SAP ECC 6.00 August 2007 English V5F: Rework Production Order (Work-in-Process) SAP AG Dietmar-Hopp-Allee Business Process Procedure

Rework in Production

Embed Size (px)

Citation preview

Page 1: Rework in Production

SAP ECC 6.00

August 2007

English

V5F: Rework Production Order (Work-in-Process)

SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany

Business Process Procedure

Page 2: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

Copyright

© Copyright 2007 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix are trademarks or registered trademarks of IBM Corporation.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

MaxDB is a trademark of MySQL AB, Sweden.

SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

© SAP AG Page 2 of 18

Page 3: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

External Process

Business Process Alternative/Decision Choice

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

Process Flow Legend

© SAP AG Page 3 of 18

Page 4: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

© SAP AG Page 4 of 18

Page 5: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

Contents

1 Purpose........................................................................................................................................ 6

2 Prerequisites................................................................................................................................ 6

3 Process........................................................................................................................................ 7

3.1 Process Flow Diagram..........................................................................................................7

3.2 Process Overview Table.......................................................................................................7

4 Scenario..................................................................................................................................... 10

4.1 Create Notification from Parent Production Order...............................................................10

4.2 Insert Rework Operation on Parent Production Order.........................................................11

4.3 Confirm Parent Production Order at Rework Operation for Non-defective Quantity............11

4.4 Determine If Complaint Quantity Must Be Reworked or Scrapped......................................12

4.5 Scrap Defective Quantity That Cannot Be Reworked..........................................................13

4.6 Create Rework Order for Assembly Quantity That Can Be Reworked................................14

4.7 Confirm Parent Order for Reworked Quantity That Can Proceed to Subsequent Operations15

4.8 Set Notification Status to Technically Complete..................................................................15

© SAP AG Page 5 of 18

Page 6: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

V5F: Rework Production Order (Work-in-Process)

1 PurposeNotifications are used to process defective materials on a production order. Since the defective material is at the operation level of the production order we refer to this as WIP – In Process Rework. These defects are identified as specific operations on the Parent Production Order; hence the notification is created with reference to the specified operation on the Parent Production Order. The first step is to determine what quantity of materials can be reworked or should be scrapped.

The Rework on the Parent Production Order functions as a gate. A work center called “REWORK” needs to be created for inserting this operation on the Parent Production Order. The new operation is incremented by 1 as compared to the operation of the Notification. The new operation that is 1 greater than the operation on the notification is inserted into the Parent Production Order.

Non defective quantities are confirmed and allowed to pass through the inserted operation for the subsequent processing. The defective quantity that can not be reworked will be scrapped and charged to a cost center. A rework order is created and confirmed for correcting the defective materials. The rework order is linked to the Parent Production Order.

These are the business process alternatives that you must consider when executing this scenario:

Step 4.4: If the quantity will be scrapped, go to step 4.5. Otherwise, go to step 4.6.

These choices are denoted by the icon.

2 PrerequisitesYou have entered the master data required to go through the procedures of this scenario. Ensure that the following scenario-specific master data exists before you test this scenario:

Material Plant Description

F26 BP01 PenF1000-M1 BP01 Configurable Pen

For additional detail on the master data, see the V30_Master_Data_EN_CA document (located on the DVD under \BBLibrary\Documentation).

© SAP AG Page 6 of 18

Page 7: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

3 Process

3.1 Process Flow Diagram

© SAP AG Page 7 of 18

Page 8: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

3.2 Process Overview TableStep Step Name External

Process Reference

Business Condition

Role Transaction Code

Expected Results

4.1 Create Notification from Parent Production Order

When defective materials are discovered on a production order a notification is created for tracking the rework or scrapping of the defective materials and are linked to the Parent Production Order.

Shopfloor IQS1 New Notification of type ZI is created

4.2 Insert Rework Operation on Parent Production Order

For the defective materials that can be reworked a new operation “Rework” will need to be inserted

Shopfloor IQS2 New Operation that is 1 greater than the Operation on the Notification is inserted into the

© SAP AG Page 8 of 18

Page 9: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

on the Parent Production Order.

Parent Production Order

4.3 Confirm Parent Production Order at Rework Operation for Non-defective Quantity

In order for the non-defective materials to flow through the inserted “Rework” operation of the Parent confirm the non-defection quantity.

Shopfloor IQS2 Non-defective quantity is confirmed at the inserted operation on the Parent Production Order

4.4 Determine If Complaint Quantity Must Be Reworked or Scrapped

The first step is to determine if the defective material can be reworked or it should be scrapped.

Shopfloor IQS2

4.5 Scrap Defective Quantity That Cannot Be Reworked

The material that is defective and can not be reworked will need to be scrapped and charged to

Shopfloor IQS2 Creation of a Rework Order, linked to the Notification

© SAP AG Page 9 of 18

Page 10: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

a cost center.

4.6 Create Rework Order for Assembly Quantity That Can Be Reworked

A Rework Order is created for the defective quantity and is linked to the Parent Production Order.

Shopfloor IQS2 Creation of a Rework Order, linked to the Notification

4.7 Confirm Parent Order for Reworked Quantity That Can Proceed to Subsequent Operations

Confirm the rework order.

Shopfloor IQS2 Additional confirmation of specified quantity at the inserted Rework Operation

4.8 Set Notification Status to Technically Complete

At the completions of the rework the notification is set to technically complete. This indicated that there is no further processing necessary on the

Shopfloor IQS2 No further processing of the Notification. It switches to display mode and Action boxes disappear

© SAP AG Page 10 of 18

Page 11: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

notification.

© SAP AG Page 11 of 18

Page 12: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

4 Scenario

4.1 Create Notification from Parent Production Order

UseNotifications of type ZI are used to process defective materials on production orders. Since the defective material is the header material on the production order, this type of Notification is referred to as a Notification for Parent Rework / Scrap. These defects are identified at specific operations on the Parent Production order and hence, the Notification is created with reference to the specified operation on the Parent Order.

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics ® Central Functions ®Notification ® Create ® Extended View

Transaction code IQS1

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Create Notification

2. Enter Notification type ZI and choose Enter.

3. Make the following entries:

Field name Description User action and values Comment

Plant BP01

Production Order number

<enter a production order number>

Operation number

<enter an operation number>

Choose Yes to obtain data from production order

Complaint quantity

<enter a quantity>

Reference quantity

<enter a quantity>

Description <enter a description>

Long text associated

<enter long text>

© SAP AG Page 12 of 18

Page 13: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

with defect

4. Choose Save.

5. Enter the mandatory partner field values (Author and Coordinator USERIDs). Make a note of the notification number:

ResultA new notification (of type ZI) is created.

4.2 Insert Rework Operation on Parent Production Order

UseThe Rework Operation on the Parent Production Order functions as a gate. A work center called 'REWORK' must be created for inserting this operation on the Parent Order which has an operation number that is incremented by 1 as compared to the operation of the Notification.

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics ® Central Functions ®Notification ® Change ® Extended View

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the previous step) and choose Enter.

3. Choose the Insert Rework Operation action item from the Action pane on the right hand side.

4. On the Insert operation 00XX dialog box, choose Continue.

5. Choose Save.

ResultA new Operation (one greater than the Operation on the Notification) is inserted into the Parent Production Order.

4.3 Confirm Parent Production Order at Rework Operation for Non-defective Quantity

© SAP AG Page 13 of 18

Page 14: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

UseThis confirmation is to enable non-defective quantities to be passed through the inserted operation for subsequent processing.

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Office ® Notification ® Change

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the earlier step) and choose Enter.

3. Chose the Confirm Parent Order action item.

4. In the Accept confirmation quantity dialog box, enter the quantity that is not defective in Yield to confirm.

5. Choose Continue .

6. Choose Save.

ResultThe non-defective quantity is confirmed at the inserted operation on the Parent Production Order.

4.4 Determine If Complaint Quantity Must Be Reworked or Scrapped

UseIn this activity, manufacturing determines if the complaint quantity must be reworked or scrapped. A single Notification can handle both Rework and Scrap of quantities from the Parent Production Order.

After you process this activity:

Option A: if you are scrapping the quantity, go to step 4.5.

Option B: If you are reworking the quantity, go to step 4.6.

© SAP AG Page 14 of 18

Page 15: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Office V Notification ® Change

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the earlier step) and choose Enter.

3. Choose the Quantities/MRP Controller tab.

4. Split the complaint quantity into the quantity to be scrapped and the quantity to be reworked.

5. Choose Save.

ResultA determination has been made.

4.5 Scrap Defective Quantity That Cannot Be Reworked

UseIn this activity, manufacturing scraps the defective material that cannot be reworked.

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Office ® Notification ® Change

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the earlier step) and choose Enter.

3. Choose the Scrap parent action item.

© SAP AG Page 15 of 18

Page 16: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

4. Enter the quantity to be scrapped.

5. In the dialog box, enter the cost centers to which to charge the value of the scrap.

The proportion of cost distribution must equal 100%.

6. Choose Save.

ResultA rework order is created, linked to the notification. Do not process any other steps in this document.

4.6 Create Rework Order for Assembly Quantity That Can Be Reworked

UseIn this activity, we will create a rework order for the quantity that can be reworked.

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Office ® Notification ® Change

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the earlier step) and choose Enter.

3. Choose the Create PP Rework Order action item from the Action box in the right hand side pane.

The rework order is created for the quantity in the Rework Quantity field in the Quantity tab of the notification.

4. When the prompt appears for Reference Operation Set to bring into the Rework Order, enter the Group number of the Reference Operation Set.

5. Enter the relevant cost center for the order costs to be directed to. Enter the percentage for the allocation of the costs, typically 100%.

© SAP AG Page 16 of 18

Page 17: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

6. Choose Back.

7. Choose Save.

ResultA rework order is created with a link to the notification.

4.7 Confirm Parent Order for Reworked Quantity That Can Proceed to Subsequent Operations

UseThis step will enable reworked quantities to be processed by subsequent operations.

Procedure

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Office ® Notification ® Change

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the earlier step) and choose Enter.

3. Choose the Confirm Parent Order action item.

4. Enter the quantity that has been reworked.

5. Choose Save.

ResultThe system provides an additional confirmation of specified quantity at the inserted Rework Operation.

4.8 Set Notification Status to Technically Complete

UseIn this activity, you set the notification status to technically complete.

Procedure

© SAP AG Page 17 of 18

Page 18: Rework in Production

SAP Best Practices V5F: Rework Production Order (Work-in-Process) - BPP

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Office ® Notification ® Change

Transaction code IQS2

Business Role Manufacturing

Option 2: SAP NetWeaver Business Client (SAP NWBC) via Business role

Business role (Name) SAP_AIO_SHOPFLOORSPECIALIST-S (Manufacturing)

Business role Menu Shop Floor ® Discrete ® Change Notification

2. Enter the Notification number (from the earlier step) and choose Enter.

3. From the menu, choose Notification Functions Complete.

4. Choose Save.

ResultThe notification status is technically complete.

© SAP AG Page 18 of 18