16
FES INTERNATIONAL Establis hed in 2011 COMPANY PROFILE Commitment our ethics, knowledge our strength Consultancy & Supply

Profile, F E S Int

Embed Size (px)

Citation preview

Page 1: Profile, F E S Int

FES INTERNATIONAL

Established in 2011

COMPANY PROFILECommitment our ethics, knowledge our strength

Consultancy & Supply

Page 2: Profile, F E S Int

FES INTERNATIONAL BACKGROUND

Since its birth in 2011, formed by some experienced and adolescent engineers

from Bangladesh University of Engineering and Technology (BUET), the adage of

FAHIM ENGINEERING SOLUTION is to accommodate one stop band-aid to the

client. Thats why the basin of experts includes humans from altered abandon and

sectors which accommodate it is the adequacy to complete multidisciplinary

tasks. As the name FAHIM ENGINEERING SOLUTIONS means derives ideas, style,

or aftertaste from a ample and assorted ambit of sources. We ace the appropriate

ideas, methods and plan for the applicant and abutment with our expertise. The

basin of experts includes professionals from the acreage of management,

engineering, amusing and ambiance studies. We accept acquired ability in activity

management, activity monitoring, study, research, analysis in altered field.

On the added duke Fahim Engineering Band-aid has been formed beneath the

administration of Mohammad Azhar Ali who has a continued career in the RMG

area in industrial Design, installation Master Plan, Layout, machineries selection,

Electro-Mechanical Design aliment specialization. He has served abounding

companies as agent and aswell as consultant; above audience are Bitopi-Misami

Group, Integrated Textile Ltd., Bangladesh Navy, Metro Knitting and Dyeing

Page 3: Profile, F E S Int

Industries, IDS Group, Square Knit Fabrics Ltd., Sparkle Knit Composite Ltd.,

Esquire Knit Composite Ltd. etc. FES has all-inclusive ability in Electro-Mechanical

Architecture of RMGs. This accumulated access will advance to a different

consultancy band-aid to the applicant both in architecture aesthetics and able use

of resources.

Page 4: Profile, F E S Int

COMPANY HIERARCHY

CEO

DESIGN SALES & SERVICE

SERVICE

HR& ACCOUNTS

DESIGN HEAD

EXECUTIVE

DRAFTS MAN

GM

SALES EXECUTIVE

SERVICE EXECUTIVE

HR & ACC HEAD

ACCOUNTS

OFFICE ASSISTANT

Page 5: Profile, F E S Int

SERIAL NO

CLIENTS NAME YEAR OF SERVICE

TYPES OF SERVICE RENDERED

1. BITOPI-MISAMI GROUPContact Details- Col Hasan Executive DirectorMob- 01713095748

2011-2013

Design of all utility (water supply, air line system, boiler system) works

Supervision of utility line setup Selection of machineries WTP, ETP design and

installation. Water recycle plant design.

2.

INTEGRATED TEXTILE LTDContact Details- Md. MoniruzzamanManaging DirectorMob-01755568404

2011

Factory design Machine layout preparation Design of utility (water supply,

air line system, boiler system) works

ETP design.

3. BANGLADESH NAVY 2011-2012

Design of Iron removal plant

Supervision of plant installation.

4.

METRO KNITTING &DYEING Contact Details-Mr Taraq GM EngineeringMob-01713041526

Running

Design of 40 ton dyeing capacity plant

All utility system design

Supervision of works

5. IDS GROUP Completed Energy audit of whole

electromechanical system.

6. BROTHER FURNITURE FACTORY

Completed

Electrical & Plumbing design &drawing

Estimating electrical and plumbing

500kva substation design and supervision

Supervision of labor shed and all lighting works

PROJECT STRENGTH OF FAHIM ENGINEERING SOLUTIONS

PROJECT STRENGTH OF FAHIM ENGINEERING SOLUTIONS

Page 6: Profile, F E S Int

SERIAL NO

CLIENTS NAME YEAR OF SERVICE

TYPES OF SERVICE RENDERED

7 SPARKLE KNIT COMPOSITE LTD.Contact details- Mr Azizul IslamHead Of FinanceMob-01713388102

2011-2012 Master plan Making. Utility Design. Machineries selection. Etp, Wtp design. Installation of whole project.

8 SQUARE KNIT FABRICS LTD

Completed Machine layout making. Energy savings utility Design Energy efficient boiler selection. Energy efficient machineries

selection. Salt recovery plant design. Cost effective ETP Design. Effient thermal design. Lighting and ventilation design. Humidification plant design

9 MASCO GROUP Completed Energy efficiency Audit and solution.

ETP Plant making. WTP Installation.

10 Leeu Fashion Ltd. Completed Complete Factory design ETP Plant making. Lighting and ventilation design. Machine layout making.

Note- Act as External Consultant of CP project of WORLD Bank Project.

Page 7: Profile, F E S Int

Design SMFL of Square Group

FIGURE: ETP PLANT OF SQUARE FASION LTD

POJECT RESPONSIBILITIES:

1. ETP RENNOVATION DESIGN

2. SALT RECOVERY PLANT ANALYSIS

3. WHOLE UTILITY DESIGN

4. ESTIMATING AND BOQ

5. SUPERVISION OF THE PROJECT

Page 8: Profile, F E S Int

BRIEF DESCRIPTION OF THE PROJECTLOCATION HORINDHORA, TANNERY

HEMAYETPUR, SAVAR ,DHAKACOUNTRY BANGLADESH

CLIENT BROTHERS FURNITURE LTD YEAR 2012-2013CLIENT ADDRESS

HORINDHORA, TANNERY HEMAYETPUR, SAVAR ,DHAKA

STATUS 80 % COMPLETE

PROJECT TYPE

INDUSTRIAL ELECTRICAL & PLUMBING DESIGN

PROJECT COST

15 CRORE VALUE OF SERVICE

4 LAC

FIGURE: UNDER CONTRUCTION OF DB, MDB OF BROTHER FURNITURE FACTORY SHED 1

POJECT RESPONSIBILITIES:

6. ELECTRICAL DESIGN & DRAWING

7. PLUMBING DESIGN & DRAWING

8. ESTIMATING ELECTRICAL AND PLUMBING

9. 500KVA SUBSTATION DESIGN AND SUPERVISION

10. SUPERVISION OF LABOR SHED AND ALL LIGHTING WORKS

ELECTRIFICATION DESIGN AND SUPERVISION OF BROTHERS FURNITURE

Page 9: Profile, F E S Int

Design SPARKLE KNIT COMPOSITE LTD

BRIEF DESCRIPTION OF THE PROJECTLOCATION JIRANI BAZAR, SAVAR COUNTRY BANGLADESH

CLIENT SPARKLE KNIT COMPOSITE LTD. YEAR 2010-2012CLIENT ADDRESS

JIRANI BAZAR, SAVAR

STATUS COMPLETED PROJECT TYPE

INDUSTRIAL DESIGN, ETP , WATER RECYCLE, UTILITY,ELECTRICAL.

PROJECT COST

80 CRORE

FIGURE: FACTORY PREMISES OF SPARKLE KNIT COMPOSITE LTD.

POJECT RESPONSIBILITIES:

1. FACTORY MASTER PLAN MAKING, MACHINERIES SELECTION, PROCESS LAYOUT DESIGN AND INSTALLATION .

2. ETP,WTP DESIGN AND INSTALLATION.

3. WHOLE UTILITY DESIGN AND INSTALLATION.

4. ESTIMATING AND BOQ, SUPERVISION OF THE PROJECT

Page 10: Profile, F E S Int

BRIEF DESCRIPTION OF THE PROJECTLOCATION SAVAR,NOBINOGOR COUNTRY BANGLADESHCLIENT BANGLADESH ARMY YEAR 2013CLIENT ADDRESS

BANGLADESH ARMY ,SAVAR CANTONMENT

STATUS RUNNUNG PROJECT TYPE

UTILITY DESIGN

PROJECT COST

35 CRORE

FIGURE: ELECTRICAL NETWORK OF SAVAR DOHS

POJECT RESPONSIBILITIES:

1. ELECTRICAL DESIGN & DRAWING2. ESTIMATING ELECTRICAL AND PLUMBING3. STREET LIGHTING DESIGN 4. SOLAR PANEL DESIGN

ELECTRIC AND PLUMBING DESIGN OF SAVAR DOHS

Page 11: Profile, F E S Int

BRIEF DESCRIPTION OF THE PROJECTLOCATION NABIK COLONY COUNTRY BANGLADESHCLIENT BANGLADESH NAVY YEAR 2011-2012CLIENT ADDRESS

GE NAVY , ISSA KHA, CTITTAGONG , BANGLADESH

STATUS COMPLETED PROJECT TYPE

PLANT DESIGN

PROJECT COST

1.41 CRORE VALUE OF SERVICE

3 LAC

FIGURE: BANGLADESH NAVY CHIEF VISITED IRON REMOVAL PLANT

POJECT RESPONSIBILITIES:

1. WHOLE PLANT FILTRATION SYSTEM 2. PLUMBING AND ELECTRIFICATION DESIGN3. BOQ AND ESTIMATING OF PLUMBING , FILTRATION VASSEL AND ELECTRICAL WORKS4. IRON REMOVAL ON CHEMICAL PROCESS5. SUPERVIOSION OF THE PROJECT

IRON REMOVAL PLANT DESIGN ( BANGLADESH NEAVY)

Page 12: Profile, F E S Int

BMA ( MILITARY ACADEMY)

BRIEF DESCRIPTION OF THE PROJECTLOCATION VATIARY COUNTRY BANGLADESHCLIENT BANGLADESH ARMY YEAR 2011-2012CLIENT ADDRESS

MILITARY ACADEMY, CTITTAGONG , BANGLADESH

STATUS ONGOING PROJECT TYPE

LIGHTING DESIGN

PROJECT COST

VALUE OF SERVICE

Page 13: Profile, F E S Int

PRODUCTS AND SERVICES

1. TUPESA WASHING PLANT MACHINERIES – SPAIN

2. Belly Wash – Taizhou. China

3. Warehouse rack , fork lift ,Scissor Lift – Sino Lift

Warehouse fork lift, Ireland Scissor lift, China

Ware House Rack, China

4. Industrial Lighting with 50-80% Energy savings – Spark LED

5. Industrial and Commercial Design and Installation

6. Energy Efficiency Audit and Improvement

7. WTP, ETP, Sewerage Treatment plant , Water Recycle System , Salt Recovery Plant ,

Ventilation , Lighting design.