DAFTAR HARGA SATUAN BAHAN DAN UPAH
NO. JENIS BAHAN SATUAN KETERANGAN
1 2 3 4 5
I Tenaga Kerja / Upah
1 Pekerja hari/org 40,000.00 2 Kepala tukang hari/org 55,000.00 3 Tukang batu hari/org 45,000.00 4 Tukang kayu hari/org 45,000.00 5 Tukang cat hari/org 45,000.00 6 Tukang besi hari/org 45,000.00 7 Mandor hari/org 55,000.00 8 Pembantu mekanik hari/org 45,000.00 9 Mekanik hari/org 55,000.00
10 Pembantu operator hari/org 40,000.00 11 Operator terlatih hari/org 45,000.00
II B a h a n
A. Bahan Pasangan 1 Batu Pecah/Split m³ 658,075.00 2 Kerikil Sungai m³ 398,200.00 3 Pasir urug m³ 114,950.00 4 Pasir pasang m³ 142,450.00 5 Pasir cor / beton m³ 142,450.00 6 Tanah urug/timbun m³ 59,950.00 7 Semen PC 50Kg kg 1,295.80 8 Portland cement putih kg 2,632.30 9 Batu bata bh 844.80
11 Bataco bh 1,363.56 12 Paving blok bh 1,659.90
B. BAHAN KAYU 1 Balok kayu kelas II m³ 4,236,980.00 2 Kayu persegi punak m³ 2,724,480.00 3 Papan kayu kelas II m³ 5,446,980.00 4 Papan Punak m³ 2,751,980.00 5 Balok kayu kelas III m³ 2,179,980.00 6 Papan kayu kelas III m³ 1,816,980.00 7 Kayu bakar m³ 248,820.00 8 Kayu cerocok Panjang 5 m' m' 1,947.00 9 Perancah/Dolken Ø 8-10 cm Pj. 4 m btg 4,642.00
10 Kayu/Papan Bekisting m³ 1,541,980.00 11 Kayu Ikat Ikat 68,035.00
C. BAHAN BESI 1 Besi Beton Polos kg 9,273.00 2 Besi Beton Ulir kg 9,878.00 3 Kawat Ikat Beton kg 19,801.98 4 Plat strip kg 3,729.00 5 Baja profil kg 14,000.00 6 Baut 3/4" Bh 4,419.80 7 Kawat nyamuk m² 16,579.20 8 Kawat harmonika m² 8,879.20
D. BAHAN LANTAI 1 Keramik 40 x 40 Kualitas Standar (Garuda) bh 12,149.50 2 Keramik 30 x 30 Kualitas Standar (Garuda) bh 6,089.60 3 Keramik 20 x 25 Kualitas Standar (Garuda) bh 3,054.70 4 Keramik 20 x 20 Kualitas Standar (Garuda) bh 2,219.80 5 Keramik 10 x 20 Kualitas Standar (Garuda) bh 1,043.90 6 Keramik 10 x 30 Kualitas Standar (Garuda) bh 2,029.87 7 Keramik 10 x 40 Kualitas Standar (Garuda) bh 3,037.38 8 Marmer m¹ 15,200.00
HARGA SATUAN STANDAR CONCONG
NO. JENIS BAHAN SATUAN KETERANGAN
1 2 3 4 5
HARGA SATUAN STANDAR CONCONG
E. BAHAN ATAP 1 Seng Gelombang BJLS 20 KI lbr 36,190.00 2 Seng plat Bjls 20 k lbr 49,698.00 3 Seng Alumunium Kulit Jeruk lbr 48,000.00 4 Perabung Seng Aluminium Kulit Jeruk lbr 30,000.00 5 Atap Genteng Metal Zincalume 0,25 mm lbr 38,390.00 6 Perabung Raja Metal Zincalume Panjang 80 cm bh 31,295.00 7 Karet Paku bh 125.00
F. BAHAN PELAFOND DAN LAP. DINDING 1 Plywood 4 mm lbr 61,985.00 2 Plywood 6 mm lbr 78,485.00 3 Plywood 9 mm lbr 133,980.00 4 Plywood 12 mm lbr 172,480.00 6 Gypsum lbr 66,990.00 7 List profil kayu m' 3,245.00 8 List Profil Gypsum m' 22,990.00
G. BAHAN PIPA 1 Pipa PVC dia. 1/2" Panjang 4 m Tebal m' 4,127.48 2 Pipa PVC dia. 3/4" Panjang 4 m Tebal m' 4,952.48 3 Pipa PVC dia. 2" Panjang 4 m Tebal m' 14,577.48 4 Pipa PVC dia. 2.5" Panjang 4 m Tebal m' 22,827.48 5 Pipa PVC dia. 4" Panjang 4 m Tebal m' 51,702.48 6 Pipa Galvanis dia. 1" Panjang 6 m Tebal m' 21,248.33 7 Pipa Galvanis dia. 1.5" Panjang 6 Tebal m' 30,415.00 8 Pipa Galvanis dia. 2.5" Panjang 6 m Tebal m' 52,662.50
H. BAHAN SANITAIR 1 Kloset Jongkok keramik, bh 142,945.00 2 Kloset duduk bh 1,765,445.00 3 Bak Mandi Fiber 20 Liter bh 280,445.00 4 Washtafel Keramik (Lengkap) bh 775,445.00 5 Urinoir Keramik bh 1,215,445.00 6 Tangki Air Plastik Kapasitas 1000 Liter bh 1,435,445.00 7 Kran Air 1/2" Kualitas (Plastik) bh 9,919.80 8 Saringan Air Lantai (Floor Drain) Plastik bh 12,045.00 9 Seal tape bh 2,219.80
I. BAHAN PAKU 1 Paku beton kg 33,099.00 2 Paku seng kg 33,039.60 3 Paku tripleks / teakwood kg 16,539.60 4 Paku asbes kg 27,599.00 5 Paku Biasa kg 15,439.60 6 Paku gypsum kg 20,000.00
J. BAHAN PENGGANTUNG / KUNCI 1 Kunci Tanam 2 Slaagh Kualitas Standart bh 100,000.00 2 Kunci Tanam Bulat Kualitas Standar bh 38,519.80 3 Grendel Pintu bh 15,000.00 4 Engsel Kuningan 4" bh 12,000.00 5 Engsel Kuningan 3" bh 10,000.00 6 Kait Angin Kualitas Standar bh 3,000.00 7 Handle jendela standar bh 4,000.00 8 Grendel Jendela Kuningan bh 7,500.00
K. BAHAN KACA 1 Kaca bening 3 mm m² 83,985.00 2 Kaca bening 5 mm m² 94,985.00 3 Kaca nako 7 Daun + rangka Set 116,985.00 4 Kaca rayben 8 mm m² 105,985.00
NO. JENIS BAHAN SATUAN KETERANGAN
1 2 3 4 5
HARGA SATUAN STANDAR CONCONG
L. BAHAN LISTRIK 1 Titik lampu + Instalasai ttk 60,000.00 2 Stop kontak + Instalasi bh 60,000.00 3 Saklar tunggal bh 10,000.00 4 Saklar ganda bh 11,000.00 5 Lampu pijar 25 Watt bh 5,750.00 6 Lampu pijar 40 Watt bh 7,475.00 7 Lampu SL save energy 20 watt bh 40,000.00 8 Panel MCB Komplit (Standar PLN) bh 16,000.00
M. BAHAN PINTU 1 Pintu fiber warna bh 230,000.00 2 Pintu Panel 1 Daun bh 450,000.00 3 Pintu Panel 2 Daun bh 800,000.00 4 Pintu Panel 2 Daun + Kaca bh 800,000.00
N. BAHAN FINISHING 1 Cat minyak kg 35,000.00 2 Cat tembok kg 15,000.00 3 Cat vernish ltr 25,000.00 4 Cat kayu dasar kg 25,000.00 5 Minyak cat/thinner ltr 20,000.00 6 Residu kg 12,000.00 7 Dempul kg 14,000.00 8 Kertas pasir / amplas lbr 3,000.00 9 Plamir kg 14,000.00
10 Cat meni kg 12,000.00 11 Kuas 3" bh 13,800.00 12 Kuas gulung / rol bh 18,000.00 13 Minyak bekisting ltr 5,000.00
Tembilahan, Mei 2011Konsultan Perencana :
CV. SARANA MULTI JAYA KONSULTANT
Ir. MAHMUDDirektur
Diperiksa Oleh :DIREKSI TEKNIS
H. MUKHRIM CHNIP 19550620 197903 1 003
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
DAFTAR ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN1 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN
TENAGAPekerja 0.1000 OH 40,000.00 4,000.00 Mandor 0.0050 OH 55,000.00 275.00
JUMLAH 4,275.00 - JUMLAH TOTAL 4,275.00
2 1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK TENAGA
Pekerja 0.1000 OH 40,000.00 4,000.00 Tukang Kayu 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANKayu 5/7 0.1200 Btg 11,339.17 1,360.70 Paku Biasa 2'-5' 0.0200 Kg 15,439.60 308.79 Kayu Papan 3/20 0.0070 Kg ### 12,718.86
JUMLAH 9,325.00 14,388.35 JUMLAH TOTAL 23,713.35
ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH3 1 M3 GALIAN TANAH BIASA SEDALAM 1 M
TENAGAPekerja 0.4000 OH 40,000.00 16,000.00 Mandor 0.0400 OH 55,000.00 2,200.00
JUMLAH 18,200.00 - JUMLAH TOTAL 18,200.00
4 1 M3 URUGAN KEMBALI TENAGA
Pekerja 0.1920 OH 40,000.00 7,680.00 Mandor 0.0190 OH 55,000.00 1,045.00
JUMLAH 8,725.00 - JUMLAH TOTAL 8,725.00
5 1 M3 URUGAN PASIR TENAGA
Pekerja 0.3000 OH 40,000.00 12,000.00 Mandor 0.0100 OH 55,000.00 550.00
BAHANPasir urug 1.2000 M3 114,950.00 137,940.00
JUMLAH 12,550.00 137,940.00 JUMLAH TOTAL 150,490.00
6 1 M3 URUGAN TANAH TENAGA
Pekerja 0.3000 OH 40,000.00 12,000.00 Mandor 0.0100 OH 55,000.00 550.00
BAHANTanah 1.2000 M3 59,950.00 71,940.00
JUMLAH 12,550.00 71,940.00 JUMLAH TOTAL 84,490.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING7 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:2)
TENAGAPekerja 0.6500 OH 40,000.00 26,000.00 Tukang 0.2000 OH 45,000.00 9,000.00 Kepala Tukang 0.0200 OH 55,000.00 1,100.00 Mandor 0.0300 OH 55,000.00 1,650.00
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
BAHANBatu Bata 140.0000 Bh 844.80 118,272.00 Semen Portland 43.5000 Kg 1,295.80 56,367.30 Pasir Pasang 0.0800 M3 142,450.00 11,396.00
JUMLAH 37,750.00 186,035.30 JUMLAH TOTAL 223,785.30
8 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:3) TENAGA
Pekerja 0.6500 OH 40,000.00 26,000.00 Tukang 0.2000 OH 45,000.00 9,000.00 Kepala Tukang 0.0200 OH 55,000.00 1,100.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANBatu Bata 140.0000 Bh 844.80 118,272.00 Semen Portland 32.9500 Kg 1,295.80 42,696.61 Pasir Pasang 0.0910 M3 142,450.00 12,962.95
JUMLAH 37,750.00 173,931.56 JUMLAH TOTAL 211,681.56
9 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:4) TENAGA
Pekerja 0.6500 OH 40,000.00 26,000.00 Tukang 0.2000 OH 45,000.00 9,000.00 Kepala Tukang 0.0200 OH 55,000.00 1,100.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANBatu Bata 140.0000 Bh 844.80 118,272.00 Semen Portland 26.5500 Kg 1,295.80 34,403.49 Pasir Pasang 0.0930 M3 142,450.00 13,247.85
JUMLAH 37,750.00 165,923.34 JUMLAH TOTAL 203,673.34
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:2) TENAGA
Pekerja 0.3200 OH 40,000.00 12,800.00 Tukang 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0150 OH 55,000.00 825.00
BAHANBatu Bata 70.0000 Bh 844.80 59,136.00 Semen Portland 18.9500 Kg 1,295.80 24,555.41 Pasir Pasang 0.0380 M3 142,450.00 5,413.10
JUMLAH 18,675.00 89,104.51 JUMLAH TOTAL 107,779.51
11 1 M2 PASANGAN BATACO (1:2) TENAGA
Pekerja 0.3200 OH 40,000.00 12,800.00 Tukang 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0150 OH 55,000.00 825.00
BAHANBataco 35.0000 Bh 1,363.56 47,724.60 Semen Portland 18.9500 Kg 1,295.80 24,555.41 Pasir Pasang 0.0380 M3 142,450.00 5,413.10
JUMLAH 18,675.00 77,693.11 JUMLAH TOTAL 96,368.11
12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:3) TENAGA
Pekerja 0.3200 OH 40,000.00 12,800.00 Tukang 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0150 OH 55,000.00 825.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
BAHANBatu Bata 70.0000 Bh 844.80 59,136.00 Semen Portland 14.3700 Kg 1,295.80 18,620.65 Pasir Pasang 0.0400 M3 142,450.00 5,698.00
JUMLAH 18,675.00 83,454.65 JUMLAH TOTAL 102,129.65
13 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA (1:4) TENAGA
Pekerja 0.3200 OH 40,000.00 12,800.00 Tukang 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0150 OH 55,000.00 825.00
BAHANBatu Bata 70.0000 Bh 844.80 59,136.00 Semen Portland 11.5000 Kg 1,295.80 14,901.70 Pasir Pasang 0.0430 M3 142,450.00 6,125.35
JUMLAH 18,675.00 80,163.05 JUMLAH TOTAL 98,838.05
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
14 1 M2 PLESTERAN 1:2, TEBAL 15 MM TENAGA
Pekerja 0.2000 OH 40,000.00 8,000.00 Tukang batu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0100 OH 55,000.00 550.00
BAHANSemen Portland 8.5200 Kg 1,295.80 11,040.22 Pasir Pasang 0.0170 M3 142,450.00 2,421.65
JUMLAH 16,125.00 13,461.87 JUMLAH TOTAL 29,586.87
15 1 M2 PLESTERAN 1:4, TEBAL 15 MM TENAGA
Pekerja 0.2000 OH 40,000.00 8,000.00 Tukang batu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0100 OH 55,000.00 550.00
BAHANSemen Portland 5.2000 Kg 1,295.80 6,738.16 Pasir Pasang 0.0200 M3 142,450.00 2,849.00
JUMLAH 16,125.00 9,587.16 JUMLAH TOTAL 25,712.16
16 1 M2 PLESTERAN BERAPEN 1:3, TEBAL 30 MM TENAGA
Pekerja 0.1500 OH 40,000.00 6,000.00 Tukang batu 0.0700 OH 45,000.00 3,150.00 Kepala Tukang 0.0070 OH 55,000.00 385.00 Mandor 0.0080 OH 55,000.00 440.00
BAHANSemen Portland 7.0700 Kg 1,295.80 9,161.31 Pasir Pasang 0.0210 M3 142,450.00 2,991.45
JUMLAH 9,975.00 12,152.76 JUMLAH TOTAL 22,127.76
17 1 M2 PLESTERAN BETON 1:3, TEBAL 15 MM TENAGA
Pekerja 0.2600 OH 40,000.00 10,400.00 Tukang batu 0.2000 OH 45,000.00 9,000.00 Kepala Tukang 0.0200 OH 55,000.00 1,100.00 Mandor 0.0130 OH 55,000.00 715.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
BAHANSemen Portland 7.0700 Kg 1,295.80 9,161.31 Pasir Pasang 0.0210 M3 142,450.00 2,991.45
JUMLAH 21,215.00 12,152.76 JUMLAH TOTAL 33,367.76
18 1 M2 PASANGAN KAWAT HARMONIKA GASS TENAGA
Pekerja 0.1000 OH 40,000.00 4,000.00 Tukang Kayu 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0005 OH 55,000.00 27.50
BAHANKawat harmnika khas 1.1000 M2 8,879.20 9,767.12 Kayu /Papan bekisting 0.0018 M3 ### 2,775.56 Paku Biasa 0.0200 Kg 15,439.60 308.79
JUMLAH 9,077.50 12,851.48 JUMLAH TOTAL 21,928.98
ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU19 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU PUNAK
TENAGAPekerja 6.0000 OH 40,000.00 240,000.00 Tukang kayu 18.0000 OH 45,000.00 810,000.00 Kepala Tukang 2.0000 OH 55,000.00 110,000.00 Mandor 0.3000 OH 55,000.00 16,500.00
BAHANKayu Punak 1.2000 M3 ### 3,269,376.00
JUMLAH ### 3,269,376.00 JUMLAH TOTAL 4,445,876.00
20 1 M2 PASANG RAM / BINGKAI JENDELA + KACA 5 MM TENAGA
Pekerja 0.0800 OH 40,000.00 3,200.00 Tukang kayu 2.0000 OH 45,000.00 90,000.00 Kepala Tukang 0.2000 OH 55,000.00 11,000.00 Mandor 0.0400 OH 55,000.00 2,200.00
BAHANKayu, papan klas III 0.0350 M3 ### 63,594.30 Paku Biasa 2'-5' 0.1000 M3 15,439.60 1,543.96 Kaca 5 mm 1.1000 M3 94,985.00 104,483.50
JUMLAH 106,400.00 169,621.76 JUMLAH TOTAL 276,021.76
21 1 M2 PASANG JALUSI MATI KAYU KELAS III TENAGA
Pekerja 0.5000 OH 40,000.00 20,000.00 Tukang kayu 2.0000 OH 45,000.00 90,000.00 Kepala Tukang 0.2000 OH 55,000.00 11,000.00 Mandor 0.0250 OH 55,000.00 1,375.00
BAHANPapan kayu kelas III 0.0600 M3 ### 109,018.80 Paku Biasa 1/2" - 1" 0.1500 Kg 15,439.60 2,315.94
JUMLAH 122,375.00 111,334.74 JUMLAH TOTAL 233,709.74
22 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI TENAGA
Pekerja 4.0000 OH 40,000.00 160,000.00 Tukang kayu 12.0000 OH 45,000.00 540,000.00 Kepala Tukang 1.2000 OH 55,000.00 66,000.00 Mandor 0.2000 OH 55,000.00 11,000.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
BAHANBalok Kayu kelas III / kayu Meranti 1.1000 M3 ### 2,397,978.00 Besi strip 15.0000 Kg 3,729.00 55,935.00 Paku Biasa 2'-5' 0.8000 Kg 15,439.60 12,351.68
JUMLAH 777,000.00 2,466,264.68 JUMLAH TOTAL 3,243,264.68
23 1 M3 PASANG KONSTRUKSI RANGKA ATAP (GORDING) TENAGA
Pekerja 2.000 OH 40,000.00 80,000.00 Tukang kayu 6.000 OH 45,000.00 270,000.00 Kepala Tukang 1.200 OH 55,000.00 66,000.00 Mandor 0.200 OH 55,000.00 11,000.00
BAHANBalok Kayu kelas III 1.100 M3 ### 2,397,978.00 Paku Biasa 2'-5' 0.500 Kg 15,439.60 7,719.80
JUMLAH 427,000.00 2,405,697.80 JUMLAH TOTAL 2,832,697.80
24 1 M2 PASANG KASO + RENG ATAP TENAGA
Pekerja 0.1200 OH 40,000.00 4,800.00 Tukang kayu 0.1200 OH 45,000.00 5,400.00 Kepala Tukang 0.0120 OH 55,000.00 660.00 Mandor 0.0060 OH 55,000.00 330.00
BAHANBalok Kayu kelas III / kayu Meranti 0.0140 M3 ### 30,519.72 Paku Biasa 0.1500 Kg 15,439.60 2,315.94
JUMLAH 11,190.00 32,835.66 JUMLAH TOTAL 44,025.66
25 1 M' PASANG LISPLANG UKURAN 3X20 TENAGA
Pekerja 0.1000 OH 40,000.00 4,000.00 Tukang kayu 0.2000 OH 45,000.00 9,000.00 Kepala Tukang 0.0250 OH 55,000.00 1,375.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANPapan Kayu Kelas II 0.0072 M3 ### 39,218.26 Paku Biasa 0.0500 Kg 15,439.60 771.98
JUMLAH 14,650.00 39,990.24 JUMLAH TOTAL 54,640.24
27 1 M' PASANG LISPLANG UKURAN 2,5/10 + 2,5/20 TENAGA
Pekerja 0.1500 OH 40,000.00 6,000.00 Tukang kayu 0.2500 OH 45,000.00 11,250.00 Kepala Tukang 0.0250 OH 55,000.00 1,375.00 Mandor 0.0750 OH 55,000.00 4,125.00
BAHANPapan Kayu Kelas III/Meranti 0.0081 M3 ### 14,717.54 Paku Biasa 0.0600 Kg 15,439.60 926.38
JUMLAH 22,750.00 15,643.91 JUMLAH TOTAL 38,393.91
28 1 M3 PEKERJAAN TIANG KAYU / M3 TENAGA
Pekerja 4.0000 OH 40,000.00 160,000.00 Tukang kayu 12.0000 OH 45,000.00 540,000.00 Kepala Tukang 1.2000 OH 55,000.00 66,000.00 Mandor 0.2000 OH 55,000.00 11,000.00
BAHANBalok Kayu Punak 1.1000 M3 ### 2,996,928.00 Paku Biasa 0.2000 Kg 15,439.60 3,087.92
JUMLAH 777,000.00 3,000,015.92 JUMLAH TOTAL 3,777,015.92
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
29 1 M3 PEKERJAAN BALOK KAYU / M3 TENAGA
Pekerja 12.0000 OH 40,000.00 480,000.00 Tukang kayu 26.0000 OH 45,000.00 1,170,000.00 Kepala Tukang 3.6000 OH 55,000.00 198,000.00 Mandor 0.6000 OH 55,000.00 33,000.00
BAHANBalok Kayu Punak 1.1000 M3 ### 2,996,928.00 Paku Biasa 0.5000 Kg 15,439.60 7,719.80
JUMLAH ### 3,004,647.80 JUMLAH TOTAL 4,885,647.80
30 1 M3 PEKERJAAN RENG BALOK KAYU / M3 TENAGA
Pekerja 6.0000 OH 40,000.00 240,000.00 Tukang kayu 18.0000 OH 45,000.00 810,000.00 Kepala Tukang 1.8000 OH 55,000.00 99,000.00 Mandor 0.3000 OH 55,000.00 16,500.00
BAHANBalok Kayu Punak 1.1000 M3 ### 2,996,928.00 Paku Biasa 0.5000 Kg 15,439.60 7,719.80
JUMLAH ### 3,004,647.80 JUMLAH TOTAL 4,170,147.80
31 1 M3 PEKERJAAN LANTAI PAPAN / M2 TENAGA
Pekerja 0.6000 OH 40,000.00 24,000.00 Tukang kayu 0.3600 OH 45,000.00 16,200.00 Kepala Tukang 0.1800 OH 55,000.00 9,900.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANPapan Kayu Kelas III 0.0250 M3 ### 45,424.50 Paku Biasa 0.2000 Kg 15,439.60 3,087.92
JUMLAH 51,750.00 48,512.42 JUMLAH TOTAL 100,262.42
32 1 M3 PEKERJAAN DINDING PAPAN / M2 TENAGA
Pekerja 0.2800 OH 40,000.00 11,200.00 Tukang kayu 0.8000 OH 45,000.00 36,000.00 Kepala Tukang 0.0800 OH 55,000.00 4,400.00 Mandor 0.0140 OH 55,000.00 770.00
BAHANPapan Kayu Kelas III 0.0220 M3 ### 39,973.56 Paku Biasa 0.2000 Kg 15,439.60 3,087.92
JUMLAH 52,370.00 43,061.48 JUMLAH TOTAL 95,431.48
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON33 1 M3 MEMBUAT BETON 1:3:5
TENAGAPekerja 1.6500 OH 40,000.00 66,000.00 Tukang batu 0.2500 OH 45,000.00 11,250.00 Kepala Tukang 0.0250 OH 55,000.00 1,375.00 Mandor 0.0800 OH 55,000.00 4,400.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
BAHANSemen Portland 218.0000 Kg 1,295.80 282,484.40 Pasir Beton 0.5200 M3 142,450.00 74,074.00 Kerikil Sungai 0.8700 M3 398,200.00 346,434.00
JUMLAH 83,025.00 702,992.40 JUMLAH TOTAL 786,017.40
34 1 M3 MEMBUAT BETON BERTULANG 1:2:3 TENAGA
Pekerja 2.0000 OH 40,000.00 80,000.00 Tukang batu 0.3500 OH 45,000.00 15,750.00 Kepala Tukang 0.0350 OH 55,000.00 1,925.00 Mandor 1.0000 OH 55,000.00 55,000.00
BAHANSemen Portland 336.0000 Kg 1,295.80 435,388.80 Pasir Beton 0.5400 M3 142,450.00 76,923.00 Kerikil Sungai 0.8100 M3 398,200.00 322,542.00
JUMLAH 152,675.00 834,853.80 JUMLAH TOTAL 987,528.80
35 1 M3 MEMBUAT PONDASI BETON 1:2:3 BERTULANG (BESI, 67,883 KG+BEKISTING) TENAGA
Pekerja 3.9000 OH 40,000.00 156,000.00 Tukang batu 0.3500 OH 45,000.00 15,750.00 Tukang Kayu 1.0400 OH 45,000.00 46,800.00 Tukang Besi 1.0500 OH 45,000.00 47,250.00 Kepala Tukang 0.2450 OH 55,000.00 13,475.00 Mandor 0.1650 OH 55,000.00 9,075.00
BAHANKayu/Bekisting 0.1143 M3 ### 176,226.29 Paku Biasa 1.5000 Kg 15,439.60 23,159.40 Minyak bekisting 0.4000 Ltr 5,000.00 2,000.00 Besi beton polos 67.883 Kg 9,273.00 629,475.84 Kawat beton 2.2500 Kg 19,801.98 44,554.46 Semen Portland 323.0000 Kg 1,295.80 418,543.40 Pasir Beton 0.5200 M3 142,450.00 74,074.00 Kerikil Sungai 0.7800 M3 398,200.00 310,596.00
JUMLAH 288,350.00 1,678,629.38 JUMLAH TOTAL 1,966,979.38
36 1 M3 MEMBUAT KOLOM BETON 1:2:3 BERTULANG (BESI ; 185,205 KG+BEKISTING) TENAGA
Pekerja 7.3000 OH 40,000.00 292,000.00 Tukang batu 0.3500 OH 45,000.00 15,750.00 Tukang Kayu 3.3000 OH 45,000.00 148,500.00 Tukang Besi 2.1000 OH 45,000.00 94,500.00 Kepala Tukang 0.5700 OH 55,000.00 31,350.00 Mandor 0.2500 OH 55,000.00 13,750.00
BAHANKayu/Bekisting 0.4000 M3 ### 616,792.00 Paku Biasa 4.0000 Kg 15,439.60 61,758.40 Minyak bekisting 2.0000 Ltr 5,000.00 10,000.00 Besi beton polos 185.205 Kg 9,273.00 1,717,405.96 Kawat beton 4.5000 Kg 19,801.98 89,108.91 Semen Portland 323.0000 Kg 1,295.80 418,543.40 Pasir Beton 0.5200 M3 142,450.00 74,074.00 Kerikil Sungai 0.7800 M3 398,200.00 310,596.00 Balok kayu kelas III 0.1500 M3 ### 326,997.00 Dolken 20.0000 Btg 4,642.00 92,840.00
JUMLAH 595,850.00 3,718,115.67 JUMLAH TOTAL 4,313,965.67
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
37 1 M3 MEMBUAT BALOK BETON BERTULANG (82,844 KG+BEKISTING) TENAGA
Pekerja 5.9600 OH 40,000.00 238,400.00 Tukang batu 0.3500 OH 45,000.00 15,750.00 Tukang Kayu 2.8000 OH 45,000.00 126,000.00 Tukang Besi 1.4000 OH 45,000.00 63,000.00 Kepala Tukang 0.4550 OH 55,000.00 25,025.00 Mandor 0.2080 OH 55,000.00 11,440.00
BAHANKayu/Bekisting 0.3200 M3 ### 493,433.60 Paku Biasa 3.2000 Kg 15,439.60 49,406.72 Minyak bekisting 1.6000 Ltr 5,000.00 8,000.00 Besi beton polos 82.8440 Kg 9,273.00 768,212.41 Kawat beton 3.0000 Kg 19,801.98 59,405.94 Semen Portland 323.0000 Kg 1,295.80 418,543.40 Pasir Beton 0.5200 M3 142,450.00 74,074.00 Kerikil Sungai 0.7800 M3 398,200.00 310,596.00 Balok kayu kelas III 0.1400 M3 ### 305,197.20 Dolken 16.0000 Btg 4,642.00 74,272.00
JUMLAH 479,615.00 2,561,141.27 JUMLAH TOTAL 3,040,756.27
38 1 M3 MEMBUAT PELAT BETON 1:2:3 BERTULANG (BESI ; 82.20 KG+BEKISTING) TENAGA
Pekerja 5.6000 OH 40,000.00 224,000.00 Tukang batu 0.3500 OH 45,000.00 15,750.00 Tukang Kayu 2.6400 OH 45,000.00 118,800.00 Tukang Besi 1.0500 OH 45,000.00 47,250.00 Kepala Tukang 0.4000 OH 55,000.00 22,000.00 Mandor 0.1930 OH 55,000.00 10,615.00
BAHANKayu/Bekisting 0.2400 M3 ### 370,075.20 Paku Biasa 3.2000 Kg 15,439.60 49,406.72 Minyak bekisting 1.6000 Ltr 5,000.00 8,000.00 Besi beton polos 68.5000 Kg 9,273.00 635,200.50 Kawat beton 2.2500 Kg 19,801.98 44,554.46 Semen Portland 323.0000 Kg 1,295.80 418,543.40 Pasir Beton 0.5200 M3 142,450.00 74,074.00 Kerikil Sungai 0.7800 M3 398,200.00 310,596.00 Balok kayu kelas III 0.1400 M3 ### 305,197.20 Dolken 24.0000 Btg 4,642.00 111,408.00
JUMLAH 438,415.00 2,327,055.48 JUMLAH TOTAL 2,765,470.48
39 1 M' MEMBUAT KOLOM PRAKTIS BETON BERTULANG TENAGA
Pekerja 0.0600 OH 40,000.00 2,400.00 Tukang batu 0.0200 OH 45,000.00 900.00 Tukang Kayu 0.0200 OH 45,000.00 900.00 Tukang Besi 0.0200 OH 45,000.00 900.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0030 OH 55,000.00 165.00
BAHANKayu/Bekisting 0.0020 M3 ### 3,083.96 Paku Biasa 0.0100 Kg 5,000.00 50.00 Besi beton polos 3.0000 Kg 9,273.00 27,819.00 Kawat beton 0.4500 Kg 19,801.98 8,910.89 Semen Portland 4.0000 Kg 1,295.80 5,183.20 Pasir Beton 0.0060 M3 142,450.00 854.70 Kerikil Sungai 0.0090 M3 398,200.00 3,583.80
JUMLAH 5,595.00 49,485.55 JUMLAH TOTAL 55,080.55
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP40 1 M2 PASANG ATAP GENTENG METAL
TENAGAPekerja 0.2000 OH 40,000.00 8,000.00 Tukang Kayu 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0100 OH 55,000.00 550.00
BAHANGenteng metal 2.5 mm 1.020 Lbr 38,390.00 39,157.80 Paku Biasa 0.200 Kg 15,439.60 3,087.92
JUMLAH 13,600.00 42,245.72 JUMLAH TOTAL 55,845.72
41 1 M' PASANG NOK GENTENG METAL TENAGA
Pekerja 0.2500 OH 40,000.00 10,000.00 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0130 OH 55,000.00 715.00
BAHANNok genteng metal 1.1000 Lbr 31,295.00 34,424.50 Paku Biasa 0.0500 Kg 15,439.60 771.98
JUMLAH 18,290.00 35,196.48 JUMLAH TOTAL 53,486.48
42 1 M2 PASANG ATAP SENG GELOMBANG ALUMINIUM KULIT JERUK TENAGA
Pekerja 0.1200 OH 40,000.00 4,800.00 Tukang Kayu 0.0600 OH 45,000.00 2,700.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0060 OH 55,000.00 330.00
BAHANSeng gelombang Aluminium Kulit jeruk 0.7000 Lbr 48,000.00 33,600.00 Paku seng 0.0200 Kg 33,039.60 660.79 Karet Paku 6.0000 Bh 125.00 750.00
JUMLAH 8,160.00 35,010.79 JUMLAH TOTAL 43,170.79
43 1 M2 PASANG ATAP SENG GELOMBANG TENAGA
Pekerja 0.1200 OH 40,000.00 4,800.00 Tukang Kayu 0.0600 OH 45,000.00 2,700.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0060 OH 55,000.00 330.00
BAHANSeng gelombang bjls 20 K 0.7000 Lbr 36,190.00 25,333.00 Paku seng 0.0200 Kg 33,039.60 660.79
JUMLAH 8,160.00 25,993.79 JUMLAH TOTAL 34,153.79
44 1 M' PASANG ATAP PERABUNG SENG ALUMINIUM TENAGA
Pekerja 0.1500 OH 40,000.00 6,000.00 Tukang Kayu 0.0700 OH 45,000.00 3,150.00 Kepala Tukang 0.0800 OH 55,000.00 4,400.00 Mandor 0.0600 OH 55,000.00 3,300.00
BAHANPrabung Seng Aluminium 0.6250 Lbr 30,000.00 18,750.00 Paku seng 0.0400 Kg 33,039.60 1,321.58
JUMLAH 16,850.00 20,071.58 JUMLAH TOTAL 36,921.58
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLAFOND45 1 M2 PASANG RANGKA PLAFOND
TENAGAPekerja 0.1500 OH 40,000.00 6,000.00 Tukang kayu 0.2500 OH 45,000.00 11,250.00 Kepala Tukang 0.0250 OH 55,000.00 1,375.00 Mandor 0.0750 OH 55,000.00 4,125.00
BAHANBalok Kayu kelas III / kayu Meranti 0.0120 M3 ### 26,159.76 Paku Biasa 2'-5' 0.1000 Kg 15,439.60 1,543.96
JUMLAH 22,750.00 27,703.72 JUMLAH TOTAL 50,453.72
46 1 M2 PLAFON PLYWOOD 4 mm TENAGA
Pekerja 0.0700 OH 40,000.00 2,800.00 Tukang Kayu 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0035 OH 55,000.00 192.50
BAHANPlywood 4 mm 0.3750 Lbr 61,985.00 23,244.38 Paku triplek 0.0300 Kg 16,539.60 496.19
JUMLAH 8,042.50 23,740.56 JUMLAH TOTAL 31,783.06
47 1 M2 PLAFOND GYPSUM BOARD TENAGA
Pekerja 0.1000 OH 40,000.00 4,000.00 Tukang Kayu 0.0500 OH 45,000.00 2,250.00 Kepala Tukang 0.0050 OH 55,000.00 275.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANGypsum board 0.3640 Lbr 66,990.00 24,384.36 Paku gubsum 0.1100 Kg 20,000.00 2,200.00
JUMLAH 6,800.00 26,584.36 JUMLAH TOTAL 33,384.36
48 1 M2 PASANG PLAFOND PIRI-PIRI TENAGA
Pekerja 0.2500 OH 40,000.00 10,000.00 Tukang kayu 0.0250 OH 45,000.00 1,125.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0250 OH 55,000.00 1,375.00
BAHANPapan kayu kelas III 0.0120 M3 ### 21,803.76 Paku Biasa 0.1000 Kg 15,439.60 1,543.96
JUMLAH 13,325.00 23,347.72 JUMLAH TOTAL 36,672.72
49 1 M' PASANG LIST PLAFOND KAYU PROFIL TENAGA
Pekerja 0.0210 OH 40,000.00 840.00 Tukang kayu 0.0210 OH 45,000.00 945.00 Kepala Tukang 0.0020 OH 55,000.00 110.00 Mandor 0.0010 OH 55,000.00 55.00
BAHANList profil kayu 1.0500 M' 3,245.00 3,407.25 Paku Biasa 0.0200 Kg 15,439.60 308.79
JUMLAH 1,950.00 3,716.04 JUMLAH TOTAL 5,666.04
50 1 M' LIST LANGIT-LANGIT GYPSUM TENAGA
Pekerja 0.0500 OH 40,000.00 2,000.00 Tukang Kayu 0.0500 OH 45,000.00 2,250.00 Kepala Tukang 0.0050 OH 55,000.00 275.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
Mandor 0.0030 OH 55,000.00 165.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
BAHANList Profil gybsum 1.1000 Lbr 22,990.00 25,289.00 Paku gubsum 0.0100 Kg 20,000.00 200.00
JUMLAH 4,690.00 25,489.00 JUMLAH TOTAL 30,179.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI51 1 SET MEMASANG 1 BUAH KLOSET JONGKOK
TENAGAPekerja 1.0000 OH 40,000.00 40,000.00 Tukang 1.5000 OH 45,000.00 67,500.00 Kepala Tukang 0.1500 OH 55,000.00 8,250.00 Mandor 0.1600 OH 55,000.00 8,800.00
BAHANKloset Jongkok 1.0000 Bh 142,945.00 142,945.00 Semen Portland 6.0000 Kg 1,295.80 7,774.80 Pasir pasang 0.0100 M3 142,450.00 1,424.50
JUMLAH 124,550.00 152,144.30 JUMLAH TOTAL 276,694.30
52 1 SET MEMASANG 1 BUAH URINOIR TENAGA
Pekerja 1.0000 OH 40,000.00 40,000.00 Tukang 1.0000 OH 45,000.00 45,000.00 Kepala Tukang 0.1000 OH 55,000.00 5,500.00 Mandor 0.1000 OH 55,000.00 5,500.00
BAHANUrinoir 1.0000 Bh ### 1,215,445.00 Perlengkapan (30% dari harga Urinoir) 1.0000 Ls 364,633.50 364,633.50 Semen Portland 6.0000 Kg 1,295.80 7,774.80 Pasir pasang 0.0100 M3 142,450.00 1,424.50
JUMLAH 96,000.00 1,589,277.80 JUMLAH TOTAL 1,685,277.80
53 1 SET MEMASANG 1 BUAH WASTAFEL TENAGA
Pekerja 1.2000 OH 40,000.00 48,000.00 Tukang 1.4500 OH 45,000.00 65,250.00 Kepala Tukang 0.1500 OH 55,000.00 8,250.00 Mandor 0.1000 OH 55,000.00 5,500.00
BAHANWastafel 1.0000 Bh 775,445.00 775,445.00 Perlengkapan (12% dari harga Wastafel 1.0000 Ls 93,053.40 93,053.40 Semen Portland 6.0000 Kg 1,295.80 7,774.80 Pasir pasang 0.0100 M3 142,450.00 1,424.50
JUMLAH 127,000.00 877,697.70 JUMLAH TOTAL 1,004,697.70
54 1 SET MEMASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 0.3 M3 TENAGA
Pekerja 1.2000 OH 40,000.00 48,000.00 Tukang 1.4500 OH 45,000.00 65,250.00 Kepala Tukang 0.1500 OH 55,000.00 8,250.00 Mandor 0.1000 OH 55,000.00 5,500.00
BAHANBak fiberglass 1.0000 Bh 93,481.67 93,481.67 Perlengkapan (18% dari harga bak fiber 1.0000 Ls 16,826.70 16,826.70
JUMLAH 127,000.00 110,308.37 JUMLAH TOTAL 237,308.37
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
55 1 BH MEMASANG FLOOR DRAIN PLASTIK TENAGA
Pekerja 0.0100 OH 40,000.00 400.00 Tukang 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANfloor drain 1.0000 Bh 12,045.00 12,045.00
JUMLAH 5,725.00 12,045.00 JUMLAH TOTAL 17,770.00
56 1 BH MEMASANG KRAN DIA. 1/2" ATAU 3/4" TENAGA
Pekerja 0.0100 OH 40,000.00 400.00 Tukang 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANKran air 1.0000 Bh 9,919.80 9,919.80 Seal Tape 0.0250 Bh 2,219.80 55.50
JUMLAH 5,725.00 9,975.30 JUMLAH TOTAL 15,700.30
57 1 M' MEMASANG PIPA PVC TYPE AW DIAMTER 3/4" TENAGA
Pekerja 0.0360 OH 40,000.00 1,440.00 Tukang 0.0600 OH 45,000.00 2,700.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0018 OH 55,000.00 99.00
BAHANPipa PVC 3/4" 1.2000 m' 4,952.48 5,942.97 Perlengkapan = 35 % x Harga Pipa 1.0000 Ls 1,733.37 1,733.37
JUMLAH 4,569.00 7,676.34 JUMLAH TOTAL 12,245.34
58 1 M' MEMASANG PIPA PVC TYPE AW DIAMTER 2" TENAGA
Pekerja 0.0360 OH 40,000.00 1,440.00 Tukang 0.0600 OH 45,000.00 2,700.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0018 OH 55,000.00 99.00
BAHANPipa PVC 3/4" 1.2000 m' 14,577.48 17,492.97 Perlengkapan = 35 % x Harga Pipa 1.0000 Ls 5,102.12 5,102.12
JUMLAH 4,569.00 22,595.09 JUMLAH TOTAL 27,164.09
59 1 M' MEMASANG PIPA PVC TYPE AW DIAMTER 4" TENAGA
Pekerja 0.0360 OH 40,000.00 1,440.00 Tukang 0.0600 OH 45,000.00 2,700.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0018 OH 55,000.00 99.00
BAHANPipa PVC 3/4" 1.2000 m' 51,702.48 62,042.97 Perlengkapan = 35 % x Harga Pipa 1.0000 Ls 18,095.87 18,095.87
JUMLAH 4,569.00 80,138.84 JUMLAH TOTAL 84,707.84
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA60 1 BH PASANG KUNCI TANAM 2 SLAAG
TENAGAPekerja 0.0100 OH 40,000.00 400.00 Tukang Kayu 0.5000 OH 45,000.00 22,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANKunci Tanam 2 Slaag 1.0000 Bh 100,000.00 100,000.00
JUMLAH 23,725.00 100,000.00 JUMLAH TOTAL 123,725.00
61 1 BH PASANG KUNCI TANAM BULAT (ALFA) TENAGA
Pekerja 0.0100 OH 40,000.00 400.00 Tukang Kayu 0.5000 OH 45,000.00 22,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0050 OH 55,000.00 275.00
BAHANKunci Tanam 2 Slaag 1.0000 Bh 38,519.80 38,519.80
JUMLAH 23,725.00 38,519.80 JUMLAH TOTAL 62,244.80
62 1 BH PASANG ENGSEL PINTU TENAGA
Pekerja 0.0150 OH 40,000.00 600.00 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0008 OH 55,000.00 41.25
BAHANEngsel Kuningan 4" 1.0000 Bh 12,000.00 12,000.00
JUMLAH 8,216.25 12,000.00 JUMLAH TOTAL 20,216.25
63 1 BH PASANG ENGSEL JENDELA TENAGA
Pekerja 0.0100 OH 40,000.00 400.00 Tukang Kayu 0.1000 OH 45,000.00 4,500.00 Kepala Tukang 0.0100 OH 55,000.00 550.00 Mandor 0.0005 OH 55,000.00 27.50
BAHANEngsel Jendela 3" 1.0000 Bh 10,000.00 10,000.00
JUMLAH 5,477.50 10,000.00 JUMLAH TOTAL 15,477.50
64 1 BH PASANG KAIT ANGIN / HAK ANGIN TENAGA
Pekerja 0.0150 OH 40,000.00 600.00 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0008 OH 55,000.00 41.25
BAHANKait Angin 1.0000 Bh 3,000.00 3,000.00
JUMLAH 8,216.25 3,000.00 JUMLAH TOTAL 11,216.25
65 1 BH PASANG GRENDEL PINTU TENAGA
Pekerja 0.0150 OH 40,000.00 600.00 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0008 OH 55,000.00 41.25
BAHANGrendel Pintu 1.0000 Bh 15,000.00 15,000.00
JUMLAH 8,216.25 15,000.00 JUMLAH TOTAL 23,216.25
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
66 1 BH PASANG GRENDEL JENDELA TENAGA
Pekerja 0.0150 OH 105,985.00 1,589.77 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0008 OH 55,000.00 41.25
BAHANGrendel Jendela 1.0000 Bh 7,500.00 7,500.00
JUMLAH 9,206.03 7,500.00 JUMLAH TOTAL 16,706.03
67 1 BH PASANG TARIKAN TANGAN TENAGA
Pekerja 0.0150 OH 40,000.00 600.00 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0008 OH 55,000.00 41.25
BAHANKait Angin 1.0000 Bh 4,000.00 4,000.00
JUMLAH 8,216.25 4,000.00 JUMLAH TOTAL 12,216.25
68 1 M2 PASANG KACA 5 MM TENAGA
Pekerja 0.0150 OH 40,000.00 600.00 Tukang Kayu 0.1500 OH 45,000.00 6,750.00 Kepala Tukang 0.0150 OH 55,000.00 825.00 Mandor 0.0008 OH 55,000.00 41.25
BAHANKaca 1.1000 Bh 94,985.00 104,483.50
JUMLAH 8,216.25 104,483.50 JUMLAH TOTAL 112,699.75
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI & DINDING69 1 M2 PASANG LANTAI KERAMIK 40X40
TENAGAPekerja 0.6200 OH 40,000.00 24,800.00 Tukang Batu 0.3500 OH 45,000.00 15,750.00 Kepala Tukang 0.0350 OH 55,000.00 1,925.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANKeramik 40x40 6.0000 Bh 12,149.50 72,897.00 Semen Portland 8.8000 Kg 1,295.80 11,403.04 Pasir Pasang 0.0215 M3 142,450.00 3,062.67 Semen warna 1.3000 Kg 2,632.30 3,421.99
JUMLAH 44,125.00 90,784.71 JUMLAH TOTAL 134,909.71
70 1 M2 PASANG LANTAI KERAMIK 30x30 TENAGA
Pekerja 0.6200 OH 40,000.00 24,800.00 Tukang Batu 0.3500 OH 45,000.00 15,750.00 Kepala Tukang 0.0350 OH 55,000.00 1,925.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANKeramik 30x30 11.0000 Bh 6,089.60 66,985.60 Semen Portland 11.3800 Kg 1,295.80 14,746.20 Pasir Pasang 0.0420 M3 142,450.00 5,982.90 Semen warna 1.5000 Kg 2,632.30 3,948.45
JUMLAH 44,125.00 91,663.15 JUMLAH TOTAL 135,788.15
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
71 1 M2 PASANG LANTAI KERAMIK 20x20 TENAGA
Pekerja 0.6200 OH 40,000.00 24,800.00 Tukang Batu 0.3500 OH 45,000.00 15,750.00 Kepala Tukang 0.0350 OH 55,000.00 1,925.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANKeramik 20x20 25.0000 Bh 2,219.80 55,495.00 Semen Portland 11.3800 Kg 1,295.80 14,746.20 Pasir Pasang 0.0420 M3 142,450.00 5,982.90 Semen warna 1.5000 Kg 2,632.30 3,948.45
JUMLAH 44,125.00 80,172.55 JUMLAH TOTAL 124,297.55
72 1 M' PASANG PLINT KERAMIK 10x30 TENAGA
Pekerja 0.0600 OH 40,000.00 2,400.00 Tukang Batu 0.0300 OH 45,000.00 1,350.00 Kepala Tukang 0.0030 OH 55,000.00 165.00 Mandor 0.0030 OH 55,000.00 165.00
BAHANPlin Keramik 10x30 3.3300 Bh 2,029.87 6,759.46 Semen Portland 1.6500 Kg 1,295.80 2,138.07 Pasir Pasang 0.0032 M3 142,450.00 455.84 Semen warna 0.1000 Kg 2,632.30 263.23
JUMLAH 4,080.00 9,616.60 JUMLAH TOTAL 13,696.60
73 1 M' PASANG PLINT KERAMIK 10x40 TENAGA
Pekerja 0.0800 OH 40,000.00 3,200.00 Tukang Batu 0.0400 OH 45,000.00 1,800.00 Kepala Tukang 0.0040 OH 55,000.00 220.00 Mandor 0.0040 OH 55,000.00 220.00
BAHANPlin Keramik 10x40 2.6500 Bh 3,037.38 8,049.04 Semen Portland 1.2000 Kg 1,295.80 1,554.96 Pasir Pasang 0.0030 M3 142,450.00 427.35 Semen warna 0.1000 Kg 2,632.30 263.23
JUMLAH 5,440.00 10,294.58 JUMLAH TOTAL 15,734.58
74 1 M2 PASANG KERAMIK DINDING 20x25 TENAGA
Pekerja 0.6000 OH 40,000.00 24,000.00 Tukang Batu 0.4500 OH 45,000.00 20,250.00 Kepala Tukang 0.0450 OH 55,000.00 2,475.00 Mandor 0.0300 OH 55,000.00 1,650.00
BAHANKeramik 20x25 20.0000 Bh 3,054.70 61,094.00 Semen Portland 11.3800 Kg 1,295.80 14,746.20 Pasir Pasang 0.0180 M3 142,450.00 2,564.10 Semen warna 1.5000 Kg 2,632.30 3,948.45
JUMLAH 48,375.00 82,352.75 JUMLAH TOTAL 130,727.75
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN75 1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA
TENAGAPekerja 0.1500 OH 40,000.00 6,000.00 Mandor 0.0025 OH 55,000.00 137.50
BAHANSoda Api 0.0500 Kg 9,200.00 460.00
JUMLAH 6,137.50 460.00 JUMLAH TOTAL 6,597.50
76 1 M2 RESIDU KAYU / BEKISTING TENAGA
Pekerja 0.0400 OH 40,000.00 1,600.00 Tukang Cat 0.0400 OH 45,000.00 1,800.00 Kepala Tukang 0.0040 OH 55,000.00 220.00 Mandor 0.0025 OH 55,000.00 137.50
BAHANResidu 0.0800 Kg 12,000.00 960.00
JUMLAH 3,757.50 960.00 JUMLAH TOTAL 4,717.50
77 1 M2 PENGECATAN PERMUKAAN KAYU DENGAN MENIE TENAGA
Pekerja 0.0200 OH 40,000.00 800.00 Tukang Cat 0.2000 OH 45,000.00 9,000.00 Kepala Tukang 0.0200 OH 55,000.00 1,100.00 Mandor 0.0100 OH 55,000.00 550.00
BAHANMenie kayu 0.1000 Kg 12,000.00 1,200.00 Kuas 0.0100 Bh 13,800.00 138.00
JUMLAH 11,450.00 1,338.00 JUMLAH TOTAL 12,788.00
78 1 M2 PENGECATAN BIDANG KAYU LAMA TENAGA
Pekerja 0.0700 OH 40,000.00 2,800.00 Tukang Cat 0.0750 OH 45,000.00 3,375.00 Kepala Tukang 0.0075 OH 55,000.00 412.50 Mandor 0.0025 OH 55,000.00 137.50
BAHANPlamir 0.1500 Kg 14,000.00 2,100.00 Cat dasar 0.1700 Kg 25,000.00 4,250.00 Cat penutup 0.1700 Kg 35,000.00 5,950.00
JUMLAH 6,725.00 12,300.00 JUMLAH TOTAL 19,025.00
79 1 M2 PENGECATAN BIDANG KAYU BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP) TENAGA
Pekerja 0.0700 OH 40,000.00 2,800.00 Tukang Cat 0.0090 OH 45,000.00 405.00 Kepala Tukang 0.0060 OH 55,000.00 330.00 Mandor 0.0025 OH 55,000.00 137.50
BAHANCat meni 0.2000 Kg 12,000.00 2,400.00 Plamir 0.1500 Kg 14,000.00 2,100.00 Cat dasar 0.1700 Kg 25,000.00 4,250.00 Cat penutup 2X 0.2600 Kg 35,000.00 9,100.00
JUMLAH 3,672.50 17,850.00 JUMLAH TOTAL 21,522.50
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
80 1 M2 VERNISH TENAGA
Pekerja 0.1600 OH 40,000.00 6,400.00 Tukang Cat 0.1600 OH 45,000.00 7,200.00 Kepala Tukang 0.0160 OH 55,000.00 880.00 Mandor 0.0025 OH 55,000.00 137.50
BAHANVernish 0.1500 Ltr 25,000.00 3,750.00 Dempul 0.0500 Kg 14,000.00 700.00 Amplas 0.1000 Lbt 3,000.00 300.00 Kuas 0.0100 Bh 13,800.00 138.00
JUMLAH 14,617.50 4,888.00 JUMLAH TOTAL 19,505.50
81 1 M2 PENGECATAN BIDANG TEMBOK BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP) TENAGA
Pekerja 0.0200 OH 40,000.00 800.00 Tukang Cat 0.0630 OH 45,000.00 2,835.00 Kepala Tukang 0.0063 OH 55,000.00 346.50 Mandor 0.0025 OH 55,000.00 137.50
BAHANPlamir 0.1000 Kg 14,000.00 1,400.00 Cat dasar 0.1000 Kg 15,000.00 1,500.00 Cat penutup 2X 0.2600 Kg 15,000.00 3,900.00
JUMLAH 4,119.00 6,800.00 JUMLAH TOTAL 10,919.00
82 1 M2 PENGECATAN BIDANG TEMBOK LAMA (1 CAT DASAR : 2 CAT PENUTUP) TENAGA
Pekerja 0.0200 OH 40,000.00 800.00 Tukang Cat 0.0630 OH 45,000.00 2,835.00 Kepala Tukang 0.0063 OH 55,000.00 346.50 Mandor 0.0025 OH 55,000.00 137.50
BAHANCat penutup 2X 0.2600 Kg 15,000.00 3,900.00
JUMLAH 4,119.00 3,900.00 JUMLAH TOTAL 8,019.00
83 1 M2 PENGECATAN IMPRA 4X SAPU TENAGA
Pekerja 0.1500 OH 40,000.00 6,000.00 Tukang Cat 0.3000 OH 45,000.00 13,500.00 Kepala Tukang 0.0250 OH 55,000.00 1,375.00 Mandor 0.0070 OH 55,000.00 385.00
BAHANCat Impra 0.1000 Kg 50,000.00 5,000.00 Kuas Golong 0.1000 Bh 18,000.00 1,800.00 Kertas Amplas 0.0100 Lbr 3,000.00 30.00 Thinner 0.1000 Ltr 20,000.00 2,000.00 Perancah Kayu 0.0260 M3 ### 40,091.48 Papan Meranti 0.0020 M3 ### 3,083.96
JUMLAH 21,260.00 52,005.44 JUMLAH TOTAL 73,265.44
ANALISA BIAYA KONSTRUKSI PEKERJAAN LAIN-LAIN84 1 M' PEMANCANGAN KAYU CEROCOK (BOW)
TENAGAPekerja 1.8000 OH 40,000.00 72,000.00 Tukang Kayu 0.0400 OH 45,000.00 1,800.00 Kepala Tukang 1.8000 OH 55,000.00 99,000.00 Mandor 1.0450 OH 55,000.00 57,475.00
BAHANKayu cerocok 1.0000 M' 1,947.00 1,947.00
JUMLAH 230,275.00 1,947.00 UPAH x 0.025 5,756.88 1,947.00
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
JUMLAH TOTAL 7,703.88
NO URAIAN PEKERJAAN VOLUME JUMLAH
UPAH BAHAN 1 2 3 4 5 6
HARGA SATUAN
85 1 M2 PAVING BLOCK TENAGA
Pekerja 0.5000 OH 40,000.00 20,000.00 Tukang Batu 0.0200 OH 45,000.00 900.00 Kepala Tukang 0.0200 OH 55,000.00 1,100.00 Mandor 0.0020 OH 55,000.00 110.00
BAHANPaving blok 38.0000 Bh 1,659.90 63,076.20 Pasir Pasang 0.0070 M3 142,450.00 997.15
SUB TOTAL 22,110.00 64,073.35 JUMLAH 86,183.35 DIBULATKAN 86,180.00
Tembilahan, Mei 2011Konsultan Perencana :
CV. SARANA MULTI JAYA KONSULTANT
Ir. MAHMUDDirektur
Diperiksa Oleh :DIREKSI TEKNIS
H. MUKHRIM CHNIP 19550620 197903 1 003
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
ENGINEERING ESTIMATE( E E )
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/
PUSKESMAS PEMBANTU DAN JARINGANNYA
KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS
PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS CONCONG LUAR
LOKASI : KEC. CONCONG
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN HARGA
( Rp. ) ( Rp. )1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lokasi 1 354.750 4,275.00 1,516,556.25
2 Pekerjaan Pembongkaran Bangunan Lama - - Ls 2,000,000.00 -
3 Pas. Papan Nama Kegiatan - 1.000 Ls 500,000.00 500,000.00
4 Pek. Pas. Bouwplank/Pengukuran 2 92.000 23,713.35 2,181,628.38
Sub Jumlah 4,198,184.63
II. PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 3 #REF! 18,200.00 #REF!
2 Pek. Kayu Cerocok Ø 10-12 cm pj. 5 m 84 - 7,703.88 -
3 Pek. Pasir Urug bawah tapak pondasi 5 - 150,490.00 -
4 Pek. Lantai Kerja camp 1 : 3 : 5 33 #REF! 786,017.40 #REF!
5 Pek. Cor Beton Bertulang Tapak Pondasi 35 #REF! 1,966,979.38 #REF!
6 Pek. Cor Beton Bertulang Kolom 20/20 cm 36 0.893 4,313,965.67 3,851,508.55
Sub Jumlah #REF!
III. PEKERJAAN BALOK DAN LANTAI
1 Pek. Cor Beton Bertulang Sloof 20/20 cm 37 11.744 3,040,756.27 35,710,641.66
2 Pek. Balok Anak Kayu Punak 7/10 cm 29 5.393 4,885,647.80 26,347,321.46
3 Pek. Balok Anak Kayu Punak 10/10 cm 29 1.572 4,885,647.80 7,680,238.34
4 Pek. Lantai Papan Kayu Kelas III 2,5/20 cm 31 348.880 100,262.42 34,979,553.09
5 Pek. Cor Beton Bertulang Lantai Toilet 38 1.814 2,765,470.48 5,017,669.63
6 Pek. Pas. Lantai Lantai Toilet 20 x 20 cm 71 15.120 124,297.55 1,879,379.02
7 Pek. Pas. Papan Penutup Balok 2 x 2,5/20 cm - 75.000 35,000.00 2,625,000.00
Sub Jumlah 114,239,803.19
IV. PEKERJAAN RANGKA DINDING DAN PLASTERAN
1 Pek. Kozen/Rangka Dinding Kayu 6/9 cm 19 2.997 4,445,876.00 13,325,490.76
2 Pek. Rangka Dinding / Tiang Induk Kayu 9/9 cm 28 1.074 3,777,015.92 4,056,741.72
3 Pek. Tiang Teras 9/9 cm 28 0.606 3,777,015.92 2,288,418.41
4 Pek. Rangka Dinding / Tiang Kayu 6/9 CM 28 2.104 3,777,015.92 7,945,829.26
5 Pek. Reng Balok Kayu /Reng Balok 6/9 30 2.548 4,170,147.80 10,626,620.83
6 Pek. Kolom Praktis KM/WC T. 1.5 m 39 16.300 55,080.55 897,812.98
7 Pek. Pas. Kawat Harmonika gass 18 553.817 21,928.98 12,144,639.70
8 Pek. Pas. Dinding Bata Ik. 1/2 Batu Camp 1 : 4 13 34.474 98,838.05 3,407,392.35
9 Pek. Pas.Dinding Plaster kawat Hasgas Camp 1 : 4 15 1,107.634 25,712.16 28,479,662.63
10 Pek. Pas. Dinding Keramik Toilet 20 x 25 cm T. 1.5 m 74 41.400 130,727.75 5,412,129.02
11 Pek. Menie kozen dan Rangka Dinding 77 201.096 12,788.00 2,571,609.25
Sub Jumlah 91,156,346.91
V. PEK. KUDA - KUDA/RANGKA ATAP DAN PENUTUP ATAP
1 Pek. Kuda - Kuda Kayu Kelas III 22 4.418 3,243,264.68 14,327,705.51
2 Pek. Rangka Atap (Gording, Nok & Ikatan Angin) 23 2.759 2,832,697.80 7,815,894.79
3 Pek. Pas. Papan rabung 2 x 2/15 - 18.000 M' 30,000.00 540,000.00
4 Pek. Pas. Baut diameter 12 mm Daf. Bahan 226.000 Bh 4,419.80 998,874.80
5 Pek. Listplank Papan 27 101.360 M' 38,393.91 3,891,607.12
6 Pek. Atap Seng Gelombang Aluminium Kulit Jeruk 42 537.461 M2 43,170.79 23,202,617.04
7 Pek. Perabung Atap Seng Aluminium 44 42.400 M' 36,921.58 1,565,475.16
8 Pek. Singap Papan Motif Jalusi 21 3.559 M2 233,709.74 831,866.45
9 Pek. Residu Rangka Atap 76 467.376 M2 4,717.50 2,204,848.17
Sub Jumlah 55,378,889.04
VI. PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond Kayu Klas III 45 364.000 M2 50,453.72 18,365,154.08
2 Pek. Pas. Plafond Plywood 4 mm 46 364.000 M2 31,783.06 11,569,034.93
3 Pek. Rangka Piri - Piri Kayu Kals III 45 84.000 M2 50,453.72 4,238,112.48
4 Pek. Pas. Piri - Piri Kayu Klas III 48 94.720 M2 36,672.72 3,473,640.04
5 Pek. List Profil Plafond 49 160.000 M' 5,666.04 906,566.72
Sub Jumlah 38,552,508.25
ANALISA NOMOR
m2
m1
m3
m1
m3
m3
m3
m3
m3
m3
m3
m2
m3
m2
m'
m3
m3
m3
m3
m3
m1
m2
m2
m2
m2
m2
m3
m3
1 2 3 4 5 6 7
VII. PEKERJAAN PINTU DAN JENDELA
1 Pek. Daun Pintu Panel 2 Daun Daf. Bahan 1.000 Bh 800,000.00 800,000.00
2 Pek. Daun Pintu Panel 2 Daun + Kaca Daf. Bahan 1.000 Bh 800,000.00 800,000.00
3 Pek. Daun Pintu Panel 1 Daun Daf. Bahan 23.000 Bh 450,000.00 10,350,000.00
4 Pek. Daun Pintu Fiber Daf. Bahan 2.000 Bh 230,000.00 460,000.00
5 Pek. pas. jendela bingkai + kaca 5 mm 20 18.935 Bh 276,021.76 5,226,416.82
6 Pek. Ventilasi Kaca Mati 5 mm 68 39.403 Bh 112,699.75 4,440,708.25
7 Pek. List Kaca Daf. Bahan 372.520 m' 3,245.00 1,208,827.40
Sub Jumlah 23,285,952.47
VIII. PEKERJAAN ALAT PENGANTUNG
1 Pek. Pas. Kunci Tanam 2 Slaag 60 25.000 Bh 123,725.00 3,093,125.00
2 Pek. Pas. Kunci Alfa 61 2.000 Bh 62,244.80 124,489.60
3 Pek. Pas. Engsel Kuningan Pintu 4" 62 87.000 Bh 20,216.25 1,758,813.75
4 Pek. Pas. Engsel Kuningan Jendela 3" 63 74.000 Bh 15,477.50 1,145,335.00
5 Pek. Pas. Grandel Pintu 65 56.000 Bh 23,216.25 1,300,110.00
6 Pek. Pas. Grandel Jendela 66 74.000 Bh 16,706.03 1,236,245.85
7 Pek. Pas. Kait Angin Jendela 64 74.000 Bh 11,216.25 830,002.50
8 Pek. Pas. Handle Jendela 67 37.000 Bh 12,216.25 452,001.25
Sub Jumlah 9,940,122.95
IX. PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Titik Lampu + Instalasi Daf. Bahan 30.000 Ttk 60,000.00 1,800,000.00
2 Pek. Pas. Stop Kontrak + Instalasai Daf. Bahan 14.000 Ttk 60,000.00 840,000.00
3 Pek. Pas. Lampu SL 20 watt Daf. Bahan 30.000 bh 40,000.00 1,200,000.00
4 Pek. Pas. Saklar Ganda Daf. Bahan 5.000 bh 11,000.00 55,000.00
5 Pek. Pas. Saklar Tunggal Daf. Bahan 13.000 bh 10,000.00 130,000.00
6 Pek. Pas. Zakering Khas / MCB Daf. Bahan 1.000 bh 16,000.00 16,000.00
Sub Jumlah 4,041,000.00
X. PEKERJAAN SANITASI
1 Pek. Pas. Kloset Jongkok 51 3.000 Bh 276,694.30 830,082.90
2 Pek. Pas. Flour Drain 55 3.000 Bh 17,770.00 53,310.00
3 Pek. Pas. Kran Air 56 3.000 m2 15,700.30 47,100.89
4 Pek. Pas. Bak Air Fiber 54 3.000 m2 237,308.37 711,925.10
5 Pek. Pas. Instalasi Pipa PVC 3/4" 57 20.000 m2 12,245.34 244,906.73
6 Pek. Pas. Instalasi Pipa PVC 2" 58 9.000 m2 27,164.09 244,476.78
7 Pek. Pas. Instalasi Pipa PVC 4" 59 11.000 m2 84,707.84 931,786.20
8 Pek. Pas. Sptictank - 2.000 Unit 1,000,000.00 2,000,000.00
Sub Jumlah 5,063,588.59
XI. PEKERJAAN PENGECATAN
1 Pek. Cat Dinding 81 973.483 M2 10,919.00 10,629,455.42
2 Pek. Cat Plafond 81 364.000 M2 10,919.00 3,974,516.00
3 Pek. Cat Minyak ; Kosen 79 134.152 M2 21,522.50 2,887,275.66
4 Pek. Cat Minyak ; Pintu 79 86.520 M2 21,522.50 1,862,126.70
5 Pek. Cat Minyak ; Jendela 79 15.219 M2 21,522.50 327,555.23
6 Pek. Cat Minyak ; Listplank 79 101.360 M2 21,522.50 2,181,520.60
7 Pek. Cat Minyak ; Piri - Piri 79 84.000 M2 21,522.50 1,807,890.00
8 Pek. Cat Minyak ; List Plafond 79 16.000 M2 21,522.50 344,360.00
9 Pek. Cat Minyak ; Tiang Teras + Rangka Dinding 79 141.778 M2 21,522.50 3,051,417.01
Sub Jumlah 27,066,116.61
XII. PEKERJAAN LAIN-LAIN
1 Pek. Pas. Pagar pengaman Teras - 18.000 m' 75,000.00 1,350,000.00
2 Jalusi Diatas Teras - 60.000 m' 50,000.00 3,000,000.00
2 Pek. Tempat Duduk Teras - 36.000 m' 50,000.00 1,800,000.00
3 Pek. Jalan Penghubung Lebar 3 m - 10.000 m' 175,000.00 1,750,000.00
4 Pek.Pembersihan Akir Proyek - 1.000 Ls 500,000.00 500,000.00
Sub Jumlah 8,400,000.00
Tembilahan, Mei 2011Konsultan Perencana :
CV. SARANA MULTI JAYA KONSULTAN
Ir. MAHMUDDirektur
Diperiksa Oleh :DIREKSI TEKNIS
H. MUKHRIM CHNIP 19550620 197903 1 003
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
REKAPITULASI BIAYA
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/
PUSKESMAS PEMBANTU DAN JARINGANNYA
KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS
PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS CONCONG LUAR
LOKASI : KEC. CONCONG
TOTAL
NO. URAIAN PEKERJAAN HARGA
( Rp. )
I. PEKERJAAN PERSIAPAN 4,198,184.63
II. PEKERJAAN PONDASI #REF!
III. PEKERJAAN BALOK DAN LANTAI 114,239,803.19
IV. PEKERJAAN RANGKA DINDING DAN PLASTERAN 91,156,346.91
V. PEK. KUDA - KUDA/RANGKA ATAP DAN PENUTUP ATAP 55,378,889.04
VI. PEKERJAAN PLAFOND 38,552,508.25
VII. PEKERJAAN PINTU DAN JENDELA 23,285,952.47
VIII. PEKERJAAN ALAT PENGANTUNG 9,940,122.95
IX. PEKERJAAN INSTALASI LISTRIK 4,041,000.00
X. PEKERJAAN SANITASI 5,063,588.59
XI. PEKERJAAN PENGECATAN 27,066,116.61
XII. PEKERJAAN LAIN-LAIN 8,400,000.00
JUMLAH #REF!
PPN 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
TERBILANG :
Tembilahan, Mei 2011Konsultan Perencana :
CV. SARANA MULTI JAYA KONSULTANT
Ir. MAHMUDDirektur
Diperiksa Oleh :DIREKSI TEKNIS
H. MUKHRIM CHNIP 19550620 197903 1 003
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
REKAPITULASI BIAYA
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/PUSKESMAS PEMBANTU DAN JARINGANNYA
KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS DAN
: PERENCANAAN PEMBANGUNAN GEDUNG PUSKESMAS PERAWATAN LOKASI : KEC. CONCONG
TOTAL
NO. URAIAN PEKERJAAN HARGA
( Rp. )
A PEMBANGUNAN PUSKESMAS #REF!
B PEMBANGUNAN PUSKESMAS PERAWATAN #REF!
JUMLAH #REF!
TERBILANG :
Tembilahan, Mei 2011Konsultan Perencana :
CV. SARANA MULTI JAYA KONSULTANT
Ir. MAHMUDDirektur
Diperiksa Oleh :DIREKSI TEKNIS
H. MUKHRIM CHNIP 19550620 197903 1 003
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
JADWAL WAKTU PELAKSANAAN(Kurva "S")
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/ PUSKESMAS PEMBANTU DAN JARINGANNYA
KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS CONCONG LUAR LOKASI : KEC. CONCONG
NO URAIAN PEKERJAAN
BOBOT BULAN KE - I BULAN KE - II BULAN KE - III BULAN KE - IV
PEKERJAAN MINGGU MINGGU MINGGU MINGGU (%) KET
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
I. PEKERJAAN PERSIAPAN #REF! #REF! #REF! 100
II. PEKERJAAN PONDASI #REF! #REF! #REF! #REF!
III. PEKERJAAN BALOK DAN LANTAI #REF! #REF! #REF! #REF!
IV. PEKERJAAN RANGKA DINDING DAN PLASTERAN #REF! #REF! #REF!
V. PEK. KUDA - KUDA/RANGKA ATAP DAN PENUTUP ATAP #REF! #REF! #REF! #REF!
VI. PEKERJAAN PLAFOND #REF! #REF! #REF! 50
VII. PEKERJAAN PINTU DAN JENDELA #REF! #REF! #REF!
VIII. PEKERJAAN ALAT PENGANTUNG #REF! #REF! #REF!
IX. PEKERJAAN INSTALASI LISTRIK #REF! #REF!
X. PEKERJAAN SANITASI #REF! #REF! #REF!
XI. PEKERJAAN PENGECATAN #REF! #REF! #REF!
XII. PEKERJAAN LAIN-LAIN #REF! #REF! #REF! 0
J u m l a h #REF!
RENCANA
Mingguan #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! Waktu Pelaksanaan
Kumulatif Mingguan - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 120 Hari Kalender
Bulanan #REF! #REF! #REF! #REF!
Kumulatif Bulanan #REF! #REF! #REF! #REF!
AKTUAL
Mingguan
Kumulatif Mingguan
Bulanan
Kumulatif Bulanan
DEVIASIMingguan (+) atau (-)
Bulanan (+) atau (-)
Tembilahan, Mei 2011Konsultan Perencana :
CV. SARANA MULTI JAYA KONSULTANT
Ir. MAHMUDDirektur
Diperiksa Oleh :DIREKSI TEKNIS
H. MUKHRIM CHNIP 19550620 197903 1 003
Diketahui Oleh :PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
H. M. KHAIRUDDIN, SKMNip. 19651231 198703 1 048
Disetujui Oleh :KEPALA DINAS KESEHATANKABUPATEN INDRAGIRIHILIR
Hj. RUMISIS, S.Ip, M.KesNip. 19550603 197606 2 001
Page 31 of 56
PERHITUNGAN KUANTITAS (VOLUME)
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/ KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS CONCONG LUAR LOKASI : KEC. CONCONG
NO. KETERANGAN SKET GAMBAR ANALISA HITUNGAN KUANTITAS VOLUME
1 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran Bangunan Lama Lbr PjLuas 16.5 21.5 = 354.75 m2 354.750 m2
2 Pek. Pembersihan Lokasi Lbr PjLuas 22.5 27.5 = 618.750 m2 618.750 m2
3 Pas. Papan Nama Kegiatan Bh = 1.00 Bh 1.000 Bh
4 Pek. Pas. Bouwplank/Pengukuran Lbr Pj Pj. KrjPjg = 16.5 21.5 4.0 = ((Lbr + Pj. Krj) x 2)) + ((Pj + Pj. Krj) x 2)) = 92.000 m1 92.000 m1
II. PEKERJAAN PONDASI Panjang Galian ( Pj) Lebar ( L ) Tinggi ( t ) 1 Pek. Galian Tanah Pondasi 202.775 m 0.9 m 0.75 m
Volume = ( Pj x t1 x lb1 ) = 136.873 m3 136.873 m3
Pondasi Lajur
2 Pek. Kayu Cerocok Ø 10-12 cm Pjg. 7 m Panjang Galian Pondasi Lajur Dikurangi Galian Pondasi TapakPanjang Galian ( Pj ) Jarak Cerocok ( Jc ) Panjang Cerocok ( Pc )
127.300 m' 0.500 m' 7.000 m'
Pj Cerocok 1 = ((( Pj / Jc )+1)*3) x Pc = 5,369.000 M1
Pondasi Tapak
Tapak A Tapak B Tapak CBh L P Jmlh Pj Bh L P Jmlh Pj Bh L P Jmlh Pj
31.00 0.80 0.80 16.00 7.00 19.00 0.65 0.65 9.00 7.00 3.00 0.80 1.30 24.00 7.00
Pj Cerocok 1 = ( Bh*JCTA * Pc ) + ( Bh*JCTB * Pc ) + ( Bh*JCTC * Pc ) + n .... = 5,173.000 M1
Jumlah Panjang Cerocok = ( Pj Cerorok 1 + Pj Cerocok 2 ) = 10,542.000 M1 10,542.000 m3
Page 32 of 56
1 3 4 5
3 Pek. Pasir Urug Bawah Tapak Pondasi Menerus, Tbl 10 cm Panjang Galian = 202.775 Tinggi t1 = 0.10 Lebar lb1 = 0.90
Vol. Urugan Pasir = ( Pj x t1 x lb1 ) = 18.250 m3 18.250 m3
Page 33 of 56
1 3 4 5
4 Pek. Cor Lantai Kerja, Camp 1 : 3 : 5 Tbl 5 cm Panjang Galian = 202.775 Tinggi t1 = 0.05 Lebar lb1 = 0.90
Vol. Cor Lantai Kerja = ( Pj x t1 x lb1 ) = 9.125 m3 9.125 m3
5 Pek. Cor Beton Bertulang A. Pek. Cor Beton Bertulang Tapak Pondasi Tapak A Tapak B Tapak C
Bh L P T Bh L P T Bh L P T31.00 0.80 0.80 0.20 19.00 0.65 0.65 0.20 3.00 0.80 1.30 0.20
Volume Tapak A = ( Bh x L x P x T ) = 3.968 m3 3.968 m3
Volume Tapak B = ( Bh x L x P x T ) = 1.606 m3 1.606 m3
Volume Tapak C = ( Bh x L x P x T ) = 0.624 m3 0.624 m3
B. Pek. Cor Beton Bertulang Tapak Pondasi Menerus Pondasi Lajur
Panjang Galian Pondasi Lajur Dikurangi Galian Pondasi TapakPanjang Lajur ( PL ) Lebar Tapak Lajur ( LT ) Tinggi Tapak Lajur ( TT )
127.300 m' 0.500 m' 0.200 m'
Volume Tapak Pondasi Lajur = ( PL x LT x TT ) = 12.730 m3 12.730 m3
6 Pek. Cor Beton Bertulang Kolom 20/20 cm Jumlah Vol. 1 kolom = P x L x T
= 0.2 x 0.2 x 0.72
= 0.029 M3
Jumlah Kolom = 31.0 bhJumlah Total = 31.0 x ###
= 0.893 M3 0.893 m3
7 Pek. Pas. Dinding Batu Bata 1 Batu Pondasi Menerus, Camp. 1:2 Ukuran Jumlah SatPanjang m 202.775 mTinggi m 0.72 m
Vol = ( Panjang x Tinggi ) = 145.998 M2 145.998 m2
8 Pek. Plasteran Dinding Pondasi Menerus, Camp. 1:2 Ukuran Jumlah SatPanjang m 202.775 mTinggi m 0.72 m
Vol = 2 x ( Panjang x Tinggi ) = 291.996 M2 291.996 m2
III. PEKERJAAN LANTAI
1 Pek. Cor Beton Bertulang Sloof 20/25 cm Balok Memanjang = 26 + 0.2= 26.2 m'
Jumlah balok memanjang = 6 Batang
Page 34 of 56
1 3 4 5
Volume = 6 x 26.2 x 0.2 x 0.2= 6.288 M3
Balok Melintang = 14 + 0.2 - 0.2 x 6= 13 m'
Jumlah balok memanjang = 10 BatangVolume = 10 x 13 x 0.2 x 0.2
= 5.200 M3
Balok T. Duduk = 16 Batang= 16 x 0.4 x 0.2 x 0.2= 0.256 M3
Jumlah Total Volume = 11.744 M3 11.744 m3
Page 35 of 56
1 3 4 5
2 Pek. Balok Anak Kayu Punak 7/10 cm Jarak Balok anak Per 50 cm = 28 Batang = 28 Batang
Panjang Balok kayu memjg = 26 + 0.2= 26.2 m'
Volume = 0.07 x 0.1 x 26.2 x 28 = 5.135 M3
Jumlah Batang Teras = 4 Buah
Panjang Balok kayu memjg = 9.0 + 0.2= 9.2 m'
Volume = 0.07 x 0.1 x 9.2 x 4 = 0.258 M3
Total Volume Balok = ### + ### 5.393 m3
3 Pek. Balok Anak Kayu Punak 10/10 cm Jumlah Balok Anak 10/10 = 6 Buah
Panjang Balok kayu memjg = 26.0 + 0.2= 26.2 m'
Volume = 0.10 x 0.1 x 26.2 x 6 = 1.572 M3 1.572 m3
4 Pek. Lantai Papan Kayu Kelas III 2,5/20 cm Luas Bangunan Menggunakan Lantai Papan
Luas Total = 14.0 x 26.0= 364.000 M2
Luas Lantai Cor = 1.8 x 2.8 x 3= 15.120 M2
Luas Bangunan Menggunakan Lantai Papan = 348.880 M2 348.880 m2
5 Pek. Cor Beton Bertulang Lantai Toilet Luas Lantai Cor = 1.8 x 2.8 x 3= 15.120 M2
Tebal Plat Lantai = 0.12 m'
Volume = 1.814 M3 1.814 m3
6 Pek. Pas. Lantai Lantai Toilet 20 x 20 cm Luas Lantai = 1.80 x 2.80 x 3= 15.120 M2 15.120 m2
7 Pek. Pas. Papan Penutup Balok 2 x 2,5/20 cm Panjang = 14 + 14 + 3 + 3 + 2 + 2 + 9 + 9+ 5 + 12 + 0.5 + 0.5 + 0.5 + 0.5 = 75.000 m'
Page 36 of 56
1 3 4 5
Page 37 of 56
1 3 4 5
IV PEKERJAAN RANGKA DINDING DAN PLASTERAN
Type P1 = 14.0 Unit Pj Kozen = 8.90 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 6.20 m' Lbr menie = ### m'
= 1.40 m' = ### m'L Lob = 2.12 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x P1 = ### m3- L menie = ( Pj menie x Lbr menie ) x P1 = ### m2- L Lob = ( L Lob x P1 ) = ### m2- Pintu panel 1 Daun = = ### Bh
Lbr Pj Dn Unit 0.8 2.1 1.0 14.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.5 0.37 2.0 14.0 = ### m2
Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Kunci Tanam = 14.00 Bh- Engse pintu = 42.00 Bh- Grendel pintu = 28.00 Bh
Type P2 = 2.0 Unit Pj Kozen = 8.70 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 6.10 m' Lbr menie = ### m'
= 1.40 m' = ### m'L Lob = 1.86 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x P2 = ### m3- L menie = ( Pj menie x Lbr menie ) x P2 = ### m2- L Lob = ( L Lob x P2) = ### m2- Pintu panel 1 Daun = = ### Bh
Lbr Pj Dn Unit 0.7 2.1 1.0 2.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.5 0.33 2.0 2.0 = ### m2
Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Kunci Tanam = 2.00 Bh- Engse pintu = 6.00 Bh- Grendel pintu = 4.00 Bh
2.10
0.50
0.80
Kaca5 mm
Kaca5 mm
DETAIL PI (14 Unit)SKALA 1 : 25
2.10
0.50
0.70
Kaca5 mm
Kaca5 mm
DETAIL P2 (2 Unit)
Page 38 of 56
1 3 4 5
Type P3 = 1.0 Unit Pj Kozen = 11.77 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 7.00 m' Lbr menie = ### m'
= 1.40 m' = ### m'L Lob = 4.24 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x P3 = ### m3- L menie = ( Pj menie x Lbr menie ) x P3 = ### m2- L Lob = ( L Lob x P3) = ### m2- Pintu panel 2 Daun = = ### Bh
Lbr Pj Dn Unit 0.8 2.1 2.0 1.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.36 0.5 2.0 1.0 = ### m2
0.225 0.77 2.0 1.0 = ### m2### m2
Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- ` = 1.00 Bh- Engse pintu = 6.00 Bh- Grendel pintu = 4.00 Bh
Type P4 = 1.0 Unit Pj Kozen = 11.77 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 7.00 m' Lbr menie = ### m'
= 1.40 m' = ### m'L Lob = 4.24 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x P4 = ### m3- L menie = ( Pj menie x Lbr menie ) x P4 = ### m2- L Lob = ( L Lob x P4) = ### m2- Pintu panel 2 Daun = = ### Bh
Lbr Pj Dn Unit 0.8 2.1 2.0 1.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.36 0.5 2.0 1.0 = ### m20.77 0.225 2.0 1.0 = ### m2
### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Kunci Tanam = 1.00 Bh- Engsel pintu = 6.00 Bh- Grendel pintu = 4.00 Bh
2.10
0.50
1.60
0.37 0.77 0.37
Kaca5 mm
Kaca5 mm
Kaca5 mm
Kaca5 mm
DETAIL P3 (1 Unit)SKALA 1 : 25
2.10
0.50
1.60
0.37 0.77 0.37
Kaca5 mm
Kaca5 mm
Kaca5 mm
Kaca5 mm
Kaca5 mm
Kaca5 mm
DETAIL P4 (1 Unit)SKALA 1 : 25
Page 39 of 56
1 3 4 5
Type P5 = 2.0 Unit Pj Kozen = 7.50 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 4.90 m' Lbr menie = ### m'
= 1.40 m' = ### m'L Lob = 1.40 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x P1 = ### m3- L menie = ( Pj menie x Lbr menie ) x P1 = ### m2- L Lob = ( L Lob x P1 ) = ### m2- Pintu Piber 1 Daun = = ### Bh
Lbr Pj Dn Unit 0.7 2.0 1.0 2.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit - - - - = - m2
Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = - m2
Pekerjaan Alat Penggantung
- Kunci Alfa = 2.00 Bh- Engsel pintu = 6.00 Bh- Grendel pintu = 2.00 Bh
Type AP = 1.0 Unit Pj Kozen = 25.20 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 9.70 m' Lbr menie = ### m'
= 4.60 m' = ### m'L Lob = 4.97 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x AP = ### m3- L menie = ( Pj menie x Lbr menie ) x AP = ### m2- L Lob = ( L Lob x AP) = ### m2- Pintu Panel 1 Daun = = ### Bh
Lbr Pj Dn Unit 0.8 2.1 1.0 1.0 = ### m2
- Jendela Bingkai = Lbr Pj Bh Unit0.82 0.62 2.0 1.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.38 0.5 6.0 1.0 = ### m20.2 0.8 2.0 1.0 = ### m2
### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- L cat jendela = Lbr Pj Bh Unit Sapu
0.08 2.56 2.0 1.0 2.0 = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Kunci Tanam = 1.00 Bh- Engsel pintu = 3.00 Bh- Grendel pintu = 2.00 Bh
2.00
0.70
DETAIL P5 (2 Unit)SKALA 1 : 25
Fiber
Kaca 5 mm 0.80
Kaca 5 mmKaca 5 mm
Kaca 5 mm
Kaca 5 mm
Kaca 5 mmKaca 5 mm
Kaca 5 mm
1.80
0.80
2.60
Kaca 5 mmKaca 5 mm
2.100.50
DETAIL
AP (1 U
nit)SKA
LA 1 : 2
5
LOKET
LOKET
Page 40 of 56
1 3 4 5
- Engsel jendela = 4.00 Bh- Grandel jendela = 4.00 Bh- Kait angin jendela = 4.00 Bh- Handle jendela = 2.00 Bh
Type PJ1 = 3.0 Unit Pj Kozen = 23.50 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 9.65 m' Lbr menie = ### m'
= 4.60 m' = ### m'L Lob Pintu = 4.97 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x PJ1 = ### m3- L menie = ( Pj menie x Lbr menie ) x PJ1 = ### m2- L Lob = ( L Lob x PJ1) = ### m2- Pintu Piber 1 Daun = = ### Bh
Lbr Pj Dn Unit 0.8 2.1 1.0 3.0 = ### m2
- Jendela Bingkai = Lbr Pj Bh Unit0.82 0.62 2.0 3.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.38 0.5 6.0 3.0 = ### m20.5 0.8 2.0 3.0 = ### m2
### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- L cat jendela = Lbr Pj Bh Unit Sapu
0.08 2.56 2.0 3.0 2.0 = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Kunci = 3.00 Bh- Engse pintu = 9.00 Bh- Grendel pintu = 6.00 Bh- Engsel jendela = 12.0 Bh- Grandel jendela = 12.0 Bh- Kait angin jendela = 12.0 Bh- Handle jendela = 6.0 Bh
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm 0.80
2.60
Kaca
5 mm
Kaca
5 mm
2.100.50
DETAIL
PJ1 (3
Unit)
SKALA
1 : 25
Kaca
5 mm
Kaca
5 mm 0.80
Kaca
5 mm
Kaca
5 mm
Page 41 of 56
1 3 4 5
Type PJ2 = 3.0 Unit Pj Kozen = 23.50 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 9.65 m' Lbr menie = ### m'
= 4.60 m' = ### m'L Lob = 4.97 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x PJ2 = ### m3- L menie = ( Pj menie x Lbr menie ) x PJ2 = ### m2- L Lob = ( L Lob x PJ2) = ### m2- Pintu Piber 1 Daun = = ### Bh
Lbr Pj Dn Unit 0.8 2.1 1.0 3.0 = ### m2
- Jendela Bingkai = Lbr Pj Bh Unit0.82 0.62 2.0 3.0 = ### m2
- Ventilasi Kaca Mati = Lbr Pj Bh Unit0.38 0.5 6.0 3.0 = ### m20.5 0.8 2.0 3.0 = ### m2
### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x P1 - ( L menie ) = ### m2- L cat pintu = L pintu x 2 bidang = ### m2- L cat jendela = Lbr Pj Bh Unit Sapu
0.08 2.56 2.0 3.0 2.0 = ### m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Kunci Tanam = 3.00 Bh- Engse pintu = 9.00 Bh- Grendel pintu = 6.00 Bh- Engsel jendela = 12.0 Bh- Grandel jendela = 12.0 Bh- Kait angin jendela = 12.0 Bh- Handle jendela = 6.0 Bh
Kaca
5 mm 0.80
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm
Kaca
5 mm
1.80
0.80
2.60
Kaca
5 mm
Kaca
5 mm
2.100.50
DETAIL
PJ2 (3
Unit)
SKALA
1 : 25
Page 42 of 56
1 3 4 5
Type J1 = 11.0 Unit Pj Kozen = 16.15 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 7.10 m' Lbr menie = ### m'
= 4.80 m' = ### m'L Lob = 2.80 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x J1 = ### m3- L menie = ( Pj menie x Lbr menie ) x J1 = ### m2- L Lob = ( L Lob x J1) = ### m2- Jendela Bingkai = Lbr Pj Bh Unit
0.62 0.82 2.0 11.0 = ### m2- Ventilasi Kaca Mati = Lbr Pj Bh Unit
0.37 0.5 4.0 11.0 = ### m20.5 0.8 2.0 11.0 = ### m2
### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x J1 - ( L menie ) = ### m2- L cat jendela = Lbr Pj Bh Unit Sapu
0.08 2.56 2.0 11.0 2.0 = ### m2- L cat ventilasi = Lbr Pj Bh Lbg Unit
- - - 4.00 ### = - m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Engsel jendela = = ### Bh- Grandel jendela = = ### Bh- Kait angin jendela = = ### Bh- Handle jendela = = ### Bh
Type L = 1.0 Unit Pj Kozen = 12.00 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 5.80 m' Lbr menie = ### m'
= 3.20 m' = ### m'L Lob = 1.98 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x L = ### m3- L menie = ( Pj menie x Lbr menie ) x L = ### m2- L Lob = ### m2- Jendela Bingkai = Lbr Pj Bh Unit
0.62 1.02 1.0 1.0 = ### m2- Ventilasi Kaca Mati = Lbr Pj Bh Unit
0.47 0.5 2.0 1.0 = ### m20.2 1.0 1.0 1.0 = ### m2
### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x J2 - ( L menie ) = ### m2- L cat jendela = Lbr Pj Bh Unit Sapu
0.08 2.96 1.0 1.0 2.0 = ### m2- L cat ventilasi = Lbr Pj Bh Lbg Unit
0 0 1.0 2.0 1.0 = - m2- Les Kaca = ((L Ventilasi x 2)+(P Ventilasi x2)) x 2 x Unit x bh = ### m'
Pekerjaan Alat Penggantung
- Engsel jendela = ### Bh
Kaca5 mm
0.50
0.80
0.60
Kaca5 mm
Kaca5 mm 0.50
Kaca5 mm
Kaca5 mm
Kaca5 mm
Kaca5 mm
Kaca5 mm1.80
0.80
1.75
DETAIL JI (8 Unit)SKALA 1 : 25
Kaca5 mm
0.25
0.60
0.50
Kaca5 mm
Kaca5 mm
Kaca5 mm1.80
1.00
1.10
loket
0.20
DETAIL L (1 Unit)SKALA 1 : 25
Page 43 of 56
1 3 4 5
- Grandel jendela = ### Bh- Kait angin jendela = ### Bh- Handle jendela = ### Bh
Type BV = 3.0 Unit Pj Kozen = 6.22 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 3.20 m' Lbr menie = ### m'
= 2.80 m' = ### m' 6.00L Lob = 0.43 m2 L Kozen = ### m2
- V Kozen = ( Pj kozen x L Kozen ) x BV = ### m3- L menie = ( Pj menie x Lbr menie ) x BV = ### m2- L Lob = ### m2- Ventilasi Kaca Mati = Lbr Pj Bh Unit
0.3 0.4 4.0 3.0 = ### m2Pekerjaan Cat
- L cat kozen = ( Pj kozenxLbr bidang ) x J2 - ( L menie ) = ### m2- L cat ventilasi = Lbr Pj Bh Lbg Unit
0 0 1.0 4.0 3.0 = - m2Pekerjaan Alat Penggantung
- Engsel jendela = = - Bh- Grandel jendela = = - Bh- Kait angin jendela = = - Bh- Handle jendela = = - Bh
Daftar Pekerjaan Kozen, Pintu, Jendela dan Rangka Dinding
P1 P2 P3 P4 P5 AP PJ1 PJ2 J1 L BV Jumlah
* V Kozen 0.7 0.1 0.1 0.1 0.1 0.1 0.4 0.4 1.0 0.1 0.1 2.997 m3* L menie 9.5 1.3 0.7 0.7 1.1 1.3 4.0 4.0 8.0 0.6 1.0 32.363 m2* Pintu Panel 2 Daun - - 1.0 1.0 - - - - - - - 2.000 Bh* Pintu Panel 1 Daun 14.0 2.0 - - - 1.0 3.0 3.0 - - - 23.000 Bh* Pintu Fiber - - - - 2.0 - - - - - - 2.000 Bh* Jendela kaca bingkai - - - - - 1.0 3.1 3.1 11.2 0.6 - 18.935 m2* Ventilasi Kaca Mati 5.2 0.7 0.7 0.7 - 1.5 5.8 5.8 16.9 0.7 1.4 39.403 M2* List Kaca 97.4 13.3 14.8 14.8 - 18.6 41.8 41.8 121.36 8.7 - 372.520 m'
Pekerjaan Pasangan
- L Lobang kozen 29.7 3.7 4.2 4.2 2.8 5.0 14.9 14.9 30.9 - - 110.308 m2
Pekerjaan Cat
* L cat kozen 27.8 3.9 2.8 2.8 3.4 6.2 17.2 17.2 45.3 3.0 4.6 134.152 m2* L cat pintu 47.0 5.9 6.7 6.7 - - 10.1 10.1 - - - 86.520 m2* L cat jendela - - - - - 0.8 2.5 2.5 9.0 0.5 - 15.219 m2* L cat ventilasi - - - - - - - - - - - - m2- L cat dinding partisi - - - - - - - - - - - - m2- L cat list dinding partisi - - - - - - - - - - - - m2
Kaca5 mm
0.25
0.60
0.50
Kaca5 mm
Kaca5 mm
Kaca5 mm1.80
1.00
1.10
loket
0.20
DETAIL L (1 Unit)SKALA 1 : 25
Kaca5 mm
Kaca5 mm
0.50
0.40 0.40
DETAIL BV (3 Unit)SKALA 1 : 25
Page 44 of 56
1 3 4 5
Pekerjaan Alat Penggantung
- Kunci Tanam 2 Slaag 14.0 2.0 1.0 1.0 - 1.0 3.0 3.0 - - - 25.000 Bh- Kunci Alfa - - - - 2.0 - - - - - - 2.000 Bh- Engse pintu 42.0 6.0 6.0 6.0 6.0 3.0 9.0 9.0 - - - 87.000 Bh- Grendel pintu 28.0 4.0 4.0 4.0 2.0 2.0 6.0 6.0 - - - 56.000 Bh- Engse jendela - - - - - 4.0 12.0 12.0 44.0 2.0 - 74.000 Bh- Grendel jendela - - - - - 4.0 12.0 12.0 44.0 2.0 - 74.000 Bh- Kait angin jendela - - - - - 4.0 12.0 12.0 44.0 2.0 - 74.000 Bh- Handle jendela - - - - - 2.0 6.0 6.0 22.0 1.0 - 37.000 Bh
Rangka Induk = 39.0 Tiang Pj Rangka = 3.4 m' Kll Bidang = ### m'Kayu 9/9 Pj menie = 3.4 m' Lbr menie = ### m'
L Lob = - m2 L Bidang = ### m2
- V Kayu = ( Pj Rgk x L Bidang ) x Jml Tiang = ### m3- L menie = ( Pj menie x Lbr menie ) x Jml Tiang = ### m2- L Lob = = - m2
Pekerjaan Cat
- L cat Kayu = (( Pj Rgk x Kll bidang ) x Jml Tiang) - ( L menie ) = ### m2
Tiang Teras = 22.0 Tiang Pj Rangka = 3.4 m' Lbr Bidang = ### m'Kayu 9/9 Pj menie = - m' Lbr menie = - m'
L Lob = - m2 L Rangka = ### m2
- V Kayu = ( Pj Rgk x L Bidang ) x Jml Tiang = ### m3- L menie = ( Pj menie x Lbr menie ) x Jml Tiang = - m2- L Lob = = - m2
Pekerjaan Cat
- L cat Kayu = (( Pj Rgk x Kll bidang ) x Jml Tiang) - ( L menie ) = ### m2
Rangka Dinding = 50.0 Tiang Tg Rangka = 3.4 m' Lbr Bidang = ### m'Kayu 6/9 = 6.0 Tiang Tg Rangka WC = 2.0 m'Vertikal Tg menie = 3.4 m' Lbr menie = ### m'
= 2.0 m'L Lob = 0.0 m2 L Rangka = ### m2
- V Kayu = ( Pj Rgk x L Bidang ) x Jml Tiang = ### m3- L menie = ( Pj menie x Lbr menie ) x Jml Tiang = ### m2- L Lob = = - m2
Pekerjaan Cat
- L cat Kayu = (( Pj Rgk x Kll bidang ) x Jml Tiang) - ( L menie ) = ### m2
R. APOTIK ± 0.0
0R. KE
SLING / P
2M ± 0.00
KIA / KB ± 0.0
0R. PO
LI GIGI ± 0.0
0R. PO
LI UMUM ± 0.0
0R. TA
TA USAH
A ± 0.00
TOILET S
TAFF - 0.10R. PANTR
Y ± 0.00
GUDANG
OBAT ± 0.0
0
LOKET ± 0.00
R. LAB
± 0.00
R. GIZI ± 0.0
0R. KE
PALA ± 0.00
R. RAPAT
/ PENYULU
HAN± 0.0
0
K O R I D O
R ± 0.00
T. DUDUK
T. DUDUK
T. DUDUK
T. DUDUK
3.00
3.00
3.00
2.00
3.00
4.00
1.00
2.00
3.00
26.00
2.00
24
35
610
1213
158
3.00
3.00
3.00
3.00
3.00
3.00
1.75
1.25
14
2.002.00
4.002.002.002.002.002.00
14.00
ABCDEFGH
DENAH R
ENCANA
SKALA 1
: 100P u s
k e s m a
s
TOILET - 0.10 TOILET - 0.10
3.00
9.00
3.00
3.00
A A
BB
- 0.05
DINDING B
ATA Tingg
i 150 CM
911
71
SELASAR ± 0.0
0
SELASAR ± 0.0
0
SELASAR ± 0.0
09.00
Page 45 of 56
1 3 4 5
Rangka Dinding = 2.0 Palang Pj Rangka = 103.8 m' Lbr Bidang = ### m'Kayu 6/9 Pj menie = 50.8 m' Lbr menie = ### m'Horizontal / Palang L Lob = 0.0 m2 L Rangka = ### m2
- V Kayu = ( Pj Rgk x L Bidang ) x Jml Tiang = ### m3- L menie = ( Pj menie x Lbr menie ) x Jml Tiang = ### m2- L Lob = = - m2
Pekerjaan Cat
- L cat Kayu = (( Pj Rgk x Kll bidang ) x Jml Tiang) - ( L menie ) = ### m2
Reng Balok = 1.0 Pj Reng Kayu = 314.6 m' Lbr Bidang = ### m'Kayu 6/9 dan Sepatu Bawah Pj menie = 314.6 m' Lbr menie = ### m'
L Lob = - m2 L Kayu = ### m2
- V Kayu = ( Pj Rgk x L Bidang ) x Jml Tiang = ### m3- L menie = ( Pj menie x Lbr menie ) x Jml Tiang = 34.61 m2- L Lob = = - m2
Pekerjaan Residu
- L cat Kayu = (( Pj Rgk x Kll bidang ) x Unit) - ( L menie ) = 59.77 m2
Daftar Pekerjaan Struktur Dinding / Plesteran
Rangka Induk Tiang Teras Rangka Dinding Rangka Dinding Reng Balok Plat Jumlah
* V Kayu = 1.1 0.6 1.1 1.0 2.55 - 6.33 m3* L menie = 18.6 - 11.2 20.0 34.6 - 84.37 m2- L Lobang Kayu = - - - - - - - m2
Pekerjaan Cat
- L cat Kayu = 29.2 26.9 51.1 34.6 - 141.78 m2- L Residu = - - - - 59.8 59.77 m2
1 Pek. Kozen/Rangka Dinding Kayu 6/9 cm = 2.997 m3 2.997 m3
2 Pek. Rangka Dinding / Tiang Induk Kayu 9/9 cm 1.074 m3
3 Pek. Tiang Teras 9/9 cm 0.606 m3
4 Pek. Rangka Dinding / Tiang Kayu 6/9 CM 2.104 m3
5 Pek. Reng Balok Kayu /Reng Balok 6/9 2.548 m3
6 Pek. Kolom Praktis KM/WC T. 1.5 m T = 1.63 m x 10 batang 16.300 m'
7 Pek. Pas. Kawat Harmonika gass Panjang Dinding = 189.75 m'Tinggi Dinding = 3.50 m'
L dinding = (Pj Dinding x Tinggi) = 664.125 m2Dikurangi :
L Lobang kozen = = 110.308 m2L Dinding plester = 553.817 m2 553.817 m2
Page 46 of 56
1 3 4 5
8 Pek. Pas. Dinding Bata Ik. 1/2 Batu Camp 1 : 4 P = 21.15 m' T = 1.63 m' 34.474 m2
9 Pek. Pas.Dinding Plaster kawat Hasgas Camp 1 : 4 Luas yang dipelaster = 553.817 x 2 1,107.634 m2
10 Pek. Pas. Dinding Keramik Toilet 20 x 25 cm T. 1.5 m Luas Lantai KM/WC = 1.5 x 10 - 0.8 x 3= 41.400 M2 41.400 m2
11 Pek. Menie kozen dan Rangka Dinding = 116.730 m2 + 84.37 m2 201.096 m2
V PEK. KUDA - KUDA/RANGKA ATAP DAN PENUTUP ATAP
1 Pek. Kuda - Kuda Kayu Kelas III K1 = 7.0 Bh Kayu a b KK = 17.28 m0.07 0.1 B Tarik = 29.46 m
Skor = 9.80 mT Makelar = 3.12 mJumlah 59.66 = 417.62 m'
Kayu a b Blk Gapit = 14.78 = 103.46 m'0.05 0.1
1/2 K1 = 2.0 Bh Kayu a b KK = 6.32 0.07 0.1 B Tarik = 10.88
Skor = 3.28 T Makelar = 2.24 Jumlah 22.72 = 45.44 m'
Kayu a b Blk Gapit = 4.80 = 9.60 m'0.05 0.1
Jr K1 = 4.0 Bh Kayu a b KK = 7.89 0.07 0.1 B Tarik = 12.08
Skor = 1.85 T Makelar = - Jumlah 21.82 = 87.28 m'
Total Panjang a b0.07 0.1 = 550.34 m'0.05 0.1 = 113.06 m'
Volume Kuda-Kuda = ( a x b x Pj ) = 4.418 m3 4.418 m3
- Residu L1 L2 Luas residu = 221.034 m2 0.34 0.30
2 Pek. Rangka Atap (Gording, Nok & Ikatan Angin) Gording Kayu a b Pj 1 = 535 m'0.05 0.07 Pj 2 = 166 m'
Pj 3 = - m'Pj 4 = - m'
700.6 m'
14.00
Kayu 5/7
Listplank 2
/10 + 2/20
Piri - piri 2/
10 Kayu 5/7
Kayu 5/10
Kayu 5/7
Listplank 2
/10 + 2/20
Piri - piri 2/
10Kayu
5/7
TIANG MAK
ELAR 7/10
BALOK TAR
IK 7/10
SENG BJLS
20k
GORDING 5
/7BALO
K GAPIT 2
x 5/10
BALOK SKO
OR 7/10
KAKI KUDA
- KUDA 7/10
PERABUNG
SENG
BALOK NO
K 5/10
Mur Baut Ø
12Mur B
aut Ø 12
PLAT BESI
40.4BALO
K 7/10
Mur Baut Ø
121.00
1.00
5.054.00
5.052.00
4.002.00
2.004.00
1.001.00
KAKI KUDA
- KUDA 7/10
BALOK TAR
IK 7/10
TIANG MAK
ELAR 7/10
BALOK SKO
OR 7/10
BALOK TAR
IK 7/10
KAKI KUDA
- KUDA 7/
10BALO
K SKOOR 7/
10BALO
K APIT 7/10
Mur Baut Ø
12
PLAT BESI
40.4BALO
K 7/10
Mur Baut Ø
12BALO
K 7/10
1.001.00
BALOK API
T 7/10
HG
ED
BA
+3.5
0
+5.1
2
+6.5
1
3.01
DETAIL KU
DA-KUDA
K1SKAL
A 1 : 50
P u s k e s
m a s
Kayu 5/10
Kayu 5/10
Kayu 5/10
Kayu 5/10
Kayu 5/10
Kayu 5/10
Kayu 5/10
1.27
26.00
24
35
610
1213
158
911
71
1.00
1.00
3.00
3.00
3.00
3.00
1.00
2.00
2.00
3.00
3.00
3.00
4.002.002.002.002.002.00
14.00
ABCDEFGH
1.00 1.00
LISTPLAN
K 2/10 + 2
/20LIST
PLANK 2/1
0 + 2/20
GORDING
5/7KUD
A-KUDA K
2
7/10 7/10 7/107/10JURAI 7/10
JURAI 7/10
3.00
1.00
3.00
3.00
3.00
3.00
KUDA - K
UDA K1
3.00
3.00
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
7/107/10
JURAI 7/10
JURAI 7/10
KUDA-KU
DA K2
LISTPLAN
K 2/10 + 2
/20GOR
DING 5/7
BALOK NO
K 5/10
RENCAN
A KAP AT
APP u s
k e s m a
s
Page 47 of 56
1 3 4 5
Nok Gording Kayu a b = 18.0 m'Ikatan Angin 0.05 0.1 = 43.4 m'
61.4 m'Total Panjang a b
0.05 0.07 = 700.62 m'0.05 0.1 = 61.40 m'
Volume Gording = = 2.76 m3 2.759 m3
Luas residu L1 L2 = 187 m2 0.24 0.30
3 Pek. Pas. Papan rabung 2 x 2/15 Pjg. papan rabung = = 18.00 m' 18.000 m'
4 Pek. Pas. Baut diameter 12 mm Baut Kuda - Kuda K1 = 30 x 7 = 210 BhBaut Kuda - Kuda K2 = 8 x 2 = 16 Bh
226 Buah 226.000 Bh
5 Pek. Listplank Papan Pj Listplank = List Plank Memanjang = 28.08 x 2 = 56.16 m'List Palnk Melintang = 16.04 x 2 = 32.08 m'List Palnk Singap = 3.28 x 4 = 13.12 m'
JUMLAH PANJANG LIST PLANK 101.360 M' 101.360 m'
Luas List Plank = 0.3 x 101.360 = 30.41 m2
26.00
24
35
610
1213
158
911
71
1.00
1.00
3.00
3.00
3.00
3.00
1.00
2.00
2.00
3.00
3.00
3.00
4.002.002.002.002.002.00
14.00
ABCDEFGH
1.00 1.00
LISTPLAN
K 2/10 + 2
/20LIST
PLANK 2/1
0 + 2/20
GORDING
5/7KUD
A-KUDA K
2
7/10 7/10 7/107/10JURAI 7/10
JURAI 7/10
3.00
1.00
3.00
3.00
3.00
3.00
KUDA - K
UDA K1
3.00
3.00
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
KUDA - K
UDA K1
7/107/10
JURAI 7/10
JURAI 7/10
KUDA-KU
DA K2
LISTPLAN
K 2/10 + 2
/20GOR
DING 5/7
BALOK NO
K 5/10
RENCAN
A KAP AT
APP u s
k e s m a
s
Page 48 of 56
1 3 4 5
6 Pek. Atap Seng Gelombang Aluminium Kulit Jeruk LUAS ATAP = L1 = 28.24 + 20.11 x 5.47 = 132.237 m22
L2 = 20.11 x 3.30 = 66.363 m2L3 = 20.11 x 3.30 = 66.363 m2L4 = 28.24 + 20.11 x 5.47 = 132.237 m2
2L5 = 16.23 + 5.72 x 6.39 = 70.130 m2
2L6 = 16.23 + 5.72 x 6.39 = 70.130 m2
2 537.461 m2 537.461 m2
2.9
LUAS TOTAL ATAP = 537.461 m2 537.461 m2
7 Pek. Perabung Atap Seng Aluminium Pj Rabung = Pj1 Pj2 18.0 24.4 = ### m' 42.400 m'
8 Pek. Singap Papan Motif Jalusi L singap = 4.81 x 0.74 x 0.5 x 2 = ### m2 3.559 m2
9 Pek. Residu Rangka Atap L residu = L Kuda2 L Gording L Rgk Paran 221.034 186.569 59.774 = ### m2 467.376 m2
VI PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond Kayu Klas III Luas Rangka Plafond = P x L26.00 x 14.00 = ### m2 364.000 m2
2 Pek. Pas. Plafond Plywood 4 mm Luas Plafond Triplek 4 mm = P x L 26.00 x 14.00 = ### m2 364.000 m2
3 Pek. Rangka Piri - Piri Kayu Kals III Luas Rangka Piri - Piri = Pj x Lbr84.00 x 1.00 = ### m2 84.000 m2
4 Pek. Pas. Piri - Piri Kayu Klas III Luas Piri-Piri Tras Keliling = Pj x Lbr84.00 x 1.00 = ### m2
Luas Piri-Piri Singap = 0.80 x 3.35 x 4.00 = ###
### 94.720 m2
5 Pek. List Profil Plafond Pj list profil = = ### m' 160.000 m'
26.00
1.00
1.00
4.00 2.00 2.00 2.00 2.00 2.00
14.00
A B C D E F G H
3.00
3.00
3.00
3.00
4.00
3.00
2.00
2.00
3.00
613
169
117
1
I II III IV
V
VI
5/75/7
5/75/75/7
5/7
5/75/7
5/75/7
5/75/7
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
ABCDEFGH
24
35
610
1213
158
911
71
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
0.60
0.60
0.60
0.60
0.60
0.60
PIRI - PIR
I 2/10
3.00
3.00
3.00
3.00
4.00
1.00
2.00
3.00
26.00
2.00
1.00
2.00
4.002.002.002.002.002.00
14.00
2.00
3.00
1.00
1.00
1.00 1.00
PIRI - PIR
I 2/10
PIRI - PIR
I 2/10
RENCAN
A PLAFO
NDSKA
LA 1 : 10
0P u s
k e s m a
s
Page 49 of 56
1 3 4 5
5/75/7
5/75/75/7
5/7
5/75/7
5/75/7
5/75/7
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
ABCDEFGH
24
35
610
1213
158
911
71
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
0.60
0.60
0.60
0.60
0.60
0.60
PIRI - PIR
I 2/10
3.00
3.00
3.00
3.00
4.00
1.00
2.00
3.00
26.00
2.00
1.00
2.00
4.002.002.002.002.002.00
14.00
2.00
3.00
1.00
1.00
1.00 1.00
PIRI - PIR
I 2/10
PIRI - PIR
I 2/10
RENCAN
A PLAFO
NDSKA
LA 1 : 10
0P u s
k e s m a
s
Page 50 of 56
1 3 4 5
VII PEKERJAAN PINTU DAN JENDELA
1 Pek. Daun Pintu Panel 2 Daun Pek. Daun Pintu Panel 2 Daun = 1.000 Bh 1.000 Bh
2 Pek. Daun Pintu Panel 2 Daun + Kaca Pek. Daun Pintu Panel 2 Daun + Kaca = 1.000 Bh
3 Pek. Daun Pintu Panel 1 Daun Pek. Daun Pintu Panel 1 Daun = 23.000 Bh 23.000 Bh
4 Pek. Daun Pintu Fiber Pek. Daun Pintu Fiber = 2.000 Bh 2.000 Bh
5 Pek. pas. jendela bingkai + kaca 5 mm Pek. pas. jendela bingkai + kaca 5 mm = 18.935 m2 18.935 m2
6 Pek. Ventilasi Kaca Mati 5 mm Pek. Ventilasi Kaca Mati 5 mm = 39.403 m2 39.403 m2
7 Pek. List Kaca Pek. List Kaca = 372.520 m' 372.520 m'
VIII PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Titik Lampu + Instalasi Pek. Pas. Titik Lampu + Instalasi = 30.000 Ttk 30.000 Ttk
2 Pek. Pas. Stop Kontrak + Instalasai Pek. Pas. Stop Kontrak + Instalasai = 14.000 Ttk 14.000 Ttk
3 Pek. Pas. Lampu SL 20 watt Pek. Pas. Lampu SL 20 watt = 30.000 Bh 30.000 bh
5 Pek. Pas. Saklar Ganda Pek. Pas. Saklar Ganda = 5.000 Bh 5.000 bh
6 Pek. Pas. Saklar Tunggal Pek. Pas. Saklar Tunggal = 13.000 Bh 13.000 bh
7 Pek. Pas. Zakering Khas / MCB Pek. Pas. Zakering Khas / MCB = 1.000 Bh 1.000 bh
IX PEKERJAAN ALAT PENGANTUNG
1 Pek. Pas. Kunci Tanam 2 Slaag Pek. Pas. Kunci Tanam 2 Slaag = 25.000 Bh 25.000 bh
2 Pek. Pas. Kunci Alfa Pek. Pas. Kunci Alfa = 2.000 Bh 2.000 bh
3 Pek. Pas. Engsel Kuningan Pintu 4" Pek. Pas. Engsel Kuningan Pintu 4" = 87.000 Bh 87.000 bh
4 Pek. Pas. Engsel Kuningan Jendela 3" Pek. Pas. Engsel Kuningan Jendela 3" = 74.000 Bh 74.000 bh
5 Pek. Pas. Grandel Pintu Pek. Pas. Grandel Pintu = 56.000 Bh 56.000 bh
6 Pek. Pas. Grandel Jendela Pek. Pas. Grandel Jendela = 74.000 Bh 74.000 bh
7 Pek. Pas. Kait Angin Jendela Pek. Pas. Kait Angin Jendela = 74.000 Bh 74.000 bh
8 Pek. Pas. Handle Jendela Pek. Pas. Handle Jendela = 37.000 Bh 37.000 bh
5/75/7
5/75/75/7
5/7
5/75/7
5/75/7
5/75/7
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
Plafond P
lywood 3.6 M
m + 3.43
ABCDEFGH
24
35
610
1213
158
911
71
1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
0.60
0.60
0.60
0.60
0.60
0.60
PIRI - PIR
I 2/10
3.00
3.00
3.00
3.00
4.00
1.00
2.00
3.00
26.00
2.00
1.00
2.00
4.002.002.002.002.002.00
14.00
2.00
3.00
1.00
1.00
1.00 1.00
PIRI - PIR
I 2/10
PIRI - PIR
I 2/10
RENCAN
A PLAFO
NDSKA
LA 1 : 10
0P u s
k e s m a
s
5
13
30
14
LAMPU SL
SAKLAR TUNGGAL
1
KWH METER
MCB
STOPKONTAK
SAKLAR GANDA
1
SIMBOL KETERANGAN UNIT
P4
PJ1
GUDANG OBAT± 0.00
J1
P1
LOKET± 0.00
P2
P1
AP PJ1 PJ2
J1
J1
J1
P2P1 P1 P1 P1
P3 PJ2 PJ2 J1
J1
J1
PJ1J1J1J1J1 P1
P1
P1 P1 P1
P5
P5
L
P1
P4
PJ1
GUDANG OBAT± 0.00
J1
P1
LOKET± 0.00
P2
P1
AP PJ1 PJ2
J1
J1
J1
P2P1 P1 P1 P1
P3 PJ2 PJ2 J1
J1
J1
PJ1J1J1J1J1 P1
P1
P1 P1 P1
P5
P5
L
P1
Page 51 of 56
1 3 4 5
X PEKERJAAN SANITASI
1 Pek. Pas. Kloset Jongkok Pek. Pas. Kloset Jongkok = 3.000 Bh 3.000 Bh
2 Pek. Pas. Flour Drain Pek. Pas. Flour Drain = 3.000 Bh 3.000 Bh
3 Pek. Pas. Kran Air Pek. Pas. Kran Air = 3.000 m2 3.000 m2
4 Pek. Pas. Bak Air Fiber Pek. Pas. Bak Air Fiber = 3.000 m2 3.000 m2
5 Pek. Pas. Instalasi Pipa PVC 3/4" Pek. Pas. Instalasi Pipa PVC 1/2" = 20.000 m2 20.000 m2
6 Pek. Pas. Instalasi Pipa PVC 2" Pek. Pas. Instalasi Pipa PVC 2" = 9.000 m2 9.000 m2
7 Pek. Pas. Instalasi Pipa PVC 4" Pek. Pas. Instalasi Pipa PVC 4" = 11.000 m2 11.000 m2
8 Pek. Pas. Sptictank Pek. Pas. Sptictank = 2.000 Unit 2.000 Unit
XI PEKERJAAN PENGECATAN
L cat = = 1,107.634 m2
Dikurangi :
L Cat Rangka = = 134.152 m3
L Cat Dinding = = 973.483 m2
1 Pek. Cat Dinding Luas. Pek. Cat Dinding = 973.483 m2 973.483 m2
2 Pek. Cat Plafond Luas. Pek. Cat Plafond = 364.000 m2 364.000 m2
3 Pek. Cat Minyak ; Kosen Luas. Pek. Cat Minyak ; Kosen = 134.152 m2 134.152 m2
4 Pek. Cat Minyak ; Pintu Luas. Pek. Cat Minyak ; Pintu = 86.520 m2 86.520 m2
5 Pek. Cat Minyak ; Jendela Luas. Pek. Cat Minyak ; Jendela = 15.219 m2 15.219 m2
6 Pek. Cat Minyak ; Listplank Luas. Pek. Cat Minyak ; Listplank = 101.360 m2 101.360 m2
7 Pek. Cat Minyak ; Piri - Piri Luas. Pek. Cat Minyak ; Piri - Piri = 84.000 m2 84.000 m2
8 Pek. Cat Minyak ; List Plafond Luas. Pek. Cat Minyak ; List Plafond = 16.000 m2 16.000 m2
9 Pek. Cat Minyak ; Tiang Teras + Rangka Dinding Luas. Pek. Cat Minyak ; Tiang Teras + R. Dinding = 141.778 m2 141.778 m2
XII PEKERJAAN LAIN - LAIN
1 Pek. Pas. Pagar pengaman Teras Pj pagar = 18 m' 18.000 m'
2 Jalusi Diatas Teras Panjang Jalusi = 23.0 + 23.0 + 14.0 = 60.0 60.000 m'
3 Pek. Tempat Duduk Teras Lebar 50 cm Panjang = 9 m' x 4 = 36.000 m'
4 Pek. Jalan Penghubung Lebar 3 m Pj Jalan = 10 m' 10.000 m'
5 Pek.Pembersihan Akir Proyek 1.000 Ls
Page 52 of 56
1 3 4 5
PERHITUNGAN BETON BERTULANG
1 Plat Setempat 0.70/0.70/0.2 Volume 0.098 M³ (1 buah)a Besi yang digunakan
Berat Baja tulangan 0.887 Kg/M'dalam 1 buah diperlukan 7.500 M'
(7.500*0.887)/ 0.098 = 67.883 Kg/m3 >>>>>> 67.883 Kg
b Cetakan Beton
= (0,15 x 0,8) x 4 Jumlah sisi cetakan 0.560 m / 0.098 = 5.714
Jadi Analisa Plat Setempat 70/70 67.883 Kg Besi
5.714 Cetakan Beton 0.020
0.114 Cetakan Beton
2 Kolom Bawah 0.2/0/2/1 m (Pot-3) Volume 0.04 M³ (1 buah kolom)a Besi yang digunakan
Berat Baja tulangan 0.887 Kg/M³ dalam 1 buah Kolom diperlukan 6.600 M'/Batang Kolom
= (6.6*0.887) Tulangan Pokok >>>>>> 5.854 Kg
Sengkang 10.000 0.600 ditambang bengkoknya 0.1 m 0.700
0.700 x 0.222 x 10.000 = 1.554 Kg 7.408 Kg
Total Julah Tulangan 7.408 / 0.040 = 185.205 Kg
b Cetakan Beton
= (0,15 x 0,8) x 4 Jumlah sisi cetakan 0.800 m / 0.040 = 20.000
Jadi Analisa Kolom 20/20 185.205 Kg Besi
20.000 Cetakan Beton 0.020
0.400 Cetakan Beton
3 25.00a Besi yang digunakan
10.550 batang
Sengkang 187.500 0.800 ditambang bengkoknya 0.1 m 0.900 14.062 batang 10.550 x 10.653 = 112.390
Jadi Penggunaan Ø 6 = 14.062 x 2.663 = 37.452 >>>>>> 149.843 Kg
b Cetakan Beton
Jumlah sisi cetakan 0.600 m x 25.000 = 15.000
Jadi Analisa Balok 20/20 149.843 Kg Besi
15.000 Cetakan Beton
10 f 12 mm
Jadi Penggunaan f 12 =
m2
m2 m3/m2 Cetakan
m3
tulangan pokok = 4 f 12 mmSengkang = f 6 -100 mm
Jadi Penggunaan f 12 =
Jumlah Sengkang dalam 1 m3
Jadi Penggunaan f 6 =
m2
m2 m3/m2 Cetakan
m3
Balok 20X20 /m3 dalam (1m3)tulangan pokok = 5 f 10 mmSengkang = f 6 -150 mm
Tulangan pokok = 5 f 10 mm
dalam 1 m3 20/20 = f 10 mm
Jumlah Sengkang dalam 1 m3
Jadi Penggunaan Ø 12 =
1 m3 = m2
m2
2 25.00 / 1.000 25 Btga Besi yang digunakan
8.333 batang
Sengkang 250.000 0.600 ditambang bengkoknya 0.1 m 0.700 14.583 batang 8.333 x 10.653 = 88.776 14.583 x 2.663 = 38.839
>>>>>> 127.616 Kgb Cetakan Beton
Jumlah sisi cetakan 1.300 m x 25.000 = 32.500
Jadi Analisa Kolom 20/20 127.616 Kg Besi
32.500 Cetakan Beton
3 8.33a Besi yang digunakan
4.630 batang = Memanjang 4.630 batang
4.630 x 7.398 = 34.250 0.617 4.630 x 7.398 = 34.250
>>>>>> 68.5 KgJadi Analisa Plat tebal 10 Cm 68.500 Kg Besi
Kolom Dibawah 20X20 /m3 dalam (1m3)tulangan pokok = 4 f 12 mmSengkang = f 6 -100 mm
Tulangan pokok = 4 f 12 mm
dalam 1 m3 20/20 =
Jumlah Sengkang dalam 1 m3
Jadi Penggunaan f 16 =Jadi Penggunaan f 6 =
1 m3 = m2
m2
Plat Lantai Dasar tebal 12 Cm /m 3 dalam (1m3)Tulangan Plat = f 10 -150 mm
Tulangan Plat = f 10-150 mm
dalam 1 m3 10/100 = Melintang
Jadi Penggunaan f 10 =
PEMERINTAH KABUPATEN INDRAGIRI HILIR
DINAS KESEHATAN JL M. BOYA NO. 67 TELP. (0768) – 21255 FAX. (0768) 22015 TEMBILAHAN
ENGINEERING ESTIMATE( E E )
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA
: PUSKESMAS/PUSKESMAS PEMBANTU DAN JARINGANNYA
KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS
PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS DAN
LOKASI : KEC. CONCONG
KONSULTANT PERENCANA :
CV. SARANA MULTI JAYA KONSULTANTJL. KEMBANG No. 85 TEMBILAHAN
PEMERINTAH KABUPATEN INDRAGIRI HILIR
DINAS KESEHATAN JL M. BOYA NO. 67 TELP. (0768) – 21255 FAX. (0768) 22015 TEMBILAHAN
DOKUMEN PERENCANAAN
PROGRAM : PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA
: PUSKESMAS/PUSKESMAS PEMBANTU DAN JARINGANNYA
KEGIATAN : PERENCANAAN PEMBANGUNAN PUSKESMAS
PEKERJAAN : PERENCANAAN REHABILITASI DAN PEMBANGUNAN GEDUNG PUSKESMAS DAN
PERENCANAAN PEMBANGUNAN GEDUNG PUSKESMAS PERAWATAN
LOKASI : KEC. CONCONG
KONSULTANT PERENCANA :
CV. SARANA MULTI JAYA KONSULTANTJL. KEMBANG No. 85 TEMBILAHAN