54
Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Pretam Enterprises, At S. No. - 386/1, 387/1, 388/1, 388/2, 287/2, Vadgaon, Tal - Hatkanangale, Dist - Kolhapur 49.30 Crs. Establish JD(APC) 1 to 11 2 Gala Precision Technology Pvt. Ltd., Plot No. - 295 - III, Village - Vadavali, Post - Uchat, Tal - Wada, Dist - Thane 20.24 Crs. Establish JD(APC) 12 to 34 3 Godrej & Boyce Mfg. Co. Ltd., Plot No. 2 Mulshi Road, Pirangut, Tal: Mulshi, Dist: Pune 26.12 Crs. Establish JD(APC) 35 - 43 4 MMP industries Limited, (Formerly know as Maharashtra Metal Powders Ltd.), Vil. - Maregaon, Post - Shahpur, Dist - Bhandara 11.46 Crs. Establish (Expansion) JD(APC) 44 - 55 5 MMP industries Limited, (Formerly know as Maharashtra Metal Powders Ltd.), Vil. - Maregaon, Post - Shahpur, Dist - Bhandara 36.62 Crs. Renewal JD(APC) 56 - 68 6 Delval Flow Control (P) Ltd., Gut No. 25, 37, 43/1/1, Village - Kavathe, Tal - Khandala, Dist- Pune 29.24 Crs. Renewal JD(APC) 69 - 87 7 Parathamesh Ceramics Pvt. Ltd., Gut No. 230, Village. Lakhmapur, Tal: Dindori, Dist: Nashik 73.43 Crs. Renewal JD(APC) 88 - 106 Fresh Agenda 1 Envision Enviro Engineers Pvt. Ltd., A-1, 10, Shree Shram Safalya CHS Ltd., Opp. 12 Bunglow, Dhobighat, Near TMC Hospital, Kopri, Thane(East) 1.25 Crs. Establish PSO 107 - 134 2 SMS Envoclean Pvt. Ltd., Near Deonar Dumping Fround, Ghatkopar Mankhurd Link Road., Govandi (West), Mumbai 8.63 Crs. 1st Operate PSO 135 - 163 3 Global Eco Save Systems, S. No. 238, Furgapur Road, Badnera, Dist. Amravati 99.74 lakh 1st Operate PSO 164 - 186 4 Mansai Biomedical Waste Enterprises Pvt. Ltd., S. No. 413, Kanakai Road, Near Resources Factory, Shivaji Nagar, Jalgaon 93.39 lakh 1st Operate PSO 187 - 219 5 Water Grace Products, Survey No. 122, Near Patoda Village, Aurangabad. 98 Lakh 1st Operate PSO 220 - 237 6 Nature in Need, R.S.S. No. 206, C.S. no. 92/29/A, E-ward, Kasaba Bawada, Kolhapur 31 Lakh 1st Operate PSO 238 - 252 7 Aarti Industries Ltd., Plot No. E-50, MIDC Tarapur, Boisar, Tal. Palghar, Dist: Thane 72.82 Crs. Operate (Amendment) AS(T) 253 - 273 8 Vinati Organics Ltd., Plot No. B-12, B-13/1, MIDC Mahad, Dist - Raigad 45.79 Crs. 1st Operate (Expansion) with Amalgmation AS(T) 274 - 288 9 Gharad Chemicals Ltd., Plot No. F-1/1, MIDCLote Parshuram, Tal: Khed, Dist - Ratnagri. 64.70 Crs. 1st Operate (affitional Boiler) with Amalgmation AS(T) 289 - 307 10 Henkel CAC Pvt. Ltd., Plot No. D-73/2, D- 74/2, D-74/6, MIDC TTC Turbhe, Navi Mumbai 69.39 Crs. Operate (Amendment) AS(T) 308 - 329 11 Appasaheb Nalawade Gadhinglaj Taluka SSK Ltf., (Distillery), Harali, Dist - Kolhapur 60.56 Crs. Renewal JD(WPC) 330 - 338 List of Cases to be submitted before 19th Consent Committee Meeting of 2014-15 scheduled on 12.12.2014 at 01:00 p.m. (Booklet No. - 36)

Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Embed Size (px)

Citation preview

Page 1: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Sr. No.

Name & AddressCapital

InvestmentApplied For Section Page No. Remarks

Resubmission

1Pretam Enterprises, At S. No. - 386/1, 387/1, 388/1, 388/2, 287/2, Vadgaon, Tal - Hatkanangale, Dist - Kolhapur

49.30 Crs. Establish JD(APC) 1 to 11

2Gala Precision Technology Pvt. Ltd., Plot No. - 295 - III, Village - Vadavali, Post - Uchat, Tal - Wada, Dist - Thane

20.24 Crs. Establish JD(APC) 12 to 34

3Godrej & Boyce Mfg. Co. Ltd., Plot No. 2 Mulshi Road, Pirangut, Tal: Mulshi, Dist: Pune 26.12 Crs. Establish JD(APC) 35 - 43

4

MMP industries Limited, (Formerly know as Maharashtra Metal Powders Ltd.), Vil. - Maregaon, Post - Shahpur, Dist - Bhandara 11.46 Crs.

Establish(Expansion)

JD(APC) 44 - 55

5

MMP industries Limited, (Formerly know as Maharashtra Metal Powders Ltd.), Vil. - Maregaon, Post - Shahpur, Dist - Bhandara 36.62 Crs. Renewal JD(APC) 56 - 68

6Delval Flow Control (P) Ltd., Gut No. 25, 37, 43/1/1, Village - Kavathe, Tal - Khandala, Dist- Pune

29.24 Crs. Renewal JD(APC) 69 - 87

7Parathamesh Ceramics Pvt. Ltd., Gut No. 230, Village. Lakhmapur, Tal: Dindori, Dist: Nashik

73.43 Crs. Renewal JD(APC) 88 - 106

Fresh Agenda

1

Envision Enviro Engineers Pvt. Ltd., A-1, 10, Shree Shram Safalya CHS Ltd., Opp. 12 Bunglow, Dhobighat, Near TMC Hospital, Kopri, Thane(East)

1.25 Crs. Establish PSO 107 - 134

2SMS Envoclean Pvt. Ltd., Near Deonar Dumping Fround, Ghatkopar Mankhurd Link Road., Govandi (West), Mumbai

8.63 Crs. 1st Operate PSO 135 - 163

3Global Eco Save Systems, S. No. 238, Furgapur Road, Badnera, Dist. Amravati

99.74 lakh 1st Operate PSO 164 - 186

4

Mansai Biomedical Waste Enterprises Pvt. Ltd., S. No. 413, Kanakai Road, Near Resources Factory, Shivaji Nagar, Jalgaon 93.39 lakh 1st Operate PSO 187 - 219

5Water Grace Products, Survey No. 122, Near Patoda Village, Aurangabad.

98 Lakh 1st Operate PSO 220 - 237

6Nature in Need, R.S.S. No. 206, C.S. no. 92/29/A, E-ward, Kasaba Bawada, Kolhapur 31 Lakh 1st Operate PSO 238 - 252

7Aarti Industries Ltd., Plot No. E-50, MIDC Tarapur, Boisar, Tal. Palghar, Dist: Thane

72.82 Crs.Operate

(Amendment)AS(T) 253 - 273

8Vinati Organics Ltd., Plot No. B-12, B-13/1, MIDC Mahad, Dist - Raigad 45.79 Crs.

1st Operate (Expansion) with

AmalgmationAS(T) 274 - 288

9Gharad Chemicals Ltd., Plot No. F-1/1, MIDCLote Parshuram, Tal: Khed, Dist - Ratnagri.

64.70 Crs.1st Operate

(affitional Boiler) with Amalgmation

AS(T) 289 - 307

10Henkel CAC Pvt. Ltd., Plot No. D-73/2, D-74/2, D-74/6, MIDC TTC Turbhe, Navi Mumbai

69.39 Crs. Operate

(Amendment)AS(T) 308 - 329

11Appasaheb Nalawade Gadhinglaj Taluka SSK Ltf., (Distillery), Harali, Dist - Kolhapur 60.56 Crs. Renewal JD(WPC) 330 - 338

List of Cases to be submitted before 19th Consent Committee Meeting of 2014-15 scheduled on 12.12.2014 at 01:00 p.m. (Booklet No. - 36)

Page 2: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

12

Ninaidevi Sakhar Karkhana Ltd., (Sugar Unit) (A unit of Dalmia Bharat Sugar & Industries Ltd.), A/p - Krangali-Arala, Tal - Shirala, Dist. - Sangli

30 Crs. Renewal JD(WPC) 339 - 350

13Manganga SSK Ltd., (Distillery), Sonarsiddhnagar, Tal. - Atpadi, Dist - Sangli. 63.79 Crs. Renewal JD(WPC) 351 - 366

14Menon Piston Rings Pvt. Ltd., (Expansion), 197/A, Sambhapur - Kasarwadi Road Top, Tal - Hatkanangle

59 Crs.Renewal

(with increase in C.I.)

JD(APC) 367 - 377

15

Visteon Interior System India Pvt Ltd., Sr. No. 283/2, Raisoni Industrial Park, Vill. Mann, Tal. Mulshi, Dist. Pune 61.38 Crs.

Renewal(with change in

name & increase in C.I.)

JD(APC) 378 - 391

16Bharat Gears Ltd., Gut No. 232/2, 232/3, 232/13, 236/2, Belachamala Road, A/p Lonand, Tal: Khandala, Dist: Satara

68 Crs. Renewal JD(APC) 392 - 405

17Samson Controls Pvt. Ltd., Plot No. D-281, MIDC Ranjangaon, Tal. Shirur, Dist. Pune 60.41 Crs.

Renewal(with increase in

C.I.)JD(APC) 406 - 420

18Bharat Forge Ltd., Sr. No. 664, A/p Vaduth, Tal. Dist: Satara 46.96 Crs.

Renewal(with increase in

C.I.)JD(APC) 421 - 435

19AA Energy Ltd., Gat No. 327/2, 328, 324, 327/1, 327, 2, 3, wadsa Desaiganj, Dist: Gadchiroli

48.41 Crs. Renewal JD(APC) 436 - 442

Fresh Agenda - New Entry to CC

1Deepak Novachem Technology Ltd., Plot No. D-27/3/1, MIDC Lote Parshuram, Tal. Khed, Dist Ratnagiri

41.15 Crs.Renewal

(with increase in C.I.)

AS(T) 443 - 468

2ACG Associated Capsules Pvt. Ltd., Ashagad, Dhanu Road, Tal. Dahanu, Dist. Palghar.

51.45 Crs.Renewal

(with increase in C.I.)

AS(T) 469 - 478

3BEC Chemicals Limited, 24 MIDC Dhatav, Tal. Roha, Dist - Raigad 28.58 Crs.

Amendment (change in product

mix)AS(T) 479 - 494

4SOM Autotech Pvt. Ltd., Gut No. 927 & 928, Sompure Rd., Bidkin, Paithan, Aurangabad 28.21 Crs. Renewal JD(APC) 495 - 502

Review Item1

Revised Environmental Standards for Cement Industry

_____ _____ JD(APC) 503 - 514

2Application for renewal of consent of Industires in Dhanu Area

_____ _____ JD(WPC) 515 - 515

3Rama Petrochemicals Limited, Cill. Vashivali, Patalganga, Savroli- Kharpada Road, Tal: Panvel, Dist: Raigad

_____ _____ AS(T) 516 - 534

4Thumb Rules for slaughter House waste mangment and defign of pollution control systems / measures

_____ _____ JD(WPC) 534 - 540

5

Reagrding LAQ unstarred question No. 1552 - regarding illegal construction activity of Infrastructure project at Nashik District.

_____ _____ RO(HQ) 541 - 556

JD(WPC) 3AS(T) 7RO(HQ) 0JD(APC) 14PSO 6Total 30

Page 3: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 1

CC- Resubmission Agenda

Agenda no. 1 Region : SRO Kolhapur Section : JD APC Date :

Name & Address Pretam Enterprises , AT S No- 386/1, 387/1, 388/1, 388/2, 287/2, Vadgaon, Tal- Hatkanangale, Dist- Kolhapur.

Consent For CE

Capital Investment 4930 Lacs

Previous Consent Validity

---

Industry Type R21 Ferrous and Non ferrous metal extraction involving different

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details :- Indl effluent will be NIL, only DM plant backwash will be generated, propose

to provide ETP for same. Domestic effluent 10 CMD, SSTP is proposed.

Compliance Of Ai r Pollution Related Conditions

Yes

Proposed to provide dust collector and scrubber to furnace and Sand plant.

Water Cess Assessment Done : NA Paid Upto : NA

BG Details Amount : Validity :

Submission of Environmental Statement

Period

NA

Other Relevant Information

Case discussed in CC meeting held on 05/9/2014, it was decided to issue SCN for

refusal due proposed APC system seems to be inadequate, not submitted NOC from

municipal authorities, distance certificate as per RRZ policy. SCN issued on22/9/2014

and till date industry has not submitted the reply against said SCN. (Applied for

consent to Establish. Ferrous casting 2000 MT/M. Ci is Rs. 49.30 crores. Have applied

for NOC with Vadgaon Nagarparishad, which is local body, but not yet received).

Recommendation of SRO/RO

SRO recommended grant of consent after receipt of NOC from local body.

Page 4: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 2

Agenda no. 2 CC Item -

Region : Mumbai │Section : JD(APC) Date: .12.2014

Name & Address M/s.Gala Precision Technology Pvt Ltd , Plot No-295-III Village

Vadavali , Post , Uchat , Tal , Wada , Dist – Thane

Consent for Application for consent to Establish

Capital Investment

C.I. - Rs.20.24 Cr. For plot No 295-III

Consent Valid upto

…………

Industry Type R36 Industry or process involving metal surface treatment or pro

Compliance of Water Pollution Related Conditions

Yes √

No

Industrial effluent is 1.0 CMD – ETP provided

Domestic effluent - 3.0 CMD septic tank and soak pit provided.

Water Cess No Paid upto: no

Compliance of Air Pollution Related Conditions

Yes √ No

a) Stack of 15 Mtrs height will be provided to Furnace . and 4 nos of D.G. set having 250, 200,125 25 KVA each as fuel .HSD used , for DG Set will be provided with acoustic enclosure

Other Relevant Information

1) It was decided in CC meeting on 17.10.2014 to keep the application in

abeyance till the verification from SRO regarding location of plots, products and

number of consent granted to M/s .Gala Precision Technology Pvt Ltd.

2) SRO Kalyan-III submitted verification on of all plots location and

production capacity report vide letter dtd 10.11.2014 , as fallows

1) M/s Gala Precision Technology Pvt Ltd, at survey no 295 musarne road

Village-Vadavali Tal-Wada Dist-Thane

a) Consent stratus- BO/JD(APC)/EIC No.KN-5691-12/O/CC-858 dated

01.03.2013

Page 5: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 3

valid up to 31.10.2015Products:- 1) Compressor Valves & Assembly

Qty-4000 Pcs/M 2)Valve Plates, Spring Plates, Sheet Metal

Components, Turn Parts/spares Qty-15 Lac/ Pcs/M.

b) Present statues :- Proposed to dismental and handed over to

owner 2) M/s Gala Precision Technology Pvt Ltd

a) Proposed unit applied C to E No-295(III) Village-Vadavali Post-Ucha

t,Tal-Wada Dist-Palghar b) 1) Compressor Valves & AssemblyQty-4000 PCs/M 2) Valve Plates,

Spring Plates, Sheet Metal Components, Turn Parts/spares Qty-15 Lac/

Pcs/M c) Present statues :- Which is independent plot & not adjacent to plot no-

295 (I) & (II) though it falls under survey no 295. 3) M /s Gala Precision Technology Pvt Ltd, Survey no-302 Village-Musarne

Tal-Wada Dist-Thane a) Consent stratus: consent no BO/PCI-II/ROKN/R/EIC No.KN-2348-

09/380809/CC-195 dt.28.05.2009 valid upto 31.12.2011& applied for

further renewal for a period of three year i.e.31.12.2014 b) Products : 1) Disc Spring & Autombile Components Qty-50 MT/M

2)Reed Valve retainer Qty-10 Lakhs pices/M 3)Reed valve Qty-50,000

Picese /M c) Present statues : Running condition

4) M/s Gala Precision Engineering Pvt Ltd ,Plot no-295(II),Village-Vadavali

,Musarne Road,Tal-Wada Dist-Thane a) consent no-MPCB/ROK/R/KN-6279-12CC-258 dt.11.10.2012 Valid upto

30.6.2017

b) Product: 1)Disc Spring, Washer,ssemblies & Precision Metal

Components Qty-10 Lacs Nos/M.

c) Present Statues : Separate owner Running condition

5) M/s Gala Precision Engineering Pvt Ltd, plot no 302(II) Village-Musarne Tal-

Wada Dist-Thane

a) consent no.MPCB/ROK/O/KN-628012-CC-259 date-11.10.2012 under

RED/SSI category ,Valid up to 30.06.2017

b) Products : Disc Spring, Washer,Assemblies & Precision Metal

Components Qty-50.0 MT/M

a) Present statues :- Separate owner Running condition, admeasuring

area approximately around 20,000 Sq.Mtrs more or less

3) Further SRO kalyan reported that the unit has completely stopped the

manufacturing activities from existing survey no -295 Musarne road Vill-

Vadavali Tal-Wada Dist-Thane & dismantled the machineries in the month of

September-2014 from the said plot & reinstalled machineries at proposed new

plot No-295(III) Village-Vadavali Post-Uchat,Tal-Wada Dist-Palghar for which

applicant has applied for C to E for manufacturing of product 1) Compressor

Valves & AssemblyQty-4000 PCs/M 2) Valve Plates, Spring Plates, Sheet Metal

Components, Turn Parts/spares Qty-15 Lac/ Pcs/M at plot no 295 (III).Which is

independent plot & not adjacent to plot no-295 (I) & (II) though it falls under

survey no 295.(The photograph of proposed new plot no-295(III) is enclosed).

Page 6: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 4

4) During visit it is noticed that at proposed new plot No-295(III) Village- Vadavali

Post- Uchat :- The said proposed new plot admeasuring area around 4800

Sq.Mtrs has taken on lease for a period of five year from

Mr.Naryan,Suhas,Vikas, Prakash & Gopal Sawant. And at the said proposed

building name by Hoerbiger & applied by name of M/s Gala Precision

Technology Pvt Ltd.

a) The unit has installed there plant & machineries at said proposed site and

same was found engaged in manufacturing of products such as Reeds ,Valve

plates, Retainers & other compressor parts.

b) The unit has provided ETP consisting of collection tank-O&G trap-

Neutralization tank-MBBR aeration tank-SDB-Pressure sand filter & Activated

carbon filter & same was not found in operation.( Photo copy of the same is

enclosed)

c) The unit has not provided port hole, platform, ladder to the chimney

attached to heat treatment furnace & austempering furnace (Photo copy of the

same is enclosed).

d) The hazardous waste generated from manufacturing activities i.e. Waste

residue containing oil category 5.2 , Cotton waste etc approximately 1000 Kg

was found stored unscientifically in the premises. ( Photo copy of the same is

enclosed).

6) As per SRO kalyan –III report plot no 295(III) is not adjoin with plot no 295(I)

and 295 (II) even survey no is same ( report of SRO kalyan –III enclosed )

In view of above industry has applied for consent to Establish for said

project , without obtain consent to establish , meanwhile industry has started

its production activity as reported by SRO Kalyan-III, its seen that the unit

applied for consent to Establish of plot No 295 (III) separately no connecting

with plot no 295(I) & 295(II) and is having cost plot 295 (III) is of Rs 20.24Cr ,

and it is under preview of HOD power . Case is submitted in CC meeting for

further decision for grant of consent .

Recommendation of SRO/RO

SRO Recommendation: recommended case for grant of consent to Establish up

to commissioning of unit.

Page 7: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 5

Agenda no. 3 Region : Pune Section : JD(APC) Date : /12/2014

Name & Address M/s. Godrej & Boyce Mfg. Co. Ltd., Plot No.2 Mulshi Road, Pirangut, Tal: Mulshi, Dist: Pune

Consent For Establish Capital Investment Rs. 26.12 Crs

Previous Consent Validity

------

Industry Type R27 Heavy Engineering

Industry Category Red

Compliance Of Water Pollution Related Conditions

Domestic Effluent – 6.0 CMD, STP proposed

Industrial effluent –Nil [8.0 CMD Cooling tower effluent will be Recycled.]

Compliance Of Air Pollution Related Conditions

- Stack will be provided to D.G. section.

Water Cess Assessment Done :------- Paid Upto : --- ----

BG Details Amount : Rs. ------- Validity : ------- BG Obtained against : -------

Details of BG forfeited/encashed , if any : ------- Submission of Environmental Statement

Period -----

Other Relevant Information

1. Industry has applied for grant of consent to establish for refrigeration assembly activity.

2. Industry is located 1.9 km away from Mula River.[ A-II Class ] ,Not satisfied RRZ Policy. Copy of river distance certificate not submitted by the industry.

3. Industry is not located in Western Ghat area. 4. SRO Pune-II has called copy of river distance certificate 5. Industry has submitted copy of NOC of Pirangut Grampanchayat. 6. This case was discussed in the CC meeting held on 24.11.2014.in this

meeting it was decided to HOD verify the category of the industry. 7. Industry has proposed to consume MDI, Polyol and cyclopentane –

Isopntane chemical in door assembly section which are hazardous chemicals hence this industry can considered under RED category.

Recommendation of SRO/RO

SRO Pune-II has reported that case will be considered after receipt of copy of river distance certificate and NOC of Grampanchayat from the industry.

Page 8: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 6

Agenda no. 4 Region : SRO Bhandara Section : JD APC Date :

/12/2014

Name & Address MMP Industries Limited ,

(Formarly Know as Maharashtra Metal Powders Ltd)

Vill- Maregaon, Post- Shahpur, Dist- Bhandara.

Consent For Consent to Establish (Expansion)

Capital Investment 1146.1 Lacs

Previous Consent Validity

31/04/2015

Industry Type Metal

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details : - Trade effluent generation is nil.

For sewage effluent treatment septic tank with soak pit provided.

Water Cess Assessment Done : 31/12/2012 Paid Upto : 31/12/2012.

BG Details Amount : 1) Rs. 2.0 Lakhs – Not submitted

2) Rs. 5.0 Lakhs –submitted

Validity : 11/11/2014

BG Obtained against : O & M of pollution control systems.

Detai ls of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

2013-2014

Page 9: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 7

Other Relevant Information

1] Operation & Maintance of Air Pollution Control is poor so exceeding the analysis results of stack monitoring as per prescribed standards.

2] Industry has not submitted BG of Rs. 2.0 Lakhs towards earlier consent conditions.

3) The case was discussed in Board’s CC Meeting, dt: 24/11/2014 and it was decided to issue SCN for refusal as industry has failed to submit Board’s resolution / BG as per previous consent condition and results of stack monitoring are exceeding. SCN for refusal issued vide no: 4969, dt: 01/12/2014.

4) In response to SCN for refusal industry has submitt ed reply, dt: 04/12/2014 and stated as,

a) They presumed that the application referred in SCN for refusal under reference pertains to their application dt: 15/09/2014 which was submitted at SRO-Bhandara on 16/09/2014 for grant of expansion from the consented capacity of 230 MT/M to 505 MT/M (Increase of 275 MT/M) of the existing facility for production of “Dry Milled Flake powder of Aluminum”. This presumption is on account of the fact that subject of SCN for refusal for expansion while referring their application for renewal which was applied separately. The application for renewal has been submitted separately for plain renewal i.e without any expansion in production capacity of any of the consented items, hence these two applications are not related in any way.

b) The additional item Aluminum Ingots & Casting = 300 MT/M was already included in the consent at Sr.no: 5 of condition no: 2 of consent, hence in effect the above quoted condition at Sr.no: 11 of existing consent, dt: 09/05/2013 which was valid upto: 31/05/2014 doesn’t hold. Therefore, after receiving this consent they had appealed to Board vide letter dt: 12/06/2013 & reminder dt: 23/08/2013 to withdrawn condition no: 11. But till date they didn’t receive any communication from Board.

Recommendation of SRO/RO

Expansion in existing premises so C to E May be granted.

Page 10: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 8

Agenda no. 5 Region : SRO Bhandara Section : JD (APC) Date : /12/2014

Name & Address M/s. MMP Industries Limited,

Vill- Maregaon, Post- Shahpur,

Dist- Bhandara.

Consent For CR

Capital Investment 3662 Lacs

Previous Consent Validity

31/05/2014

Industry Type Metal

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( Y)

Details :- Trade effluent generation is nil.

For sewage effluent treatment septic tank with soak pit provided.

Water Cess Assessment Done : 31/12/2012 Paid Upto : 31/12/2012.

BG Details Amount : 1) Rs. 2.0 Lakhs – Not submitted

2) Rs. 5.0 Lakhs –submitted

Validity : 11/11/2014

BG Obtained against : O & M of pollution control systems.

Details of BG forfeite d/encashed , if any : nil

Submission of Environmental Statement

Period 2013-2014

Other Relevant Information

1) Operation & Maintance of Air Pollution Control is poor so exceeding the analysis results of stack monitoring as per prescribed standards.

2) SRO-Bhandara vide email dt: 03/11/2014 submitted proposal with recommendations that BG of Rs. 5.0 Lakhs shall be forfeited as exceeding stack results.

3) The case was discussed in Board’s CC Meeting, dt: 24/11/2014 and it

Page 11: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 9

was decided to issue SCN for refusal as industry has failed to submit Board’s resolution / BG as per previous consent condition and results of stack monitoring are exceeding. SCN for refusal issued vide no: 4968, dt: 01/12/2014.

4) In response to SCN for refusal industry has submitt ed reply, dt: 04/12/2014 and stated as,

a) The additional item Aluminum Ingots & Casting = 300 MT/M was already included in the consent at Sr.no: 5 of condition no: 2 of consent, hence in effect the above quoted condition at Sr.no: 11 of existing consent, dt: 09/05/2013 which was valid upto: 31/05/2014 doesn’t hold. Therefore, after receiving this consent they had appealed to Board vide letter dt: 12/06/2013 & reminder dt: 23/08/2013 to withdrawn condition no: 11. But till date they didn’t receive any communication from Board.

b) They had enclosed two stack reports No: 191 & 192 and both pertaining to the same stack attached to boiler. The source of confusion is report no: 191, dt: 09/01/2013 wherein PM concentration is 918.8 mg/Nm3. The figure 918.8 mg/Nm3 appears to to be a typographical error and it should read as 91.98 mg/Nm3. This is corroborated by other report no: 192 which records PM concentration as 92.01 mg/Nm3.

Recommendation of SRO/RO

SRO-Bhandara vide email, dt: 08/10/2014 submitted compliance report wrt BG as per existing consent condition and states as,

1) Applicant not submitted Board resolution & not subm itted relevant BG of Rs. 2.0 Lakhs .

2) Industry has submitted BG of Rs. 5.0 Lakhs towards O & M of pollution control system valid upto: 11/11/2014 and further added results of stack monitoring results exceeded consen ted limits.

Page 12: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 10

Agenda no. 6 Region : Satara Section : JD(APC) Date : /12/2014

Name & Address M/s. Delval Flow Control (P) Ltd., Gut no. 25, 37, 37, 43/1/1, Village: Kavathe, Tal: Khandala, Dist: Pune

Consent For Renewal Capital Investment Rs.29.24Crs.

Previous Consent Validity

31.01.2014

Industry Type R27 Heavy Engineering

Industry Category Red

Compliance Of Water Pollution Related Conditions

Yes.

Domestic Effluent – 16.0 CMD, STP provided. Industrial effluent – 1.0 CMD, ETP provided.

Compliance Of air Pollution Related Conditions

Yes- Industry has provided stack to dry paint booth and D.G.Set section.

Water Cess Assessment Done : Paid Upto : June-2014

BG Details Amount : 2.0 Lakhs Validity : -----

BG Obtained against: Towards o& M of pollution control system.

Details of BG forfeited/encashed , if any : - Submission of Environmental Statement

Period Not submitted for 2013-14

Other Relevant Information

1. Industry has applied for grant of renewal of consent to operate. 2. Earlier consent was valid up to 31.01.2014. 3. Justification about increase in CI not submitted by the industry. 4. Not submitted copy of the manifest about disposal of H.W. 5. Industry has not submitted BG of Rs.1.0 Lakhs as per earlier consent

condition. 6. This case was discussed in CC meeting held on 24.11.2014.In this

meeting it was decided to issue SCN as not submitted justification about increase CI, non submission of BG as per earlier consent condition and manifest.

7. SCN was issued to industry on 28.11.2014. 8. Industry has submitted copy of reply letter on 03.12.2014 stating

information about justification about increase in CI,BG submitted in the Board.

Recommendation of SRO/RO

- SRO Satara has reported that decision may be taken at H.Q.level.

Page 13: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 11

Agenda no. 7 Region : Nasik Section : JD(APC) Date : /10/2014

Name & Address M/s. Prathamesh Ceramics Pvt. Ltd. Gut no.230, Village: Lakhmapur,Tal: Dindori Dist: Nashik

Consent For Renewal of consent to operate.

Capital Investment Rs 73.43 Crs

Previous Consent Validity

31.01.2014.

Industry Type Ceramics, Refractories.

Industry Category Red

Compliance Of Water Pollution Related Conditions

Yes

a. Domestic Effluent – 04.00 CMD Septic tank followed by soak pit provided.

b. Industrial Effluent – 75.00 CMD [100% reuse in the process] Compliance Of Air Pollution Related Conditions

No. Dampers are provided to kiln and Thermopack section.

Industry is using pet coke as a fuel without permission from the Boar d.

Water Cess Assessment Done : ------ Paid Up to : --------

BG Details Amount : Rs. 5.0 Lakhs Validity : -------

BG Obtained against : Not submitted BG due to financial condition

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement Period ------

Other Relevant Information

1. Industry has applied for renewal of consent. 2. Earlier consent obtained vide no. BO/JD (APC)/EIC No. NK-12218-

13/O/CC-2913 dated 06.04.2013 valid till 31/01/2014. 3. Earlier CI was Rs.69.70 Crs. Now declared CI RS.73.43 Crs.

[increased by Rs.3.73 crs] Justification not submitted by the industry. 4. As per the earlier consent condition industry has not submitted BG of

Rs. 5.0 lakhs. Recommenda tion of SRO/RO

SRO Nashik has recommended case for renewal up to 31.01.2015.Also submitted proposal along with application to initiate against industry i.e. To stop use of pet coke and submit distance certificate and obtain BG against the same.

Page 14: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 12

CC-Fresh Agenda

Agenda no. 1

CC Item

Region :Kalyan │Section : P SO Date : -

Name & Address

M/s. Envision Enviro Engineers Pvt. Ltd., 208, G-Tower, Sankeshwar Complex, above Girish Group of Hospital, Sangrampura Surat-395002. Local Office: A-1- 108, Shree Shram Safalya CHS ltd; Opp. 12 Bunglow, Dhobighat, Near TMC Hospital, Kopri, Thane (East)

Consent for Fresh application for BMW authorization and consent to Establish for Common Biomedical Waste treatment and disposal facility.

Capital Investment Rs. 1.25 Crore Land cost is shown Nil

Consent Valid upto Fresh applied for Consent to Establish

Industry Type RED/R-14

Compliance of Water Pollution Related Conditions

Details: - N.A.

Water Cess Assessment Done: N.A. Fees Paid for - BMWA-7,500/- (Transport) Consent 31,100/-

Submission of Environmental Statement N.A.

Compliance of Air Pollution Related Conditions Details: - Proposed to provide the same

Other Relevant Information

1) This is a fresh application for BMW authorization and C to E for Common Biomedical Waste treatment and disposal facility located at Adharwadi Jail Road, Umberde Gaon, Kalyan (West)

2) The capital Investment certified by C.I. dated 13.11.2014 is 1.25 Crore. DPR is not enclosed and Land cost is shown Nil C-148

3) They have submitted Consent fees of Rs. 7,500 only for transportation and Consent to Establish fees of Rs.31,000/- for C to E. C -2 & C-41.

4) The Total Plot Area is 1 acre same is not earmarked by KDMC and BUA is 350 sq.mt. C-42

5) The applicant has made agreement with KDMC for upgradation, operation and maintenance of oldadandoned CBWTSDF owned by KDMC C-63 to C-77 .

6) Dy. Engg. (Env.), KDMC vide letter dated 12/09/2014 has informed Board to grant authorization in the name of M/s. Envision Enviro Engineers, Surat without holding

Page 15: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 13

responsibility. C-10

7) Old CBWTSDF of KDMC is not in operational condition and entire machinery, equipments and pollution control devices are scrapped.

5. The applicant is presently insisting for separate permission

for collection and transportation of BMW from KDMC area and disposal at CBMWTSDF, MWML, Taloja.

7. The applicant has not started any activity at existing site. 8. They have enclosed copy of letter received from MWML,

CBMWTSDF, Taloja for acceptance of BMW collected from KDMC area dated 30/08/2014. C-50

9. They have enclosed the agreement copy with Shri.

Dyandev L. Zarekar for providing vehicles dt. 26/08/2014 alongwith details and fitness certificate of vehicle to be used for transportation of BMW. C-56 to C-62 .

10. The applicant has enclosed the work schedule for

modification of existing incineration facility work and the commissioning and performance trial with take above six months. C-91

11. During site verification on visit report dated 11/11/2014,

Board official noted that CBWTSDF was not in operation. All equipment including incinerator, shredder are scrapped and not in operation. All BMW collected from Kalyan region is collected at facility site and sent to M/s. SMS Anamklean Green tech, Deonar, Mumbai. C-96

12. Clause 12.13 of agreement (C-68) allows contractor i.e.

applicant to appoint “Transport Operator” for collection of BMW from KDMC and treatment and disposal of its own facility after upgradation, obtaining permissions from statutory authorities including MPCB and after satisfying KDMC official in-charge.

14. The map submitted by the applicant vide letter dated

Page 16: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 14

17.11.2014 do not reflect exact location and C.S.No. of BMW plant C-117 to C-119

Recommendation of SRO/RO

SRO, Kalyan-I vide letter dated 11/11/2014 stated that the site is situated at a distance of 0.5 km from habitant, about 2.0 km from river and CRZ is applicable. C-98

SRO- Kalyan – I has recommended to grant Combined Consent to Operate and authorization after commissioning / completion of plant with appropriate B.G. and putting the responsibility on KDMC authority.

Page 17: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 15

Agenda no. 2

CC Item

Region :Mumbai │Section : P SO Date : -

Name & Address M/s. SMS Envoclean Pv. Ltd., Near Deonar dumping ground, Ghatkopar Mankhurd Link Road, Govandi (West), Mumbai.

Consent for Fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

Capital Investment Rs. (8.63 Crore)

Consent Valid upto BMW authorization from Board valid upto 31.12.2013. Now applied for renewal alongwith authorization fees for three years period i.e. upto 31.12.2016

Industry Type RED/R-14

Compliance of Water Pollution Related Conditions

Details: - ETP is provided

Water Cess Assessment Done: -- Paid upto - Rs. 2,75,000=00

Submission of Environmental Statement --

Compliance of Air Pollution Related Conditions

Details: -1) Ventury scrubber and stack of 30 mtrs. height 2) D.G.Set of capacity 62.5 KVA provided

Other Relevant Information

1) This is a fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

2) They have obtained BMW authorization from Board valid upto 31.12.2013. Thereafter, they have applied for renewal alongwith fees for three years period, which is in process at HQ.

3) The capital Investment certified by C.A. dated 16.12.2013 is 8.63 Crore. Fixed Assets for gross block year 31.03.2013 certified by C.A. dated 24.01.2014 is submitted. C-31 Land cost is shown NIL

4) They have submitted Consent fees of Rs. 2,75,000=00 for Eleven year period. C -5.

5) The year of commissioning of the said facility is since May 2009. C-6

6) The Total Plot Area is 41,000 sq. ft. and BUA is 14,000 sq.ft. C-6

7) They have provided D.G.Set of capacity 62.5 KVA. Detail of stackand fuel consumption is not mentioned. C-8

Page 18: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 16

8) ETP is provided. However, capacity is not mentioned.

9) Membership of CHWTSDF , TTC is obtained for disposal of ETP sludge and Incineration ash.

10) They have provided 4 nos. of incinerator of capacity 250 kg/hr each followed by ventury scrubber and stack of 30 mtrs. height.

11) Autoclave and Shredder is provided.

12) Boiler is also provided by the facility.

13) HCL is exceeding for the month November -2013. C-53

14) BOD is exceeding for the month from January to June -2013 and COD is exceeding in the month January- 2013. C-52

Recommendation of SRO/RO

SRO- Mumbai – III has recommended to grant Consent to Operate for a period upto 31.05.2016.

Page 19: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 17

Agenda no. 3

CC Item

Region :Amravati │Section : P SO Date : -

Name & Address M/s. Global Eco Save Systems, S. No.238, Durgapur R oad, Badnera, Dist. Amravati

Consent for Fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

Capital Investment Rs. (99.74 Lakhs)

Consent Valid upto BMW authorization from Board valid upto 28.02.2014. Now applied for renewal alongwith authorization fees for three years period i.e. upto 28.02.2017

Industry Type RED/R-14

Compliance of Water Pollution Related Conditions

Details: - ETP is provided

Water Cess Assessment Done: -- Paid upto - Rs. 20,000=00

Submission of Environmental Statement --

Compliance of Air Pollution Related Conditions

Details: -1) Ventury scrubber and stack of 30 mtrs. height 2) D.G.Set of capacity 25 KVA provided

Other Relevant Information

1) This is a fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

2) They have obtained BMW authorization from Board valid upto 28.02.2014. Thereafter they have applied for renewal alongwith fees for three years period, which is in process at HQ. C- 18

3) The capital Investment certified by C.A. dated 16.12.2013 is 99.74 lakhs. C-9

4) They have submitted Consent fees of Rs. 20,000=00 for four year period i.e. upto 04.06.2016. C - 1.

5) The year of commissioning of the said facility is since March 2003. C-2

6) The Total Plot Area is 6700 sq. mtrs and BUA is 2400 sq.mtrs. C-2

Page 20: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 18

7) They have provided D.G.Set of capacity 25 KVA followed by stack of 1mtrs. height . Fuel is LDO and is used about 550 Kl/month NS-3

8) ETP is provided. However, capacity is not mentioned.

9) Membership of CHWTSDF is not obtained for disposal of ETP sludge.

10) They have provided 2 nos. of incinerator of capacity 300 and 100 kg/hr respectively followed by ventury scrubber and stack of 30 mtrs. height.

11) Particulate matter is exceeding for the month June, August, October and November-2013. C-10

12) Spore Test report for the month January-2014 shows negative result i.e. adequate C-13

13) Latest water analysis report is not enclosed.

Recommendation of SRO/RO

SRO- Amravati – I on non confirming the level of SPM, it is recommended for Consent to Operate for a period upto 31.05.2016 by incorporating the condition towards proper operation and maintenance of pollution control system with requisite B.G. as per Board Circular.

Page 21: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 19

Agenda no. 4

CC Item

Region :Nashik │Section : P SO Date : -

Name & Address M/s. Mansai Biomedical waste Enterprises Pvt. Ltd., S.No. 413, Kanakai Road, Near Resource factory, Shivaji N agar, Jalgaon

Consent for Fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

Capital Investment Rs. (93.39 Lakhs)- C.A. certificate not enclosed

Consent Valid upto BMW authorization from Board valid upto 31.08.2013. Now they have applied for renewal and is in process at HQ.

Industry Type RED/R-14

Compliance of Water Pollution Related Conditions

Details: - ETP is provided

Water Cess Assessment Done: -- Paid upto - Rs. 20,000=00

Submission of Environmental Statement --

Compliance of Air Pollution Related Conditions

Details: - 1) Ventury scrubber and stack of 30 mtrs. height 2) D.G.Set of capacity 32 KVA provided

Other Relevant Information

1) This is a fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

2) They have obtained BMW authorization from Board valid upto 31.08.2013. Now they have applied for renewal along with fees for three year period i.e. upto 31.08.2016 C-9

3) The capital Investment is 92.39 lakhs. C.A. certificate is not enclosed.

4) They have submitted Consent fees of Rs. 20,000/- for four year period i.e. upto 04.06.2016 C - 1.

5) The year of commissioning of the said facility is n ot mentioned

6) The Total Plot Area is 1.25 acre and BUA is 265.0 sq.mtrs. C-2

7) They have provided D.G.Set of capacity 32 KVA followed by stack of 1mtrs. height and LDO is used as fuel. Quantity of fuel is 15 Kg/hr.C-4

8) Shredder is provided.

9) Autoclave detail is not provided .

Page 22: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 20

10) ETP is provided. However, capacity is not mentioned .

11) They have not obtained membership of CHWTSDF, for disposal of ETP sludge and Incineration ash.

12) They have provided of incinerator of capacity 50 kg/hr respectively followed by ventury scrubber and stack of 30 mtrs. height.

13) Analysis report of Stack, Effluent and Spore test i s not provided.

Recommendation of SRO/RO

SRO- Jalgaon-I has recommended to grant Consent to Establish and operate to this facility.

Page 23: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 21

Agenda no. 5

CC Item Region :Nashik │Section : P SO Date : -

Name & Address M/s. Water Grace Products, Survey No.122, Near Pato da village, Aurangabad

Consent for Fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

Capital Investment Rs. (98.00 Lakhs)-

Consent Valid upto BMW authorization from Board valid upto 30.11.2015 imposing B.G. of Rs.5.75/- lakhs

Industry Type RED/R-14

Compliance of Water Pollution Related Conditions

Details: - ETP is provided

Water Cess Assessment Done: -- Paid upto - Rs. 30,000=00

Submission of Environmental Statement --

Compliance of Air Pollution Related Conditions

Details: - 1) Ventury scrubber and stack of 30 mtrs. height 2) D.G.Setis not provided

Other Relevant Information

1) This is a fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

2) They have obtained BMW authorization from Board valid upto 30.11.2015 imposing B.G. of Rs.5.75/- lakhs

3) The capital Investment is 98.00 lakhs. C.A. certificate dated 01.08.2013 is enclosed. C-42

4) They have submitted Consent fees of Rs. 30,000/- for six year period i.e. upto 04.06.2018 C - 1.

5) The year of commissioning of the said facility is 01.11.2003. C-2

6) The Total Plot Area is 1 acre and BUA is not mentioned . C-2

7) They have not provided D.G.Set

8) They have provided of incinerator of capacity 300 kg/hr respectively followed by ventury scrubber and stack of 30 mtrs. height.

9) Autoclave and Shredder is provided.

10) ETP is provided. However, capacity is not mentioned .

11) They have not obtained membership of CHWTSDF, for disposal of ETP sludge and Incineration ash.C-28

12) Particulate matter is exceeding the limit for the month

Page 24: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 22

August -2013. C-71

13) Analysis report of Effluent shows mentioned parameters are exceeding the prescribed limit for the month April, June and August, 2013.C-68, 69 & 70

Recommendation of SRO/RO

SRO- Aurangabad-I has recommended to grant Consent to Establish and operate to this facility imposing B.G.

Page 25: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 23

Agenda no. 6

CC Item

Region :Mumbai │Section : P SO Date : -

Name & Address M/s. Nature In Need R.S.S. No. 206, C.S.No.92/29/A, E- ward, Kasaba Bawada, Kolhapur

Consent for Fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

Capital Investment Rs. (31.00 lakhs)

Consent Valid upto BMW authorization from Board valid upto 31.05.2015.

Industry Type RED/R-14

Compliance of Water Pollution Related Conditions

Details: - ETP is provided

Water Cess Assessment Done: -- Paid upto - Rs. 7,500=00

Submission of Environmental Statement --

Compliance of Air Pollution Related Conditions

Details: -1) Ventury scrubber and stack of 30 mtrs. height 2) D.G.Set of capacity 82.5 KVA provided

Other Relevant Information

1) This is a fresh application for C to O for Common Biomedical Waste treatment and disposal facility.

2) They have obtained BMW authorization from Board valid upto 31.05.2015.

3) The capital Investment certified by C.A. dated 07.01.2014 is 31.00 lakhs is submitted. Land is allotted by KMC. C-40

4) They have submitted Consent fees of Rs. 7,500=00 for Five year period. C -16.

5) The year of commissioning of the said facility is since June 2012. W.O. issued by KMC dated 11.09.2012 is enclosed. C-38

6) The Total Plot Area is 10,000 sq. ft. and BUA is 6,500 sq.ft. C-17

7) They have provided D.G.Set of capacity 82.5 KVA. C-20

8) ETP is provided. However, capacity is not mentioned.

9) Membership of CHWTSDF , MEPL, Ranjangaon is obtained for disposal of ETP sludge and Incineration ash.C-36

10) They have provided of incinerator of capacity 100 kg/hr

Page 26: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 24

followed by ventury scrubber and stack of 30 mtrs. height.

11) Autoclave and Shredder is provided.

12) Conditional Direction was issued by Board on 26.11.2013. Accordingly, they have submitted B.G. of Rs. 7.75 lakhs. C-24

13) Copy of NGT Court Order dated 05.05.2014 is enclosed

C-1

Recommendation of SRO/RO

SRO- Kolhapur has recommended to grant Consent to the facility.

Page 27: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 25

Agenda no. 7 CC Item –

Region : Thane │Section : AS(T) Date: /12/2014

Name & Address

M/s Aarti Industries Ltd. , Plot No. E-50, MIDC Tarapur, Boisar,

Tal. Palghar, Dist. Thane-401 506.

Consent for Amendment of Consent to Operate for proposed change in product-mix.

Capital Investment Existing C.I. Rs.72.82 Crs.

Consent Valid upto 30/11/2015.

Industry Type Bulk Drug

Industry Category RED/LSI

Compliance of Water Pollution Related Conditions

YES

Details:

Existing ETP: Industry has provided ETP consisting of collection tank (35 Kl), neutralization tank (40 Kl) and Double Effect Evaporator (25 CMD) to treat 16 CMD of industrial effluent followed by incinerator to incinerate concentrate.

Analysis results of JVS of treated effluent dtd. 28/02/14 shows that concentrations of all the parameters are within limits.

Compliance of Air Pollution Related Conditions

Yes

Details :

Chimney of appropriate height provided to D.G. Sets (500 & 625 KVA each) as per Rule.

Actual consumption of Diesel for D.G. Sets used during Electric supply cutoff is 85 Ltrs/hr, but it is wrongly mentioned as 85 Ltrs/day in Consent.

Water Cess August 2014. Paid upto: --

BG Details

Amount: - Rs. 27.5 Lakh. Validity - Upto 31/01/2015.

BG obtained against: Compliance of Restart Directions.

Details of BG forfeited/ enchased, if any: N.A.

Submission of Environmental Statement

Period 2011-12

Page 28: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 26

Other Relevant Information

1.Existing industry has obtained Consent to Operate on 09/10/2012 for mfg. of 39 Nos.of Bulk Drug products with the total production quantity of 14.10 MT/M with the validity upto 30/11/2015.

2.Industry has submitted application for grant of amendment of Consent to Operate for proposed change in product-mix on 24/09/14 for deletion of 3 Nos. of existing products, reduction in production of 5 Nos. of existing products and addition of one new product of same group/family with total production quantity unchanged.

3.Due to proposed change in product-mix, there will not be any increase in water consumption, effluent generation, air emission and HW. In support of their application, industry has submitted ‘Proforma’ of Self Assessment and Certificate issued by Dr BATU in respect of ‘No increase in pollution load’.

4.Board has issued Closure Directions to the industry on 15/10/13 after observing non-compliances during recent survey of the Tarapur MIDC Area.

5.Board has extended personal hearing to the industry on 31/10/13 and issued Conditional Directions to Restart Mfg. activities vide letter No. MPCB/AS(T)/TB/Dir/B-5001 dtd. 31/10/13.

6.Team of Officers from HQ visited the industry on 04/04/2014 for verification of the compliances of the conditions of the conditional directions and observed that industry had complied with all the conditions of the Restart Order dtd. 31/10/13.

7.Board’s Committee constituted for Tarapur area had a meeting on 21/06/2014 and formulated policies for dealing CC/CAC cases from MIDC Tarapur area.

8.Above policy was discussed in CC meeting on 27/06/2014, and it was decided to approve the same.

Recomm endation of SRO/RO

SRO recommended grant of amendment of Consent to Operate for proposed change in product-mix.

Page 29: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 27

Agenda no. 8 Region : Raigad Section : Date :

Name & Address Vinati Organics Ltd, Plot No.B-12 B-13/1, MIDC, Mahad, Dist-Raigad.

Consent For Consent to 1st operate expansion and amalgamation with existing consent.

Capital Investment 45.79.2 cr

Previous Consent Validity

31/05/2015.

Industry Type R59 Petrochemicals (Manufacture of and not merely use of as raw material)

Indu stry Category Red

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details: - The industry has provided ETP comprising Collection tank, Skimmer tank, Neutralization Tank, Primary settling tank, Aeration tank, Secondary settling tank, Sand filter & Carbon filter.

Water Cess Assessment Done : returns submitted upto-September-2014

Paid Upto :March -2014

BG Details Amount : (i) 3.5 lakh

(ii) 27.0 lakh

Validity : (i)16/01/2015

(ii) 31/07/2015

BG Obtained against : (i) Direction by RO Raigad dtd-21/12/2013.

(ii) Consent conditions.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period 2013-14

Other Relevant Information

Application received from SRO Mahad recommending for amalgamation of C to E granted with E.C condition on 13/02/2014 and C to O valid upto 31/03/2015. Industry has carried out the study on the capacity expansion of Isobutyl Benzene (IBB) from 10,000 MTA to 18024 MTA from Institution of Chemical Technology by B.N.Thorat professor of Chemical Engineering. Professor Thorat has carried out the study and submitted that since there will be no increase in pollution load subsequent to increase in the production capacity of IBB from the existing 10000 MTA to 18024 MTA, the company does

Page 30: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 28

not require prior Environment Clearance as per Interim Operational Guidelines of 13 th October, 2006 of Ministry of Environment and Forest and subsequent Clarification Circular, Para1, Sub-Para (ii) issued on 14 th December 2006.

Recommendation of SRO

This is a case for 1st consent to operate with amalgamation of existing C2O for manufacturing of isobutyl benzene -18000 MT/A. Technical report of Institute of chemical technology (ICT),Mumbai is enclosed which explain that there will be no increase in pollution load subsequent to increase in production capacity of IBB from 10000 MT/A to 18000 MT/A. Industry has installed adequate ETP & APC systems which is operated continually hazardous waste is regularly disposed at MWML Taloja form IV & environment statement submitted. Proposed direction were issued dt.25/10/2013 & ID dt 21/12/2013 respectively. Industry has submitted reply to interim direction dtd18/06/2014 regarding provision of flow meter wet scrubber for TFH, chimney & acoustic to DG set etc. & also submitted BG. In view of above, first Consent to Operate with amalgamation of existing C2O for manufacturing of IBB -18000 MT/A (Existing 10000 MT/A & proposed -8000 MT/A) may be granted ,if approved

Page 31: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 29

Agenda no. 9 Region : SRO Chiplun Section : AST Section Date : 05.12.2014

Name & Address M/s. Gharda Chemicals Ltd.,PlotNo.F-1/1,MIDC, Lote Parshuram, Tal Khed, Dist. Ratnagiri.

Consent For Consent First operates for additional standby Boiler and amalgamation of existing consent.

Capital Investment Total- Rs. 64.70 Crs. (Existing-Rs. 47.48 Crs. and proposed-Rs.17.11 Crs)

Previous Consent Validity C to E

Industry Type R66 Power Generation Plants [Except Wind, Solar and Mini Hydel Industry Category Red Compliance Of Water Pollution Related Conditions

YES ( √ ) Details: - I.E.-125 M3/D. For existing plant Industry has provided Primary treatment with RO system to treat IE. JVS analysis reports of water seem within consented standards.

Water Cess Assessment Done: Oct 2014 Paid Upto : July 2013

BG Details Amount : 5 Lakh Validity : 30.04.2019

BG Obtained against : O & M of Pollution Control systems

Details of BG forfeite d/encashed , if any : NA

Compliance Of Air Pollution Related Conditions

YES ( √ ) NO ( ) Details: Industry has provided separate ESP and dust collector to each Boiler. JVS analysis report of existing boiler stack seems within consented standards.

Submission of Environmental Statement

Period 2013-14

Other Relevant Information

Industry is located in MIDC Lote Parshuram. Industry has applied for consent to first operate for additional standby boiler of capacity 46 TPH only for stand by purpose. Industry is located in MIDC Lote. Industry has obtained C to E dtd. 31.01.2014 for additional standby boiler. Industry is having valid consent for Captive Co-generation power plant upto 31.12.2018 Industry has installed separate ESP and dust collector to proposed boiler the stack is combine with Existing and new boiler. Industry has also proposed to install DG set of Capacity 1250 KVA Total CI is Rs. 64.70 Crs (Existing- Rs. 47.48 Crs and proposed is Rs. 17.22 Crs). Industry has paid Rs. 2, 50, 000/- fees as per total CI.

Recommendation of SRO/RO

SRO has recommended that consider the case for grant of consent to operate incorporating in existing valid consent.

Page 32: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 30

Agenda no. 10 Region : SRO Navi Mumbai I

Section : AST Section Date : 26.11.2014

Name & Address Henkel CAC Pvt. Ltd. , Plot No. D-73/2, D-74/2, D-74/6, MIDC TTC, Turbhe, Navi Mumbai

Consent For Consent to Amendment

Capital Investment 6939 Lacs

Previous Consent Validity 31.01.2016

Industry Type R05 Basic Chemicals and electro chemicals and its derivatives in Industry Category Red Compliance Of Water Pollution Related Conditions

YES ( √ ) 1. Details: - Industry has provided Primary, Secondary & tertiary treatment to treat IE.

JVS analysis reports of water seem within consented standards.

Water Cess Assessment Done: …. Paid Upto : Dec 2014

BG Details Amount : 5 Lakh Validity : 31.05.2016

BG Obtained against : O & M of Pollution Control systems

Details of BG forfeite d/encashed , if any : NA

Compliance Of Air Pollution Related Conditions

YES ( ) NO ( ) Industry has provided adequate stack to Thermopack. JVS analysis reports of air seem within consented standards.

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

Industry has submitted application for Amendment in the Consent for production without increase in Effluent load. 1. Previous consent is valid upto 31.01.2016. 2. Industry has provided Primary, Secondary & tertiary treatment to treat IE. JVS

analysis reports of water seem within consented standards. 3. Industry has provided adequate stack to Thermopack. JVS analysis reports of air

seem within consented standards. 4. The Adhesives production on Plant No.2 i. e. Plot No. D-74/2 is @ 400.5MT/M &

now applied for amendment of production is @ 1360 MT/M. 5. The Adhesives production on Plant No. 3 i. e. Plot No. D-74/6 is @1955.0 MT/M &

Amendment of production is @ 1000.0MT/M. 6. Industry shift some machines from Plant No. 3 to Plant No. 2 according to this the

production quantity per month reflect as above. 7. The capital investment increases from Rs.60.84 Crs to 69.39 Crs. The increased

capital investment is @ 8.55 Crs. 8. Industry has submitted additional fees of Rs. 25,000/- for increase in CI.

Recommendation of SRO/RO Consider the case granting with overriding effect

Page 33: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 31

Agenda no. 11 Region : SRO Kolhapur Section : JD(WPC) Date :01.12.2014

Name & Address Appasaheb Nalawade Gadhinglaj Taluka SSK Ltd(Distillery) , Harali, Dist.- Kolhapur

Consent For CR

Capital Investment 439 Lacs (Total C.I of the Industry is Rs.60.56 Crs.)

Previous Consent Validity

31.08.2014

Industry Type R15 Distillery including Fermentation industry

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details : - Industrial effluent Details:

a. Quantity: 134 CMD.

b. Treatment /Disposal: On compost yard of about 4.5 Acres, this seems to be inadequate.

c. SRO reported that out of three Nos. of compost yard 1 compost yard is concretized and remaining two are Kuccha compost ya rd.

Compliance Of Air Pollution Related Conditions

Steam is taken from the Boiler of Sugar Unit.

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Rs.5.0 Lakhs & Rs.2.0 Lakhs (Not Submitted)

Validity : Not Submitted

BG Obtained against : BG are imposed in the previous consent for completion of compost yard and towards compliance of the consent conditions.

Details of BG forfeite d/encashed , if any :

Submission of Environmental Statement

Period 201-13

Page 34: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 32

Other Relevant Information

a) Close proximity of river i.e 1.0 KM from river H iranykeshi (A -II) Class, b) Two Nos. of compost yard are not impervious, c) Spent wash is stored in two Nos of Kuccha pit an d d) Not completed the work of the compost yard and n ot submitted the BG’s as per the previous consent condition towards the c ompliance of the same.

Recommendation of SRO/RO

Consent may be decided at Higher level.

Page 35: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 33

Agenda no. 12 Region : SRO Sangli Section : JD(WPC) Date: 04/12/2014

Name & Address Ninaidevi Sakhar Karkhana Ltd. (A unit of Dalmia Bharat Sugar & Industries Ltd.) , A/p-Krangali-Arala, Tal.- Shirala, Dist.- Sangli.

Consent For CR

Capital Investment 3000 Lacs (Previous C.I was 46.57 Crs.)

Previous Consent Validity

31.12.2001

Industry Type R74 Sugar (excluding Khandsari)

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details : - Total Water consumption is 725 CMD.

Industrial effluent Details:

a. Quantity: 500 CMD. (Exceeding as per the CREP Norms 100 Lit/ ton cane crushed)

b. Treatment: ETP is provided with Secondary treatment based on Activated Sludge Process.

c. Disposal: As per the application area available for the disposal of the treated effluent is 50 Acres, However SRO has issued query letter for the submission of land details.

Compliance Of Air Pollution Related Conditions

Mechanical Type of Dust collector is provided as an APC to two nos of Bagasse fired Boiler.

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeite d/encashed , if any :

Submission of Environmental Statement

Period

Page 36: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 34

Other Relevant Information

a) Industry is located at 1.2 KM Warna River (A-II Class), b) Previous consent validity is 2001, c) Unit is not in operation from last 7 Years, d) Industrial effluent generation quantity is more than the CREP norms, e) 15 Days storage tank for the treated effluent is not provided.

Recommendation of SRO/RO

SRO office has issued letter for discrepancies dt.10.10.2014, industry has requested to extend the time for submission of information vide letter dt.29.10.2014. SRO reported that as Now no body can enter in the industry, we may consider the consent after submission of required information and total completion of revamping of mfg. units, ETP, Boiler and APC system and treated effluent disposal system.

Page 37: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 35

Agenda no. 13 Region : SRO Sangli Section : JD(WPC) Date : 04.12.2014

Name & Address Manganga SSK Ltd (Distillery) , Sonarsiddhnagar, Tal.- Atpadi, Dist.- Sangli

Consent For CR

Capital Investment 965.97 Lacs (total C.I of the Industry is Rs.63.79 Crs)

Previous Consent Validity

81.08.2014

Industry Type R15 Distillery including Fermentation industry

Industry Category Red

Compl iance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details : - Industrial effluent Details: a. Quantity: 320 CMD.

b. Treatment: Biomenthanization followed by Biocomposting.

C. Disposal: Biocomposting on about 9 Acres impervious composting yard as per CREP Noms.

d. 30 Days storage tank for spent wash is provided.

Compliance Of Air Pollution Related Conditions

Steam is taken from the Boiler of Sugar Unit.

Water Cess Assessment Done : Dec 2013 Paid Upto :

BG Details Amount : Not Submitted BG of Rs.5.0 Lakhs & Rs.5.0 Lakhs

Validity :

BG Obtained against : As per previous consent condition 1. For provision of H2S scrubber and 2. For O & M of PCS and compliance of consent conditions.

Details of BG forfeite d/encashed , if any :

Submissi on of Environmental Statement

Period 2012-13

Other Relevant Information

9 Acres impervious composting yard as per CREP Norms is provided.

Recommendation of SRO/RO

Grant of renewal of consent may be decided at CC.

Page 38: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 36

Agenda no. 14 Region : SRO Kolhapur Section : Date :

Name & Address Menon Piston Rings Pvt Ltd (Expansion) , 197/A,Sambhapur-Kasarwadi Road,Top,Tal-Hatkanangle

Consent For CR

Capital Investment 5900 Lacs

Previous Consent Validity

31/12/2014

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

Compliance Of Water Pollution Related Conditions

NO

Details : -Provided primary & tertiary treatment facilities, b ut SRO reported that operation & maintenance is poor

Compliance Of Ai r Pollution Related Conditions

No

APC provided to furnace was dismantled.

Water Cess Assessment Done : No Paid Upto : --

BG Details Amount : Rs. 5/- lacs & Rs. 2/ - lacs Validity : Not submitted

BG Obtained against : O & M of PCS & submission of BR

Details of BG forfeite d/encashed , if any :

Submission of Environmental Statement

Period

Details Not submitted by industry or SRO/RO

Other Relevant Information

Applied for renewal of consent. CI is Rs. 59.0 crs, existing was Rs. 39.89 crs, increase is of Rs. 19 crs, this is due to modernization & purchase of new advanced machineries.

SRO has reported that industry has established additional activity of chrome plating, 3 nos. of new furnaces without obtaining consent to Establish. Due to non compliances such as non operation of APCS & ETP, SRO have submitted proposal for action to RO.

RO has reported that industry has submitted the clarification regarding the additional activity and it is stated by industry that there is no additional activity and production qty is also same as per last consented qty. CI increase is due to modernization & purchase of new advanced machineries.

Also it is noted that industry have not submitted BG’s of Rs. 2/- lacs and 5/- lacs as per

Page 39: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 37

last consent conditions which were for submission of BR and for O & M of pollution control system. Industry have violated the consent condition by again increased the CI form Rs. 39.89 crs to Rs.59 crs for modernization & purchase of new advanced machineries without obtaining prior permission from Board, though it was intimated.

Recommendation of SRO/RO

RO recommended plain renewal of consent.

Page 40: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 38

Agenda no. 15

Region : Pune Section : JD(APC) Date : /12/2014

Name & Address M/s. Visteon Interior Systems Indi a Pvt. Ltd., Sr. No. 283/2, Raisoni Industrial Park, Vil. Mann, Tal. Mulshi, Dist. Pune

Consent For Change in name with increased CI

Capital Investment 61.38 Crs

Previous Consent Validity

31/03/2016

Industry Type R22 Fiber glass production (excluding moulding)

Indu stry Category Red

Compliance Of Water Pollution Related Conditions

Yes -Domestic Effluent – 13.80 CMD, STP provided.

Industrial effluent – 3.25 CMD, ETP provided.

Compliance Of Air Pollution Related Conditions

Yes- Industry has provided water scrubber system to common booth exhaust .

Water Cess Assessment Done :not reported Paid Upto :

BG Details Amount : Rs. 5.0 Lakhs Validity :

BG Obtained against : O & M of pollution control system.

Details of BG forfeited/encashed , if any :Nil

Submis sion of Environmental Statement

Period 2013-2014

Other Relevant Information

1. Industry has applied for C to O with change in name and increased CI. 2. Earlier consent obtained in the name M/s. Visteon A utomotive

Systems India Pvt. Ltd., vide No. BO/JD(APC)/EIC No. PN-15234-12/O/CC/MPCB/2012/10/0160 dated 10/10/2012 valid till 31/03/2016

3. There is no change in production quantity. 4. Earlier CI was Rs. 47.42 Crs. Now Shown CI Rs.61.38Crs. [Rs.13.96

increased], CI was increased due to modernization of plant and machineries.

Recommendation of SRO/RO

Recommended change in name with increased CI.

Page 41: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 39

Agenda no. 16

Region : Pune Section : JD(APC) Date : /12/2014

Name & Address M/s. Bharat Gears Ltd., Gut No. 232/2,232/3,232/13,236/2, Belachamala Road, A/p Lonand, Tal. Khandala, Dist. Satara

Consent For Renewal

Capital Investment 68.00 Crs

Previous Consent Validity

30/09/2014

Industry Type R04 Automobile manufacturing (integrated facilities)

Industry Category Red

Compliance Of Water Pollution Related Conditions

Yes

a. Domestic Effluent – 14.40 CMD, STP Provided. b. Industrial Effluent – 2.0 CMD, ETP Provided.

Compliance Of Air Pollution Related Conditions

Industry has provided stack to furnace and D.G.set.

Water Cess Assessment Done : not reported Paid Upto : September 2014

BG Details Amount : Rs. 5.00 Lakh Validity : 31/01/2015

BG Obtained against : O & M of Pollution Control Systems

Details of BG forfeited/encashed , if any : Nil

Submission of Environmental Statement

Period 2013-2014

Other Relevant Information

1. Industry has applied for plain renewal of consent. 2. Earlier consent obtained vide No. BO/JD(APC)/EIC No. PN-18713-

13/O/CC-1518 dated 15/02/2014 valid till 30/09/2014 3. Total C.I. declared Rs.68.00 Crs. Earlier C.I.was same.

Recommendation of SRO/RO

SRO Pune Satara has recommended for grant of renewal of consent.

Page 42: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 40

Agenda no. 17 Region : Pune Section : JD(APC) Date : /11/2014

Name & Address M/s. Samson Controls Pvt. Ltd., Plot No.D-281, MIDC Ranjangaon, Tal. Shirur, Dist. Pune

Consent For Plain Renewal of consent.

Capital Investment Rs.60.41Crs

Previous Consent Validity

31.07.2014

Industry Type R-36 Industry involving metal surface treatment

Industry Category Red/LSI

Compliance Of Water Pollution Related Conditions

Yes

Domestic Effluent – 22.00 CMD,STP Provided.

Industrial Effluent – 01.00 CMD, ETP Provided.

Analysis results are within consented limits.

Compliance Of Air Pollution Related Conditions

Yes. Dust collector provided to powder coating section.

Water Cess Assessment Done: -- Paid Up to : --------

BG Details Amount : Rs. 5.0 Lakhs. Validity : 31.07.2014.

BG Obtained against: towards O& M of PCS.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

5. Industry has applied for plain renewal of consent. 6. Earlier consent obtained vide No. BO/JD (APC)/EIC No. PN-13882-

12/0-CC-811 dated 15/01/2013 valid till 31.07.2014. 7. Earlier CI was Rs.35.84 Crs. Now shown CI Rs.60.41Crs [increased

by Rs.24.57 Crs].SRO Pune has reported that industry has submitted justification for increase in CI by letter dated 13.11.2014. Copy of the same is not enclosed.

8. Industry has submitted BG of Rs. 5 lakhs as per earlier consent

Page 43: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 41

condition.

Recommendation of SRO/RO

- SRO-Pune-II has recommended case for renewal of consent up to 31.07.2017.

Page 44: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 42

Agenda no. 18 Region : Pune Section : JD(APC) Date : /12/2014

Name & Address M/s. Bharat Forge Ltd., Sr. No. 664, A/p Vaduth, Tal. & Dist. Satara

Consent For Renewal

Capital Investment 46.96 Crs

Previous Consent Validity

30/11/2014

Industry Type R27 Heavy Engineering

Industry Category Red

Compliance Of Water Pollution Related Conditions

Details : - a. Domestic Effluent – 8.0 CMD, STP Provided. b. Industrial Effluent – NIL. Analysis results are within the consented limits

Compliance Of Air Pollution Related Conditions

1. Industry has provided dust collector to shot blasting section. Analysis results are within the consented limits

Water Cess Assessment Done :not reported Paid Upto :

BG Details Amount : Rs. Nil Validity : -------

BG Obtained against : Nil

Details of BG forfeited/encashed , if any : Nil

Submission of Environmental Statement

Perio d 2013-2014

Other Relevant Information

1. Industry has applied for plain renewal of consent. 2. Earlier consent obtained vide No. BO/JD(APC)/EIC No. PN-12191-

11/O/CC-206 dated 09/02/2012 valid till 30/11/2014. 3. Total C.I. declared Rs.46.96 Crs. Earlier C.I.was Rs.35.19 crs. [Increase

in CI 11.77 Crs.] Justification submitted by the industry i.e. increased due to renovation and automation.

Recommendation of SRO/RO

Recommended renewal of consent upto 30/11/2016

Page 45: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 43

Agenda no. 19 Region : SRO Chandrapur Section : JD APC Date : /12/2014

Name & Address M/s. A A Energy Ltd,

Gat No: 327/2, 328, 324, 327/1, 327, 2,3,

Wadsa Desaiganj, Dist: Gadchiroli.

Consent For C to OR

Capital Investment 4841 Lacs

Previous Consent Validity

31/01/2011

Industry Type R81 Thermal Power Plants (Bio Mass Power Plant)

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details : - They have provided effluent treatment plant for the treatment of industrial effluent consisting of collection tank, neutralization tank, treated effluent storage tank, etc

Water Cess Assessment Done : Details not submitted.

Paid Upto : ..

BG Details Amount : Rs. 5.0 Lakhs Validity : not submitted

BG Obtained against : BG not submitted as per previous consent conditions.

Details of BG forfeited/encashed , if any : ..

Submission of Environmental Statement

Period Details not submitted.

Other Relevant Information

1) Industry has not submitted Cess paid details & Environment statement for the years and not submitted BG of Rs. 5.0 Lakhs towards previous consent conditions.

2) The stack monitoring results submitted reveals that parameters are exceeding most of the times

Page 46: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 44

Recommendation of SRO/RO

SRO-Chandrapur recommends case for grant of Consent to Operate (Renewal) upto 30/09/2015

Page 47: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 45

CC-Fresh Agenda - New Entry

Agenda no. 1 Region : SRO Chiplun Section : AST Section Date : 26.11.2014

Name & Address Deepak Novachem Technology Ltd., Plot No D-27/3/1, MIDC Lote Parshuram, Tal. Khed, Dist. Ratnagiri.

Consent For Consent to Renewal with increase in CI

Capital Investment 4115.4 Lakhs

Previous Consent Validity 31.10.2014

Industry Type R05 Basic Chemicals and electro chemicals and its derivatives in Industry C ategory Red Compliance Of Water Pollution Related Conditions

YES ( √ ) Details: - Industry has provided ETP consisting Collection tank, Neutralization tank, Toluene extractor, Resin bed filter, Secondary collection tank, Pressure Sand Filter, Activated Carbon Filter. Final treated effluent collection tank. Treated effluent is reused for cooling tower make up. No discharge to CETP.

Water Cess Assessment Done: March 2014 Paid Upto: Dec 2012

BG Details Amount : Rs. 50,000/- and Rs 2.0 lakhs

Validity : 09.02.2014 and 30.11.2014 respectively.

BG Obtained against : 1. Interim direction dtd 10.05.2010, industry has made compliance and made zero discharge also requested to return the same. 2. As per consent condition 1. To maintain zero effluent discharge.

Details of BG forfeite d/encashed , if any : NA

Compliance Of Air Pollution Related Conditions

YES ( √ ) NO ( ) For briquette fire TPH Multi cyclone dust collector provided. For Thermopack (FO fired) 38.5 m stack provided. For Xylidine & D-Novocan Plant double stage ammonia scrubber provided. Spent ammonia is recycled in plant.

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

1. Industry is engaged in mfg of chemicals namely Ortho Cresol, D-Novocan etc. 2. Industry is having consent no BO/RO Kolhapur/PCI-I/EIC No KP-3155-09/)/CC-27 dtd 12.10.2009 which is valid up to 31.10.2014.& also obtained amendment to consent on 25/02/2012 for briquette fired TPH.

3. Industry has provided ETP consisting Collection tank, Neutralization tank, Toluene extractor, Resin bed filter, Secondary collection tank, Pressure Sand Filter, Activated Carbon Filter. Final treated effluent collection tank. Treated effluent is reused for cooling tower make up. No discharge to CETP.

4. Haz. Waste Spent Catalyst sends to CHWTSDF. 5. For briquette fire TPH Multi cyclone dust collector provided. For Thermopack (FO fired) 38.5 m stack provided. For Xylidine & D-Novocan Plant double stage ammonia scrubber provided. Spent ammonia is recycled in plant.

6. Industry has submitted form IV for Haz waste, Form V- Env statement, regularly and paid cess up to Dec 2012 and returns filed up to March 2014.

7. As per consent condition no.1 Industry has submitted BG of Rs. 2.0 Lacs to maintain Zero discharge. SRO has mentioned that Industry has made Zero discharge.

8. Industry has submitted BG of Rs 50,000/- which was valid up to 09.02.2014

Page 48: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 46

towards interim direction dtd 10.05.2010. Industry has made compliances & made Zero discharge. Industry requested to return the same.

9. The total investment of the industry as per previous consent was Rs. 14.2 Cr Now it is shown Rs 41.15 Cr. Increase in capital is Rs 26.95 Cr. SRO has send query letter to industry on 08.09.14. Industry submitted reply dated 16.09.14. Increase in Capital investment is due to process improvement, infrastructure development.

10. SRO has mentioned that there is no increase in production, Waste Water Aspect, Air emission Aspect & Hazardous Waste Aspect. Industry has paid fees for capital addition Rs 1, 00, 000/- as per the break up shown in letter. since from year 2011 (during the this period fees up to 50 Cr investment was Rs 50,000/- per year thereafter it becomes Rs 75,000/- per year by new rate schedule. hence difference per year from 2011 to 2014 is Rs 25,000/- per year hence it becomes Rs 1 Lacs . Further fees paid of Rs 75,000/- towards consent to establish for capital addition) and renewal fees for 5 year Rs. 3, 75, 000/- for the period up to 31.10.2019.

Recommendation of SRO/RO

Decision regarding renewal of consent may be taken at higher level and Consent may be granted if approved up to 31.01.2019.

Page 49: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 47

Agenda no. 2

CC Item –

Page 50: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 48

Region : Thane │Section : AS(T) Date: /12/2014

Name & Address

M/s ACG Associated Capsules Pvt. Ltd.,

Ashagad, Dahanu Road, Tal. Dahanu,

Dist. Palghar, Pin - 401 602

Consent for Renewal of Consent to Operate with inclusion of 1250 KVA (2 Nos. D.G. Sets) and increase in C.I. in Eco fragile area

Capita l Investment Rs. 51.45 Crores

Consent Valid upto Upto 31/12/2014.

Industry Type Gelatin Capsules Mfg.

Industry Category Red

Compliance of Water Pollution Related Conditions

YES

Details: For the treatment of 70 CMD of industrial effluent, industry has provided ETP comprising of primary, secondary & tertiary level treatment and treated effluent is applied on land for irrigation/ gardening purpose. 15 CMD of domestic/sewage effluent is treated in septic tank followed by soak pit, overflow is applied on land for irrigation/ gardening purpose.

78,952 sq. mtrs. of land is available for utilization of treated effluent/ sewage for irrigation/ gardening purpose.

Compliance of Air Pollution Related Conditions

YES (-) NO (-)

Details :- Chimneys of adequate heights provided to Boilers (3 Nos.) & D.G. Sets (1,000 KVA – 3 Nos & 1,250 KVA – 4 Nos.)

Water Cess Assessment Done: Returns not submitted Paid upto: Not paid

BG Details Amount: -- Validity - --

BG obtained against: --

Details of BG forfeited / enchased, if any: --

Submission of Environmental Statement

Period

Not submitted.

Page 51: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 49

Other Relevant Information

1.Existing unit engaged in mfg. of Gelatin Capsules (Total Production Capacity- 25,000 Lakh Nos./Month) in Dahanu Taluka which is declared as Ecologically fragile area vide MoEF Notification dtd. 26/06/1991.

2.Board has granted Consent to Operate to the industry under ‘Orange’ category on 21/07/2009 which is valid upto 31/12/2014.

3.Industry has applied for grant of NOC/ amendment of Consent to Operate on 24/01/2014 for inclusion of 2X1,250 KVA D.G. Sets with increase in C.I. from Rs. 49.34 Crs. to Rs. 51.45 Crs. at S.R.O.(Tarapur-II) Office.

4.Total D.G. Set Capacity exceeds 5 MVA [3X1,000 KVA (existing)+ 2X1,250 KVA (existing) + 2X1,250 KVA (newly proposed/installed)]. As per CPCB’s direction dtd. 04/06/2012 regarding classification of industries into Red/Orange/Green category, industry having D.G. Set capacity over 5 MVA falls under ‘Red’ category.

5.SRO(Tarapur-II)/ R.O.(Thane) have not submitted JVS results. Also, not furnished details about compliance of CESS Act/ HW Rules & submission of Environmental Statement.

6.The location is in Eco-fragile area, hence falls under the purview of CC.

Recommendation of SRO/RO

SRO(Tarapur-II) has recommended to grant of amendment in existing Consent to Operate with overriding effect for the period upto 31/12/2014.

R.O. has recommended to grant of renewal of Consent to Operate with inclusion of D.G. Set after receipt of details of compliance of Consent conditions from the industry and additional Consent fees of Rs. 50,000/-.

Page 52: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 50

Agenda no. 3 Region : Raigad Section :AST Date :

Name & Address Bec Chemicals Limited , 24, MIDC Dhatav, Tq- Roha Dist-Raigad

Consent For Amendment with change in product mix.

Capital Investment 28.58 Cr

Previous Consent Validity

31/12/2016

Industry Type R05 Basic Chemicals and electro chemicals and its derivatives

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details: -Full fledge ETP is provided and treated effluent is disposed to CETP. The JVS results are within limits.

Water Cess Assessment Done : Return submitted upto Sep-2014

Paid Upto : Sept-2013

BG Details Amount : 5.0 lakh Validity : 31/12/2016

BG Obtained against : Consent condition towards not to take any effective steps for proposed product mix.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

2013-14

Other Relevant Information

Application for Amendment in consent with change in product mix. The existing consent is valid upto 31/12/2016. The Capital Investment of industry is increase from 17.71 Cr to 28.50 Cr (new entry in CC).The increase in C.I is due replacement of old machinery for compliances of guideline pertaining to GMP, GLP and EHS as audited by Drug authorities and Indian and API formulation Manufacturing. Industry has installed two new Scrubbers for Friedal craft reactor and Chlorination reactor. PP has submitted details of “NO increase in pollution load” in Boards performa and certificate dtd-16/8/2014 from Dr.Babasaheb Ambedkar Technological University which seem to be in order.

Page 53: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 51

Recommendation of SRO

Industry has applied for amendment of consent for product mix for deletion of 09 products & increasing the production capacity of 03 products. Industry has submitted certificate from BATU & Irrigation Dept. for no increase in pollution load & distance from river Kundalika resp. It is submitted that Consent to Operate with amendment for product mix may be granted for period up to 31/12/2019, if approved.

Page 54: Resubmission - Maharashtra Pollution Control Boardmpcb.gov.in/consentappraisal/pdf/19thCC_Book36_121214.pdf · Resubmission 1 Pretam Enterprises, ... AA Energy Ltd., Gat No. 327/2,

Web agenda of 19th

CC meeting (Booklet No. 36) of 2014-15 dtd. 12.12.2014 52

Agenda no. 4 Region : SRO Aurangabad I Section : JD APC Date :

Name & Address SOM Autotech Pvt. ltd. , Gut no. 927&928, Sompure Rd. Bidkin, Paithan, Aurangabad

Consent For CR

Capital Investment 2821.5 Lacs

Previous Consent Validity

30/09/2014

Industry Type R04 Automobiles Manufacturing (integrated facilities)

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details :- Indl. Effluent is NIL, Domestic effluent is 15 CMD, provided STP. There is generation of cooling water.

Compliance Of Ai r Pollution Related Conditions

Yes

Provided stack to furnace.

Water Cess Assessment Done : No Paid Upto : --

BG Details Amount : NIL Validity : NA

BG Obtained against : NA

Details of BG forfeite d/encashed , if any : NA

Submission of Environmental Statement

Period

2012-2013

Other Relevant Information

Applied for renewal of consent with increase in cap ital investment. Carrying o ut Aluminium pressure die casting. CI is Rs. Rs. 28.21 crs, existing was Rs. 4.86 crs., increase is of about Rs. 23 crs. The increase is for modernization of plant & machinaries and no increase in production quantitie s. Have not obtained permission or C to E for modernization of plant & m achineries.

Recommendation of SRO/RO

SRO recommended renewal of consent with suitable BG for not carrying out expansion without permission of MPCB in future.