6 21.55 2.99 3.29

64 M.H. Daily Totals 1869.2 2969.55 29.2 46.4

Crew A-12Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Asbestos Foreman 26.65 213.2 43.85 350.8 26.21 43.117 Asbestos Workers 26.15 1464.4 43 24084 Airless Sprayers 109.6 120.552 HEPA Vacs., 16 Gal. 62.4 68.651 Large Prod. Vac. Loader 468.2 515 10 11

64 M.H. Daily Totals 2317.8 3463 36.21 54.11

Crew A-13Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (light) 23.1 184.8 36.85 294.8 23.1 36.851 Large Prod. Vac. Loader 468.2 515 58.53 64.388 M.H. Daily Totals 653 809.8 81.63 101.23

Page 50: Productivity Rates

1.671159 30.9785 31.62775 80 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.671159 31 80 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.671159 31 160 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.671159 31 161.629243 31.2 8

0 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.62982 31.7 80 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.670236 39 161.627586 35.4 8

0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.671159 31 161.629243 31.2 2

0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.595238 36.85 81.595062 32.3 8

0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!

Page 51: Productivity Rates

#VALUE! #VALUE!1.595238 36.85 81.595062 32.3 81.665746 30.15 8

0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.595238 36.85 81.595062 32.3 81.665746 30.15 16

0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.645403 43.85 81.644359 43 56

0 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.645403 43.85 81.644359 43 56

0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.645403 43.85 81.644359 43 56

0 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.645403 43.85 81.644359 43 56

0 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!0 #DIV/0!

#VALUE! #VALUE!#VALUE! #VALUE!

1.595238 36.85 80 #DIV/0!0 #DIV/0!

Page 52: Productivity Rates

Crew B-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.22 32.12 Building Laborers 18.55 296.8 31 496

24 M.H. Daily Totals 461.2 770.4 19.22 32.1

Crew B-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 18.95 31.664 Building Laborers 18.55 593.6 31 992

40 M.H., Daily Totals 758 1266.4 18.95 31.66

Crew B-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.11 33.034 Building Laborers 18.55 296.8 31 4961 Equip. Oper. (med.) 24.1 192.8 38.45 307.62 Truck Drivers (heavy) 19.45 311.2 31.7 507.21 F.E Loader, T.M., 2.5 C.Y. 764 840.42 Dump Trucks, 16 Ton 775.6 853.15 32.08 35.28

48 M.H., Daily Totals 2504.8 3278.75 52.19 68.31

Crew B-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.03 31.674 Building Laborers 18.55 593.6 31 9921 Truck Drivers (heavy) 19.45 155.6 31.7 253.61 Tractor, 4 x 2, 195 H.P. 285.4 313.952 Platform Trailer 137.4 151.15 8.81 9.69

48 M.H., Daily Totals 1336.4 1985.1 27.84 41.36

Crew B-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 21.06 34.494 Building Laborers 18.55 593.6 31 9922 Equip. Oper. (Med.) 24.1 385.6 38.45 615.21 Mechanic 25.55 204.4 40.75 3261 Air Compr., 250 C.F.M. 102.8 113.12 Air tools and accessories 29.6 32.552 50 ft. Air hoses, 1.5" dia. 12.8 14.11 F.E.Loader, T.M., 2.5 C.Y. 764 840.4 14.21 15.63

64 M.H., Daily Totals 2257.2 3207.75 35.27 50.12

Crew B-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Building Laborers 18.55 296.8 31 496 20.07 32.952 Equip. Oper. (Med.) 23.1 184.8 36.85 294.81 Backhoe Loader, 48 H.P 200.6 220.65 8.36 9.19

24 M.H., Daily Totals 682.2 1011.45 28.43 42.14

Crew B-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.81 32.794 Building Laborers 18.55 593.6 31 992

Page 53: Productivity Rates

1 Equip. Oper. (Med.) 24.1 192.8 38.45 307.61 Chipping Machine 188.6 207.451 F.E Loader, T.M., 2.5 C.Y. 764 840.42 Chain Saws 90 99 21.72 23.89

24 M.H., Daily Totals 1993.4 2720.85 41.53 56.68

Crew B-7ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Laborers 18.55 296.8 31 496 20.07 32.951 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Rake w/ Tractor 197.6 217.352 Chain Saws 44.4 48.85 10.08 11.09

24 M.H., Daily Totals 723.6 1057 30.15 44.04

Crew B-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.63 33.612 Building Laborers 18.55 296.8 31 4962 Equip. Oper. (med.) 24.1 385.6 38.45 615.21 Equip. Oper. Oiler 20.25 162 32.3 258.42 Truck Drivers (heavy) 19.45 311.2 31.7 507.21 Hyd. Crane, 25 Ton 508.2 5591 F.E. Loader, T.M., 2.5 C.Y. 764 840.42 Dump Truck, 16 Ton 775.6 853.15 32 35.2

24 M.H., Daily Totals 3367.8 4403.75 20.63 33.61

Crew B-9Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 18.95 31.664 Building Laborers 18.55 593.6 31 9921 Air Compr., 250 C.F.M. 102.8 113.12 Air Tools & Accessories 29.6 32.552 50-Ft. Air Hoses, 1.5" Dia. 12.8 14.1 3.63 3.99

40 M.H., Daily Totals 903.2 1426.15 22.58 35.65

Crew B-10Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 12412 M.H., Daily Totals 267 431.6 22.25 35.97

Crew B-10ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Roll. Compact., 2K Lbs. 79.2 87.1 6.6 7.26

12 M.H., Daily Totals 346.2 518.7 28.85 43.23

Crew B-10BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 200 H. P. 832 915.2 69.33 76.27

Page 54: Productivity Rates

12 M.H., Daily Totals 1099 1346.8 91.58 112.24

Crew B-10CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 200 H. P. 832 915.21 Vibratory Roller, Towed 96 105.6 77.33 85.07

12 M.H., Daily Totals 1195 1452.4 99.58 121.04

Crew B-10DBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 200 H. P. 832 915.21 Sheepsft. Roller, Towed 107.4 118.15 78.28 86.11

12 M.H., Daily Totals 1206.4 1464.95 100.53 122.08

Crew B-10EBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Tandem Roller, 5 Ton 122.8 135.1 10.23 11.26

12 M.H., Daily Totals 389.8 566.7 32.48 47.23

Crew B-10FBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Tandem Roller, 10 Ton 223.8 246.2 18.65 20.52

12 M.H., Daily Totals 490.8 677.8 40.9 56.49

Crew B-10GBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Sheepsft Roll., 130 H.P. 512 563.2 42.67 46.93

12 M.H., Daily Totals 779 994.8 64.92 82.9

Crew B-10HBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Diaphr. Water Pump. 2" 19 20.91 20 ft. Suction Hose, 2" 4.4 4.852 50 Ft. Disch. Hoses, 2" 6.8 7.5 2.52 2.77

12 M.H., Daily Totals 297.2 464.85 24.77 38.74

Crew B-10IBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Diaphr. Water Pump, 4" 54 59.4

Page 55: Productivity Rates

1 20 Ft. Suction Hose, 4" 11.4 12.552 50 Ft. Disch. Hoses, 4" 12.8 14.1 6.52 7.17

12 M.H., Daily Totals 345.2 517.65 28.77 43.14

Crew B-10JBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Centr. Water Pump, 3" 28.4 31.251 20 Ft. Suction Hose, 3" 7.4 8.152 50 Ft. Disch. Hoses, 3" 8.8 9.7 3.72 4.09

12 M.H., Daily Totals 311.6 480.7 25.97 40.06

Crew B-10KBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Centr. Water Pump, 6" 156.8 172.51 20 Ft. Suction Hose, 6" 19.4 21.352 50 Ft. Disch. Hoses, 6" 30.8 33.9 17.25 18.98

12 M.H., Daily Totals 474 659.35 39.5 54.95

Crew B-10LBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 75 H.P. 291.8 321 24.32 26.75

12 M.H., Daily Totals 558.8 752.6 46.57 62.72

Crew B-10MBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 300 H.P. 926.6 1019.25 77.22 84.94

12 M.H., Daily Totals 1193.6 1450.85 99.47 120.91

Crew B-10NBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, T.M., 1.5. C.Y 358 393.8 29.83 32.82

12 M.H., Daily Totals 625 825.4 52.08 68.79

Crew B-100Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, T.M., 2.25. C.Y 459.6 505.55 38.3 42.13

12 M.H., Daily Totals 726.6 937.15 60.55 78.1

Crew B-10PBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

Page 56: Productivity Rates

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, T.M., 2.5 C.Y 764 840.4 63.67 70.03

12 M.H., Daily Totals 1031 1272 85.92 106

Crew B-10QBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, T.M., 5 C.Y 1062 1168.2 88.5 97.35

12 M.H., Daily Totals 1329 1599.8 110.75 133.32

Crew B-10RBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, W.M., 1 C.Y 235.2 258.7 19.6 21.56

12 M.H., Daily Totals 502.2 690.3 41.85 57.53

Crew B-10SBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, W.M., 1.5 C.Y 329 361.9 27.42 30.16

12 M.H., Daily Totals 596 793.5 49.67 66.13

Crew B-10TBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, W.M., 2.5 C.Y 502 552.2 41.83 46.02

12 M.H., Daily Totals 769 983.8 64.08 81.99

Crew B-10UBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 F.E. Loader, W.M., 5.5 C.Y 943.6 1037.95 78.63 86.5

12 M.H., Daily Totals 1210.6 1469.55 100.88 122.47

Crew B-10VBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 700 H.P. 2689 2957.9 224.08 246.49

12 M.H., Daily Totals 2956 3389.5 246.33 282.46

Crew B-10WBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 105 H.P. 414.8 456.3 224.08 246.49

12 M.H., Daily Totals 681.8 887.9 246.33 282.46

Page 57: Productivity Rates

Crew B-10XBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Dozer, 410 H.P. 1204 1324.4 100.33 110.37

12 M.H., Daily Totals 1471 1756 122.58 146.34

Crew B-10YBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.25 35.97

0.5 Building Laborer 18.55 74.2 31 1241 Vibratory Drum Roller 316.2 347.8 26.35 28.99

12 M.H., Daily Totals 583.2 779.4 48.6 64.96

Crew B-11Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 248

16 M.H., Daily Totals 341.2 555.6 21.33 34.73

Crew B-11ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 2481 Dozer, 200 H.P. 832 915.2 52 57.2

16 M.H., Daily Totals 1173.2 1470.8 73.33 91.93

Crew B-11BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 2481 Dozer, 200 H.P. 832 915.21 Air Powered Tamper 13.8 15.21 Air. Compr. 365 C.F.M. 190.4 209.452 50 Ft. Air Hoses, 1.5" Dia. 12.8 14.1 65.56 72.12

16 M.H., Daily Totals 1390.2 1709.55 86.89 106.85

Crew B-11CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 2481 Backhoe Loader, 48 H.P. 200.6 220.65 12.54 13.79

16 M.H., Daily Totals 541.8 776.25 33.87 48.52

Crew B-11KBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 2481 Trencher, 8'D., 16"W. 447.8 492.6 27.99 30.79

16 M.H., Daily Totals 789 1048.2 49.32 65.52

Crew B-11LBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P

Page 58: Productivity Rates

1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 2481 Grader, 30,000 Lbs. 557.4 613.15 34.84 38.32

16 M.H., Daily Totals 898.6 1168.75 56.17 73.05

Crew B-11MBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 21.33 34.731 Building Laborer 18.55 148.4 31 2481 Backhoe Loader, 80 H.P. 282.4 310.65 17.65 19.42

16 M.H., Daily Totals 623.6 866.25 38.98 54.15

Crew B-12Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.4

16 M.H., Daily Totals 361.6 576.8 22.6 36.05

Crew B-12ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 1 C.Y. 575 632.5 35.94 39.53

16 M.H., Daily Totals 936.6 1209.3 58.54 75.58

Crew B-12BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 1.5 C.Y. 724.6 797.05 45.29 49.82

16 M.H., Daily Totals 1086.2 1373.85 67.89 85.87

Crew B-12CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 2 C.Y. 968.8 1065.7 60.55 66.61

16 M.H., Daily Totals 1330.4 1642.5 83.15 102.66

Crew B-12DBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 3.5 C.Y. 2157 2372.7 134.81 148.29

16 M.H., Daily Totals 2518.6 2949.5 157.41 184.34

Crew B-12EBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, .5 C.Y. 320.8 352.9 20.05 22.06

16 M.H., Daily Totals 682.4 929.7 42.65 58.11

Page 59: Productivity Rates

Crew B-12FBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, .75 C.Y. 453.6 498.95 28.35 31.19

16 M.H., Daily Totals 815.2 1075.75 50.95 67.24

Crew B-12GBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, .5 C.Y. 398.6 438.451 Clamshell Bucket, .5 C.Y 46.2 50.8 27.8 30.58

16 M.H., Daily Totals 806.4 1066.05 50.4 66.63

Crew B-12HBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, 1 C.Y. 459.8 505.81 Clamshell Bucket, 1 C.Y 62 68.2 32.61 35.87

16 M.H., Daily Totals 883.4 1150.8 55.21 71.92

Crew B-12IBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, .75 C.Y. 424.4 466.851 Dragline Bucket, .75 C.Y 31 34.1 28.46 31.31

16 M.H., Daily Totals 817 1077.75 51.06 67.36

Crew B-12JBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Gradall, 3 Ton, .5 C.Y. 587.6 646.35 36.73 40.4

16 M.H., Daily Totals 949.2 1223.15 59.33 76.45

Crew B-12KBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Gradall, 3 Ton, 1 C.Y. 811.2 892.3 50.7 55.77

16 M.H., Daily Totals 1172.8 1469.1 73.3 91.82

Crew B-12LBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, .5 C.Y. 398.6 438.451 F.E. Attachment, .5 C.Y. 47.8 52.6 27.9 30.69

16 M.H., Daily Totals 808 1067.85 50.5 66.74

Page 60: Productivity Rates

Crew B-12MBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, .75 C.Y. 424.4 466.851 F.E. Attachment, .75 C.Y. 90.6 99.65 32.19 35.41

16 M.H., Daily Totals 876.6 1143.3 54.79 71.46

Crew B-12NBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, 1 C.Y. 459.8 505.81 F.E. Attachment, 1 C.Y. 127.6 140.35 36.71 40.38

16 M.H., Daily Totals 949 1222.95 59.31 76.43

Crew B-12OBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, 1.5 C.Y. 694.2 763.61 F.E. Attachment, 1.5 C.Y. 143.4 157.75 52.35 57.59

16 M.H., Daily Totals 1199.2 1498.15 74.95 93.64

Crew B-12PBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crawler Crane, 40 Ton 694.2 763.61 Dragline Bucket, 1.5 C.Y. 43.6 47.95 46.11 50.72

16 M.H., Daily Totals 1099.4 1388.35 68.71 86.77

Crew B-12QBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 5/8 C.Y. 372.4 409.65 23.28 25.6

16 M.H., Daily Totals 734 986.45 45.88 61.65

Crew B-12RBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 1.5 C.Y. 724.6 797.05 45.29 49.82

16 M.H., Daily Totals 1086.2 1373.85 67.89 85.87

Crew B-12SBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Excavator, 2.5 C.Y. 1732 1905.2 108.25 119.08

16 M.H., Daily Totals 2093.6 2482 130.85 155.13

Page 61: Productivity Rates

Crew B-12TBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crawler Crane, 75 Ton 817.6 899.351 F.E. Attachment, 3 C.Y. 265.4 291.95 67.69 74.46

16 M.H., Daily Totals 1444.6 1768.1 90.29 110.51

Crew B-12VBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 22.6 36.051 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crawler Crane, 75 Ton 817.6 899.351 Dragline Bucket, 3 C.Y. 77.8 85.6 55.96 61.56

16 M.H., Daily Totals 1257 1561.75 78.56 97.61

Crew B-13Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.99 32.914 Building Laborers 18.55 593.6 31 9921 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Crane, 25 ton 508.2 559 9.08 9.98

56 M.H., Daily Totals 1627.8 2402.2 29.07 42.89

Crew B-14Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.64 32.524 Building Laborers 18.55 593.6 31 9921 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Backhoe Loader, 48 H.P. 200.6 220.65 4.18 4.6

48 M.H., Daily Totals 1143.4 1781.85 23.82 37.12

Crew B-15Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equipment Oper. (med 24.1 192.8 38.45 307.6 20.65 33.53

0.5 Building Laborer 18.55 74.2 31 1242 Truck Drivers (heavy) 19.45 311.2 31.7 507.22 Dump Trucks, 16 Ton 775.6 853.151 Dozer, 200 H.P. 832 915.2 57.41 63.16

28 M.H., Daily Totals 2185.8 2707.15 78.06 96.69

Crew B-16Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.27 322 Building Laborers 18.55 296.8 31 4961 Truck Driver (heavy) 19.45 155.6 31.7 253.61 Dump Truck, 16 Ton 387.8 426.6 12.12 13.33

32 M.H., Daily Totals 1004.6 1450.6 31.39 45.33

Crew B-17Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Building Laborers 18.55 296.8 31 496 19.91 32.641 Equip. Oper. (light) 23.1 184.8 36.85 294.8

Page 62: Productivity Rates

1 Truck Driver (heavy) 19.45 155.6 31.7 253.61 Backhoe Loader, 48 H.P. 200.6 220.651 Dump Truck, 12 ton 315.6 347.15 16.13 17.74

32 M.H., Daily Totals 1153.4 1612.2 36.04 50.38

Crew B-18Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.22 32.12 Building Laborers 18.55 296.8 31 4961 Vibrating Compactor 45.2 49.7 1.88 2.07

24 M.H., Daily Totals 506.4 820.1 21.1 34.17

Crew B-19Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Pile Driver Foreman 25.5 204 45.2 361.6 23.71 40.464 Pile Drivers 23.5 752 41.65 1332.82 Equip. Oper. (crane) 24.95 399.2 39.8 636.81 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crane, 40 Ton & Access. 694.2 763.6

60 L.F. Leads, 15K Ft. Lbs. 60 661 Hammer, 15K Ft. Lbs 275 302.51 Air Compr.,600 C.F.M. 269.6 296.552 50 Ft. Air Hoses, 3" Dia. 29.6 32.55 20.76 22.83

64 M.H., Daily Totals 2845.6 4050.8 44.47 63.29

Crew B-20Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (out) 20.55 164.4 34.3 274.4 21.07 35.051 Skilled Worker 24.1 192.8 39.85 318.81 Building Laborer 18.55 148.4 31 248

24 M.H., Daily Totals 505.6 841.2 21.07 35.05

Crew B-21Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (out) 20.55 164.4 34.3 274.4 21.62 35.731 Skilled Worker 24.1 192.8 39.85 318.81 Building Laborer 18.55 148.4 31 248

0.5 Equip. Oper. (crane) 24.95 99.8 39.8 159.20.5 S.P. Crane, 5 Ton 112.6 123.85 4.02 4.4228 M.H., Daily Totals 718 1124.25 25.64 40.15

Crew B-22Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (out) 20.55 164.4 34.3 274.4 21.84 361 Skilled Worker 24.1 192.8 39.85 318.81 Building Laborer 18.55 148.4 31 248

0.75 Equip. Oper. (crane) 24.95 149.7 39.8 238.80.75 S.P. Crane, 5 Ton 168.9 185.8 5.63 6.19

30 M.H., Daily Totals 824.2 1265.8 27.47 42.19

Crew B-23Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 18.95 31.664 Building Laborers 18.55 593.6 31 992

Page 63: Productivity Rates

1 Drill Rig 417.6 459.351 Light truck, 3 Ton 155.8 171.4 14.34 15.77

40 M.H., Daily Totals 1331.4 1897.15 33.29 47.43

Crew B-24Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Cement Finisher 23.05 184.4 36.7 293.6 21.65 35.571 Building Laborer 18.55 148.4 31 2481 Carpenter 23.35 186.8 39 312

24 M.H., Daily Totals 519.6 853.6 21.65 35.57

Crew B-25Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 20.25 33.337 Laborers 18.55 1038.8 31 17363 Equip. Oper. (med) 24.1 578.4 38.45 922.81 Asphalt Paver, 130 H.P 1145 1259.51 Tandem Roller, 10 Ton 223.8 246.21 Roller, Pneumatic Wheel 231.4 254.55 18.18 20

88 M.H., Daily Totals 3381.8 4693.45 38.43 53.33

Crew B-25BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 20.57 33.767 Laborers 18.55 1038.8 31 17364 Equip. Oper. (medium 24.1 771.2 38.45 1230.41 Asphalt Paver, 130 H.P 1145 1259.52 Rollers, Steel Wheel 447.6 492.351 Roller, Pneumatic Wheel 231.4 254.55 19 20.9

96 M.H., Daily Totals 3798.4 5247.2 39.57 54.66

Crew B-26Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.81 34.646 Building Laborers 18.55 890.4 31 14882 Equip. Oper. (med.) 24.1 385.6 38.45 615.21 Rodman (reinf.) 25.85 206.8 47.1 376.81 Cement Finisher 23.05 184.4 36.7 293.61 Grader, 30,000 Lbs 557.4 613.151 Paving Mach. & Equip. 1238 1361.8 20.4 22.44

88 M.H., Daily Totals 3627 5022.95 41.21 57.08

Crew B-27Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.05 31.833 Building Laborers 18.55 445.2 31 7441 Berm Machine 62 68.2 1.94 2.13

32 M.H., Daily Totals 671.6 1086.6 20.99 33.96

Crew B-28Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 21.75 36.331 Building Laborers 18.55 148.4 31 248

Page 64: Productivity Rates

24 M.H., Daily Totals 522 872 21.75 36.33

Crew B-29Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.99 32.914 Building Laborers 18.55 593.6 31 9921 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Gradall, 3 Ton, 1/2 C.Y 587.6 646.35 10.49 11.54

56 M.H., Daily Totals 1707.2 2489.55 30.48 44.45

Crew B-30Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 21 33.952 Truck Drivers (heavy) 19.45 311.2 31.7 507.21 Hyd. Excavator, 1.5 C.Y. 724.6 797.052 Dump Truck, 16 Ton 775.6 853.15 62.51 68.76

24 M.H., Daily Totals 2004.2 2465 83.51 102.71

Crew B-31Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.91 33.263 Building Laborers 18.55 445.2 31 7441 Carpenter 23.35 186.8 39 312

102.8 113.19.8 10.8

2 50 Ft. Air Hoses, 1.5" Dia. 12.8 14.1 3.14 3.4540 M.H., Daily Totals 921.8 1468.4 23.05 36.71

Crew B-32Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Highway Laborer 18.55 148.4 31 248 22.71 36.593 Equip. Oper. (med.) 24.1 578.4 38.45 922.81 Grader, 30,000 Lbs. 557.4 613.151 Tandem Roller, 10 Ton 223.8 246.21 Dozer, 200 H.P. 832 915.2 50.41 55.45

32 M.H., Daily Totals 2340 2945.35 73.12 92.04

Crew B-32ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Laborer 18.55 148.4 31 248 22.25 35.972 Equip. Oper. (medium 24.1 385.6 38.45 615.21 Grader, 30,000 Lbs. 557.4 613.151 Roller, Vibratory, 29,000 Lbs 366 402.6 38.48 42.32

24 M.H., Daily Totals 1457.4 1878.95 60.73 78.29

Crew B-32BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Laborer 18.55 148.4 31 248 22.25 35.972 Equip. Oper. (medium 24.1 385.6 38.45 615.21 Dozer, 200 H.P. 832 915.21 Roller, Vibratory, 29,000 Lbs 366 402.6 49.92 54.91

24 M.H., Daily Totals 1732 2181 72.17 90.88

Page 65: Productivity Rates

Crew B-32CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 21.66 35.282 Laborers 18.55 296.8 31 4963 Equip. Oper. (medium 24.1 578.4 38.45 922.81 Grader, 30,000 Lbs. 557.4 613.151 Roller, Steel Wheel 223.8 246.21 Dozer, 200 H.P. 832 915.2 33.61 36.97

48 M.H., Daily Totals 2652.8 3467.75 55.27 72.25

Crew B-33Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

14 M.H., Daily Totals 315.2 508.5 22.51 36.32

Crew B-33ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 Scraper, Towed, 7 C.Y. 65.8 72.41 Dozer, 300 H.P. 926.6 1019.25

0.25 Dozer, 300 H.P. 231.65 254.8 87.43 96.1814 M.H., Daily Totals 1539.25 1854.95 109.94 132.5

Crew B-33BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 Scraper, Towed, 10 C.Y. 180.4 198.451 Dozer, 300 H.P. 926.6 1019.25

0.25 Dozer, 300 H.P. 231.65 254.8 95.62 105.1814 M.H., Daily Totals 1653.85 1981 118.13 141.5

Crew B-33CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 Scraper, Towed, 12 C.Y. 180.4 198.451 Dozer, 300 H.P. 926.6 1019.25

0.25 Dozer, 300 H.P. 231.65 254.8 95.62 105.1814 M.H., Daily Totals 1653.85 1981 118.13 141.5

Crew B-33DBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 S.P. Scraper, 14 C.Y. 1460 1606

Page 66: Productivity Rates

0.25 Dozer, 300 H.P. 231.65 254.8 120.83 132.9214 M.H., Daily Totals 2006.85 2369.3 143.34 169.24

Crew B-33EBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 S.P. Scraper, 24 C.Y. 1747 1921.70.25 Dozer, 300 H.P. 231.65 254.8 141.33 155.47

14 M.H., Daily Totals 2293.85 2685 163.84 191.79

Crew B-33FBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 Elev. Scraper, 11 C.Y. 623.2 685.50.25 Dozer, 300 H.P. 231.65 254.8 61.06 67.17

14 M.H., Daily Totals 1170.05 1448.8 83.57 103.49

Crew B-33GBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 22.51 36.32

0.5 Building Laborer 18.55 74.2 31 1240.25 Equip. Oper. (med.) 24.1 48.2 38.45 76.9

1 Elev. Scraper, 20 C.Y. 847.2 931.90.25 Dozer, 300 H.P. 231.65 254.8 77.06 84.77

14 M.H., Daily Totals 1394.05 1695.2 99.57 121.09

Crew B-34Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.78 M.H., Daily Totals 155.6 253.6 19.45 31.7

Crew B-34ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Dump Truck, 12 Ton 315.6 347.15 39.45 43.48 M.H., Daily Totals 471.2 600.75 58.9 75.1

Crew B-34BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Dump Truck, 16 Ton 387.8 426.6 48.48 53.328 M.H., Daily Totals 543.4 680.2 67.93 85.02

Crew B-34CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck Tractor, 40 Ton 365.6 402.151 Dump Trailer, 16.5 C.Y. 114.8 126.3 60.05 66.068 M.H., Daily Totals 636 782.05 79.5 97.76

Page 67: Productivity Rates

Crew B-34DBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck Tractor, 40 Ton 365.6 402.151 Dump Trailer, 20 C.Y. 115.8 127.4 60.18 66.198 M.H., Daily Totals 637 783.15 79.63 97.89

Crew B-34EBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck, Off Hwy., 25 Ton 580.6 638.65 72.58 79.838 M.H., Daily Totals 736.2 892.25 92.03 111.53

Crew B-34FBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck, Off Hwy., 22 C.Y. 908 998.8 113.5 124.858 M.H., Daily Totals 1063.6 1252.4 132.95 156.55

Crew B-34GBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck, Off Hwy., 34 C.Y. 1155 1270.5 144.38 158.818 M.H., Daily Totals 1310.6 1524.1 163.83 190.51

Crew B-34HBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck, Off Hwy., 42 C.Y. 1446 1590.6 180.75 198.838 M.H., Daily Totals 1601.6 1844.2 200.2 230.53

Crew B-34JBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck, Off Hwy., 60 C.Y. 1962 2158.2 245.25 269.788 M.H., Daily Totals 2117.6 2411.8 264.7 301.48

Crew B-34KBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck Tractor, 240 H.P. 463.4 509.751 Low Bed Trailer 274.4 301.85 92.23 101.458 M.H., Daily Totals 893.4 1065.2 111.68 133.15

Crew B-35Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Laborer Foreman (out) 20.55 164.4 34.3 274.4 22.63 36.691 Skilled Worker 24.1 192.8 39.85 318.81 Welder (plumber) 27.4 219.2 42.9 343.21 Laborer 18.55 148.4 31 2481 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.4

Page 68: Productivity Rates

1 Electric Welding Mach. 45.8 50.41 Hyd. Excavator, .75 C.Y. 453.6 498.95 10.4 11.44

48 M.H., Daily Totals 1585.8 2310.55 33.03 48.13

Crew B-36Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 21.17 34.642 Highway Laborers 18.55 296.8 31 4962 Equip. Oper. (med.) 24.1 385.6 38.45 615.21 Dozer, 200 H.P 832 915.21 Aggregate Spreader 62 68.21 Tandem Roller, 10 Ton 223.8 246.2 27.95 30.74

40 M.H., Daily Totals 1964.6 2615.2 49.12 65.38

Crew B-36ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 22.01 35.732 Laborers 18.55 296.8 31 4964 Equip. Oper. (medium 24.1 771.2 38.45 1230.41 Dozer, 200 H.P 832 915.21 Aggregate Spreader 62 68.21 Roller, Steel Wheel 223.8 246.21 Roller, Pneumatic Wheel 231.4 254.55 24.09 26.5

56 M.H., Daily Totals 2581.6 3484.95 46.1 62.23

Crew B-37Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.64 32.524 Building Laborers 18.55 593.6 31 9921 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Tandem Roller, 5 Ton 122.8 135.1 2.56 2.81

48 M.H., Daily Totals 1065.6 1696.3 22.2 35.33

Crew B-38Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.97 34.322 Building Laborers 18.55 296.8 31 4961 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Equip. Oper. (medium 24.1 192.8 38.45 307.61 Backhoe Loader, 48 H.P. 200.6 220.651 Demol. Hammer, (1000lb) 353.6 388.951 F.E. Loader (170 H.P.) 586.4 645.051 Pavt. Rem. Bucket 40.2 44.2 29.52 32.47

40 M.H., Daily Totals 2019.6 2671.65 50.49 66.79

Crew B-39Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.64 32.524 Building Laborers 18.55 593.6 31 9921 Equipment Oper. (light 23.1 184.8 36.85 294.81 Air Compr., 250 C.F.M. 102.8 113.12 Air Tools & Accessories 29.6 32.552 50 Ft. Air Hoses, 1.5" Dia. 12.8 14.1 3.03 3.33

48 M.H., Daily Totals 1088 1720.95 22.67 35.85

Page 69: Productivity Rates

Crew B-40Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Pile Driver Foreman 25.5 204 45.2 361.6 23.71 40.464 Pile Drivers 23.5 752 41.65 1332.82 Equip. Oper. (crane) 24.95 399.2 39.8 636.81 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crane, 40 Ton 694.2 763.61 Vibratory Hammer & Gen. 1119 1230.9 28.33 31.16

64 M.H., Daily Totals 3330.4 4584.1 52.04 71.62

Crew B-41Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.28 32.064 Building Laborers 18.55 593.6 31 992

0.25 Equip. Oper. (crane) 24.95 49.9 39.8 79.60.25 Equip. Oper. Oiler 20.25 40.5 32.3 64.60.25 Crawler Crane, 40 Ton 173.55 190.9 3.94 4.34

44 M.H., Daily Totals 1021.95 1601.5 23.22 36.4

Crew B-42Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.74 34.914 Building Laborers 18.55 593.6 31 9921 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Welder 26 208 48.85 390.81 Hyd. Crane, 25 Ton 508.2 5591 Gas Welding Machine 73.4 80.751 Horz. Boring Csg. Mch. 446.2 490.8 16.06 17.67

64 M.H., Daily Totals 2355.4 3364.55 36.8 52.58

Crew B-43Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.23 33.233 Building Laborers 18.55 445.2 31 7441 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Drill Rig & Augers 26 1569 1725.9 32.69 35.96

48 M.H., Daily Totals 2540.2 3321.1 52.92 69.19

Crew B-44Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Pile Driver Foreman 25.5 204 45.2 361.6 23.49 40.34 Pile Drivers 23.5 752 41.65 1332.82 Equip. Oper. (crane) 24.95 399.2 39.8 636.81 Building Laborer 18.55 148.4 31 2481 Crane, 40 Ton, & Access. 694.2 763.6

45 L.F. Leads, 15K Ft. Lbs. 45 49.5 11.55 12.7164 M.H., Daily Totals 2242.8 3392.3 35.04 53.01

Crew B-45Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 21.78 35.08

Page 70: Productivity Rates

1 Truck Driver (heavy) 19.45 155.6 31.7 253.61 Dist. Tank Truck, 3K Gal. 326 358.61 Tractor, 4 x 2, 250 H.P 329.6 362.55 40.98 45.07

16 M.H., Daily Totals 1004 1282.35 62.76 80.15

Crew B-46Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Pile Driver Foreman 25.5 204 45.2 361.6 21.36 36.922 Pile Drivers 23.5 376 41.65 666.43 Building Laborers 18.55 445.2 31 7441 Chain Saw, 36" Long 45 49.5 0.94 1.03

48 M.H., Daily Totals 1070.2 1821.5 22.3 37.95

Crew B-47Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Blast Foreman 20.55 164.4 34.3 274.4 20.73 34.051 Driller 18.55 148.4 31 2481 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Crawler Type Drill, 4" 229 251.91 Air Compr., 600 C.F.M. 269.6 296.552 50 Ft. Air Hoses, 3" Dia. 29.6 32.55 22.01 24.21

24 M.H., Daily Totals 1025.8 1398.2 42.74 58.26

Crew B-47ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Drilling Foreman 20.55 164.4 34.3 274.4 21.92 35.471 Equip. Oper. (heavy) 24.95 199.6 39.8 318.41 Oiler 20.25 162 32.3 258.41 Quarry Drill 478.8 526.7 19.95 21.95

24 M.H., Daily Totals 1004.8 1377.9 41.87 57.42

Crew B-48Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor foreman (outsid 20.55 164.4 34.3 274.4 20.64 33.753 Building laborers 18.55 445.2 31 7441 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Centr. Water Pump, 6" 156.8 172.51 20 Ft. Suction Hose, 6" 19.4 21.351 50 Ft. Disch. Hose, 6" 15.4 16.951 Drill Rig & Augers 1569 1725.9 31.44 34.58

56 M.H., Daily Totals 2916.6 3826.7 52.08 68.33

Crew B-49Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor foreman (outsid 20.55 164.4 34.3 274.4 21.52 35.63 Building laborers 18.55 445.2 31 7442 Equip. Oper. (crane) 24.95 399.2 39.8 636.82 Equip. Oper. Oilers 20.25 324 32.3 516.81 Equip. Oper. (light) 23.1 184.8 36.85 294.82 Pile Drivers 23.5 376 41.65 666.41 Hyd. Crane, 25 Ton 508.2 5591 Centr. Water Pump, 6" 156.8 172.5

Page 71: Productivity Rates

1 20 Ft. Suction Hose, 6" 19.4 21.351 50 Ft. Disch. Hose, 6" 15.4 16.951 Drill Rig & Augers 1569 1725.9 25.78 28.36

88 M.H., Daily Totals 4162.4 5628.9 47.3 63.96

Crew B-50Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Pile Driver foreman 20.55 408 45.2 723.2 22.7 38.946 Pile Drivers 23.5 1128 41.65 1999.22 Equip. Oper. (crane) 24.95 399.2 39.8 636.81 Equip. Oper. Oiler 20.25 162 32.3 258.43 Building Laborers 18.55 445.2 31 7441 Crane, 40 Ton 694.2 763.6

60 L.F. Leads, 15K Ft. Lbs 60 661 Hammer, 15K Ft. Lbs. 275 302.51 Air Compr., 600 C.F.M. 269.6 296.552 50 Ft. Air Hoses, 3" Dia. 29.6 32.551 Chain Saw, 36" Long 45 49.5 12.26 13.49

112 M.H., Daily Totals 3915.8 5872.3 34.96 52.43

Crew B-51Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 18.98 31.584 Building Laborers 18.55 593.6 31 9921 Truck Driver (light) 19.15 202.8 31.2 249.61 Light Truck, 1.5 Ton 186.8 168.75 3.2 3.52

48 M.H., Daily Totals 445.2 1684.75 22.18 35.1184.4

Crew B-52103.4 Incl. Subs O&P Cost per Manhour

Hr. 96.4 Hr. Daily Bare Costs Incl. O&P1 Carpenter Foreman 25.35 202.8 42.35 338.8 21.77 36.261 Carpenter 23.35 186.8 39 3123 Building Laborers 18.55 445.2 31 7441 Cement Finisher 23.05 184.4 36.7 293.6

0.5 Rodman (reinf.) 25.85 103.4 47.1 188.40.5 Equip. Oper. (med.) 24.1 96.4 38.45 153.80.5 F.E. Ldr. T.M., 2.5 C.Y. 382 420.2 6.82 7.556 M.H., Daily Totals 1601 2450.8 28.59 43.76

Crew B-53Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (light) 23.1 184.8 36.85 294.8 23.1 36.851 Trencher, Chain, 12 H.P. 79 86.9 9.88 10.868 M.H., Daily Totals 263.8 381.7 32.98 47.71

Crew B-54Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (light) 23.1 184.8 36.85 294.8 23.1 36.851 Trencher, Chain, 40 H.P. 182.6 200.85 22.83 25.118 M.H., Daily Totals 367.4 495.65 45.93 61.96

Crew B-55Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Building Laborers 18.55 296.8 31 496 18.75 36.85

Page 72: Productivity Rates

1 Truck Driver (light) 19.15 153.2 31.2 249.6 10.861 Flathed Truck w/ Auger 417.6 459.351 Truck, 3 Ton 155.8 171.4 23.89 26.28

24 M.H., Daily Totals 1023.4 1376.35 42.64 73.99

Crew B-56Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborers 18.55 148.4 31 248 20.83 33.921 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Crawler Type Drill, 4" 229 251.91 Air Compr., 600 C.F.M. 269.6 296.551 50 Ft. Air hose. 3" Dia. 14.8 16.3 32.09 35.3

16 M.H., Daily Totals 846.6 1107.55 52.92 69.22

Crew B-57Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.99 34.212 Building Laborers 18.55 296.8 31 4961 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Equip. Oper. Oiler 20.25 162 32.3 258.41 Power Shovel, 1 C.Y. 459.8 505.81 Clamshell Bucket, 1 C.Y 62 68.21 Centr. Water Pump. 6" 156.8 172.51 20 Ft. Suction Hose, 6" 19.4 21.35

20 50 Ft. Disch. Hoses, 6" 308 338.8 20.96 23.0548 M.H., Daily Totals 2013.6 2748.65 41.95 57.26

Crew B-58Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Building Laborers 18.55 296.8 31 496 20.07 32.951 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Backhoe Loader, 48 H.P. 200.6 220.651 Small Helicopter 3180 3498 140.86 154.94

24 M.H., Daily Totals 3862.2 4509.45 160.93 187.89

Crew B-59Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Truck Driver (heavy) 19.45 155.6 31.7 253.6 19.45 31.71 Truck, 30 Ton 285.4 313.951 Water Tank, 5000 Gal. 195 214.5 60.05 66.068 M.H., Daily Totals 636 782.05 79.5 97.76

Crew B-60Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 21.29 34.592 Building Laborers 18.55 296.8 31 4961 Equi[. Oper. (crane) 24.95 199.6 39.8 318.42 Equip. Oper. (light) 23.1 369.6 36.85 589.61 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crawler Crane, 40 Ton 694.2 763.6

45 L.F. Leads, 15K Ft. Lbs. 45 49.51 Backhoe Loader, 48 H.P. 200.6 220.65 16.78 18.46

56 M.H., Daily Totals 2132.2 2970.55 38.07 53.05

Page 73: Productivity Rates

Crew B-74Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 21.8 35.311 Highway Laborer 18.55 148.4 31 2484 Equip. Oper. (med.) 24.1 771.2 38.45 1230.42 Truck Drivers (heavy) 19.45 311.2 31.7 507.21 Motor Grader, 30,000 20.25 557.4 613.151 Grader Attach., Ripper 54 59.42 Stabilizers, 310 H.P 1270.8 1397.91 Flatbed Truck, 3 Ton 155.8 171.41 Chem. Spreader, Towed 94.8 104.31 Vibr. Roller, 29,000 Lb. 366 402.61 Water Tank 5000 Gal. 195 214.51 Truck, 30 Ton 285.4 313.95 46.55 51.21

64 M.H., Daily Totals 4374.4 5537.2 68.35 86.52

Crew B-75Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 22.14 35.831 Highway Laborer 18.55 148.4 31 2484 Equip. Oper. (med.) 24.1 771.2 38.45 1230.41 Truck Drivers (heavy) 19.45 155.6 31.7 253.61 Motor Grader, 30,000 Lb. 557.4 613.151 Grader Attach., Ripper 54 59.42 Stabilizers, 310 H.P 1270.8 1397.91 Dist. Truck, 3000 Gal. 326 358.61 Vibr. Roller, 29,000 Lb. 366 402.6 45.97 50.56

56 M.H., Daily Totals 3813.8 4838.05 68.11 86.39

Crew B-76Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Dock Builder Foreman 25.5 204 45.2 361.6 23.68 40.595 Dock builders 23.5 940 41.65 16662 Equip. Oper. (crane) 24.95 399.2 39.8 636.81 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crawler Crane, 50 Ton 802.2 882.41 Barge, 400 Ton 405.6 446.151 Hammer, 15K. Ft. Lbs. 275 302.5

60 L.F. Leads, 15K. Ft. Lbs. 60 661 Air Compr., 600 C.F.M 269.6 296.552 50 Ft. Air Hoses, 3" Dia. 29.6 32.55 25.58 28.14

72 M.H., Daily Totals 3547.2 4948.95 49.26 68.73

Crew B-77Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 19.07 31.73 Laborers 18.55 445.2 31 7441 Truck Driver (light) 19.15 153.2 31.2 249.61 Crack Cleaner, 25 H.P. 75 82.51 Crack Filler, Trailer Mtd. 133.6 146.951 Flatbed Truck, 3 Ton 155.8 171.4 9.11 10.02

40 M.H., Daily Totals 1127.2 1668.85 28.18 41.72

Page 74: Productivity Rates

Crew B-78Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 18.98 31.584 Laborers 18.55 593.6 31 9921 Truck Driver (light) 19.15 153.2 31.2 249.61 Paint Striper, S.P. 190 2091 Flatbed Truck, 3 Ton 155.8 171.41 Pickup Truck, 3/4 Ton 113.4 124.75 9.57 10.52

48 M.H., Daily Totals 1370.4 2021.15 28.55 42.1

Crew B-79Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 19.07 31.73 Laborers 18.55 445.2 31 7441 Truck Driver (light) 19.15 153.2 31.2 249.61 218.6 240.451 Flatbed Truck, 3 Ton 155.8 171.42 Pickup Truck, 3/4 Ton 226.8 249.5 15.03 16.53

40 M.H., Daily Totals 1364 1929.35 34.1 48.23

Crew B-80Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 20.34 33.341 Laborers 18.55 148.4 31 2481 Truck Driver (light) 19.15 153.2 31.2 249.61 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Flatbed Truck, 3 Ton 155.8 171.41 Post Driver, T.M. 271 298.1 13.34 14.67

32 M.H., Daily Totals 1077.6 1536.3 33.68 48.01

Crew B-81Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Laborers 18.55 148.4 31 248 20.7 33.721 Equip. Oper. (med.) 24.1 192.8 38.45 307.61 Truck Driver (heavy) 19.45 155.6 31.7 253.61 Hydromulcher, T.M. 253.6 278.951 Tractor Truck, 4x2 285.4 313.95 22.46 24.7

24 M.H., Daily Totals 1035.8 1402.1 43.16 58.42

Crew B-82Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Highway Laborer 18.55 148.4 31 248 20.83 33.921 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Horiz. Borer, 6 H.P. 39.8 43.8 2.49 2.74

16 M.H., Daily Totals 373 586.6 23.32 36.66

Crew B-83Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Tugboat Captain 24.1 192.8 38.45 307.6 21.33 34.731 Tugboat Hand 189.55 148.4 31 2481 Tugboat, 250 H.P 482.2 530.4 30.14 33.15

16 M.H., Daily Totals 823.4 1086 51.47 67.88

Crew B-84Bare Costs Incl. Subs O&P Cost per Manhour

Page 75: Productivity Rates

Crew B-84 Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 24.1 38.451 Rotary Mower/Tractor 232.6 255.85 29.08 31.988 M.H., Daily Totals 425.4 563.45 53.18 70.43

Crew B-85Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Highway Laborers 18.55 445.2 31 744 19.84 32.631 Equip. Oper. (med.) 24.1 192.8 38.45 307.61 Truck Driver (heavy) 19.45 155.6 31.7 253.61 Aerial Lift Truck 544 598.41 Brush Chipper, 130 H.P. 188.6 207.451 Pruning Saw, Rotary 18 19.8 18.77 20.64

40 M.H., Daily Totals 1544.2 2130.85 38.61 53.27

Crew B-86Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 24.1 38.451 Stump Chipper, S.P 155.4 170.95 19.43 21.378 M.H., Daily Totals 348.2 478.55 43.53 59.82

Crew B-86ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (medium 24.1 192.8 38.45 307.6 24.1 38.451 Grader, 30,000 Lbs. 557.4 613.15 69.68 76.648 M.H., Daily Totals 750.2 920.75 93.78 115.09

Crew B-86BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (medium 24.1 192.8 38.45 307.6 24.1 38.451 Dozer, 200 H.P 832 915.2 104 114.48 M.H., Daily Totals 1024.8 1222.8 128.1 152.85

Crew B-87Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Common Laborer 18.55 148.4 31 248 22.99 36.964 Equip. Oper. (med.) 24.1 771.2 38.45 1230.42 Feller Bunchers, 50 H.P 664.8 731.31 Long Chipper, 22" Tree 1921 2113.11 Dozer, 105 H.P 291.8 3211 Chainsaw, Gas, 36" Long 45 49.5 73.07 80.37

40 M.H., Daily Totals 3842.2 4693.3 96.06 117.33

Crew B-88Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Common Laborer 18.55 148.4 31 248 23.31 37.396 Equip. Oper. (med.) 24.1 1156.8 38.45 1845.62 Feller Bunchers, 50 H.P 664.8 731.31 Long Chipper, 22" Tree 1921 2113.12 Long Skidders, 50 H.P. 679.2 747.11 Dozer, 105 H.P 291.8 3211 Chainsaw, Gas, 36" Long 45 49.5 64.32 70.75

56 M.H., Daily Totals 4907 6055.6 87.63 108.14

Page 76: Productivity Rates

Crew B-89Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (light) 23.1 184.8 36.85 294.8 21.13 34.031 Truck Driver (light) 19.15 153.2 31.2 249.61 Truck, Stake Body, 3 Ton 155.8 171.41 Concrete Saw 98.8 108.71 Water Tank, 65 Gal. 7 7.7 16.35 17.99

16 M.H., Daily Totals 599.6 832.2 37.48 52.02

Crew B-89ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Skilled Worker 24.1 192.8 39.85 318.8 21.33 35.421 Laborer 18.55 148.4 31 2481 Core Drill (large) 52.2 57.4 3.26 3.59

16 M.H., Daily Totals 393.4 624.2 24.59 39.01

Crew B-90Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.16 33.053 Highway Laborers 18.55 445.2 31 7442 Equip. Oper. (light) 23.1 369.6 36.85 589.62 Truck Drivers (heavy) 19.45 311.2 31.7 507.21 Road Mixer, 310 H.P. 923.4 1015.751 Dist. Truck, 2000 Gal. 297.8 327.6 19.08 20.99

64 M.H., Daily Totals 2511.6 3458.55 39.24 54.04

Crew B-90ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 22.01 35.732 Laborers 18.55 296.8 31 4964 Equip. Oper. (medium 24.1 771.2 38.45 1230.42 Graders, 30,000 Lbs. 1114.8 1226.31 Roller, Steel Wheel 223.8 246.21 Roller, Pnuematic Wheel 231.4 254.55 28.04 30.84

56 M.H., Daily Totals 2802.4 3727.85 50.05 66.57

Crew B-90BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman 20.55 164.4 34.3 274.4 21.66 35.282 Laborers 18.55 296.8 31 4963 Equip. Oper. (medium 24.1 578.4 38.45 922.81 Roller, Steel Wheel 223.8 246.21 Roller, Pneumatic Wheel 231.4 254.551 Road Mixer, 310 H.P. 923.4 1015.75 28.72 31.59

48 M.H., Daily Totals 2418.2 3209.7 50.38 66.87

Crew B-91Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 21.69 35.232 Highway Laborers 18.55 296.8 31 4964 Equip. Oper. (med.) 24.1 771.2 31.7 1230.41 Truck Driver (heavy) 19.45 155.6 253.61 Dist. Truck, 3000 Gal. 326 358.6

Page 77: Productivity Rates

1 Aggreg. Spreader, S.P. 593.2 652.51 Roller, Pneu. Tire, 12 Ton 231.4 254.551 Roller, Steel, 10 Ton 223.8 246.2 21.48 23.62

64 M.H., Daily Totals 2762.4 3766.25 43.17 58.85

Crew B-92Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.05 31.833 Highway Laborers 18.55 445.2 31 7441 Crack Cleaner, 25 H.P. 75 82.51 Air Compressor 68.4 75.251 Tar Kettle, T.M. 18.2 201 Flatbed Truck, 3 Ton 155.8 171.4 9.92 10.91

32 M.H., Daily Totals 927 1367.55 28.97 42.74

Crew B-93Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (med.) 24.1 192.8 38.45 307.6 24.1 38.451 Feller Buncher, 50 H.P. 332.4 365.65 41.55 45.718 M.H., Daily Totals 525.2 673.25 65.65 84.16

Crew B-94Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 18.55 318 M.H., Daily Totals 148.4 248 18.55 31

Crew B-94ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 18.55 311 Diaph. Water Pump, 2" 19 20.91 20 Ft. Suction Hose, 2" 4.4 4.852 50 Ft. Disch. Hoses, 2" 6.8 7.5 3.78 4.158 M.H., Daily Totals 178.6 281.25 22.33 35.15

Crew B-94BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 18.55 311 Diaph. Water Pump, 4" 54 59.41 20 Ft. Suction Hose, 4" 11.4 12.552 50 Ft. Disch. Hoses, 4" 12.8 14.1 9.78 10.758 M.H., Daily Totals 226.6 334.05 28.33 41.75

Crew B-94CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 18.55 311 Centr. Water Pump, 3" 28.4 31.251 20 Ft. Suction Hose, 3" 7.4 8.152 50 Ft. Disch. Hoses, 3" 8.8 9.7 5.58 6.138 M.H., Daily Totals 193 297.1 24.13 37.13

Crew B-94DBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 18.55 31

Page 78: Productivity Rates

1 Centr. Water Pump, 6" 156.8 172.51 20 Ft. Suction Hose, 6" 19.4 21.352 50 Ft. Disch. Hoses, 6" 30.8 33.9 25.88 28.468 M.H., Daily Totals 355.4 475.75 44.43 59.46

Crew B-95Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 21.75 35.41 Building Laborer 18.55 148.4 31 248

16 M.H., Daily Totals 348 566.4 21.75 35.4

Crew B-95ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 21.75 35.41 Building Laborer 18.55 148.4 31 2481 Hyd. Excavator, 5/8 C.Y. 372.4 409.65 23.28 25.6

16 M.H., Daily Totals 720.4 976.05 45.03 61

Crew B-95BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 21.75 35.41 Building Laborer 18.55 148.4 31 2481 Hyd. Excavator, 1.5 C.Y. 724.6 797.05 45.29 49.82

16 M.H., Daily Totals 1072.6 1363.45 67.04 85.22

Crew B-95CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Equip. Oper. (crane) 24.95 199.6 39.8 318.4 21.75 35.41 Building Laborer 18.55 148.4 31 2481 Hyd. Excavator, 2.5 C.Y. 1732 1905.2 108.25 119.08

16 M.H., Daily Totals 2080 2471.6 130 154.48

Page 79: Productivity Rates

Crew C-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Carpenters 23.35 560.4 39 936 22.15 371 Building Laborer 18.55 148.4 31 2483 Power Tools 24.6 27.05 0.77 0.85

32 M.H., Daily Totals 733.4 1211.05 22.92 37.85

Crew C-1ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenters 23.35 186.8 39 312 23.35 391 Circular Saw, 7" 8.2 9 1.03 1.138 M.H., Daily Totals 195 321 24.38 40.13

Crew C-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter Foreman (ou 25.35 202.8 42.35 338.8 22.88 38.234 Carpenters 23.35 747.2 39 12481 Building Laborers 18.55 148.4 31 2484 Power Tools 32.8 36.1 0.68 0.75

48 M.H., Daily Totals 1131.2 1870.9 23.56 38.98

Crew C-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Rodman Foreman 27.85 222.8 50.75 406 23.93 42.254 Rodmen (reinf.) 25.85 827.2 47.1 1507.21 Equip. Oper. (light) 23.1 184.8 36.85 294.82 Building Laborers 18.55 296.8 31 4963 Stressing Equipment 36.6 40.25

0.5 Grouting Equipment 121.4 133.55 2.47 2.7264 M.H., Daily Totals 1689.6 2877.8 26.4 44.97

Crew C-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Rodman Foreman 27.85 222.8 50.75 406 26.35 48.013 Rodmen (reinf.) 25.85 620.4 47.1 1130.43 Stressing Equipment 36.6 40.25 1.14 1.26

32 M.H., Daily Totals 879.8 1576.65 27.49 49.27

Crew C-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Rodman Foreman 27.85 222.8 50.75 406 25.21 44.464 Rodmen (reinf.) 25.85 827.2 47.1 1507.21 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Crane, 25 Ton 508.2 559 9.08 9.98

56 M.H., Daily Totals 1919.8 3049 34.29 54.44

Crew C-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.63 32.54 Building Laborers 18.55 593.6 31 9921 Cement Finisher 23.05 184.4 36.7 293.62 Gas Engine Vibrators 64.8 71.3 1.35 1.49

Page 80: Productivity Rates

48 M.H., Daily Totals 1007.2 1631.3 20.98 33.99

Crew C-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.06 33.065 Building Laborers 18.55 742 31 12401 Cement Finisher 23.05 184.4 36.7 293.61 Equip. Oper. (med.) 24.1 192.8 38.45 307.62 Gas Engine Vibrators 64.8 71.31 Concrete Bucket, 1 C.Y. 19.2 21.11 Hyd. Crane, 55 Ton 710 781 12.41 13.65

64 M.H., Daily Totals 2077.6 2989 32.47 46.71

Crew C-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.91 34.163 Building Laborers 18.55 445.2 31 7442 Cement Finisher 23.05 368.8 36.7 587.21 Equip. Oper. (med.) 24.1 192.8 38.45 307.61 Concrete Pump (small) 542.6 596.85 9.69 10.66

56 M.H., Daily Totals 1713.8 2510.05 30.6 44.82

Crew C-8ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.38 33.453 Building Laborers 18.55 445.2 31 7442 Cement Finisher 23.05 368.8 36.7 587.2

48 M.H., Daily Totals 978.4 1605.6 20.38 33.45

Crew C-9Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Cement Finisher 23.05 184.4 36.7 293.6 23.05 36.71 Gas Finishing Mach. 37.2 40.9 4.65 5.128 M.H., Daily Totals 221.6 334.5 27.7 41.82

Crew C-10Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Building Laborer 18.55 148.4 31 248 21.55 34.82 Cement Finishers 23.05 368.8 36.7 587.22 Gas Finishing Mach. 74.4 81.85 3.1 3.41

24 M.H., Daily Totals 591.6 917.05 24.65 38.21

Crew C-11Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 25.47 46.426 Struc. Steel Workers 26 1248 48.85 2344.81 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Truck Crane, 150 Ton 1441 1585.1 20.01 22.02

72 M.H., Daily Totals 3274.6 4927.5 45.48 68.44

Crew C-12Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P

Page 81: Productivity Rates

1 Carpenter Foreman (ou 25.35 202.8 42.35 338.8 23.15 38.363 Carpenters 23.35 560.4 39 9361 Building Laborer 18.55 148.4 31 2481 Equip. Oper. Oiler 24.95 199.6 39.8 318.41 Hyd. Crane, 12 Ton 375.4 412.95 7.82 8.6

48 M.H., Daily Totals 1486.6 2254.15 30.97 46.96

Crew C-13Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Worker 26 208 48.85 390.8 25.12 45.571 Welder 26 208 48.85 390.81 Carpenter 23.35 186.8 39 3121 Gas Welding Machine 73.4 80.75 3.06 3.36

48 M.H., Daily Totals 676.2 1174.35 28.18 48.93

Crew C-14Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter Foreman (ou 25.35 202.8 42.35 338.8 22.83 38.635 Carpenters 23.35 934 39 15604 Building Laborers 18.55 593.6 31 9924 Rodmen (reinf.) 25.85 827.2 47.1 1507.22 Cement Finishers 23.05 368.8 36.7 587.21 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crane, 80 Ton, & Tools 962.4 1058.653 Power Tools 24.6 27.052 Gas Finishing Mach. 74.4 81.85 7.37 8.11

144 M.H., Daily Totals 4349.4 6729.55 30.2 46.74

Crew C-15Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter Foreman (ou 25.35 202.8 42.35 338.8 22.18 37.092 Carpenters 23.35 373.6 39 6243 Building Laborers 18.55 445.2 31 7442 Cement Finishers 23.05 368.8 36.7 587.21 Rodman (reinf.) 25.85 206.8 47.1 376.82 Power Tools 16.4 18.051 Gas Finishing Mach. 37.2 40.9 0.74 0.82

72 M.H., Daily Totals 1650.8 2729.75 22.92 37.91

Crew C-16Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 22.01 37.043 Building Laborers 18.55 445.2 31 7442 Cement Finishers 23.05 368.8 36.7 587.21 Equip. Oper. (med.) 24.1 192.8 38.45 307.62 Rodmen (reinf.) 25.85 413.6 47.1 753.61 Concrete Pump (small) 542.6 596.85 7.54 8.29

72 M.H., Daily Totals 2127.4 3263.65 29.55 45.33

Crew C-17Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.5 40.518 Skilled Workers 24.1 1542.4 39.85 2550.4

Page 82: Productivity Rates

80 M.H., Daily Totals 1960 3240.8 24.5 40.51

Crew C-17ABare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.51 40.58 Skilled Workers 24.1 1542.4 39.85 2550.4

0.125 Equip. Oper. (crane) 24.95 24.95 39.8 39.80.125 Crane, 80 Ton, & Tools 120.3 132.350.125 Hand Held Power Tools 1.02 1.150.125 Walk Behind Power Tools 4.65 5.1 1.56 1.71

81 M.H., Daily Totals 2110.92 3419.2 26.07 42.21

Crew C-17BBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.51 40.498 Skilled Workers 24.1 1542.4 39.85 2550.4

0.25 Equip. Oper. (crane) 24.95 49.9 39.8 79.60.25 Crane, 80 Ton, & Tools 240.6 264.650.25 Hand Held Power Tools 2.05 2.250.25 Walk Behind Power Tools 9.3 10.25 3.07 3.38

82 M.H., Daily Totals 2261.85 3597.55 27.58 43.87

Crew C-17CBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.52 40.488 Skilled Workers 24.1 1542.4 39.85 2550.4

0.375 Equip. Oper. (crane) 24.95 74.85 39.8 119.40.375 Crane, 80 Ton, & Tools 360.9 3970.375 Hand Held Power Tools 3.08 3.40.375 Walk Behind Power Tools 13.95 15.35 4.55 5.01

83 M.H., Daily Totals 2412.78 3775.95 29.07 45.49

Crew C-17DBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.52 40.488 Skilled Workers 24.1 1542.4 39.85 2550.4

0.5 Equip. Oper. (crane) 24.95 99.8 39.8 159.20.5 Crane, 80 Ton, & Tools 481.2 529.30.5 Hand Held Power Tools 4.1 4.50.5 Walk Behind Power Tools 18.6 20.45 6 6.684 M.H., Daily Totals 2563.7 3954.25 30.52 47.08

Crew C-17EBare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.5 40.518 Skilled Workers 24.1 1542.4 39.85 2550.41 Hyd. Jack with Rods 57.4 63.15 0.72 0.79

80 M.H., Daily Totals 2017.4 3303.95 25.22 41.3

Crew C-18Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P0.125 Labor Foreman (out) 20.55 20.55 34.3 34.3 18.77 31.37

1 Building Laborer 18.55 148.4 31 2481 Concrete Cart, 10 C.F 47.4 52.15 5.27 5.79

Page 83: Productivity Rates

9 M.H., Daily Totals 216.35 334.45 24.04 37.16

Crew C-19Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P0.125 Labor Foreman (out) 20.55 20.55 34.3 34.3 18.77 31.37

1 Building Laborer 18.55 148.4 31 2481 Concrete Cart, 18 C.F 96 105.6 10.67 11.739 M.H., Daily Totals 264.95 387.9 29.44 43.1

Crew C-20Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.06 33.065 Building Laborers 18.55 742 31 12401 Cement Finisher 23.05 184.4 36.7 293.61 Equip. Oper. (med.) 24.1 192.8 38.45 307.62 Gas Engine Vibrators 64.8 71.31 Concrete Pump (small) 542.6 596.85 9.49 10.44

64 M.H., Daily Totals 1891 2783.75 29.55 43.5

Crew C-21Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 20.06 33.065 Building Laborers 18.55 742 31 12401 Cement Finisher 23.05 184.4 36.7 293.61 Equip. Oper. (med.) 24.1 192.8 38.45 307.62 Gas Engine Vibrators 64.8 71.31 Concrete Conveyer 130 143 3.04 3.35

64 M.H., Daily Totals 1478.4 2329.9 23.1 36.41

Crew C-22Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Rodman Foreman 27.85 222.8 50.75 406 26.08 47.274 Rodmen (reinf.) 25.85 827.2 47.1 1507.2

0.125 Equip. Oper. (crane) 24.95 24.95 39.8 39.80.125 Equip. Oper. Oiler 20.25 20.25 32.3 32.30.125 Hyd. Crane, 25 Ton 63.53 69.9 1.51 1.66

42 M.H., Daily Totals 1158.73 2055.2 27.59 48.93

Crew C-23Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.2 39.756 Skilled Workers 24.1 1156.8 39.85 1912.81 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crane, 90 Ton 994.4 1093.85 12.43 13.67

80 M.H., Daily Totals 2930.4 4273.85 36.63 53.42

Crew C-24Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker Forem 26.1 417.6 43.15 690.4 24.2 39.756 Skilled Workers 24.1 1156.8 39.85 1912.81 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Truck Crane, 150 Ton 1441 1585.1 18.01 19.81

Page 84: Productivity Rates

80 M.H., Daily Totals 3377 4765.1 42.21 59.56

Crew C-25Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Rodmen (reinf.) 25.85 413.6 47.1 753.6 20.55 37.32 Rodmen Helpers 15.25 244 27.5 440

32 M.H., Daily Totals 657.6 1193.6 20.55 37.3

Page 85: Productivity Rates

Crew D-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer 24.05 192.4 39.6 316.8 21.45 35.331 Bricklayer Helper 18.85 150.8 31.05 248.4

16 M.H., Daily Totals 343.2 565.2 21.45 35.33

Crew D-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Bricklayers 24.05 577.2 39.6 950.4 22.1 36.442 Bricklayer Helpers 18.85 301.6 31.05 496.8

0.5 Carpenter 23.35 93.4 39 15644 M.H., Daily Totals 972.2 1603.2 22.1 36.44

Crew D-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Bricklayers 24.05 577.2 39.6 950.4 22.04 36.312 Bricklayer Helpers 18.85 301.6 31.05 496.8

0.25 Carpenter 23.35 46.7 39 7842 M.H., Daily Totals 925.5 1525.2 22.04 36.31

Crew D-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer 24.05 192.4 39.6 316.8 21.21 34.642 Bricklayer Helpers 18.85 301.6 31.05 496.81 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Grout Pump 102.8 113.11 Hoses & Hopper 24.2 26.61 Accessories 10.4 11.45 4.29 4.72

32 M.H., Daily Totals 816.2 1259.55 25.5 39.36

Crew D-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer 24.05 192.4 39.6 316.8 24.05 39.61 Power Tool 36.8 40.5 4.6 5.068 M.H., Daily Totals 229.2 357.3 28.65 44.66

Crew D-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Bricklayers 24.05 577.2 39.6 950.4 21.53 35.473 Bricklayer Helpers 18.85 452.4 31.05 745.2

0.25 Carpenter 23.35 46.7 39 7850 M.H., Daily Totals 1076.3 1773.6 21.53 35.47

Crew D-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Tile Layer 23.5 188 37.05 296.4 21.1 33.281 Tile Layer Helper 18.7 149.6 29.5 236

16 M.H., Daily Totals 337.6 532.4 21.1 33.28

Crew D-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Bricklayers 24.05 577.2 39.6 950.4 21.97 36.182 Bricklayer Helpers 18.85 301.6 31.05 496.8

Page 86: Productivity Rates

40 M.H., Daily Totals 878.8 1447.2 21.97 36.18

Crew D-9Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Bricklayers 24.05 577.2 39.6 950.4 21.45 35.333 Bricklayer Helpers 18.85 452.4 31.05 745.2

48 M.H., Daily Totals 1029.6 1695.6 21.45 35.33

Crew D-10Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer Foreman 26.05 208.4 42.9 343.2 22.55 36.881 Bricklayer 24.05 192.4 39.6 316.82 Bricklayer Helpers 18.85 301.6 31.05 496.81 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Truck Crane, 12.5 Ton 441.2 485.3 11.03 12.13

40 M.H., Daily Totals 1343.2 1960.5 33.58 49.01

Crew D-11Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer Foreman 26.05 208.4 42.9 343.2 22.98 37.851 Bricklayer 24.05 192.4 39.6 316.81 Bricklayer Helper 18.85 150.8 31.05 248.4

24 M.H., Daily Totals 551.6 908.4 22.98 37.85

Crew D-12Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer Foreman 26.05 208.4 42.9 343.2 21.95 36.151 Bricklayer 24.05 192.4 39.6 316.82 Bricklayer Helpers 18.85 301.6 31.05 496.8

32 M.H., Daily Totals 702.4 1156.8 21.95 36.15

Crew D-13Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Bricklayer Foreman 26.05 208.4 42.9 343.2 22.68 37.231 Bricklayer 24.05 192.4 39.6 316.82 Bricklayer Helpers 18.85 301.6 31.05 496.81 Carpenter 23.35 186.8 39 3121 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Truck Crane, 12.5 Ton 441.2 485.3 9.19 10.11

48 M.H., Daily Totals 1530 2272.5 31.87 47.34

Page 87: Productivity Rates

Crew E-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Welder Foreman 28 224 52.6 420.8 25.7 46.11 Welder 26 208 48.85 390.81 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Gas Welding Machine 73.4 80.75 3.06 3.36

24 M.H., Daily Totals 690.2 1187.15 28.76 49.46

Crew E-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 25.31 45.734 Struc. Steel Workers 26 832 48.85 1563.21 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crane, 90 Ton 994.4 1093.85 17.76 19.53

56 M.H., Daily Totals 2412 3654.65 43.07 65.26

Crew E-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 26.67 50.11 Struc. Steel Worker 26 208 48.85 390.81 Welder 26 208 48.85 390.81 Gas Welding Machine 73.4 80.751 Torch, Gas & Air 66 72.6 5.81 6.39

24 M.H., Daily Totals 779.4 1355.75 32.48 56.49

Crew E-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 26.5 49.793 Struc. Steel Workers 26 624 48.85 1172.41 Gas Welding Machine 73.4 80.75 2.29 2.52

32 M.H., Daily Totals 921.4 1673.95 28.79 52.31

Crew E-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Struc. Steel Foremen 28 448 52.6 841.6 25.72 47.045 Struc. Steel Workers 26 1040 48.85 19541 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Welder 26 208 48.85 390.81 Equip. Oper. Oiler 20.25 162 32.3 258.41 Crane, 90 Ton 994.4 1093.851 Gas Welding Machine 73.4 80.751 Torch, Gas & Air 66 72.6 14.17 15.59

80 M.H., Daily Totals 3191.4 5010.4 39.89 62.63

Crew E-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Struc. Steel Foremen 28 672 52.6 1262.4 25.77 47.29 Struc. Steel Workers 26 1872 48.85 3517.21 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Welder 26 208 48.85 390.81 Equip. Oper. Oiler 20.25 162 32.3 258.41 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Crane, 90 Ton 994.4 1093.85

Page 88: Productivity Rates

1 Gas Welding Machine 73.4 80.751 Torch, Gas & Air 66 72.6

90.2 99.2Compact Wrenches 59.6 65.55 10.03 11.03

128 M.H., Daily Totals 4582 7453.95 35.8 58.23

Crew E-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 25.72 47.044 Struc. Steel Workers 26 832 48.85 1563.21 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Welder Foreman 28 224 52.6 420.82 Welders 26 416 48.85 781.61 Crane, 90 Ton 994.4 1093.852 Gas Welding Machines 146.8 161.5 14.27 15.69

80 M.H., Daily Totals 3198.8 5018.55 39.99 62.73

Crew E-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 25.56 46.534 Struc. Steel Workers 26 832 48.85 1563.21 Welder Foreman 28 224 52.6 420.84 Welders 26 832 48.85 1563.21 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Crane, 90 Ton 994.4 1093.854 Gas Welding Machines 293.6 322.95 12.38 13.62

104 M.H., Daily Totals 3946.4 6256.4 37.94 60.15

Crew E-9Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Struc. Steel Foremen 28 448 52.6 841.6 25.77 47.25 Struc. Steel Workers 26 1040 48.85 19541 Welder Foreman 28 224 52.6 420.85 Welders 26 1040 48.85 19541 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Crane, 90 Ton 994.4 1093.855 Gas Welding Machines 367 403.71 Torch, Gas & Air 66 72.6 11.15 12.27

128 M.H., Daily Totals 4725.8 7612.15 36.92 59.47

Crew E-10Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Welder Foreman 28 224 52.6 420.8 27 50.721 Welder 26 208 48.85 390.84 Gas Welding Machines 293.6 322.951 Truck, 3 Ton 155.8 171.4 28.09 30.9

16 M.H., Daily Totals 881.4 1305.95 55.09 81.62

Crew E-11Bare Costs Incl. Subs O&P Cost per Manhour

Page 89: Productivity Rates

Crew E-11 Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Painters, Struc. Steel 22.55 360.8 45.05 720.8 21.69 39.491 Building Laborer 18.55 148.4 31 2481 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Air Compressor 250 C.F.M. 102.8 113.11 Sand Blaster 24.2 26.61 Sand Blasting Accessories 10.4 11.45 4.29 4.72

32 M.H., Daily Totals 831.4 1414.75 25.98 44.21

Crew E-12Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Welder Foreman 28 224 52.6 420.8 25.55 44.721 Equip. Oper. (light) 23.1 184.8 36.85 294.81 Gas Welding Machines 73.4 80.75 4.59 5.05

16 M.H., Daily Totals 482.2 796.35 30.14 49.77

Crew E-16Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Welder Foreman 28 224 52.6 420.8 27 50.721 Welder 26 208 48.85 390.81 Gas Welding Machines 73.4 80.75 4.59 5.05

16 M.H., Daily Totals 505.4 892.35 31.59 55.77

Page 90: Productivity Rates

Crew F-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter 23.35 186.8 39 312 23.35 391 Power Tools 26 8.2 9 1.03 1.138 M.H., Daily Totals 195 321 24.38 40.13

Crew F-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 23.35 392 Power Tools 16.4 18.05 1.03 1.13

16 M.H., Daily Totals 390 642.05 24.38 40.13

Crew F-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P4 Carpenters 23.35 747.2 39 1248 23.67 39.161 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Hyd. Crane, 12 Ton 375.4 412.952 Power Tools 16.4 18.05 9.8 10.77

40 M.H., Daily Totals 1338.6 1997.4 33.47 49.93

Crew F-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P4 Carpenters 23.35 747.2 39 1248 23.1 38.021 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Equip. Oper. Oiler 20.25 162 32.3 258.41 Hyd. Crane, 55 Ton 710 7812 Power Tools 16.4 18.05 15.13 16.65

48 M.H., Daily Totals 1835.2 2623.85 38.23 54.67

Crew F-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter Foreman 25.35 202.8 42.35 338.8 23.85 39.843 Carpenters 23.35 560.4 39 9362 Power Tools 16.4 18.05 0.51 0.56

32 M.H., Daily Totals 779.6 1292.85 24.36 40.4

Crew F-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 21.75 35.962 Building Laborers 18.55 296.8 31 4961 Equip. Oper. (crane) 24.95 199.6 39.8 318.41 Hyd. Crane, 12 Ton 375.4 412.952 Power Tools 16.4 18.05 9.8 10.77

40 M.H., Daily Totals 1261.8 1869.4 31.55 46.73

Crew F-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 20.95 352 Building Laborers 18.55 296.8 31 4962 Power Tools 16.4 18.05 0.51 0.56

32 M.H., Daily Totals 686.8 1138.05 21.46 35.56

Page 91: Productivity Rates

Crew G-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Roofer Foreman 23.25 186 41.95 335.6 19.82 35.764 Roofers, Composition 21.25 680 38.35 1227.22 Roofer Helpers 15.25 244 27.5 4401 Application Equipment 148.4 163.25 2.65 2.92

56 M.H., Daily Totals 1258.4 2166.05 22.47 38.68

Crew G-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Plasterer 22.8 182.4 37.25 298 20.13 33.131 Plasterer Helper 19.05 152.4 31.15 249.21 Building Laborer 18.55 148.4 31 2481 Grouting Equipment 242.8 267.1 10.12 11.13

24 M.H., Daily Totals 726 1062.3 30.25 44.26

Crew G-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Sheet Metal Workers 26.65 426.4 42.7 683.2 22.6 36.852 Building Laborers 18.55 296.8 31 4963 Power Tools 24.6 27.05 0.77 0.85

32 M.H., Daily Totals 747.8 1206.25 23.37 37.7

Crew G-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (outsid 20.55 164.4 34.3 274.4 19.22 32.12 Building Laborers 18.55 296.8 31 4961 Light Truck, 1.5 Ton 153.4 168.751 Air Compr., 160 C.F.M. 90.2 99.2 10.15 11.17

24 M.H., Daily Totals 704.8 1038.35 29.37 43.27

Crew G-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Roofer Foreman 23.25 186 41.95 335.6 19.25 34.732 Roofers, Composition 21.25 340 38.35 613.62 Roofer Helpers 15.25 244 27.5 4401 Application Equipment 148.4 163.25 3.71 4.08

40 M.H., Daily Totals 918.4 1552.45 22.96 38.81

Page 92: Productivity Rates

Crew H-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Glaziers 23.5 376 38 608 24.75 43.422 Struc. Steel Workers 26 416 48.85 781.6

32 M.H., Daily Totals 792 1389.6 24.75 43.42

Crew H-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Glaziers 23.5 376 38 608 21.85 35.671 Building Laborer 18.55 148.4 31 248

24 M.H., Daily Totals 524.4 856 21.85 35.67

Crew H-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Glaziers 23.5 188 38 304 20.8 34.081 Helper 18.1 144.8 30.15 241.2

16 M.H., Daily Totals 332.8 545.2 20.8 34.08

Page 93: Productivity Rates

Crew J-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Plasterers 22.8 547.2 37.25 894 21.3 34.812 Plasterer Helpers 19.05 304.8 31.15 498.41 Mixing Machine, 6 C.F. 38.6 42.45 0.97 1.06

40 M.H., Daily Totals 890.6 1434.85 22.27 35.87

Crew J-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Plasterers 22.8 547.2 37.25 894 21.62 35.212 Plasterer Helpers 19.05 304.8 31.15 498.41 Lather 23.2 185.6 37.2 297.61 Mixing Machine, 6 C.F. 38.6 42.45 0.8 0.88

48 M.H., Daily Totals 1076.2 1732.45 22.42 36.09

Crew J-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Terrazzo Worker 23.7 189.6 37.35 298.8 21.53 33.921 Terrazzo Helper 19.35 154.8 30.5 2441 Terrazzo Grinder,Electric 37.2 40.91 Terrazzo Mixer 58.6 64.45 5.99 6.59

16 M.H., Daily Totals 440.2 648.15 27.52 40.51

Crew J-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Tile Layer 23.5 188 37.05 296.4 21.1 33.281 Tile Layer Helper 18.7 149.6 29.5 236

16 M.H., Daily Totals 337.6 532.4 21.1 33.28

Page 94: Productivity Rates

Crew K-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter 23.25 186.8 39 312 21.25 35.11 Truck Driver (light) 19.15 153.2 31.2 249.61 Truck w/ Power Equip. 155.8 171.4 9.74 10.71

16 M.H., Daily Totals 495.8 733 30.99 45.81

Crew K-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 24.38 44.221 Struc. Steel Worker 26 208 48.85 390.81 Truck Driver (light) 19.15 153.2 31.2 249.6

Truck w/ Power Equip. 155.8 171.4 6.49 7.1424 M.H., Daily Totals 741 1232.6 30.87 51.36

Page 95: Productivity Rates

Crew L-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician 26.7 213.6 41.4 331.2 27.05 42.151 Plumber 27.4 219.2 42.9 343.2

16 M.H., Daily Totals 432.8 674.4 27.05 42.15

Crew L-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter 23.35 186.8 39 312 20.73 34.581 Carpenter Helper 18.1 144.8 30.15 241.2

16 M.H., Daily Totals 331.6 553.2 20.73 34.58

Crew L-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter 23.35 186.8 39 312 25.01 40.53

0.5 Electrician 26.7 106.8 41.4 165.60.5 Sheet Metal Worker 26.65 106.6 42.7 170.816 M.H., Daily Totals 400.2 648.4 25.01 40.53

Crew L-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Skilled Worker 24.1 385.6 39.85 637.6 22.1 36.621 Helper 18.1 144.8 30.15 241.2

24 M.H., Daily Totals 530.4 878.8 22.1 36.62

Crew L-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 26.14 48.095 Struc. Steel Workers 26 1040 48.85 19541 Equip. Oper. (crane) 24.95 199.6 39.8 318.4

508.2 559 9.08 9.98M.H., Daily Totals 1971.8 3252.2 35.22 58.07

Crew L-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Plumber 27.4 219.2 42.9 343.2 27.17 42.4

0.5 Electrician 26.7 106.8 41.4 165.612 M.H., Daily Totals 326 508.8 27.17 42.4

Crew L-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 22.46 37.061 Building Laborer 18.55 148.4 31 248

0.5 Electrician 26.7 106.8 41.4 165.628 M.H., Daily Totals 628.8 1037.6 22.46 37.06

Crew L-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Carpenters 23.35 373.6 39 624 24.16 39.78

0.5 Plumber 27.4 109.6 42.9 171.620 M.H., Daily Totals 483.2 795.6 24.16 39.78

Crew L-9Bare Costs Incl. Subs O&P Cost per Manhour

Page 96: Productivity Rates

Crew L-9 Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Labor Foreman (inside 19.05 152.4 31.8 254.4 21.22 36.32 Building Laborers 18.55 296.8 31 4961 Struc. Steel Worker 26 208 48.85 390.8

0.5 Electrician 26.7 106.8 41.4 165.636 M.H., Daily Totals 764 1306.8 21.22 36.3

Page 97: Productivity Rates

Crew M-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P3 Elevator Constructors 27.25 654 42.5 1020 25.89 40.381 Elevator Apprentice 21.8 174.4 34 2725 Hand Tools 80 88 2.5 2.75

32 M.H., Daily Totals 908.4 1380 28.39 43.13

Crew M-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Millwrights 24.35 389.6 38.8 620.8 24.35 38.82 Power Tools 16.4 18.05 1.03 1.13

16 M.H., Daily Totals 406 638.85 25.38 39.93

Page 98: Productivity Rates

Crew Q-1Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Plumber 27.4 219.2 42.9 343.2 24.65 38.581 Plumber Apprentice 21.9 175.2 34.25 274

16 M.H., Daily Totals 394.4 617.2 24.65 38.58

Crew Q-2Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P2 Plumbers 27.4 438.4 42.9 686.4 25.57 40.021 Plumber Apprentice 21.9 175.2 34.25 274

24 M.H., Daily Totals 613.6 960.4 25.57 40.02

Crew Q-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Plumber Foreman (ins 27.9 223.2 43.65 349.2 26.15 40.932 Plumbers 27.4 438.4 42.9 686.41 Plumber Apprentice 21.9 175.2 34.25 274

32 M.H., Daily Totals 836.8 1309.6 26.15 40.93

Crew Q-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Plumber Foreman (ins 27.9 223.2 43.65 349.2 26.15 40.931 Plumber 27.4 219.2 42.9 343.21 Welder (plumber) 27.4 219.2 42.9 343.21 Plumber Apprentice 21.9 175.2 34.25 2741 Electric Welding Mach. 45.8 50.4 1.43 1.57

32 M.H., Daily Totals 882.6 1360 27.58 42.5

Page 99: Productivity Rates

Crew R-3Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 26.55 41.41 Electrician 26.7 213.6 41.4 331.2

0.5 Equip. Oper. (crane) 24.95 99.8 39.8 159.20.5 S.P. Crane, 5 Ton 112.6 123.85 5.63 6.1920 M.H., Daily Totals 643.6 951.85 32.18 47.59

Crew R-4Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Struc. Steel Foreman 28 224 52.6 420.8 26.54 48.113 Struc. Steel Workers 26 624 48.85 1172.41 Electrician 26.7 213.6 41.4 331.21 Gas Welding Machine 73.4 80.75 1.84 2.02

40 M.H., Daily Totals 1135 2005.15 28.38 50.13

Crew R-5Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 23.62 37.384 Electrician Lineman 26.7 854.4 41.4 1324.82 Electrician Operators 26.7 427.2 41.4 662.44 Electrician Groundme 18.1 579.2 30.15 964.81 Crew Truck 169.6 186.551 Tool Van 308 338.81 Pick-up Truck 113.4 124.75

0.2 Crane, 55 Ton 142 156.20.2 Crane, 12 Ton 75.08 82.60.2 Auger, Truck Mtd. 313.8 345.2

1 Tractor w/ Winch 265.4 291.95 15.76 17.3488 M.H., Daily Totals 3465.68 4815.65 39.38 54.72

Crew R-6Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 23.62 37.384 Electrician Linemen 26.7 854.4 41.4 1324.82 Electrician Operators 26.7 427.2 41.4 662.44 Electrician Groundme 18.1 579.2 30.15 964.81 Crew Truck 169.6 186.551 Tool Van 308 338.81 Pick-up Truck 113.4 124.75

0.2 Crane, 55 Ton 142 156.20.2 Crane, 12 Ton 75.08 82.60.2 Auger, Truck Mtd. 313.8 345.2

1 Tractor w/ Winch 265.4 291.953 Cable Trailers 392.4 431.65

0.5 Tensioning Rig 127.9 140.70.5 Cable Pulling Rig 764 840.4 30.36 33.3988 M.H., Daily Totals 4749.98 6228.4 53.98 70.77

Crew R-7Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 19.62 32.165 Electrician Groundme 18.1 724 30.15 12061 Crew Truck 169.6 186.55 3.53 3.89

Page 100: Productivity Rates

48 M.H., Daily Totals 1111.2 1730.15 23.15 36.05

Crew R-8Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 23.92 37.783 Electrician Linemen 26.7 640.8 41.4 993.62 Electrician Groundme 18.1 289.6 30.15 482.41 Pick-up Truck 113.4 124.751 Crew Truck 169.6 186.55 5.9 6.49

48 M.H., Daily Totals 1431 2124.9 29.82 44.27

Crew R-9Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 22.46 35.881 Electrician Linemen 26.7 213.6 41.4 331.22 Electrician Operators 26.7 427.2 41.4 662.44 Electrician Groundme 18.1 579.2 30.15 964.81 Pick-up Truck 113.4 124.751 Crew Truck 169.6 186.55 4.42 4.86

64 M.H., Daily Totals 1720.6 2607.3 26.88 40.74

Crew R-10Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 25.35 39.664 Electrician Linemen 26.7 854.4 41.4 1324.81 Electrician Groundma 18.1 144.8 30.15 241.21 Crew Truck 169.6 186.553 Tram Cars 462.6 508.85 13.17 14.49

48 M.H., Daily Totals 1849 2599 38.52 54.15

Crew R-11Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Electrician Foreman 27.2 217.6 42.2 337.6 24.38 38.424 Electricians 26.7 854.4 41.4 1324.81 Helper 18.1 144.8 30.15 241.21 Common Laborer 18.55 148.4 31 2481 Crew Truck 169.6 186.551 Crane, 12 Ton 375.4 412.95 9.73 10.71

56 M.H., Daily Totals 1910.2 2751.1 34.11 49.13

Crew R-12Bare Costs Incl. Subs O&P Cost per Manhour

Hr. Daily Hr. Daily Bare Costs Incl. O&P1 Carpenter Foreman 23.85 190.8 39.85 318.8 21.96 37.014 Carpenters 23.35 747.2 39 12484 Common Laborers 18.55 593.6 31 9921 Equip. Oper. (med.) 24.1 192.8 38.45 307.61 Steel Worker 26 208 48.85 390.81 Dozer, 200 H.P. 832 915.21 Pick-up Truck 113.4 124.75 10.74 11.82

88 M.H., Daily Totals 2877.8 4297.15 32.7 48.83