Upload
gaston
View
36
Download
0
Embed Size (px)
DESCRIPTION
Refrigerator Decommissioning: Next Steps for Measure Update. March 18th , 2014. Measure Update Research Priorities. Staff, with subcommittee feedback, is researching if secondary market effects can be estimated using existing data. Staff to assess compliance with guidelines as a UES measure. - PowerPoint PPT Presentation
Citation preview
1
Refrigerator Decommissioning: Next
Steps for Measure Update
March 18th, 2014
2
Measure Update Research Priorities• Staff, with subcommittee feedback, is researching if
secondary market effects can be estimated using existing data.
• Staff to assess compliance with guidelines as a UES measure.
• Staff, with subcommittee feedback, will update measure parameters as necessary using latest research.
3
Proposed Timeline (Communicated to Subcommittee):• March 14th - Subcommittee reconvenes to understand existing
sources of data. Recommend path forward (Staff makes all necessary revisions to the measure)
• Mid April - Subcommittee meets to review results of staff
work. (Further subcommittee meetings on an as-needed basis. The subcommittee may also meet between March and April if required or if there is no need to wait further.
• May RTF meeting: Presentation to the RTF; aim to get an RTF decision.
• June RTF meeting (If Required): Second presentation to the RTF if necessary.
4
New Refrigerator Decommissioning Studies Considered:
Report State Evaluator Year
PacificPower: See Ya Later, Refrigerator Evaluation Report Idaho Cadmus 2011-12
PacificPower: See Ya Later, Refrigerator Evaluation Report Washington Cadmus 2011-12
ARPs are RAD: How to Incorporate Environmental Benefits from Appliance Recycling Programs into Cost-Effectiveness Calculations
California IEPEC Paper (Cadmus) 2013
Appliance Recycling Program Process Evaluation and Market Characterization
California SCE & PGE 2013
Appliance Recycling Program Retailer Trial Final Report California Innovologie 2013
PSE Refrigerator Decommissioning Washington KEMA 2013
5
March 14th Subcommittee Meeting Update and Next Steps• Subcommittee agrees with staff proposed process
to update the measure.
• The next subcommittee meeting will primarily focus on determining the “brother-in-law” factor.• Staff to prepare a proposal for this factor in advance of
the meeting.
• Other measure parameters will be updated using similar methodology, latest regional datasets.