44
PROJECT LEARNING No longer scissors, glue and dioramas…

PROJECT LEARNING No longer scissors, glue and dioramas…

Embed Size (px)

Citation preview

Page 1: PROJECT LEARNING No longer scissors, glue and dioramas…

PROJECT LEARNINGNo longer scissors, glue and dioramas…

Page 2: PROJECT LEARNING No longer scissors, glue and dioramas…

Spaghetti and Marshmallows Astrological signs Spaghetti and marshmallows Terri Steimer – Marshmallow

commissioner… 18 minutes!!! Why This Activity?

Page 3: PROJECT LEARNING No longer scissors, glue and dioramas…

What is Project Learning?

What it is NOT!!! An additional

demand Scissors and glue Dioramas Necessarily long,

drawn out activities

What it is A strategy for

application An approach – a

way of thinking about instruction

Integrated instructional method

Page 4: PROJECT LEARNING No longer scissors, glue and dioramas…

Project Based Learning is a teaching and learning model (curriculum development and instructional

approach) that emphasizes student-centered instruction by assigning

projects. It allows students to work more autonomously to construct their

own learning, and culminates in realistic, student-generated products.

What is project learning?

Page 6: PROJECT LEARNING No longer scissors, glue and dioramas…

The Homework “Project”

Quadratic Equations Comma splices Table of Elements Civil War Reconstruction 4/4 vs. Cut Time Portrait drawing “Where’s the restroom” in four different

languages

Page 8: PROJECT LEARNING No longer scissors, glue and dioramas…

EPIC – Generation iY

Experiential Participatory Image Rich Collaborative

Page 9: PROJECT LEARNING No longer scissors, glue and dioramas…

BREAK TIME…Ticket to break – 2 sentences on the Marshmallow Challenge

Page 10: PROJECT LEARNING No longer scissors, glue and dioramas…

Standards Grading

Paper Airplane Challenge Does it Fly

1 – little or no sustained flight – “crash & burn” 2 – flies but not on a predictable path, or makes

an immediate turn 3 – sustained flight on some throws,

unpredictable performance, above average reliability

4 – flies straight and true for distance and speed

Standards vs. Traditional Grading??????????

Page 11: PROJECT LEARNING No longer scissors, glue and dioramas…

The Elementary Report Card

Learner Objectives Defined standards Separates effort and behavior from

mastery Can it work at the high school level?

Page 12: PROJECT LEARNING No longer scissors, glue and dioramas…

STANDARDS-BASED GRADING (SBG)

A Case Study…Kinda

@MR_ABUD #TEAMPHYSICS

Page 13: PROJECT LEARNING No longer scissors, glue and dioramas…

MOTIVATION FOR THE SHIFT

Meaning of a gradeWhat you did vs. what you know

Students motivated (by meaning of the grade) to do assignments/tasksLike finishing the weekend chores checklistFocus on learning and mastery is lost

Students “make up” missing work at the end of a marking period for credit to help their grade

Without focus on learning for mastery, taking learning risks can be too costly

Page 14: PROJECT LEARNING No longer scissors, glue and dioramas…

THE PROBLEMHow might we make a grade better represent what students know rather than what they did?

Page 15: PROJECT LEARNING No longer scissors, glue and dioramas…

THE SOLUTIO

NAt least, it was an attempt at one…

Page 16: PROJECT LEARNING No longer scissors, glue and dioramas…

THIS PLAN WAS DEVELOPED OVER CHRISTMAS BREAK & IMPLEMENTED AT THE START OF 2ND SEMESTER

Stopped checking in homework all together Previously was checked for “completion” (approach to assess student

attempt) Wrote standards for each unit (adapted from curriculum map

and state HSCEs) Written in student-centered “I statements”

Developed assessments that generated ostensible evidence of student learning on standards Linked individual assessments (and even individual questions) to one or

more standards Kept record of student scores on assessments Reported student assessment scores according to standards

Used an average of all assessment scores for a given standards Managed Scores in Microsoft Excel Created “Standards” in Pinnacle instead of assignments Input standards scores in Pinnacle

Calculated summative score & reported all standards and ratings to students separately from their report card

Actions Taken:

Page 17: PROJECT LEARNING No longer scissors, glue and dioramas…

TRACKING PROGRESS WITH GRAPHS

Page 18: PROJECT LEARNING No longer scissors, glue and dioramas…

TRACKING PROGRESS WITH TABLES

From: Frank Noschese’s blog post, “The Tower” (7/27/11)

Page 19: PROJECT LEARNING No longer scissors, glue and dioramas…

GRADEBOOK BEFORETask Grade

Homework 1 10/10

Homework 2 10/10

Homework 3 10/10

Quiz 2/10

Homework 4 10/10

Homework 5 10/10

Test 15/50

Homework 6 10/10

Quiz 2 5/10

Homework 7 10/10

Project 95/100

Test 2 30/50

Overall Grade 227/290 ( 78% | C+ | 8 )

Page 20: PROJECT LEARNING No longer scissors, glue and dioramas…

THE SBG SCALE

Traditional (%)

14-Point Range

Letter SBG Rating

Proficiency Level with Standard

90-100 12-14 A 4 Exceeds proficiency

80-89 9-11 B 3 Demonstrates proficiency

70-79 6-8 C 2 Approaches proficiency

60-69 3-5 D 1 Falls well below proficiency

<60 1-2 E 0 Lacks all proficiency

0 0 Z 0 No attempt made

Inspired by the 4.0 grade point average system, the rating system used in SBG simply assigns a numeric value to a level of proficiency.

Here is how it looks in comparison to how we are used to grading:

Page 21: PROJECT LEARNING No longer scissors, glue and dioramas…

GR

AD

EB

OO

KA

FTER

Page 22: PROJECT LEARNING No longer scissors, glue and dioramas…

FINDINGS Students:

Agreed with SBG as a means to more accurately reflect what they know

Used the feedback from their SBG report to improve their understanding and strived for mastery (completed reassessments)

Stopped copying just to get assignments completed so they would “get [their] points” toward a grade

Shifted their focus from doing to learning Struggled with the adjustment to a different

grading approach that Did not readily see how to use SBG feedback, or

did not choose to use the SBG feedback Still asked, “what assignments am I missing that

my grade is so low?” Wished it had been implemented from day 1

Page 23: PROJECT LEARNING No longer scissors, glue and dioramas…

COMPLAINTS & CRITICISMS OF SBG

Students: Cognitive dissonance with

regard to grading“What the formula” (WTF) moments occurred when students could not figure the calculation of their gradeSOLUTION: MORE TRANSPARENT PROCESS

Forces them to have to know itMany are used to being able to “fake it to make it” (the game of school)SOLUTION: START FROM DAY 1 & INTRODUCE PROCESS WITH AN INVITING EXPERIENCE

Mr. Abud, I was wondering what my grade is; it

says “approaching proficiency” a

bunch of times.

Page 24: PROJECT LEARNING No longer scissors, glue and dioramas…

COMPLAINTS & CRITICISMS OF SBG

Parents: Not possible with Pinnacle to

see why their student has the grades on the standards that they doSearching for a missing “checklist” that

their student did not completeSOLUTION: STUDENTS KEEP TRACK

OF THEIR PROGRESSGrade lower than expected,

yet student “does their work”Parents used to having completion

accountability for students’ gradesSOLUTION: LETTERS HOME

EXPLAINING PROCESS

Perhaps my grade was artificially

inflated by all that copying I

did on my homework for completion…

Page 25: PROJECT LEARNING No longer scissors, glue and dioramas…

CONCLUSIONS, REFLECTIONS, & RECOMMENDATIONS

Focus on learning, not just doing

Opportunity for improvement

Removes pressure of academic risk-taking

Connects grade to learning

Makes assessment and grading more transparent/relevant

Standards in gradebook instead of tasks

Starts from day 1 Students track their

own progress More formative

assessment Obtrusive Unobtrusive Student-generated

Rubrics Letter home to

explain process

Strengths (+) Changes (∆)

Page 26: PROJECT LEARNING No longer scissors, glue and dioramas…

NEXT STEPS…FOR INTERESTED PARTIES

Consider How you ALREADY use rubrics to assess students What your performance objectives look like To what extent your assessments connect to your objectives The function of homework in your class (practice or chore)

Reflect on How often you have students wanting to make up missing

work for points but gain nothing from doing that work The extent to which a grade in your class truly reflects

learning Whether your students are motivated to learn or do What opportunities exist for students to recover from early

mistakes

Page 27: PROJECT LEARNING No longer scissors, glue and dioramas…

ACTIONS YOU CAN TAKE TO TRY SBGThe following actions can be part of a small action research project

in your own classroom: Consider for an upcoming unit/chapter/lesson/project

Writing objectives in “I statement” language that connect to your content standards

Developing assessments (formative and summative) that make it easy to observe proficiency with the objectives

Adding a rubric to that assessment if it doesn’t already have one (omit components unrelated to objectives, e.g., 1” margins)

Creating proficiency rankings with explanations of each ranking level

Assessing students according to the rubric components Reporting students’ scores on the rubric and generating

a summative score as well Providing students a means to track their own

performance Debriefing the grading approach with your class

Page 28: PROJECT LEARNING No longer scissors, glue and dioramas…

FINAL THOUGHTS

SBG is not a replacement for a summative grade It just gives more substantive meaning to that grade

It is completely possible to implement with any number of students in any content area

It is best for teaching and learning It promotes formative assessment, feedback, and

student ownership over learning It can be done in a low-tech (paper grids / graphs)

or a high-tech way (Excel, Pinnacle, cloud-based apps)

It is more “fun” when you do it with others

Page 29: PROJECT LEARNING No longer scissors, glue and dioramas…

RESOURCES

Always Formative Blog: http://bit.ly/ksFvZk

ActiveGrade – a cloud-based web app for SBG http://activegrade.com

Sample Classroom SBG Policy Handout http://bit.ly/nnAGly

SBG w/Voice http://t.co/MBvlgNM

US Dept. of Ed. SBG Resources http://1.usa.gov/lOgtWu

Frank Noschese’s Action-Reaction Blog http://fnoschese.wordpress.com/

Page 30: PROJECT LEARNING No longer scissors, glue and dioramas…

GPPSS FORMAT FOR EFFECTIVE TEACHER EVALUATIONA guide to the new GPPSS teacher evaluation process

Page 31: PROJECT LEARNING No longer scissors, glue and dioramas…

The Process

Representatives from teachers’ union, building administrators, and central office began meeting in winter of 2011

Established parameters and philosophies Examined various models and tools, with significant

focus on Marzano and Danielson teacher evaluation models

Developed a framework Developed an instrument to fit the framework Agreed on rubric Agreed on rating system based on rubric Implementation for 2011-2012

Page 32: PROJECT LEARNING No longer scissors, glue and dioramas…

The Team

Teachers: Ranae Beyerlein –

GPEA President Dan Quinn –

GPEA Executive Board

Chris Geerer Peter Signorello Nancy Nihem

Administrators Tom Harwood – Asst.

Supt. for HR Monique Beels –

Asst. Supt. for C & I Tim Bearden – North

Principal Mary Macdonald –

Barrett – Richard Principal

Mark Mulholland – Parcells Principal

Page 33: PROJECT LEARNING No longer scissors, glue and dioramas…

Foundational Beliefs

The committee established the following beliefs as the basis for the new process: The goal of the instrument is collaboration to improve

instruction with the intent of improving student learning The instrument / rubric must define good instruction Multiple rating categories Adaptable Instrument Focus Observation Areas Locally established growth and measurement models Establish clear standards for effective performance Focus on evidence of planning & Preparation Focus on a variety of instructional methodologies

Page 34: PROJECT LEARNING No longer scissors, glue and dioramas…

The Basis - Danielson

Committee agreed upon Charlotte Danielson domains and rubric as a basis for the process. Danielson’s Framework for Enhancing Professional Practice was published in the mid 90’s as a guide for improving instruction, and has been a standard ever since.

“A framework for professional practice can be used for a wide range of purposes, from meeting novices’ needs to enhancing veterans’ skills.” – Charlotte Danielson

Page 35: PROJECT LEARNING No longer scissors, glue and dioramas…

Michigan Law – New Requirements

Among other things, key features of Michigan’s new legislation relative to teacher evaluation include: Mandate that all teachers and

administrators must be evaluated annually Evaluation must include measurement data

relative to student achievement Ratings must use the categories of

Ineffective, Effective, and Highly Effective

Page 36: PROJECT LEARNING No longer scissors, glue and dioramas…

GPPSS New Format - Features Same process for on-cycle tenured

teachers and probationary teachers except for the # of required observations

Teachers and administrators reach mutual agreement on measurement tools

For some observations, walk-through visits can be substituted for longer formal visits

Clearly defined categories of effectiveness based on an established rubric

Page 37: PROJECT LEARNING No longer scissors, glue and dioramas…

Process

Initial meeting with all teachers being evaluated to review process

Email or personal notification to set goal-setting meeting

Teacher and evaluator agree on three goals: an instructional goal from Danielson rubric Domain 1 or 3, Achievement Goal, A classroom environment / affective goal from Danielson Domain 2

Page 38: PROJECT LEARNING No longer scissors, glue and dioramas…

Process (cont.)

Teacher and Evaluator agree on measurement tools for each goal. A variety of options are outlined in the instrument, and allowance is made for the teacher and evaluator to agree on a tool not listed as an option.

Classroom Observations Written Evaluation Completed

Page 39: PROJECT LEARNING No longer scissors, glue and dioramas…

Process – Classroom Observation Requirements

Probationary Teacher Minimum of 1 pre-scheduled

observation of 30 minutes or more in the teacher’s first month of teaching

Minimum of 1 un-announced observation of 30 minutes or more to occur in an agreed upon one week window within the teacher’s first four months of teaching and approx. 60 days after the first observation

1 additional un-announced observation of 30 minutes or more, OR 3 or more walk-through visits of ten minutes or more each

Tenured On-Cycle Teacher

Minimum of 1 pre-scheduled observation of 30 minutes or more

Minimum of 1 un-announced observation of 30 minutes or more to occur in an agreed upon one week window, OR 6 or more walk-through visits of a minimum of 5 minutes each

Page 40: PROJECT LEARNING No longer scissors, glue and dioramas…

Evaluation Tool - Handout

Focus Areas: Admins will evaluate in at least ten total

categories with a minimum of two per domain

Administrators will provide comments in the expandable table for each domain component used for evaluation

There is an opportunity for teacher comment within each domain

Administrators will comment on progress towards identified goals in the provided narrative space

Page 41: PROJECT LEARNING No longer scissors, glue and dioramas…

Evaluation Tool - Rating

Probationary Year 1 Effective = 100% of ratings in Rubric columns 2-4

Probationary Year 2 Effective = 100% of ratings in columns 2-4, 75% or more in columns 3 & 4

Probationary Year 3 Effective = 100% of ratings in columns 2-4, 90% in columns 3 & 4

Probationary Year 4 Effective = 100% of rankings in columns 3 & 4

Tenured Teacher Effective = 100% of rankings in 3 or 4. Any rankings in columns 1 or 2 result in an IDP

For a rating of “Effective” or “Highly Effective”, a teacher must have made measurable progress towards identified goals.

Page 42: PROJECT LEARNING No longer scissors, glue and dioramas…

Interim Annual Evaluation Process for Off-Cycle Tenured Teachers

Michigan law requires annual evaluation of teachers and administrators. In GP tenured teachers will continue to be on a 3 year evaluation cycle. In interim years, the following process will be used: Email notification of assigned evaluator. Minimum of one un-announced classroom

observation of 30 minutes or more, OR 3 walk-through observations of 5-10 minutes each.

Teacher self-reflection on the year. Evaluator narrative summary of observations in

writing by May 31st.

Page 43: PROJECT LEARNING No longer scissors, glue and dioramas…

Handouts Include:

GPPSS Format for Effective Teacher Evaluation

Definition of Terms Teacher Evaluation Report Probationary and Tenured Checklists Domain rubric

Page 44: PROJECT LEARNING No longer scissors, glue and dioramas…

Goal

The goal is effective, dynamic instruction that leads to growth in

student achievement. This is intended to be a collaborative

process built on a researched model to enhance professional practice.