1 PRE FEASIBILITY REPORT for PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE AT DAHEJ SEZ of M/S. GUJARAT DYESTUFF INDUSTRIES PLOT NO. Z/25-28, DAHEJ SEZ, VILL: DAHEJ, TEHSIL: VAGRA, DIST: BHARUCH (GUJ.) NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002 Prepared By: NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002 NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat - 395002 Prepared By:

PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

  • Upload
    dohanh

  • View
    224

  • Download
    4

Embed Size (px)

Citation preview

Page 1: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

1

PRE FEASIBILITY REPORT

for

PROPOSED EXPANSION (PRODUCT CHANGE) TO

MANUFACTURE ACETIC ANHYDRIDE AT DAHEJ

SEZ

of

M/S. GUJARAT DYESTUFF INDUSTRIES PLOT NO. Z/25-28, DAHEJ SEZ, VILL: DAHEJ,

TEHSIL: VAGRA, DIST: BHARUCH (GUJ.)

NABL Accredited Testing Laboratory

ISO 9001:2008 Certified Company

Aqua-Air Environmental Engineers P. Ltd.

403, Centre Point, Nr. Kadiwala School, Ring

Road, Surat - 395002

Prepared By:

NABL Accredited Testing Laboratory

ISO 9001:2008 Certified Company

Aqua-Air Environmental Engineers P. Ltd.

403, Centre Point, Nr. Kadiwala School, Ring

Road, Surat - 395002

NABL Accredited Testing Laboratory

ISO 9001:2008 Certified Company

Aqua-Air Environmental Engineers P. Ltd.

403, Centre Point, Nr. Kadiwala School, Ring

Road, Surat - 395002

Prepared By:

Page 2: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

2

CONTENTS

Sr.

No.

Description Page No.

1. Executive Summary 3

2. Introduction of the Project/Background information 6

3. Project Description 8

4. Site Analysis 17

5. Planning Brief 19

6. Proposed Infrastructure 22

7. Rehabilitation and resettlement (R & R) Plan 23

8. Project Schedule & Cost Estimates 23

9. Analysis of Proposal (Final Recommendations) 24

Page 3: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

3

1.0 EXECUTIVE SUMMARY

1.1 Company Profile

Gujarat Dyestuff Industries, SEZ (A Unit of Gujarat Dyestuff Industries), RLG Group began its

journey in 1974, when the company was established and formed by Sh. Ram Lal Goyal as a

Plasticizer manufacturing company. Today, the company has grown into a large & dynamic

business house, which currently occupies a leading position in the field of Chemical

Manufacturing, Pharmaceutical’s Manufacturing, Power Plant, Marketing & Exports in the

Domestic as well as the International Market.

M/s. Gujarat Dyestuff Industries, SEZ unit is a well established enthusiastic & professionally

managed manufacturing facility. The plant is located at Plot No. Z- 25, 26, 27, 28, SEZ GIDC,

Dahej, Tehsil: Vagra, Dist: Bharuch (Guj.) and proposes to produce Acetic Anhydride. The

total area of the premises is 76,689.32 sq.m.

The Promoters

Sr.

No.

Name Address Designation Contact No.

1. Sh. Shami Garg E- 19, Naveen Shahdara,

Near Tikona Park,

Delhi – 110032

Director 011 - 26515127

2. Sh. D.C. Sharma 2, Shri Ram Society No.2,

Near Vaibahv Park Soc.,

Near Natubhai Circle, Gotri

Road, Baroda – 390023

Director 0265 - 2326676

3. Sh. Om Prakash

Aggrarwal

C - 122, Mahendra

Enclave, Azad Pur, Modal

Town, Delhi - 110033

Director 011 - 26515126

Regd. Office:

106, P. V. Parekh Tower, Diwan balubhai Road,

Kankaria, Ahmedabad-380022

Gujarat

E-mail: [email protected]

Phone (079)25464789

Factory:

Plot No. Z/25-28, SEZ Dahej,

Tal. Vagra, Dist: Bharuch - 392130,

Gujarat (India)

Page 4: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

4

1.2 Project Details

1.2.1 Products along with Production Capacity

QUANTITY

(MT/MONTH)

SR.

NO.

PRODUCT NAME

EXISTING ADDITIONAL

PROPOSED

TOTAL

1

Vinyl Sulphone

(From Condensed VS as Raw Material)

430

-430

0

2 Acetic Acid -92 % 100 -100 0

3 Acetic Anhydride 0 1200 1200

Total 530 1200 1200

1.3 Raw Material Requirement

Sr.

No.

Name of Raw Material Quantity

(MT/Month)

1 Acetic Acid 1680

2 Tri Ethyl Phosphate 0.1

1.4 Water Requirement, Waste Water Generation and Treatment

Total water requirement is 34.5 KL/day [24 Fresh + 10.5 Reuse] which is met through GIDC

water supply. The wastewater generation is 14.5 KL/day in which the industrial 10.5 KL/Day

(processing 8.5 KL/Day is treated from inter reaction of RM, reused in cooling and 2.0

KL/Day is cooling bleed off and utilized in greenbelt). So, there will be no industrial waste

water generation and Domestic Waste water generation 4 KL/Day is disposed in septic

tank/soak pit.

1.5 Air Pollution Source and Control Management

There will be four types of flue gas which are the main emission source from the plant

under the Air Pollution Control Act, 1981. Proper Stack height will be provided in order to

achieve norms prescribed by statutory authority. The details of stacks are given below

Page 5: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

5

Sr.

No.

Stack attached to Fuel Type Stack

Height/

dia in m

APC measures Probable

emission

� Existing Flue gas Stacks

1. Thermic Fluid

Heater (6 Lacs

kcal/hr)

LDO/NG 20 _

2. D.G. Set (380 KVA) HSD 11 __

PM<150 mg/Nm3

SO2 <100 ppm

NOX <50 ppm

Existing Flue gas stack will be replaced after proposed expansion with following

new stacks

1. Thermic Fluid

Heater (20 Lakh

kcal/hrs)- 2 Nos

Coal 30 Air Pre heater

Multi cyclone

Bag filter

2. Furnace- 2 nos. FO 30 Air Pre heater

Heat recovery unit

Caustic Scrubber

PM<150 mg/Nm3

SO2 <100 ppm

NOX <50 ppm

3. DG set ( stand by) HSD 11 _

4. Incinerator FO 30 Ventury scrubber

Packed bed

scrubber

Drop back

scrubber

PM<150 mg/Nm3

SO2 <100 ppm

NOX <50 ppm

HCl <50 mg/Nm3

CO <50 mg/Nm3

TOC<20 mg/Nm3

� Process Gas Stack : no Process Gas Stack

1.6 Hazardous Waste

Sr.

No

Waste

details

Category Existing

Quantity

Total

Proposed

MT/Month

Mode of Disposal

1. ETP Sludge 35.3 50

Kg/Month

50 Kg/Month Collection, storage,

transportation and disposal

at TSDF.

2. Incineration Ash 37.2 - 1.25

MT/Month

Collection, storage,

transportation and disposal

at common Incineration

site.

3. Used Oil 5.1 25

Lit/Month

25 Lit/Month

Or

0.3 KL/Annum

Collection, storage,

transportation and selling

to authorized recyclers.

4. Bags and Containers 33.1 100

Nos. /Month

Nil Collection, storage,

transportation and selling

to authorized recyclers.

Page 6: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

6

1.7 Green Belt

Total 76,689.32 sq. meter land area is available at site; out of this area about 1,112 sq.

meter area are covered as greenbelt and other forms of greenery.

1.8 Power & Fuel Requirements

Total Power Requirement & Source of Power

Energy : 1200 KW

Source : From Torrent Power

D.G. Sets: 1200 KVA

FUEL REQUIREMENT

Sr.

No.

Fuel Requirement

1 Coal 20.16 TPD

2 FO (Furnace Oil) 4.64 KL/day

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of the project and project proponent. In case of mining project, a copy

of mining lease/letter of intent should be given.

Identification of the project & project proponent

M/s. Gujarat Dyestuff Industries, proposes expansion to manufacture Acetic Anhydride

located at Plot No. Z 25-28, Dahej SEZ, Taluka: Vagra, Dist. Bharuch – 392 130, Gujarat.

2.2 Brief description of nature of the Project

Proposed Expansion to manufacture Acetic Anhydride in existing premises.

2.3 Need for the project and its importance to the country and or region

The demand for products intended to be manufacture is increasing in the international

market. By expanding this unit, M/s. Gujarat Dyestuff Industries will be able to meet the

demand of proposed product in foreign countries. The project will earn forex. This will also

Page 7: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

7

generate direct and indirect employment opportunity for various level of people in the state

of Gujarat.

2.4 Demand -Supply Gap

Based on our informal survey of the market with our current customers and various traders,

we have found that there is a big potential for the product we are planning. This product

will be an addition to the current range of our products at other locations.

2.5 Imports vs. Indigenous production

Raw materials are available in local market and if not available then we have to import from

international market.

2.6 Domestic/Export Markets

Our products have good demand in international markets. We shall export substantial

output from the plant.

2.7 Employment Generation (Direct and Indirect) due to project.

M/s. Gujarat Dyestuff Industries have given direct employment to approx. 20 Nos. of people

based on qualification and requirement & after proposed expansion additional approx. 20

Nos. of people shall be employed. In addition to direct employment, indirect employment

shall generate additional business to some extent for the local population.

Page 8: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

8

3.0 Project Description

3.1 Type of Project including interlinked and interdependent projects, if any.

No interlinked project has been submitted.

3.2 Location (map showing general location, specific location and project boundary &

project site layout) with coordinates.

• Map showing general location

(Courtesy: Environmental Information Center, New Delhi)

Page 9: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

9

Specific location and project boundary

(Courtesy: Environmental Information Center, New Delhi)

Project

Site

Page 10: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

10

Page 11: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

11

Page 12: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

12

• Project Site (Google Map)

Page 13: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

13

Plot Layout

Page 14: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

14

3.3 Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted.

Looking to the market demand of the products it was decided by M/s. Gujarat Dyestuff

Industries to expand the existing facility as well as come up with new product. As Dahej SEZ

is centrally located as in Special Economic Zone near to Sea Port & Import Export activities

can be easily handled, so it was decided to go for expansion within the existing premises.

Over and above Gujarat has been chemical industry friendly, Skilled/ un-skilled persons are

easily available so it was finally decided to expand the unit in Gujarat.

Major factors involved in the selection of site are listed below:

• Proposed Expansion project is within the Dahej SEZ. Minor site clearance activities shall

be carried out to clear shrubs and weed.

• The project site is located on level ground, which does not require any major land filling

for area grading work.

• Proximity to Raw Material suppliers.

• Site is very well connected by sea, road, air and railway.

• Availability of NG, Power, Water, etc.

• Availability of Skilled, Un-skilled persons.

• Availability of Good Housing for Staffs

Modern infrastructure support and amenities at par in other global markets, including:

� Efficient transport facilities.

� Environment-friendly zone.

� Uninterrupted power supply.

3.4 Size or Magnitude of Operation

Please refer Section-1.2.1, Page No. 04.

Page 15: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

15

3.5 Project Description with process details (a schematic diagram/flow chart showing the

project layout, components of the project, etc. should be given)

Please refer Please refer Form-I, Annexure-III.

3.6 Raw Material required along with estimated quantity, likely source, marketing area of

final product/s, mode of transport of raw material and Finished product.

For raw material required along with quantity; Please refer Section-1.2.1, Page No. 4. We

shall procure the raw material as much as possible from domestic market and if there is no

availability of any raw material we will import.

3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly outlined.

Total water requirement will be 34.5 KL/day [24 Fresh + 10.5 Reuse] which shall be met

through GIDC water supply. The wastewater generation is 14.5 KL/day in which the

industrial 10.5 KL/Day (processing 8.5 KL/Day is treated from inter reaction of RM, reuse in

cooling and 2.0 KL/Day is cooling bleed off and utilize in greenbelt). So, there will be no

industrial waste water discharge and Domestic Waste water generation 4 KL/Day is

disposed in septic tank/soak pit.

3.8 Availability of water its source, energy/power requirement and source should be

given.

Water Source

Total water requirement shall meet through GIDC water supply.

Power & Fuel Requirement

Total Power Requirement & Source of Power

Energy : 1200 KW

Source: from Torrent Power

D.G Sets: 1200 KVA

Page 16: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

16

FUEL REQUIREMENT

Sr.

No.

Fuel Requirement

1 Coal 20.16 TPD

3 FO (Furnace Oil) 4.64 KL/Day

3.9 Quantity of waste to be generated (liquid and solid) and scheme for their

management/disposal.

Please refer Please refer Form-I, Annexure-V.

3.10 Schematic representations of the feasibility drawing which give information of EIA

purpose.

RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT

MARKET ASSESSMENT

FINANCIAL REPORT

PROJECT REPORT

INTRODUCTION

MONITORING OF AIR, WATER & SOIL QUALITY & NOISE

LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC

STATUS & BASIC AMENITIES. SITE VISITS BY AND

INTERVIEWS WITH LOCALS

BASELINE

ENVIRONMENTAL

STATUS

ENVIRONMENTAL INFORMATION CENTRE

CENTRAL GROUND WATER BOARD

GUJARAT POLLUTION CONTROL BOARD (GPCB)

PUBLIC HEALTH ENGINEERING DEPT.

AGRICULTURE DEPARTMENT

FOREST DEPARTMENT

IRRIGATION DEPARTMENT

EMPLOYMENT EXCHANGE

HEALTH CENTER

CENSUS DEPT.

INDIAN METEOROLOGICAL DEPT.

SOCIOECONOMIC

STATUS &

INFRASTRUCTURE

EXISTING &

PROPOSED

PLANT

FACILITY DESCRIPTION

IMPACTS

METHODOLOGY OF

IMPACT

ASSESSMENT

IDENTIFICATION & ASSESSMENT OF IMPACTS

EVALUATION OF IMPACTS BY MATRIX METHOD

SOURCE OF INFORMATION OVERVIEW OF

E. I. A. STUDIES

ACTIVITIES

ENVIRONMENTAL

MANAGEMENT PLAN

DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR

POLLUTION CONTROL, HAZARDOUS WASTE

MANAGEMENT, GREEN BELT DEVELOPMENT MONITORING

PROGRAM

RISK ANALYSIS

STUDIES &

DISASTER

MANAGEMENT PLAN

SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY

DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. CONSEQUENCE ANALYSIS

PREPARATION OF DISASTER MANAGEMENT PLAN

Page 17: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

17

4.0 Site Analysis

4.1 Connectivity

• Site is very well connected by sea, road, air & railway.

• Availability of water, power, etc.

4.2 Land Form, Land Use and Land Ownership

It will be incorporated in EIA Study.

4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including

area under CRZ)), shortest distances from the periphery of the project to periphery of the

forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from

HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette

notification should be given.

It will be incorporated in EIA Study.

4.5 Existing Infrastructure

Existing Infrastructure is shown in Plot Layout on Page No. 12 of the same report.

4.6 Soil Classification

Soil Characteristics under Project Area are as below Table;

CATEGORY AREA_SQ

KM DESCRIPTION TAXONOMY1 TAXONOMY2 CLASS SUB_CLASS

A 88.93

Very deep,

moderately

well drained,

calcareous,

fine soils on

very gently

sloping

alluvial plain

with slight

erosion and

moderate

salinity;

Fine,

montmorillonitic

(calcareous),

hyperthermic

Typic

Chromusterts

Fine,

montmorillonitic

(calcareous)

hyperthermic

Udic

Chromusters

Soils of

west

coast

(soils

of

Gujarat

plain)

Soils of

alluvial

plains

Page 18: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

18

associated

with very

deep

moderately

well drained,

calcareous,

fine soils

with

moderate

erosion.

C 108.64

Very deep,

poorly

drained,

calcareous

fine-loamy

soils on very

gently

sloping

coastal plain

with

moderate

erosion and

strong

salinity;

associated

with very

deep ,

imperfectly

drained,

calcareous,

fine soils

with severe

erosion and

strong

salinity.

Fine-loamy,

mixed

(calcareous),

hyperthermic

Aeric

Haplaquepts

Fine, mixed

(calcareous),

hyperthermic

Typic

Halaquepts

Soils of

west

coast

(soils

of

Gujarat

plain)

Soils of

coastal

plains

- 116.43 Sea - - - -

4.7 Climatic data from secondary sources.

Climatic data from primary & secondary sources will be incorporated in EIA Study.

Page 19: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

19

5.0 Planning Brief

5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country

planning/Development authority classification.

Type of Industry: Proposed Expansion to manufacture Acetic Anhydride in existing premises.

5.2 Population Projection

Name Population

(Persons)

Population Density

(Person / sq. km.)

Sex ratio

(No. of females per

1000 males)

Within 5 km Radius (2011) 25483 324 675

Within 10 km Radius (2011) 32430 103 728

Taluka Vagra (2001) 82569 94 916

Taluka Vagra (2011) 100044 114 870

District Bharuch (2001) 1370104 210 920

District Bharuch (2011) 1551019 238 925

(Courtesy: Census Dept., GOI)

5.3 Land use planning (breakup along with green belt etc.)

SR.

NO.

LAND USE BUILT UP AREA

(SQ. MT.)

1 Security Cabin 4.00

2 Visitors, Excise Room & Weigh Bridge 148.00

3 Store Room 800.00

4 Coal Storage & TFH Shed 1760.00

5 U.G. Water Tank 120.00

6 Plant-1 2142.00

7 Tank Farm-1 364.00

8 Tank Farm-2 364.00

9 Cooling Tower-1 72.00

10 Maintenance Area-1 399.00

11 FO Tank-1 270.00

12 Plant-2 2142.00

13 Coal Storage & TFH Shed 1760.00

14 Tank Farm-1 364.00

15 Tank Farm-2 364.00

16 Cooling Tower-2 72.00

17 Maintenance Area-2 313.50

18 FO Tank-2 270.00

Page 20: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

20

19 Effluent Treatment Plant 2500.00

Total Built-up Area 14,228.50

Common Open Plot 4,392.89

Surrender Plot Area 2,566.31

Parking Area Provided 7,465.00

Open Land 46,924.62

Green Belt Area Provided 1,112.00

Total Plot Area 76,689.32

5.4 Assessment of Infrastructure Demand (Physical & Social)

• Employment would be as per prevailing norms of state government for skilled and

unskilled people for the proposed expansion project.

• Social Welfare

• Cordial relation with the nearby villagers shall be established and representation shall

be made to villages for help for creation of facilities related to health, education, etc.

5.5 Amenities/Facilities

Details of amenities available in study area

(Courtesy: Census Dept., GOI)

ABBREVIATIONS

Taluka Village Educational Medical Drinking

Water

Post &

Telegraph

Communication Approach

to

Village

Nearest

Town

Power

Supply

Galenda P(2),Ac,O RP,CHW T,W,TK PO BS PR,KR Bharuch EA

Samatpor P(2),Ac RP,CHW W,TK -(-5 Kms) BS PR,KR Bharuch EA

Vav P(2),Ac RP,CHW T,W,TK,HP -(-5 Kms) BS,RS PR,KR Bharuch EA

Jolva P(2),Ac,O PHS,FPC,RP,CHW W,TK -(-5 Kms) BS,NW PR,KR Bharuch EA

Vadadla P(2),Ac CHW W,TK PO BS PR,KR Bharuch EA

Dahej

P(4),H,Ac(4),O PHC,D,FPC,RP,

CHW

T,W,TK PTO,

Phone

BS,RS,NW PR,KR Bharuch EA

Lakhigam P(2) PHS,RP,CHW W,TK po BS,NW PR,KR Bharuch EA

Luvara P(2),Ac RP,CHW W,TK -(-5 Kms) BS,NW PR,KR,NR Bharuch EA

Jageshwar P(2),Ac,H RP,CHW W,TK PO BS,NW PR,KR,NR Bharuch EA

Ambheta P(2),Ac CHW T,W,TK PO BS,NW KR,NR Bharuch EA

Suva P(2),Ac -(5-10 Kms) W,TK,R -(-5 Kms) BS,NW PR,KR,NR Bharuch EA

Rahiad P(2),Ac(2),O RP,CHW W,TK PO BS,NW PR,KR.NR Bharuch EA

Harinagar

Un

inhabited

Padariya P(2),Ac RP,CHW W,TK PO BS PR,KR Amod EA

Kadodara

P(2),Ac(2),H PHS,FPC,

RP,CHW

W,TK PO BS PR,KR Bharuch EA

Vagra

Sambheti P(2),Ac -(10+Kms) W,TK PO BS,RS PR,KR Bharuch EA

Page 21: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

21

1. Education

P-Primary Elementary School

H-Matriculation or Secondary

O-Other Educational Institution

PUC-Higher Secondary/Intermediate/pre-University/junior Collage

AC – Adult literacy class

TR – Training center

2. Medical Facilities

RP-Registered Private Practitioner

PHS-Primary Health Centre

FPC-Family Planning Centre

D- Dispensary

CHW - Community Health Worker/Health Worker

H - Hospital

NH - Nursing Home

MH - Maternity Home

PHC - Public Health Centre

CWC - Child Welfare Centre

TB - T.B Clinic

O - Others

3. Drinking Water

T-Tap Water

HP-Hand Pump

TK-Tank Water

W-Well Water

R-River Water

C-Canal

N - Nallah

S - Spring

4. Post & Telegraph

PO-Post Office

PTO-Post & Telegraph

Phone-Telephone Communication

5. Transportation

RS- Railway Station

Page 22: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

22

BS-Bus Station

NW-Navigable Waterway

6. Approach to Village

PR- Pucca Road

KR- Kuccha Road

7. Power Supply

EA-Electricity for all purposes

EAG - Electricity for Agriculture

ED - Electricity for domestic

EO - Electricity for other purpose like Industrial, Commercial etc.

6.0 Proposed Infrastructure

Please refer Section 5.3 of this report.

6.3 Green Belt

Total 76,689.32 sq. meter land area is available at site; out of this area about 1,112 sq.

meter area are covered as greenbelt and other forms of greenery.

6.4 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc)

Major factors involved in the selection of site are listed below:

• Site is very well connected by sea, road, air & railways.

• Proximity to Raw Material suppliers

• Availability of sufficient land free from cultivation

• Availability of power evacuation facilities

• Availability of water for industrial use

6.5 Drinking water Management (Source & Supply of water)

Total water requirement shall meet through GIDC supply.

Page 23: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

23

6.6 Sewerage System

Sewage pipes are laid in entire company for the removal and disposal of mainly non-

harmful liquid wastes from the offices, canteen and domestic waste coming from different

sections. These liquid wastes are sent to septic tank & soak pit.

6.7 Solid Waste Management

Please refer Section 1.6, Page No. 6 of this report.

6.8 Power Requirement & Supply/Source

Please refer Section 1.8 of this report.

7.0 Rehabilitation and Resettlement (R & R) Plan

7.1 Policy to be adopted (central/state) in respect of the project affected including home

oustees, land oustees and landless laborers (a brief outline to be given)

There is no habitation on the proposed expansion project land, so R & R policy is not

applicable to this project. There shall not be displacement of any population in project area.

The increasing industrial activity will boost the commercial and economical status of the

locality up to some extent.

8. Project Schedule & Cost Estimates

8.1 Likely date of start of construction and likely date of completion (Time schedule for

the project to be given).

We shall start construction after getting EC & CTE. We shall start production after applying

for CCA.

8.2 Estimated Project cost along with analysis in terms of economic viability of the

project.

Total Project Cost for proposed project activity is Rs. 15 Crores. Out of this around Rs. 200

Lakhs will be invested for pollution control measures.

Page 24: PROPOSED EXPANSION (PRODUCT CHANGE) TO MANUFACTURE ACETIC ANHYDRIDE …environmentclearance.nic.in/writereaddata/FormB/TOR/PFR/17_Jan... · 1 pre feasibility report for proposed expansion

24

9. Analysis of Proposal (Final Recommendations)

9.1 Financial and social benefits with special emphasis on the benefit to be local people

including tribal population, if any, in the area.

• Employment would be as per prevailing norms of state government for skilled and

unskilled people for the proposed expansion project.

• Social Welfare shall be done.

• Cordial relation with the nearby villagers shall be established and representation shall

be made to villages for help for creation of facilities related to health, education, etc.