140

Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

  • Upload
    vulien

  • View
    230

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete
Page 2: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473

Item 2 – Revised Plan Holders List Remove ‘Plan House-1’ included in the original bid package. Replace with the attached revised ‘Plan House-1 (Revised 6-21-13)’.

Item 3 – Revised Table of Contents Remove pages 00003-1 through 00003-3 titled ‘Table of Contents’ included in the original bid package. Replace with the attached revised 00003-1 (revised 6-20-13) through 00003-3 (revised 6-20-13) titled ‘Table of Contents’.

Item 4 – Revised Bid Schedule Remove Bid Form B-1 through B-23 ‘Bid Schedule’ included in the original bid package in its entirety. Replace with the attached revised Bid Form B-1 through B-19 ‘Bid Schedule (revised 6-21-13)’. Pages B-24 through B-34 are still applicable and must be submitted as required. The revised package will not contain pages B-20 through B-23.

Item 5 – Revised Specification Section 1010 Remove Specification 1010 included in the original bid package in its entirety. Replace with the attached revised Specification 1010 (revised 6-20-13).

Item 6 – Revised Specification Section 1810 Remove Specification 1810 included in the original bid package in its entirety. Replace with the attached revised Specification 1810 (revised 6-20-13).

Item 7 – Revised Specification Section SP-G-700 Remove Specification SP-G-700 included in the original bid package in its entirety. Replace with the attached revised Specification SP-G-700 (revised 6-21-13).

Item 8 – Revised Specification Section SS-L-100 Remove Specification SS-L-100 included in the original bid package in its entirety. Replace with the attached revised Specification SS-L-100 (revised 6-21-13).

Item 9 – Revised Specification Section SS-L-111 Remove Specification SS-L-111 included in the original bid package in its entirety. Replace with the attached revised Specification SS-L-111 (revised 6-21-13).

Page 3: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473

Item 10 – Revised Plan Cover Sheet Remove Plan Cover Sheet included in the original bid package. Replace with the attached revised Plan Cover Sheet.

Item 11 – Revised Technical Specification Certification Sheet Remove ‘Technical Specification Certification’ Sheet included in the original bid package. Replace with the attached revised ‘Technical Specification Certification’ Sheet.

Item 12 – Questions and Answers 1. Can the existing Rockwell Regulator control modules be reinstalled in the new constant current regulators? No. The controls for the new constant current regulators should be new and not used. 2. Base Bid, Item #6 and Item #4 on all three Alternates notes “Removing Stabilized Base and Asphalt Paving (4”).” Asphalt thickness on the shoulders is typically 6” thick with a 4” base course and 2” top course. Should these bid items be revised accordingly?

In the revised attached Bid Form Base Bid Item #6, Add Alternate 1 Item #4, Add Alternate 2 Item #4, and Add Alternate 3 Item #4 have all been changed to read: ‘DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL)’

Page 4: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

Rehabilitate Airfield Pavements FY 2012 Plan House-1 Contract No. 9500473 (Revised 6-21-13)

DISTRIBUTION OF BID SET PLANS & SPECIFICATIONS D/FW is not responsible for the accuracy or correctness of the following addresses and phone numbers.

ONE SET OF PLANS & SPECIFICATIONS TO THE FOLLOWING AGC/QuoinViolet Lee 14305 Inwood Rd. Dallas, Texas 75244 800-364-2059 ext. 8304 [email protected] or [email protected]

Website: www.isqft.com AGC of Texas Helga Krahe 6220 N. Beltline Rd., Ste. 210 Irving, Texas 75063 972-580-8685 [email protected] Website: www.agctx.com Asian American Contractors Association of Greater Dallas Katherine Dressi 2964 LBJ Freewat, Suite 430 Dallas, Texas 75234 972-623-7678 [email protected] Website: www.aacatx.com American Indian Chamber of Commerce Tosawi Marshall 11245 Indian Trail, 2nd Floor Dallas, TX 75229 972-241-6450 [email protected] Website: www.aicct.org Black Contractors Association Jonni Gipson 1409 S. Lamar, Ste. 251 Dallas, Texas 75215 214-928-7097 [email protected] Website: www.blackcontractors.org Builders Exchange of Texas Jeannette Olguin 8411 Sterling, Ste. 101 Irving, Texas 75063 214-687-9000 [email protected] Website: www.virtualbx.com Dallas Black Chamber of Commerce Carmen Humble 2838 Martin Luther King Jr., Blvd. Dallas, Texas 75215 214-421-5200 [email protected] Website: www.dbcc.org DFW Minority Supplier Dev. Council Sharon Richardson 8828 N. Stemmons Freeway, Ste. 550 Dallas, Texas 75247 214-630-0747 [email protected] Website: www.dfwmsdc.com

Fort Worth Hispanic Chamber of Commerce Andrea Puente 1327 North Main Street Ft. Worth, Texas 76164 817-625-1405 [email protected] Website: www.fwhcc.org Fort Worth Metropolitan Black Chamber of Commerce Allen Smith 1150 S. Freeway, Ste. 211 Ft. Worth, Texas 76104 817-870-0372 [email protected] Website: www.fwmbcc.org Greater Dallas Asian Chamber of Commerce Hoyoung Kim 7610 Stemmons Freeway, Suite 690 Dallas, Texas 75247 972-241-8250 [email protected] Website: www.gdaacc.com Greater Dallas Hispanic Chamber of Commerce Sagrario Ortiz 4622 Maple Avenue, Ste. 207 Dallas, Texas 75219 214-521-6007 [email protected] Website: www.gdhcc.com Greater Dallas Indo-American Chamber of Commerce Arnel Trovada 5930 LBJ Freeway, Suite 350 Dallas, Texas 75240 214-346-9559 [email protected] and [email protected]: www.gdiacc.org Regional Hispanic Contractors Association Yolanda Tafoya 2210 W. Illinois Dallas, Texas 75224 972-786-0909 [email protected] Website: http://regionalhca.org McGraw-Hill Construction Dodge Nikki Verdier 4300 Beltway Place, #180 Arlington, Texas 76018 817-375-2959 [email protected] Website: www.construction.com Women’s Business Council - Southwest Debbie Hurst 2201 N. Collins, Suite 158 Arlington, Texas 76011 817-299-0566 [email protected] Website: www.wbcsouthwest.org

Page 5: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

TABLE OF CONTENTS

Division Description

DFW International Airport TABLE OF CONTENTS Contract No. 9500473 00003 - 1 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

Section 00001 Contacts IFB 4-27-13 Section 00002 Consultant Contacts IFB 4-27-13 Section 00003 Table of Contents IFB 4-27-13 Section 01001 Definitions IFB 4-27-13 Section 01010 Summary of Work IFB 4-27-13 Section 01027 Application for Payment IFB 4-27-13 Section 01030 Alternates IFB 4-27-13 Section 01040 Coordination IFB 4-27-13 Section 01060 Regulatory Requirements IFB 4-27-13 Section 01065 Wage Rates and Forms IFB 4-27-13 Section 01065-A Wage Rates and Forms - Attachment IFB 4-27-13 Section 01090 Reference Standards IFB 4-27-13 Section 01110 Minimum Standards for Construction & Maintenance

on the AOA IFB 4-27-13

Section 01110-A Minimum Standards for Construction & Maintenance on the AOA - Attachment

IFB 4-27-13

Section 01200 Project Meetings IFB 4-27-13 Section 01310 Progress Schedule IFB 4-27-13 Section 01340 Shop drawings, Product Data, and Samples IFB 4-27-13 Section 01400 Contractor’s Quality Control System IFB 4-27-13 Section 01410 Independent Testing Agency Services IFB 4-27-13 Section 01450 Protection of Existing Underground Utilities & Cables IFB 4-27-13 Section 01500 Temporary Facilities & Controls IFB 4-27-13 Section 01505 Contractor’s Construction Area IFB 4-27-13 Section 01520 Contractor Staging Yard IFB 4-27-13 Section 01540 Concrete Batch Plant Permitting IFB 4-27-13 Section 01561 Spill Response IFB 4-27-13 Section 01563 Erosion and Sediment Control IFB 4-27-13 Section 01564 Construction Site Spill Prevention Control and

Countermeasures IFB 4-27-13

Section 01565 Waste Management IFB 4-27-13 Section 01565-A Waste Management - Attachment IFB 4-27-13 Section 01566 Waste Characterization IFB 4-27-13 Section 01569 Construction Cleaning IFB 4-27-13 Section 01570 Traffic Regulation IFB 4-27-13 Section 01574 Concrete Slurry Waste IFB 4-27-13 Section 01620 Storage & Protection IFB 4-27-13 Section 01630 Product Options and Substitutions IFB 4-27-13 Section 01700 Contract Closeout IFB 4-27-13 Section 01710 Final Cleaning IFB 4-27-13 Section 01720 Project Record Documents IFB 4-27-13 Section 01740 Warranties & Bonds IFB 4-27-13 Section 01810 Commissioning

Commissioning Plan IFB 4-27-13

Section 02055 Clean Soil Management IFB 4-27-13 Technical Specifications

SP-G-300 SP-G-500

Special Provision to Item G-300 Special Provision to Item G-500

IFB 4-27-13 IFB 4-27-13

SP-G-700 Special Provision to Item G-700 IFB 4-27-13 SP-P-151 Special Provision to Item P-151 IFB 4-27-13 SP-P-152 Special Provision to Item P-152 IFB 4-27-13 SP-P-304 Special Provision to Item P-304 IFB 4-27-13

Page 6: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

TABLE OF CONTENTS

Division Description

DFW International Airport TABLE OF CONTENTS Contract No. 9500473 00003 - 2 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

SP-P-401 Special Provision to Item P-401 IFB 4-27-13 SP-P-602 Special Provision to Item P-602 IFB 4-27-13 SP-P-603 Special Provision to Item P-603 IFB 4-27-13 SP-P-605 Special Provision to Item P-605 IFB 4-27-13 SP-P-620 Special Provision to Item P-620 IFB 4-27-13 SP-T-904 Special Provision to Item P-904 IFB 4-27-13 SP-T-905 Special Provision to Item P-905 IFB 4-27-13 SP-L-109 Special Provision to Item L-109 IFB 4-27-13

Part I- General Requirements G-300 Construction Barricade and Traffic Control IFB 4-27-13 G-500 Mobilization IFB 4-27-13 G-700 Demolition IFB 4-27-13

Part II- Earthwork P-151 Clearing and Grubbing IFB 4-27-13 P-152 Excavation and Embankment IFB 4-27-13 Part III- Flexible Base Course P-304 Cement Treated Base IFB 4-27-13 Part IV- Flexible Surface Course P-401 Plant Mix Bituminous Pavements IFB 4-27-13 Part V- Rigid Concrete None IFB 4-27-13 Part VI- Miscellaneous P-602 Bituminous Prime Coat P-603 Bituminous Tack Coat IFB 4-27-13 P-605 Joint Sealing Filler IFB 4-27-13 P-620 Runway, Taxiway, Apron, and AARF Road Painting IFB 4-27-13 Part VII- Turfing T-904 Sodding IFB 4-27-13

T-905 Topsoiling IFB 4-27-13

Part IX- Lighting/Electrical

L-108 Underground cables for Airports IFB 4-27-13 L-109 Airport Transformer Vault and Vault Equipment IFB 4-27-13 L-110 Airport Underground Electrical Duct Banks and

Conduits IFB 4-27-13

L-115 Electrical manholes and Junction Structures IFB 4-27-13

Page 7: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

TABLE OF CONTENTS

Division Description

DFW International Airport TABLE OF CONTENTS Contract No. 9500473 00003 - 3 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

Special Specifications

SS-L-100 General Provisions and Requirements for Electrical Work

SS-L- 105 Alterations, Removal ,and Demolition

SS-L-111 Airfield Electrical Installation and Testing

SS-L-125 Lighting Fixtures and Bases

SS-P-635A Thermoplastic Coal-Tar Emulsion Seal Coat

END OF SECTION

Page 8: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-1 Addendum No. 1

BID SCHEDULE

BASE BID: TAXIWAYS (WK, WL, WM, Q), NORTH AND SOUTH BLAST PADS

ITEM NO.

ESTIMATED

QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

1

1

LS

MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

2

1

LS

INSURANCE ______________________________________ Dollars and __________________________________Cents per LUMP SUM (LS)

3 1 LS

INSTALL, MAINTAIN AND REMOVE TRAFFIC CONTROL AND BARRICADES ______________________________________Dollars and __________________________________Cents per LUMP SUM (LS)

4 2 EA

LIGHTED RUNWAY CLOSURE MARKERS ______________________________________Dollars and __________________________________Cents per EACH (EA)

5 59,405 SY

SODDING ______________________________________Dollars and __________________________________Cents per SQUARE YARD (SY)

6 35,230 SY

DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and __________________________________Cents per SQUARE YARD (SY)

7 6,604 TN

2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________ Dollars and __________________________________Cents per TON (TN)

Page 9: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-2 Addendum No. 1

ITEM NO.

ESTIMATED

QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

8 13,207 TN

4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and __________________________________Cents per TON (TN)

9 60,032 SY

CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

10 58,698 SY

THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and __________________________________Cents per SQUARE YARD (SY)

11 10,125 LF

JOINT SEALING FILLER ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

12 21,978 CY

EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and __________________________________Cents per CUBIC YARD (CY)

13 1 EA

ADJUST ELEVATION OF EXISTING STORM MANHOLE ______________________________________Dollars and __________________________________Cents per EACH (EA)

14 3 EA

ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and __________________________________Cents per EACH (EA)

15 1 LS

EROSION CONTROL ______________________________________Dollars and __________________________________Cents per LUMP SUM (LS)

Page 10: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-3 Addendum No. 1

ITEM NO.

ESTIMATED

QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

16 139,600 SF

REMOVE PAVEMENT MARKINGS ______________________________________Dollars and _________________________________Cents per SQUARE FOOT (SF)

17 126,315 SF

PAINT – TAXIWAY BLACK ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)

18 50,526 SF

PAINT – TAXIWAY YELLOW - W/ GLASS BEADS ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)

19 10,800 SF

PAINT – HOLD BAR BLACK ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)

20 4,050 SF

PAINT – HOLD BAR YELLOW - W/ GLASS BEADS ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)

21 12,165 SF

PAINT – BLAST PAD BLACK ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)

22 9,075 SF

PAINT – BLAST PAD YELLOW W/ GLASS BEADS ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)

23 155 EA

REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS ______________________________________Dollars and _______________________Cents per EACH (EA)

24 135 EA

REMOVE & SALVAGE LIGHT/BASE CAN TO REMAIN IN EXISTING PAVEMENT AREAS ______________________________________Dollars and _____________________Cents per EACH (EA)

Page 11: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-4 Addendum No. 1

ITEM NO.

ESTIMATED

QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

25 10 EA

REMOVE & SALVAGE LIGHT/BASE CAN TO REMAIN AND ADD NEW STEEL COVERPLATE IN EXISTING PAVEMENT AREAS ______________________________________Dollars and ________ _______________________Cents per EACH (EA)

26 14,650 LF

REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

27 31,050 LF

REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

28 12,000 LF

REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

29 3,150 LF

REMOVE CONDUIT IN EARTH ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

30 28,750 LF

NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

31 16,840 LF

NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

32 3,000 LF

TEMPORARY/BYPASS CABLES IN 2” CONDUIT ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

Page 12: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-5 Addendum No. 1

ITEM NO.

ESTIMATED

QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

33 70 EA

CABLE SPLICE ______________________________________Dollars and __________________________________Cents per EACH (EA)

34 6 EA

30KW, 5-STEP REGULATOR ______________________________________Dollars and __________________________________Cents per EACH (EA)

35 14,650 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ______________________________Cents per (LF)

36 2,300 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, DIRECT EARTH BURIED ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

37 300 LF

4-WAY 4” PVC CONDUIT, CONCRETE ENCASED ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

38 300 LF

ENCASE EXISTING 4-WAY, 4” PVC CONDUIT ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)

39 65 EA

CONDUIT TRANSITION ______________________________________Dollars and __________________________________Cents per EACH (EA)

40 75 EA

DUCT MARKER ______________________________________Dollars and __________________________________Cents per EACH (EA)

Page 13: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-6 Addendum No. 1

ITEM NO.

ESTIMATED

QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

41 10 EA

L-867D PULLBOX ______________________________________Dollars and __________________________________Cents per EACH (EA)

42 12 EA

ADJUST ELEVATION OF EXISTING STRUCTURE (2’X2’X2’ OR SMALLER) ______________________________________Dollars and __________________________________Cents per EACH (EA)

43 15 EA

ADJUST ELEVATION AND MODIFY FOR AIRCRAFT RATED OF EXISTING STRUCTURE (3’X3’X3’ OR LARGER) ______________________________________Dollars and _______________________________Cents per EACH (EA)

44 200 EA

L-861T LED MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________ _______________________Cents per EACH (EA)

45 130 EA

L-861T LED MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and ________ _______________________Cents per EACH (EA)

46 60 EA

REMOVE AND REPAIR BOLTS/THREADS ON EXISTING BASE CAN ______________________________________Dollars and ________________________________Cents per EACH (EA)

47 30 EA

FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and ________________________________Cents per EACH (EA)

48 75 EA

ADDITIONAL FIXTURE TAG ______________________________________Dollars and __________________________________Cents per EACH (EA)

Page 14: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-7 Addendum No. 1

TOTAL BASE BID ITEMS: 1 THROUGH 48………………………………………………….. $________________________________

ADD ALTERNATE BID NO.1: TAXIWAY F FROM WK TO WL

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

1

1

LS

MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

2

1

LS

INSURANCE ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

3 5,470 SY

SODDING ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

4 5,849 SY

DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

5 1,039 TN

2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)

6 2,079 TN

4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)

Page 15: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-8 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

7 9,496 SY

CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

8 9,238 SY

THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

9 2,090 LF

JOINT SEALING FILLER ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

10 2,557 CY

EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and _________________________________Cents per CUBIC YARD (CY)

11 2 EA

ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and _________________________________Cents per EACH (EA)

12 1 LS

EROSION CONTROL ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

13 65 EA

REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS _____________________________________Dollars and ______________________________Cents per EACH (EA)

14 1 EA

REMOVE & SALVAGE LIGHT/BASE CAN TO REMAIN IN EXISTING PAVEMENT AREAS ______________________________________Dollars and _______________________________Cents per EACH (EA)

Page 16: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-9 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

15 3,050 LF

REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

16 7,310 LF

REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

17 2975 LF

REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

18 100 LF

REMOVE CONDUIT IN EARTH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

19 8,200 LF

NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

20 3,310 LF

NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and _______________________________Cents per LF

21 850 LF

TEMPORARY/BYPASS CABLES IN 2” CONDUIT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

22 20 EA

CABLE SPLICE ______________________________________Dollars and _________________________________Cents per EACH (EA)

Page 17: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-10 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

23 3,060 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

24 190 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, DIRECT EARTH BURIED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

25 150 LF

4-WAY 4” PVC CONDUIT, CONCRETE ENCASED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

26 50 LF

ENCASE EXISTING 4-WAY, 4” PVC CONDUIT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

27 20 EA

CONDUIT TRANSITION ______________________________________Dollars and _________________________________Cents per EACH (EA)

28 15 EA

DUCT MARKER ______________________________________Dollars and _________________________________Cents per EACH (EA)

29 2 EA

L-867D PULLBOX ______________________________________Dollars and _________________________________Cents per EACH (EA)

30 6 EA

ADJUST ELEVATION OF EXISTING STRUCTURE (2’X2’X2’ OR SMALLER) ______________________________________Dollars and _________________________________Cents per EACH (EA)

Page 18: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-11 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

31 2 EA

ADJUST ELEVATION AND MODIFY FOR AIRCRAFT RATED OF EXISTING STRUCTURE (3’X3’X3’ OR LARGER) ______________________________________Dollars and _______________________________Cents per EACH (EA)

32 70 EA

L-861T QUARTZ MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ______________________________Cents per EACH (EA)

33 6 EA

L-861T QUARTZ MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and _______________________________Cents per EACH (EA)

34 10 EA

FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and _______________________________Cents per EACH (EA)

35 20 EA

ADDITIONAL FIXTURE TAG ______________________________________Dollars and _________________________________Cents per EACH (EA)

TOTAL ADD ALTERNATE NO.1 BID ITEMS: 1 THROUGH 35…………………………… $________________________________

Page 19: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-12 Addendum No. 1

ADD ALTERNATE BID NO.2: TAXIWAY F FROM WL TO WM

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

1

1

LS

MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

2

1

LS

INSURANCE ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

3 16,528 SY

SODDING ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

4 13,254 SY

DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

5 2,207 TN

2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)

6 4,414 TN

4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)

7 20,117 SY

CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

8 19,619 SY

THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

Page 20: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-13 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

9 4,805 LF

JOINT SEALING FILLER ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

10 5,991 CY

EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and _________________________________Cents per CUBIC YARD (CY)

11 28 EA

ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and _________________________________Cents per EACH (EA)

12 1 LS

EROSION CONTROL ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

13 30 EA

REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS ______________________________________Dollars and _________ _______________________Cents per EACH (EA)

14 1,500 LF

REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

15 2,600 LF

REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

16 1,250 LF

REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

Page 21: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-14 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

17 240 LF

REMOVE CONDUIT IN EARTH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

18 2,650 LF

NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

19 1,800 LF

NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

20 275 LF

TEMPORARY/BYPASS CABLES IN 2” CONDUIT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

21 6 EA

CABLE SPLICE ______________________________________Dollars and _________________________________Cents per EACH (EA)

22 1,575 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

23 200 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, DIRECT EARTH BURIED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

24 50 LF

4-WAY 4” PVC CONDUIT, CONCRETE ENCASED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

Page 22: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-15 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

25 8 EA

CONDUIT TRANSITION ______________________________________Dollars and _________________________________Cents per EACH (EA)

26 15 EA

DUCT MARKER ______________________________________Dollars and _________________________________Cents per EACH (EA)

27 1 EA

L-867D PULLBOX ______________________________________Dollars and _________________________________Cents per EACH (EA)

28 5 EA

ADJUST ELEVATION OF EXISTING STRUCTURE (2’X2’X2’ OR SMALLER) ______________________________________Dollars and _________________________________Cents per EACH (EA)

29 1 EA

ADJUST ELEVATION AND MODIFY FOR AIRCRAFT RATED OF EXISTING STRUCTURE (3’X3’X3’ OR LARGER) ______________________________________Dollars and ________ _______________________Cents per EACH (EA)

30 32 EA

L-861T QUARTZ MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ________________________________Cents per EACH (EA)

31 4 EA

L-861T QUARTZ MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and ________________________________Cents per EACH (EA)

32 4 EA

FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and ________________________________Cents per EACH (EA)

Page 23: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-16 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

33 12 EA

ADDITIONAL FIXTURE TAG ______________________________________Dollars and _________________________________Cents per EACH (EA)

TOTAL ADD ALTERNATE NO.2 BID ITEMS: 1 THROUGH 33…………………………… $________________________________

ADD ALTERNATE BID NO.3: TAXIWAY F FROM WH TO WY

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

1

1

LS

MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

2

1

LS

INSURANCE ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

3 3,224 SY

SODDING ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

4 4,154 SY

DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

5 718 TN

2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)

Page 24: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-17 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

6 1,436 TN

4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)

7 6,544 SY

CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

8 6,383 SY

THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)

9 1,570 LF

JOINT SEALING FILLER ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

10 1,732 CY

EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and _________________________________Cents per CUBIC YARD (CY)

11 4 EA

ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and _________________________________Cents per EACH (EA)

12 1 LS

EROSION CONTROL ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)

13 20 EA

REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS ______________________________________Dollars and ________ _______________________Cents per EACH (EA)

Page 25: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-18 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

14 1,650 LF

REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

15 1,800 LF

REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and ________________________________Cents per LENGTH FEET (LF)

16 1,650 LF

REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

17 1,800 LF

NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

18 1,650 LF

NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LF

19 1,625 LF

1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)

20 2 EA

CONDUIT TRANSITION ______________________________________Dollars and _________________________________Cents per EACH (EA)

21 2 EA

DUCT MARKER ______________________________________Dollars and _________________________________Cents per EACH (EA)

Page 26: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-21-13) Contract No. 9500473 B-19 Addendum No. 1

ITEM NO.

ESTIMATED QUANTITY

UNIT

UNIT DESCRIPTION WITH

UNIT PRICE BID IN WORDS

UNIT

PRICE BID

AMOUNT

BID

22 21 EA

L-861T QUARTZ MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ________ _______________________Cents per EACH (EA)

23 2 EA

L-861T QUARTZ MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and ______________________________Cents per EACH (EA)

24 2 EA

FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and _______ _______________________Cents per EACH (EA)

25 2 EA

ADDITIONAL FIXTURE TAG ______________________________________Dollars and _________________________________Cents per EACH (EA)

TOTAL ADD ALTERNATE NO.3 BID ITEMS: 1 THROUGH 25…………………………… $________________________________

TOTAL BID SUMMARY TOTAL BASE BID ITEMS: 1 THROUGH 48………………………..………………………… $________________________________ TOTAL ADD ALTERNATE NO.1 BID ITEMS: 1 THROUGH 35………………………… $________________________________ TOTAL ADD ALTERNATE NO.2 BID ITEMS: 1 THROUGH 33………………………… $________________________________ TOTAL ADD ALTERNATE NO.3 BID ITEMS: 1 THROUGH 25………………………… $________________________________ TOTAL PROJECT BID – BASE BID & ADD ALTERNATE BIDS NO.1, 2, 3: ………. $________________________________

Page 27: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 1 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

SECTION 01010

SUMMARY OF WORK

– GENERAL PART 1

WORK COVERED BY CONTRACT DOCUMENTS 1.1

A. Work of this Contract comprises general construction for the FY12 Rehabilitate Airfield Pavements project which includes taxiway shoulder reconstruction to Group VI compliance, runway blast pad reconstruction, edge light electrical system removal and replacement, electrical fixture replacement, conversion to LED edge lights in specified locations, and lighting vault regulator replacement. Construction will be inside the Airport's Air Operations Area (AOA). The Contractor shall be responsible for reviewing all existing conditions associated with the work prior to commencement of work activities.

The specified scope items are as follows:

1. Taxiways WK, WL, & WM between Runway 18L/36R and Taxiway G (Base Bid)

a. Asphalt shoulder removal and reconstruction to Group VI compliance

b. Removal and replacement of the edge lighting system with LED fixtures

c. Taxiway Edge line and hold bar marking removal and replacement

d. Asphalt Shoulder Sealing

2. Taxiways WK, WL, & WM between Runway 18L/36R and Taxiway C (Base Bid)

a. Removal and replacement of edge lighting fixtures only with LED fixtures.

3. Runway 18L/36R (Base Bid)

a. Remove and replace the north and south blast pads.

4. Taxiway Q (Base Bid)

a. Removal and replacement of Taxiway edge markings.

Page 28: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 2 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

5. Taxiway F between Taxiways WK & WL (Add Alternate #1)

a. Asphalt shoulder removal and reconstruction to Group VI compliance

b. Removal and replacement of the edge lighting system with incandescent fixtures

c. Taxiway Edge line and hold bar marking removal and replacement

d. Asphalt Shoulder Sealing

6. Taxiway F between Taxiways WL & WM (Add Alternate #2)

a. Asphalt shoulder removal and reconstruction to Group VI compliance

b. Removal and replacement of the edge lighting system with incandescent fixtures

c. Taxiway Edge line and hold bar marking removal and replacement

d. Asphalt Shoulder Sealing

7. Taxiway F between Taxiways WH & Y (Add Alternate #3)

a. Asphalt shoulder removal and reconstruction to Group VI compliance

b. Removal and replacement of the edge lighting system with incandescent fixtures

c. Taxiway Edge line and hold bar marking removal and replacement

d. Asphalt Shoulder Sealing

CONTRACT METHOD 1.2

A. Construct the work under a Unit Price contract.

CONTRACT TIME 1.3

A. Sequence and stage work in accordance with the requirements of the Contract Documents so as to complete the work within 365 consecutive calendar days for substantial completion, with an additional 60 consecutive calendar days for final contract completion from the date set forth in the Notice to Proceed. The following project milestones apply:

1. Milestone 1: All work requiring the closure of Runway 18R-36L must be completed during an assigned 30 day Runway Closure. This Closure is anticipated to start Friday, August 23, 2013 and end

Page 29: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 3 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

Sunday, September 22, 2013. Liquidated damages for this portion of work is $1,000 per day.

2. Milestone 2: All work requiring the closure of Runway 18L-36R must be completed during an assigned 30 day Runway Closure. This Closure is anticipated to start Friday, September 27, 2013 and end Sunday, October 27, 2013. Liquidated damages for this portion of work is $1,000 per day.

HOURS OF WORK 1.4

A. Work may be performed in all areas up to 24 hours a day, 7 days a week as necessary to meet the project completion dates, except as noted below.

B. Exceptions to above work hours:

Work within aircraft parking aprons and Object Free Areas of active taxiways/taxi lanes will be restricted to the following:

1. Work activities requiring the closure of Runway 18R-36L & Runway 18L-36R will be performed during two scheduled 30 day Runway closures.

2. All work to be performed on Taxiway G will take place at night between 10:45 p.m. to 6:45 a.m.

3. All work to be performed on Taxiway Q will take place at night between 10:45 pm to 6:45 a.m.

4. Work activities within Aircraft Operations Area may be canceled and the area reopened in the event of airfield emergencies, late airline complexes, and unforeseen conditions that could create significant delays to the airport.

5. During the holidays of Thanksgiving and Christmas, the Airport has blackout dates in which no construction can occur that hinders the operation in any way. The days include the Friday before Thanksgiving to the Monday after Thanksgiving and the Friday before Christmas to the Monday after New Years Day.

CONSTRUCTION 1.5

A. The project shall be constructed in accordance with the requirements and restrictions shown on the plans.

B. The Construction Safety Phasing Plan (CSPP) provided by DFW Airport shall be incorporated in the Contractors Safety Plan.

C. The Contractor can schedule as many work crews as necessary to complete the work within the duration noted in Section 01010-1.3. However, each morning at 6:45 a.m. the airport must be able to reopen active taxiways to aircraft operations. In order for the taxiway to become

Page 30: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 4 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

operational, the following guidelines must be satisfied for the work area within 160 feet of the operational taxiway centerline.

1. Within the taxiway Object Free Area (OFA), objects or potentially hazardous conditions shall be properly marked.

2. The taxiway surfaces shall be cleaned and swept of all debris (mud, dirt, sand, loose aggregate, foreign objects, rubber deposits, other contaminates, and chemical solvents) to the satisfaction of the Owner’s Authorized Representative.

3. Disturbed unpaved areas shall be adequately compacted and sufficiently stable to prevent rutting by emergency equipment, or the loosening or buildup of surface material which could impair directional control of aircraft or drainage.

4. All excavations must be marked by lighted barricades approved by the Owner’s Authorized Representative within the taxiway safety area and by cones and lights throughout the remainder of the taxiway OFA. No objects will be allowed to remain within taxiway OFA above barricade height or 18", whichever is less.

NOTE: There may be some nights that the Airport will not allow the taxiways to be closed due to unforeseen circumstances. The Contractor will be notified each day if he will not be allowed to work. If the Contractor cannot work because of the Airport, the allotted number of calendar days noted in Section 01010-1.3 may be adjusted accordingly. The Contractor should include inefficiency costs in his bid for crew show-up time where he/she will not be allowed to work due to unforeseen circumstances in the OFA of the Taxiway.

WORK REQUIREMENTS AND RESTRICTIONS 1.6

A. The specific work requirements and restrictions are identified throughout the specifications and contract drawings. Special attention is to be given to the notes on contract drawings for construction phasing and sequencing that may only be amended by executing a change order.

B. All Contractor work activities shall be under the oversight of the Owner’s Authorized Representative (OAR).

C. Do not perform work in the AOA without the continuous presence of the OAR and/or advance approval of Airfield Operations.

D. Construction operations at the site shall be confined to areas permitted by Law, Ordinances, Permits, and these Contract Documents.

E. Restrict construction personnel from access to areas other than those designated within these specifications and associated drawings.

Page 31: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 5 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

F. Obtain a permit from the DFW Department of Public Safety for all hot work activities including cutting, welding, grinding or open flame operations.

G. The Contractor is responsible for maintaining grass (vegetation) within the construction areas on the AOA to a height less than 6 inches.

H. No personnel will be allowed into the Object Free Area of taxiway/taxi lane unless that taxiway/taxi lane has been officially closed and properly marked and lighted or “pull back” operations have been authorized by Airfield Operations adjacent to an active taxiway/taxi lane.

I. The Contractor will be required to submit the following items prior to issuance of a construction permit:

1. Spill Response Plan (SRP) - Projects that involve the use of fuels, oils, paints, chemicals, and any other material that may pose a threat to human health or the environment may require a Spill Response Plan (SRP).

2. Erosion Control Plan (ECP) - Projects that involve the disturbance of surface soils, grass, vegetation or impervious surfaces require erosion control measures. An ECP is required for projects disturbing less than one acre.

3. Construction Stormwater Pollution Prevention Plan (SWPPP) - Projects that involve the disturbance of surface soils, grass, vegetation or impervious surfaces require erosion control measures. A SWPPP is required for projects disturbing one acre or more.

4. Solid Waste Management Plan (SWMP) - Identify the types and quantities of all solid wastes (including hazardous, non-hazardous or otherwise regulated wastes) that will be generated during this project and provide details on the management of these wastes, including labeling, storage, transportation and disposal. A sample Solid Waste Management Plan spreadsheet is contained in the Guidance document.

5. Soil Management Plan (SMP) - Projects that involve the excavation, stockpiling or movement of soils and subsurface drilling require a Soil Management Plan (SMP). The SMP details the procedures that will be employed to ensure the proper handling and disposition of soils.

6. Contaminated Media Contingency Plan (CMCP) - Projects that involve excavation, drilling or other movement of soils require a Contaminated Media Contingency Plan (CMCP). The CMCP details the field screening and confirmatory laboratory sampling planned for the project to detect the presence of contaminants in the soil. The CMCP in association with the SMP will provide the appropriate disposal options for any impacted soil.

Page 32: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 6 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

7. Air Emission Estimate - Projects that involve the emission of volatile organic compounds (VOC’s) or nitrogen oxides (NOx) into the atmosphere during construction or subsequent operations may require an emissions estimate.

8. Asphalt Documentation - Projects that involve the installation of asphalt pavement require documentation of the asphalt characteristics. The use of cutback asphalt is prohibited between April 15 and September 15.

9. Construction Site SPCC Plan - Projects that involve the temporary storage of petroleum fuels for fueling construction equipment in quantities greater than 42,000 gallons below ground or 1,320 gallons aboveground (with any single container greater than 660 gallons) will require submittal of a Construction Site Spill Prevention, Control and Countermeasure (SPCC) Plan.

CONTRACTOR USE OF PREMISES 1.7

A. Authority and Project Coordination:

1. Coordination with the Board, governmental agencies, utility companies or other entities associated with performance of work required under this Contract shall be accomplished through the OAR. There shall be a daily coordination of the Contractor/OAR schedule and a Coordination Center Airfield Activity/Closure/Circuit Lockout Request to Airfield Operations no later than 11:00 a.m. for that night's and the next day's work.

2. Under unusual, urgent or emergency circumstances, Board Representatives such as the Departments of Public Safety and/or Airfield Operations may issue instructions directly to Contractor or subcontractor personnel.

3. Cooperate fully with other Contractors, Board, or FAA personnel who may be performing maintenance, navigational aid or other work within the project areas. Access to FAA facilities shall be coordinated through the OAR.

4. Notify the OAR immediately of any project conditions or situations that might affect the safety of Airport operations or constitute a deviation from the requirements and restrictions contained in these Contract Documents.

B. Safety:

1. The Contractor and all subcontractors are required to attend a kickoff safety meeting prior to the start of work. Periodic safety meetings will be required during the construction of the project.

Page 33: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 7 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

2. Implement and maintain an effective program to control the blowing of dust and debris due to wind or jet blast.

3. Provide reverse movement alarms on construction vehicles as required under OSHA regulations.

4. Ensure that all Contractor and subcontractor employees present on the job site are thoroughly familiar with and adhere to the safety and security requirements and restrictions stipulated in the Specifications before commencing work.

5. Employ adequate and OAR-approved fire and safety precautions when using open flame welding or torch cutting operations. Maintain adequate shielding to prevent pilot, employee, or public viewing of such open flame operations.

6. Provide adequate levels of artificial temporary lighting for areas of work when natural lighting is not adequate for safety and for the proper performance of work. Temporary lighting shall be approved in advance by the OAR. Lighting shall be shielded and/or aimed in a manner to prevent lighting from impairing the vision of pilots, airport personnel, air traffic controllers or the general public.

7. Provide head, ear, and eye protection to all personnel working within AOA work areas. Reflectorized vests are required outer clothing for all AOA work.

8. Adhere to supplemental project safety or security procedures that shall be prepared and issued by the OAR from time to time on an as-needed basis.

9. The Contractor shall provide a full time safety/security representative who has the authority to enforce safety requirements. That representative shall not be the project manager, superintendent, or foreman.

10. Maintain, on a 24-hour per day, seven days-a-week basis, clear unobstructed routes for routine and emergency vehicle traffic within project areas and access routes to and from project areas.

C. Construction Facilities and Storage Areas:

1. Restrict Contractor's material/equipment storage and employee parking to areas defined in the Contract documents and/or as approved by the OAR.

2. The Contractor assumes full responsibility for protection and safekeeping of all stored products.

3. General Storage: Store products immediately upon delivery and in accordance with the manufacturer's instructions, with labels and seals intact. Protect until installed. Contractor will not be allowed

Page 34: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 8 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

to store materials in terminal areas. Storage shall be arranged to provide access for maintenance and inspection.

4. Enclosed Storage: Store products subject to damage by the elements in substantial weather tight enclosures. Maintain temperature, humidity, and ventilation per manufacturer's instructions.

5. Exterior Storage: Provide substantial platforms, blocking or skids to support fabricated products above ground; slope to provide drainage. Provide impervious sheeting over products subject to dislocation and deterioration from exposure to the elements. Provide proper drainage and prevent the mixing of refuse and chemically injurious materials.

6. Do not block or obstruct any portion of any roadway while conducting activities associated with delivery or movement of materials, equipment or personnel, unless approved by the OAR in conjunction with a Traffic Control Plan.

D. Vehicle Access and Haul Routes:

1. All vehicles will be escorted from AOA access gates to project work areas and from project work areas back to AOA access gates.

2. Do not unreasonably encumber site with material or equipment.

E. Storage and Disposal of Spoils and Refuse:

1. Maintain project areas in a clean and safe condition at all times. Immediately remove all trash, debris, and surplus materials from work areas regardless of source. Clean paved surfaces within project related areas as required or directed by OAR.

F. Summary of Notification Requirements: Notify the OAR in advance of commencement of the following work activities by not less than the number of calendar days shown:

Page 35: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 9 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

ACTIVITY NOTICE (DAYS)

1. Work Activities in AOA Daily **

2. Dedicated Airfield Operations Escort 2

3. Installation/Reinstallation of Safety and Haul Route Markers

5

4. Temporary Lighting 5

5. Disconnect or Disabling of Power Circuits 5

6. Rerouting of ARFF Road 14

7. Runway/Taxiway Closure (First Notice) 30 *

8. Runway/Taxiway Closure (Second Notice)

7

9. Crane Operations (FAA Approval) 45 *

10. Crane Operations (AOA Approval) Daily **

* Denotes "Notice" process initiated by the Airport

** Daily schedules of work activities, closures, and circuit lockouts within the AOA must be submitted in writing by e-mail, fax or other means to the Coordination Center (See Section 01110 Attachment 2).

WORK BY OTHERS 1.8

A. During this contract, there may be other construction activities occurring on behalf of the AIRPORT BOARD in the same area(s). Coordination and cooperation with these contractors will be required during the prosecution of the project.

INDEX OF DRAWINGS 1.9

A. An index of all the drawings for this project is to be listed in the Contract Drawings set.

—PRODUCTS PART 2

Not Used.

- EXECUTION PART 3

Not Used.

- END OF SECTION -

Page 36: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport SUMMARY OF WORK Contract No. 9500473 01010- 10 (revised 6-20-13) Issue for Bid FY12 Rehabilitate Airfield Pavements April 27, 2013

This page intentionally left blank.

Page 37: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 1 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

SECTION 01810

COMMISSIONING

PART 1 – GENERAL

1.1. SUMMARY

A. Section includes the following:

1. Start up and testing of equipment and systems.

2. Identification and documentation of equipment and system deficiencies and failures.

3. Corrective actions and acceptance of corrected equipment and systems.

4. Operation and Maintenance (O & M) manuals and Owner Training.

5. Coordination of Subcontractors / Installer requirements.

1.2 DESCRIPTION

A. Equipment/systems to be commissioned will be listed in detail in the below listed Technical Specifications.

1. Lighting Systems (Lights and Fixtures)

2. Constant Current Regulators

1.3 DEFINITIONS

A. COMMISSIONING: Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the Owner’s operational needs. Commissioning during the construction phase is intended to achieve the following specific objectives according to the Contract Documents.

1. Verify that applicable equipment and systems are installed according to the contract requirements, manufacturer’s recommendations and to industry accepted minimum standards and that they receive adequate operational checkout by installing contractors.

2. Verify and document proper performance of equipment and systems.

3. Verify that O&M documentation is complete.

Page 38: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 2 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

4. Verify that the Owner’s operating personnel are adequately trained.

B. COMMISSIONING AGENT: The Commissioning Agent chairs the Commissioning Team and coordinates and oversees the development and execution of the Commissioning Plan. The Commissioning Agent shall be selected and employed by the Owner. The Commissioning Agent firm shall employ a licensed professional engineer in the state of Texas and shall be experienced in the commissioning of mechanical and electrical systems of the type and complexity installed in this project. Experience in construction process, direct digital control systems, test and balance. The Commissioning Agent shall not be associated with or employed by the Contractor or any of its subcontractors or equipment/systems suppliers connected with the project.

C. COMMISSIONING COORDINATORS: Authorized Representatives of the Owner, Contractor, Installing Contractors or other members of the Commissioning Team who are designated in writing to the Commissioning Team, who attend commissioning meetings and who act as the responsible central point of contact between their companies and the Commissioning Team.

D. COMMISSIONING PLAN: The commissioning plan, written and prepared by the Commissioning Agent, provides guidance and outlines the execution of the commissioning process, verifying that the systems perform at or above the expected level as specified in the contract documents. The Commissioning Plan is a detailed account of the Commissioning activities as they relate to the project. The plan includes a listing of commissioning team members, phases of the particular project, each team member’s commissioning-related responsibilities during each phase and the expected deliverables from each team member. Communication protocols between the members of the team and their respective companies are defined in the Commissioning Plan. As a living document, the plan will be continuously updated to reflect the evolving process as developed by the Commissioning Team.

E. COMMISSIONING TEAM: The Commissioning Team will normally consist of the following members:

1. Commissioning Agent (CxA).

2. Architect/Engineer (Designer).

3. General Contractor.

4. Controls Contractor (CC).

5. Electrical Contractor (EC).

6. Mechanical Contractor (MC).

7. Owner’s Authorized Representative (OAR).

8. Owner’s Building or Plant Operator/Engineer.

Page 39: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 3 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

9. Other Installing Subcontractors or suppliers of equipment.

F. CONTRACTOR: The individual, partnership, firm, or corporation primarily liable for the acceptable performance of the Work contracted and for the payment of all legal debts pertaining to the Work who acts directly or through lawful agents or employees to complete the contract Work.

G. CONTRACTORS TEST REPORT: Contractors’ tests are defined as any form of start-up, adjustment or calibration performed on individual pieces of equipment as specified within the technical sections of the construction documents. The Commissioning Agent will provide a Test Report Form to be used by the Installing Contractor as a cover sheet to the actual test results, for the documentation of each specified contractors test.

H. DEFICIENCY: An issue that prohibits the successful passing of any step on the verification test procedure for any equipment/system that is specified in the commissioning scope of the project.

I. INSTALLING CONTRACTOR: Contractor/Supplier responsible for the actual installation of the equipment/system.

J. PRE-FUNCTIONAL / SYSTEM READINESS CHECKLIST: Checklists created by the Commissioning Agent designed to demonstrate that the system is completely installed and ready for operational testing. At the end of installation, the Installing Contractor completes the checklist to certify that the work is complete and the system is ready for independent verification testing.

K. VERIFICATION / FUNCTIONAL TEST PROCEDURE: A procedure that confirms each system will perform as specified functionally. The Installing Contractor will perform the verification. The Commissioning Agent will coordinate and witness the final verification testing. During the verification testing, the Installing Contractor will sequence the system as outlined in the approved verification test procedure and provide the required test equipment.

1.4 COMMISSIONING PLAN

A. Commissioning Plan. The Commissioning Plan provides guidance in the execution of the commissioning process. The Commissioning Plan is included at the end of this section for reference only.

B. Commissioning Process. The following provides a brief overview of typical commissioning tasks during construction and the general order in which they occur.

1. Commissioning during construction begins with a scoping meeting conducted by the Commissioning Agent where the commissioning process is reviewed with the commissioning team members.

Page 40: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 4 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

2. Additional meetings will be required throughout construction to plan, scope, coordinate, schedule future activities and resolve problems.

3. Equipment documentation is submitted to the Commissioning Agent through normal submittals, including detailed start-up procedures.

4. The Commissioning Agent works with the Commissioning Team in developing start-up documentation formats, including pre-functional checklists to be completed, during the start-up process.

5. The checkout and performance verification proceeds from simple to complex, from component level to equipment to systems and intersystem levels with pre-functional checklists being completed before functional testing.

6. The Installing Contractors, under their own direction, execute and document the pre-functional checklists and perform start-up and initial checkout. The Contractor documents that the checklists and start-up were completed according to the approved plans. Installing Contractor(s) will provide (72) hours notice, normal business days, notification to the Commissioning Agent, Owner’s Authorized Representative, and User/O&M personnel of the date and time scheduled for performing start-up and initial checkout processes prior to the start up so that these personnel may witness start-up and the initial checkout.

7. The Contractor in cooperation with the Installing Contractors, suppliers and manufacturers, develops specific equipment and system functional performance test procedures.

8. The procedures are executed by the Installing Contractors, under the direction of, and documented by the Contractor with representation from the Commissioning Agent.

9. Items of non-compliance in material, installation or setup are corrected at the Installing Contractor’s expense and the system retested.

10. The Contractor reviews the O&M documentation for completeness and schedules and coordinates Owner training. All O&M documentation must be submitted and approved before the start of training.

11. Commissioning shall be completed and documented before Substantial Completion Inspection is scheduled.

12. The Contractor reviews, pre-approves and coordinates the training provided by the Installing Contractors and verifies that it was completed.

Page 41: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 5 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

13. Deferred testing is conducted, as specified or required.

1.5 RESPONSIBILITIES

A. The Contractor shall:

1. Develop and provide a complete list of equipment and systems to be commissioned and of equipment and systems requiring Owner training for inclusion into the Commissioning Plan.

2. Facilitate the coordination of the commissioning work and ensure that commissioning activities are being scheduled into the master schedule.

3. Include the cost of commissioning in the contract price.

4. Furnish a copy of all construction documents, addenda, Requests for Information (RFI), change orders, and approved submittals and shop drawings related to commissioned equipment to the Commissioning Agent.

5. Ensure each purchase order or subcontract written, includes requirements for submittal data, O&M data, commissioning tasks and training.

6. Develop and document Commissioning Test Procedures for all equipment with Installing Contractors.

7. Ensure that all Installing Contractors execute their commissioning responsibilities according to the Commissioning Plan, Contract Documents and schedule.

8. Designate Commissioning Coordinator who shall attend commissioning scoping meeting and other necessary meetings scheduled by the Commissioning Agent to facilitate the commissioning process.

9. Coordinate the training of the Owner Personnel. Review and approve Contractor Training Plans. Coordinate digital recording (DVD format) of owner personnel training.

B. The Contractor shall ensure that the Installing Contractor:

1. Include the cost of commissioning as a line item in the sub-contract price.

2. In each purchase order or subcontract written, provide submittal data, O&M data, commissioning tasks and training according to Contract Documents.

3. Designate Commissioning Coordinator who shall attend commissioning scoping meeting and other necessary meetings

Page 42: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 6 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

scheduled by the Commissioning Agent to facilitate the commissioning process.

4. Provide normal cut sheets and shop drawings submittals of approved commissioned equipment as part of the normal submittal process.

5. Provide additional requested documentation, prior to normal O&M manual submittals to the Contractor and Commissioning Agent for development of start-up and functional testing procedures.

a. This will include detailed manufacturer installation and start-up, operating, troubleshooting and maintenance procedures, full details of any owner-contracted tests, full factory test reports, if any, and full warranty information, including clearly identifying all responsibilities of the Owner to keep the warranty in force. In addition, the installation, start-up and checkout materials that are actually shipped inside the equipment and the actual field checkout sheet forms to be used by the factory or field technicians shall be submitted to the Contractor and the Commissioning Agent.

b. Provide proposed O&M Manual format, organization and content to the Commissioning Agent for review and comment.

c. Note: The Commissioning Agent may request further documentation necessary for the commissioning process.

6. Provide a copy of the O&M manuals and submittals of commissioned equipment through normal channels through the Contractor to the Commissioning Agent for review and comment.

7. Assist (along with the design engineers) in clarifying the operation and control of commissioned equipment in areas where the specifications, control drawings or equipment documentation is not sufficient for writing detailed testing procedures.

8. Installing Contractors shall provide to the Commissioning Agent the specific functional performance test procedures to ensure feasibility, safety and equipment protection and provide necessary written alarm limits to be used during the tests through the Contractor.

9. Develop a full start-up and initial checkout plan using manufacturer’s start-up procedures and the pre-functional checklists for all commissioned equipment. Submit through the Contractor to Commissioning Agent for review and comment prior to start-up.

Page 43: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 7 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

10. During the start-up and initial checkout process, execute the System Readiness (Pre-functional) Checklists for all commissioned equipment.

11. Perform and clearly document all completed start-up and system operational checkout procedures, providing a copy to the Contractor and Commissioning Agent.

12. Address and resolve current punch list items before functional testing.

13. Provide skilled technicians to execute starting of equipment and to execute the functional performance tests. Ensure that they are available and present during the agreed upon schedules and for sufficient duration to complete the necessary tests. Adjustments and problem solving.

14. Perform Functional Performance testing for specified equipment. Assist the Commissioning Agent in interpreting the monitoring data, as necessary.

15. Correct deficiencies (differences between specified and observed performance) as interpreted by the Contractor and/or Commissioning Agent and designer and retest the equipment.

16. Prepare O&M manuals according to the Contract Documents, including clarifying and updating the original sequences of operation to as-built conditions.

17. Prepare redline and CAD (electronic) as-built drawings for all drawings and final as-builts for contractor-generated coordination drawings.

18. Provide training of the Owner’s operating personnel as provided for in the plans specified above.

19. Coordinate with equipment manufacturers to determine specific requirements to maintain the validity of the warranty. Develop, execute and document Contractor Maintenance Plans for equipment put into service prior to Beneficial Occupancy. Provide records and reports of all pre-turnover maintenance.

20. Provide equipment for testing per specification requirements.

C. The Contractor shall ensure that Equipment Suppliers:

1. Provide all requested submittal data, including detailed start-up procedures and specific responsibilities of the Owner to keep warranties in force.

2. Include all special tools (including software) and instruments (only available from vendor, specific to a piece of equipment) required for testing equipment according to these Contract Documents in the

Page 44: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 8 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

base bid price to the Contractor, except for stand-alone data logging equipment that may be used by the Commissioning Agent.

3. Provide information requested by the Commissioning Agent regarding equipment sequence of operation and testing procedures.

4. Review test procedures for equipment installed by factory representatives.

D. Architect/Engineer (Designer).

1. Designate a Commissioning Coordinator who shall attend commissioning scoping meeting and other necessary meetings scheduled by the Commissioning Agent to facilitate the commissioning process.

2. Provide Basis of Design (BOD) documentation for inclusion in the O&M Manual to the Contractor.

3. Prepare System Readiness Checklists for each equipment/system to be commissioned.

4. Assist in clarifying the operation and control of commissioned equipment in areas where specifications, control drawings or equipment documentation is not sufficient for writing detailed testing procedures.

5. Review O&M manuals according to Contract Documents.

6. Provide technical assistance for resolution of non-conformances or deficiencies as appropriate.

E. Commissioning Agent. The primary role of the Commissioning Agent is to coordinate the development and execution of a Commissioning Plan, and to observe and document performance – which systems are functioning in accordance with the documented design intent and in accordance with the Contract Documents. The Commissioning Agent is not responsible for design concept, design criteria, compliance with codes, design or general construction scheduling, cost estimating, or construction management. The Commissioning Agent may assist with problem solving non-conformances or deficiencies, but ultimately that responsibility resides with the Contractor, Installing Contractor, Manufacturer and/or the Designer (as appropriate).

1. Coordinates the development of and maintains the Commissioning Plan.

2. Coordinates the commissioning activities.

3. Coordinate the commissioning work and coordinate with the Commissioning Team to assure that commissioning activities are being scheduled into the master schedule.

Page 45: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 9 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

4. Assist with the revisions, as necessary, to the Commissioning Plan – Construction Phase.

5. Plan and conduct a commissioning scope meeting.

6. Request and review additional information required to perform commissioning tasks, including O&M materials, Contractor start-up and checkout procedures.

7. Before start-up, gather and review the current control sequences and interlocks and work with Installing Contractor and Design Engineers until sufficient clarity has been obtained, in writing, to be able to assure detailed testing procedures are written.

8. Review normal Contractor and Installing Contractors submittals applicable to systems being commissioned for compliance with commissioning needs, along with Contractor design reviews.

9. Review, approve and distribute preliminary pre-functional tests and checklists.

10. Review and approve an enhanced start-up and initial systems checkout plan as developed by the Installing Contractors.

11. Perform site visits, as necessary, to observe component and system installations. Attend selected planning and job-site meetings to obtain information on construction progress. Review construction-meeting minutes for revisions / substitutions relating to the commissioning process. Assist in resolving any discrepancies.

12. Approve pre-functional tests and checklist completion by reviewing pre-functional checklist reports and by selected site observation and spot-checking.

13. Approve systems startup by reviewing start-up reports and by selected site observation.

14. Analyze any functional performance trend logs and monitoring data to verify performance.

15. Coordinate witness and approve manual functional performance tests performed by Installing Contractors. Coordinate retesting as necessary until satisfactory performance is achieved.

16. Review equipment warranties to assure that the Owner’s responsibilities are clearly defined.

17. Oversee and coordinate the training of the Owner’s operating personnel.

18. Compile and maintain a commissioning issues record log.

19. Review and approve the preparation of the O&M manuals.

Page 46: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 10 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

20. Provide a final commissioning report. Make suggestions for improvements and for recording these changes in the O&M manuals. Identify additional areas that should be included in the warranty information provided or in other areas under the construction contract. Assist facility staff in developing reports, documents and requests for services to remedy outstanding problems.

1.6 SCHEDULING

The Commissioning Agent will work with the Commissioning Team to schedule the commissioning activities. The Commissioning Agent will provide sufficient notice to the Commissioning Team for scheduling commissioning activities. The Contractor will integrate all commissioning activities into the master schedule. All parties will address scheduling problems and make necessary notifications in a timely manner in order to expedite the commissioning process.

1.7 QUALITY ASSURANCE

Each Contractor will assign a Commissioning Coordinator Representative with at least five years experience with coordination of construction disciplines and verification testing of complete systems. The Contractors Commissioning Coordinators will be submitted for approval by Owner’s Authorized Representative subject to satisfactory experience and performance. Contractor Commissioning Coordinator’s responsibilities include:

1. Coordination Meetings.

2. Planning.

3. Scheduling.

4. Documentation.

5. Close communication and coordination with Commissioning Agent.

6. Development of Testing Procedures in coordination with the Installing Contractor.

7. Installing Contractors’ test report submittal.

8. System readiness checklists submittal.

9. Perform system verification tests.

10. Corrective actions rectification and documentation.

11. Specified training planning and coordination.

1.8 QUALITY CONTROL

Page 47: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 11 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

A. Ensure that the Contractor and all its’ Installing Contractors follow the established Contractor’s Quality Control Program and Procedures.

B. Ensure that the Contractor and its’ Installing Contractors correct all deficiencies and make necessary adjustments to O&M manuals and as-built drawings for applicable issues identified in any seasonal testing.

1.9 SUBMITTALS

A. The Commissioning Agent will provide the Contractor with a specific request for the type of submittal documentation required to facilitate the commissioning work. These requests include the submission of electronic versions of all submittals, documents, manuals, etc. and will be integrated into the normal submittal process and protocol of the Construction Team and added to the Contractor’s submittal register. At minimum, the request will include:

1. Manufacturer and model number.

2. Manufacturer’s printed installation and detailed and detailed start-up procedures.

3. Full sequences of operation.

4. O&M data.

5. Performance data.

6. Any performance test procedures.

7. Control drawings.

8. Details of Owner contracted tests.

9. List of installation materials that are actually shipped inside/with the equipment.

10. Actual field checkout sheet forms to be used by the factory or field technicians.

11. Factory test results.

B. All documentation requested by the Commissioning Agent will be included in the Installing Contractors O&M manual contributions.

C. The Commissioning Agent will review and approve submittals related to the commissioned equipment for conformance to the Contract Documents as it relates to the commissioning process, to the functional performance of the equipment and to adequacy for developing test procedures. This review is intended primarily to aid in the development of functional testing procedures and only secondarily to verify compliance with equipment specifications.

Page 48: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 12 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

D. Contractor to ensure that Installing Contractors designate Commissioning Coordinators and provide information facilitating the incorporation and coding identification of commissioning activities in the Contractors’ master construction schedule within four (4) weeks of contract award.

E. Contractor submit detailed verification testing schedule to Commissioning Agent at least four (4) weeks prior to start of testing.

F. Contractor to ensure that Installing Contractors submit Test Reports through the Contractor to Commissioning Agent upon successful completion of each test.

G. Contractor to ensure that Installing Contractors submit Operation and Maintenance manuals (Format, Content, and Organization) through the Contractor to Designer and the Commissioning Agent for review within at least ninety (90) days prior to the start of scheduled verification testing.

H. Contractor and Installing Contractors submit Operations and Maintenance manuals and the individual technical sections requiring operations and maintenance manuals. The requirements of these Sections will govern.

I. The vendor and equipment installer/sub-contractor will certify that installed and operating equipment and systems have been completed (with all deficiencies corrected) and that they are performing to contract specifications per tests and other requirements stipulated.

1.10 TRAINING

A. Contractor shall coordinate operation and maintenance training activities through the Commissioning Plan.

1. Contractor shall provide training plans for equipment software systems and major components as specified in individual Technical Specifications ninety (90) days prior to beginning Verification testing.

B. The Training Plan should include:

1. Equipment or system involved in training session.

2. Trainer’s name, company and experience.

3. Course outline and list of training materials.

4. Time required for the training session(s).

C. Suggested Training Topics:

1. Preventive Maintenance procedures and frequencies.

2. Visual inspection parameters. Operating sound and noise warnings.

3. Normal range of gauge and meter readings.

4. Use of special tools.

Page 49: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 13 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

5. Source of operating supplies, lubricants, cleaning materials, etc.

6. Manufacturer contact names and telephone numbers.

7. Warranty periods and enforcement procedures.

8. Design and normal functional operating parameters (capacities, flows, temperatures, speeds, energy consumption, etc.

9. Breakdown or malfunction conditions and troubleshooting.

10. Routine testing procedures.

D. Contractor shall document performance of training session by completing the Operation and Maintenance Training Form. Indicate on the form:

1. Date of training.

2. List of attendees and their affiliation.

3. Planned duration of training (hours & minutes).

4. Topics agenda, Instructor names & company affiliation, instructor phone numbers.

5. Detailed list of planned handouts.

E. Contractor shall obtain written acceptance of training session from the Commissioning Agent on Operation and Maintenance Training Form.

F. Contractor shall videotape all training sessions. Record each session on a dedicated digital video disk (DVD) standard play mode. Submit (4) DVDs to the Commissioning Agent with fully executed Operation and Maintenance Training Form.

PART 2 – PRODUCTS

2.1 TEST EQUIPMENT

A. All standard testing equipment required to perform startup and initial checkout and required functional performance testing shall be provided by the Installing Contractor for the equipment being tested.

B. Special equipment, software, tools and instruments (only available from vendor, specific to a piece of equipment) required for testing equipment, according to these Contract Documents shall be included in the base bid price to the Contractor and left on site.

C. All testing equipment shall be of sufficient quality and accuracy to test and/or measure system performance with the tolerances specified in the Specifications.

Page 50: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 14 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

D. Calibration records for all testing equipment to be provided to the Commissioning Agent through the Contractor.

PART 3 – EXECUTION

3.1 MEETINGS

A. Scoping Meeting. Approximately 30-60 days prior to commencement of construction (of the equipment/systems to be commissioned), the Commissioning Agent will schedule, plan and conduct a commissioning scoping meeting with the entire commissioning team in attendance. It is the intent that there will be multiple scoping meetings held for multiple features of Work as the construction progresses. The Contractor will prepare and distribute meeting minutes to all parties. Information gathered from this meeting will allow the Commissioning Agent to revise the Commissioning Plan to its “final” version, which will also be distributed to all parties.

B. Miscellaneous Meetings. Other meetings will be planned and conducted by the Commissioning Agent as construction progresses. These meetings will cover such items as coordination, deficiency resolution and planning issues with particular Installing Contractors.

3.2 REPORTING

A. The Commissioning Agent will provide regular reports.

B. The Commissioning Agent will regularly communicate with all members of the Commissioning Team, keeping them apprised of commissioning progress and scheduling changes through memos, progress reports, etc.

C. The Commissioning Agent will prepare non-conformance and deficiency reports with the review and testing as described in later sections.

D. A final summary report by the Commissioning Agent will be provided focusing on evaluating commissioning process issues and identifying areas where the process could be improved. All acquired documentation, logs, minutes, reports, deficiency lists, communications, findings, unresolved issues, etc., will be compiled in appendices and provided with the summary report. Pre-functional checklists, functional tests and monitoring reports will not be part of the final report, but will be stored in the Commissioning Record in the O&M Manuals.

3.3 CONTRACTOR TESTS

A. The Contractor shall ensure that the Installing Contractor/Suppliers provide a list and schedule of specified contractor tests to the Commissioning Agent.

Page 51: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 15 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

B. Unless specified otherwise, the Contractor shall provide a minimum two weeks (2) notice to the Commissioning Agent before execution of specified Contractor’s tests.

C. The Contractor shall submit test reports to the Commissioning Agent and Architect/Engineer (Designer) within one week of completion of each test.

3.4 SUBSTANTIATING SYSTEM READINESS

A. The Contractor shall construct or install systems and confirm readiness for testing prior to start of verification test procedures.

B. The Contractor shall inform the Commissioning Agent in writing of system readiness for verification testing at least two-weeks (2) prior to the scheduled start of testing. Complete System Readiness Checklists and submit to Commissioning Agent.

C. The Contractor shall perform and document instrumentation and digital controller calibration or provide documentation verifying manufacturer’s performance of calibration prior to verification testing. The Commissioning Agent may observe calibration procedures.

D. System verification testing will not commence until system is documented ready for testing via submittal of System Readiness Checklist to the Commissioning Agent.

3.5 START-UP, PRE-FUNCTIONAL / SYSTEM READINESS CHECKLISTS AND INITIAL CHECKOUT

A. The following procedures apply to all equipment and systems to be commissioned.

B. The Installing Contractor responsible for startup of any equipment/system will develop detailed start-up plans for all equipment. Each piece of equipment will receive a full pre-functional checkout. The Commissioning Agent will assist in the development of detailed start-up plan to ensure that each of the manufacturer-recommended procedures has been completed. Parties responsible for pre-functional checklists and startup are identified in the commissioning scoping meeting and in the checklist forms. Parties responsible for executing functional performance tests are identified in the testing requirements.

1. The Commissioning Agent will assist in the development of checklists that indicate required procedures to be executed as part of startup and initial checkout of the systems and the party responsible for their execution.

2. The Contractor determines which trade is responsible for executing and documenting each of the line items tasks and notes that trade

Page 52: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 16 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

on the form. Each form may have more than one trade responsible for its execution.

3. The Contractor will assure that the Installing Contractor responsible for the purchase of the equipment develops the full start-up plan by combining (or adding to) the Architect/Engineer (Designer’s) checklists with the manufacturer’s detailed start-up and checkout procedures from the O&M manual and the normally used field checkout sheets. The plan will include checklists and procedures with specific boxes or lines for recording and documenting the checking and inspections of each procedure and a summary statement with a signature block at the end of the plan. The full start-up plan could consist of something as simple as:

a. The pre-functional checklists.

b. The manufacturer’s standard written start-up procedures copied from the installation manuals with check boxes by each procedure and a signature block added by hand at the end.

c. The manufacturer’s normally used field checkout sheets.

4. The Contractor will have the Installing Contractor submit the full start-up plan to the Commissioning Agent for review and approval.

5. The Commissioning Agent reviews and approves the procedures and the format for documenting them, noting any procedures that need to be added.

6. The full start-up procedures and the approval form may be provided to the Contractor for review and approval, depending upon the management protocol.

C. Execution of Pre-functional Checklists and Start-up.

1. Two (2) weeks prior to start-up, the Contractor and its’ Installing Contractors and vendors will schedule start-up and checkout with the Commissioning Agent. The performance of the pre-functional checklists, startup and checkout are directed and executed by the Installing Contractor or vendor with oversight by the Contractor. When checking off pre-functional checklists, signatures may be required of other Installing Contractors for verification of completion of work.

2. The Commissioning Agent shall observe the procedures for each piece of primary equipment, unless there are multiple units, (in which case a sampling strategy may be used as approved).

3. For lower-level components of equipment the Commissioning Agent shall observe a sampling of the pre-functional and start-up procedures.

Page 53: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 17 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

4. The Contractor in conjunction with Installing Contractors and vendors shall execute start-up and provide the Commissioning Agent with a signed and dated copy of the completed start-up and pre-functional tests and checklists.

5. Only individuals that have direct knowledge and witnessed that a line item task on the pre-functional checklist was actually performed shall initial or check that item off.

D. Deficiencies, Non-conformance and Approval in Checklists and Start-up.

1. The Contractor shall insure that the Installing Contractors clearly list any outstanding items of the initial start-up and pre-functional procedures that were not completed successfully, at the bottom of the procedures form or on an attached sheet. The procedures form and any outstanding deficiencies are provided to the Contractor and Commissioning Agent within two (2) days of test completion.

2. The Contractor and Commissioning Agent review the report and submit either a non-compliance report or an approval to the Installing Contractor. The Contractor and Commissioning Agent shall work with the Installing Contractors and vendors to correct retest deficiencies or uncompleted items. The Contractor shall have its’ Installing Contractor or vendors correct all areas that are deficient or incomplete in the checklists and test in a timely manner, and shall notify the Commissioning Agent as soon as outstanding items have been corrected and resubmit an updated start-up report and a Statement of Correction on the original Non-Compliance Report. When satisfactorily completed, the Commissioning Agent recommends approval of the execution of the checklists and start-up of each system using a standard form.

3.6 VERIFICATION/ FUNCTIONAL TESTS

A. Objective. The objective of functional testing and verification tests is to demonstrate that each system is operating according to the documented design intent and Contract Documents. Functional testing facilitates bringing the systems from a state of substantial completion to full dynamic operation. Each system should be operated through all modes of operation where there is a specified system response. Verifying each sequence in the sequences of operation is required.

B. Functional testing and verification may be achieved by manual testing (persons manipulate the equipment and observe performance) or by monitoring the performance and analyzing the results. The Commissioning Agent will determine which method is most appropriate for tests that do not have a method specified. Simulating conditions shall be allowed, though timing the testing to experience actual conditions is encouraged wherever practical. Each function and test shall be performed

Page 54: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 18 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

under conditions that simulate actual conditions as close as is practically possible. The Contractor and its’ Installing Contractor executing the test shall provide all necessary materials, system modifications, etc. to produce the necessary flows, pressures, temperatures, etc. necessary to execute the test according to the specified conditions. At completion of the test, the Contractor and its’ Installing Contractor shall return all affected building equipment and systems, due to these temporary modifications, to their pre-test condition.

C. The Contractor and its’ Installing Contractors perform verification test procedures as outlined in the approved verification test plan.

D. The Installing Contractors will provide input into the Contractors master scheduling process with regards to timing and duration of verification test procedures.

E. The Commissioning Agent will review and provide comment on final detailed verification test procedures developed by the Contractor and its’ Installing Contractors based on the system shop drawings and submittals. Provide feedback as to the efficiency of the procedures and possible alternate approaches to achieving the same results.

F. The Contractor and its’ Installing Contractors will provide personnel and equipment, to perform the verification test procedures.

3.7 CORRECTIVE ACTIONS

A. The Contractor shall perform corrective actions for resolution of deficiencies found during:

1. QA/QC reviews/inspections and listed in the Outstanding Punch List Log.

2. Contractor testing.

3. Test and balance.

4. Control System Calibration.

5. System Readiness Checklist performances.

6. Verification testing.

B. The Contractor will document deficiencies discovered during the commissioning process on Corrective Action Report (CAR) Form within one (1) working day of discovery.

1. Deficiency Identification Process:

a. Document Date of identification.

b. Describe nature of deficiency.

c. Enter deficiency into Outstanding Punch List Log.

Page 55: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 19 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

d. Distribute original CAR to the Installing Contractor’s Commissioning Coordinator.

e. Distribute copies to:

1). Commissioning Agent.

2). Owner’s Authorized representative.

3). Architect/Engineer (Designer).

4). Other contractors impacted by deficiency.

2. The Contractor shall have the Installing Contractor:

a. Obtain original form.

b. Record date of direction.

c. Provide description of corrective action required.

d. Name of person issuing the direction.

e. Estimated date to complete the corrective action.

f. Distribute original form Commissioning Agent.

g. Distribute copies to:

1). Owners Authorized Representative.

2). Architect/Engineer (Designer).

3). Contractor.

4). Installing Contractor’s Commissioning Coordinator.

5). Other contractors impacted by deficiency.

3. The Contractor shall require its’ Installing Contractor/Supplier to take the following actions when Corrective Actions are Completed (by Installing Contractor/Supplier and/or Contractor):

a. Obtain the original form.

b. Record date of correction.

c. Provide description of final equipment status or corrective action performed.

d. Name of Installing Contractor/Supplier performing work.

e. Submit original form through channels to Commissioning Agent.

f. Distribute copies to:

1). Owners Authorized Representative.

2). Architect/Engineer (Designer).

3). Contractor’s Commissioning Coordinator.

Page 56: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 20 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

4). Commissioning Coordinator of the Installing

Contractor/Supplier.

5). Other contractors impacted by deficiency.

4. The Commissioning Agent will perform Verification of Corrective Action Completion:

a. Date of retest.

b. Status description - resolved or more work required.

c. Name of person performing verification.

d. Enter resolution into Outstanding Punch List Log.

e. Distribute copies to:

1). Owners Authorized Representative.

2). Architect/Engineer (Designer).

3). Installing Contractor’s Commissioning Coordinator.

4). Contractor.

5). Other contractors impacted by deficiency.

C. Cost of Retesting. The cost for the Contractor or its Installing Contractor to retest a pre-functional or functional test, if they are responsible for the deficiency, shall be theirs. If they are not responsible, any cost recovery for retesting costs shall be negotiated with the Contractor in accordance with the Contract Documents.

D. Failure Due to Manufacturer Defect. If ten percent (10 %), or three (3) each, whichever is greater, of identical pieces (size alone does not constitute a difference) of equipment fail to perform to the Contract Documents (mechanically or substantively) due to manufacturing defect, not allowing it to meet its submitted performance spec, all identical units may be considered unacceptable. The Contractor shall provide the Owner with the following:

1. Within one (1) week of notification, the Installing Contractor or manufacturer’s representative shall examine all other identical units making a record of the findings. The findings shall be provided within two (2) weeks of the original notice.

2. Within two (2) weeks of the original notification, the Installing Contractor or manufacturer shall provide a signed and dated, written explanation of the problem, cause of failures, etc. and all proposed solutions, which shall include full equipment submittals of the original installation.

Page 57: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 21 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

3. The Owner will determine whether a replacement of all identical units or a repair is acceptable.

4. Upon acceptance, the Contractor, Installing Contractor and/or manufacturer shall replace or repair all identical items, at their expense and extend the warranty accordingly, if the original equipment warranty had begun. The replacement/repair work shall proceed with reasonable speed beginning within one (1) week from when parts can be obtained.

E. Approval. The Commissioning Agent notes each satisfactorily demonstrated function on the test form. The Commissioning Agent recommends acceptance of each test using a standard form. The Owner’s Authorized Representative gives final approval on each test using the same form, providing a signed copy to the Commissioning Agent and the Contractor.

3.8 OPERATION AND MAINTENANCE MANUALS

A. The following O&M manual requirements do not replace O&M manual documentation requirements elsewhere in these specifications.

B. The Architect/Engineer (Designer) shall compile and prepare design documentation for all equipment and systems designed and specified in each Division of the Technical Specifications and deliver this documentation to the Contractor for inclusion in the O&M manuals, according to this Section, prior to the training of Owner personnel.

C. The Commissioning Agent shall receive a copy of the O&M manuals for review.

D. Field checkout sheets and logs should be provided to the Commissioning Agent for inclusion in the Commissioning Record Book Section of the O&M Manuals.

E. Review of the commissioning related sections of the O&M manuals shall be made by the Architect/Engineer (Designer), Contractor and the Commissioning Agent.

3.9 TRAINING OF OWNER PERSONNEL

A. The Contractor shall be responsible for training coordination, scheduling and ultimately to ensure that training is completed.

B. The Commissioning Agent shall be responsible for overseeing and approving the content and adequacy of the training of Owner personnel for commissioned equipment.

3.10 WRITTEN WORK PRODUCTS

Page 58: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport COMMISSIONING Contract No. 9500473 01810- 22 Issue For Bid FY12 Rehabilitate Airfield Pavements (revised 6-20-13) April 27, 2013

A. The Contractors’ written work products will consist of the start-up and initial checkout plan described and the filled out start-up, initial checkout and pre-functional checklists, manufacturer’s factory and field testing and inspection forms, Contractor inspection forms, and Operation and Maintenance Manuals both in electronic and hard copy. These work products will be supplied to the Commissioning Agent to be included in the final commissioning report.

- END OF SECTION -

Page 59: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

Rehabilitate Airfield Pavement FY12 Contract No. 8500285

Commissioning Plan

September 28th

, 2012

Contact: Michele Swayzer, P.E. QCxP, Project Manager Swayzer Engineering, Inc. Email: [email protected] 3102 Maple Ave, Suite 205 Phone: 214-880-7929 Dallas, Texas 75201

Page 60: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

i COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Table of Contents

1.0 Overview ........................................................................................................................ 2

1.1 Abbreviations and Definitions ............................................................................... 2

1.2 Commissioning Plan Purpose .............................................................................. 2

1.3 Commissioning Scope ......................................................................................... 3

1.4 Commissioned Equipment Systems ..................................................................... 3

1.5 Forms .................................................................................................................. 3

2.0 General Project Information ......................................................................................... 5

3.0 Design, Commissioning, and Construction Team Data ............................................. 5

4.0 Roles and Responsibilities ........................................................................................... 6

4.1 Role and Responsibility Descriptions and Explanations ....................................... 6

4.2 Team Members .................................................................................................... 6

4.3 General Management Plan .................................................................................. 6

4.4 General Role Descriptions ................................................................................... 6

5.0 Commissioning Process Description .......................................................................... 7

5.1 Commissioning Scoping Meeting ......................................................................... 7

5.2 Preliminary and Final Commissioning Plan Updates ............................................ 7

5.3 Site Observation .................................................................................................. 7

5.4 Miscellaneous Meetings ....................................................................................... 8

5.5 Miscellaneous Management Protocols ................................................................. 8

5.6 Progress Reports and Logs ................................................................................. 9

5.7 Submittals and Documentation ............................................................................ 9 5.7.1 Standard Submittals ................................................................................. 9 5.7.2 Special Submittals, Notifications and Clarifications .................................. 9

5.8 Construction Check Lists, Start-up Plan and Initial Checkout ............................ 10 5.8.1 Initial Checkout and Start-up Plan (CL's) ................................................ 10 5.8.2 Initial Checkout and Start-up Execution .................................................. 11 5.8.3 Deficiencies and Non-Compliance .......................................................... 11

5.9 Functional Testing and Verification Development .............................................. 11 5.9.1 Functional Testing Overview .................................................................. 11

Page 61: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

ii COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

5.9.2 Functinal Testing Plan Overview ans Status Record .............................. 12 5.9.3 Functinal Testing Scope ......................................................................... 12 5.9.4 Development Process ............................................................................ 12

5.10 Functional Testing Execution ............................................................................. 13 5.10.1 Functional Testing Procedure Overview and Process ............................ 13 5.10.2 Deficiencies and Retesting ..................................................................... 13 5.10.3 Facility Staff Participation ....................................................................... 13 5.10.4 Sampling ................................................................................................ 13

5.11 O&M Manuals, Warranties, and Commissioning Record Book .......................... 13 5.11.1 O&M Manual and Warranty Overview .................................................... 13 5.11.2 Commissioning Record Book ................................................................. 14

5.12 Owner Personnel Training and Orientation ........................................................ 14

6.0 Summarry Report ........................................................................................................ 14

7.0 Schedule ...................................................................................................................... 15

7.1 General Issues ................................................................................................... 15

7.2 Project Schedule ................................................................................................ 15

Page 62: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

iii COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Appendix 1 – Application Forms

Form Title

C-01 Construction Issues Log

C-02 Commissioning Document Tracking and Control Log

C-03D Commissioning Request For Information

C-03E Commissioning Request For Information Log

C-05 Staff Training and Orientation Record

C-06 Commissioning Corrective Action Report

C-07 Commissioning Progress Record

C-14 Facility Staff Participation in Commissioning

C-17 Submittal Review

C-18 Observations and Tests

C-21 Operation and Maintenance Manual Review

C-22 Construction Checklist Review

Appendix 2 – Construction Checklists

Checklist Title

CL-0201 Lighting Systems (Lights and Fixtures)

CL-0202 Constant Current Regulators (5) (CCR)

Appendix 3 – Functional Performance Testing

Checklist Title

FT-0201 Lighting Systems (Lights and Fixtures)

FT-0202 Constant Current Regulators (5) (CCR)

Page 63: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

iv COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Cx Process Appendices

Appendix A Project Intent

Appendix B Basis of Design (BOD)

Appendix C Commissioning Specifications – N/A

Appendix D Design Reviews – N/A

Appendix E Commissioning Meetings

Appendix F Submittal Reviews

Appendix G Commissioning Process Issues

Appendix H Construction Checklists (CC’s)

Appendix I Site and Observation Visits

Appendix J O&M Manual Reviews

Appendix K TAB Verification Report – N/A

Appendix L Systems Manual– N/A

Appendix M Training

Appendix N Functional Performance Testing

Appendix O Transition Meeting – N/A

Appendix P Warranty Reviews

Appendix Q Lessons Learned Workshop – N/A

Page 64: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 1 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Commissioning Plan – Construction Phase

Project: Rehabilitate Airfield Pavement FY12 Commissioning Plan Version

x Preliminary – Design Phase

Contact: Preliminary – Bid Phase

Construction Phase

Date: September 28th, 2012 Final Acceptance Phase

Plan Approved:

Signature Title Date

sellis
Text Box
Stacie Ellis, PM
Page 65: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 2 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

1.0 Overview

Fundamental Building Systems Commissioning Tasks:

1. Engage a Cx Agent

2. Review design intent and Basis of Design

3. Include Cx Requirements in construction documents

4. Develop and utilize a Cx Plan

5. Verify installation, functional performance, training and documentation for each commissioned system and/or component

6. Complete a Commissioning Report

1.1 Abbreviations and Definitions

The following are common abbreviations used in this document.

A/E - Architect & Engineer Design Team

EC - Electrical Contractor

CxAg - Commissioning Agent FT - Functional Test CxAu - DFW Cx Authority Designees GC - General Contractor

CC - Controls Contractor LC - Louver Contractor CL - Construction Check List MC - Mechanical Contractor CM - Construction Manager PM - Project Manager Cx - Commissioning SMC - Sheet Metal Contractor

Cx Cord - Commissioning Coordinator Subs - Subcontractors

Cx Plan - Commissioning Plan document TAB - Test and Balance Contractor

1.2 Commissioning Plan Purpose

The Commissioning Plan purpose is to provide clear and concise procedures for the commissioning process and to provide a record of the results of the commissioning process. It is a means of issue resolution, describes the roles of parties, means of reporting, means of approval, and coordination. The materials and information that is developed during the commissioning process are included in the appendices.

The structure of this Commissioning Plan is a main body and appendices. The specific sections include:

Project and Contact Information: Proper communication is critical for the success of any project. This section lists the contact information for the commissioning team members.

Roles and Responsibilities: The roles and responsibilities of each commissioning team member are clearly defined in this section. The goal of this section is to have each individual understand what they must do and how they fit into the entire process.

Communication Structures: The communication paths to be used by the commissioning team members are detailed in this section.

Page 66: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 3 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Commissioned Systems and Equipment: The commissioned systems include those that are in the commissioning authority’s contract. These systems were expanded using the drawings and specifications to develop a detailed listing of each type of equipment in each system to be commissioned.

Commissioning Process Description: This section provides a detailed description of the tasks to be accomplished during the commissioning process. Focuses specifically on what must be accomplished during the design, construction, turnover, and operation phases of the project.

Commissioning Process Schedule: there are specific sequences of events that must occur during the commissioning process. These events are detailed in this section. In addition, details on the LEED requirements, if applicable, for the commissioning activities are included within this section.

Appendices: The appendices present the information developed during the commissioning process. As work is completed, the results are added to the proper appendix and the status and date of the document are inserted into Table 1 found on page 4.

1.3 Commissioning Scope

Commissioning is a systematic process ensuring building systems perform interactively according to design intent and Owner’s operational needs. For this project, this is achieved by beginning in the design phase and continuing through the acceptance period with performance verification.

The commissioning process is intended to achieve the following specific objectives in accordance with contract documents:

Ensure applicable equipment and systems are installed properly and receive adequate operational checkout by installing contractors.

Verify and document proper equipment and system functional testing.

Ensure O&M documentation is complete.

Ensure Owner’s operating personnel are adequately trained.

1.4 Commissioned Equipment / Systems

The following equipment / systems shall be commissioned.

1. Lighting Systems (Lights and Fixtures)

2. Constant Current Regulators (5) (CCR)

1.5 Forms

Commissioning (application) forms are referred to in this plan by: Form C-xx, where “C” represents Construction phase.

Blank forms are found in Appendix 1 at the end of this document.

Page 67: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 4 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Table 1. Appendix Completion Status

Appendix Name Status Date of

Document

Appendix A - Project Intent - -

Appendix B - Basis of Design (BOD) - -

Appendix C - Commissioning Specifications N/A -

Appendix D - Design Review 65%

Design Review 95%

IFB Design Review

N/A

-

-

-

Appendix E – Pre-Scoping Meeting (K/O) - -

Appendix F – Submittal Reviews - -

Appendix G – Commissioning Process Issues - -

Appendix H – Construction Checklists (Completed) - -

Appendix I – Site Visit and Commissioning Meeting Reports - -

Appendix J – O&M Manual Reviews - -

Appendix K – TAB Verification Report N/A -

Appendix L – Systems Manual N/A -

Appendix M – Training - -

Appendix N – Functional Performance and Seasonal Testing - -

Appendix O – Transition Meeting N/A -

Appendix P – Warranty Review - -

Appendix Q – Lessons Learned Workshop N/A -

Page 68: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 5 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

2.0 General Project Information

Project Name: Rehabilitate Airfield Pavements FY12

Project Location: DFW Airport, Texas

Project Agency: DFW International Airport Board

Construction Period:

3.0 Design, Commissioning, and Construction Team Data

Team Member Company and

Contact Names

Office/Cell, Fax,

and E-mail Address

Owner DFW International Airport Asset Management Department 3010 East Airfield Drive DFW Airport, TX 75261-9428

Phone:

Fax:

E-mail:

Airport Project

Manager

Stacie Ellis , PM ADE Building 3003 S. Service Rd

Phone:

Cell:

E-mail:

Project Architect Phone:

Cell:

E-mail:

Mechanical

Design Engineer

Phone:

Fax:

E-Mail:

Electrical Design

Engineer

Construction

Manager

TBD Phone:

Cell:

E-mail:

General

Contractor

TBD Phone:

Cell:

Email:

Commissioning

Agent,

Representative

Michele Swayzer, P.E. Swayzer Engineering, Inc. 3102 Maple Ave, Suite 450 Dallas, TX 75201

Phone: 214-880-7929

Fax: 214-880-9005

Cell: 214-878-7929

E-mail: [email protected]

sellis
Text Box
Rehabiliate Airfield Pavements FY12
Page 69: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 6 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

4.0 Roles and Responsibilities

4.1 Role and Responsibility Descriptions and Explanations

Role and responsibility descriptions and explanations are found in the following locations: Team Members: Cx Plan, Section 4.2.

General Management Plan: Cx Plan, Section 4.3.

General Role Descriptions: Cx Plan, Section 4.4.

Specific Responsibilities:

All parties: Cx Plan.

CM, PM: Cx Plan.

Construction Contractor Specifications. Div 1 thru 14.

Mechanical Contractor, Specifications Div. 1 and 15.

TAB Contractor, Controls Contractor: Electrical Contractor, Communications Specifications Div. 1 , 16 and 17. Contractor, Security Contractor:

CxAg: Specifications Div. 1, 15, 16 and 17.

4.2 Team Members

Commissioning team members consist of Dallas Fort Worth Airport Asset Management (AM) Department personnel, Dallas Fort Worth Airport QA personnel (QA), Dallas Fort Worth Airport QC personnel (QC), CxAg, PM, and CM assigned members. Also included are mechanical, electrical, test and balance, and controls contractors, installing subcontractors and/or equipment suppliers.

4.3 General Management Plan

Dallas Fort Worth Airport Development Department contracted the CxAg on behalf of Dallas Fort Worth Airport Asset Management Department. The CxAg coordinates commissioning activities and reports to Dallas Fort Worth Airport Asset Management Department’s Project Manager. All members work together to fulfill their contracted responsibilities and meet contract document objectives.

4.4 General Role Descriptions

General commissioning role descriptions are:

CxAg: Coordinates Cx process, performs limited construction observations, identifies concerns and issues to A/E & PM, writes Cx plan; construction check lists; and functional testing requirements and procedures, functional testing status record, oversees, and documents performance verification tests, and provides limited problem resolution assistance.

PM: Facilitates and supports the Cx process, approves Cx work, and approves test plans.

CM: Facilitates Cx process, ensures Subs perform their responsibilities, and integrates Cx into construction process, schedule, and approves test plans.

Page 70: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 7 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

GC: Responsible for and demonstrates proper system installation and performance (typically through the use of its installers, subs, and/or manufacturer

A/E: Performs construction observation, During testing a design issues may result in a request for information from the A/E. The A/E or Contractor provide written response to the CA listing their disposition on each issue and their planned actions, reviews, modifies and issues Cx Specifications, approves O&M manuals, and assists in resolving problems.

Subs: Demonstrates proper system installation and performance.

Mfr.: Equipment manufacturers and vendors provide documentation to facilitate commissioning work and perform contracted start-up services.

5.0 Commissioning Process Description

This section sequentially details the commissioning process by commissioning task or activity. The intent of this section is to document how the tasks are accomplished as part of the commissioning effort for this project. This information is prescriptive and stepwise in nature to focus the commissioning efforts on verifying the owner’s project intent has been met.

5.1 Commissioning Scoping Meeting

The CxAg conducts a commissioning scoping meeting prior to acceptance phase testing. Representatives of CxAg, CM, PM, A/E, MEP engineers and Subs should attend. The agenda shall be as follows:

Commissioning party introduction.

Commissioning process overview.

Preliminary Cx Plan overview.

Management and reporting line overview.

Roles and responsibilities.

Proposed commissioning schedule.

5.2 Preliminary and Final Commissioning Plan Updates

The CxAg prepares the Preliminary Commissioning Plan prior to the Scoping meeting. The Commissioning Plan is then updated from information gathered from the scoping meeting and throughout the project. The initial commissioning schedule is also developed in Section 7. The commissioning schedule shall be adjusted as construction progresses. Prior to primary equipment start-up, the CxAg shall meet with CM and PM to develop a detailed commissioning schedule. The PM approves the final commissioning plan.

5.3 Site Observation

The CxAg, PM, and selected DFW personnel make periodic site visits as necessary to witness equipment and system installations. As construction progresses and mechanical and electrical system installation activities increase; the CxAg may increase the frequency of site observations as required. A site observation report will provide an overview for each site observation. Observed deficiencies shall be documented on Form C-6, Commissioning Corrective Action Report, and tracked on form C-1, Construction Commissioning Issues Log, Form C-6 shall be forwarded to the design team for coordination of system deficiency resolution with a copy being sent to the project manager.

Page 71: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 8 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

5.4 Miscellaneous Meetings

The CxAg attends selected planning and job-site meetings and shall provide meeting minutes thereof. The PM and CM provide the CxAg with information regarding substitutions, change orders, or any Design Change Notices (DCN’s) that may affect commissioned equipment and systems, or the commissioning schedule. The CxAg shall review construction-meeting minutes, or change orders, for the same purpose.

The CxAg shall schedule commissioning team member meetings through the PM as required during construction.

5.5 Miscellaneous Management Protocols

The following protocols shall be used on this project:

Issue Protocol

Requests for information (RFI) or formal documentation requests:

The CxAg forwards to Design Team or CM as appropriate.

Minor or verbal information and clarifications:

The CxAg communicates to Design Team or CM as appropriate.

Deficiency notification: The CxAg documents deficiencies through A/E, but may discuss deficiency issues with the CM prior to notifying A/E. Copies of deficiency reports shall be provided to PM.

FT’s or Training Scheduling: The CxAg may provide input for (and do some coordination of) training and testing, but does not schedule tests or training.

Commissioning meeting scheduling:

The CxAg coordinates date and schedules through PM and CM.

Significant change requests: The CxAg has no authority to issue contract changes.

Minor change requests: The CxAg may suggest (through PM to go to A/E for approval) changes in sequences of operations to improve efficiency or to control or correct deficiencies. Engineer approved changes shall be documented and forwarded to CM for modification by responsible subcontractor.

Disagreements between contractors and CxAg’s requests or interpretations:

First works with CxAg. Second through CM. The CM shall work with CxAg directly or through PM for resolution as required.

Page 72: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 9 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

5.6 Progress Reports and Logs

The CxAg provides PM with periodic commissioning progress reports. Progress report frequency may be increased to twice per month, as necessary, just prior to initial major equipment start-up and continuing until functional testing is complete and all non-compliance issues are resolved.

Progress reports contain:

Schedule update with requested schedule changes and newly scheduled items.

New and outstanding deficiency list described on Form C-6, Commissioning Corrective Action Report and tracked on form C-1, Construction Commissioning Issues Log.

Commissioning progress that may include Form C-7, Commissioning Progress Record.

The CxAg regularly communicates with commissioning team members keeping them apprised of outstanding issues, commissioning progress, and scheduling through memos, progress reports, etc. The CxAg maintains all commissioning related materials to become part of final commissioning report.

5.7 Submittals and Documentation

5.7.1 Standard Submittals

The CxAg provides subcontractors responsible for commissioned equipment and systems with respective commissioning documentation requirements through the CM and PM. Subcontractor documentation submissions typically coincide with the Engineer submittal process.

At a minimum, documentation submissions shall contain:

Manufacturer’s installation instructions.

Start-up and checkout procedures.

Operation and Maintenance data.

Performance data.

Control drawings.

Sequence of Operations

The CxAg reviews commissioning related submissions specified in contract documents. Form C-2, Request for Documentation and Record of Submissions for Commissioning, shall be used to request documentation and to track documents. Form C-2 shall also be used for part of the final O&M documentation review checkoff.

5.7.2 Special Submittals, Notifications, and Clarifications

Sub-contractors, CM, or A/E shall notify CxAg within one week of approval of any design intent or operating parameter changes, commissioned system changes, added control strategies and operation sequences, or other change orders that may affect commissioned systems. The GC provides CxAg with a complete points list including details requested by CxAg in accordance with Specification Section 01810. Thirty (30) days prior to performing any applicable DFW-contracted tests, the sub’s must provide CxAg with full procedural details. These submittals do not constitute O&M manual submittal compliance. O&M manual documentation requirements are discussed in Commissioning Plan, Section 5.11. The CxAg may request additional design narrative clarification from A/E and/or the Contractor depending on completeness of original bid documents. The CxAg may submit written RFIs to contractors through CM using Form C-3D, Commissioning Request for Information.

Page 73: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 10 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

5.8 Construction Check Lists, Start-up Plan and Initial Checkout

Construction Check Lists (CLs) augment and are combined with manufacturer’s installation instructions, start-up instructions, and checkout plans. CLs help to document that systems have been installed and operate in accordance with contract documents and manufacturer’s recommendations and to ensure functional testing proceeds with minimal delays. Responsible contractors must fill in each commissioned equipment and system construction check list. No prefunctional testing sampling strategies shall be used. System prefunctional testing must be successfully completed prior to formal respective equipment, subsystem or assembly functional testing. CLs are primarily static inspections and procedures to identify installation requirements, equipment, or system initial operation requirements (e.g., oil levels OK, fan belt tension, labels affixed, gages in place, sensor Calibration, etc.). However, some pre-functional items entail simple testing of component function, equipment, or system piece (such as measuring voltage imbalance on a three-phase pump motor of a chiller system). As the term implies, “prefunctional” testing refers to testing that takes place prior to functional testing.

Contractors normally perform some, if not all, pre-functional items recommended by CxAg as part of start-up. This project requires written documentation of the installing contractor’s procedures. The CxAg witnesses selected prefunctional testing and start-up procedures and some spot-checking thereof.

The intent of these checklists is to verify the proper equipment was delivered prior to acceptance. If problems are not identified at this stage, then schedules and budgets are often compromised for both the owner and contractors.

There are system-based (ductwork, piping, etc.) and component-based (heat pumps, AHU’s, etc.) installation checklists. System-based check lists are developed to be used regularly on the systems for which work is on-going, and component-based checklists are separated based on the task being completed (e.g. hanging the box, hooking ductwork up, etc.) and are to be completed during a particular installation step.

Construction checklists are provided in Appendix 2 at the end of this document.

5.8.1 Initial Checkout and Start-up Plan (CL’s)

The CxAg assists commissioning team members to develop detailed equipment prefunctional testing and start-up plans. Responsible parties are identified in Form C-7, Commissioning Progress Record, and in CLs.

The following procedures shall be used:

1. The CxAg obtains manufacturer’s installation instructions, start-up instructions, and checkout plans, along with field technician checkout sheets from CM. Contractors shall provide supplemental detail and documentation to CxAg for systems with inadequate manufacturer’s start-up and checkout procedures, particularly components integrated with other equipment.

2. The CxAg develops a construction check list for each equipment piece from these materials.

3. Construction check lists, manufacturer’s installation instructions, start-up instructions, and checkout plans along with field technician checkout sheets become the Start-up and Checkout Plan.

4. The CxAg transmits the complete Start-up and Checkout Plan to the CM, who designates which trade or contractor is responsible to fill out each line item as indicated in the “Contr” column on the PC form. The CM then transmits the full start-up plan to Subs for their

Page 74: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 11 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

review and use. (This usually means CLs, alone, go to more than one Sub, while the full plan goes to the primary installing contractor.)

5.8.2 Initial Checkout and Start-up Execution

Subs and vendors schedule prefunctional testing and start-up with PM, CM, and CxAg four weeks prior to execution. Prefunctional testing and start-up are directed and executed by Subs and/or vendors. The CxAg, assisted by selected Owner Staff and PM, if necessary, observes selected prefunctional testing and start-up procedures.

To document prefunctional testing and start-up processes, site technicians performing line item tasks initial and date each construction check list paragraph, start-up plan, and manufacturer’s field checkout sheets. Only individuals having direct knowledge of a line item being completed shall check and initial forms.

Subs and vendors execute and submit signed construction check lists and start-up tests to CxAg for approval/acceptance. The CxAg may review prefunctional testing in progress. Each responsible trade shall fill out their portion of the construction check list form and provide them to CxAg through CM. The CxAg and/or selected Owner’s Staff may conduct spot-checks of completed forms.

5.8.3 Deficiencies and Non-Compliance

Subs must clearly identify incomplete start-up and construction check list items at bottom of procedure form or attach sheets as required. The procedure form and deficiencies must be provided to CxAg within 7 days of test completion. The CxAg works with Subs and vendors to correct deficiencies or incomplete items and retest, involving CM and others as necessary. Installing Subs or vendors correct deficient or incomplete areas according to checklists and tests. The CxAg completes Form C-7, Commissioning Progress Record, to recommend system start-up approval and forwards it to PM. The CxAg records all issues/deficiencies on Form C-01, as well as tracking of the cost benefits of commissioning.

5.9 Functional Testing and Verification Development

The CxAg uses a formal acceptance phase for use in the commissioning process that helps to facilitate the closeout of a project and helps minimize problems upon occupancy. The two items that are critical to this phase is the completion of functional testing and the completion of additional training.

5.9.1 Functional Testing Overview

Functional testing is equipment and system dynamic testing under all specified operation modes in lieu of individual system components (e.g., associated exhaust fan is tested interactively with air handling unit to verify constant differential pressure set point under various load conditions). Systems shall be tested under various modes in accordance with industry established test procedures, such as low or high load, component failure, unoccupied mode, varying outside air temperatures, fire alarm, power failure, etc. Equipment and system responses to all specified operation sequences shall be verified. The CxAg develops functional testing procedures in a sequential written format and coordinates, oversees, and documents installing contractor and/or vendor performed testing.

Page 75: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 12 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

5.9.2 Functional Testing Plan Overview and Status Record

The CxAg prepares the functional testing schedule and to integrate functional testing into the construction schedule. The CxAg will identify testing prerequisites, required contractors, and estimated time required for each test. The CxAg shall record results during functional testing.

5.9.3 Functional Testing Scope

The following equipment / systems will be tested:

Sample functional performance testing procedures are presented in Appendix 3 at the end of this document.

Table 2. List of Systems and Equipment to be Commissioned by the General Contractor (GC).

GC to provide Qualified Personnel to commission equipment identified. Construction Checklist and Functional Tests shall be provided to the GC for review and completion prior to scheduling functional tests. See items below.

Cx’ed

System Equipment Included

Reviews Checklists Field

Review

PVT

** Design Spec Submtl Sys Equip

Electrical System

Lighting Systems (Lights and Fixtures)

Constant Current Regulators (5) (CCR) Construction Checklist

* NC Represents items not completed to date and “C” represents items completed

** FPT Functional Performance Test

5.9.4 Development Process

Before writing testing procedures, the CxAg shall obtain all required documentation and change orders affecting commissioned equipment and systems, including updated points list, control sequences, and set points. The CxAg shall develop specific testing procedures to verify proper operation of all equipment and systems listed in the Commissioning Plan and Specifications. The CxAg shall obtain additional clarification from contractors and/or the Engineer regarding operation sequences as required.

Prior to functional testing execution, the CxAg shall provide a copy of equipment, and systems functional testing forms to the PM, who forwards them to installing Subs through the CM. The subs review tests for feasibility, safety, warranty, and equipment protection. Blank test procedure copies are included in O&M manuals for later use by facility operation staff.

Functional testing and verification may be preformed manually in accordance with State and Regulatory Guidelines or by manipulating equipment and observing performance. The CxAg follows the specified test procedures when given and uses discretion when test procedures are not given to determine which method is most appropriate. The CxAg reviews Owner-contracted

1. Lighting Systems (Lights and Fixtures)

2. Constant Current Regulators (5) (CCR) Construction Checklist

Page 76: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 13 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

and factory required tests where applicable to determine if further testing is required for specification compliance verification.

5.10 Functional Testing Execution

5.10.1 Functional Testing Procedure Overview and Process

The CxAg schedules functional testing through PM and CM. Prior to performing any equipment or system functional testing, the CxAg obtains CLs with signatures confirming systems are ready for functional testing. The CxAg oversees, witnesses, and documents all equipment and system functional testing according to Cx Specifications and Plan. The Subs execute tests, unless otherwise specified. Testing proceeds from components, to subsystems, to systems, and finally to system interlocks. Refer to Commissioning Plan, Section 6 for additional functional testing scope details.

5.10.2 Deficiencies and Retesting

Minor deficiencies discovered during functional testing may be corrected during testing at the CxAg’s discretion. The CxAg records test results on the functional testing procedure form. Deficiencies and non-compliance issues are noted and reported to CM and PM on Form C-6, Commissioning Corrective Action Report. Subs correct deficiencies, notify CxAg of correction, and return Form C-6 certifying correction.

The CxAg schedules re-testing through the CM. Decisions regarding deficiencies and corrections are made between CxAg or CM and Sub. Primary dispute resolution authority resides with the Owner followed by the Engineer. The CxAg recommends test acceptance to CM who gives final approval for each test using Form C-22, Commissioning Construction check list and Start-up Submittal / Approval. Form C-7, Commissioning Progress Record, is provided for progress tracking and status.

5.10.3 Facility Staff Participation

DFW personnel shall assist CxAg and participate in the testing process. Form C-14, Facility Staff Participation in Commissioning, summarizes planning of staff involvement. The CxAg shall notify the PM, who shall then notify facility staff when commissioning events will occur.

5.10.4 Sampling

Multiple identical pieces of non-life-safety or otherwise non-critical equipment may be functionally tested using a sampling strategy at the CxAg’s direction. Commissioning Specifications address allowed sampling strategies.

5.11 O&M Manuals, Warranties, and Commissioning Record Book

5.11.1 O&M Manual and Warranty Overview

The CxAg reviews commissioned systems O&M manuals, documentation, and as-built drawings for specification compliance verification. The CxAg recommends O&M manual approval and acceptance to CM. The CxAg also reviews equipment warranties for clear Owner requirement descriptions to keep warranties in force.

Page 77: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 14 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

5.11.2 Commissioning Record Book

The CxAg compiles, organizes, and indexes listed commissioning data by equipment into labeled, indexed, and tabbed three-ring binders. Binders and O&M manuals shall be delivered to the CM upon construction completion. Correspondence, meeting minutes, progress reports, miscellaneous notes, etc. shall be kept in only the Construction Phase Commissioning Record Book. The manual format shall be as follows:

General Tab I -1 Commissioning Plan. Tab I -2 Final Commissioning Report. Tab I -3 Commissioning Issues Log (Form C-1). Tab I -4 Commissioning Progress Record (Form C-7).

Equipment Specific Tab 01 System Type 1 Mechanical System(s)

Sub - Tab A Equipment 1 design narrative and criteria, sequences, and approvals

Sub - Tab B Start-up plan and report, approvals, corrections, blank CLs with separator sheets for each equipment type

Sub - Tab C Completed functional test reports, trending and analysis, approvals and corrections, training plan, records and approvals, blank functional test forms, and recommended re-commissioning schedule.

Tab 02 System Type 2 Repeat for Subsequent systems.

5.12 Owner Personnel Training and Orientation

Refer to Bid Document Specifications.

6.0 Summary Report

The CxAg shall provide PM with a final summary report within 30 days of substantial completion. The report shall include an executive summary, participant list, participant roles, and brief building description, commissioning scope, testing scope, and testing method description. For all commissioned equipment and systems, the report shall contain the CxAg’s opinion regarding the commissioning team meeting contractual obligations for:

Equipment performing in accordance with design intent.

Correct equipment installation.

Functional performance and efficiency.

Operator training.

All outstanding non-compliant items shall be specifically listed. Recommendations for equipment or operation improvement, future actions, commissioning process changes, etc. shall also be included. Each non-compliance issue shall be referenced to specific functional test, inspection, trend log, etc. where deficiency is documented. Equipment functional performance and efficiency shall include a brief verification method description (manual testing, building control system trend log, data loggers, etc.) and include observations and conclusions.

Appendices shall contain control sequence documentation, logs, meeting minutes, progress reports, deficiency lists, site visit reports, findings, unresolved issues, communications, etc.

Page 78: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 15 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Construction check lists and functional tests (along with blanks for operators), and monitoring data and analysis shall be provided in a separate labeled binder.

The commissioning plan, construction check lists, functional tests, and monitoring reports shall be included in the Commissioning Record and O&M manuals, as described in Specification Section 01810.

7.0 Schedule

7.1 General Issues

The following sequential priorities shall be followed:

1. Equipment shall not be used until pre-start checklist items and all manufacturers’ pre-start procedures have been completed. Moisture, dust, and other environmental and building integrity issues must also have been addressed.

2. System functional testing shall begin only after prefunctional testing, and start-up work has been completed. This requirement is not intended to preclude phased functional testing.

7.2 Project Schedule

Refer to master project schedule.

Table 7-1. Commissioning Schedule Summary

Tasks / Activity Estimated Start Date Estimated End Date

Design Phase

Project Intent - -

Initial basis of Design - -

Commissioning Plan (draft) - -

Develop Cx Specifications - -

65% Design Review - -

100 % Design Review - -

IFB Design Reviews - -

Final Basis of Design - -

Construction documents review - -

General Tasks / Activities

CxAg to prepare Pre-Scoping Meeting Preliminary Construction Phase Commissioning Plan. (Cx Plan, Section 5.2)

- -

CxAg to conduct scoping meeting. (Cx Plan, Section 5.1)

- -

Page 79: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 16 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Tasks / Activity Estimated Start Date Estimated End Date

CxAg to provide commissioned equipment and system documentation requirements to CM. (Cx Plan, Section 5.7.1)

- -

Begin construction site visits and inspections. (Cx Plan, Section 5.3)

- -

Start-up and Checkout Tasks / Activities

CM to compile manufacturer’s installation instructions, start-up instructions, and checkout plans and deliver to CxAg. (Cx Plan, Section 5.8.1.1)

- -

CxAg to prepare start-up and checkout plans and deliver to CM. (Cx Plan, Section 5.8.1.4)

- -

CM to deliver notification of prefunctional testing and start-up execution to CxAg. (Cx Plan, Section 5.8.2)

14 days prior to scheduled prefunctional

testing and start-up -

Execute prefunctional testing and start-up. (Cx Plan, Section 5.8.2)

Upon completion of each Equipment / System

installation -

CM to forward completed construction check lists to CxAg. (Cx Plan, Section 5.8.2)

Upon completion of checklist; but at least 72 hrs prior to scheduled FT

-

Functional testing Tasks / Activities

CM to forward all documentation and change orders affecting commissioned equipment and systems to CxAg. (Cx Plan, Section 5.7.2)

- -

CM to prepare control sequences and deliver to CxAg.

- -

CxAg to prepare functional testing forms and deliver to CM. (Cx Plan, Section 5.9.4)

- -

CxAg to prepare functional testing schedule to CM. (Cx Plan, Section 5.10.1)

- -

Execute functional performance tests. (Cx Plan, Section 5.10.1)

- -

Page 80: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473

REHABILITATE AIRFIELD PAVEMENT FY12

- 17 - COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Tasks / Activity Estimated Start Date Estimated End Date

O&M Manuals and Training Tasks / Activities

CxAg to review O&M manuals and provide approval recommendation to CM. (Cx Plan, Section 5.11.1)

- -

CxAg to prepare training and orientation agenda and forward to CM. (Cx Plan, Section 5.12.1.1)

- -

Prepare training and orientation materials and forward to CxAg for review. (Cx Plan, Section 5.12.1.2)

- -

Execute training and orientation. (Cx Plan, Section 5.12)

- -

CxAg to prepare final commissioning summary Report and forward to PM. (Cx Plan, Section 6.0)

- -

Execute seasonal or deferred functional testing. (Cx Plan, Section 5.13)

- -

Page 81: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Appendix 1. Commissioning Application Forms

Form Title

C-01 Construction Issues Log

C-02 Commissioning Documentation Tracking and Control Log

C-03D Commissioning Request for Information

C-03E Commissioning Request for Information Log

C-05 Staff Training and Orientation Record

C-06 Commissioning Corrective Action Report

C-07 Commissioning Progress Record

C-14 Facility Staff Participation in Commissioning

C-17 Submittal Review

C-18 Observations and Tests

C-21 Operation and Maintenance Manual Review

C-22 Construction Checklist Review

Page 82: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C- 01- CONSTRUCTION ISSUES LOG

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Constructions Issues Log Identification:

Issue Date: Issue Number:

B. Construction Issues Log Executed By:

(Name) (Discipline)

C. Construction Issues Log Sent To:

Mechanical Engineer Mechanical Engineer

Construction Manager / General Contractor Construction Manager / General Contractor

Owner / Project Manager Other: _____________________________

D. Construction Issues Log Copied To:

(Name) (Discipline)

E. Purpose and Issue Classification:

The purpose of this document is to present ongoing tracking of issues identified as of the date of this document, as well as tracking the cost benefits of commissioning .

The matrix below is segmented as follows:

• Tracking - Identifies Relevant Dates

• Original Issues - Items identified during previous site observation or system Functional Performance Testing

• Original Comments - Comments made during previous site observation or system Functional Performance Testing

Issues are classified as follows:

• Back –Check - System refinement resulting from testing or site observation requiring future back checking

• Closed - Issue is considered resolved and is therefore closed

• Correction - Amendment of issue on preciously issued report

• Corrective Action - System deficiency found during site observation or system FPT requiring corrective action prior

to system initial FPT execution or FPT re-execution

• Designer Input - Designer input requested

• Requested Information - Requested information

• Summary - Test result summary

• Terminal - Previously identified issue planned to be pursued no further

Areas of Concern:

Cited observations are classified according as follows:

• GEN General Comment

• IEQ Indoor Environmental Quality Issue

• COD Code Issue

• QC Quality Control Issue

• CON Contract Requirement Issue

• INST Installation Issue

Page 83: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C- 01- CONSTRUCTION ISSUES LOG

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Issue Comments Tracking

Issue No.

Issue Classification

Area of Concern Description Action Taken

Date Identified

Date Contr.

Notified Resolution

Date

Benefits Summary:

Page 84: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C- 01- CONSTRUCTION ISSUES LOG

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Commissioning Benefits Matrix

Components Measures

Measure Code

Implemented [Y, N, ?] Detail Problems & Remediation Measures

Solid State 400Hz Frequency Converters

Frequency Converters Paralleling System

s

28VDC Gate Boxes

Molded Case Circuit Breakers – 60Hz & 400Hz

Controls

Design, Installation, Retrofit,

Replacement

Operations & Control Maintenance Design Change

Installation Modification

Retrofit / Equipment

Replacement

Other

Implement Advanced Reset

Start / Stop (Enviro. Determined)

Scheduling (Occupancy

Determined)

Modify Setpoint

Equipment Staging

Modify Sequence of Operation

Loop Tuning

Manual Changes to Operations

Other

Calibration

Mechanical Fix

Heat Transfer Maintenance

Filtration Maintenance

Other

S

F

V

M

C

D1

D2

D3

D4

O1

O2

O3

O4

O5

O6

O7

O8

O9

M 1 M 2 M 3 M 4 M

Page 85: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

Required Document

Discipline

Required By

Date Required

Date Received By

CA

Comments

Notes

Plans and Specs

ALL

DFor Commissioning Use

Current Addendums

ALL

DFor Commissioning Use

Schedules Showing

Commissioning

Activities

ALL

CFor Review and comments

Design Intent Document

CA

For Review and comments

Design Criteria

D-ALL

DFor Review and comments

Equipment submittal

Schedule

ALL

C4 weeks prior to

contract aw

ard

For review and comments

Product Submittals

ALL

C,D

Approved with Comments

Shop Drawings

ALL

C,D

Inform

ation Only

Coordination Drawings

ALL

D,O

Inform

ation Only

Submittal Log or Registry

ALL

Inform

ation Only

RFI's

ALL

OInform

ation Only

RFI's with responds

ALL

D,O

Inform

ation Only

RFI Log

ALL

C,D

Inform

ation Only

ASI's, SIs, Bulletins,

ALL

D,O

Inform

ation Only

PCOs

ALL

OInform

ation Only

CCDs

ALL

OInform

ation Only

Change Orders

ALL

OInform

ation Only

DA

LL

AS

/ F

OR

T W

OR

TH

AIR

PO

RT

RE

HA

BIL

ITA

TE

AIR

FIE

LD

PA

VE

ME

NT

FY

12

FORM C- 02- DOCUMENTATION TRACKING & CONTROL LOG

Design and Construction Documents

Legend: D= Design Team C= Contractor CA= Commissioning Agent O=Owner

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Page 86: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DA

LL

AS

/ F

OR

T W

OR

TH

AIR

PO

RT

RE

HA

BIL

ITA

TE

AIR

FIE

LD

PA

VE

ME

NT

FY

12

FORM C- 02- DOCUMENTATION TRACKING & CONTROL LOG

Legend: D= Design Team C= Contractor CA= Commissioning Agent O=Owner

Fan Coil Units

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Exhaust Fans

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Heat Pumps

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Electric Unit Heaters

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Computer Room AC

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Mechanical Controls

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Air Compressor System

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Equipment Documents for Verification Testing procedures (VTPs)

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Page 87: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DA

LL

AS

/ F

OR

T W

OR

TH

AIR

PO

RT

RE

HA

BIL

ITA

TE

AIR

FIE

LD

PA

VE

ME

NT

FY

12

FORM C- 02- DOCUMENTATION TRACKING & CONTROL LOG

Legend: D= Design Team C= Contractor CA= Commissioning Agent O=Owner

HW Pressure W

asher

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

1/14/2011

Manufacturer Start up and

recommendations. O&M

Material

Only received product data

Solar Heat System

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Domestic Hot Water

System

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Make-Up Air Fans

Mech

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

DX Roof Top Unit

Mech

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Primary Power Electrical

Switchgear

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Panelboards

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Transform

ers

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Page 88: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DA

LL

AS

/ F

OR

T W

OR

TH

AIR

PO

RT

RE

HA

BIL

ITA

TE

AIR

FIE

LD

PA

VE

ME

NT

FY

12

FORM C- 02- DOCUMENTATION TRACKING & CONTROL LOG

Legend: D= Design Team C= Contractor CA= Commissioning Agent O=Owner

Lighting Fixtures

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Lighting Controls

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Emergency Generator Set

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Automatic Transfer

Switches

Electric

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Security System

sComm

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Audio/Video System

sComm

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

CCTV System

Comm

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

Building Envelope

(Curtainwalls Only)

Arch

C

Per Div 1 Section

1730 at 50%

construction

schedule

Manufacturer Start up and

recommendations. O&M

Material

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Page 89: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DA

LL

AS

/ F

OR

T W

OR

TH

AIR

PO

RT

RE

HA

BIL

ITA

TE

AIR

FIE

LD

PA

VE

ME

NT

FY

12

FORM C- 02- DOCUMENTATION TRACKING & CONTROL LOG

Legend: D= Design Team C= Contractor CA= Commissioning Agent O=Owner

Nam

e Plate Data

All

CPrior to VTP

NPD incorporated in VTP

form

Construction M

eeting

Minutes

All

CWeekly

Inclusive of OAC and

Progress m

eetings

Contractor Required

Testing Reports

All

C

Within 1 week of

succesful

completion of

each test

Required by Specifications

Verification Testing

Schedule

Per Sec. 01810

Paragraph 1.02-

All Disciplines

involved in

VTP

CFour (4) weeks

prior to testing

For review and approval

O&M Training Schedule

and plans

All system

s

requiring

training per

specifications

Attach to O&M

Materials at 50%

construction

schedule

For review and approval

Test Adjust and Balance

Report

Mech

C

2 weeks prior to

start of system

VTPs

For Review and Approval

System

readiness

checklist

All

C

10 days prior to

commencement of

VTPs

For review and approval

Contractor Required Tests and Documentation

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Page 90: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-03D – COMMISSIONING REQUEST FOR INFORMATION

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Request for Information (RFI) Identification:

RFI ID:

RFI Date:

General Description

Equipment Identification

(ID Number / Tag) (Equipment Description)

Equipment Location

RFI Initiated From: Equipment/System Test Observation Document Review Discussion

Attachments Included No Yes Description:

B. Information Sought For:

Developing construction checklist Developing functional performance testing

Maintaining functional performance testing schedule Resolving functional performance testing issue

Resolving other issue

C. RFI Authored By:

(Requestor’s Name) (Company)

D. RFI Addressed To:

Architect Mechanical Engineer

Electrical Engineer Construction Manager/General Contractor

Owner Other:

E. Copied To:

(Name) (Company)

F. Requested Information:

G. Addressee’s Response:

Page 91: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-03E – COMMISSIONING RFI LOG

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Issue Number

Commissioning RFI ID

(Form C-3D)

Information Required Date Identified

Date Closed RFI Response

Page 92: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-5 – OVERALL STAFF TRAINING AND ORIENTATION

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Overall Staff Training and Orientation:

Issue Date: Issue Number:

B. Overall Staff Training and Orientation Executed By:

(Name) (Discipline)

C. Overall Staff Training and Orientation Forwarded To:

Architect Mechanical Engineer

Electrical Engineer Construction Manager/General Contractor

Owner Other:

Project Manager

D. Overall Staff Training and Orientation Copies To:

(Name) (Discipline)

E. Purpose and Nomenclature:

The purpose of this document is to identify the status of equipment/system functional performance testing progress.

The matrix below is segmented as follows:

• Equipment/System – Identifies Equipment • Status – Identifies Status of Testing

Matrix notes are as follows:

• 1 - General Scope Codes are as follows:

A. Provide an overview of the purpose and operation of this equipment, including required interactions of trainees with the equipment.

B. At an intermediate level, provide technical information regarding the purpose, operation and maintenance of this equipment, expecting that serious malfunctions will be addressed by factory reps.

C. At a very technical level, provide information regarding the purpose, operation, troubleshooting and maintenance of this equipment, expecting that almost all operation, service and repair will be provided by the trainees.

• 2 - Trainee Type Codes are as follows:

• FM - Facility Manager. • PM - Project Manager

• FE - Facility Engineer and Assistants • O - Other

• FT - Facility Technician/Maintenance •

• 3 - Re-commissioning. The CA will provide instruction on the use of blank functional test forms for periodic re-commissioning of equipment and systems, per the Specification.

• 4 - Mechanical Design Engineer. The mechanical designer will provide an overview of the major systems and equipment in the facility, including for each system: the design intent, why the system was chosen, an overview of its operation, and interactions with other systems, any special features, issues regarding future expansion and remodeling, etc.

Page 93: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-5 – OVERALL STAFF TRAINING AND ORIENTATION

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

F. Overall Staff Training and Orientation:

EQUIPMENT/SYSTEM

SPEC SECTION

TOTAL HOURS

SCOPE

CODE1

TRAINEE

TYPE2

PRIMARY RESPONSIBLE CONTRACTOR

TRAINERS COMPANY

AGENDA RECV’D

DATE

Mechanical

Electrical

Re-Commissioning3

Mechanical Designer4

NOTES:

01

02

03

04

05

Page 94: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-06 – COMMISSIONING CORRECTIVE ACTION REPORT

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Report Identification:

Correction Action ID:

Report Date: Issue Date:

Equipment Identification: (ID Number / Tag) (Equipment Description)

Equipment Location:

Information Source: Equipment/System Test Observation Document Review Discussion Attachments Included: No Yes Description ____________________________________________

B. Deficiency and/or Issue and Resulting Effects (To Be Completed By Commissioning Agent):

The above equipment has been tested, observed, reviewed, or was discussed and was found to not comply with the contract document.

1. Deficiencies or Issues:

2. Resulting Effects:

C. Corrective Actions and Dates (To Be Completed By Commissioning Agent):

The below listed corrective actions are: Required Recommended

For testing to proceed in a timely manner, it is imperative that the required corrective action be completed by

(Date or Event)

D. Design Team Action (To Be Completed By Design Team If Indicated):

No Design Team action required, information provided for record purposes only. Design Team Corrective action plan required. Design Team Concurrence requested but not required for corrective action execution

Design Team Concurrence required prior to corrective action execution

(Design Team Concurrence)

E. Contacts Relevant to Corrective Actions:

Address To:

Cx Agent:

Owner’s Rep:

Report Copied To:

(Name) (Company)

F. Contractor’s Statement of Correction (To Be Completed By Contractor):

Deficiencies identified above have been correct with the following actions:

(Signature (Company) (Date)

Page 95: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REPLACE REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-07 – COMMISSIONING PROGRESS RECORD

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

System and Related Controls

Document/ Task Delivered

(Doc or Req.)

Due Back

Received Approved Execution Approved

Construction checklists _____________ Docs: Submittals Start-up Date: Installation & field forms O&M booklets Controls & sequences Associated PCs: Functional tests Training Plan &

Execution

O&M Manuals

Construction checklists _____________ Docs: Submittals Start-up Date: Installation & field forms O&M booklets Controls & sequences Associated PCs: Functional tests Training Plan &

Execution

O&M Manuals

Construction checklists _____________ Docs: Submittals Start-up Date: Installation & field forms O&M booklets Controls & sequences Associated PCs: Functional tests Training Plan &

Execution

O&M Manuals

Construction checklists _____________ Docs: Submittals Start-up Date: Installation & field forms O&M booklets Controls & sequences Associated PCs: Functional tests Training Plan &

Execution

O&M Manuals

Page 96: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-14 – STAFF PARTICIPATION IN COMMISSIONING

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Date:_______________________ Prepared by: _______________________________

Commissioning Activity: _____________________________________________________________________

Description of Involvement Staff # (See Data Below)

Staff Data:

Staff 1:

Staff 2:

Staff 3:

Staff 4:

Staff 5:

Staff 6:

Staff 7:

Staff 8:

Staff 9:

Staff 10:

(Name) (Title) (Telephone)

Note: Use additional sheets as necessary to fully document those present for commissioning activities

Page 97: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-17 – SUBMITTAL REVIEW

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Submittal Review Identification:

Submittal Date: Review Date:

Received Date: Submittal Review Index:

Specification Number: Submittal Number:

Specification Name:

B. Submittal Review Disposition:

Approval recommended Not reviewed

Approval recommended with comments herein Disapproval and entire resubmittal recommended

Additional information requested Disapproval and partial resubmittal recommended

Reviewed for Commissioning Consideration Other: _______________________________________

C. Submittal Review Executed By:

(Name) (Discipline)

D. Submittal Review Disposition Forwarded To:

Architect Mechanical Engineer

Electrical Engineer Construction Manager/General Contractor

Owner Other:_______________________________________

Project Manager

E. Submittal Review Disposition Copied To:

(Name) (Discipline)

F. Submittal Review Comments:

COMMENT NUMBER

RELEVANT SPECIFICATION/

DRAWING

COMMENT

A/E SUBMITTAL

Page 98: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING FORM C-18 – FIELD OBSERVATIONS AND TESTS

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Field Observations and Tests Identification:

Report Number:

Observation Date: Issue Date:

Observation Description:

Attachments Included: No Yes Number(s):

Description:

B. Field Observations and Tests Executed By:

(Name) (Discipline)

C. Field Observations And Tests Disposition Forwarded To:

Architect Mechanical Engineer

Electrical Engineer Construction Manager/General Contractor

Owner Other:

Project Manager

D. Field Observations And Tests Copies To:

(Name) (Discipline)

E. Field Observations And Tests Comments:

Classification

The purpose of this observation/test report is to document site observation, start-up results, and/or to summarize system Functional Performance Testing (FPT). Information is classified as follows:

• Back-check System refinement resulting from testing or site observation requiring future back- checking

• Correction Clarification of previously issued report.

• Corrective Action System deficiency found during site observation or system FPT requiring corrective action prior to system initial FPT execution or FPT re-execution.

• Designer Input Designer input requested.

• Req Information Requested information.

• Terminal Previously identified issue planned to be pursued no further.

• Information For informational purposed only.

• Start-up Equipment Start-up Observation

• Summary Test Results Summary

F. Field Observations And Tests Areas of Concern:

Areas of Concern

Cited observations are classified according as follows:

• GEN General Comment

• IEQ Indoor Environmental Quality Issue

• COD Code Issue

• QC Quality Control Issue

• CON Contract Requirement Issue

Page 99: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING FORM C-18 – FIELD OBSERVATIONS AND TESTS

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

• INST Installation Issue

OBSERVATION / TEST NO.

CLASSIFICATION AREA OF CONCERN

OBSERVATION/TEST

Page 100: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-21 – OPERATION & MAINTENANCE MANUAL REVIEW

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Operation & Maintenance Manual Review Identification:

Received Date: Review Date:

Submittal Date: Submittal No:

Specification Number:

Specification Name:

B. Operation & Maintenance Manual Review Disposition:

Approval recommended Not reviewed

Approval recommended with comments herein Disapproval and entire resubmittal recommended

Additional information requested Disapproval and partial resubmittal recommended

Reviewed for Commissioning Consideration Other: _______________________________________

C. Operation & Maintenance Manual Review Executed By:

(Name) (Discipline)

D. Operation & Maintenance Manual Review Forwarded To:

Architect Mechanical Engineer

Electrical Engineer Construction Manager/General Contractor

Owner Other:_______________________________________

Project Manager

E. Operation & Maintenance Manual Review Copied To:

(Name) (Discipline)

F. Purpose and Issue Classification:

The purpose of this document is to identify items in the O&M manual which do not conform to the specifications.

The matrix below is segmented as follows:

• Issues - Observations made from this review

• Comment/Recommendations - Comments/recommendations that provide supplemental information

• Tracking - Tracking/adjudication information

Issues are classified as follows:

• Closed - Issue is considered resolved and is therefore closed

• Corrective Action - Manual section should be returned to contractor for inclusion of additional or supplemental information

• Organization - Specified information included without organizational structure for easy reference by building operators.

• Requested Information - Information requested by reviewer

• Summary - Review summary

• Terminal - Previously identified issue planned to be pursued no further

Page 101: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-21 – OPERATION & MAINTENANCE MANUAL REVIEW

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

G. Operations and Maintenance Manual Issues:

Number

Classification

Original Review Tracking

Issues Comments/Recommendations

400 Hz Frequency Generators

Page 102: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

FORM C-22 – CONSTRUCTION CHECKLIST REVIEW

DFW INTERNATIONAL AIRPORT CONTRACT NO. 9500473 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Construction Checklist Review Identification:

Received Date: Review Date:

Submittal Date: Submittal No:

B. Construction Checklist Review Disposition:

Approval recommended Not reviewed

Approval recommended with comments herein Disapproval and entire resubmittal recommended

Additional information requested Disapproval and partial resubmittal recommended

Reviewed for Commissioning Consideration Other: _______________________________________

C. Construction Checklist Review Executed By:

(Name) (Discipline)

D. Construction Checklist Review Disposition Forwarded To:

Architect Mechanical Engineer

Electrical Engineer Construction Manager/General Contractor

Owner Other:_______________________________________

Project Manager

E. Construction Checklist Review Disposition Copied To:

(Name) (Discipline)

F. Construction Checklist Review Comments:

COMMENT NUMBER

CONSTRUCTION CHECKLIST

IDENTIFICATION

COMMENT

NUMBER DESCRIPTION

Page 103: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

APPENDIX 2

CONSTRUCTION CHECKLIST

Checklist Title

CL-0201 Constant Current Regulators (CCR) Construction Checklist

CL-0202 Lighting Systems Construction Checklist

Page 104: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

CONSTANT CURRENT REGULATORS AND ASSOCIATED CONTROLS

CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Construction Checklists Identification:

Construction Checklists Number:

Equipment Description: Constant Current Regulator and Associated Controls

Specification Section Number:

B. Construction Checklists Preparation Instructions:

1. These Construction Checklists are intended to augment manufacturer’s installation instructions, and start-up instructions and checkout plans.

2. Construction checklist shall be completed prior to functional testing as part of start-up and pre-functional testing.

Construction checklist submission signifies equipment and systems integral to them are ready for functional testing with exception of incomplete inconsequential items.

3. Incomplete inconsequential items shall be limited to those not essential to safe, complete, and reliable functional testing execution. These items shall be identified with supplemental documentation describing incomplete item(s) and corrective action plan.

4. Line items shall be complete and shall be checked off only by parties having direct knowledge of that line item being completed.

5. Inapplicable line items shall be identified as such with an explanation demonstrating inapplicability.

6. Contractor’s assigned responsibility for checklist line items shall be responsible for those line items, even if line items are subcontracted.

7. Completed checklists will include instructive pages and all required copies of checklist tables demonstrating that each line item of each table has been checked off.

8. Relevant nomenclature used herein includes:

A/E - Architect and Engineer Design Team GC - General Contractor

All - All Contractors MC - Mechanical Contractor

CA _ Commissioning Authority TAB - Test and Balance Contractor

CM _ Construction Manager Tamb - Temperature, Outdoor Ambient

C. Contractor’s Approvals:

Contractor’s signature signifies equipment identified herein and systems integral to them are complete and ready for functional testing with the exception of inconsequential items. ______________________________ _____________________________ ___________________ (General Contractor Signature) (Company) (Date) ______________________________ _____________________________ ___________________ (Sub-Contractor Signature) (Company) (Date)

Page 105: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

CONSTANT CURRENT REGULATORS AND ASSOCIATED CONTROLS

CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

D. Equipment Verification Checklist: 1) The Equipment Verification Checklist is intended to be used for documenting that each

equipment item conforms to the contract documents. Installed equipment not being from specified or submitted manufacturer constitutes a deficiency.

2) Inapplicable line items shall be identified as such by: a) “N/A” for non-applicable line items.

i. Record a remark number and provide an associated comment with date explaining non-applicability.

b) “BO” for line items by others. i. If “BO” is entered for any item, the responsible contractor shall initiate inclusion of another equipment verification checklist table with his/her checks for items indicated “BO” on other tables.

ii. Several equipment verification checklist tables for the same system or component may be required where multiple parties are required to interface with the checklist.

3) Identify line item status by: a) If complete, check the respective box.

i. Specification box means that the installed item complies with the technical specifications.

ii. Submittal box means that the installed item is matches it’s approved submittal for the same line item.

iii. Checking the installation box means that the item is installed as indicated on the contract drawings.

b) If incomplete, provide a remark number and an associated comment with date. Multiple remarks may be required prior to a fully completed checklist.

4) “Contr.” Identifies the responsible contractor.

E. Equipment Installation Checklist: 1) This Equipment Installation Checklist is used to document that each equipment prerequisite line item required for functional testing has been completed. 2) Inapplicable line items shall be identified as such by:

a) “N/A” for non-applicable line items. i. Provide a remark number and an associated comment with date explaining non-applicability.

b) “B/O” for line items by others. i. If “BO” is entered for an item, the responsible contractor shall initiate inclusion of another equipment installation checklist table with his/her checks for items indicated “BO” on other tables.

ii. Several equipment installation checklist tables for the same system or component may be required where multiple parties are required to interface with noted checklist.

3) Identify line item status: a) Indicating line item is complete by checking the respective box. b) Indicating line item is incomplete by recording a remark number in remark column and an associated comment with date. Multiple remarks may be required prior to a fully completed checklist.

4) “Contr.” Identifies the responsible contractor.

Page 106: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

CONSTANT CURRENT REGULATORS AND ASSOCIATED CONTROLS

CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Installation and Connection of Constant Current Regulators (CCR) in Lighting Vault

Vault Location: CCR #:

Checked Items:

Contractor (Initial)

1.

Verify mounting CCR, IRMS plug cutout and selector switch cabinet meets details shown on drawings.

2.

Verify installation of plug-in breaker, including current and A/C rating shown on drawings.

3.

Verify connections to CCR primary power is per manufacturer’s guidelines and recommendations.

4.

Verify proper connector to plug cutout in spare location designated.

5.

Verify all openings around cable in plug cutout have been sealed with RTV sealant.

6.

Verify installation of equipment in selector switch cabinet is per details and manufacturer’s recommendations.

7.

Verify the installation and connection of CCR interface sub-panel in new CCR per manufacturer’s recommendations.

Page 107: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

CONSTANT CURRENT REGULATORS AND ASSOCIATED CONTROLS

CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

EQUIPMENT VERIFICATION CHECKLIST

EQUIPMENT DESCRIPTION Specification

Submittal

Installation

Remarks

Cont.

Fixture #

Notes:

Comments:

Page 108: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT – REHABILITATE AIRFIELD PAVEMENT FY12

NEW LIGHTING FIXTURE CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

A. Construction Issues Log Identification:

Construction Checklist Number: ______________________________________________________________ Equipment Description: _______________________________________________________________ Specification Section Number: _______________________________________________________________

B. Construction Checklist Preparation Instructions:

1. This Construction checklist is intended to augment manufacturer’s installation instruction, start-up instructions, and checkout plans

2. Construction checklist shall be completed prior to functional testing as part of the start-up and initial checkout. 3. Construction checklist submission signifies equipment and system integral to them are ready for functional

testing with the exception of incomplete consequential items 4. Incomplete consequent items shall be limited to those not essential to safe complete and reliable FT

execution. These items shall be identified with supplemental documentation describing incomplete item(s) and correction action plan.

5. Line items shall be complete and shall be checked off only by parties having direct knowledge of that line item being completed.

6. Inapplicable line items shall be identified as such. 7. Contractors assigned responsibility for checklist line items shall be responsible for those line items, even if line

items are subcontracted. 8. “Contr.” Column or abbreviations in brackets to the right of a line item identifies responsible contractor. 9. Relevant nomenclature used herein includes:

A/E Architect and Engineer Design Team EC Electrical Contractor

All All Contractors GC General Contractor

BCS Building Control System MC Mechanical Contractor

CA Commissioning Authority OWN Owner

CC Controls Contractor SMC Sheet metal Contractor

CM Construction Manager TAB Test and Balance Contractor

C. Contractors Approvals:

____________________________________ ________________________ ______________ (General Contractor Signature) (Company) (Date)

____________________________________ ________________________ ______________ (Electrical Contractor Signature) (Company) (Date)

D. Equipment Verification

This equipment verification section is intended to be used for documenting that each equipment piece is compliant with project plans and specifications. Indicate compliance by checking respective numbered manufacturer, model and rating subcategory box. Indicate deficiencies by recording number 1, 2, or 3 in respective subcategory box. Installed equipment not being from specified or submitted manufacturer is a deficiency example.

Page 109: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT – REHABILITATE AIRFIELD PAVEMENT FY12

NEW LIGHTING FIXTURE CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Sub-category checks and numbers shall have the following meanings:

1. Sub-column “1” – Check indicates manufacturer, model, or rating is as specified while written number “1” indicates this is not the case.

2. Sub-column “2” – Check indicates manufacturer, model, or rating is as submitted while written number “2” indicates this is not the case.

3. Sub-column “3” – Check indicates manufacturer, model, or rating is as installed as shown on plans number “3” indicates this is not the case.

EQUIPMENT TAG MANUFACTURER MODEL NUMBER RATING

1 2 3 1 2 3 1 2 3

E. Equipment Installation Check List:

This equipment installation checklist section in intended to be used for documenting that each equipment piece prerequisite line item required for functional testing has been completed.

Line items shall be complete and shall be checked off only by parties having direct knowledge of that line item being completed.

Inapplicable line items shall be identified as such by:

• “N/A “ for Non-Applicable line items.

• “BO” for line items By Others.

Contractor’s assigned responsibility for checklist line items shall be responsible for those line items, even if the line item is sub-contracted.

• Indicate line item is complete by checking respective box.

• Indicate line item is incomplete by recording a remark number in respective box and providing associated comment below table.

CHECKED ITEM EQUIPMENT IDENTIFICATION

CONTRACTOR

General Installation

Block and packing materials have been removed completely

Page 110: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT – REHABILITATE AIRFIELD PAVEMENT FY12

NEW LIGHTING FIXTURE CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Verify light fixture is anchored / mounted / supported properly and securely

Fixture lamps are installed and of the scheduled type

Fixture has been verified to be free of light leaks, exposed screws and pointed projections, sharp edges, scarred, marred, and scratched finishes.

Fluorescent Luminaires (as applicable)

Verify fixtures 2’ or longer supported by four hangers minimum.

Provide prime coat and finished in high reflectance baked white enamel; 85% reflectance.

Provide 22 gauge steel housing .

Provide hinged frames with removable catches for cleaning, and support lay-in lenses on all sides with flip ends on short dimension.

Provide virgin acrylic diffusers, 0.125” thick

Recessed Luminaires (as applicable)

Provide prewired type with J-box forming integral part of assembly

Verify fixture installed to permit removal from below , to gain access to outlet or prewired box

Verify trim type is compatible with ceiling system installed

Verify correct reflector and lamp position to provide high efficiency and even brightness; no lamp lines

Verify luminaire connected to fixture box with flex conduit and fixture wire

Verify supported and secured from the ceiling T-bar grid structure.

Provide integral encapsulated ballast for recessed HID luminaires (as applicable)

Exit Lights

Verify background color white with green letters

Verify directions and faces are correct

Outdoor Lighting Fixtures

Page 111: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT – REHABILITATE AIRFIELD PAVEMENT FY12

NEW LIGHTING FIXTURE CONSTRUCTION CHECKLIST

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285 REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Poles installed plumb and anchor bolts thoroughly tightened; bolt covers installed

Verify installation of 5/8” x 8’ ground rod; bonded to pole ground

Fixture shall bear the UL “DL” label

Verify fixture is gasketed and sealed to prevent moisture and bug entrance.

- END OF TEST -

Page 112: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

APPENDIX 3

FUNCTIONAL PERFORMANCE TESTS

Test Title

FT-0201 Constant Current Regulators (CCR) Functional Test

FT-0202 Lighting Systems Functional Test

Page 113: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

Constant Current Regulators (CCR)

Functional Test

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Date:

Description:

Location:

Owner Representative:

Commissioning Agent:

General Contractor:

Electrical Contractor:

Prerequisite Checklist

1. ___ All punch list items for this equipment corrected.

2. ___ Safeties and operating procedures reviewed.

3. ___ Test requirements and sequences of operations attached.

Verification of Miscellaneous Pre-functional Checks

1. Miscellaneous checks of the pre-functional checklist and start-up reports completed successfully

Pass? Y / N _________

NOTE:

The functional test listed below must be completed to demonstrate all operational requirements have

been met for the CCR as required by AC 150/5345-10

Functional / Certification Tests listed below:

Test ID Action Results

Pass / Fail

1.01 Regulation Test

1.02 Input Voltage Test

1.03 Reactive Load Test

1.04 Remote Control Test

1.05 Temperature Rise Test

1.06 Measure Efficiency

1.07 Measure Power Factor

1.08 Crest Factor Loading Test

1.09 Altitude Test

1.10 Low Temperature Test

1.11 Humidity

1.12 Altitude

Page 114: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

Constant Current Regulators (CCR)

Functional Test

DFW INTERNATIONAL AIRPORT CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Page 115: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

Lighting Systems Functional Test

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

FT-______ LS-______ Location: _________________________________

1. Participants

Party Participation

2. Prerequisite Checklist a. __ All control system functions for this and all interlocking systems are programmed and operable

per contract documents, including final setpoints, schedules, and debugging. b. __ All A/E punch-list items for this equipment corrected. c. __ Safeties and operating ranges reviewed. d. __ Test requirements and sequences of operation attached. e. __ Schedule of fixtures and control type has been reviewed.

3. Device Calibration Checks.

4. Verification of Misc. Prefunctional Checks.

Misc. site checks of the prefunctional checklist and startup reports completed successfully.Pass? Y / N _______

5. Functional Testing Record Proced.

No. &

Spec.

Seq. ID

Req ID

No.

Test Procedure3

(including special conditions)

Expected and Actual Response4

[Write ACTUAL response in brackets or circle]

Pass

Y/N

& Note

#

1

Measure and record Voltage at lighting sub panel main breaker.

Expected: 277/208VAC

Measured:

2

Measure and record load current at lighting sub-panel main breaker.

Measured

Check loads on all breakers to ensure that the breaker is properly sized

Make note of any discrepancies

3 Measure THD (Total Harmonic Distortion) voltage at each panel and at each lighting Transformer in branch circuit.

Expected value: < 20%

4 Calibrate each instrumentation device by making a comparison between the graphic display and the reading at the device, using an instrument which shall be at least twice as accurate as the device to be calibrated

Make note of any discrepancies

5 Check each digital control point by making a comparison between the control command at the control panel and the status of the controlled device

Make note of any discrepancies

Page 116: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DALLAS / FORT WORTH AIRPORT REHABILITATE AIRFIELD PAVEMENT FY12

Lighting Systems Functional Test

DFW INTERNATIONAL AIRPORT

CONTRACT NO. 8500285

REHABILITATE AIRFIELD PAVEMENT FY12

COMMISSIONING PLAN

CONSTRUCTION PHASE

SEPTEMBER 28, 2012

Proced.

No. &

Spec.

Seq. ID

Req ID

No.

Test Procedure3

(including special conditions)

Expected and Actual Response4

[Write ACTUAL response in brackets or circle]

Pass

Y/N

& Note

#

6 Check each digital input point by making a comparison of the state of the sensing device and the OI display

Make note of any discrepancies

7 Verify operation of lighting controls (dimming, photo-control, regular switching)

Record results

8 Demonstrate Daylight Sensor Operations per manufacturer’s specifications.

Record results.

9 Demonstrate Occupancy Sensor Operations (per manufacturer’s specifications).

Record results.

10 Verify all lighting schedules have been programmed per occupant’s direction

11 Demonstrate proper programming of lighting zones based on contract documents

12 For Operator Interfaces: Verify all elements on the graphics are functional and properly bound to physical devices and/or virtual points and that hot links or page jumps are functional and logical

Make note of any discrepancies

13 Check light fixtures for flicker. Note any faulty fixtures on separate sheet with location and circuit information.

14 Measure and record lumen level at working surface level in each work area or office

Note any deviation from DFW Airport standards.

15 Measure and record temperature of each distribution panel for hot spots using infrared, non-contact thermometer.

Note any excessive hot spots, electrical contractor to resolve immediately.

16 Simulate power failure, check operation of emergency lighting.

Note failures.

17 Return all lights and control panel to

pretest conditions.

Witness by: Signature and Date

Electrical Contractor

Start-up Personnel

Commissioning Agent

-- END OF TEST --

Page 117: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport Demolition Contract No. 9500473 SP-G-700-1 (revised 6-21-13) Addendum No. 1 FY12 Rehabilitate Airfield Pavements April 27, 2013

SPECIAL PROVISIONS

ITEM SP- G -700 DEMOLITION

The work under this item shall conform to the requirements of Item G-700 of the FAA Standard Specification, which have been reproduced entirely herein on white sheets, with the following modifications and additions reproduced on blue sheets. Where reference is made to specifications of ASTM or AASHTO, it shall be construed to mean the latest standard in effect on the date of the proposal. 1. SECTIONS 700-1.1 DESCRIPTION

a. Delete line item d. Utility Lines and Appurtunances

b. Delete line item e. Storm Drainage Structures

c. Delete line item f. Storm Drain Pipe

d. Delete line item g. Electrical Cable, Conduit and Duct Bank (Concrete-encased)

e. Delete line item h. Electrical Items and their components

f. Delete line item i. Fencing

g. Delete line item j. FAA NAVAID Equipment

h. Delete line item k. Signs

i. Delete line item i. Fire Hydrants

2. SECTION 700-2.2 DISPOSITION OF MATERIALS

a. 700-2.2.c - Delete this section in its entirety and replace with the following:

i. “Burning at the project site for disposal of refuse and debris will not be permitted.”

b. Add the following section: i. “The Contractor shall meet all laws governing maximum load requirements on

public roads while transporting debris from DFW Airport property to the final disposal site.”

3. SECTION 700-2.3 UTILITIES

a. Delete this section in its entirety. 4. SECTION 700-2.4 DEMOLITION OPERATIONS

a. 700-2.4.c. – Delete this section in its entirety.

b. 700-2.4.d. – Delete this section in its entirety.

c. 700-2.4.g. – Delete this section in its entirety

Page 118: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport Demolition Contract No. 9500473 SP-G-700-2 (revised 6-21-13) Addendum No. 1 FY12 Rehabilitate Airfield Pavements April 27, 2013

d. 700-2.4.j. – Delete this section in its entirety.

.

5. METHOD OF MEASUREMENT a. 700-3.2. – Delete this section in its entirety.

b. 700-3.3. – Delete this section in its entirety.

c. 700-3.4. – Delete this section in its entirety. d. 700-3.6. – Delete this section in its entirety. e. 700-3.7. – Delete this section in its entirety. f. 700-3.8. – Delete this section in its entirety. g. 700-3.9. – Delete this section in its entirety. h. 700-3.10. – Delete this section in its entirety. i. 700-3.12. – Delete this section in its entirety.

6. BASIS OF PAYMENT

a. 700-4.1. – Delete this section in its entirety and replace with the following:

i. Payment for the demolition and removal of asphalt pavement will be made at the

contract unit price per square yard. This price shall be full compensation for all preparation, excavation, removal, disposal, labor, equipment, tools, and incidentals necessary to complete this item. Removal and disposal of asphalt pavement base sections ie. Cement treated base, flexible base etc. shall be considered as subsidiary to the payment for the demolition and removal of asphalt pavement measures as SY. Payment will be made under:

“Removing Stabilized Base and Asphalt Paving (4”)”

DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL), per square yard.

b. 700-4.2. – Delete this section in its entirety.

c. 700-4.3. – Delete this section in its entirety.

d. 700-4.4. – Delete this section in its entirety. e. 700-4.6. – Delete this section in its entirety. f. 700-4.7. – Delete this section in its entirety. g. 700-4.8. – Delete this section in its entirety.

Page 119: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport Demolition Contract No. 9500473 SP-G-700-3 (revised 6-21-13) Addendum No. 1 FY12 Rehabilitate Airfield Pavements April 27, 2013

h. 700-4.9. – Delete this section in its entirety. i. 700-4.10. – Delete this section in its entirety. j. 700-4.12. – Delete this section in its entirety.

END OF ITEM SP-G- 700

Page 120: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-1 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

ITEM SS-L-100 GENERAL PROVISIONS AND REQUIREMENTS FOR ELECTRICAL WORK

DESCRIPTION

100-1.1. GENERAL. This item is intended to supplement the specifications for the Airfield Electrical, Lighting and Lighting Control requirements of this contract. It is the intent and meaning of the Plans and Specifications that the Contractor shall provide an electrical installation that is operational and complete, including all items and appurtenances necessary, reasonably incidental or customarily included, even though each and every item is not specifically called out or shown.

Installations and construction under these provisions shall be coordinated with the Airport Construction Manager. Specification requirements for approvals, reviews, or other involvements of the Engineer shall be transmitted by the Contractor through the Construction Manager to the Engineer. 100-1.2. APPLICABLE CODES. All electrical work shall conform to the requirements and recommendations of the latest edition of the National Electrical Code. In conflicts among

drawings, specifications and codes, the most stringent requirements shall govern. 100-1.3. APPLICABLE STANDARDS. The specifications and standards of the following organizations are by reference made part of these specifications and all electrical work, unless otherwise indicated, shall comply with their requirements and recommendations wherever applicable.

a. Institute of Electrical and Electronic Engineers (IEEE)

b. American National Standards Institute (ANSI)

c. American Society for Testing and Materials (ASTM)

d. Insulated Power Cable Engineers Association (ICEA)

e. National Bureau of Standards (NBS)

f. National Electrical Contractor's Association (NECA)

g. National Electrical Manufacturer's Association (NEMA)

h. National Fire Protection Association (NFPA)

i. Underwriter's Laboratories, Inc. (UL)

j. National Electrical Safety Code (NESC)

QUALITY ASSURANCE 100-2.1. REQUIREMENTS OF REGULATORY AGENCIES. Airport lighting equipment and materials covered by FAA specifications shall be certified under the Airport Lighting Equipment Certification Program described in Advisory Circular (AC) 150/5345-53, current edition, and be listed in the current Addendum of the AC. All Advisory Circulars referenced in these specifications shall be the latest edition.

Page 121: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-2 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

All other equipment and materials, covered by other referenced specifications shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification, when requested by the Engineer.

The requirements and recommendations of the latest edition of the Occupational Safety and Health Act are by reference made a part of these specifications and all electrical work shall comply with their requirements and recommendations wherever applicable. 100-2.2. WORKMANSHIP AND PERSONNEL REQUIREMENTS.

a. All electrical work shall be performed by workmen skilled in the electrical trade and licensed for the work either by the DFW Metroplex area or State of Texas. The DFW International Airport Building Official will recognize the credentials of Master Electricians with valid current licenses from the State of Texas. DFW Metroplex area. Credentials will be recognized of Journeyman Electricians with valid current licenses from the State of Texas DFW Metroplex area or other licensing entities having established reciprocal agreements with these municipalities.

b. A licensed Master Electrician will be required for the issuance of a building permit for constructing, installing, altering, maintaining, repairing or replacing any electrical wiring, apparatus, or equipment on any voltage level in the jurisdiction of the Airport.

c. A licensed Master Electrician or a licensed Journeyman Electrician is required to be on the job site whenever any electrical work is performed. Any airfield electrical work or associated electrical installations shall be accomplished under the direct supervision of a licensed Journeyman Electrician.

d. To insure compliance with Paragraph "c" above, only a documented Electrical work force with a ratio of a maximum of licensed Apprentices for each licensed Journeyman Electrician shall be allowed to work on the airfield electrical systems.

e. Contractor shall prepare documentation associated with the electrical work force confirming adherence to the requirements of Paragraph "d" above. These documents shall be submitted to the Construction Manager for approval. Also, any work force changes or revisions which affect compliance with paragraph "d" above shall also be submitted to the Construction Manager for approval.

f. All airfield circuits will be handled throughout the installation process by qualified licensed electrical personnel.

g. Every airfield lighting cable splicer shall be qualified in making airfield cable splices and terminations on cables rated above 1,000 volts A.C. The Contractor shall submit for approval of the Construction Manager proof of the qualifications of each proposed cable splicer for the cable type and voltage level to be worked on. Cable splicing/terminating personnel shall have a minimum of three (3) years experience in terminating/splice medium voltage cable at airports.

h. At least thirty (30) days prior to performing any cable splicing/terminating, Contractor shall submit to the Construction Manager a written list of proposed cable splicing/terminating personnel, including written evidence that the proposed personnel have had a minimum of eight (8) hours of technical training by authorized splice/termination kit manufacturer personnel. Approved training shall include a thorough review of kit components and splicing/terminating techniques and procedures. Field splices shall only be installed by technicians approved by the Construction Manager and by DFW Representative.

Page 122: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-3 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

i. In addition, each trained cable splicer shall be required to install a splice and a connector on type and size of the cable to be used under this contract. Sample connections shall be accomplished in accordance with the manufacturer's instructions and in the presence of the Construction Manager.

j. The Contractor performing construction on the airfield electrical system shall have a minimum of 5 years of experience on construction of projects of similar type of work and of similar size and complexity.

k. Electrical contractor qualifications shall be based on previous work experience as follows:

i. Installed elevated taxiway airfield lighting systems.

ii. Perform construction activities within an active CAT II AOA.

100-2.3. EQUIPMENT, MATERIAL AND INSTALLATION REQUIREMENTS. The Contractor shall furnish and install all materials, equipment, accessories, connections and incidental items in accordance with the approved recommendations of the manufacturer and the best practices of the trade to provide a complete installation ready for use and operational by the OAR.

All equipment and materials shall be new, unless specifically noted otherwise, and shall bear the manufacturer's name, trademark and ASME, UL, and/or other labels in every case where a standard had been established for the particular item.

Where applicable, equipment shall be FAA approved design of a standard product of a manufacturer regularly engaged in the production of the required type of equipment, and shall be supported by a service organization reasonably convenient to the site, as determined by the Construction Manager.

The Contractor shall promptly notify the Construction Manager in writing of any conflict between any requirements of the Contract Documents and equipment manufacturer's directions and shall obtain written instructions from the Construction Manager before proceeding with the work. Should the Contractor perform any work that does not comply with the manufacturer's directions or such written instructions from the Construction Manager, Contractor shall bear all costs arising in correcting deficiencies.

After review of equipment submittals, and instructions by the Engineer to proceed, equipment installations may require arrangements or connections different from those shown on the drawings. It is the responsibility of the Contractor to install the equipment to operate properly. The Contractor shall provide any additional equipment and/or materials required for installations to operate in accordance with the intent of the drawings and specifications.

It is the responsibility of the Contractor to insure that items installed fit the space available with adequate room for proper equipment operation and maintenance. Contractor shall make field measurements to ascertain space requirements, including those for connections, and shall furnish and install such sizes and shapes of equipment that the final installation provides a complete and operational system that complies with the requirements of the drawings and specifications.

Page 123: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-4 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

The Contractor shall be responsible for coordinating proper location of roughing in and connections by other trades. Changes associated with coordination requirements shall be made at no increase in the Contract amount or additional costs to other trades.

The Contractor shall support work and equipment plumb, rigid and true to line. The Contractor shall determine how equipment, fixtures, conduit, etc., are to be installed, as required by codes, drawings and specifications. Foundations, bolts, inserts, stands, hangers, brackets and accessories required for proper support shall be provided by the Contractor, whether or not specifically indicated on the drawings.

Uniform illumination levels for similar lighting systems throughout the airfield shall be installed. Contractor shall insure illumination levels for installed airfield edge or centerline lighting systems do not vary due to faulty installations from illumination levels of similar airfield lighting systems.

100-2.4. SUBMITTALS. Submit manufacturer's data or shop drawings of the following items giving full information as to the dimensions, materials, and other information required to define compliance with the specifications. Other items to be submitted are listed in the specification sections.

Handholes/Manholes/ Pull Boxes and Accessories

S-1 Plug Cutouts and Cabinet

Ductbanks Constant Current Regulator Conduit Switches, Terminal Strips Support Hardware Airfield Fixture Lamps #6 5KV L-824C Cable Multi-hole Adapter Ring #6 Stranded Counterpoise Wire L-823 Connectors Airfield Lighting Fixtures Identification Tags Isolation Transformers Grounding Fixture Bases, and accessories Fixture Installation and Location Splice Kits Plug-In Circuit Breakers Ground Rods Wiring and Accessories Cadweld Tape 3/8+ - Ground Rod Test Reports

When requested by the Engineer, samples of these items shall be submitted for approval. Equipment/installation diagrams shall also be submitted for approval, as required by project specifications and/or requested by the Engineer.

Contractor submittal package shall include a typewritten list indicating each bid item, with a breakdown of all item components and all parts that are assembled or associated with bid item installation.

Submittal package list shall indicate: (1) Bid item number, (2) Part numbers of associated item components, as required and (3) Reference page number where item and components information is located in the submittal package. The contractor shall organize submittals so that common components to multiple bid items are not duplicated in the submittals.

Checking of submittals by the Engineer is done only as an aid to the Contractor and approval of submittals shall not relieve Contractor of responsibility for any errors or omissions in the

Page 124: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-5 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

submittals, nor shall it relieve the Contractor of total responsibility for proper and complete execution of the job.

100-2.5. INSPECTION AND TESTING. All work performed by the Contractor shall be subject to periodic inspections by the Engineer, the Airport Owner’s Authorized Representative (OAR), and the Owner's Construction Manager to verify that the installation is in compliance with the applicable requirements of these specifications.

System and component testing shall be performed as specified in Item SS-L-111 Airfield Electrical Installation and Testing. Test results shall be evaluated by the Engineer, DFW Representative and the Construction Manager based upon the criteria indicated.

Any installation found which does not conform to the required technical provisions of these specifications or any specimen which does not meet the test criteria defined in Item SS-L-111 Airfield Electrical Installation and Testing shall be immediately removed by the Contractor and then replaced at his expense. When required, testing shall be performed on the new specimen in place to verify compliance with the criteria defined in Item SS-L-111 Airfield Electrical Installation and Testing.

CONSTRUCTION PROVISIONS

100-3.1. AOA AREA INSTALLATION PROVISIONS. To enhance personnel safety and avoid contractual problems, the Contractor shall comply with the provisions indicated below.

100-3.2. ELECTRICAL WORK PROVISIONS. Existing Underground Utilities. At least forty-eight (48) hours prior to beginning any excavation within the AOA, locations of all utility lines and FAA cables in the construction area will be identified and marked with surveyor flags by appropriate utility and/or FAA personnel. The Contractor shall be responsible for maintaining the location flags. Any flags displaced shall be replaced by the Contractor. The Contractor shall coordinate with Construction Manager any additional prior notification time required during weekend and/or holiday work periods.

Also at least forty-eight (48) hours prior to beginning any excavation within the AOA, the contractor shall request the construction manager to have airport staff identify circuits in proposed excavation areas. The Contractor shall coordinate with Construction Manager any additional prior notification time required during weekend and/or holiday work periods.

The above noted line identification information shall not relieve the Contractor of the responsibility of pinpointing underground lines to avoid unplanned disruptions or disturbing of installation or operation of underground lines in construction areas. Contractor shall use cable tracing equipment or other methods approved by the Construction Manager at his disposal, to pinpoint line locations. Excavation shall not proceed until all underground lines have been identified to the satisfaction of the Construction Manager.

Contractor shall hand excavate in areas of Airport underground electrical lines to avoid disturbing circuits such as FAA, telecom and NAVAIDS.

Repair of underground lines damaged by the Contractor shall be the sole responsibility of the Contractor.

Page 125: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-6 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

100-3.3. LOCKOUT PROCEDURES. The Contractor is required to lockout the power source feeding any airfield lighting circuit that he will come in contact with (either by hand or with equipment) during the course of the workday. Refer to the Lockout Procedure for Airfield Series Lighting Circuits section in the 01110-A specification for all lockout procedures.

100-3.4. TEMPORARY AND BYPASS CIRCUIT PROVISIONS. During construction, temporary or bypass wiring or cable installations may be required to maintain operation of certain equipment and/or airfield lighting circuits, as indicated in Construction Documents and/or as specified. Temporary/bypass circuit installations shall adhere to provisions indicated below.

General Requirements. Contractor shall review the requirements in the specifications and Construction Documents, including, but not restricted to: Phasing and Sequencing Plans, Demolition Plans and Wiring Diagrams. Contractor shall determine locations, sizes and quantities of temporary/bypass wiring and conduits required for project construction.

At least 14 days prior to commencement of installation of temporary/bypass wiring, the Contractor shall submit a layout of proposed temporary/bypass conduits and circuits to the Construction Manager for review and approval, including proposed installation protection provisions.

Equipment and Materials. Temporary/bypass wiring shall meet the requirements of Section Item L-108 Underground Cable for Airports, and shall also conform to the Construction Plans. Temporary/bypass wiring shall be identified at junction points with brass tags as approved by the Construction Manager.

Installation. Temporary/bypass circuits shall be installed with due consideration to personnel safety and circuit protection against physical damage. All damage to existing circuits as a result of Contractor action or inaction shall be corrected accordingly at the Contractor's expense and corrective action approved by the OAR.

Temporary/bypass, high voltage lighting system cables shall be protected from damage by vehicles with suitable fencing, barriers and/or adequately sized boards or timbers.

Temporary/bypass circuits shall be removed immediately upon completion of construction or purpose for which the wiring was installed. Upon removal of boards or timbers fastened to the pavement surface to protect temporary/bypass circuits, the Contractor shall repair the pavement with materials and methods approved by the Construction Manager. Temporary/bypass cable and counterpoise shall be removed and discarded off the Airport by the Contractor,

100-3.5. EXISTING ELECTRICAL EQUIPMENT AND MATERIALS. The Contractor shall remove all existing wiring and electrical equipment made unnecessary by the new installation. All materials removed shall become property of the Contractor and disposed of by the Contractor. The Contractor shall list materials according to type, class and/or size, and store or dispose of materials as directed by the Construction Manager.

100-3.6. POWER SERVICE CONTINUITY. Provide labor, materials and supervision required to maintain full capacity power service continuity when connection or modifications are made to existing systems and facilities. Do not interrupt service without prior consent of the Construction Manager, with a definite understanding of time and duration of outage. All outages will take place at a time for minimum disruption of facility activity. Coordinate with Owner.

Page 126: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-7 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

100-3.7. AS-BUILT DRAWINGS. The Contractor shall maintain a set of as-built drawings on the job site as required the General Provisions of the Contract. Contractor shall mark on the as-built drawings all work details, alterations installed to meet site conditions and changes made by Change Notices. As-built drawings shall be kept available for inspection by the Construction Manager and/or the Engineer at all times.

Airfield wiring verification diagrams shall be maintained throughout the project and later submitted to DFW Airport Construction Manager upon completion. These field wiring diagrams shall depict the exact routing and number of cables installed in each conduit originating from the airfield lighting vaults and extending to each manhole, handhole, pullbox, sign, and lighting fixture for each new circuit or circuit revision.

MEASUREMENT AND PAYMENT

100-4.1. There will be no measurement or payment for this section. All work will be considered incidental for complete installation of the work to which it is related.

END OF ITEM SS-L-100

Page 127: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

GENERAL PROVISIONS AND DFW International Airport REQUIREMENTS FOR ELECTRICAL WORK Contract No. 9500473 SS-L-100-8 Addendum No. 1 FY12 Rehabilitate Airfield Pavements June 21, 2013

THIS PAGE INTENTIONALLY LEFT BLANK

Page 128: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-1 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

ITEM SS-L-111 AIRFIELD ELECTRICAL INSTALLATION AND TESTING

DESCRIPTION 111-1.1 GENERAL. This item shall consist of furnishing all equipment, materials and appliances necessary for testing of airfield lighting circuit installations and associated systems.

The Contractor shall provide testing to confirm installations are acceptable for ground rod testing and airfield lighting circuit testing. and the Contractor shall obtain the service of an independent agency to perform the Hi-Pot Test.

Requirements under this item shall be coordinated with the Airport Owner’s Authorized Representative (OAR). Specification requirements for approvals, reviews or other involvement of the Engineer shall be transmitted by the Contractor through the OAR to the Engineer.

111-1.2 RELATED SECTIONS

a. L-100 - General Provision and Requirements for Electrical Work

b. L-108 - Underground Power Cable

c. L-109 - Installation of Power Distribution Equipment for Airfield Circuits

EQUIPMENT AND MATERIALS

111-2.1 GENERAL. Materials and equipment covered by this item shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification, when requested by the Engineer.

CONSTRUCTION METHODS

111-3.1 GENERAL. The Contractor shall furnish all necessary equipment and appliances for testing installations as indicated below.

111-3.2 GROUND ROD TESTING.

a. Contractor shall provide equipment and personnel to measure the resistance to earth for all ground rods installed using Fall of Potential Method. Earth resistance measurement tests shall adhere to recommendations of IEEE Standard 142, latest edition. Contractor shall submit testing procedure, equipment and report form to the OAR for approval.

b. As each rod is installed, tests shall be administered. Any rod that does not have a resistance to ground of 10 ohms or less shall be augmented by an additional rod not less than 10 feet away. No testing of the additional rod is required. Testing results, including confirmation of installation of augmenting ground rods, shall be submitted to the Engineer for approval.

111-3.3 AIRFIELD LIGHTING CIRCUITS TESTING. The Contractor shall notify the OAR and Facilities Maintenance 48-hours prior to cable testing. All testing shall be conducted in the

Page 129: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-2 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

presence of the Engineer and DFW Energy and Asset Management Department personnel. All test results shall be simultaneously recorded by the Contractor and Facilities Maintenance. Contractor shall provide test report information to the Engineer and DFW Energy and Asset Management Department for approval. Test procedures for the following required tests, including field test report forms, shall be submitted to the Engineer for approval prior to testing.

a. Testing Requirements

1. All Circuits i. Prior to commencement of work on any circuit the Low Voltage Tests shall be

performed in accordance with Paragraph a.4.i.(a)below. ii. Upon completion of all rewiring of each circuit, the Low Voltage Tests shall be

performed on the completed circuit following Paragraph a.4.i.(a) below, to determine if the circuits are free of grounds. Circuits tested shall meet the requirements of listed below. Any faults indicated by these tests shall be corrected before proceeding with additional testing. All test results shall be submitted to the Engineer for approval.

2. Testing Required for Existing Circuits and Existing Portions of Circuits to be Extended. The existing part of circuits to be extended shall be subject to Low Voltage Tests listed below. Tests shall be performed with the isolation transformers and other lighting system devices connected. Test results shall be submitted to the Engineer for approval prior to extending or revising the existing circuit.

3. Testing Required for Existing Circuits with Circuit Modifications and/or Extensions Completed. Each existing series circuit that has been modified and/or extended shall be subjected to Low Voltage Tests listed below. Any faults indicated by these tests shall be corrected before proceeding with additional testing. Tests results shall be submitted to the Engineer for Approval.

4. Testing Required for New Circuits and New Portions of Existing Circuits. Each new series circuit, or new part of existing circuits being extended or replaced, shall be tested as follows: i. After new cable with new connectors is installed and prior to connecting light

fixture transformers, the following tests shall be performed. (a) Low Voltage Megger (Continuity and Insulation Resistance [IR]) Tests

listed below, to determine if the total insulation resistance of each circuit is satisfactory, so that the series lighting circuit will operate without excessive leakage current when energized. Circuits tested shall meet the requirements listed below. Any faults indicated by these tests shall be corrected before proceeding with additional testing. All test results shall be submitted to the Engineer for approval.

(b) After meeting the requirements listed above, new circuits shall then be subjected to a Hi-Pot Test listed below. Circuits tested shall meet the requirements listed below. Any faults indicated by the test shall be corrected before proceeding with additional testing. All test results shall be submitted to the Engineer for approval.

Page 130: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-3 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

ii. New segments of existing circuits meeting the requirements listed above shall then have the isolation transformers connected and shall again be subjected to the Low Voltage Megger Tests of Paragraph a.4.i.(a). Any faults indicated by these tests shall be corrected before energizing the circuit. All test results shall be submitted to the Engineer for approval.

b. Testing Procedures.

1. Low Voltage Tests. Low Voltage Continuity and Insulation-Resistance (Megger) Tests i. Test Required. As noted above, circuits and portions of circuits shall be

subjected to a low voltage (5000 volt) continuity test and a low voltage (5000 volt) insulation-resistance (megger) test.

ii. Test Products. Contractor shall provide a 5000-volt direct current Megger for low voltage testing. Megger tester shall be non-crank type, as manufactured by Associated Research Meg-Check, the James Biddle Megger, General Radio Mega-Ohmmeter or approved equivalent. The Contractor shall be responsible for providing any required 120V AC power source at testing locations remote from available power. Products calibration information shall be readily available for review by the CM, as requested.

iii. Test Procedures. Refer to Item L-100 for Lock-Out Procedure requirements. Test procedures for the required tests, including field test report forms, shall be submitted to the Engineer for approval prior to testing. (a) Test equipment grounding electrode shall be adjacent to the test

equipment and be a port of/connected to the airfield grounding counterpoise/ground rode system.

(b) Verify that all devices and accessories connected to the cable are rated for the test voltage to be applied.

(c) Ground other cables in the same conduit as cable under test. (d) Clean and isolate “remote” end of cable to be tested. (e) Ground the cable for a minimum of one (1) minute prior to testing. (f) Test Cable (g) After testing is complete, cable shall be discharged to the grounding

electrode using resistor designed for the purpose. Solidly ground the cable after discharge. Cable shall remain solidly grounded for a minimum of 5 minutes.

iv. Test Results. Test values not meeting the requirements below shall be considered faulty and shall be corrected accordingly. Refer to paragraph c. below for cables not meeting testing requirements.

2. Hi-Pot Test. DC High Potential/High Voltage Current Leakage Test i. Test Required. As noted above, all circuits installed in conduit shall have all

sections of new cable Hi-Pot Tested. A section may be comprised of multiple segments joined by L-823 connectors without isolation transformers installed.

ii. Test Agency. All Hi-Pot tests shall be performed by an independent agency certified by the National Electrical Testing Association (NETA) with certified technicians using properly calibrated equipment and standard procedures. The independent agency must be approved by the Board.

Page 131: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-4 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

iii. Test Equipment. The test instrument shall be a suitable high voltage tester which has a steady, filtered direct current output voltage. The high voltage tester shall include an accurate voltmeter and micrometer for reading the voltage applied to the circuit and resultant insulation leakage current. Voltages in excess of the test values specified below shall not be applied.

iv. Test Procedures. Refer to the Lockout Procedure for Airfield Series Lighting Circuits section of Specification 01110-A for lock-out procedure requirements. Prepare cable and conduct test in accordance with IEEE 400 and NEMA WC-7 requirements and as required by testing agency. The procedure to be followed is: (a) Ground all conductors, except the one to be tested. (b) Ensure adequate clearance of the tested specimen from ground to

prevent flashover. (c) Carefully clean test conductor surface to remove any dust or other

miscellaneous debris. (d) “Corona-proof” the cable test specimen to minimize corona discharge. (e) Secure test site and fence off perimeter for the safety of personnel

working in the area. (f) Perform Insulation Resistance [IR] (low voltage megger) testing of cable

specimen immediately prior to Hi-Pot testing. Any cable that exhibits low IR (megger) readings initially is questionable and should be investigated before performing the DC Hi-Pot test.

(g) Connect the output of test set to cable specimen and attach the ground terminal of the set and an approved grounding electrode adjacent to the test equipment. Grounding electrode shall be a part of/connected to the airfield grounding counterpoise/ground rod system.

(h) Bring the DC voltage up to the prescribed maximum test voltage of 15 kV in five equal steps. Raise the voltage at an even rate to obtain each required step in not less than 10 seconds. Hold the voltage at each step for 60 seconds. Read and record the leakage current at the end of each hold period.

(i) Hold the maximum test voltage of 15 kV for approximately 10 minutes. Read and record the leakage current at 15 second intervals during the first 2 minutes and then every minute thereafter for the remainder of the test.

(j) Bring the test voltage control quickly and smoothly to zero. Read and record the voltage remaining on the cable after 30 seconds, and again after one minute.

(k) Discharge the cable to the ground using a properly terminated resistor stick. When the test set voltmeter indicates zero volts on the cable, solidly ground the cable specimen and then disconnect the test set and resistor stick. Cable specimen shall remain solidly grounded to the grounding electrode a minimum of 15 minutes.

(l) Test each subsequent lighting cable in the same manner as described above.

(m) During the tests, plot the leakage current versus the applied test voltage on appropriate graph paper to field verify the integrity of the cable insulation. Submit copies of the test data to the Engineer, the OAR and the DFW Energy and Asset Management for approval.

Page 132: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-5 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

v. Test Results. Cable specimens that do not meet the test criteria given below shall be considered completely unacceptable.

3. For all Testing. All existing and/or new cables, equipment and materials damaged during testing shall be repaired and/or replaced by the Contractor at no additional cost to the Owner, as directed by the Engineer. Tests shall be performed and faulty installations corrected, until satisfactory results are obtained. Exact correction procedures for specific fault installation circumstances shall be as specified and approved by the Engineer. The Contractor is not responsible for the repair of existing cables that are to be modified or extended that are deemed by the Engineer to be faulty prior to modification of extension unless directed by the contract documents.

c. Testing Results.

1. New Circuits and New Portions of Existing Circuits. i. Low Voltage Tests shall demonstrate to the satisfaction of the Engineer the

following: ii. All circuits are properly connected following the applicable wiring diagrams. iii. All lighting power and control circuits are continuous and free from short

circuits. iv. All circuits are free from unspecified grounds. v. The insulation-resistance to ground is equivalent to or greater than 1000

mega-ohms for all circuits and new segments of existing circuits with current transformers disconnected. Isolation transformers shall then be connected. New circuits and new segments of existing circuits shall maintain an insulation resistance of not less than 500 megohms, with isolation transformers connected, through the end of the construction and not less than 450 megohms at the end of the warranty period.

vi. The insulation-resistance to ground of all new non-grounded conductors or multiple circuits meets both of the following requirements. Insulation resistance to ground is equal or greater than 1000 megohms. In addition, new circuits shall exhibit an insulation resistance of not less than 900 megohms, valid through the end of the construction warranty period. Insulation-resistance of cables of approximately the same length installed in same duct bank shall not show a comparison ratio of over 3 to 1.

vii. Hi-Pot Tests shall demonstrate to the satisfaction of the Engineer the following most significant insulation leakage current characteristics necessary to evaluate the condition of the cable: (a) The leakage current increases in a linear function as the test voltage is

increased between zero and the prescribed maximum test voltage. (b) The leakage current stabilizes or decreases to a slightly lower stable

value after the maximum test voltage is obtained and during the maximum test voltage hold period.

d. Deficient Testing Results (Circuits Not Meeting Requirements).

1. New Circuits and New Portions of Existing Circuits.

Page 133: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-6 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

i. Cables not meeting the requirements of sub-paragraph 3 above shall be considered faulty. Faulty cables shall be corrected, if possible, and re-tested. If acceptable test values cannot be obtained, cables shall be removed from the conduit and replaced with new cable at Contractor's expense, as directed by the CM. Required testing of new cable in place shall then be implemented.

2. Existing Circuits and Existing Portions of Circuits that have been Extended or Modified. i. Cables that do not meet the test criteria listed above shall be considered

unacceptable and shall not be energized until corrected. Refer to Item L-100 for procedures to follow for cable that does not conform to the test criteria.

ii. If all requirements of Item L-100 Lockout Procedure have been satisfied by the Contractor and the Engineer determines non-complying circuits or portions of circuits are the responsibility of the Owner, then the Contractor shall provide to DFW Energy and Asset Management, throught OAR, all test reports identifying location of non-complying cables.

e. Submittal of Testing Data.

1. Low Voltage Tests. Contractor shall submit 5 copies of tests reports for approval by the Engineer and DFW Energy and Asset Management. Report shall include all measured data including applied voltage, time length of voltage application of cable within a circuit.

DATE CABLE NUMBER START TIME OPERATING VOLTAGE END TIME MAX. TEST VOLTAGE CABLE B/M NO. FROM PRODUCTS DESCRIPTION TO PRODUCTS TEMP. MEASURE EQUIP. NO. HUMID. MEASURE

EQUIP. NO. CALIBRATION DUE DATE AMBIENT TEMPERATURE RELATIVE HUMIDITY

2. Hi-Pot Tests. Contractor shall submit 5 copies of tests reports for approval by the Engineer and DFW Energy and Asset Management. Report shall include all measured data including leakage current, applied voltage, time length of voltage application and calculated megohms from each portion (section) of cable within a circuit.

DATE CABLE NUMBER START TIME OPERATING VOLTAGE END TIME MAX. TEST VOLTAGE CABLE B/M NO. FROM PRODUCTS DESCRIPTION TO PRODUCTS TEMP. MEASURE EQUIP. NO. HUMID. MEASURE

EQUIP. NO. CALIBRATION DUE DATE AMBIENT TEMPERATURE RELATIVE HUMIDITY

Page 134: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-7 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

111-3.4 SYSTEM TESTS

a. After the airfield lighting systems installation is complete and at such times as the Engineer may direct, the contractor shall conduct airfield lighting systems operating tests for approval.

b. The equipment shall be demonstrated to operate in accordance with the requirements of this specification. The test shall be performed in the presence of the Engineer or his authorized representative. The contractor shall furnish all equipment and personnel required for the test.

c. Each applicable switch in the control tower lighting panels shall be operated so that each switch position is engaged at least ten times. During this process, all lights and associated equipment shall be observed to determine that each control device properly commands the corresponding circuit. Radio communication between the operator and the observers shall be provided by the Contractor.

d. The above tests shall be repeated from the local control switches on the regulators. Each installed or revised lighting circuit shall be tested by operating the lamps throughout the range of applicable steps and shall be operated separately at Step 3 or Step 5 as appropriate for full intensity or as directed by the Engineer, for not less than 1 hour. Visual examination shall be made at the beginning and at the end of this test to determine that the installed airfield light fixtures are illuminating at full intensity.

e. If circuit regulators are installed under project construction, regulator output ampacity shall be adjusted for proper outputs following manufacturer's recommendations and requirements to insure proper circuit operation.

f. Systems tests shall confirm by demonstration in service that all lighting circuits are in good operating condition to the satisfaction of the Engineer if the tests are unsatisfactory, lighting systems installed shall be corrected and systems tests shall again be implemented.

111-3.5 RGL SYSTEM

a. Following installation and checkout of all of the components of the runway guard light system, an on-site acceptance test shall be performed by the City’s independent testing laboratory limiting tests to only new and modified systems.

b. The purpose of this test is to ensure that the RGL control and monitoring system provides the correct functionality and complies with the requirements of FAA AC 150-5340-30.

c. The RGL control and monitoring system supplier shall perform a system test to demonstrate to the testing firm, that the operational and functional performance of the system meets all requirements of the runway guard lights. In addition, an acceptance test shall be conducted under the supervision of the testing firm to determine that the RGL control and monitoring system is in compliance to the applicable FAA advisory circulators. Each RGL bar shall be testing for proper functionality.

d. The testing shall include, but is not limited to:

1. Measurement of flash functionality

Page 135: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-8 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

2. Failure mode behavior 3. Loss of communications performance 4. Alarm performance 5. Monitoring performance 6. Electrical performance

e. All performance items are subject to being tested and verified by the testing firm. All RGL controls timing measurements shall be made on a per bar basis, measuring the electrical performance of all control components of fixtures in the bar simultaneously.

f. The RGL control and monitoring system must meet these requirements to the satisfaction of the Engineer. If it is determined that deficiencies exist in the system, these deficiencies must be corrected and the testing shall be started. All costs and expenses associated with the restart of the testing shall be the responsibility of the RGL system supplier.

111-3.6 ALRCS SYSTEM

a. Following final installation and calibration of the ALRCS, the supplier shall perform a demonstration of system performance to the satisfaction of the Engineer. An acceptance test shall be conducted by an independent testing firm selected by the City to determine if the system meets the functional and performance requirements of the specification. Satisfactory performance of control functions, monitoring and display functions, alarming, and printout functions for a period of not less than one (1) week of continuous operation shall be demonstrated. All performance requirements in the ALRCS specification 16917 are subject to testing and verification. If the system does not meet the performance requirements of this specification, the supplier shall make modifications so that the requirements can be met, and shall bear all associated costs including the cost of performing the test again. Any changes to the system as submitted shall be subject to the approval of the engineer.

111-3.7 CONSTANT CURRENT REGULATOR

a. Following final installation and calibration of the CCRs, the supplier shall perform a demonstration of system performance to the satisfaction of the Engineer. An acceptance test shall be conducted by an independent testing firm selected by the City to determine if the CCR meets the functional and performance requirements of the specification. Satisfactory performance of the CCR power system, control functions, monitoring and display functions, alarming for a period of not less than one (1) week of continuous operation shall be demonstrated. All performance requirements in the CCR specification 16461 are subject to testing and verification. If the CCRs do not meet the performance requirements of this specification, the supplier shall make modifications so that the requirements can be met, and shall bear all associated costs including the cost of performing the test again. Any changes to the system as submitted shall be subject to the approval of the engineer.

111-3.8 L-807 WINDCONE

a. The L-807 LED Wind Cone shall be fully tested by continuous operation for not less than 24 hours as a completed system prior to acceptance. The test shall include operating the constant current regulator in each step not less than 10 times at the beginning and end of the 24-hour test. The L-807 shall illuminate properly during each portion of the test.

Page 136: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-9 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

METHOD OF MEASUREMENT AND PAYMENT

111-4.1 There will be no separate measurement for payment on the work discussed in this section. All work will be considered incidental for the completion of the component of work to which it is related.

END OF ITEM-SS-L-111

Page 137: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

DFW International Airport AIRFIELD ELECTRICAL Contract No. 9500473 SS-L-111-10 INSTALLATION AND TESTING FY12 Rehabilitate Airfield Pavements Addendum No. 1 June 21, 2013

THIS PAGE INTENTIONALLY LEFT BLANK

Page 138: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete

56

7

9

10

11

13

14

15

22

23

24

31

32

33

34

35

36

37

42

43

44

45

46

47

48

49

50

515253

70

71

75

76

77

78

79

A9

B6B7B8

B10B

B11

B12

B13

B14

B15

B16

B18

B19

B21

B23

B25

B28

B29

B30

B31

B35 B36B39

C2 C3 C4C6 C7 C8

C10

C12

C14

C15

C16

C17

C19

C20

C21

C22

C24B

C25

C26

C27

C28

C29

C30

C31C32

C35

C36C37C39

E2 E4 E5E6

C33

E8

E10

E11

E12

E13

E14

E15

E16

E17

E18

E20

E21

E31

E32

E33

E34E35E36E37

E38

E26

E25E24

E23

E22

E30E29

E28

E27

B34

B33

B24

B5

B3

B2

A14

A15

A16

A17

A18

A19

A20

A22

A24A

A25

A26

A28

A29

A33

A34A35A36A37A38A39

A23A

A21

A13A12

A11

A10

C11

B20

A6A7A8

AE29 AE31

AE28

AE27

AE26

AE25

AE24

AE32

AE33

AE34

AE35

AE36

AE30

105

106

107

110

111

113

114

115

B33A

B34AB36A

B10A

B9B B9A

B4B

B4A

E7AE7B

E9AE9B

C24A

C21A

C19A

C15A

C14A

C11A

C10A

A37A A35A

A34A

A28A

A26A

A24

A23

A21A

A20A

A5

A2A3A4

A1

132

131

124

122

133

134

135

136

137

138

142

143

144

D6D7D8D16 D15 D14 D12 D11D10

D17

D18

D20

D21

D22

D23

D24

D25

D27

D28

D29

D30 D31 D33 D34 D36 D37 D38 D39D40

N

ARLINGTON

EULESS

COLLEYVILLE

IRVING

SOUTHLAKE

DALLAS

FT. WORTH

TARRANT COUNTY DALLAS COUNTY

BEDFORD

COPPELL

18R18L 17R

17C

13R

31L

36L 36R 35L 35C

31R

13L

35R

IH-35E

635

114

183

IH-30

IH-20

75

IH-35 IH-45

IH-35W

820

IH-35W

287

IH-30

IH-20

635

121

N

AB

C

E

DALLAS / FT. WORTHINTERNATIONALAIRPORT

DATE: FILENAME:

AIRPORT LOCATION MAP

DALLAS / FORT WORTH

INTERNATIONAL

AIRPORT

PROJECT

LOCATION MAP

D

REHABILITATE AIRFIELDPAVEMENTS FY 2012

DFW INTERNATIONAL AIRPORTAIRPORT DEVELOPMENT & ENGINEERING DEPARTMENT3003 SOUTH SERVICE ROADDFW AIRPORT, TX. 75261

PROJECT LOCATION

GRANDPRAIRIE

SUITE 205

DALLAS, TEXAS 75252

(214) 884-4253

18333 PRESTON ROAD

Project Management

Associates

Civil Engineers and Construction Managers

8500 N. Stemmons Freeway, Suite 6055

Dallas, Texas 75247

Texas Registered Engineering Firm F-10640

12801 N. Central Expy Suite 1250

Dallas, Texas 75243

TBPE REGISTRATION FIRM No. F-819

(214) 739-3152 Fax (214) 739-3169

VOLUME 1 OF 2

CONTRACT NUMBER 9500473

Permit Number: A11-178B

ISSUED FOR BID - APRIL 27, 201311

13

7

8

9

10

5

6

1 2

43

12

Page 139: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete
Page 140: Rehabilitate Airfield Pavements FY12 Addendum No. 1 ... · Rehabilitate Airfield Pavements FY12 Addendum No. 1 Contract No. 9500473 Item 2 – Revised Plan ... Part V- Rigid Concrete