Martinez, Karlo Joseph C. CPN 529 – 1CPM 1. Establishing an Internet Cafe I. Project Schedule NOTE: Activity D is moved to the end date of Activity C. Activity E is moved to the end date of Activity C, Activity G is moved to the start date of Activity F II. Network Diagram A 0 2 2 0 2 B 2 5 3 2 5 C 8 22 14 8 22 D 5 8 3 5 8 E 22 25 3 22 25 F 25 39 14 25 39 G 39 46 7 39 46 H 39 53 14 39 53 I 46 53 7 46 53 J 53 74 21 53 74 K 74 79 5 74 79 L 79 80 1 79 80 M 80 81 1 80 81 N 81 83 2 81 83 O 83 86 3 83 86

Scheduling Using PERT CPM

Embed Size (px)

DESCRIPTION

using pert

Citation preview

Page 1: Scheduling Using PERT CPM

Martinez, Karlo Joseph C.CPN 529 – 1CPM

1. Establishing an Internet CafeI. Project Schedule

NOTE: Activity D is moved to the end date of Activity C.Activity E is moved to the end date of Activity C,Activity G is moved to the start date of Activity F

II. Network Diagram

A 0 22 0 2

B 2 53 2 5

C 8 2214 8 22

D 5 83 5 8

E 22 253 22 25

F 25 3914 25 39

G 39 467 39 46

H 39 5314 39 53

I 46 537 46 53

J 53 7421 53 74

K 74 795 74 79

L 79 801 79 80

M 80 811 80 81

N 81 832 81 83

O 83 863 83 86

P 86 882 86 88

Q 88 891 88 89

R 89 901 89 90

Page 2: Scheduling Using PERT CPM

A B C D E F G H I

JKLMNOPQR

Page 3: Scheduling Using PERT CPM

Hosting a Conference

I. Project Schedule

II. Network Diagrams

III. Critical Path

a 0 22 0 2

b 2 42 2 4

d 4 73 4 7

c 7 2114 7 21

e 21 221 21 22

f 21 221 21 22

g 21 221 21 22

Page 4: Scheduling Using PERT CPM

Critical Path

Designing a Brochure

I. Project Design

II. Network Diagram

a b c d e f g

a 0 44 0 4

b 4 95 4 9

c 9 167 9 16

d 9 167 9 16

e 16 193 16 19

f 19 267 19 26

g 19 267 19 26

h 26 282 26 28

i 28 291 28 29

j 29 301 29 30

k 30 311 30 31

l 30 311 30 31

m 30 311 30 31

n 30 3130 31

o 30 311 30 31

p 31 321 31 32