12
Sanjeev Kumar Agrawal Email ID: [email protected] Mobile No. : 9899364241 CAREER ABRIDGEMENT BROADBAND AND OSP EXPERTISE Exposure in execution of classic broadband access technology related project delivered alongside phone service on twisted pairs of copper wire mostly ADSL technology. Knowledge of performance issue related to broadband operation and maintenance of the network and ensuring all operational efficiencies. Knowledge of types of DSL (ADSL,CDSL,HDSL,IDSL,RADSL,UDSL,VDSL, Knowledge of their downstream & upstream rate & distance limits. Exposure in passive optical networks which comprises optical line terminals (OLT)/Last Mile Core ,Optical network terminals (ONT)/Last mile gateways & Lat mile taps (Splitters), Voice gateways/Switch. Knowledge of tapping fibers from existing DLCs and RSUs and RLUs. Knowledge of different PON technologies like BPON, GEPON, GPON and NG-PON working on different protocols . Exposure on outside plant network, knowledge of material specification, survey, drawings etc. Heading OSP planning activities cost modeling and cost analysis, budgeting and capex generation, Rollout plans for OFC and Copper distribution wire line. Co- ordination with OSP design and other NI planning managers. Final approval of ‘As-Built’ documentation for OSP Principal Accountabilities, OSP Material standards & specifications, Interaction with vendors and data/price collection, update master list for capex, Carrier Service Areas and Distribution Service Areas layout/CSA maps.

Resume sanjeev agarwal New

Embed Size (px)

Citation preview

Page 1: Resume sanjeev agarwal New

Sanjeev Kumar AgrawalEmail ID: [email protected] No. : 9899364241

CAREER ABRIDGEMENT

BROADBAND AND OSP EXPERTISE

Exposure in execution of classic broadband access technology related project delivered alongside phone service on twisted pairs of copper wire mostly ADSL technology.

Knowledge of performance issue related to broadband operation and maintenance of the network and ensuring all operational efficiencies.

Knowledge of types of DSL (ADSL,CDSL,HDSL,IDSL,RADSL,UDSL,VDSL, Knowledge of their downstream & upstream rate & distance limits.

Exposure in passive optical networks which comprises optical line terminals (OLT)/Last Mile Core ,Optical network terminals (ONT)/Last mile gateways & Lat mile taps (Splitters), Voice gateways/Switch. Knowledge of tapping fibers from existing DLCs and RSUs and RLUs.

Knowledge of different PON technologies like BPON, GEPON, GPON and NG-PON working on different protocols .

Exposure on outside plant network, knowledge of material specification, survey, drawings etc. Heading OSP planning activities cost modeling and cost analysis, budgeting and capex generation, Rollout plans for OFC and Copper distribution wire line. Co-ordination with OSP design and other NI planning managers. Final approval of ‘As-Built’ documentation for OSP Principal Accountabilities, OSP Material standards & specifications, Interaction with vendors and data/price collection, update master list for capex, Carrier Service Areas and Distribution Service Areas layout/CSA maps.

SDH, GSM & OTHER KNOWLEDGE AREA

Knowledge of concepts of SDH, Multiplexing in SDH, SDH frame structure, Overhead bytes, Synchronization, Pointers, Ring protection etc.

Exposure on Optical transmission technologies like SDH/ SONET, DXE & DWDM technologies. Wireless transmission that includes HFCL make PDH range of microwave radios. The PDH microwave solutions range covers operational frequency range from 2 GHz to 23 GHz with different data rates.

Page 2: Resume sanjeev agarwal New

Wireless Access technologies like CorDECT, CDMA.GSM &Local multipoint distribution systems (LMDS)Wireline access technologies DLC, DIAS.

Well versed with GSM,UMTS,GPRS, EDGE, CDMA, WLL, Wi-Fi, Wi-MAX technologies.

Working knowledge of link planning (includes wireless supporting information like free space loss, attenuation, total path loss, fade margin, Fresnel zone, Earth’s curvature at obstructions, Anteena gain.

Knowledge of GSM

Well aware of GSM system architecture (Includes MSC, HLR, VLR, EIR, AVC, BSS, OMC) & technical specifications. GSM system & their functions, system interfaces, frequency spectrum, channel mapping, GSM Radio link, mobility management, call management, Radio resource management, Idea of GSM system services.

EMPLOYMENT SCAN

(Apr’ 2004 -- Till date ) with Telecommunication Consultants India Ltd -- Dy Manager (A Government of India Enterprises).

Looking after Training/support activities of ERP and Business development activities. Monitoring of global and domestic tenders on websites which included Railway projects,

Rajasthan Govt. rural Electrification project, Report preparation of Srilanka Broadband project. Meeting with vendors for E-Governance project (CCTNS project, etc).

Worked on consultancy project for Canal automation pilot project for SSNNL.(Sardar Sarovar Nagar Nigam Limited) in Gujrat.(In this project dedicated Fibre Optic Cable line all along the canal was proposed for data communication, and VSAT (Very Small Aperture satellite Terminal) was adopted as a back-up (fall back) arrangement.). & payment realization from Dishnet wireless Limited , a division of Aircel Limited.

Coordination with vendors and staff for training and installation activities of Electronic toll collection system at Gobind- Garh toll plaza (Punjab) which provides complete lane control, vehicle classification & revenue collection system. This system is fully auditable ( monitors each vehicle passage & records any incidents or discrepancies for corrective action ), also having flexible payment options ,sensors for classification.

Execution of IRCON Project of Railway in Kashmir of System Design, Supply, Installation, Testing & Commissioning of STM-1/STM-4 systems and Digital Primary Mux’s, control/emergency/LC gate Communications systems, Power Supply Systems and OFC measuring instruments, trenching & refilling, blowing/laying, jointing, terminating, testing of under ground armored Optical Fiber and Quad Cable on Quazigund - Baramullah section new BG Rail link .

Page 3: Resume sanjeev agarwal New

Managed different Cost Plus Profit Contracts of BSNL in J&K for rollout Pole-less Networking and UG Cable projects including realization of old pending payments from clients in Jammu region.

Managed different Cost Plus Profit Contracts of BSNL in Rajasthan for rollout Pole-less Networking project in the Udaipur and Jodhpur Region.

Transmission and Commercial Division--As a part of commercial Division and transmission division team managed techno commercial operations involving tender preparation (Including MOU Preparation, Putting RFQ as per tender BOQ to different vendors for supply of OFC equipment, Optical fibre measurement equipment, fibre optic accessories , other telecom equipment, power plant and other OSP (Outside plant materials) material for different clients including Railway . Liaison with vendors and clients, discussion with team members on technical and commercial apects like Taxes, duties, Freight, octroi etc), assisting in preparation of schedule of requirements (of material and services). Discussion on all important aspects of technical Bid preparation (Administrative documents, Eligibility Criteria Documents, Engineering documents, Methodology of Work & Time Schedule, Programme for Quality Assurance during execution of work, compliance statement, technical details of offered equipment, about bidder etc preparation of financial condition documents, Company margin details in commercial Division team.

Page 4: Resume sanjeev agarwal New
Page 5: Resume sanjeev agarwal New

(February 2004 – April 2004) with Hindustan Teleprinter Limited as Deputy Project Manager (Formerly Hindustan Teleprinter Ltd., A Govt.of India Undertaking)

Worked on a project of Railtel Corporation of India Limited for Broadband long haul telecom network- II.

This project comprised of “System design, detailed engineering of OFC based digital backbone communication system including supply, installation, testing and commissioning of STM- 16/ STM-4 SDH ADD/DROP MUXES and other associated equipment of the system and network management system”.

(Jun’ 2003- Feb’ 2004) with NTS (An Omzest Group Company of Muscat (Oman) as Telecommunication Engineer (Project leader). Managed the Rehabilitation & cutover of the Outside Plant Network from Qurum Exchange to Al-

Khuwair Exchange & Expansion of the OSP Network at Al-Khuwair area in Muscat Governorate. Following activities were performed.

a) Heading OSP Planning activities, Cost modeling and Cost analysis, budgeting and Capex generation. Rollout plans for OFC and Copper distribution wire line. Co-ordination with OSP design and other NI planning managers. Final approval of ‘As-Built’ documentation for OSP Principal Accountabilities. OSP Material standards & specifications. Interaction with vendors and data/price collection, update master list for Capex. Carrier Service Areas and Distribution Service Areas layout/CSA maps

b) Managing & Liaised with OMANTEL (Muscat) and BT teleconsult (Registered Office, Newgate Street, London) for project related activities. Co-ordination with Omantel & BT Teleconsult for site layouts and at the same time approval of site instructions.

c) Securing of permission from Municipality & R.O.P. Detailed survey of the site, preparation of DBOQ, approval of DBOQ, securing of permission. Deciding cable route plan including duct structure, Copper cable distribution, final location of handholes /manholes, cabinets, DPs, thrust boring location, road cutting details, preparing implementation schedules & monitoring the progress on the same. Close co-ordination with vendors and implementation group.

d) Primary/secondary cable cut-over T jointing, testing cables, renumbering. Removal of T joints, final testing & acceptance testing.

Jan’ 1997- Jun’ 2003 with Himachal Futuristic Communication Limited ( International Division), Gurgaon. Last designated as Assistant Manager (Projects) Responsible for outside and indoor plant activities in execution of fiber optic transmission

network, (knowledge of specification, type of protection provided, general information regarding specification of different material utilized in construction of OFC outside plant. OFC Cable A/T (Different meters required for OFC Cable A/T’s ), OFC System Acceptance testing (various types of meters required for OFC A/T). Knowledge of limits for OFC Systems, Bit rate, Offset and no of channels.

Copper cable fault locator used to locate several types of faults in 4 Quad cable such as short circuit, joint circuit sheath fault, low insulation fault etc.

Hands on experience on different test equipment related to fiber networking & testing- like Power meter, optical-loss test kits, optical fiberscope, optical fiber identifier, visual fault locator, optical

Page 6: Resume sanjeev agarwal New

calibrated light source, optical return-loss test kit, fiber-optic talk set, optical attenuator, OTDR , variable attenuator, DTA set (Digital transmission analyzer), SDH Analyzer etc.

Knowledge of operation of different types of blowing machines, OTDR & Splicing machines Knowledge of all optical network and devices (Functional modules like Optical add drop

multiplexers & optical cross connect) WDM, optical couplers, optical amplifiers. Inspection & tests. Acceptance tests of OSP includes (Conduit systems, Primary cables tests,

secondary cables tests, fiber optic cable tests like- Identification, Splice loss & end to end attenuation). Various field tests related to copper cables like wire map test, length test, attenuation test & near and crosstalk test.

Instrumental in the successful execution of the following:

A) Managed a broadband network project (copper and fiber access) for Tata Teleservices Ltd, at Delhi – Okhla Phase III and Mohan Co-operative RSU.

B) Managed a feeder & Customer service area project in different area of Hyderabad (Gowliguda- Charminar- Feeder route, M.J Market Concentrator- CSA route) and Vishakapatnam (MVP Colony to Chinna waltair- Feeder route, Velampeta Concentrator – CSA route) for Tata Teleservices Ltd. Which is now joint venture of Japan-based telecom operator NTT DoCoMo (DoCoMo).

C) Steered maintenance activities of Fiber Optic Transmission network for Tata Teleservices Ltd. between Hyderabad-Suryapeth-Vijaywada-Vishakapatnam in A.P and Tata Cellular Ltd between Hyderabad-Suryapeth-Vijaywada-Nellore-Ongole in A.P.

D) Constructed a 140 Km Fiber optic transmission route between Tirupati to Naidupeta in the State of Andhra Pradesh for Tata Teleservices Ltd in Andhra Pradesh.

E) Worked on a Fiber-Optic Transmission backbone link & Copper access network project for providing basic services/broadband facilities for HFCL Connect in Punjab, which is now the part of Reliance Industries.

F) Set up a Fibre-Optic Transmission backbone link for Shyam in Rajasthan which is now joint venture of Sistema which is a Russia based telecom company. Responsible for Bhiwadi to Ajmer (Around 325 K.M) of route. They became the first new mobile operator to get a pan-India start-up spectrum to start their mobile service operations in the country.

MTS, the mobile telephony brand of Sistema- Shyam Teleservices (SSTL) had been conferred National Telecom Award for being the fastest growing data operator in India.

G) Set up a Fiber-Optic Transmission link for RCPO (88 Kms.) (Radar & Communication Project Office), for the Indian Air Force at Delhi including fiber optic equipments, FDF,DDF etc.

H) Set up Fiber-Optic Transmission Network for the Eastern Railway in Bihar (Danapur-Jhajha Section of Eastern Railway) for the Indian Railways. The Project covered Supply, installation, testing and commissioning of Optical Fiber Communication system along-with 4 Quad telecom Cable & Copper cable for providing communication facilities. Designed

Page 7: Resume sanjeev agarwal New

Optical Fibre Communication System with special emphasis on power link budget. Total 31 stations were covered between Danapur-Jhajha.

Responsible for outside and indoor plant activities in execution of fiber optic transmission network, Coordination with vendors like Nokia in installations of their fibre optic equipments. It was a challenging project for Indian Railways. Specially (Mokama- Kiul) section was very much difficult in terms of notorious area, cable theft and damages in all the routes.( Mokama- kiul )section was most difficult to execute due to long bridges of all types (Long Arch bridges, Girder bridges, etc). commutation was difficult.

I) Set up Fiber-Optic Transmission Network for the South-Eastern Railway in Bihar now Jharkhand (Ilu-Muri-Barkakhana Section) for the Indian Railways.

J) Worked for sterling cellular Ltd- Essar Cell Phone- Hutch in Jalandhar, Amritsar and Ludhina in 1997. Fiber-Optic Transmission Network was set up between MSC to BSC and Installation of HFCL ML 33 , Optimux equipment was done.

K) Fault rectification of Fiber-Optic Transmission link of sterling cellular Ltd- Essar Cell Phone- Hutch was done between Okhla phase-III and Chandralok building in new delhi in 1999.

Zenith Computers Limited, Chandigarh- As System Support and marketing Engineer. (November 1995- December 1996).

Technical Teachers Training Institutes (T.T.T.I, Sector-26, Chandigarh)-- Worked as a research/project associate . (June 1995- November 1995).

1) Worked on a project "Digital Fault Diagnosis" using ADDA-12 Card in QBasic on PC-286.

1) Organised various training programs for engineering students from REC kurushetra, Haryana .

3) Organised various training program on MS-DOS, Wordstar, and Dbase-III for teachers from polytechnic colleges from all over India.

Recorders and Medicare Systems Limited, Chandigarh - As a Hardware Support Engineer. (February 1995 – June 1995).

Worked as hardware support engineer. Machine included 32 channel EEG, lie detector, etc.

Recorders and medicare Systems Pvt. Ltd, is the leading manufacturer of medical equipments like EEG Machine, Tele ECG, Patient Monitoring system, X- Ray Machine, C- Arm, Biochemistry Analyzer etc. in the Indian Subcontinent. Polyrite, the first Indian Polygraph was developed within the first year of inception in 1975 followed by EEG machine in the year 1977.

Page 8: Resume sanjeev agarwal New

ACADEMIA

1)1995 BE (Electronics and Telecommunications) from P.D.A. Engineering College,

GULBARGA DIST.:Gulbarga,KARNATAKA-585102. Poojya Dodappa Appa (P.D.A) College of Engineering is one of the Premier Institutes of Karnataka State affiliated to Gulbarga University. PDA college of Engineering was established in the year 1958. One of the unique features of Our college is, it is the First College in Karnataka State to start the Electronics and Communication Engineering branch way back in the year 1967, to join NIT Surathkal and IISc, Bangalore. Also, it is the only college in the state and one among the three colleges across the country, offering a course in Ceramic and Cement Technology.

(I) Industrial training in final year Engineering in Electronic System Punjab Limited, ( A state PSU, Punjab)Chandigarh, Mohali in 1993. During software training MSDOS, WORDSTAR,DBASE III Plus was taught. During hardware training worked in production deptt. In assembly, testing and integration section of micro computers. Understood the operation and working of flow soldering machine and tested/de-bugged microcomputer cards based on Intel 8088 and 80286 CPUs. Also integrated systems based on these microprocessors with MSDOS operating system. Also saw the reapir of monitors, SMPS, Floppy drives and other peripherals, working of manufacturing process of ceramic capacitors in component division.

(II)Delivered seminar on Applications of Fiber optic Communication.(III) Project on Digital Energy meter-PCB Fabrication and embedding of SW

for Intel chip processing of Energy consumed and bill for the month. (IV) Industrial visits to AIR station, Chennai Avadi and study of Radio

transmission.

.

2)Passed MBA in 2011 from Amity University, Uttar Pradesh (ACeL Course), Specialization in Information Technology (Major) & Human Resource Management (Minor) .

Research Analysis on Opportunities in Africa’s nascent ICT sector" was done.

TRAININGS

1)- Attended training on Optimux, Primary and higher order Mux installation, etc at HFCL

Wire line Division, at Solan on HFCL ML 33 , Optimux equipment in February 1997.During Training various technical aspects were explained.

(I) Fundamentals of digital transmission were explained. (II) Configuration of 34 Mb/140 Mb/s Optimux was explained.(III) Product specifications were explained.(IV) Various modules were described.

Page 9: Resume sanjeev agarwal New

(V) Usage of hand held terminal (HHT), use of subrack adapter & Rack alarm unit, system operations for configurations, networking and special functions, alarm monitoring were explained.

(VI) Instalaltion of Rack & subrack, cabling with DDF was explained.(VII) Description of test parameters ie. BER, Jitter acceptance, Output Jitter, Jitter

suppression (JTF), Optical power, optical receiver sensitivity, return loss etc. were explained.

(VIII) Testing procedures were explained.(IX) Factory visit was made and practical training for testing 34 Mb/s Optimux (1+1

Configuration) was arranged.(X) Troubleshooting charts were explained.(XI) Practical simulation of faults and their diagnosis were explained.

2)Attended PMP Workshop from a registered education provider from PMI (Project Management Institute).Throughout knowledge of Project management professional exam study guide (PMBOK). It covereda) Project life cycle & organization.b) The standards for project management of a project (It specifies all the project management

processes that are used by the project team to manage a project.)c) The project management knowledge areas organizes the 44 project management processes

into nine knowledge areas.

3)

- Attended training program on Primavera Enterprise Version 5 (Planning tool) from a registered education provider from PMI, Project Management Institute.

DATE OF BIRTH: 1st Jul-1973