Regional ATN Transition Planning Varadero, Cuba May 2002 Presentation ATN 4.2 by H. Tran

Regional ATN Transition Planning

  • Upload
    frisco

  • View
    53

  • Download
    0

Embed Size (px)

DESCRIPTION

Regional ATN Transition Planning. Presentation ATN 4.2 by H. Tran. Varadero, Cuba May 2002. Regional ATN Planning. Establish an ATN Regional Task Force The Regional Task Force should develop an ATN Transition Plan for the CAR/SAM Region - PowerPoint PPT Presentation

Citation preview

Page 1: Regional ATN Transition Planning

Regional ATN Transition Planning

Varadero, Cuba

May 2002

Presentation ATN 4.2 by H. Tran

Page 2: Regional ATN Transition Planning

Regional ATN Planning

Establish an ATN Regional Task Force

The Regional Task Force should develop an ATN Transition Plan for the CAR/SAM Region

The Regional Task Force should be tasked to develop various regional ATN implementation related documents

Page 3: Regional ATN Transition Planning

ATN Implementation Related Documents

The following ATN Implementation issues need to be addressed by the regional ATN task force:

Regional ATN Routing Architecture Plan Regional ATN Addressing Plan Regional ATN AMHS Naming Plan Regional ATN NSAP Addressing Registration Regional AMHS ICD Regional BIS Router ICD Regional CNS FASID Regional ATN Transition Plan Regional ATN Routing Policy (IDRP) Regional Routing Policy (MTA) Regional Directory Services Regional System Management System Performance Security

Page 4: Regional ATN Transition Planning

ATN Transition Plan

Recommendation for a Three Stage ATN Transition: Stage 1 - Upgrade Current/Existing

Infrastructure Stage 2 - Establishment of a Ground ATN

Backbone Router Network Stage 3 - Connectivity of User ATN

Routers to the Backbone

Page 5: Regional ATN Transition Planning

Stage 1 - Existing Infrastructure

AFTN InfrastructureBased on point to point circuitsMajority of Circuits are low speed: 50 baud

through to 9600bpsCircuit Protocols range from no protocols

through to COPB and X.25

Page 6: Regional ATN Transition Planning

Current US/CAR/SAM/Mexico AFTN/VOICE Connections

In order to easily grasp the network inits entirety part of the map have been

distorded. Countries are notrepresented to scale.

Aruba

VenezuelaColombia

Ecuador

Peru

Bolivia

Chile

Paraguay

UruguayArgentina

Brasil

GuyaneFrançaise

SurinameGuyana

Belize

Guatemala

El Salvador

Honduras

Costa Rica

Panama

Nicaragua

USA

Bahamas

Cuba

CaymanIslands

Jamaica

HaïtiRepublicaDominican

aPuertoRico

Trinidad&

Tobago

Curaçao

REDDIG

Connection between Networks

CAMSAT

E-CAR

MEVA

IS Router

BIS Router

St Marteen

St Vincent

Guadeloupe

St Lucia

St Kitts& Nevis

Dominica

Martinique

Antigua

Anguilla

Montserrat

Grenada

Barbados

US

Page 7: Regional ATN Transition Planning

Aruba

Belize

Guatemala

El Salvador

Honduras

Costa Rica

Panama

Nicaragua

USA

Bahamas

Cuba

CaymanIslands Jamaica

Haïti Republica

Dominican

a

Puerto

Rico

Curaçao

Peru

Current US/MEVA AFTN/VOICE Connections

Current US/MEVA AFTN/VOICE Connections

Page 8: Regional ATN Transition Planning

Venezuela

Guyana

PuertoRico

Trinidad&

Tobago

St Marteen

St Vincent

Guadeloupe

St Lucia

St Kitts& Nevis

Dominica

Martinique

Antigua

Anguilla

Montserrat

Grenada

Barbados

USA

Current US/E-CAR AFTN/VOICE Connections

Current US/E-CAR AFTN/VOICE Connections

Page 9: Regional ATN Transition Planning

VenezuelaColombia

Ecuador

Peru

Bolivia

Chile

Paraguay

UruguayArgentina

Brasil

Guyane

Française

SurinameGuyana

Trinidad

&Tobago

USAPuertoRico

USA

Current US/REDDIG AFTN/VOICE Connections

Current US/REDDIG AFTN/VOICE Connections

Page 10: Regional ATN Transition Planning

Belize

Guatemala

El Salvador

Honduras

Costa Rica

Panama

Nicaragua

USA

Cuba

Cayman

Islands

Mexico

Current US/CAMSAT AFTN/VOICE Connections

Current US/CAMSAT AFTN/VOICE Connections

Page 11: Regional ATN Transition Planning

Current CAR/SAM Region AFTN Data Speed

13%

35%

2%5%

20%

2%

1%

8%14%

75 Bauds300 Bauds

9.6 Kbps 50 Bauds2.4 Kbps

150 Bauds 110 Bauds

600 Bauds

1.2 Kbps

CAR/SAM/3-WP/18APPANDIX A

Page 12: Regional ATN Transition Planning

2%

83B32%

85A22%

X2510%

None77%

COPB7%

Current Regional ProtocolsCurrent Regional Protocols

About 90% None ATN supports protocolsCAR/SAM/3-WP/18APPANDIX A

Page 13: Regional ATN Transition Planning

Stage 1 - Upgrade of Circuits

ATN at present recommend to use Subnetworks to interface at X.25, Which require existing non-compatible AFTN circuits will need to be upgraded

Page 14: Regional ATN Transition Planning

Stage 1 - Bandwidth Issues

Overheads from each layer of the OSI stack will increase total message size as much as 94% (standard AFTN message size using AMHS)

Bandwidth for circuits will need to be increased substantially

Minimum speed 9.6kbps is required for ATN AMHS application

Recommend 64kbps or higher will need to be considered for the regional ATN backbone

Page 15: Regional ATN Transition Planning

Site A

AMHS

AIDC

ADS

CPDLC

FIS

Site C

ADS

CPDLC

FIS

Site B

AMHS

AIDC

ATN Applications

ATN

Page 16: Regional ATN Transition Planning

Stage 2 - ATN Backbone

Selection of Locations based on Existing Inter-Regional Connections and Main Internal ConnectionsDiversity for Backbone Connectivity within the CAR/SAM Region and Neighbouring RegionsMinimum of 64kbps for Backbone Trunk Speeds

Page 17: Regional ATN Transition Planning

Inter-Regional Trunk ConnectionIntra-Regional Trunk Connection

EUR RegionASIA Region

AFI Region

CAR/SAM Region

Example ATN Regional Backbone

I

A

C

G

D

F

B

H

E

Page 18: Regional ATN Transition Planning

Example CAR/SAM ATN Routing

G

A B

F

D

H

TO TV WFG2

GJGG

ID

AB

GK J1 NC WS

A4

AC

CB

PG

DF

DC

BN

PH

A3

H1

FHF1

D3

D1

D3

A1 A2

G1

I

I3 I4 PII2

ATN Backbone Site

ATN Site

C

E

Page 19: Regional ATN Transition Planning

Stage 3 - ATN Connectivity

Generally ATN Routers will connect to the ATN Backbone

In some cases ATN Routers will connect to other ATN Routers to get to the ATN Backbone

Page 20: Regional ATN Transition Planning

AFTN to AMHS Transition

For the very first time there is now an alternative to the replacement of an AFTN system - AMHS

Transition to AMHS can involve a number of steps- Introduction of AFTN/AMHS Gateways.- To full AMHS Interconnection between

States.

Page 21: Regional ATN Transition Planning

Current AFTN Environment

Site C

Site D

Site B

Site A

AFTNSystem

X.25X.25

X.25

Low Speed

Low Speed

AFTNSystem

AFTNSystem

AFTNSystem

Page 22: Regional ATN Transition Planning

Site A

AMHSGateway

ATNRouter

ATNRouter

AMHSGateway

Implementation of AFTN/AMHS Gateways

Site BAFTN

System

AFTNSystem

X.25

Site DAFTN

System

Site CAFTN

System

X.25X.25

Low Speed

Low Speed

Page 23: Regional ATN Transition Planning

Site A

AMHSSystem

ATNRouter

AMHSGateway

Domestic Network

DomesticAMHS

Systems

DomesticAMHS

Terminals

Migration to AMHS - 1

Site CAFTN

System

Site DAFTN

System

X.25

X.25

ATNRouter

AMHSGateway

ATN

Site BATN

RouterAMHS

System

Page 24: Regional ATN Transition Planning

Migration to AMHS - 2

Site CATN

RouterAMHS

System

Site BATN

RouterAMHS

System

Site A

AMHSSystem

ATNRouter

ATN

Domestic Network

DomesticAMHS

Systems

DomesticAMHS

Terminals

Site DAFTN

SystemATN

RouterAMHS

Gateway

Page 25: Regional ATN Transition Planning

Full AMHS Implementation

Site DATN

RouterAMHS

System

Site CATN

RouterAMHS

System

Site BATN

RouterAMHS

System

Site A

AMHSSystem

ATNRouter

ATN

Domestic Network

DomesticAMHS

Systems

DomesticAMHS

Terminals

Page 26: Regional ATN Transition Planning

Current ATN Trials Infrastructure In Europe

Page 27: Regional ATN Transition Planning

Inter-Regional Trunk ConnectionNew Inter-Regional Trunk ConnectionIntra-Regional Trunk ConnectionNew Intra-Regional Trunk Connection

ATN Asia Regional Backbone Plan

NAM Region

EUR Region

MID Region

AFI Region

Asia Region

AU

CN JP

IN

TH

SG

HK

Page 28: Regional ATN Transition Planning

Asia/Pacific ATN Routing PlanAsia/Pacific ATN Routing Plan

AU

CN JP

IN

TH

SG

TO TV WFPF

FJNZ

ID

KR

NR

CK KI NC WS

NP

MO

TW

VUPG SBBD

VN

BNPH

MM

MV

LKBT

KH

LAMY

KP MN

NU

US

MH FM PWAS

ATN Backbone Site

ATN Site

HK

Page 29: Regional ATN Transition Planning

ATN G/G ApplicationsAIDC

The AIDC will automatically exchange ATC information between ATSU, in support of the ATC functions :

• NOTIFICATION of flights approaching an FIR boundary,

• CO-ORDINATION of boundary crossing conditions,

• TRANSFER of control at the FIR boundary.

Page 30: Regional ATN Transition Planning

AIDC OverviewAIDC Overview

BISAIDC

BISES ES

Aircraft Flight

AIDC Flight notification, coordination, and transfer between FIRs

LegendAIDC ATS Inter-facility Data CommunicationBIS Boundary RouterES End SystemFIR Flight Information Region

ATN

BIS AIDCES

ES

AIDC

Page 31: Regional ATN Transition Planning

AIDC Implementation

ATN AIDC is not Compatible with AIDC over AFTN

Implementation of ATN AIDC will need to be implemented by arrangement between both parties

Possible phased implementation can be AIDC over AFTN to AIDC over AMHS

Page 32: Regional ATN Transition Planning

AIDC Over AMHS

ATN

Site A

AMHSSystem

ATNRouter

Domestic Network

AIDCEnd

System

Site B

ATNRouter

AMHSSystem

Domestic Network

AIDCEnd

System

Page 33: Regional ATN Transition Planning

Conclusions

ATN is a policy agreed among ICAO member statesImplement new links or Upgrade existing AFTN links where appropriate to be compatible with ATN protocolsPlan for adequate bandwidth which can be increased without restrictionEach Region needs to developed its own implementation plan and related documents to address its own regional environmentInterim arrangements can be set up between States/Organizations which can provide ATN service or gateway