Sr. No. Description Page No.
1. Executive Summary 3
2. Introduction of the Project/Background information 9
3. Project Description 10
4. Site Analysis 16
5. Planning Brief 18
6. Proposed Infrastructure 19
7. Rehabilitation and resettlement (R & R) Plan 21
8. Project Schedule & Cost Estimates 21
9. Analysis of Proposal (Final Recommendations) 22
3
1.0 EXECUTIVE SUMMARY
1.1 Company Profile
M/s. D Y Industries proposes organic chemicals manufacturing in the existing inorganic
chemicals manufacturing unit located at Plot no. 3003, GIDC Panoli-394116, Taluka:
Ankleshwar, Dist: Bharuch, Gujarat by expansion.
1.2 Project Details
1.2.1 Products along with Production Capacity Sr.
No.
Product Existing
Quantity
(TPM)
Additional
Quantity
(TPM)
Total
Quantity
(TPM)
Inorganic Products
1 Copper Sulphate
850
0
850 2 Potassium Sulphate
3 Mono Ammonium Phosphate
4 Sodium Nitrate
Organic Products
1 Theobromine 0 10 10
2 MetaBromo Anisol
0
25
25
3 Chlorhexidine Base
4 Chlorhexidine Digluconate
5 Chlorhexidine Diacetate
6 Chlorhexidine Hydrochloride
7 3-Chloropropiophenone
8 Tetra Butyl Ammonium Bromide
9 Tetra Butyl Ammonium Chloride
10 Tetra Butyl Ammonium Hydrogen Sulphate
11 Tetra Butyl Ammonium Iodide
12 Tetra Butyl Ammonium Fluoride Trihydrate
13 N-Butyl Bromide
14 N-Propyl Bromide
15 Bis-2-chloro ethyl amine hydrochloride
16 2-Nitro 4-Thiocyno Aniline
By Products
1 Acetic Acid 0 19 19
2 Spent Sulphuric Acid 0 173 173
3 Dilute HCl 0 82 82
4 AlCl3 Solution 0 81 81
5 Potassium Bromide Solution 0 152 152
4
6 Sodium Bromide Solution 0 15 15
7 Sodium Sulphite Solution 0 156 156
1.3 Raw Material Requirement
List of Raw Materials and Their Capacity
SR. NO. Name of Raw Materials CAPACITY (MT/Tonne of Product)
Inorganic Products
1. Copper Sulphate
1. Copper Metal 0.473
2. Sulphuric Acid 0.684
2. Potassium Sulphate
1. Potassium Hydroxide 0.653
2. Sulphuric Acid 0.573
3.Mono Ammonium Phosphate
1. Phosphoric Acid 1.010
2. Anhydrous Ammonia 0.151
4. Sodium Nitrate
1. Sodium Carbonate 0.637
2. Nitric Acid 1.070
Organic Products
1. Theobromine
1. Cyno Acetic Acid 1.80
2. Mono Methyl Urea 1.19
3. Acetic Anhydride 1.87
4. Caustic Lye 48% 1.97
5. HCl 1.83
6. Sodium Nitrite 0.79
7. Acetic Acid 0.60
8. Pd on Carbon 0.00
9. Formic Acid 1.58
10. DiMethyl Sulphate 1.32
11. Activated Carbon 0.10
12. Water 1.60
2. Meta Bromo Anisol
1. Nitrobenzene 1.11
2. Oleum 23% 3.93
3. Bromine 0.59
4. Iodine 0.01
5. Soda Ash 0.06
6. Methanol 0.28
7. Toluene 6.11
8. Potassium Hydroxide 0.56
9. Sodium Methoxide 0.28
10. Salt 0.72
5
11. HCl 1.94
12. Tetra Butyl Ammonium Bromide 0.19
13. Water 4.03
3.Chlorohexidine
1. Sodium dicynamide 0.36
2. N-Butanol 0.69
3. Hexamethyl Diammine 0.23
4. TEA 0.02
5. Caaustic Lye 48% 0.10
6. PCA HCl 0.64
7. Methanol 0.66
8. Water 0.69
4. Chlorhexidine Digluconate
1. Chlorhexidine 0.57
2. Gluconic Acid 0.44
3. Water 4.02
4. Carbon 0.01
5.Chlorhexidine Diacetate
1. Chlorhexidine 0.81
2. Acetic Acid 0.20
3. Recycle Water 0.37
4. Water 0.17
5. Carbon 0.02
6. Chlorhexidine Dihydrochloride
1. Chlorhexidine 0.81
2. HCl 30% 0.12
3. Water 1.62
7. 3-Chloropropiophenone
1. MDC 3.29
2. AlCl3 1.96
3. Propiophenone 1.64
4. Chlorine Gas 1.30
5. NaoH 0.03
6. Water 5.47
7. Hexane 1.64
8. HCl 0.59
8. Tetra Butyl Ammonium Bromide
1. Tri N-Butyl Amine 0.55
2. Butyl Bromide 0.45
3. Acetonitrile 0.30
4. Ethyl Acetate 0.40
5. Soda Ash 0.10
9. Tetra Butyl Ammonium Chloride
1. Tetra Butyl Ammonium Bromide 1.20
2. Potassium Hydroxide 0.32
3. Toluene 2.24
6
4. HCl 0.48
5. Methanol 2.64
6. Water 2.00
10. Tetra Butyl Ammonium Hydrogen Sulphate
1. Tetra Butyl Ammonium Bromide 0.96
2. Butanol 1.20
3. Sulphuric Acid 0.40
4. Sodium Hydrogen Sulphate 0.12
5. Soda Ash 0.12
6. Methyl Ethyl Ketone 0.80
7. Methyl Isobutyl Ketone 0.80
8. Methylene Dichloride 0.80
11. Tetra Butyl Ammonium Iodide
1. Tetra Butyl Ammonium Bromide 1.00
2. Potassium Iodide 0.50
3. Ethyl Acetate 1.00
4. Methanol 2.00
5. Sulphuric Acid 0.33
6. Sodium Hydroxide 0.25
7. Water 5.00
12. Tetra Butyl Ammonium Fluoride Trihydrate
1. Tetra Butyl Ammonium Bromide 1.17
2. Potassium Hydroxide 0.33
3. Methanol 2.00
4. Hydrofloric Acid 0.25
5. Charcoal 0.08
13. N-Butyl Bromide
1. N-Butanol 0.57
2. Sulphure Powder 0.05
3. Bromine 0.67
4. Soda Ash 0.02
5. Water 0.23
14. N-Propyl Bromide
1. N-Propanol 0.57
2. Sulphure Powder 0.06
3. Bromine 0.76
4. Soda Ash 0.01
5. Water 0.23
15. Bis-2-chloro ethyl amine hydrochloride
1. Diethanol amine 0.63
2. Thionyl Chloride 1.56
3. Toluene 1.88
4. Caustic Lye(48%) 2.00
5. Soda Ash 0.05
6. Water 4.03
16.2-Nitro 4-ThiocynoAniline
7
1.4 Water Requirement, Waste Water Generation and Treatment
Total water requirement will be 17.21 m3/day which will be met through GIDC water supply.
The total waste water generation will 5.6 m3/day. The Industrial effluent 3.3 m3/day will be
treated in ETP consists of primary treatment and after primary treatment the effluent will be
sent to CETP for further treatment and disposal.
Domestic Waste water 2.3 m3/day will be disposed of through the specific tank & Soak Pit
System.
1.5 Air Pollution Source and Control Management
There will be flue gas emission from Boiler, THF and process gas emission from stack attached
to reactor. Company will install water Scrubber to reduce air pollution.
1.6 Hazardous Waste
CAT. NO.
HAZARDOUS WASTE
Existing Quantity
Additional Quantity
Total Quantity METHOD OF DISPOSAL
33.3 Discarded / containers/ barrels /liners
3 MT/Month
5 MT/Month 8 MT/Month Collection, Storage, Decontamination & Reuse or given GPCB registered vendors.
5.1 Used Oil 1 Lit/Month 2 Lit/Month 3 Lit/Month Collection, Storage and Reuse as Lubricant Within Premises/given to GPCB registered Recycler/Reprocessors.
33.1 ETP Sludge 0 5 MT/Month 5 MT/Month Collection, Storage, Transportation & disposal at TSDF.
28.1 Process Residue 0 4 MT/Month 4 MT/Month Collection, Storage, Transportation & sent for
1. Orthonitroaniline 0.74
2. Ammonium Thiocynate 0.88
3. Methanol 2.82
4. Chlorine Gas 0.51
5. Soda Ash 0.33
6. Water 4.03
8
co-processing or incineration.
28.2 Spent charcoal 0 0.2 MT/Month 0.2 MT/Month Collection, Storage, Transportation & sent for co-processing or disposal in TSDF.
28.5 Spent Solvent 0 0.1 MT/Month
0.1 MT/Month Collection, Storage, Transportation & sent for co-processing or incineration.
20.3 Distillation Residue
0 3.5 MT/Month
3.5 MT/Month
1.7 Green Belt
Total 1,000 sq. meter land area is available at site; out of this area around 300 sq. meter (30 %)
area will be developed as greenbelt.
1.8 Power & Fuel Requirements
Power Requirements: Power required : 71 HP (Existing) : 125 HP (Proposed) Source: DGVCL Fuel Requirements: LDO/Diesel: 360 Lit/Day (Existing capacity) Natural Gas: 800 SCM/Day (Proposed capacity)
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy of
mining lease/letter of intent should be given.
Identification of the project and project proponent
M/s. D Y Industries proposes expansion of organic chemicals manufacturing in the existing
inorganic chemicals manufacturing unit located at Plot no. 3003, GIDC, Panoli-394116, Taluka:
Ankleshwar, Dist: Bharuch, Gujarat.
List of Directors:
Sr. No.
Name of Directors
Residential. Address Phone No. Qualification Experience
9
1. Mr. Manharbhai M. Malaviya
B. No. 17, Vaikunth Society, GIDC, Ankleshwar-393002
+919998016156
Graduate 25 years
2. Mr. Rasikbhai M. Malaviya
B. 14, Amber Vilash Society, GIDC, Ankleshwar-393002
- Graduate 25 years
2.2 Brief description of nature of the Project
Proposed Expansion of Organic chemicals manufacturing in the existing inorganic chemicals
manufacturing unit.
2.3 Need for the project and its importance to the country and or region
The demand for products intended to be manufacture is increasing in the country by expanding
this unit, M/s. DYI will be able to meet the demand of various products locally. The project will
save forex as certain products import will be reduced. This will also generate direct and indirect
employment opportunity for various levels of people.
2.4 Demands-Supply Gap
Based on our informal survey of the market with our current customers and various traders, we
have found that there is a big potential for the range of the products we are planning. These
products will be an addition to the current product.
2.5 Imports vs. Indigenous production
Based on the current cost of indigenous raw materials and the non availability of some
materials, we will have to import some of the key raw materials as they are not available
indigenously. This will make us very competitive against imported finished products and we will
export of our finished products in the international market.
2.6 Export possibility
We shall explore the possibility of export the products.
2.7 Domestic/Export Markets
10
Our products have good demand in domestic & international markets. We shall explore the
possibility of export the products.
2.8 Employment Generation (Direct and Indirect) due to project.
M/s. D Y Industries will give direct employment to local people based on qualification and
requirement. In addition to direct employment, indirect employment shall generate ancillary
business to some extent for the local population.
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
No interlinked project has been submitted.
Location (map showing general location, specific location and project boundary & project
site layout) with coordinates.
10
Plot Layout
25.00 MTR. X 40.00 MTR.
GATE
OFFICE & Q.C, Q.A LABORATORY
PLANT
RAW MATERIAL STORAGE
UTILITY
G R E E N
B E L T
ETP
14
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Looking to the international market demand of the products it was decided by M/s. D Y
Industries to expand existing facility.
Major factors involved in the selection of site are listed below:
Existing operational facility
Minor site clearance activities shall be carried out.
The project site is located on level ground, which does not require any major land filling
for area grading work.
Proximity to Raw Material suppliers.
Site is very well connected by road and railway.
Availability of Fuel, Power, TSDF, CETP, etc.
Modern infrastructure support and amenities at par in other global markets, including:
Efficient transport facilities.
Environment-friendly zone.
Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Please refer Section-1.2.1, Page No. 3.
3.5 Project Description with process details (a schematic diagram/flow chart showing the
project layout, components of the project, etc. should be given)
Please refer Form-I, Annexure-III.
15
3.6 Raw Material required along with estimated quantity, likely source, marketing area of
final product/s, mode of transport of raw material and Finished product.
For raw material required along with quantity; Please refer Section-1.3, Page No. 4. We shall
procure the raw material as much as possible from domestic market and if there is no
availability of any raw material we will import. We shall explore the possibility of export the
finished products.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be
briefly outlined.
After expansion of the unit, possibility for reuse and recycle will be explored.
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
Total water requirement shall be met through GIDC Water Supply.
Power Requirements: Power required : 71 HP (Existing) : 125 HP (Proposed) Source: DGVCL Fuel Requirements: LDO/Diesel: 360 Lit/Day (Existing) Natural Gas: 800 SCM/Day (Additional)
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
Please refer Please refer Form-I, Annexure-IV & VI.
16
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
4.0 Site Analysis
4.1 Connectivity
Site is very well connected by road
Availability of fuel, power, TSDF, CETP, etc.
4.2 Land Form, Land Use and Land Ownership
Land Use will be incorporated in the EIA Study.
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT MARKET ASSESSMENT FINANCIAL REPORT PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS & BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE CENTRAL GROUND WATER BOARD GUJARAT POLLUTION CONTROL BOARD (GPCB) PUBLIC HEALTH ENGINEERING DEPT. AGRICULTURE DEPARTMENT FOREST DEPARTMENT IRRIGATION DEPARTMENT EMPLOYMENT EXCHANGE HEALTH CENTER CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC STATUS &
INFRASTRUCTURE
PROPOSED
PLANT
FACILITY DESCRIPTION
IMPACTS METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL MANAGEMENT PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT, GREEN BELT DEVELOPMENT MONITORING PROGRAM
RISK ANALYSIS STUDIES & DISASTER
MANAGEMENT PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
17
4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ)), shortest distances from the periphery of the project to periphery of the
forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from
HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette
notification should be given.
Existing land use pattern will be incorporated in the EIA Study. CRZ is not applicable.
4.5 Existing Infrastructure
Existing operating industry having Manufacturing plant, Adm. Bldg., Godown, etc.
4.6 Soil Classification
Soil Classification will be incorporated in the EIA Study.
4.7 Climatic data from secondary sources.
Climatic data will be incorporated in the EIA Study.
4.8 Social infrastructure available.
Various Programs/ Projects related to Social & Economic development of surrounded area
has been planned, which are as follows.
A) Natural Resource Management – The main focus of this program will be to maximize the
yield returns of the farmers through efficient management of existing resources &
extension of new agricultural practices.
1) Integrated Agricultural Growth Project – For improvement and use of the modern
techniques and thereby would certainly contribute to prosperity in the agriculture
sector and reduce the rural poverty by programs like Farmers Training, Nursery
Growing Trainings, Modern agriculture equipment distribution programs etc.
2) Animal Husbandry Projects – Various programs like health checkups & treatment,
vaccination program, Anti sterility camps, breed improvement etc. will be carried
out.
18
B) Income Generation Program -
1) Establishment of Self help groups.
2) Rural Entrepreneurship Development Program
3) Handcrafts Development Program
4) Vocational Training
5) Business process outsourcing
C) Health, Education & Infrastructure
1) Aids Awareness Program
2) General Health Camps
3) Innovative Teaching Methods
4) Adult Education
5) Sanitation
6) Infrastructure Development Projects
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country
planning/Development authority classification.
Type of Industry: Proposed expansion of organic chemicals manufacturing in existing
inorganic chemicals manufacturing unit.
5.2 Population Projection
Population Projection will be incorporated in the EIA Study
5.3 Land use planning (breakup along with green belt etc.)
SR.
NO.
PARTICULAR AREA (m2) % OF TOTAL LAND
1 Process Plant 320 32
2 Raw Material & Product Storage 150 15
19
3 Utility 20 2
4 Storage (Hazardous Chemicals) 20 2
5 Hazardous Waste Storage Area 20 2
6 Effluent Treatment Plant 20 2
7 Green Belt 300 30
8 Roads 40 4
9 Parking Area 20 2
10 Administrative Building 30 3
11 Undeveloped Open Area 60 6
Total 1,000 100
5.4 Assessment of Infrastructure Demand (Physical & Social)
Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed expansion activity.
Social Welfare
Cordial relation with the villages shall be established and representation shall be made
to villagers for help for creation of facilities related to health, education, etc.
5.5 Amenities/Facilities
Details of amenities available in study area
Population Projection will be incorporated in the EIA Study.
6.0 Proposed Infrastructure
6.1 Industrial Area (Processing Area)
Processing Area (Process Plant, Utility , ETP Area, Administrative Buliding) = 390 m2
6.2 Residential Area (Non Processing Area)
Non Processing Area (Raw material & product storage area, storage (Hazardous Chemicals)
area, Hazardous waste storage Area, Road ,Parking Area ,green belt and Undeveloped open
area) = 630 m2
20
Green Belt: 300 m2
6.3 Green Belt
Total 1,000 sq.meter land area is available at site; out of this area around 300 sq. meter
(30%) area will be developed as greenbelt.
6.4 Social Infrastructure
Water requirement will be met through GIDC Water Supply.
Power supply by DGVCL.
6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)
Major factors involved in the selection of site are listed below:
Site is very well connected by road
Proximity to Raw Material suppliers
Availability of sufficient land free from cultivation
Availability of power facilities
Availability of fuel
6.6 Drinking water Management (Source & Supply of water)
Total water requirement shall be met through GIDC Water Supply.
6.7 Sewerage System
Sewage pipes are laid in entire company for the removal and disposal of mainly non-
harmful liquid wastes from the offices, canteen and domestic waste coming from different
section of industry. These liquid wastes are sent to septic tank & soak pit.
6.8 Solid Waste Management
Please refer Form-I, Annexure-VI. 6.9 Power Requirement & Supply/Source
Please refer Section 1.8, Page No. 8 of this report.
21
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land oustees and landless laborers (a brief outline to be given)
There is no habitation on the proposed expansion project activity area and it is open
industrial land, so R & R policy is not applicable to this project.
There shall not be displacement of any population in project area. Any major activity that
may lead to resettlement of the people is considered as permanent impact. Hence, there is
no permanent impact on this account. The increasing industrial activity will boost the
commercial and economical status of the locality up to some extent.
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
We shall start construction of expansion project after getting EC & CTE and we shall start
production after applying for CCA.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
The total cost of the project after proposed expansion will be around Rs. 2.0 Crores.
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed expansion project.
Social Welfare shall be done.
Cordial relation with the industry shall be established and representation shall be made