Construction Permit Tips Quick Tips for Quick Applications BEFORE YOU APPLY APPLICATION INSPECTIONS Sign up for project alerts at pittsburghpa.buildingeye.com. Email [email protected] for a copy of your current Certificate of Occupancy. Consult checklists and bulletins and confirm all items are addressed fully. Ensure project manager is aware of the entire scope of work in order to apply for any additional permit types such as HVAC, electrical, sign, etc. Check with other agencies such as PWSA, ACHD, DPW, ACCD and PA DOH to ensure no other permits are required. We now offer concurrent reviews with Zoning to reduce permit review times. Caution-if Zoning approves a different project than was submitted to PLI, it must be re-reviewed by our plans examiner. Phase your permits - You can apply for an interior demolition or foundation only permit while waiting for other building plans to go through review process. Apply for trade permits at the same time as building permit (or as soon as plans are completed) to avoid delays. You can name the contractor at the time of permit issuance. Any authorized agent can apply for permits. When submitting for re-review, ensure that the design professional has addressed all plan comments from our plan reviewer. Double check that all documentation from Zoning includes an accurate and complete work description . We cannot change this and will send you back to Zoning! Schedule an inspection when you are certain the job will be ready. Cancelling last minute or having the inspector conduct an inspection that will fail limits open time slots for jobs that are completed properly. We now offer OT inspections if we cannot honor your request within 5 business days. Just contact your inspector on your permit for more info. Ensure that your third party electrical inspector submits inspection record to us in a timely manner. Keep the STAMPED AND APPROVED construction drawings on site at all times. buildingeye pittsburghpa.buildingeye.gov/building USEFUL LINKS Permit Review timeline pittsburghpa.gov/pli/permit-status ACHD Plumbing Division achd.net/plumbing/ DPW pittsburghpa.gov/dpw/permit PWSA pgh2o.com/forms-permits PLI Newsletter pittsburghpa.gov/pli/communityresources/ Allegheny County Conservation District conservationsolutioncenter.org/ PA DOH health.pa.gov

Quick Tips for Quick Applications - Pittsburgh › redtail › images › 1561... · Construction Permit Tips Quick Tips for Quick Applications BEFORE YOU APPLY APPLICATION INSPECTIONS

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Quick Tips for Quick Applications - Pittsburgh › redtail › images › 1561... · Construction Permit Tips Quick Tips for Quick Applications BEFORE YOU APPLY APPLICATION INSPECTIONS

Construction Permit TipsQuick Tips for Quick Applications

BEFORE YOU APPLY APPLICATION INSPECTIONS

Sign up for project alerts atpittsburghpa.buildingeye.com.

Email [email protected] for a copy of your current Cert i f icate of Occupancy.

Consult checklists and bulletins and confirm al l i tems are addressed ful ly.

Ensure project manager is aware of the entire scope of work in order to apply for any addit ional permit types such as HVAC, electrical, sign, etc.

Check with other agencies such as PWSA, ACHD, DPW, ACCD and PA DOH to ensure no other permits are required.

We now offer concurrent reviews with Zoning to reduce permit review t imes. Caution-i f Zoning approves a different project than was submitted to PLI, i t must be re-reviewed by our plans examiner.

Phase your permits - You can apply for an interior demoli t ion or foundation only permit whi le wait ing for other bui lding plans to go through review process.

Apply for trade permits at the same time as building permit (or as soon as plans are completed) to avoid delays. You can name the contractor at the t ime of permit issuance.

Any authorized agent can apply for permits.

When submitt ing for re-review, ensure that the design professional has addressed all plan comments from our plan reviewer.

Double check that al l documentat ion from Zoning includes an accurate and complete work description . We cannot change this and wil l send you back to Zoning!

Schedule an inspection when you are certain the job wil l be ready. Cancel l ing last minute or having the inspector conduct an inspection that wi l l fai l l imits open t ime slots for jobs that are completed properly.

We now offer OT inspections i f we cannot honor your request within 5 business days. Just contact your inspector on your permit for more info.

Ensure that your third party electrical inspector submits inspection record to us in a t imely manner.

Keep the STAMPED AND APPROVED construct ion drawings on site at al l t imes.

buildingeyepittsburghpa.bui ldingeye.gov/bui lding

USEFUL LINKS Permit Review timelinepittsburghpa.gov/pl i /permit-status

ACHD Plumbing Divisionachd.net/plumbing/

DPWpittsburghpa.gov/dpw/permit

PWSApgh2o.com/forms-permits

PLI Newsletterpittsburghpa.gov/pl i /communityresources/

Allegheny County Conservation Districtconservationsolut ioncenter.org/

PA DOHhealth.pa.gov