Raceways Junction Boxes for Underfloor installation

Embed Size (px)

Citation preview

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    1/32

    Raceways

    CABLE MANAGEMENT SYSTEMS

    Metal Raceways

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    2/32

    Metal Raceways (GI)- Range 38 mm

    GI Raceways 38 mm

    - One Compartment

    50 mm width

    5 mm width

    !00 mm width

    !50 mm width

    GI Raceways 38 mm

    - "hree Compartment

    ##5 mm width

    300 mm width

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    3/32

    Metal Raceways (GI)- Range #5 mm

    GI Raceways #5 mm

    - One Compartment

    50 mm width

    5 mm width

    !00 mm width

    !50 mm width

    GI Raceways #5 mm

    - "hree Compartment

    ##5 mm width

    300 mm width

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    4/32

    Metal Raceways (GI)- $eat%res

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

    Raceways with &ody and Co'er 

    ro'ides MC *creening

    Man%+act%red +rom re Gal'anised*teel *heet

    ,eli'ered in *td length o+ #..m with

    sheet thic/ness o+ !mm

    Metal Raceways allows distri1%tion

    o+ ower and ,ata to the *creed

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    5/32

    Raceways

    CABLE MANAGEMENT SYSTEMS

    PVC Raceways

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    6/32

    2C Raceways

    Range with height 38 mm

    50 mm width with one Compartment

    2C Raceways 38 mm

    !00 mm width with # Compartment

    !50 mm width with 3 Compartment

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    7/32

    2C Raceways

    Range with 4eight #5 mm

    5 mm width with one compartment

    2C Raceways #5 mm

    ##5 mm width with 3 compartment

    Option to attach compartment o+

    5mm on 1oth the a1o'e raceways

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    8/32

    2C Raceways $eat%res

    on $lame ropagating   Its light and can 1e easily c%t with

    hand

    tools

    6cellent resistance to mineral acids7

    al/alis and detergents 1%t lia1le to attac/

    +rom sol'ents

    2C ,%ct is non Cond%cti'e

    ,egree o+ rotection I#0

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    9/32

    2C Raceways $eat%res

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

    rotection against Mechanical Impact - I

    08

    Resistance to 'ertical 9oad :pplied

    thro%gh small *%r+ace :rea - !500

    Resistance to 'ertical 9oad :pplied

    thro%gh large *%r+ace :rea - 3000

    Chemical Resistance; non-corrosi'e

    and not a++ected 1y sea water 

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    10/32

    2C #5mm Raceways $eat%res

     Adjustale! "# you re$uire % co&'art&ents( you

    only need to cli' to)et*er a + co&'art&ent

    raceways wit* a , co&'art&ent raceways

    - .

    $or eg"o ha'e !50mm raceways7 clip # nos o+

    5 mm raceways

      "o ha'e 300 mm Raceways< clip one

    5 mm raceways with ##5 mm raceway

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    11/32

    Raceways :ccessories

    &rac/ets

    Co%plers

    CABLE MANAGMENT SYSTEMS

    Screed Floor Solution

    2ertical Riser 

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    12/32

    /unction Bo0CABLE MANAGEMENT SYSTEMS

    1ei)*t Adjustale wit* Flyo2er

    and wit*out Flyo2er 

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    13/32

    4eight :d=%sta1le >%nction

    CABLE MANAGMENT SYSTEMS

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    14/32

    4eight :d=%sta1le >%nction &o6 - Range

    >%nction &o6 witho%t $lyo'er 

    >& !506!50

    >& ##56##5

    >& 3006300

    >& .006.00

    CABLE MANAGMENT SYSTEMS

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    >%nction &o6 with $lyo'er 

    >& ##56##5 >& 3006300

    >& .006.00

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    15/32

    4t :d=%sta1le >%nction &o6 ?ith @

    ?itho%t $lyo'er 

    Can accept either 

    Metal Raceways

    2C Raceways

    CABLE MANAGMENT SYSTEMS

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    16/32

    *el+ :d=%sta1leA o more

    le'eling mista/es

    4eight can 1e ad=%sted +rom 5

    mm to B0 mm

    :d=%stment can 1e done a+ter

    po%ring the cement

    4t :d=%sta1le >%nction &o6 ?ith @

    ?itho%t $lyo'er 

    CABLE MANAGMENT SYSTEMS

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    17/32

    Option o+ selecting >& with Cross

    o'er to ha'e B0 ,eg crosso'ers

    1etween ,ata and ower 

    4eight :d=%sta1le >%nction &o6- $eat%res

    Optional *ite Co'er to protect screed

    entering into >%nction &o6 d%ring

    Constr%ction

    *ide lates ro'ided with noc/o%ts

    as per Raceway dimensions

    CABLE MANAGMENT SYSTEMS

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    18/32

    3'tional Co2er Protects a)ainst

    Screed enterin) into t*e /unctionBo0

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight :d=%sta1le >%nction &o6- $eat%res

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    19/32

    *ide noc/o%ts as per Raceways

    *ies

    CABLE MANAGMENT SYSTEMS

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight :d=%sta1le >%nction &o6- $eat%res

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    20/32

    4eight :d=%sta1le +eat%re

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight :d=%sta1le >%nction &o6- $eat%res

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    21/32

    4eight :d=%sta1le +eat%re

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight :d=%sta1le >%nction &o6- $eat%res

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    22/32

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight :d=%sta1le >%nction &o6- $eat%res

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    23/32

    *creed $loor *ystem

    $i6ing &rac/et

    2ertical Riser 

    Raceways

    &ac/1o6 with 9id

    and "rim

    >%nction &o6

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    24/32

    Mar/ the pathway +or Raceways7

    >%nction 1o6es and 1ac/ 1o6es

    *creed *ystem - Installation

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    $i6 risers7 =%nction 1o6es and

    1ac/1o6es on the sla1

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    25/32

    "he *ide plates ha'e to 1e c%t o%t to

    +it the reD%ired tr%n/ing

    *creed *ystem - Installation

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    $i6 the raceways with Co%plers and

    +i6ing &rac/ets

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    26/32

    o%r Concrete<

    &ac/ 1o6es and >%nction &o6es donEt

    need to 1e le'eled to *creed 4eight

    4eight ad=%stment can 1e done

    a+ter po%ring screed

    no levelling isrequired at this stage!

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    *creed *ystem - Installation

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    27/32

    On the sla17 its always 'ery di++ic%lt to

    /now e6actly the le'el o+ the screed

    I+ the 1ac/1o6 is 1adly le'eled7 most

    o+ +loor 1o6es wont 1e strong

    9e'eling is a 4eadache on *ites

    and Solution : Don’t need to level th

    ckbox before Pouring the concrete

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    *creed *ystem - Installation

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    28/32

    Once the *creed is dry7 remo'e

     disposa1le co'er protection

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight ad=%sta1le >%nction &o6 -Installation

    Fnscrew the 9id

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    29/32

    Install ca1les and earth the >%nction

    &o6 ("iling or Carpeting sho%ld 1e

    carried o%t at this stage

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight ad=%sta1le >%nction &o6 -Installation

    :d=%st the >%nction &o6 to +loor 9e'el

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    30/32

    :d=%st the >%nction &o6 to +loor 9e'el

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    4eight ad=%sta1le >%nction &o6 -Installation

    *crew the lid onto the >%nction 1o6

    and +it carpet c%t onto the lid

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    31/32

    "his system is widely %sed in areas

    where the occ%pants reD%ire the

    highest degree o+ +le6i1ility in

    recon+ig%ringwor/space

    Capacity can 1e increased 1yret%rning indi'id%al ring mains

    thro%gh di++erent r%ns o+ tr%n/ing7

    which in itsel+ allows easier

    installation

    Grid attern

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    *creed *ystem atterns

  • 8/19/2019 Raceways Junction Boxes for Underfloor installation

    32/32

    "he $ish1one attern is ideal +or a

    medi%m sied area where +ewer

    1o6es are reD%ired

    $ish1one attern

    Screed Floor SolutionCABLE MANAGMENT SYSTEMS

    *creed *ystem atterns

    "he Com1 attern is the most

    economical way o+ installation in

    which a minim%m o+ tr%n/ing is %sed

    "he Com1 attern is s%ited +or small

    to medi%m o++ice areas

    Com1 attern