Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 2 of 9Date: 08 June 2012
Feature Implementation Request
DYNAMIC BTS & MS POWER CONTROL
Recommendations and Trial Strategy
Author: Syed/Rommel/ErylDate: 08 June 2012
Ref: Max/PC/002Version: 0.1Status: Draft
Sec. Class:
7/31/2019 Pwr Ctrl Trial Rev9
2/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 3 of 9Date: 08 June 2012
Contents
1 Document Control ............................................................................................................................ 41.1 Revision History ...................................................................................................................... 41.2 Reviewers ................................................................................................................................ 41.3 Change Request Summary ..................................................................................................... 51.4 Further Details ......................................................................................................................... 6
1.4.1 The algorithms in MS Power Control and BTS Power Control are the same. .................... 61.4.2 Proposed Parameter Settings ............................................................................................. 71.4.3 Planned Implementation ..................................................................................................... 8
1.5 Trial Results ............................................................................................................................ 81.6 Conclusions ........................................................................................................................... 10
7/31/2019 Pwr Ctrl Trial Rev9
3/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 4 of 9Date: 08 June 2012
1 Document Control
1.1 Revision History
RevisionNumber Date Name Revision
R1 2/9/11 Rommel
R2 5/9/11 Rommel
R3 13/9/2011 Eryl UPDWNRATIO ratio tuned for trial BSCs
R4 21/9/2011 Rommel Adjusted MS PC settings rolled in
R5 23/9/2011 Syed Results after the BTS PC settings
R6 27/9/2011 Syed Further results after the BTS PC settings
R7 4/10/11 Rommel Results after MS+BTS PC Settings
R8 6/10/11 Syed Results after MS+BTS PC Settings
R9 3/11/11 Eryl AMR settings
1.2 Reviewers
Reviewer Date Feedback
7/31/2019 Pwr Ctrl Trial Rev9
4/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 5 of 9Date: 08 June 2012
1.3 Change Request Summary
Feature Name
Dynamic BTS and MS Power Control
Brief Feature Description
When BTS and MS Power Control are used in the network, the total amount of radiated power isreduced. This implies that the uplink co- and adjacent channel interference in the network is reduced.The C/I will be increased for connections with low signal strength or with bad quality using full BTS orMS output power, since they experience a reduced interference level. On the other hand, the C/I isdecreased for connections with high signal strength and good quality since they are subject to a reducedMS output power. The C/I reduction will however not affect the speech quality since these connectionshave a margin to the lowest tolerable C/I.
Key Benefits
Improved DCR and SDDR.
Risks
Reduced Rxlev on Active Mode during drivetest activity.
Considerations
Aggressive Power Control Settings are needed in a dense urban area to minimize the level ofinterference.
Trial Details
Below are the list of BSCs that shall be included in this trial / fine tuning activity:1. Oct3 KPNG07, KPNG08 - SSDESDLAFR2. Oct3 RWNG05, RWNG08 - SSDESULAFR3. Oct3 KPNG09, SHTI25 SSDESULAHR (OL)4. Oct4 BESI14, NILA07, NILA08, RWNG04, SHTI24 SSDESULAHR (OL)5. Oct8 KPNG09, SHTI25 SSDESULAHR (UL)
Trial Date 2011 Oct 3Proposed Roll Out ScheduleTBC Will confirm after trial results
Proposed Roll Out Date TBD
7/31/2019 Pwr Ctrl Trial Rev9
5/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 6 of 9Date: 08 June 2012
1.4 Further Details
1.4.1 The algorithms in MS Power Control and BTS Power Control are thesame.
When a connection has low path loss (left part), the BTS transmits at its lowestpossible power level. Although the MS receives a signal that exceeds the desiredvalue, the BTS cannot reduce the transmitted power any further. Conversely,when a connection experiences high path loss (right part), the BTS transmits atthe maximum allowed power level for the cell. The power cannot be increasedeven if the received signal strength in the MS is low. Note that this is dependent onthe path loss compensation used.
When quality is taken into account the output power is regulated up or downdepending on the received quality. The base station power then varies with thequality measured by the MS. When an MS has low rxqual (high quality) the basestation sends on low power and when an MS has high rxqual, on high power. Thehigher the rxqual, the higher the power and vice versa.
7/31/2019 Pwr Ctrl Trial Rev9
6/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 7 of 9Date: 08 June 2012
1.4.2 Proposed Parameter Settings
Parameter Current Value Trial 1 Values Trial 2 Values
UPDWNRATIO 134 200 200
QDESUL 10 25 20QDESULAFR 10 30 20
QDESULAHR 10 25 20
QCOMPUL 80 90 75
QCOMPUL 10 10 6
SSDESULAFR 92 92 94
QDESDL 20 30 30
SSDESDLAFR 90 92 92
QDESDLAFR 20 35 35
QDESDLAHR 20 30 30
MS POWER CONTROL BTS POWER CONTROL
7/31/2019 Pwr Ctrl Trial Rev9
7/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 8 of 9Date: 08 June 2012
Planned Implementation
The following sequence of parameter modification is proposed:
BSC Parameter Layers
KPNG07 SSDESDLAFR 92 to 93 AllKPNG08
RWNG05SSDESULAFR 94 to 95 All
RWNG08
KPNG09SSDESULAHR 94 to 92 GSM900
SHTI25
BESI14
SSDESULAHR 92 to 90 GSM1800
NILA07
NILA08
RWNG04
SHTI24
1.5 Trial Results
1.5.1 KPNG07: Improved
7/31/2019 Pwr Ctrl Trial Rev9
8/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 9 of 9Date: 08 June 2012
KPNG08: Maintained
RWNG05: Maintained
7/31/2019 Pwr Ctrl Trial Rev9
9/9
Author: Syed/ Rommel/Eryl Dynamic BTS/MS Power Control Trial Page 10 of 9Date: 08 June 2012
RWNG08: Improved
Cluster of 5 BSCs: Improved
1.6 Conclusions