Radio spectrum and broadband EU policies - Towards a European broadband strategy

  • Upload
    lguijar

  • View
    219

  • Download
    0

Embed Size (px)

DESCRIPTION

The European Commission launched the i2010 initiative in 2005 to foster the renewed Lisbon Strategy during the period 2005-2010 within the area of Information Society development. The Electronic Communications policy contributed to the i2010 initiative, as it had done to the eEurope initiative during the period 2000-2005. The paper examines in detail two lines of action that got heft within the Electronic Communications policy implemented by the European Union during the period 2005-2010: the radio spectrum policy and the broadband policy. The paper keeps track of the evolution of both policies, and it demonstrates how they were gaining political relevance until they built a European broadband strategy by the end of the period, when it was finally subsumed in the Digital Agenda in 2010. The relevance of the paper lies in providing the historical background of the formation of the radio spectrum and broadband policies, which have become essential for the achievements of the targets of Pillar IV of the Digital Agenda.

Citation preview

  • EuroCPR, Brussels, 22/03/2013

    Radio spectrum and broadband EU policies Towards a European broadband strategy Luis Guijarro Universitat Politcnica de Valncia

  • EuroCPR, Brussels, 22/03/2013

    Objectives

    To track two lines of action of Electronic Communications policy of the EU Radio spectrum policy Broadband policy

    Focus on the period 2005-2010 To present how both policies were meant

    to build a European strategy for broadband and, finally, built a Digital Agenda

    Luis Guijarro 2

  • EuroCPR, Brussels, 22/03/2013

    Background

    Regulatory framework (2002)

    i2010 initiative (2005)

    Modified Regulatory framework (2009)

    Digital Agenda (2010)

    Luis Guijarro 3

  • EuroCPR, Brussels, 22/03/2013

    Hypothesis

    i2010 provided political thrust to Radio spectrum policy Single European Information Space goal

    To accelerate the economic pay-off from digital convergence by [...] defining an efficient spectrum management strategy

    Broadband policy Inclusive information society goal

    To give guidance to extend geographical coverage of broadband in undeserved areas

    Luis Guijarro 4

  • EuroCPR, Brussels, 22/03/2013

    Radio spectrum policy

    Market-based approach Proposed by the Commission in Sept. 2005 To implement at EU level by 2010: Right to trade individual rights to use frequencies in

    a selection of spectrum bands for terrestrial electronic commun. services

    Not welcome by EP and Council It would be part of the 2007 Reform

    Proposals

    Luis Guijarro 5

  • EuroCPR, Brussels, 22/03/2013

    Radio spectrum policy

    Flexible approach Proposed by the Commission in Feb. 2007

    with the support of the RSPG Basically, technology and service neutrality e.g. 900 MHz band Abolition of 1987 GSM Directive in Sept. 2009 Technical measures to allow coexistence of GSM

    and other systems in a Commission Decision in Oct. 2009

    Luis Guijarro 6

  • EuroCPR, Brussels, 22/03/2013

    Radio spectrum policy

    Digital dividend Lack of coordination in the switchover from

    analogue to digital terrestrial TV among MS The Commission first raised the possibility of

    alternative use of digital dividend in May 2005 Finally, in Oct. 2009, the Commission

    committed to open the 800 MHz band in an harmonized manner with the support of the RSC

    Luis Guijarro 7

  • EuroCPR, Brussels, 22/03/2013

    Broadband policy

    Bridging the geographic digital divide A priority in the i2010 initiative, the

    Commission urged MS in March 2006 to update their Broadband National Strategies: State aid applicable to broadband projects

    (Guidelines) Exchange of best practices Promotion of connectivity for public

    administrations

    Broadband still played a minor role

    Luis Guijarro 8

  • EuroCPR, Brussels, 22/03/2013

    Broadband policy

    Regulated access to NGAs It involved two draft recommendations with

    their respective public consultations in 2008 and 2009

    It struggled to solve the dilemma competition vs. investment by providing guidelines to the NRA in their imposing of access obligation in NGAs

    Luis Guijarro 9

  • EuroCPR, Brussels, 22/03/2013

    Broadband policy

    The European Economic Recovery Plan Proposed by the Commission in Nov. 2008 to

    avoid (uselessly) the risk of contraction for the EU economy in 2009 following the global financial crisis.

    It contained a program of smart investments 1bn for developing broadband infrastructure in

    rural areas

    Broadband began to play a key role

    Luis Guijarro 10

  • EuroCPR, Brussels, 22/03/2013

    Digital Agenda

    Published in May 2010 as one of the 7 flagship initiatives of the Europe2020 strategy

    Identified 7+1 areas of action (aka. Pillars), where 16 key actions and other actions were proposed (100 actions)

    Luis Guijarro 11

  • EuroCPR, Brussels, 22/03/2013

    European broadband strategy Invitation by the European Council to the

    Commission (Brussels, March 2009) Subsumed in Pillar IV of the Digital Agenda

    Fast and ultra-fast internet access Three lines of actions

    To use EU and EIB funding instruments to make targeted investments

    To adopt an NGA Recommendation To develop a European Spectrum Policy

    Programme

    Luis Guijarro 12

  • EuroCPR, Brussels, 22/03/2013

    European broadband strategy Communication on European Broadband

    (Sept. 2010) To reinforce and rationalize the use of Structural

    and Rural Development Funds Proposal for a Regulation in October 2011

    Connecting Europe Facility Proposed by the Commission in October 2011 Same legal basis as the Trans-European Networks Allocation of 9.2bn to telecom./ digital

    networks during 2014-2020 (reduced to 1bn)

    Luis Guijarro 13

  • EuroCPR, Brussels, 22/03/2013

    European broadband strategy

    NGA Recommendation (Sept. 2010) Investment risk in cost-oriented access prices Level of competition in any given area Co-investments and risk-sharing promoted

    Recommendation on consistent non-discrimination and costing methodologies In preparation

    Luis Guijarro 14

  • EuroCPR, Brussels, 22/03/2013

    European broadband strategy

    Radio Spectrum Policy Program Proposed in Sept. 2010 and adopted in March

    2012. Guidelines and objectives up to 2015. Digital dividend (800 MHz band)

    Deadline for authorization processes: 1 Jan 2013

    Transfer or leasing rights of use (market-based approach)

    Shared use of spectrum Bands: 2.4GHz; short-range devices; TVWS Legally binding sharing contracts

    Luis Guijarro 15

  • EuroCPR, Brussels, 22/03/2013

    Conclusions Both policies have gained strategic relevance

    within the context of the Electronic Communications policy of the EU. Milestones: Broadband funding in the EERP Digital dividend allocation to wireless broadband

    The radio spectrum policy has found its role as a tool for realizing the broadband for all target

    The broadband policy is struggling to influence funding, e.g. Cohesion and TEN

    Luis Guijarro 16

  • EuroCPR, Brussels, 22/03/2013

    Radio spectrum and broadband EU policies Towards a European broadband strategy Luis Guijarro Universitat Politcnica de Valncia

    Radio spectrum and broadband EU policiesObjectivesBackgroundHypothesisRadio spectrum policyRadio spectrum policyRadio spectrum policyBroadband policyBroadband policyBroadband policyDigital AgendaEuropean broadband strategyEuropean broadband strategyEuropean broadband strategyEuropean broadband strategyConclusionsRadio spectrum and broadband EU policies