PROPOSED CONSTRUCTION PHASING ABUTMENT BUILD UP TO FUTURE DETOUR INTERCHANGE TO MISSILE LINCOLNWAY TO FUTURE BRIDGE ABUTMENT TO CONNECT BUILD UP TO PROPOSED MOVEMENT TO MAINTAIN SB TO WB TEMPORARY PAVEMENT RAMP NB TO EB DIRECTIONAL TO NB LOOP RAMP AND BETWEEN EXISTING EB BUILD FLYOVER BRIDGE Lincolnway Service Interchange Project A: EB to NB Connector with I-80 I- 25 U S - 30 / L I N C O L N W AY I - 2 5 U P R R U P R R B NS F B NSF 0' 2000' 500' 1000' I-80 Printed on 8/13/2019 REMOVAL STAGE 1 STAGE 2 BRIDGE TEMPORARY TIE-IN LEGEND

PROPOSED CONSTRUCTION PHASING - I-25/I-80

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROPOSED CONSTRUCTION PHASING - I-25/I-80

PROPOSED CONSTRUCTION

PHASING

ABUTMENT

BUILD UP TO FUTURE

DETOUR

INTERCHANGE

TO MISSILE

LINCOLNWAY

TO FUTURE BRIDGE

ABUTMENT TO CONNECT

BUILD UP TO PROPOSED

MOVEMENT

TO MAINTAIN SB TO WB

TEMPORARY PAVEMENT

RAMP

NB TO EB DIRECTIONAL

TO NB LOOP RAMP AND

BETWEEN EXISTING EB

BUILD FLYOVER BRIDGE

Lincolnway Service Interchange

Project A: EB to NB Connector with

I-80

I-25

US-30/LIN

COLN W

AY

I-25

UPRR

UPRR

BNSF

BN

SF

0' 2000'500' 1000'

I-80

Printed on 8/13/2019

REMOVAL

STAGE 1

STAGE 2

BRIDGE

TEMPORARY TIE-IN

LEGEND

Page 2: PROPOSED CONSTRUCTION PHASING - I-25/I-80

PROPOSED CONSTRUCTION

PHASING

PERMANENT TIE-IN

PERMANENT TIE-IN

PERMANENT TIE-IN

PERMANENT TIE-IN

PERMANENT TIE-IN

NEW NB BRIDGE

SB BRIDGE TO BUILD

DEMOLISH EXISTING

THIS PROJECT

RAMPS DURING FIRST YEAR OF

CONSTRUCTION FOR EXISTING

LEAVE GAP IN ROADWAY

DIRECTIONAL RAMP

PRIOR TO SB TO WB

RAMP NEEDS TO BE BUILT

WB TO SB CONNECTOR

NEW NB BRIDGE

SB BRIDGE TO BUILD

DEMOLISH EXISTING

AREA

THROUGH FUTURE GORE

BUILD PERMANENT TIE-IN

AREA

THROUGH FUTURE GORE

BUILD PERMANENT TIE-IN

Connector

Project B: I-25 Shift and WB to SB

I-80

I-25

US-30/LIN

COLN W

AY

I-25

UPRR

UPRR

BNSF

BN

SF

0' 2000'500' 1000'

I-80

Printed on 8/13/2019

BRIDGE

STAGE 3

STAGE 2

STAGE 1

REMOVAL

PRIOR PHASES

LEGEND

TEMPORARY TIE-IN

Page 3: PROPOSED CONSTRUCTION PHASING - I-25/I-80

PROPOSED CONSTRUCTION

PHASING

PERMANENT TIE-IN

PERMANENT TIE-IN

PERMANENT TIE-IN

WB BRIDGE

WB BRIDGE TO BUILD PROPOSED

DEMOLISH PORTION OF EXISTING

PERMANENT TIE-IN

PERMANENT TIE-IN

AUXILIARY LANE

SECTION WITH

ULTIMATE MAINLINE

PERMANENT TIE-IN

MAINLINE ROADWAY

UNDERCROSSING WITH

INSTALL CULVERT

Project C: I-80 Realignment

I-80

I-25

US-30/LIN

COLN W

AY

I-25

UPRR

UPRR

BNSF

BN

SF

0' 2000'500' 1000'

I-80

Printed on 8/13/2019

TEMPORARY TIE-IN

BRIDGE

STAGE 2

STAGE 1

REMOVAL

PRIOR PHASES

LEGEND