EnergyDriveEnergyDrive offers a Zero CAPEX and

“Zero-Budget” energy saving solution that ensures guaranteed minimum saving, at minimum risk to the client, with verifiable on-line data.

Page 3: SA First Presentation 2015 copy pdf

Energydrive  SA  Overview• Started  Jan  2011  in  Durban  SA  • 7  equal  share  partners  (5  of  the  7  are  UK  citizens)  • We  run  a  flat  management  structure,  for  high  collaboration  and  have  a  highly  trained  and  diverse  support  team.  

• Currently  controlling  17MW  of  motors  in  SA  • 200  systems  country  wide  • Fully  privately  funded

3

Page 4: SA First Presentation 2015 copy pdf
Page 5: SA First Presentation 2015 copy pdf

Four hurdles EnergyDrive OvercomesNEED FOR CAPEX FINANCE:

Typical installation paybacks are in excess of 3 years

THE MEASUREMENT AND VERIFICATION DILEMMA: How to create a verified, realistic base line, and track the actual savings

PLANT DOWN TIME: The risk that VSD failure can cause plant down time, thereby wiping out any

savings created

TECHNICAL RESOURCES: Finding the technical staff for such projects

Page 6: SA First Presentation 2015 copy pdf

Speed Law Effect

0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0 32.5 35.0 37.5 40.0 42.5 45.0 47.5 50.0

Flow 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

Pressure 0 0 1 2 4 6 9 12 16 20 25 30 36 42 49 56 64 72 81 90 100

Power 0 0 0 0 1 2 3 4 6 9 13 17 22 27 34 42 51 61 73 86 100

0

10

20

30

40

50

60

70

80

90

100

Pow

er (k

W)

Speed (Hz)

Flow, Pressure, Power vs Speed Law

Flow

Pressure

Power

Page 7: SA First Presentation 2015 copy pdf

EnergyDriveCase study 1:

Gas Fume Extraction fans

2 x 2.5MW @ 6.6kV

61%kWh savings

Page 8: SA First Presentation 2015 copy pdf

Pressure Before ED

Page 9: SA First Presentation 2015 copy pdf

Pressure After ED

Page 10: SA First Presentation 2015 copy pdf

Power Before ED

Page 11: SA First Presentation 2015 copy pdf

Power After ED

Page 12: SA First Presentation 2015 copy pdf

VSD E-cabins with Aircon

Page 13: SA First Presentation 2015 copy pdf

Link panel arrangement

Page 14: SA First Presentation 2015 copy pdf
Page 15: SA First Presentation 2015 copy pdf

EnergyDriveCase study 2:

Gas Fume Extraction fans

2 x 1MW @ 3.3kV

63% kWh savings

Page 16: SA First Presentation 2015 copy pdf
Page 17: SA First Presentation 2015 copy pdf

EnergyDriveCase study 3:

Sappi Stanger

Page 18: SA First Presentation 2015 copy pdf
Page 19: SA First Presentation 2015 copy pdf
Page 20: SA First Presentation 2015 copy pdf

EnergyDriveCase study 4:

Hot Melt Cooling towers

72%kWh savings

Page 21: SA First Presentation 2015 copy pdf
Page 22: SA First Presentation 2015 copy pdf

EnergyDrive

LV over view

8MW of 400 / 525V applications

63% overall kWh savings

Page 23: SA First Presentation 2015 copy pdf
Page 24: SA First Presentation 2015 copy pdf

All spend to Electrcitity New Electricity is predicted Energy Saving is BETTER than predicted

Energy Saving is WORSE than predicted

EnergyDrive: Diagrammatic Explanation of Contract

Existing Spend Contractural Figures Scenario A Scenario B

using an example of 10% Minimum Guarantee

Client Savings: Nil Client Savings: Guaranteed Client Savings: increases (client enjoys benefit)

Client Savings: unchanged (minimum guaranteed)

ED Fee: Nil ED Fee: annualised, billed monthly ED Fee: stays the same ED Fee: must reduced

Guaranteed saving to Client Annualised

R 1 000

R 100R 200

R 100

R 300

R 600

R 300

R 500

R 200

R 700

Total Annualised without VSD R 1 000 R 1 000 R 1 000 R 1 000

Summary of ExampleEquipment installed at Zero cost

Guaranteed minimum saving of 10%Full maintenance and 5 year warranty

Energy Drive Fee Annualised

Electricity account payment Annualised

Page 25: SA First Presentation 2015 copy pdf

EnergyDriveWhat opportunities we can work with?

1. Cooling Tower Fans2. Cooling Water Pumps3. ID / FD fans4. Fume Extraction fans5. Bag house fans6. Vacuum Pumps

Page 26: SA First Presentation 2015 copy pdf