SAFETY AUDITORS CONFERENCE 2011

Safety Audit to Tunneling Project

Page 2: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

System Audit 11Method of Method of 

excavation excavation –– TBM TBM or D&B or bothor D&B or both

22Tunnel ventilationTunnel ventilation 33

Conveyance & Conveyance & logistics supportlogistics support

44Communication Communication 

systemsystem

55Power & fueling Power & fueling 

systemsystem

66Access control & Access control & tracking systemtracking system

77Tunnel furniture & Tunnel furniture & 

layoutlayout

88Flood control, fire Flood control, fire fighting & life fighting & life 

supporting systemssupporting systems

TUNNEL PROJECTTUNNEL PROJECT

Page 3: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

• Type of TBM ‐ Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air

Tunnel Boring MachineTunnel Boring Machine

• Ergonomics in the design of TBM, e.g. how cutter discs are replaced, design of the Pilot Room, the concern of manual handling in probing, grouting and installation of facilities

• Method statements for assembling, operation and dis‐assembling of the Tunnel Boring Machine

• Subsystems: Guidance system, dust suppression & collection system, gas monitoring system, fire detection and suppression system, segment erection, cranage, probing & grouting system, muck conveying system

11

Page 4: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Tunnel Boring MachineTunnel Boring Machine

11

Page 5: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Tunnel Boring MachineTunnel Boring Machine

11

Page 6: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Tunnel Boring MachineTunnel Boring Machine

11

Page 7: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

• Type of Explosive – cartridge, emulsion or ANFO

Drill & BlastDrill & Blast

• Conveyance of Explosives – Mines vessel or vehicles, approved vehicles or train

• Method statements for blasting or concurrent blasting, especially the evacuation/ clearance procedure

• Handling of misfires and re‐entry procedure11

• Storage of Explosive – underground magazine, licensed DG stores

• Scaling procedure and rock mapping by geologist

Page 8: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Drill & BlastDrill & Blast

11

Page 9: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Drill & BlastDrill & Blast

11

Page 10: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Drill & BlastDrill & Blast

11

Page 11: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Drill & BlastDrill & Blast

11

Page 12: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

• Design criteria for bored tunnel ventilation for fresh air supply and heat dissipation

Tunnel VentilationTunnel Ventilation

• Airflow measurements using anemometer

• Gas monitoring in data‐logging mode for a period of time after blasting (CO, CO2, CH4, H2S, O2, NOX, NH3)

• Gas monitoring during TBM dismantling22• BS 6164:2001 – Minimum 0.5 m/s

• Temperature measurement – Effective WBGT (heat stress assessment)

• Dust sampling (respirable dust)

• Radon monitoring (occupational health standard = 400 Bq/m3)

• Selection of suitable PPE

Page 13: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Tunnel VentilationTunnel Ventilation

22

Page 14: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

• Conveyor belt/ rock crushing system – lockout/ tagout system, provision of guarding, installation of trip wire & emergency stops

Conveyance & Logistics SupportConveyance & Logistics Support

• Different train formations or the use of articulated vehicles

• Preventive maintenance program for the earthmoving equipment, rail and rolling stocks

33 • Long haul loaders and dumpers

• Operational safety procedures and safety devices, e.g. CCTV, sensors and warning lights

• Muck train and hoisting of muck receptacles

• Installation, operation and disassembly procedure of conveyor system/ rock crusher

Page 15: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Conveyance & Logistics Support

33

Page 16: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Communication System

44

• Contractual requirements and best practices – status of approval and implementation

• Integrated leaky cable network of mobile phone system, walkie‐talkies and FSD radio communication

• Intercom system within the TBM

• Fixed line telephone along tunnel and in TBM

• Genephone in the TBM refuge chamber and surface control centre

• Verified if the systems have been installed and whether they are working properly

Page 17: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Communication System

44

Page 18: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Power & Fueling System

55

• 110V – hand‐held equipment,  lighting & small water pumps• 415V, 3 phase – Jumbo drills, conveyor booster motors, rock 

crusher and other heavy duty equipment• 11kV ‐ TBM• Substations from power company at the surface and step‐

down transformers inside tunnel (to be protected from being hit by mobile plant)

• Application and provision of a licensed DG Store or the arrangement of daily fuel trucks; the safety of refueling operation inside tunnel

• Diesel fuel – tyre and track equipment, e.g. locomotives, dumpers, loaders, backhoes, lifting cranes, etc.

• Emergency backup – only sufficient for lighting, ventilation and flood control; emergency lighting (2 hr) operated by backup batteries

Page 19: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Access Control & Access Control & Tracking SystemTracking System

66

• Traditional tag board system with security guard acting as standby person

• Smart card system and access gates

• Real‐time tracking system

• Measure the success of implementation

Page 20: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Tunnel Furniture & Layout

77

• Segregated walkway between pedestrian and vehicular/ rail traffic – its implementation and maintenance

• Pedestrian walkway away from overhead conveyor

• The location of power supply lines, water mains/ return and compressed air piping to be identified – usually at a higher level to avoid easy accessibility and damages

• Indication and easy accessibility of emergency facilities, e.g. fixed lined telephones, fire alarms, Fire Services outlets, firehose reels, portable fire extinguishers, etc.

• Establishment and implementation of safety rules and procedures in connection with pedestrian and vehicular traffic

Page 21: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Flood Control, Fire Fighting & Life Supporting System

88

• Flood control measures and fire evacuation procedure

• Provision of fire detection system (e.g. smoke and heat detection system in TBM)

• Joint rescue exercises with emergency services

• Provision of refuge chambers and self‐rescuers

• Provision of fire suppression and extinguishing systems (e.g. CO2/ foam extinguishing system and water drenching system in TBM; mist suppression system in mobile plant engines 

Page 22: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Flood Control, Fire Fighting & Life Supporting System

88

Page 23: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

• TBM Pilots, Segment Erectors

Competency & Training

• Registered Shotfirers

• Licensed locomotive drivers, dumper operators, tower crane operators, mobile crane operators, gantry crane operators, backhoe operators, loader operators and forklift truck operators

• Registered electrical workers (LV & HV)

• Licensed jumbo drill operators, cherry picker operators, concrete pump operators

• Qualified geological and survey team

Page 24: Safety Audit to Tunneling Project - · PDF file•Type of TBM ‐Hard rock (single shield or double shield) or earth pressure balance (EPB), use of compressed air Tunnel Boring Machine

Thank You