3
Quick Update on Aeolus Preparations Will McCarty Global Modeling and Assimilation Office, NASA GSFC

Quick Update on Aeolus Preparations

  • Upload
    chin

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

Quick Update on Aeolus Preparations. Will McCarty Global Modeling and Assimilation Office, NASA GSFC. Since Last Update…. Efforts have been stopped since last update New LIPAS simulator has been obtained from KNMI Support for Continuous Mode operations - PowerPoint PPT Presentation

Citation preview

Page 1: Quick Update on Aeolus Preparations

Quick Update on Aeolus Preparations

Will McCartyGlobal Modeling and Assimilation

Office, NASA GSFC

Page 2: Quick Update on Aeolus Preparations

Since Last Update…

• Efforts have been stopped since last update• New LIPAS simulator has been obtained from KNMI– Support for Continuous Mode operations

• R. Errico OSSE “control” has been expanded – two seasons– Improved AMVs– Still lacking: N19, MetOp-A, & GPSRO

• Joint OSSE NR Cloud Verification paper in press

Page 3: Quick Update on Aeolus Preparations

Upcoming Studies

• LIPAS upgrade will allow comparison of continuous and burst-mode operations in OSSE environment

• Two seasons will allow a more concrete period of study– Errico control shows different behavior between DJF

(previous) and JJA (new) seasons, with JJA season better matching reality

• Observation impact studies (i.e. Zhu and Gelaro 2008) in addition to OSE/data denial

• L2Bp processing, necessary for NRT assimilation, still under consideration -> package had to be reworked for CM