Upload
jordan-barlow
View
219
Download
2
Embed Size (px)
DESCRIPTION
Â
Citation preview
JORDAN [email protected]
608 | 886 | 7537
521 s 7th street, apt. 306minneapolis, minnesota 55415
M. Arch, BDA
Section two is a small sample of the professional work that I’ve accomplished over the last year. I’ve been involved with all of the design phases across a range of projects during my time with HGA. I’ve also been involved in marketing efforts creating beautiful, compelling imagery to win projects. Currently my professional goal is to become licensed within two years and work in a collaborative environment that fosters and enhances my personal talent.
PROFESSIONAL WORK
49
fundraising image for the St. Louis Park Community Center
contents
51 - 52 | College of St. Scholastica - Graduate Health 53 - 58 | Boise State University - Studio Arts
59 - 64 | Boise State University - Studio Arts
65 | Marketing and Fundraising
66 | resume
50
The project was taken from schematic design to final CD’s in a three month period and imparted me with invaluable knowledge of how to create drawings sets and coordinate with other disciplines.
College of St. Scholastica | Gruaduate Healthunder construction - Duluth, Minnesota
12 14
8
6
11 19
18
5
4
9
3
5
6
6
17
6
6
12
5
8
10
11
4
51
52
Boise State University | Sculpture Artsdesign development - Boise, Idaho
west perspective
This project marks the beginning of my design contributions at HGA. The sculpted mass of the new arts building is willful - appropriate to house the expanding studio arts program at Boise State. The two wings twist toward their context and the glass lobby draws views in and through a new landscape corridor.
53
north perspective
buildingsite
54
graphic design, photography
LEVEL 05faculty lounge, mechanical penthouse
LEVEL 04painting, drawing, general education
LEVEL 03
sculpture, lobby, gallery, administrationLEVEL 01
LEVEL 02staff, metals, print media
55
R - 137’ 3”
R - 76’ 3”
R - 133’ 0”
R - 80’ 8”
R - 134’ 3”
R - 75’ 9”
R - 133’ 7”
R - 75’ 5
8’ 0”
15’ 0”
3’ 7”
8’ 0”
15’ 0”
11’ 3”
15’ 0”
42.5
5’ 8”
2’ 10”5”
the double curved nature of the form will require novel methods of description as the project progresses. In the case of a panel cladding system precise measurements of radii and bounding box geometry can make the complex geometry accessible.
south west perspective 56
the double curved geometry of the facade is generated by slightly radiating the footprint around a set of vertical anchors
floor plans distributed at the correct levels begin to describe an armature that supports the sloping form
south elevation
various iterations of a sun screen were developed for the southern expanse of glass looking to achieve visual and performative harmony
57
eastern courtyard
lobby interior
eastern courtyard 58
Children’s Museum of Cheyennedesign development - Cheyenne, Wyoming
The children’s museum is situated between two 100 + year old buildings in the historic district of Cheyenne, Wyoming. Already constrained by the nature of infill projects the precarious structures next door were cause of additional concern. The project is a study in connected volumes that create a unified experience across multiple floors of gallery space.
east perspective59
60
UP
UP
A. ALL INTERIOR PARTITIONS SHALL BE "A3_" UNLESS NOTED OTHERWISE.B. PLAN DIMENSIONS ARE FROM FACE OF FINISH WHERE “HOLD” OR “CLEAR” ARE
INDICATED. ALL OTHER PLAN DIMENSIONS ARE FROM FACE OF PARTITION TYPE ANDDO NOT INCLUDE APPLIED FINISHES.
C. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/ORFURRING ARE COPLANAR.
D. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BECONCEALED WITHIN PARTITION/WALL ASSEMBLY IN FINISHED AREAS UNLESS NOTEDOTHERWISE.
E. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL-MOUNTED ITEMS.F. ALL MECHANICAL EQUIPMENT PADS TO BE 4" HIGH MINIMUM, UNLESS NOTED
OTHERWISE. SIZE OF PADS TO BE VERIFIED BY CONTRACTORG. REFER TO SHEET A___ FOR DETAIL OF TYPICAL DOOR JAMB AT ABUTTING WALLS
OR PARTITIONS.H. ALL OFFICES, TREATMENT ROOMS, CONSULTATION ROOMS, AND RECOVERY
ROOMS TO HAVE A SINGLE COAT HOOK <CH-1> MOUNTED ON THE DOOR (ROOMSIDE) UNLESS NOTED OTHERWISE. PATCH ALL HOLES IN EXISTING SURFACESWHERE EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS OCCURRED.PREPARE SURFACES AS REQUIRED FOR NEW FINISHES. PATCH TO MATCHADJACENT SURFACE IF NOT SCHEDULED.
I. ALL EXISTING FLOOR OPENINGS AND DEPRESSIONS IN THE WORK SHALL BE FILLEDOR CLOSED, UNLESS NOTED OTHERWISE, WITH MATERIALS TO MATCH ADJACENTSURFACES, FINISHES AND FIRE RATINGS.
GENERAL NOTES - CONSTRUCTION PLAN
A
1
A4002
A4011
A4021
A4022
B
C
D
E
F
G
3 5
H
42
75 SF
ELEC119
281 SF
COATROOM
104
107 SF
ELEC110A
536 SF
STORE101
468 SF
RECEIVINGSTAGING
118
115 SF
STORAGE101A
81 SF
EMR101B
227 SF
MEN'S108
217 SF
WOMENS'106
428 SF
CORR.C100
1A410
1A410
1A411
1A411
2A412
2A412
1A413
1A413
15'-0
"
26'-0"8'-0"
15'-3
"22
'-0"
21'-3
"27
'-6"
20'-6
"7'-
5"
1,822 SF
GALLERY102
384 SF
CORR.116
34'-0" 16'-0" 34'-0"
204 SF
MECHANICAL110
103 SF
JAN112
121 SF
DIR.OFFICE
115117 SF
DIR.OFFICE
114
126 SF
VESTIBULEV100
1,954 SF
LOBBY100
263 SF
CONFERENCE117
161 SF
BOXOFFICE
103
303 SF
VOLUNTEERLOUNGE
105
204 SF
RECEPTION107
205 SF
BREAKROOM
109207 SF
OPENOFFICE
113
191 SF
OPENOFFICE
111
1'-9"
PL-W PL-E
1'-9"
PL-S
6" 6"
PROP LINE: 88'-6"
1'-2"
PROP
LINE
: 13
2'-1"
+/-
PL-N
1'-9"
1'-4"
HYNDSBUILDING
WYOMINGHOME
BUILDING
W 16TH STREET
ALLEY
PIONEERHOTEL
B3w
CW2CW1
B3
WS-1 WS-1
WS-1
B3
B3
B3
B3w
A3w
B3w
A3w A3w
A3w
B3
B3
B3
B3
B3
PM-1
7'-0"
65 SF
H20197
A3w
A3w
281 SF
EXIT STAIRS100
188 SF
EXIT STAIRS101
2
1
CW1
3
COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C
4 2 0
5 t h
S t r
e e t
N o
r t h
, S u
i t e
1 0 0
T e l
e p h
o n e
6 1
2 . 7
5 8 . 4
0 0 0
M i n
n e a
p o l
i s ,
M i n
n e s
o t a
5 5
4 0 1
REVISION HISTORY - THIS SHEET
NO DESCRIPTION DATE
DATESCALE
COMM. NO.
NOT FOR
CONSTRUCTION
NAME:DATE:REGISTRATION NUMBER:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATIONOR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED ARCHITECT UNDER THE LAWS OF THESTATE OF
CH
ILD
RE
N'S
MU
SE
UM
OF
CH
EY
EN
NE
The
docu
men
t and
the
idea
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pro
fess
iona
l ser
vice
, is
the
prop
erty
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
and
is n
ot to
be
used
, in
who
le o
r in
part
for a
ny o
ther
pro
ject
with
out t
he p
rior w
ritte
n au
thor
izat
ion
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
208
W L
inco
lnw
ayC
heye
nne,
Wyo
min
g 8
2001
9/2/
2015
2:2
7:48
PM
1/8" = 1'-0"
A201
FLOOR PLAN -FIRST LEVEL
3259-002-00
AUGUST 29TH,2015
AUGUST 29TH, 2015
SCH
EMAT
IC D
ESIG
NAU
GU
ST 2
9TH
, 201
5
KEYNOTES - FLOOR PLAN# DESCRIPTION1 GLASS ELEVATOR SHAFT AND CAB2 MONUMENTAL STAIR3 STRUCTURAL BRACING - REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION4 FLEXIBLE BOX OFFICE KIOSK5 FLEXIBLE STORE DISPLAY6 OWS - 17 ORN RAIL - 18 LFD - 1, MARVIN LIFT AND SLIDE DOORS9 VRAW - 110 ORN MET - 211 ORN RAIL - 2
1/8" = 1'-0"1 FLOOR PLAN - LEVEL 01
UP
UP
A
1
A4002
A4011
A4021
A4022
B
C
D
E
F
G
3 5
H
42
1,049 SF
SECONDFLOORLOBBY
200
1,214 SF
CLASSROOM204
75 SF
DATA201A
1A410
1A410
1A411
1A411
2A412
2A412
1A413
1A413
499 SF
STORAGE205
PL-W PL-E
PL-S
PL-N
PROP
LINE
: 13
2'-1"
+/-
1'-9"
15'-0
"15
'-3"
22'-0
"21
'-3"
27'-6
"20
'-6"
7'-5"
1'-5"
PROP LINE: 88'-6" +/-
1'-9"
HYNDSBUILDING
WYOMINGHOME
BUILDING
2'-3" 34'-0" 16'-0" 34'-0" 2'-3"
8'-0"
PIONEERHOTEL
4,882 SF
GALLERY201
436 SF
RoomS200
229 SF
EXIT STAIRS201
55 SF
FAM.TOILET
20255 SF
FAM.TOILET
203
81 SF
MOTHER'SROOM
198
1
2
6
B3w B3w
A3w
A3w
A3w
A3w
A3w
FS-1
FS-1
AFS-1
CW2
AFS-2
AFS-2
A3w
B3w
B3b
B3w
B3w
B3b
B3
B3
B3B3B3
PM-1
7
7
77
WS-1
WS-1
B3
AFS-2 AFS-2
A3w
B3w
A. ALL INTERIOR PARTITIONS SHALL BE "A3_" UNLESS NOTED OTHERWISE.B. PLAN DIMENSIONS ARE FROM FACE OF FINISH WHERE “HOLD” OR “CLEAR” ARE
INDICATED. ALL OTHER PLAN DIMENSIONS ARE FROM FACE OF PARTITION TYPE ANDDO NOT INCLUDE APPLIED FINISHES.
C. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/ORFURRING ARE COPLANAR.
D. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BECONCEALED WITHIN PARTITION/WALL ASSEMBLY IN FINISHED AREAS UNLESS NOTEDOTHERWISE.
E. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL-MOUNTED ITEMS.F. ALL MECHANICAL EQUIPMENT PADS TO BE 4" HIGH MINIMUM, UNLESS NOTED
OTHERWISE. SIZE OF PADS TO BE VERIFIED BY CONTRACTORG. REFER TO SHEET A___ FOR DETAIL OF TYPICAL DOOR JAMB AT ABUTTING WALLS
OR PARTITIONS.H. ALL OFFICES, TREATMENT ROOMS, CONSULTATION ROOMS, AND RECOVERY
ROOMS TO HAVE A SINGLE COAT HOOK <CH-1> MOUNTED ON THE DOOR (ROOMSIDE) UNLESS NOTED OTHERWISE. PATCH ALL HOLES IN EXISTING SURFACESWHERE EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS OCCURRED.PREPARE SURFACES AS REQUIRED FOR NEW FINISHES. PATCH TO MATCHADJACENT SURFACE IF NOT SCHEDULED.
I. ALL EXISTING FLOOR OPENINGS AND DEPRESSIONS IN THE WORK SHALL BE FILLEDOR CLOSED, UNLESS NOTED OTHERWISE, WITH MATERIALS TO MATCH ADJACENTSURFACES, FINISHES AND FIRE RATINGS.
GENERAL NOTES - CONSTRUCTION PLAN
COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C
4 2 0
5 t h
S t r
e e t
N o
r t h
, S u
i t e
1 0 0
T e l
e p h
o n e
6 1
2 . 7
5 8 . 4
0 0 0
M i n
n e a
p o l
i s ,
M i n
n e s
o t a
5 5
4 0 1
REVISION HISTORY - THIS SHEET
NO DESCRIPTION DATE
DATESCALE
COMM. NO.
NOT FOR
CONSTRUCTION
NAME:DATE:REGISTRATION NUMBER:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATIONOR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED ARCHITECT UNDER THE LAWS OF THESTATE OF
CH
ILD
RE
N'S
MU
SE
UM
OF
CH
EY
EN
NE
The
docu
men
t and
the
idea
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pro
fess
iona
l ser
vice
, is
the
prop
erty
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
and
is n
ot to
be
used
, in
who
le o
r in
part
for a
ny o
ther
pro
ject
with
out t
he p
rior w
ritte
n au
thor
izat
ion
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
208
W L
inco
lnw
ayC
heye
nne,
Wyo
min
g 8
2001
9/2/
2015
2:2
7:50
PM
1/8" = 1'-0"
A202
FLOOR PLAN -SECOND LEVEL
3259-002-00
AUGUST 29TH,2015
AUGUST 29TH, 2015
SCH
EMAT
IC D
ESIG
NAU
GU
ST 2
9TH
, 201
5
1/8" = 1'-0"1 FLOOR PLAN - LEVEL 02
KEYNOTES - FLOOR PLAN# DESCRIPTION1 GLASS ELEVATOR SHAFT AND CAB2 MONUMENTAL STAIR3 STRUCTURAL BRACING - REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION4 FLEXIBLE BOX OFFICE KIOSK5 FLEXIBLE STORE DISPLAY6 OWS - 17 ORN RAIL - 18 LFD - 1, MARVIN LIFT AND SLIDE DOORS9 VRAW - 110 ORN MET - 211 ORN RAIL - 2
1 Revision 1 Date 1
close to the main entry is the monumental stair and a glass elevator. Because of the constrained vertical program stack, circulation is a key element celebrated by moving it to the front as an object on display.
61
A B
C D
A
B
C D
A
1
A4002
A4011
A4021
A4022
B
C
D
E
F
G
3 5
H
42
971 SF
THEATRELOBBY
301
75 SF
DIM302C
103 SF
J.C.308
809 SF
CAFESEATING
300
271 SF
CAFE305
71 SF
S/L LOCK302A
73 SF
S/L LOCK302B
1,107 SF
SECRETGARDEN
303
267 SF
BALCONY304
1A410
1A410
1A411
1A411
2A412
1A413
1A413
3,601 SF
THEATER302
PL-W PL-E
PL-S
PL-N
2'-3" 34'-0" 16'-0" 8'-0" 26'-0" 2'-3"
PROP O.D.: 88'-6" +/1
PROP
O.D
.: 13
2'-1"
+/-
1'-4"6" 1'-9"
1'-9" 6"
1'-9"
15'-0
"15
'-3"
22'-0
"21
'-3"
27'-6
"20
'-6"
7'-5"
1'-5"
CORR.C300
STORAGE310
MEN'S306
WOMEN'S307
15'-0
"
26'-11"
1'-9"
HYNDSBUILDING
WYOMINGHOME
BUILDING
10'-0"10'-0" 30'-0"4 1/8"
PIONEERHOTEL
1'-5 1/8"
302 SF
GREENROOM
309
227 SF
EXIT STAIRS301
169 SF
EXIT STAIRS300
WS-2
WS-2
WS-2
A3wB3w
A3w
B3
FS-1
FS-1 CW2
CW1
B3w
B3
B3
B3
B3
WS-1
B3
98
1
2
AFS-2 AFS-2WS-1
B3
B6_
10 10 11
A. ALL INTERIOR PARTITIONS SHALL BE "A3_" UNLESS NOTED OTHERWISE.B. PLAN DIMENSIONS ARE FROM FACE OF FINISH WHERE “HOLD” OR “CLEAR” ARE
INDICATED. ALL OTHER PLAN DIMENSIONS ARE FROM FACE OF PARTITION TYPE ANDDO NOT INCLUDE APPLIED FINISHES.
C. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/ORFURRING ARE COPLANAR.
D. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BECONCEALED WITHIN PARTITION/WALL ASSEMBLY IN FINISHED AREAS UNLESS NOTEDOTHERWISE.
E. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL-MOUNTED ITEMS.F. ALL MECHANICAL EQUIPMENT PADS TO BE 4" HIGH MINIMUM, UNLESS NOTED
OTHERWISE. SIZE OF PADS TO BE VERIFIED BY CONTRACTORG. REFER TO SHEET A___ FOR DETAIL OF TYPICAL DOOR JAMB AT ABUTTING WALLS
OR PARTITIONS.H. ALL OFFICES, TREATMENT ROOMS, CONSULTATION ROOMS, AND RECOVERY
ROOMS TO HAVE A SINGLE COAT HOOK <CH-1> MOUNTED ON THE DOOR (ROOMSIDE) UNLESS NOTED OTHERWISE. PATCH ALL HOLES IN EXISTING SURFACESWHERE EQUIPMENT HAS BEEN REMOVED OR DEMOLITION HAS OCCURRED.PREPARE SURFACES AS REQUIRED FOR NEW FINISHES. PATCH TO MATCHADJACENT SURFACE IF NOT SCHEDULED.
I. ALL EXISTING FLOOR OPENINGS AND DEPRESSIONS IN THE WORK SHALL BE FILLEDOR CLOSED, UNLESS NOTED OTHERWISE, WITH MATERIALS TO MATCH ADJACENTSURFACES, FINISHES AND FIRE RATINGS.
GENERAL NOTES - CONSTRUCTION PLAN
COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C
4 2 0
5 t h
S t r
e e t
N o
r t h
, S u
i t e
1 0 0
T e l
e p h
o n e
6 1
2 . 7
5 8 . 4
0 0 0
M i n
n e a
p o l
i s ,
M i n
n e s
o t a
5 5
4 0 1
REVISION HISTORY - THIS SHEET
NO DESCRIPTION DATE
DATESCALE
COMM. NO.
NOT FOR
CONSTRUCTION
NAME:DATE:REGISTRATION NUMBER:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATIONOR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED ARCHITECT UNDER THE LAWS OF THESTATE OF
CH
ILD
RE
N'S
MU
SE
UM
OF
CH
EY
EN
NE
The
docu
men
t and
the
idea
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pro
fess
iona
l ser
vice
, is
the
prop
erty
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
and
is n
ot to
be
used
, in
who
le o
r in
part
for a
ny o
ther
pro
ject
with
out t
he p
rior w
ritte
n au
thor
izat
ion
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
208
W L
inco
lnw
ayC
heye
nne,
Wyo
min
g 8
2001
9/2/
2015
2:2
7:51
PM
1/8" = 1'-0"
A203
FLOOR PLAN -THIRD LEVEL
3259-002-00
AUGUST 29TH,2015
AUGUST 29TH, 2015
SCH
EMAT
IC D
ESIG
NAU
GU
ST 2
9TH
, 201
5
1/8" = 1'-0"1 FLOOR PLAN - LEVEL 03
KEYNOTES - FLOOR PLAN# DESCRIPTION1 GLASS ELEVATOR SHAFT AND CAB2 MONUMENTAL STAIR3 STRUCTURAL BRACING - REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION4 FLEXIBLE BOX OFFICE KIOSK5 FLEXIBLE STORE DISPLAY6 OWS - 17 ORN RAIL - 18 LFD - 1, MARVIN LIFT AND SLIDE DOORS9 VRAW - 1
10 ORN MET - 211 ORN RAIL - 2
A
1
A4002
A4011
A4021
A4022
B
C
D
E
F
G
3 5
H
42
GARDEN BELOW-15'
1A410
1A411
2A412
1A413
PL-W PL-E
PL-S
15'-0
"15
'-3"
22'-0
"21
'-3"
27'-6
"20
'-6"
7'-5"
1'-5"
2'-3" 34'-0" 16'-0" 8'-0" 26'-0" 2'-3"
PROP O.D.: 88'-6" +/-
PL-N
HYNDSBUILDING
WYOMINGHOME
BUILDING -BELOW
37'-9
"11
'-0"
12'-8
"35
'-4"
35'-4
"
1'-9" 50'-0" 1'-2"
12'-5
3/8"
58'-6
"7'-
5 5/8"
78'-5
"
52'-11"
PN-2
PN-2
PN-2
EMGEN
CHILLER
<SKLT-1>
AFS-2
FS-1
FS-1
WS-1
WS-1
A. XXXGENERAL NOTES - FINISH SCHEDULE
1
1
D D
E E
F F
G G
3
3
4
4
2
2
1A410
1A410
2A412
2A412
1A413
1A413
PL-W
PL-W
CHILLER
EMGEN
WS-1
WS-1
WS-1
COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C
4 2 0
5 t h
S t r
e e t
N o
r t h
, S u
i t e
1 0 0
T e l
e p h
o n e
6 1
2 . 7
5 8 . 4
0 0 0
M i n
n e a
p o l
i s ,
M i n
n e s
o t a
5 5
4 0 1
REVISION HISTORY - THIS SHEET
NO DESCRIPTION DATE
DATESCALE
COMM. NO.
NOT FOR
CONSTRUCTION
NAME:DATE:REGISTRATION NUMBER:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATIONOR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED ARCHITECT UNDER THE LAWS OF THESTATE OF
CH
ILD
RE
N'S
MU
SE
UM
OF
CH
EY
EN
NE
The
docu
men
t and
the
idea
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pro
fess
iona
l ser
vice
, is
the
prop
erty
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
and
is n
ot to
be
used
, in
who
le o
r in
part
for a
ny o
ther
pro
ject
with
out t
he p
rior w
ritte
n au
thor
izat
ion
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
208
W L
inco
lnw
ayC
heye
nne,
Wyo
min
g 8
2001
9/2/
2015
2:2
7:53
PM
1/8" = 1'-0"
A204
ROOF PLAN
3259-002-00
AUGUST 29TH,2015
AUGUST 29TH, 2015
SCH
EMAT
IC D
ESIG
NAU
GU
ST 2
9TH
, 201
5
1/8" = 1'-0"1 ROOF
KEYNOTES - ROOF PLAN# DESCRIPTION
1/8" = 1'-0"2 ROOF PLAN - THEATERthe third floor hosts a multifunctional performance space as well as the hidden garden. The garden is screened from the street but visible from the interior - the plantings slide into view as you ascend the elevator.
62
E
G H
F
E
F
GH
63 east perspective - night
LEVEL 01100' - 0"
1
LEVEL 02115' - 0"
LEVEL 03135' - 0"
35
ROOF150' - 0"
BASEMENT90' - 0"
4 2
1A410
1A411
PL-WPL-E
HIGH PARAPET161' - 8"
88'-6"
2'-3"34'-0"16'-0"8'-0"26'-0"2'-3"
GALLERY102
LOBBY100
GALLERY201
SECONDFLOORLOBBY
200
THEATRELOBBY
301
CAFESEATING
300
PER FDN EASMENT1'-6"
HYNDSBUILDING
WYOMINGHOME
BUILDING
3'-0"
8'-4"
15'-0
"20
'-0"
15'-0
"11
'-8"
58'-4
"
HIGH ROOF159' - 2"
COPYRIGHT HAMMEL, GREEN AND ABRAHAMSON, INC.C
4 2 0
5 t h
S t r
e e t
N o
r t h
, S u
i t e
1 0 0
T e l
e p h
o n e
6 1
2 . 7
5 8 . 4
0 0 0
M i n
n e a
p o l
i s ,
M i n
n e s
o t a
5 5
4 0 1
REVISION HISTORY - THIS SHEET
NO DESCRIPTION DATE
DATESCALE
COMM. NO.
NOT FOR
CONSTRUCTION
NAME:DATE:REGISTRATION NUMBER:
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATIONOR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED ARCHITECT UNDER THE LAWS OF THESTATE OF
CH
ILD
RE
N'S
MU
SE
UM
OF
CH
EY
EN
NE
The
docu
men
t and
the
idea
s in
corp
orat
ed h
erei
n, a
s an
inst
rum
ent o
f pro
fess
iona
l ser
vice
, is
the
prop
erty
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
and
is n
ot to
be
used
, in
who
le o
r in
part
for a
ny o
ther
pro
ject
with
out t
he p
rior w
ritte
n au
thor
izat
ion
of H
amm
el G
reen
and
Abr
aham
son,
Inc.
208
W L
inco
lnw
ayC
heye
nne,
Wyo
min
g 8
2001
9/2/
2015
2:2
8:23
PM
1/4" = 1'-0"
A412
BUILDINGSECTION - E-WBETWEEN 'C' +'D' - LOOKINGSOUTH
3259-002-00
AUGUST 29TH,2015
AUGUST 29TH, 2015SC
HEM
ATIC
DES
IGN
AUG
UST
29T
H, 2
015
1/4" = 1'-0"2 E-W SECTION BETWEEN C-D - LOOKING SOUTH
64E - W section
marketing | fundraising
Part of my role at HGA has been to quickly create materials that respond to vague client requests in order to win projects for the firm. The brewery below was a successful four day effort based on the companies branding document.
true respite brewery - tree house
true respite brewery - tap room65
JORDAN [email protected]
608 | 886 | 7537
521 S 7th Street, # 306minneapolis, minnesota 55415
education
extracurricular + awards
work experience
skills + software
references
University of Minnesota - College of Design 2014 - master’s of architecture 2011 - bachelor’s of design in architecture
M. Arch, BDA
fellowships + awards 2014 - Richard Morrill Master’s Final Project Award 2014 - Design Democracy Fellowship 2013 - Bill & Elizabeth Pedersen Fellowship 2013 - Saul Parness Fellowship
teaching assistant 2014 - design fundamentals 2 - Andrea Johnson 2013 - design fundamentals 1 - Lisa Hsieh 2012 - architectural history - Leon Satkowski
designer - HGA - minneapolis oct. 2014 - present - Steven Dwyer Boise State Studio Arts - Children’s Museum of Cheyenne involved in all design phases across multiple projects - marketing and client iteractions architectural intern - MSR - minneapolis dec. 2013 - may 2014 - Eric Amel U of M Raptor Center - U of M Bee Discovery - U of M Bee Lab predesign - schematic design - programming - visualization - detailing - marketing
architectural intern - Architecture Field Office - minneapolis may 2013 - sep. 2013 - Mic Johnson schematic master plan for Stadium Village schematic design - representation - 3d modeling
fabrication - CDES - minneapolis - AIA Honor Award may 2013 - dec. 2013 - Adam Marcus Centenniel Chromograph physical fabrication - digital fabrication tools - assembly staging - documentation
autocad - masteryadobe creative suite - masteryphysical modeling - proficientsketchup - masteryrhino - masterygrasshopper - competencyrevit - proficient
Sharon Roe, M. ArchDirector of BDA ProgramUniversity of Minnesota - [email protected] 747 3779
Steven R. Dwyer - AIAPrincipalHGA [email protected] 758 4214
Eric Amel - [email protected] 225 1051
Ozayr Saloojee, M. ArchAssociate ProfessorUniversity of Minnesota - [email protected] 625 0690
JORDAN [email protected] 608 | 886 | 7537
521 s 7th street, apt. 306minneapolis, minnesota 55415
M. Arch, BDA