35
Attachment C6 Proponent ESD Strategy 311

Proponent ESD Strategy

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proponent ESD Strategy

Attachment C6

Proponent ESD Strategy

311

Page 2: Proponent ESD Strategy

GHD | Report for Goodman Property Services (Aust) Pty Limited - Burrows Industrial Estate, 1- 3 Burrows Road, St

Peters, 12521130

Appendix C – Ecologically sustainable development strategy

312

Page 3: Proponent ESD Strategy

Goodman Property Services (Aust) Pty Limited

Burrows Industrial Estate, 1-3 Burrows Road, St Peters ESD Analysis and Strategy

March 2020

313

Page 4: Proponent ESD Strategy

GHD | Report for Goodman Property Services (Aust) Pty Limited - Burrows Industrial Estate, 1-3 Burrows Road, St

Peters, 12521130 | i

Table of contents 1. Introduction .................................................................................................................................... 1

1.1 Scope and limitations ........................................................................................................... 1

2. Context review ............................................................................................................................... 1

3. ESD strategy ................................................................................................................................ 18

3.1 Framework ......................................................................................................................... 18

3.2 ESD initiatives and considerations .................................................................................... 20

4. Conclusion ..................................................................................................................................... 1

Table index Table 1 – Goodman policies and project requirements ........................................................................... 1

Table 2 – Site context ............................................................................................................................... 2

Table 3 – Planning controls and policy context ........................................................................................ 3

Table 4 – Sustainability framework ........................................................................................................ 18

Table 5 – ESD Initiatives ........................................................................................................................ 20

Figure index No table of figures entries found.

314

Page 5: Proponent ESD Strategy

GHD | Report for Goodman Property Services (Aust) Pty Limited - Burrows Industrial Estate, 1-3 Burrows Road, St

Peters, 12521130 | 1

1. Introduction This report summarises the ecologically sustainable development (ESD) strategy in support of a Planning Proposal for the proposed Goodman Burrows Industrial Estate at 1-3 Burrows Road, St Peters. The report includes:

Review of site location and climate context

Review of policy and planning proposal context

A framework which defines the principles that will be incorporated into the future design, construction and operation of the site. The framework is built around key sustainability themes, principles and targets informed by best practice, site location, policy and planning controls

Summary of ESD initiatives included in the current design and additional strategies recommended for inclusion or further consideration.

The report also addresses the sustainability and ESD related elements of the Planning Proposal Lodgement Checklist specific to 1-3 Burrows Road provided by the City of Sydney (9-Dec-2019). These responses are integrated into the relevant areas of the strategy.

1.1 Scope and limitations

This report: has been prepared by GHD for Goodman Property Services (Aust) Pty Limited and may only be used and relied on by Goodman Property Services (Aust) Pty Limited for the purpose agreed between GHD and the Goodman Property Services (Aust) Pty Limited.

GHD otherwise disclaims responsibility to any person other than Goodman Property Services (Aust) Pty Limited arising in connection with this report. GHD also excludes implied warranties and conditions, to the extent legally permissible.

The services undertaken by GHD in connection with preparing this report were limited to those specifically detailed in the report and are subject to the scope limitations set out in the report.

The opinions, conclusions and any recommendations in this report are based on conditions encountered and information reviewed at the date of preparation of the report. GHD has no responsibility or obligation to update this report to account for events or changes occurring subsequent to the date that the report was prepared.

The opinions, conclusions and any recommendations in this report are based on assumptions made by GHD as described in this report. GHD disclaims liability arising from any of the assumptions being incorrect.

GHD has prepared this report on the basis of information provided by Goodman Property Services (Aust) Pty Limited and others who provided information to GHD (including Government authorities), which GHD has not independently verified or checked beyond the agreed scope of work. GHD does not accept liability in connection with such unverified information, including errors and omissions in the report which were caused by errors or omissions in that information.

315

Page 6: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 1

2.

Con

text

rev

iew

Th

e co

ntex

t rev

iew

con

tain

s a

sum

mar

y of

the

phys

ical

, reg

ulat

ory,

pol

icy

and

othe

r driv

ers

that

will

inte

ract

and

influ

ence

ESD

/ su

stai

nabl

e ou

tcom

es. T

his

revi

ew a

lso

incl

udes

con

side

ratio

n of

Goo

dman

’s o

wn

sust

aina

bilit

y an

d en

viro

nmen

tal,

soci

al a

nd g

over

nanc

e (E

SG) p

olic

ies.

The

aim

of t

he c

onte

xt re

view

is

to id

entif

y ke

y ta

rget

s, s

usta

inab

ility

them

es a

nd c

omm

on o

bjec

tives

whi

ch w

ill be

use

d to

dev

elop

a p

roje

ct s

peci

fic fr

amew

ork

and

iden

tify

appr

opria

te a

nd

prac

tical

dev

elop

men

t fea

ture

s an

d in

itiat

ives

in o

rder

to a

chie

ve th

e su

stai

nabi

lity

outc

omes

.

Tab

le 1

– G

oodm

an p

olic

ies

and

proj

ect

requ

irem

ents

Req

uire

men

t or p

olic

y Su

mm

ary

/ ove

rarc

hing

inte

nt

Rel

evan

t req

uire

men

ts /

obje

ctiv

e ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Goo

dman

’s

2030

Su

stai

nabi

lity

Stra

tegy

G

oodm

an’s

203

0 Su

stai

nabi

lity

Stra

tegy

is

stru

ctur

ed a

roun

d th

ree

pilla

rs.

• Pr

oper

ty

• Pe

ople

and

Cul

ture

• C

orpo

rate

per

form

ance

Thes

e ar

e lin

ked

to a

set

of

mat

eria

l is

sues

, with

eac

h pi

llar

back

ed b

y sh

ort

and

long

-term

ESG

tar

gets

. Pr

ogre

ss

repo

rting

aga

inst

thes

e ta

rget

s w

ill oc

cur

annu

ally

.

• C

arbo

n N

eutra

l and

100

%

rene

wab

le e

lect

ricity

by

2025

. •

Low

ene

rgy

desi

gn p

rinci

ples

, av

oida

nce

of fo

ssil

fuel

on

site

an

d m

axim

ise

on s

ite p

hoto

vo

ltaic

s (P

V)

• Fo

rmal

sus

tain

abilit

y ra

ting

to

supp

ort G

loba

l Rea

l Est

ate

Sust

aina

bilit

y Be

nchm

ark

(GR

ESB)

out

com

es.

316

Page 7: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 2

Tab

le 2

– S

ite

cont

ext

Item

C

onte

xt

Impl

icat

ions

/ co

nsid

erat

ions

for t

he d

evel

opm

ent

Site

loca

tion

/ fe

atur

es

• Th

e si

te is

in re

ason

able

pro

xim

ity to

a ra

nge

of lo

cal

amen

ities

and

has

goo

d ac

cess

to p

ublic

tran

spor

t sys

tem

s in

clud

ing

Mas

cot (

1.4

km) a

nd S

yden

ham

(2.1

km

)

• C

lose

pro

xim

ity to

Syd

ney

Airp

ort,

loca

l roa

d ne

twor

k in

clud

ing

the

Wes

tcon

nex

tunn

el e

ntry

/exi

t poi

nt a

nd th

e in

dust

rial n

atur

e of

sur

roun

ds m

eans

hig

her l

evel

s of

ex

tern

al n

oise

and

poo

rer a

ir qu

ality

• Ex

tens

ive

roof

are

a pr

ovid

es o

ppor

tuni

ty fo

r on-

site

PV

syst

em a

nd la

rge

catc

hmen

t for

rain

wat

er h

arve

stin

g

• Ex

tens

ive

roof

are

as h

ave

the

pote

ntia

l to

impa

ct u

rban

hea

t is

land

.

• In

clus

ion

of e

nd o

f trip

faci

litie

s to

faci

litat

e th

ose

cycl

ing

or

wal

king

to a

nd fr

om th

e de

velo

pmen

t

• C

onsi

der p

ositi

on o

f out

side

air

inta

kes

with

rega

rd to

loca

l po

llutio

n so

urce

s

• Ex

tern

al n

oise

ant

icip

ated

to b

e a

maj

or c

onst

rain

t for

the

deve

lopm

ent n

eces

sita

ting

addi

tiona

l aco

ustic

con

side

ratio

ns fo

r bu

ildin

g en

velo

pe e

lem

ents

ove

r gen

eral

pra

ctic

es a

nd w

ill pr

eclu

de th

e us

e of

nat

ural

ven

tilat

ion

in re

gula

rly o

ccup

ied

area

s an

d am

enity

of e

xter

nal a

reas

• In

clud

e ro

of m

ount

ed s

olar

PV

and

use

of h

igh

sola

r ref

lect

ive

inde

x m

ater

ial f

inis

hes

(bal

ance

d w

ith a

ircra

ft tra

vel p

ath

refle

ctiv

ely

limita

tions

) to

redu

ce p

oten

tial n

egat

ive

heat

isla

nd

effe

cts

• R

ainw

ater

cap

ture

for n

on-p

otab

le u

se

• Po

tent

ial t

o ut

ilise

som

e ro

of a

rea

for o

n-si

te s

taff

amen

ity s

uch

as

roof

gar

den

brea

kout

are

a w

here

stru

ctur

ally

pra

ctic

al /

feas

ible

(e

.g. o

ffice

are

a ro

of).

Clim

ate

War

m /

tem

pera

te –

cha

ract

eris

ed b

y pe

riods

of h

ot d

ays

in

sum

mer

and

mod

erat

e te

mpe

ratu

res

in w

inte

r. Th

e ai

r te

mpe

ratu

re a

nd h

umid

ity a

re ty

pica

lly w

ithin

com

fort

cond

ition

s fo

r app

roxi

mat

ely

40%

of t

he y

ear.

Clim

ate

chan

ge p

roje

ctio

ns p

ublis

hed

by N

SW O

ffice

of

Envi

ronm

ent a

nd H

erita

ge fo

r the

Syd

ney

Met

ropo

litan

regi

on

indi

cate

s:

• M

echa

nica

l hea

ting

and

cool

ing

still

be re

quire

d fo

r sig

nific

ant

perio

ds o

f the

yea

r and

mec

hani

cal v

entil

atio

n fo

r non

-con

ditio

ned

spac

es li

kely

requ

ired

year

roun

d du

e to

ext

erna

l noi

se

cons

train

ts

• C

limat

e ch

ange

pro

ject

ions

sho

uld

be c

onsi

dere

d as

par

t of t

he

proj

ect d

esig

n to

ens

ure

risks

are

ass

esse

d an

d ad

dres

sed

thro

ugh

feat

ures

to in

crea

se re

silie

nce.

317

Page 8: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 3

Item

C

onte

xt

Impl

icat

ions

/ co

nsid

erat

ions

for t

he d

evel

opm

ent

1.

Proj

ecte

d w

arm

ing

in th

e ne

ar fu

ture

(202

0-20

39) p

roje

cted

to

be

on a

vera

ge 0

.7°C

and

in th

e lo

ng-te

rm (2

060-

2079

) 1.

9°C

.

2.

Max

imum

tem

pera

ture

s ar

e al

so e

xpec

ted

to in

crea

se in

bo

th th

e ne

ar a

nd fa

r fut

ure.

3.

Incr

ease

in d

ays

with

tem

ps h

ighe

r tha

n 35

°C. A

n ad

ditio

nal 1

-5 d

ays

are

estim

ated

and

in th

e lo

ng-te

rm.

Rai

nfal

l is

expe

cted

to d

ecre

ase

in s

prin

g an

d w

inte

r and

in

crea

se in

sum

mer

and

aut

umn

Tab

le 3

– P

lann

ing

cont

rols

and

pol

icy

cont

ext

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Gre

ater

Syd

ney

Reg

ion

Plan

(G

SRP)

The

plan

def

ines

a n

umbe

r of o

vera

rchi

ng

obje

ctiv

es fo

r gre

ater

Syd

ney

incl

udin

g su

stai

nabi

lity

obje

ctiv

es c

over

ing

land

scap

e, e

ffici

ency

and

resi

lienc

e.

Obj

ectiv

e 25

: The

coa

st a

nd w

ater

way

s ar

e pr

otec

ted

and

heal

thie

r

Obj

ectiv

e 27

: Bio

dive

rsity

is p

rote

cted

, urb

an

bush

land

and

rem

nant

veg

etat

ion

is e

nhan

ced

Obj

ectiv

e 28

: Sce

nic

and

cultu

ral l

ands

cape

s ar

e pr

otec

ted

Obj

ectiv

e 31

: Pub

lic o

pen

spac

e is

acc

essi

ble,

pr

otec

ted

and

enha

nced

Ref

er to

impl

icat

ions

and

inte

ract

ions

di

scus

sed

unde

r the

Eas

tern

City

Dis

trict

Pl

an th

at is

a s

ub-p

lan

of th

e G

SRP.

318

Page 9: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 4

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Obj

ectiv

e 32

: The

Gre

en G

rid li

nks

park

s,

open

spa

ces,

bus

hlan

d an

d w

alki

ng a

nd

cycl

ing

path

s

Obj

ectiv

e 33

: A lo

w-c

arbo

n ci

ty c

ontri

bute

s to

ne

t-zer

o em

issi

ons

by 2

050

and

miti

gate

s cl

imat

e ch

ange

Obj

ectiv

e 34

: Ene

rgy

and

wat

er fl

ows

are

capt

ured

, use

d an

d re

-use

d

Obj

ectiv

e 35

: Mor

e w

aste

is re

-use

d an

d re

cycl

ed to

sup

port

the

deve

lopm

ent o

f a

circ

ular

eco

nom

y

Obj

ectiv

e 36

: Peo

ple

and

plac

es a

dapt

to

clim

ate

chan

ge a

nd fu

ture

sho

cks

and

stre

sses

Obj

ectiv

e 37

: Exp

osur

e to

nat

ural

and

urb

an

haza

rds

is re

duce

d

Obj

ectiv

e 38

: Hea

twav

es a

nd e

xtre

me

heat

ar

e m

anag

ed.

East

ern

City

D

istr

ict P

lan

(EC

DP)

The

ECD

P (th

at s

its u

nder

the

GSR

P)

defin

es a

num

ber o

f stra

tegi

c pl

anni

ng

prio

ritie

s an

d as

soci

ated

act

ions

to d

eliv

er

on th

e ci

ty w

ide

obje

ctiv

es. T

hese

incl

ude:

• Pl

anni

ng P

riorit

y E1

4 - P

rote

ctin

g an

d im

prov

ing

the

heal

th a

nd

Act

ions

58

to 6

1: in

clud

e re

quire

men

ts fo

r the

pr

otec

tion

and

enha

ncem

ent o

f wat

erw

ays

Act

ion

62: r

equi

rem

ents

for p

rote

ctio

n an

d en

hanc

emen

t of b

iodi

vers

ity

Act

ions

65

to 6

6: re

quire

men

ts to

exp

and

urba

n tre

e ca

nopy

and

Gre

en c

orrid

ors

and

wal

king

and

cyc

ling

infra

stru

ctur

e

• St

orm

wat

er m

anag

emen

t thr

ough

w

ater

sen

sitiv

e ur

ban

desi

gn

(WSU

D) a

nd tr

eatm

ent b

efor

e re

leas

e fro

m s

ite to

loca

l wat

erw

ays

• Br

ownf

ield

site

with

lim

ited

exis

ting

vege

tatio

n. O

ppor

tuni

ty to

enh

ance

319

Page 10: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 5

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

enjo

ymen

t of S

ydne

y H

arbo

ur a

nd

the

Dis

trict

’s w

ater

way

s

• Pl

anni

ng P

riorit

y E1

5 - P

rote

ctin

g an

d en

hanc

ing

bush

land

and

bi

odiv

ersi

ty

• Pl

anni

ng P

riorit

y E1

6 - P

rote

ctin

g an

d en

hanc

ing

scen

ic a

nd c

ultu

ral

land

scap

es

• Pl

anni

ng P

riorit

y E1

8 - D

eliv

erin

g hi

gh q

ualit

y op

en s

pace

• Pl

anni

ng P

riorit

y E1

7 - I

ncre

asin

g ur

ban

tree

cano

py c

over

and

de

liver

ing

Gre

en G

rid c

onne

ctio

ns

• Pl

anni

ng P

riorit

y E1

9 - R

educ

ing

carb

on e

mis

sion

s an

d m

anag

ing

ener

gy, w

ater

and

was

te e

ffici

ently

• Pl

anni

ng P

riorit

y E2

0 - A

dapt

ing

to

the

impa

cts

of u

rban

and

nat

ural

ha

zard

s an

d cl

imat

e ch

ange

Act

ion

67: e

ncou

rage

s ex

pans

ion

of n

ew o

pen

spac

e

Act

ions

68

to 7

3: re

quire

men

ts to

enc

oura

ge

achi

evem

ent o

f net

zer

o em

issi

ons

by 2

050,

us

e of

hig

h ef

ficie

ncy,

low

car

bon

desi

gn

prin

cipl

es, p

reci

nct b

ased

rene

wab

le e

nerg

y ge

nera

tion

and

was

te re

duct

ion

and

recy

clin

g

Act

ions

74

to 7

6: s

uppo

rt in

itiat

ives

that

re

spon

d to

clim

ate

chan

ge, a

void

ance

of

loca

ting

new

dev

elop

men

t in

area

s ex

pose

d to

na

tura

l haz

ards

and

miti

gatio

n of

urb

an h

eat

isla

nd e

ffect

.

thro

ugh

land

scap

ed e

lem

ents

/ op

en

and

publ

icly

acc

essi

ble

spac

e

• Pr

ojec

t to

incl

ude

cycl

ist /

act

ive

trans

port

faci

litie

s

• Pr

ojec

t to

be lo

w e

nerg

y de

sign

by

adop

ting

pass

ive

and

ener

gy

effic

ienc

y pr

inci

ples

• Pr

ojec

t to

take

adv

anta

ge o

f ex

tens

ive

roof

are

a an

d im

plem

ent

on s

ite e

nerg

y ge

nera

tion

thro

ugh

roof

top

PV to

offs

et d

eman

d

• In

add

ition

to a

bove

, del

iver

bui

ldin

g “n

et z

ero

carb

on re

ady”

thou

gh

cons

ider

atio

n of

site

fuel

sou

rcin

g (e

.g. a

void

ance

of f

ossi

l fue

ls fo

r he

atin

g an

d ho

t wat

er g

ener

atio

n –

pref

eren

ce fo

r hea

t pum

ps) a

nd

bala

nce

of e

lect

ricity

sup

plie

d fro

m

gree

n po

wer

• C

limat

e ris

k as

sess

men

t to

be

com

plet

ed a

nd ri

sks

desi

gned

out

• Ex

tern

al h

ards

cape

, lan

dsca

pe a

nd

build

ing

mat

eria

ls to

hav

e m

oder

ate

to h

igh

sola

r ref

lect

ive

inde

x (S

RI)

to

redu

ce e

ffect

s ur

ban

heat

isla

nd.

320

Page 11: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 6

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Sust

aina

ble

Sydn

ey 2

030

– C

omm

unity

St

rate

gic

Plan

20

17 -

2021

The

Sust

aina

ble

Sydn

ey 2

030

stra

tegi

c pl

an in

clud

es a

fram

ewor

k w

ith te

n st

rate

gic

dire

ctio

ns:

• A

glob

ally

com

petit

ive

and

inno

vativ

e ci

ty

• A

lead

ing

envi

ronm

enta

l per

form

er

• In

tegr

ated

tran

spor

t for

a c

onne

cted

ci

ty

• A

city

for p

edes

trian

s an

d cy

clis

ts

• A

livel

y, e

ngag

ing

city

Cen

tre

• Vi

bran

t loc

al c

omm

uniti

es a

nd

econ

omie

s

• A

cultu

ral a

nd c

reat

ive

city

• H

ousi

ng fo

r div

erse

pop

ulat

ion

• Su

stai

nabl

e de

velo

pmen

t, re

new

al

and

desi

gn

• Im

plem

enta

tion

thro

ugh

effe

ctiv

e pa

rtner

ship

s.

• 70

% re

duct

ion

of 2

006

gree

nhou

se g

as

(GH

G) b

asel

ine

by 2

030

• N

et Z

ero

Car

bon

2050

• 50

% o

f ele

ctric

ity d

eman

d m

et b

y re

new

able

s

• Ze

ro in

crea

se in

pot

able

wat

er u

se

com

pare

d to

200

6 ba

selin

e

• Tr

ee c

anop

y co

ver i

ncre

ase

by 5

0% fr

om

2006

bas

elin

e

• Bi

cycl

e tri

p ra

te –

10%

• Pu

blic

tran

spor

t trip

rate

– 8

0%.

• Pr

ojec

t to

be lo

w e

nerg

y de

sign

by

adop

ting

pass

ive

and

ener

gy

effic

ienc

y pr

inci

ples

• Pr

ojec

t to

take

adv

anta

ge o

f ex

tens

ive

roof

are

a an

d im

plem

ent

on s

ite e

nerg

y ge

nera

tion

thro

ugh

roof

top

PV to

offs

et d

eman

d

• In

add

ition

to a

bove

, del

iver

bui

ldin

g “n

et z

ero

carb

on re

ady”

thou

gh

cons

ider

atio

n of

site

fuel

sou

rcin

g (e

.g. a

void

ance

of f

ossi

l fue

ls fo

r he

atin

g an

d ho

t wat

er g

ener

atio

n –

pref

eren

ce fo

r hea

t pum

ps) a

nd

bala

nce

of e

lect

ricity

sup

plie

d fro

m

gree

n po

wer

• Pr

ojec

t to

adop

t wat

er e

ffici

ent

desi

gn p

rinci

ples

usi

ng h

igh

wat

er

effic

ienc

y la

bellin

g sc

hem

e (W

ELS)

ra

ted

fittin

gs/fi

xtur

es in

con

junc

tion

with

on-

site

rain

wat

er c

aptu

re a

nd re

us

e fo

r all

non-

pota

ble

wat

er u

ses

(toile

ts, w

ash

dow

n, la

ndsc

apin

g)

• D

evel

opm

ent t

o in

clud

e bi

ke s

tora

ge

and

end

of tr

ip (E

OT)

faci

litie

s fo

r st

aff.

321

Page 12: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 7

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Envi

ronm

enta

l A

ctio

n 20

16 –

20

21 S

trat

egy

and

Act

ion

Plan

This

stra

tegy

and

act

ion

plan

is li

nked

to

the

2030

stra

tegy

and

add

ress

es 6

key

ar

eas

for t

he c

ity:

• Lo

w-c

arbo

n

• W

ater

sen

sitiv

e

• C

limat

e re

silie

nt

• Ze

ro w

aste

• Ac

tive

and

conn

ecte

d

• G

reen

and

coo

l.

The

docu

men

t als

o in

clud

es a

gui

de fo

r ex

celle

nce

in n

ew b

uild

ing

desi

gn th

at

nom

inat

es v

olun

tary

per

form

ance

st

anda

rds

/ tar

gets

acr

oss

ener

gy,

emis

sion

s, w

ater

, mat

eria

ls a

nd

land

scap

ing

/ bio

dive

rsity

.

Targ

ets

For

com

mer

cial

bui

ldin

gs (

only

ret

ail

and

offic

e no

min

ated

):

• O

ffice

- N

atio

nal A

ustra

lian

Built

En

viro

nmen

t Rat

ing

Syst

em (N

ABER

S)

Ener

gy C

omm

itmen

t: 6

Star

s

• G

reen

Sta

r: C

ertif

ied

ratin

g un

der a

cur

rent

ve

rsio

n of

Des

ign

& As

Bui

lt –

5 St

ar o

r hi

gher

• O

ffice

Wat

er -

Des

igne

d to

mee

t Syd

ney

Wat

er G

ood

Prac

tice

stan

dard

(pro

posa

ls

with

out c

oolin

g to

wer

s: 0

.47

kL/m

2 / ye

ar;

prop

osal

s w

ith c

oolin

g to

wer

s: 0

.84

kL/m

2 /yea

r).

Des

ign

feat

ures

fo

r ex

celle

nce

in

build

ing

perfo

rman

ce

• Th

erm

ally

effi

cien

t bui

ldin

g de

sign

and

sh

ell

• H

ighe

st e

ffici

ency

app

lianc

es a

s in

dica

ted

by th

e fe

dera

l gov

ernm

ent’s

ene

rgy

ratin

g sc

hem

e

• Li

ght E

mitt

ing

Dio

de (L

ED) l

ight

ing

tech

nolo

gy

• O

nsite

rene

wab

le e

nerg

y ge

nera

tion

(esp

ecia

lly p

hoto

volta

ics)

• Pr

ojec

t to

cons

ider

targ

etin

g fo

rmal

ra

ting

unde

r Gre

en S

tar (

who

le

build

ing)

and

app

ly N

ABER

S En

ergy

/Wat

er ra

ting

prin

cipl

es to

the

deve

lopm

ent o

ffice

com

pone

nts

• En

ergy

/ ca

rbon

– S

ee a

bove

• W

ater

– S

ee a

bove

• Tr

ansp

ort –

See

abo

ve

• C

o or

tri g

ener

atio

n no

t re

com

men

ded

unle

ss o

nsite

re

new

able

/ lo

w c

arbo

n fo

rm o

f en

ergy

can

be

deriv

ed fr

om s

ite o

r lo

cal w

aste

sou

rce

(e.g

. was

te w

ood,

bi

o ga

s or

sim

ilar)

• D

evel

opm

ent m

ater

ial s

elec

tions

:

o

Cer

tifie

d tim

ber o

r rec

ycle

d tim

ber

o

Use

of c

emen

t rep

lace

men

t m

ater

ials

and

recy

cled

ag

greg

ates

.

• Pr

ojec

t to

cons

ider

sep

arat

ing

orga

nic

was

te s

tream

s fo

r co

mpo

stin

g fo

r re

use

back

on

site

in

land

scap

ing.

322

Page 13: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 8

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

• So

lar o

r hea

t pum

p w

ater

hea

ting

• O

n si

te lo

w c

arbo

n en

ergy

gen

erat

ion

(cog

ener

atio

n or

tri-g

ener

atio

n)

• H

igh

perfo

rman

ce g

lazi

ng

• Ex

tern

al s

hadi

ng (a

djus

tabl

e op

tions

) to

glaz

ing

• Bu

ildin

g m

anag

emen

t con

trol s

yste

ms

• H

ighl

y en

ergy

effi

cien

t com

mon

are

a eq

uipm

ent s

pace

• he

atin

g/co

olin

g (H

VAC

), ca

r par

k ve

ntila

tion

• H

ighe

st e

ffici

ency

fitti

ngs

(taps

, sh

ower

head

s, to

ilet c

iste

rns,

urin

als)

usi

ng

WEL

S St

ar ra

tings

• O

n si

te w

ater

cap

ture

and

re-u

se, o

r co

nnec

tion

to p

reci

nct-s

cale

recy

cled

wat

er

sche

me

whe

re a

vaila

ble

• W

ell d

esig

ned

and

cont

rolle

d co

olin

g to

wer

s

• H

ighe

st e

ffici

ency

whi

tego

ods

(esp

ecia

lly

laun

dry)

: WEL

S 4

Star

or h

ighe

r

323

Page 14: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 9

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

• Ti

mbe

r pro

duct

s –

Use

of r

e-us

ed o

r ce

rtifie

d tim

ber a

ccor

ding

to G

reen

Bui

ldin

g C

ounc

il of

Aus

tralia

• R

espo

nsib

le B

uild

ing

Mat

eria

ls 2

0.2A

and

20

.2B

• C

oncr

ete

prod

ucts

– M

ore

than

30

per c

ent

repl

acem

ent o

f Por

tland

cem

ent w

ith

supp

lem

enta

ry c

emen

titio

us m

ater

ials

• Ag

greg

ates

redu

ctio

n –

Rep

lace

men

t of

virg

in c

oars

e an

d sa

nd a

ggre

gate

as

per

Sect

ion

19B.

1.3

Gre

en S

tar D

esig

n &

As

Built

v1.

1

• O

rgan

ics

reco

very

– P

rovi

sion

for o

n-si

te

com

post

ing

of k

itche

n an

d ga

rden

was

te

• D

esig

n fo

r low

wat

er d

eman

d an

d dr

ough

t re

silie

nce

• Em

ploy

wat

er s

ensi

tive

urba

n de

sign

te

chni

ques

• Se

lect

low

wat

er d

eman

d pl

ant s

peci

es

• Pr

otec

t exi

stin

g he

alth

y tre

es in

ac

cord

ance

with

AS

4970

• Pl

ant w

ell l

ocat

ed c

anop

y tre

es th

at p

rovi

de

sum

mer

sha

de a

nd li

ght i

n w

inte

r

324

Page 15: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 10

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

• Su

pply

of q

ualit

y tre

e st

ock

in a

ccor

danc

e w

ith A

S 23

03

• Se

lect

loca

l pro

vena

nce,

har

dy a

nd

resi

lient

pla

nt s

peci

es

• En

gage

with

loca

l bus

hcar

e gr

oups

for

plan

t sto

ck/a

dvic

e

• Av

oid

dist

urbi

ng e

xist

ing

soil

prof

iles

in

area

s de

sign

ated

for l

ands

capi

ng

• C

reat

e sp

aces

for c

omm

unity

gar

dens

com

mun

ity g

arde

ns a

re ‘e

nabl

ers’

cre

atin

g so

cial

con

nect

ion

oppo

rtuni

ties

for

resi

dent

s, n

eigh

bour

s, b

usin

esse

s.

Futu

re

Tran

spor

t St

rate

gy 2

056

(FTS

)

FTS

2056

set

s th

e 40

yea

r vis

ion,

di

rect

ions

and

out

com

es fr

amew

ork

for

cust

omer

mob

ility

in N

SW to

gui

de

trans

port

inve

stm

ent o

ver t

he lo

nger

term

. It

will

be d

eliv

ered

thro

ugh

a se

ries

of

supp

ortin

g pl

ans.

It is

a s

uite

of s

trate

gies

an

d pl

ans

for t

rans

port

deve

lope

d in

co

ncer

t with

the

Gre

ater

Syd

ney

Com

mis

sion

’s S

ydne

y R

egio

n Pl

an,

Infra

stru

ctur

e N

SW’s

Sta

te In

frast

ruct

ure

Stra

tegy

, and

the

Dep

artm

ent o

f Pla

nnin

g an

d En

viro

nmen

t’s re

gion

al p

lans

, to

prov

ide

an in

tegr

ated

vis

ion

for t

he s

tate

.

N/a

Dev

elop

men

t to

incl

ude

end

of tr

ip

faci

litie

s an

d bi

ke p

arki

ng /

stor

age

• Pa

rkin

g fo

r mot

orbi

kes

/ sco

oter

s

• D

evel

opm

ent t

o in

clud

e pa

rkin

g sp

aces

for r

ide

shar

e sc

hem

es

• D

edic

ated

par

king

and

infra

stru

ctur

e fo

r low

em

issi

on /

alte

rnat

ive.

In

clud

ed E

V ch

argi

ng

• Pr

ojec

t to

be d

esig

ned

to fa

cilit

ate

acce

ss a

nd e

gres

s fo

r aut

onom

ous

vehi

cles

325

Page 16: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 11

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Rel

evan

t stra

tegi

c di

rect

ions

that

inte

ract

w

ith th

e pl

anni

ng p

ropo

sal i

nclu

de:

• M

obilit

y as

a s

ervi

ces

(Maa

S) –

en

cour

agin

g a

rang

e of

mod

es

incl

udin

g “o

n de

man

d”, “

ride

shar

e”,

“sm

art p

arki

ng”,

“Con

nect

ed a

nd

Auto

nom

ous

Vehi

cles

” and

“dig

ital

enab

lem

ent”

• U

se o

f dro

nes

for d

eliv

ery

of g

oods

an

d em

erge

ncy

resp

onse

tran

spor

t

• Sh

ort t

rip (2

km) m

obilit

y (e

-bik

es,

mot

oris

ed s

coot

ers)

• Ac

cess

ible

to m

ass

trans

it an

d ot

her

form

s of

pub

lic tr

ansp

ort

• In

crea

sing

mod

es o

f act

ive

trave

l (w

alki

ng a

nd c

yclin

g) th

roug

h be

tter

conn

ectio

ns

• En

cour

agin

g lo

w e

mis

sion

form

s of

tra

nspo

rt us

ing

alte

rnat

ive

fuel

s.

• Pr

ojec

t to

cons

ider

use

of u

se o

f dr

ones

for m

ovem

ent o

f goo

ds a

nd

enab

le fo

r fut

ure

dron

e st

agin

g ar

ea.

Bet

ter P

lace

d Be

tter P

lace

d is

NSW

Gov

ernm

ent

Arch

itect

pol

icy

that

pro

vide

s a

set o

f pr

inci

ples

and

gui

danc

e to

sup

port

good

de

sign

in N

SW. I

t inc

lude

s th

e fo

llow

ing

seve

n ob

ject

ives

whi

ch d

efin

e ke

y

N/a

R

efer

abo

ve. A

ll co

nsid

erat

ions

det

aile

d in

resp

onse

to o

ther

pol

icie

s ar

e al

so

rele

vant

to B

ette

r Pla

ced.

Add

ition

al

cons

ider

atio

ns:

326

Page 17: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 12

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

cons

ider

atio

ns fo

r des

ign

of b

uilt

envi

ronm

ent:

1.

Bet

ter f

it co

ntex

tual

, loc

al a

nd o

f its

pla

ce

2.

Bet

ter p

erfo

rman

ce s

usta

inab

le,

adap

tabl

e an

d du

rabl

e

3.

Bet

ter f

or c

omm

unity

incl

usiv

e,

conn

ecte

d an

d di

vers

e

4.

Bet

ter f

or p

eopl

e sa

fe,

com

forta

ble

and

livea

ble

5.

Bet

ter w

orki

ng fu

nctio

nal,

effic

ient

and

fit f

or p

urpo

se

6.

Bet

ter v

alue

cre

atin

g an

d ad

ding

va

lue

7.

Bet

ter l

ook

and

feel

eng

agin

g,

invi

ting

and

attra

ctiv

e

With

rega

rd to

obj

ectiv

e 2

Bette

r Pe

rform

ance

:

• Su

stai

nabl

e: R

elat

es to

the

endu

ranc

e of

sys

tem

s, b

uild

ings

, sp

aces

and

pro

cess

es –

thei

r abi

lity

to

be m

aint

aine

d at

a c

erta

in ra

te o

r le

vel,

whi

ch c

ontri

bute

s po

sitiv

ely

to

• Pr

ojec

t will

need

to c

onsi

der h

ow it

w

ill po

sitiv

ely

cont

ribut

e to

ach

ievi

ng

loca

l soc

ial a

nd e

cono

mic

out

com

es.

327

Page 18: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 13

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

envi

ronm

enta

l, ec

onom

ic a

nd s

ocia

l ou

tcom

es

• A

dapt

able

: A b

uild

ing,

pla

ce o

r spa

ce

that

is a

ble

to a

djus

t to

new

con

ditio

ns,

or to

be

mod

ified

for a

new

pur

pose

• D

urab

le: A

bui

ldin

g, p

lace

or s

pace

th

at is

bui

lt to

be

able

to w

ithst

and

wea

r and

pre

ssur

e.

Dra

ft G

reen

er

Plac

es

Gre

ener

Pla

ces

is G

ANSW

gui

de fo

r de

sign

, pla

nnin

g an

d de

liver

y of

gre

en

infra

stru

ctur

e ac

ross

NSW

. It i

nclu

des

four

key

prin

cipl

es:

• Pr

inci

ple

1 - I

nteg

ratio

n co

mbi

ne

Gre

en In

frast

ruct

ure

with

urb

an

deve

lopm

ent a

nd g

rey

infra

stru

ctur

e

• Pr

inci

ple

2 - C

onne

ctiv

ity c

reat

e an

in

terc

onne

cted

net

wor

k of

ope

n sp

ace

• Pr

inci

ple

3 –

Mul

ti fu

nctio

nalit

y de

liver

mul

tiple

eco

syst

em s

ervi

ces

sim

ulta

neou

sly

• Pr

inci

ple

4 - P

artic

ipat

ion

invo

lve

stak

ehol

ders

in d

evel

opm

ent a

nd

impl

emen

tatio

n

N/a

Fo

cus

of th

e G

reen

er p

lace

s ap

pear

s to

be

mor

e re

leva

nt to

maj

or in

frast

ruct

ure

and

publ

ic s

pace

. How

ever

pot

entia

l for

pr

ojec

t to

cont

ribut

e to

the

polic

y ai

ms

thro

ugh:

• G

roun

d pl

ane

land

scap

ed

elem

ents

incl

uded

in th

e de

sign

• C

onsi

der i

ncre

asin

g la

ndsc

aped

el

emen

ts th

roug

h gr

een

wal

ls a

nd

roof

s w

here

feas

ible

/ pr

actic

al.

328

Page 19: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 14

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

Sydn

ey L

EP

Loca

l Env

ironm

enta

l Pla

ns (L

EPs)

gui

de

plan

ning

dec

isio

ns fo

r loc

al g

over

nmen

t ar

eas

thro

ugh

zoni

ng a

nd d

evel

opm

ent

cont

rols

.

The

Sydn

ey L

EP 2

012

incl

udes

a g

ener

al

aim

to “p

rom

ote

ecol

ogic

ally

sus

tain

able

de

velo

pmen

t” an

d in

clud

es a

num

ber o

f sp

ecifi

c co

ntro

ls re

leva

nt to

ESD

in

clud

ing:

6.2.

1 D

esig

n Ex

celle

nce

(4) (

d) R

equi

res

deta

ils o

n ho

w p

ropo

sed

deve

lopm

ent a

ddre

sses

:

(vii)

env

ironm

enta

l im

pact

s, s

uch

as

sust

aina

ble

desi

gn, o

vers

hado

win

g an

d so

lar a

cces

s, v

isua

l and

aco

ustic

pr

ivac

y, n

oise

, win

d an

d re

flect

ivity

,

(viii)

the

achi

evem

ent o

f the

prin

cipl

es

of e

colo

gica

lly s

usta

inab

le

deve

lopm

ent,

(ix) p

edes

trian

, cyc

le, v

ehic

ular

and

se

rvic

e ac

cess

and

circ

ulat

ion

requ

irem

ents

, inc

ludi

ng

the

perm

eabi

lity

of a

ny p

edes

trian

ne

twor

k,

(xiii)

exc

elle

nce

and

inte

grat

ion

of

land

scap

e de

sign

.

• Im

plic

atio

ns fo

r dev

elop

men

t are

ad

dres

sed

in o

ther

Pla

nnin

g Pr

opos

al J

ustif

icat

ion

docu

men

ts

• ES

D fr

amew

ork

and

targ

ets

have

be

en d

evel

oped

for i

nclu

sion

with

in

a D

esig

n Ex

celle

nce

/ Com

petit

ion

brie

f for

the

deve

lopm

ent

• ES

D im

plic

atio

ns a

nd in

tera

ctio

ns

note

d ab

ove

in re

spon

se to

oth

er

polic

ies

addr

ess

the

sust

aina

bilit

y re

quire

men

ts o

f the

LEP

.

Sydn

ey

Dev

elop

men

t C

ontr

ol P

lan

2012

Sect

ion

3.6

of th

e of

the

DC

P 20

12

incl

udes

a n

umbe

r of E

colo

gica

lly

Sust

aina

ble

Dev

elop

men

t (ES

D) r

elat

ed

prov

isio

ns a

nd o

bjec

tives

requ

iring

D

evel

opm

ents

be

desi

gned

and

co

nstru

cted

so

that

:

Rel

evan

t ESD

des

ign

requ

irem

ents

for n

on-

resi

dent

ial d

evel

opm

ent a

re s

umm

aris

ed

belo

w:

Ener

gy E

ffici

ency

• ES

D im

plic

atio

ns a

nd in

tera

ctio

ns

note

d ab

ove

in re

spon

se to

oth

er

polic

ies

addr

ess

the

sust

aina

bilit

y re

quire

men

ts o

f the

DC

P.

329

Page 20: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 15

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

(a)

Gre

enho

use

gas

emis

sion

s w

ill be

re

duce

d.

(b)

The

use

of c

ogen

erat

ion

and

tri-

gene

ratio

n sy

stem

s w

ill be

incr

ease

d.

(c)

Ener

gy th

at is

use

d w

ill be

rene

wab

le

and

low

car

bon.

(d)

Pota

ble

wat

er u

se w

ill be

redu

ced.

(e)

Dev

elop

men

t can

ada

pt to

clim

ate

chan

ge.

(f)

Was

te w

ill be

redu

ced.

(g)

Rec

yclin

g of

was

te a

nd u

se o

f pr

oduc

ts fr

om re

cycl

ed s

ourc

es w

ill be

incr

ease

d.

(h)

Indo

or e

nviro

nmen

tal q

ualit

y w

ill be

im

prov

ed.

(i)

The

envi

ronm

enta

l im

pact

from

bu

ildin

g m

ater

ials

will

be re

duce

d th

roug

h re

duct

ion,

re-u

se a

nd

recy

clin

g of

mat

eria

ls, r

esou

rces

and

bu

ildin

g co

mpo

nent

s

(j)

The

biod

iver

sity

will

be im

prov

ed.

• D

esig

ned

and

cons

truct

ed to

inco

rpor

ate

pass

ive

desi

gn m

easu

res

redu

cing

the

need

for a

ctiv

e co

olin

g &

heat

ing.

• Pu

blic

dom

ain

light

ing

to b

e en

ergy

ef

ficie

nt s

uch

as L

ED te

chno

logy

.

• El

ectri

cal s

ub-m

eter

ing

of:

o

Ligh

ting,

air-

cond

ition

ing

and

pow

er fo

r m

ulti-

tena

nt o

r stra

ta d

evel

opm

ents

;

o

Sign

ifica

nt u

ses

(>10

,000

kWh/

yr.).

• C

ar p

arki

ng to

allo

w in

stal

latio

n of

ele

ctric

ve

hicl

e ch

argi

ng p

oint

s at

a la

ter t

ime

or

whe

re a

ppro

pria

te/p

ossi

ble

inst

all.

• Fo

r new

offi

ce w

ith N

LA >

1000

m2 ,

be

capa

ble

of s

uppo

rting

a N

ABER

S En

ergy

5.

5 St

ar B

ase

Build

ing

ratin

g.

Wat

er E

ffici

ency

• U

tilis

e th

e hi

ghes

t Wat

er E

ffici

ency

La

bellin

g Sc

hem

e (W

ELS)

sta

r rat

ed

fittin

gs &

fixt

ures

ava

ilabl

e at

the

time

of

deve

lopm

ent.

• In

stal

led

rain

wat

er c

olle

ctio

n &

reus

e sy

stem

s co

nnec

ted

to a

ppro

pria

te u

ses.

330

Page 21: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 16

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

• Irr

igat

ion

wat

er is

to b

e su

pplie

d fro

m

capt

ured

rain

wat

er o

r tre

ated

gre

y/w

aste

w

ater

.

• C

oolin

g to

wer

wat

er u

sage

is to

be

redu

ced

by a

ppro

pria

tely

con

trollin

g th

e co

ntam

inan

t ble

ed ra

te a

nd to

p up

with

co

nduc

tivity

sen

sing

of c

onta

min

ants

.

Phot

ovol

taic

Sol

ar P

anel

s

• PV

Sol

ar p

anel

pla

cem

ent i

s to

take

into

ac

coun

t ove

rsha

dow

ing

from

adj

acen

t st

ruct

ures

/pla

ntin

g as

wel

l as

pote

ntia

l pe

rmis

sibi

lity

in th

e fu

ture

.

Win

d Tu

rbin

es

• Ar

e no

t to

exce

ed n

oise

leve

ls a

t nea

rby

resi

dent

ial d

evel

opm

ent,

requ

ire re

mov

al

or p

runi

ng o

f any

exi

stin

g ve

geta

tion

that

re

quire

s co

nsen

t to

do s

o, b

e cl

ear o

f po

wer

line

s, n

ot a

ffect

bui

ldin

g st

ruct

ural

in

tegr

ity o

r her

itage

item

s an

d be

inst

alle

d pe

r man

ufac

ture

r’s s

peci

ficat

ions

.

Mat

eria

ls a

nd B

uild

ing

Com

pone

nts

• Pa

ints

and

floo

r cov

erin

gs to

hav

e lo

w

vola

tile

orga

nic

com

poun

ds (V

OC

) and

co

mpo

site

woo

d pr

oduc

ts to

be

low

fo

rmal

dehy

de e

mis

sion

.

331

Page 22: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 17

Plan

ning

co

ntro

l or

polic

y

Sum

mar

y / o

vera

rchi

ng in

tent

Sp

ecifi

c re

quire

men

ts /

obje

ctiv

e m

easu

reab

le ta

rget

s D

evel

opm

ent i

mpl

icat

ions

/ in

tera

ctio

ns

• W

here

pos

sibl

e, u

se

mat

eria

ls/fi

tting

s/fin

ishe

s th

at:

o

Hav

e be

en re

used

or a

re m

ade

from

/ in

corp

orat

e re

cycl

ed m

ater

ials

; and

o

Are

third

par

ty c

ertif

ied

by a

reco

gnis

ed

sche

me

as e

nviro

nmen

tally

frie

ndly

.

• D

esig

n fo

r lon

gevi

ty, a

dapt

atio

n,

disa

ssem

bly,

reus

e an

d re

cycl

ing.

• R

educ

e th

e am

ount

of m

ater

ials

use

d in

co

nstru

ctio

n, w

here

pos

sibl

e, c

ompa

red

to s

tand

ard

met

hods

.

332

Page 23: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 18

3.

ES

D s

trat

egy

3.1

Fram

ewor

k

The

prop

osed

ESD

stra

tegy

for t

he p

roje

ct a

ims

to in

tegr

ate

Goo

dman

’s o

wn

sust

aina

bilit

y st

rate

gy re

quire

men

ts a

long

side

the

obje

ctiv

es o

f the

bro

ader

NSW

an

d C

ity o

f Syd

ney

polic

ies

and

plan

ning

con

trols

. The

con

text

ana

lysi

s su

mm

aris

ed in

Sec

tion

2 id

entif

ies

the

rele

vant

sus

tain

abilit

y th

emes

, obj

ectiv

es a

nd

targ

ets

draw

n fro

m th

e va

rious

pol

icie

s an

d pl

anni

ng c

ontro

ls. T

hese

hav

e be

en u

sed

to d

evel

op a

pro

ject

spe

cific

fram

ewor

k th

at o

utlin

es m

echa

nism

s fo

r gu

idin

g th

e in

tegr

atio

n of

ESD

and

sus

tain

abilit

y pr

inci

ples

thro

ugho

ut th

e re

mai

nder

of t

he p

roje

ct d

esig

n an

d de

liver

y st

ages

to im

prov

e en

viro

nmen

tal

perfo

rman

ce.

Tab

le 4

– S

usta

inab

ility

fra

mew

ork

Them

e O

bjec

tive

Targ

ets

Lead

ersh

ip &

G

over

nanc

e D

emon

stra

te le

ader

ship

by

embe

ddin

g su

stai

nabi

lity

obje

ctiv

es in

to d

ecis

ion-

mak

ing

proc

esse

s an

d co

mm

ittin

g to

set

ting

targ

ets

and

havi

ng a

mea

surin

g an

d m

onito

ring

syst

em

to tr

ack

the

envi

ronm

enta

l per

form

ance

of t

he b

uild

ing.

Pro

ject

to ta

rget

a fo

rmal

sus

tain

abilit

y ra

ting

and

be d

eliv

ered

“net

zer

o ca

rbon

read

y” in

sup

port

of G

oodm

an’s

202

5 C

arbo

n N

eutra

l tar

get.

• M

inim

um 5

Sta

r Gre

en S

tar D

esig

n &

As B

uilt

v1.3

ratin

g

Ener

gy &

C

arbo

n M

inim

isat

ion

Min

imis

atio

n of

car

bon

emis

sion

s an

d en

ergy

con

sum

ptio

n th

roug

h ad

optio

n of

hie

rarc

hal

ener

gy d

esig

n st

rate

gies

usi

ng p

assi

ve d

esig

n, e

nerg

y ef

ficie

ncy

and

sour

cing

of e

nerg

y fro

m

on a

nd o

ffsite

low

or z

ero

carb

on s

ourc

es. P

roje

ct to

inco

rpor

ate

feat

ures

to s

uppo

rt us

e of

lo

w e

mis

sion

/ al

tern

ativ

e fu

el tr

ansp

ort.

• Eq

uiva

lent

to m

inim

um 5

Sta

r N

ABER

S En

ergy

for O

ffice

are

as

• M

inim

um 2

0% im

prov

emen

t on

Nat

iona

l Con

stru

ctio

n C

ode

(NC

C)

Sect

ion

J (p

rior t

o co

nsid

erat

ion

onsi

te g

ener

atio

n)

• W

hole

dev

elop

men

t del

iver

ed n

et

zero

car

bon

read

y

333

Page 24: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 19

Them

e O

bjec

tive

Targ

ets

Wat

er

Red

uce

pota

ble

wat

er u

sage

thro

ugh

dem

and

redu

ctio

n an

d m

axim

ise

oppo

rtuni

ties

for

rain

wat

er /

stor

mw

ater

cap

ture

and

reus

e fo

r non

-pot

able

pur

pose

s.

• Eq

uiva

lent

to m

inim

um 4

Sta

r N

ABER

S W

ater

for O

ffice

are

as

• M

inim

um o

f 35%

impr

ovem

ent

over

Gre

en S

tar r

efer

ence

bas

elin

e

Hea

lth a

nd

Wel

lbei

ng

Use

pas

sive

and

act

ive

mea

sure

s in

com

bina

tion

to m

aint

ain

a hi

gh s

tand

ard

of in

door

air

qual

ity, v

isua

l, ac

oust

ic a

nd th

erm

al c

omfo

rt an

d am

enity

. Inc

orpo

rate

feat

ures

to e

ncou

rage

oc

cupa

nts

to u

se a

ctiv

e m

odes

of t

rans

port.

• In

itiat

ives

to s

uppo

rt 5

Star

Gre

en

Star

Mat

eria

ls &

W

aste

M

inim

ize

cons

truct

ion

and

mat

eria

l was

te g

ener

ated

thro

ugho

ut th

e pr

ojec

t life

cycl

e by

co

nsid

erin

g em

bodi

ed li

fecy

cle

impa

cts

of m

ater

ial s

elec

tions

for t

he p

roje

ct. C

ontra

ctor

s,

subc

ontra

ctor

s an

d su

pplie

rs a

re to

inco

rpor

ate

sust

aina

bilit

y as

a k

ey in

itiat

ive

in th

eir w

ork

and

proc

urem

ent p

roce

sses

. Red

uce

was

te g

ener

atio

n an

d en

cour

age

reus

e or

recy

clin

g th

roug

h ad

optio

n of

circ

ular

prin

cipl

es to

avo

id s

ingl

e us

e an

d w

aste

goi

ng to

land

fill.

• In

itiat

ives

to s

uppo

rt 5

Star

Gre

en

Star

Land

Use

, Ec

olog

y &

B

iodi

vers

ity

Nat

ural

eco

syst

ems

and

loca

l lan

dsca

pe h

abita

t to

be p

rese

rved

and

site

eco

logi

cal v

alue

en

hanc

ed th

roug

h la

ndsc

aped

ele

men

ts.

• In

itiat

ives

to s

uppo

rt 5

Star

Gre

en

Star

Emis

sion

s an

d D

isch

arge

s R

educ

e so

urce

s of

pol

lutio

n an

d em

issi

ons

to li

mit

degr

ee o

f env

ironm

enta

l har

m c

ause

d.

• In

itiat

ives

to s

uppo

rt 5

Star

Gre

en

Star

Clim

ate

Cha

nge

Res

ilien

ce

The

site

will

be d

esig

ned

for r

esilie

nce

to th

e ef

fect

s of

clim

ate

chan

ge. C

limat

e ch

ange

risk

s an

d im

pact

s to

be

asse

ssed

, with

des

ign

stra

tegi

es a

nd p

lans

in p

lace

to a

ddre

ss th

em.

• Ac

hiev

e C

limat

e C

hang

e cr

edit

of

Gre

en S

tar

334

Page 25: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 20

3.2

ES

D in

itia

tive

s an

d co

nsid

erat

ions

The

follo

win

g ta

ble

outli

nes

ESD

stra

tegi

es a

nd/o

r com

mitm

ents

that

are

:

Inco

rpor

ated

and

form

the

basi

s of

the

curre

nt p

lann

ing

prop

osal

des

ign

Rec

omm

ende

d fo

r inc

lusi

on in

the

proj

ect.

Thes

e ar

e to

be

docu

men

ted

durin

g de

sign

and

impl

emen

ted

durin

g co

nstru

ctio

n st

ages

.

Addi

tiona

l opp

ortu

nitie

s re

quiri

ng fu

rther

inve

stig

atio

n. T

hese

are

to b

e as

sess

ed in

mor

e de

tail

and

deem

ed v

iabl

e to

be

incl

uded

into

the

proj

ect.

Tab

le 5

– E

SD

Ini

tiat

ives

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

Lead

ersh

ip &

G

over

nanc

e •

Dev

elop

men

t to

targ

et a

nd a

chie

ve

a 5

Star

Gre

en S

tar D

esig

n &

As

Built

v1.

3 ra

ting

and

be d

eliv

ered

“n

et z

ero

carb

on re

ady”

in s

uppo

rt of

Goo

dman

’s 2

025

Car

bon

Neu

tral

targ

et.

• D

esig

n st

age

deci

sion

mak

ing

on m

ajor

bu

ildin

g sy

stem

s su

ch a

s en

velo

pe, p

lant

eq

uipm

ent,

exte

nt o

f ons

ite re

new

able

s to

be

gui

ded

usin

g lif

e-cy

cle

cost

ing

and

life

cycl

e im

pact

ass

essm

ent.

• C

onst

ruct

ion

cont

ract

or to

impl

emen

t a s

ite

spec

ific

resp

onsi

ble

cons

truct

ion

prac

tices

in

clud

ing

ISO

1400

1 En

viro

nmen

tal

Man

agem

ent P

lan

and

Staf

f Wel

lnes

s pr

ogra

m.

• Im

plem

enta

tion

of c

ompr

ehen

sive

co

mm

issi

onin

g an

d tu

ning

pla

n in

ac

cord

ance

with

bes

t pra

ctic

e st

anda

rds

• Pr

ojec

t will

adop

t des

ign

stra

tegi

es to

pr

omot

e ci

rcul

ar e

cono

my

thro

ugh

desi

gn

that

enc

oura

ges

mat

eria

l re

use

and

recy

clin

g

• C

onst

ruct

ion

Con

tract

or to

hav

e fo

rmal

pol

icie

s an

d pr

oced

ures

to

pro

vide

hig

h qu

ality

sta

ff su

ppor

t tha

t exc

eed

stat

utor

y oc

cupa

tiona

l hea

lth a

nd s

afet

y re

quire

men

ts a

nd e

xten

d in

to

prom

otio

n of

wel

lbei

ng.

335

Page 26: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 21

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

Ener

gy &

C

arbo

n M

inim

isat

ion

• Bu

ildin

g fo

rm a

nd o

rient

atio

n in

corp

orat

es p

assi

ve s

olar

des

ign

prin

cipl

es in

clud

ing

shad

ing

syst

em

prop

osed

aro

und

occu

pied

/ co

nditi

oned

spa

ces

to re

duce

hea

t lo

ads

and

glar

e

• Sp

atia

l allo

wan

ce h

as b

een

mad

e fo

r a n

umbe

r of e

nerg

y ES

D

initi

ativ

es in

clud

ing:

o

Wat

er b

ased

hea

t rej

ectio

n fo

r of

fices

o

Hea

t pum

ps fo

r hot

wat

er.

• Bu

ildin

g en

velo

pe to

incl

ude

the

follo

win

g fe

atur

es to

bal

ance

hea

t loa

ds, g

lare

and

da

ylig

htin

g:

o

Offi

ce F

açad

e / g

lazi

ng s

yste

ms

shal

l be

low

-e

doub

le g

laze

d. N

omin

al w

indo

w w

all r

atio

no

t to

exce

ed 7

0%

o

Solid

wal

ls to

incl

ude

insu

latio

n an

d ou

ter

skin

cla

ddin

g to

redu

ce h

eat g

ains

to in

ner

mas

s co

nstru

ctio

n th

at is

exp

osed

wer

e pr

actic

al to

util

ise

as th

erm

al m

ass

smoo

thin

g te

mpe

ratu

re fl

uctu

atio

n an

d su

ppor

ting

occu

pant

ther

mal

com

fort

o

Roo

fs to

incl

ude

foil

face

d re

flect

ive

insu

latio

n. E

xpos

ed a

reas

of r

oof b

e lig

ht

colo

ured

roof

with

hig

h so

lar r

efle

ctan

ce a

nd

low

em

issi

vity

• Ve

ntila

tion

syst

ems:

o

Mec

hani

cally

ass

iste

d na

tura

l ven

tilat

ion

to

war

ehou

sing

exh

aust

ing

at h

igh

leve

l with

air

inta

kes

at lo

w le

vel

o

Low

tem

p Va

riabl

e Ai

r Vol

ume

air d

istri

butio

n sy

stem

for o

ffice

spa

ce w

ith C

O2

dem

and

cont

rol a

nd e

cono

my

cycl

e co

ntro

l to

utilis

e fre

e co

olin

g fro

m o

utsi

de a

ir

• Bu

ildin

g en

velo

pe:

o

Dou

ble

glaz

ed lo

w-e

with

th

erm

ally

bro

ken

fram

e to

offi

ces

o

Red

uce

win

dow

wal

l rat

io to

60%

• H

eat r

ejec

tion

o

Con

side

r int

egra

tion

of g

roun

d ba

sed

heat

exc

hang

e sy

stem

for

impr

oved

hea

t rej

ectio

n ef

ficie

ncy,

pot

entia

l to

redu

ce

plan

t spa

tial r

equi

rem

ents

for

cool

ing

tow

ers

and

the

asso

ciat

ed w

ater

con

sum

ptio

n

• Li

ghtin

g

o

Sola

r lig

htin

g tu

bes

for g

roun

d an

d le

vel 1

war

ehou

sing

runn

ing

adja

cent

to s

truct

ural

col

umns

.

• Tr

ansp

ort

o

Elec

tric

vehi

cle

(EV)

cha

rgin

g st

atio

ns

o

Inco

rpor

ate

stag

ing

area

for

futu

re d

rone

use

on

site

336

Page 27: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 22

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

o

Offi

ces

to in

clud

e se

para

te th

erm

al c

ontro

l zo

nes

for n

orth

wes

t, no

rth e

ast s

outh

eas

t pe

rimet

ers

and

cent

re z

one

o

Allo

w fo

r ove

rsiz

ing

air d

istri

butio

n du

cts

and

air h

andl

ing

units

to re

duce

sys

tem

pre

ssur

e le

adin

g to

redu

ced

fan

pow

er a

nd e

nerg

y co

nsum

ptio

n

• C

oolin

g th

erm

al p

lant

(hea

t rej

ectio

n / c

hille

rs):

o

Wat

er c

oole

d va

riabl

e sp

eed

com

pres

sor

chille

rs s

elec

ted

to b

e be

st in

cla

ss

Coe

ffici

ent o

f Per

form

ance

and

par

t loa

d ef

ficie

ncy

(IPLV

).

o

Coo

ling

tow

ers

to b

e ut

ilised

to m

axim

ise

chille

r effi

cien

cy

• D

omes

tic H

ot W

ater

(DH

W) /

Hea

ting

Hot

W

ater

(HH

W) p

lant

o

Avoi

d fo

ssil

fuel

/ ga

s ba

sed

syst

ems

o

Elec

tric

heat

pum

p sy

stem

s to

be

used

o

For i

sola

ted

amen

ities

suc

h as

thos

e lo

cate

d in

war

ehou

sing

use

loca

lised

inst

anta

neou

s el

ectri

c or

air

sour

ced

heat

pum

p to

avo

id

syst

em lo

sses

from

retic

ulat

ing

over

long

di

stan

ces

• O

n si

te e

lect

ricity

gen

erat

ion

337

Page 28: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 23

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

o

Roo

f top

sol

ar P

V sy

stem

to b

e in

clud

ed fo

r on

site

ele

ctric

al e

nerg

y ge

nera

tion.

o

Syst

em to

be

size

d to

offs

et a

s m

uch

site

en

ergy

dem

and

that

is c

ost e

ffect

ive

bala

nced

with

off-

site

gre

en p

ower

sup

ply.

• Li

ghtin

g

o

Inte

rnal

LED

ligh

ting

thro

ugho

ut c

oupl

ed w

ith

occu

panc

y an

d da

ylig

ht s

enso

rs

o

Day

light

ing

cont

rols

for o

ffice

and

war

ehou

se

spac

es w

here

day

light

is a

vaila

ble

o

Roo

f lig

hts

/ tra

nslu

cent

roof

she

etin

g to

be

incl

uded

for t

op le

vel w

areh

ouse

to re

duce

da

ytim

e ar

tific

ial l

ight

ing

requ

irem

ents

o

Exte

rnal

LED

ligh

ting

phot

oele

ctric

sen

sor

cont

rolle

d

• En

ergy

Man

agem

ent /

Bui

ldin

g C

ontro

ls

o

Build

ing

to in

clud

e co

mpr

ehen

sive

met

erin

g an

d m

onito

ring

syst

ems

to e

nabl

e on

goin

g m

onito

ring

and

man

agem

ent

o

HVA

C c

ontro

ls o

n tim

e sc

hedu

le a

nd w

ith

smar

t sta

rts (b

uild

ing

optim

isat

ion

syst

em) t

o pr

omot

e ea

rly s

tarts

ahe

ad o

f ver

y ho

ld/c

old

days

to re

duce

pea

k de

man

ds

• Tr

ansp

ort

338

Page 29: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 24

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

o

Ded

icat

ed s

pace

s fo

r low

em

issi

on v

ehic

les

and

ride

shar

e.

Wat

er

Spat

ial a

llow

ance

has

bee

n m

ade

to

incl

ude

rain

wat

er c

aptu

re.

• R

ainw

ater

tank

to b

e in

clud

ed fo

r sup

ply

of a

ll on

site

non

pot

able

wat

er u

se in

clud

ing

irrig

atio

n, fl

ushi

ng to

ilets

, coo

ling

tow

er m

ake

up w

ater

• In

stal

l wat

er e

ffici

ent f

ixtu

res

and

appl

ianc

es

• Se

lect

dro

ught

-tole

rant

nat

ive

indi

geno

us

vege

tatio

n fo

r lan

dsca

ping

• Te

stin

g w

ater

of w

et fi

re s

yste

ms

to b

e ca

ptur

ed fo

r reu

se o

r not

dis

char

ged

(e.g

. re

circ

ulat

ed) d

urin

g te

stin

g pr

oces

ses

• In

stal

l wat

er m

eter

s an

d m

onito

ring

syst

em.

• G

roun

d so

urce

hea

t rej

ectio

n to

be

cons

ider

ed in

lieu

of c

oolin

g to

wer

s to

avo

id e

vapo

rativ

e he

at re

ject

ion

wat

er c

onsu

mpt

ion

• D

ue to

ext

ensi

ve ro

of a

rea

cons

ider

opp

ortu

nitie

s to

cap

ture

ra

in w

ater

for s

uppl

ying

adj

acen

t si

tes.

Hea

lth a

nd

Wel

lbei

ng

Des

ign

of fa

çade

and

bui

ldin

g fo

rm

supp

orts

use

of d

aylig

htin

g fo

r per

imet

er

offic

e sp

aces

and

upp

er w

areh

ousi

ng

leve

l.

• U

se o

f low

form

alde

hyde

and

low

vol

atile

or

gani

c co

mpo

unds

(VO

Cs)

mat

eria

ls to

im

prov

e in

tern

al a

ir qu

ality

• Li

ghtin

g to

max

imis

e vi

sual

com

fort

thro

ugh

mai

ntai

ning

app

ropr

iate

ligh

ting

leve

ls a

nd

glar

e co

ntro

l

• O

utsi

de a

ir ra

tes

for o

ffice

are

as (o

r oth

er

area

s th

at a

re re

gula

rly o

ccup

ied)

in e

xces

s of

AS

1668

.2 re

quire

men

ts c

oupl

ed w

ith C

O2

dem

and

cont

rolle

d ve

ntila

tion

• Ex

tern

al c

omm

unal

land

scap

ed

area

s w

ith a

men

ities

suc

h as

ta

bles

, sea

ting

and

BBQ

s.

339

Page 30: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 25

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

• Ac

oust

ic tr

eatm

ent o

f bui

ldin

g en

velo

pe a

nd

vent

ilatio

n op

enin

gs to

con

trol e

gres

s of

road

tra

ffic

and

airc

raft

• Ac

oust

ic a

ttenu

atio

n of

HVA

C to

lim

it no

ise

and

vibr

atio

n fro

m a

ir ha

ndlin

g pl

ant

• Pr

ovid

e bi

ke ra

cks

and

end

of tr

ip fa

cilit

ies

(lock

ers,

sho

wer

s) to

enc

oura

ge s

taff

to u

se

activ

e m

odes

of t

rans

port

to a

nd fr

om s

ite.

Mat

eria

ls

N/a

Red

uce

Portl

and

cem

ent c

onte

nt b

y m

axim

isin

g us

e of

sup

plem

enta

ry c

emen

titio

us

mat

eria

ls s

uch

as fl

y as

h or

bla

st fu

rnac

e sl

ag

• M

axim

ise

use

of s

teel

sou

rced

from

cer

tifie

d en

viro

nmen

tally

resp

onsi

ble

supp

liers

• Pe

rman

ent f

orm

wor

k, p

ipes

, flo

orin

g, b

linds

an

d ca

bles

to b

e fre

e of

PVC

or c

onta

in P

VC

that

is re

spon

sibl

y m

anag

ed in

man

ufac

ture

pe

r the

Gre

en B

uild

ing

Cou

ncil

of A

ustra

lia’s

(G

BCA)

Bes

t Pra

ctic

e G

uide

lines

for P

VC

• Su

stai

nabl

e tim

ber p

rocu

rem

ent t

hrou

gh

GBC

A ap

prov

ed F

ores

t Cer

tific

atio

n Sc

hem

es

or re

used

sou

rces

• Se

lect

pro

duct

s w

ith v

erifi

ed th

ird p

arty

ce

rtific

atio

n su

ch a

s En

viro

nmen

tal P

rodu

ct

Dec

lara

tions

.

• R

oad

and

carp

ark

pave

men

ts (i

ncl.

sub

base

) to

use

recy

cled

pro

duct

s (s

uch

as re

cycl

ed a

ggre

gate

s,

glas

s, e

tc.)

• C

onsi

der u

se o

f stru

ctur

al ti

mbe

r w

here

pra

ctic

al, s

uch

as o

ffice

bu

ildin

g to

redu

ce e

mbo

died

ca

rbon

.

340

Page 31: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 26

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

Ope

ratio

nal

was

te

Was

te ro

om s

izin

g ba

sed

on s

tora

ge

requ

ired

for s

epar

atio

n of

gen

eral

was

te

and

recy

clab

le w

aste

stre

ams.

On

site

sep

arat

ion

and

treat

men

t of o

rgan

ic w

aste

us

ing

com

posi

ting

faci

litie

s.

Con

side

r im

plem

enta

tion

dire

ct w

aste

re

use

/ rec

yclin

g in

itiat

ives

pai

r with

co

mm

unity

nee

ds.

Land

Use

, Ec

olog

y &

B

iodi

vers

ity

Exte

rnal

gro

und

plan

land

scap

ed

elem

ents

are

incl

uded

in th

e de

sign

. •

All l

ands

capi

ng to

use

nat

ive

spec

ies

indi

geno

us to

the

loca

l are

as

• Al

l ext

erna

l bui

ldin

g m

ater

ials

and

har

dsca

pe

area

s to

be

sele

cted

with

Sol

ar R

efle

ctan

ce

Inde

x pr

oper

ties

that

redu

ce im

pact

of U

rban

H

eat I

slan

d ef

fect

.

• C

onsi

der i

nclu

ding

gre

en w

all

syst

ems

for w

areh

ousi

ng a

cces

s ro

adw

ay a

nd ra

mp

scre

enin

g

• C

onsi

der g

reen

roof

for o

ffice

bu

ildin

g w

ith p

oten

tial f

or s

taff

recr

eatio

nal u

se.

Emis

sion

s an

d D

isch

arge

s A

stor

mw

ater

ass

essm

ent h

as b

een

unde

rtake

n by

Cos

tin R

oe c

onfir

min

g th

at p

ost d

evel

opm

ent f

low

will

not

exce

ed p

re d

evel

opm

ent.

Con

trols

will

be in

clud

ed to

trea

t sto

rmw

ater

to th

e fo

llow

ing:

o

Gro

ss p

ollu

tant

s (G

P’s)

– 9

0%

o

Tota

l Sus

pend

ed S

olid

s (T

SS) –

85

%

o

Tota

l Pho

spho

rous

(TP)

– 6

0%

o

Tota

l Nitr

ogen

(TN

) – 4

5%

o

Hyd

roca

rbon

s an

d oi

l – 9

0%.

• R

efrig

eran

ts fo

r chi

llers

and

hea

t pum

ps to

ut

ilise

4th

gene

ratio

n or

nat

ural

refri

gera

nts

with

an

ozon

e de

plet

ion

pote

ntia

l of z

ero

and

a gl

obal

war

min

g po

tent

ial a

t or n

ear z

ero.

Tot

al

Syst

em D

irect

Env

ironm

enta

l Im

pact

(TSD

EI)

to b

e le

ss th

an 1

5.

• Li

ght s

pill

to n

eigh

bour

ing

prop

ertie

s to

be

cont

rolle

d

• Li

ght p

ollu

tion

to n

ight

sky

to b

e pr

even

ted

Proj

ect t

o in

vest

igat

e ad

ditio

nal l

evel

s of

sto

rmw

ater

trea

tmen

t ove

r tho

se

nom

inat

ed.

341

Page 32: Proponent ESD Strategy

GH

D |

Rep

ort f

or G

oodm

an P

rope

rty S

ervi

ces

(Aus

t) Pt

y Li

mite

d - B

urro

ws

Indu

stria

l Est

ate,

1-3

Bur

row

s R

oad,

St P

eter

s, 1

2521

130

| 27

Them

e Fe

atur

es /

com

mitm

ents

of c

urre

nt

prop

osal

R

ecom

men

ded

for a

dopt

ion

R

ecom

men

ded

for f

urth

er

Inve

stig

atio

n

Clim

ate

Res

ilien

ce

The

proj

ect i

s cu

rrent

ly d

esig

ned

to s

it ou

tsid

e th

e 1%

AEP

floo

d le

vel a

nd th

e N

SW F

lood

plai

n M

anag

emen

t Man

ual o

f 1%

AEP

+ 0

.5 m

free

boar

d, F

lood

ing

occu

rs u

p to

RL

2.3

m. T

he o

ffice

and

pr

opos

ed b

uild

ing

are

at R

L 3.

5 m

and

5.

2 m

resp

ectiv

ely.

• Pr

ojec

t to

bala

nce

exte

rnal

per

form

ance

of t

he

build

ing

enve

lope

with

risk

of o

verh

eatin

g

• H

VAC

des

ign

to c

onsi

der c

limat

e ch

ange

pr

ojec

tions

for i

mpa

ct o

n pl

ant c

apac

ity

• C

onsi

der a

ny c

limat

e ch

ange

indu

ced

flood

ris

ks a

nd in

corp

orat

e m

itiga

tion

mea

sure

s in

to

desi

gn.

• Pr

ojec

t to

com

plet

e a

form

al

clim

ate

chan

ge ri

sk a

sses

smen

t in

acco

rdan

ce w

ith a

reco

gnis

ed

stan

dard

(e.g

. AS

5334

:201

3 C

limat

e C

hang

e Ad

aptio

n fo

r Se

ttlem

ents

and

Infra

stru

ctur

e)

• Bu

ildin

g to

incl

ude

feat

ures

to

addr

ess

all e

xtre

me

and

high

risk

s.

342

Page 33: Proponent ESD Strategy

GHD | Report for Goodman Property Services (Aust) Pty Limited - Burrows Industrial Estate, 1-3 Burrows Road, St

Peters, 12521130 | 1

4. Conclusion A context analysis of the site location, climate and applicable policies and planning controls has been undertaken to identify key sustainability themes and objectives (refer Section 2).

A project specific ESD framework has been developed to capture the key overarching requirements and put in place a strategy to guide the consideration and implementation of best practice ESD features into the future design stages of the development (refer Section 3.1).

A number of sustainable design considerations have also been proposed and are summarised in Section 3.2. These include initiatives that are:

Incorporated and form the basis of the current planning proposal design

Recommended for inclusion in the project. These are to be documented during design and implemented during construction stages

Requiring further investigation. These are to be assessed in more detail and if deemed viable to be included into the project.

On the basis of this review and assumption that the sustainability framework will be followed for future stages of the development , the proposed development is capable of including best practice initiatives and meeting the requirements of current planning controls and the intent of wider local and regional policies.

343

Page 34: Proponent ESD Strategy

GHD

Level 15 133 Castlereagh Street T: 61 2 9239 7100 F: 61 2 9239 7199 E: [email protected]

© GHD 2020

This document is and shall remain the property of GHD. The document may only be used for the purpose for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form whatsoever is prohibited. 12521130-69183/https://projectsportal.ghd.com/sites/pp15_05/planningadvisoryserv/ProjectDocs/12521130-RPT-Goodman ESD Context Analysis and Strategy-R1.docx

Document Status

Revision Author Reviewer Approved for Issue Name Signature Name Signature Date

A I Dixon Tim Dunn

Shaun Lawer

24.02.2020

0 I Dixon Tim Dunn

Shaun Lawer

04.03/2020

344

Page 35: Proponent ESD Strategy

www.ghd.com

345