RIVERSIDE ELEMENTARY SCHOOL. West Contra Costa Unified School District. CalTrans Overpass. MARCH 12, 2013. SALLY SWANSON ARCHITECTS, INC . WWW.SWANARCH.COM. AGENDA. Introduction Needs Assessment Review Interchange Modifications at I-80 and San Pablo Dam Road Questions and Answers. - PowerPoint PPT Presentation
Citation preview
RIVERSIDE ELEMENTARY SCHOOL
CalTrans Overpass
MARCH 12, 2013
SALLY SWANSON ARCHITECTS, INC.WWW.SWANARCH.COM
West Contra Costa Unified School District
AGENDA
• Introduction
• Needs Assessment
• Review
Interchange Modifications at I-80 and San Pablo Dam Road
• Questions and Answers
INTRODUCTION
PRINCIPAL, CEO: Sally Swanson, AIA
Presenters
NEEDS ASSESSMENT
Existing School Site
Site Approx. = 5.925 Acres CA. Dept. of Education Standard = 10 Acres
Riverside E.S.
Riverside E.S.
REVIEW INTERCHANGE MODIFICATIONS AT I-80 AND SAN PABLO DAM ROAD
Interchange Modifications
Interchange Modifications
Interchange Modifications
SITE ANALYSIS
Design not to ADA codes:
• Path of Travel
• In vehicular way
• No designated path
• Location to Administrative
Entrance – 380 feet
• Accessible space not
compliant
• Not Van accessible
• Aisle not on passenger
side
Parking Lots and Spaces
Parking
+/- 380 Ft. POT
Overpass designed location:
• Crossing I-80....Positive
• Four story structure
creates danger zone
• Location hides parking
• Loss of 3 spaces
CalTrans Overpass
CalTrans Overpass Modification
Danger Zone+/- 380 Ft. POT
Fire Lane
Security concerns on school grounds:
• Critical issue:
• Cars, Copper piping, & Computers
• Parking - Pedestrian movement in conflict
• Campus needs to be contained
• Disabled access in conflict with vehicular
traffic
Security
Security
+/- 380 Ft. POT
Danger Zone
Fire Lane
Acoustics
Overpass designed location:
• Landscaping removed
adjacent to freeway
• Served as an Acoustical
Barrier
Overpass Barriers
• Alternate CalTrans
Overpass location
• Future value of site
not compromised
• Need for Site Design
Integration & Master
Plan
Sale of Property
Sale of Property
New Overpass Location
Conclusion
+/- 380 Ft. POT Danger Zone
Fire Lane