RILA Train Mounted Survey System, Opportunities & Constraints Trevor Burton UK Programme Manager – Fugro RailData

RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

RILA Train Mounted Survey System, Opportunities & Constraints

Trevor Burton UK Programme Manager – Fugro RailData

Page 2: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 2

RILA Train Mounted

Survey System,

Opportunities & Constraints

Trevor Burton Fugro RailData

UK Programme Manager

Page 3: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 3

(Data) Acquisition RILA is a suite of train mounted sensors

for rapid acquisition of survey data that negates the need for surveyors to be on or near the track in the acquisition of the data.

RILA survey data supports a range of topographical survey, gauging and infrastructure monitoring applications for asset management, maintenance and engineering design.

Analysis Advice Acquisition

Introduction

Page 4: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 4

(Data) Acquisition

2007 2013 2015 2018 Acquisition

Introduction

•  2007 2013/14 2017

•  RILA Track RILA 360 RILA v3.0

Page 5: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 5

(Data) Acquisition

Advice

Introduction

Page 6: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 6

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

Introduction

2013 RILA Track Trials – Wigan to Southport / Manchester Airport

2014 Project based trials – Settle to Carlisle/Carnforth

2015 Gt Western IEP, Norwich in 90, Midland Mainline Electrification, High Output Track Renewals Scotland

2016 Gt Western Route Modernisation, South Wales Electrification, Northern Hub, HOTR LNW, Western & Wales, Anglia and South East

2017/18 Wessex DMU, Crossrail, Transpennine Route Upgrade, MML, Basingstoke to Reading, Ad-hoc deliveries of existing data & onward processing.

Page 7: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 7

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

Introduction

Product Acceptance Received from NR Systems Review Panel in 2016 with 9 Safety Related Application conditions.

Reviewed & Updated in 2017 to include new system developments and 7 of the 9 SRACs closed.

Page 8: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 8

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

Introduction

NR Survey Standards

NR/L2/TRK/3100 Issue 4, December 2, 2017

Note 3 RILA Track+RILA 360 measurements are always correlated thereby improving the relative accuracy. When modelling objects (using multiple points from the point cloud) the relative accuracy between objects is +/-3mm in X,Y&Z.

Page 9: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 9

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Technology

RILA GPS and IMU

GPS 5Hz, IMU 300Hz

RILA 360 LiDAR Scanner

1Million pulses per second (400 scans each of 2500 pulses)

RILA Video System

3 lenses, 170° field of view

RILA Track Laser Vision Scanners

Static laser split by prism with camera 500Hz

Page 10: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 10

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Track Technology

x, y, z

l β

α

GPS 5 Hz, augmented with post processed RINEX data from CORS network

IMU 300 Hz

Laser Vision 500 Hz

Page 11: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 11

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Track Technology

Page 12: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 12

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Track Technology

Page 13: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 13

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Track Technology

RILA is run 4 times over each track to ensure maximum track accuracy and compensate for small differences in GPS between measurement runs.

Running multiple times in both directions also densifies the LiDAR point cloud.

Page 14: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 14

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Track Technology

RILA is run 4 times over each track to ensure maximum track accuracy and compensate for small differences in GPS between measurement runs.

Running multiple times in both directions also densifies the LiDAR point cloud.

Page 15: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 15

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA 360 Technology

RILA 360 laser operates simultaneously with the track system and scans objects and features within the rail corridor in a “what you see is what you get mode” As data is captured multiple times in both directions there are very few occluded or shadowed areas.

Complex algorithms combine the various individual runs into a single homogenous cloud.

Page 16: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 16

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA 360 Technology

Page 17: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 17

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Video Technology

RILA is also equipped with an integrated video system.

Video is acquired from a three lens camera array with a 170 degree field of view. The video is georeferenced and can be viewed in most media players, via an on-line portal or stored as individual JPGs with associated world reference files.

Page 18: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 18

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Video Technology

Page 19: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 19

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Data Applications

RILA is routinely used as a source for topographical survey. RILA track strings are produced from the track data while objects, structures and lineside features can be extracted from the point cloud.

Page 20: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 20

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Data Applications

RILA can be used for 6ft passing clearance analysis and structure gauging. NGD compliant SC0 and SCX files being the standard deliverable product.

Page 21: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 21

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Data Applications

RILA is currently awaiting approval for platform gauging but can be used to determine Heights and Staggers and measurement of OLE components.

Page 22: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 22

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Deployment

RILA can be mounted to dedicated locomotives or on the rear of an in-service passenger service, with the equipment being loaded in less than 2 minutes at terminus stations during turnarounds.

Page 23: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 23

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Deployment

Page 24: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 24

(Data) Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Deployment

RILA can be mounted to a range of different rolling stock using custom designed coupler adaptors or to buffered trains via a universal buffer adaptor.

Two RILA technicians travel with the equipment in the rear train cab.

A RILA Designated Person communicates with signalers and train crew

Page 25: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 25

(Data)Acquisition

Advice

RILA Opportunities

•  Clearly defined health and safety benefit •  No possessions or track access required

in the collection of data •  Thousands of track man-hours saved •  Survey entire routes in days •  Collect whole route data and process as

required •  Survey once and use for many different

projects/applications •  Can be mounted to a range of locos and

passenger services •  Assigned NR Band 1A accuracy

Page 26: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 26

(Data)Acquisition

Analysis Advice Acquisition Advice Acquisition

RILA Constraints & Potential Mitigation

Coverage / Completeness •  GPS loss in tunnels, deep cuttings and in

urban corridors – supplement with ground control (targets, spheres on spigots etc) or tie in to recent ground topo

•  Train pathing – on passenger services at the mercy of the paths given to particular services. Loss of data at stations with multiple platforms. Unlikely to record loops, sidings etc. – supplement where necessary with other sources of data (drones, static laser scanning, road/rail or trolley based mobile mapping systems.

Page 27: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 27

(Data)Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Constraints & Potential Mitigation

Weather •  Impossible to survey with lying snow.

Potential loss of data in heavy rain. Excessive low sun comprises photogrammetric measurement of Track data introduction of blue lasers

Network Operational Issues •  TOC and Union matters – established

procedures and track record •  Perceived risk to timetable – if turnaround

tight, wait for next service

Page 28: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 28

(Data)Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

RILA Constraints & Potential Mitigation

Data Handling •  Huge data volumes – Gt Western regional

project 40Tb – store/share in the cloud, deliver/access via web portal. Consider format choices and products carefully.

•  Typical project – point cloud as .LAS &.POD output as OSGB and Snakegrid

•  Video as individual .JPG frames and as MPEG,

•  DGN, CSV of rail strings, wire runs •  DGN of topographical survey •  SC0/SCX/SCP gauging files

Page 29: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

www.fugro.com 29

(Data)Acquisition

Analysis Advice Acquisition Ana7/1lysis Advice Acquisition

Conclusion

RILA can supply clearly defined benefits: •  Speed of Acquisition •  Health and Safety through removal of survey personnel

from the track •  Data that can be used for range of asset management

and design applications •  Mode of acquisition promotes capture once and use

many times ethos. Constraints need to be managed accordingly: •  Relatively small areas of occluded or substandard data

compared with track length captured. •  Operational issues ever present but diminishing with

experience and track record •  Survey specifications need to be prepared with

consideration to potential data volumes.

Page 30: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

We are Fugro

For more information, please contact: Trevor Burton [email protected] fugro.com/raildata

Page 31: RILA Train Mounted Survey System, Opportunities & Constraints · 3 (Data) RILA is a suite of train mounted sensors Acquisition for rapid acquisition of survey data that negates the

Q&A

RILA Train Mounted Survey System, Opportunities & Constraints

Trevor Burton UK Programme Manager – Fugro RailData