Rescue Muni’s 3-Phased PlanRescue Muni’s 3-Phased Plan For Geary Corridor Rapid For Geary Corridor Rapid
Transit Transit
Presented by Dan Krause, Presented by Dan Krause, Andrew Sullivan & David VasquezAndrew Sullivan & David Vasquez
Geary Rapid Transit in 3 Phases Geary Rapid Transit in 3 Phases
IntroductionIntroduction
Phase 1 – Inner Geary Transit Preferential Streets Phase 1 – Inner Geary Transit Preferential Streets (TPS) (TPS)
Phase 2 – “Rail-Ready” Bus Rapid Transit and Phase 2 – “Rail-Ready” Bus Rapid Transit and Transit Preferential Streets ExtensionTransit Preferential Streets Extension
Phase 3 – Convert Entire Corridor to Light-Rail Phase 3 – Convert Entire Corridor to Light-Rail
Why This Plan?Why This Plan?
Current Transit Service is woefully inadequate.Current Transit Service is woefully inadequate.
Geary is one of the most heavily used transit Geary is one of the most heavily used transit corridors in the country. corridors in the country.
Phasing Allows for Improvements in the Short-Phasing Allows for Improvements in the Short-Term for Suffering RidersTerm for Suffering Riders
Upgrade to Rail will have numerous positive Upgrade to Rail will have numerous positive effects to San Francisco’s entire transit network. effects to San Francisco’s entire transit network.
It will stimulate upgrades to the urban design for It will stimulate upgrades to the urban design for the Geary Corridor.the Geary Corridor.
Geary Rapid Transit – Phase 1Geary Rapid Transit – Phase 1Inner Geary Transit Preferential StreetsInner Geary Transit Preferential Streets
Elements:Elements:
1.1. Widening of Bus Lanes.Widening of Bus Lanes.
2.2. Add Bulb Outs at Bus Stops.Add Bulb Outs at Bus Stops.
3.3. Elimination of one Auto Lane on O’Farrell & Geary.Elimination of one Auto Lane on O’Farrell & Geary.
4.4. Some Bus Stop Consolidations.Some Bus Stop Consolidations.
5.5. Right-Turn Pocket Lanes.Right-Turn Pocket Lanes.
Geary Rapid Transit – Phase 1Geary Rapid Transit – Phase 1Inner Geary Transit Preferential StreetsInner Geary Transit Preferential Streets
Summary of Benefits:Summary of Benefits:
1.1. Speed Service – Faster Boarding & Less Speed Service – Faster Boarding & Less Stops.Stops.
2.2. Increase Reliability – Getting Cars Out of Increase Reliability – Getting Cars Out of the Transit Lane with Turn Pockets.the Transit Lane with Turn Pockets.
Geary Rapid Transit Plan Phase 2 Geary Rapid Transit Plan Phase 2 “Rail-Ready” BRT (33“Rail-Ready” BRT (33rdrd Ave. to Collins) and Ave. to Collins) and
Extension of TPS (Gough to Masonic)Extension of TPS (Gough to Masonic)
Elements:1. Bus Rapid Transit (BRT) - Exclusive transit lanes in the
center of Geary Blvd. from 33rd Ave. to Collins.
2. BRT stations with side platforms and planted median.
3. A Rail-Ready Design for BRT - Lay tracks now and design stations for rail.
4. Transit Preferential Streets – Extend right-side bus lanes from Gough to Masonic.
5. Use Local and Regional Money Only Allowing an Acceleration of Construction Schedule.
Geary Rapid Transit Plan Phase 2 Geary Rapid Transit Plan Phase 2 “Rail-Ready” BRT (33“Rail-Ready” BRT (33rdrd Ave. to Collins) and Ave. to Collins) and
Extension of TPS (Gough to Masonic)Extension of TPS (Gough to Masonic)
Map of Rescue Muni’s Phase 2
Geary Rapid Transit Plan Phase 2 Geary Rapid Transit Plan Phase 2 “Rail-Ready” BRT (33“Rail-Ready” BRT (33rdrd Ave. to Collins) and Ave. to Collins) and
Extension of TPS (Gough to Masonic)Extension of TPS (Gough to Masonic)
Map of “Rail-Ready” BRT Section – 33rd Ave. to Collins
Geary Rapid Transit Plan Phase 2 Geary Rapid Transit Plan Phase 2 “Rail-Ready” BRT (33“Rail-Ready” BRT (33rdrd Ave. to Collins) and Ave. to Collins) and
Extension of TPS (Gough to Masonic)Extension of TPS (Gough to Masonic)
Plan View of Exclusive Transit Lanes, Planted Medians and Left-Turn Pocket Lanes
Geary Rapid Transit Plan Phase 2 Geary Rapid Transit Plan Phase 2 “Rail-Ready” BRT (33“Rail-Ready” BRT (33rdrd Ave. to Collins) and Ave. to Collins) and
Extension of TPS (Gough to Masonic)Extension of TPS (Gough to Masonic)
Exclusive Transit Lanes for BRT with Rails (33rd Ave. to Collins)
Geary Rapid Transit Plan Phase 2 Geary Rapid Transit Plan Phase 2 “Rail-Ready” BRT (33“Rail-Ready” BRT (33rdrd Ave. to Collins) and Ave. to Collins) and
Extension of TPS (Gough to Masonic)Extension of TPS (Gough to Masonic)
Summary of Benefits:Summary of Benefits:
1.1. Reliability and Speed of Bus Service will Reliability and Speed of Bus Service will Increase with Exclusive Transit Lanes.Increase with Exclusive Transit Lanes.
2.2. Rail-Ready Design Allows for Rail Upgrade Rail-Ready Design Allows for Rail Upgrade without Tearing Up Geary Again.without Tearing Up Geary Again.
3.3. Will Add Capacity while Reducing Operating Will Add Capacity while Reducing Operating Costs.Costs.
4.4. Local and Regional Funding Focus Allows for Local and Regional Funding Focus Allows for Fast Implementation.Fast Implementation.
Estimated Costs: Phase 2 Estimated Costs: Phase 2
(Rail Ready BRT & TPS Extension)(Rail Ready BRT & TPS Extension)
$200M – Construction of 2.6 miles of $200M – Construction of 2.6 miles of exclusive transit lanes, including tracks and exclusive transit lanes, including tracks and stations from Collins to 33rd Ave.stations from Collins to 33rd Ave.
$5M – TPS Extension (Bus Lanes from $5M – TPS Extension (Bus Lanes from Gough to Masonic)Gough to Masonic)
TOTAL ESTIMATED COST FOR GEARY TOTAL ESTIMATED COST FOR GEARY RAIL-READY BRT - $205MRAIL-READY BRT - $205M
Rescue Muni’s Funding Plan: Phase 2 Rescue Muni’s Funding Plan: Phase 2 (Rail Ready BRT & TPS Extension)(Rail Ready BRT & TPS Extension)
$50M – Proposition K$50M – Proposition K
$110M – Capital Transit Bond #1$110M – Capital Transit Bond #1
$45M – Regional and State Sources$45M – Regional and State Sources
TOTAL REVENUE PRODUCED BY TOTAL REVENUE PRODUCED BY RESCUE MUNI PLAN - $205MRESCUE MUNI PLAN - $205M
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Elements:Elements:
1.1. Construct Subway Tunnel from Geary/Laguna to Post/Montgomery.Construct Subway Tunnel from Geary/Laguna to Post/Montgomery.
2.2. Shift Alignment of Downtown Subway Tunnel to Post St.Shift Alignment of Downtown Subway Tunnel to Post St.
3.3. Build totally grade separated transit lanes from Laguna to Collins.Build totally grade separated transit lanes from Laguna to Collins.
• Fillmore Trench Extensions under Webster and Steiner.Fillmore Trench Extensions under Webster and Steiner.
• Short Viaduct over Scott and Divisadero.Short Viaduct over Scott and Divisadero.
4.4. Take over Masonic Hill Auto Tunnel for Rail.Take over Masonic Hill Auto Tunnel for Rail.
5.5. Construct Grade Separation at Park Presidio.Construct Grade Separation at Park Presidio.
6.6. Extend exclusive transit right-of-way West from 33Extend exclusive transit right-of-way West from 33 rdrd to end of Geary. to end of Geary.
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Map of Rescue Muni’s Phase 3 Plan – Entire Corridor
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Map of Subway Portion Under Post St.One Branch Option
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Map of Subway Portion Under Post St.Two Branch Option
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Rescue Muni’s Mega-Hub Concept
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
End of the Geary/Post Line at existing Montgomery Station
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Transfer Station at Post & Stockton (Union Square)
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Subway Portal at Laguna and Geary
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Fillmore Trench Extension East (Under Webster)
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Fillmore Trench Extension West (Under Steiner)
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Short Viaduct over Scott & Divisadero
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Geary & Divisadero Elevated Station
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Existing Auto Tunnel at Masonic and Geary
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Conversion of Masonic Auto Tunnel for Light Rail (Preferred Design)
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
Light Rail Tunnel Under Existing Auto Tunnel (More Expensive)
Geary Rapid Transit Plan Phase 3 Geary Rapid Transit Plan Phase 3 Convert Entire Corridor to Light RailConvert Entire Corridor to Light Rail
See if david has out geary color picture of See if david has out geary color picture of train rather than brt. I am sure he does.train rather than brt. I am sure he does.
Estimated Costs: Phase 3 Estimated Costs: Phase 3 (Conversion to Light-Rail)(Conversion to Light-Rail)
$1B – 1.7 miles of Subway Construction $1B – 1.7 miles of Subway Construction
$50M – Short viaduct going over Divisadero and Scott streets.$50M – Short viaduct going over Divisadero and Scott streets.
$65M – Extension of Fillmore Trench under Steiner & Webster.$65M – Extension of Fillmore Trench under Steiner & Webster.
$50M – Grade separation of Park Presidio under Geary Blvd.$50M – Grade separation of Park Presidio under Geary Blvd.
$50M – Overhead electric wires.$50M – Overhead electric wires.
$100M – Financing Costs$100M – Financing Costs
TOTAL ESTIMATED COST FOR UPGRADE TO LIGHT RAIL - TOTAL ESTIMATED COST FOR UPGRADE TO LIGHT RAIL - $1.35 BILLION$1.35 BILLION
Rescue Muni’s Funding Plan: Phase 3 Rescue Muni’s Funding Plan: Phase 3 (Conversion to Light-Rail)(Conversion to Light-Rail)
$25M – Joint Development at Muni’s Presidio Maintenance Yard (rough $25M – Joint Development at Muni’s Presidio Maintenance Yard (rough estimate)estimate)
$75M – Regional Money $75M – Regional Money
$100M – Masonic Transit-Oriented Development (rough est.)$100M – Masonic Transit-Oriented Development (rough est.)
$175M – Local Transit Bond #2$175M – Local Transit Bond #2
$300M – State Funding $300M – State Funding
$675M – Federal New-Starts - 50/50 Matching $675M – Federal New-Starts - 50/50 Matching
TOTAL REVENUE PRODUCED BY RESCUE MUNI PLAN - $1.35 TOTAL REVENUE PRODUCED BY RESCUE MUNI PLAN - $1.35 BILLIONBILLION
Creative Funding: Joint Development & Creative Funding: Joint Development & Transit-Oriented Redevelopment Transit-Oriented Redevelopment
at Masonic Hillat Masonic Hill
Elements:1. Develop a mixed use transit-oriented development at Masonic
and Geary.
2. Create a vibrant, mixed-use central activity center for the entire Richmond Corridor.
3. New development could occur at the following:• Muni’s Presidio Yard (by decking over)• Existing Mall• The Trader Joe’s / Storage Building Parcels
4. Use Joint Development and Transit-Oriented Redevelopment to raise $50-$100M for the Geary Rail Project.
Creative Funding: Joint Development & Creative Funding: Joint Development & Transit-Oriented Redevelopment Transit-Oriented Redevelopment
at Masonic Hillat Masonic Hill
Trader Joes & Storage Building Sites
Creative Funding: Joint Development & Creative Funding: Joint Development & Transit-Oriented Redevelopment Transit-Oriented Redevelopment
at Masonic Hillat Masonic Hill
Muni’s Huge Presidio Yard Site
Creative Funding: Joint Development & Creative Funding: Joint Development & Transit-Oriented Redevelopment Transit-Oriented Redevelopment
at Masonic Hillat Masonic Hill
Existing Mall
Existing Mall at Geary and Masonic
How Can We Make It Happen?How Can We Make It Happen?
Strong VisionStrong Vision
Commit Now to Both BRT and Light-RailCommit Now to Both BRT and Light-Rail
Do What is Necessary to Get in Line for Do What is Necessary to Get in Line for Federal Money NowFederal Money Now
Explore Creative Funding IdeasExplore Creative Funding Ideas
NEXT STEPSNEXT STEPS
Place Transit Bond on November Place Transit Bond on November 2006 Ballot2006 Ballot
Proceed with “Rail-Ready” BRT Proceed with “Rail-Ready” BRT Project As Soon As PossibleProject As Soon As Possible
Start Official Studies for Geary Rail Start Official Studies for Geary Rail Project NowProject Now
Thank You! Thank You!
Presented by Dan Krause, Andrew Presented by Dan Krause, Andrew Sullivan & David Vasquez of Rescue Sullivan & David Vasquez of Rescue