School Library Facilities Plan. Lisa Upper. Design Overview. Design Elementary school library (within a K-12 private school) Built in 2007 Primarily designed by a rchitect facilities director prior librarian Original plan allowed for 4,000 sq. ft. - PowerPoint PPT Presentation

Citation preview

Page 1: School Library Facilities Plan

School Library Facilities PlanLisa Upper

Page 2: School Library Facilities Plan

Design OverviewDesign• Elementary school library (within a K-12 private school)• Built in 2007• Primarily designed by

– architect– facilities director– prior librarian

• Original plan allowed for 4,000 sq. ft.• Projected building cost $200 / sq. ft. for a total of

$800,000• After cutting the budget, plan allowed for 2,100 sq.

ft. (5,000 sq. ft. recommended – Morris, 2010)• Actual building cost $125 / sq. ft. for a total of

$262,500• Final dedicated student space total: 1,185 sq. ft.

Page 3: School Library Facilities Plan

Location within the School• Near office

Page 4: School Library Facilities Plan

Location within the School• Near instructional

classrooms

Page 5: School Library Facilities Plan

Location within the School

• Near teacher workroom

Page 6: School Library Facilities Plan

Location within the School

• Near restrooms

Page 7: School Library Facilities Plan

Location within the School

• Near outside entrance

Page 8: School Library Facilities Plan

Location within the School

• Near computer lab

Page 9: School Library Facilities Plan

Location within the School

• Near to noise-producing room, but well-insulated

Page 10: School Library Facilities Plan

Location within the School

Informed by North Carolina IMPACT p. 62

Page 11: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Page 12: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Page 13: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Page 14: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision

Page 15: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Page 16: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Page 17: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Page 18: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately

Page 19: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are there

Page 20: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Page 21: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Page 22: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Story area can accommodate only one class at a time

Page 23: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Story area can accommodate only one class at a time

Story area free from distraction

Page 24: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Story area can accommodate only one class at a time

Story area free from distraction

Limited line of sight within room

Page 25: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Story area can accommodate only one class at a time

Story area free from distraction

Limited line of sight within room

Visibility within school

Page 26: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Story area can accommodate only one class at a time

Story area free from distraction

Limited line of sight within room

Visibility within school

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population IMPACT p. 83

Page 27: School Library Facilities Plan

Design CritiqueWeaknesses Strengths

Former librarian lacked experience and degree

Experienced architect and facilities director

Limited program vision Designed for existing program

Form could not follow function as there was no mission / goal

Form has some ability to change with function

Elements exist separately Elements are thereNear noise-generating areas

Excellent noise dampening

Story area can accommodate only one class at a time

Story area free from distraction

Limited line of sight within room

Visibility within school

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population IMPACT p. 83

Natural light and lighting zones

Page 28: School Library Facilities Plan

Facility Areas for Major Functions• Support areas• Large group instruction• Reference• Story sharing• Independent work area• Small group activity • Informal reading• Multimedia production• Periodical storage• Administration and planning• Circulation

– Accessible to all patrons

• Automated catalog• Professional area• Parent resource area• Workroom• Display and exhibit• Secure equipment area• Computer lab / tech areas

inside or near– Wireless access– Adequate workstations

• AASL, 2009, p. 34

Page 29: School Library Facilities Plan

Functional Regions OverviewUse of Space Approx. Square

Footage

Page 30: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection

Approx. Square Footage• 420 sq. ft.

Page 31: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.

Page 32: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.

Page 33: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area• OPAC Access

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.• 35 sq. ft.

Page 34: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area• OPAC Access• Workroom

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.• 35 sq. ft.• 150 sq. ft.

Page 35: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area• OPAC Access• Workroom• IT System

Mainframe

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.• 35 sq. ft.• 150 sq. ft. • 135 sq. ft.

Page 36: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area• OPAC Access• Workroom• IT System

Mainframe• Computer Lab

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.• 35 sq. ft.• 150 sq. ft. • 135 sq. ft.• 630 sq. ft.

Page 37: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area• OPAC Access• Workroom• IT System

Mainframe• Computer Lab• Student Work and Instruction Area

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.• 35 sq. ft.• 150 sq. ft. • 135 sq. ft.• 630 sq. ft. • 350 sq. ft.

Page 38: School Library Facilities Plan

Functional Regions OverviewUse of Space• Collection• Circulation• Story Time Area• OPAC Access• Workroom• IT System

Mainframe• Computer Lab• Student Work and Instruction Area• TOTAL

Approx. Square Footage• 420 sq. ft. • 130 sq. ft.• 250 sq. ft.• 35 sq. ft.• 150 sq. ft. • 135 sq. ft.• 630 sq. ft. • 350 sq. ft.

• 2,100 sq. ft.

Page 39: School Library Facilities Plan

Functional RegionsCirculation130 sq. ft.

Approx. Total 2,100 sq. ft.

Page 40: School Library Facilities Plan

Functional Regions

Collection420 sq. ft.

Approx. Total 2,100 sq. ft.

Page 41: School Library Facilities Plan

Functional Regions

Story Time Area

250 sq. ft.Approx. Total 2,100 sq. ft.

Page 42: School Library Facilities Plan

Functional Regions

OPAC Access35 sq.

ft.

Approx. Total 2,100 sq. ft.

Page 43: School Library Facilities Plan

Functional Regions

Student Work and

Instructio

n Area350 sq.

ft.

Approx. Total 2,100 sq. ft.

Page 44: School Library Facilities Plan

Functional Regions

Computer Lab630 sq. ft.

Approx. Total 2,100 sq. ft.

Page 45: School Library Facilities Plan

Functional RegionsIT System Mainfram

e135 sq.

ft.

Approx. Total 2,100 sq. ft.

Page 46: School Library Facilities Plan

Functional RegionsWorkroom150 sq. ft.

Approx. Total 2,100 sq. ft.

Page 47: School Library Facilities Plan

Computer Lab

Page 48: School Library Facilities Plan

Computer Lab

• Connected to library, but not a functioning part of the library

Page 49: School Library Facilities Plan

Computer Lab

• Connected to library, but not a functioning part of the library

• Dedicated computer specialist

Page 50: School Library Facilities Plan

Computer Lab

• Can accommodate one class at a time

Page 51: School Library Facilities Plan

Computer Lab

• Can accommodate one class at a time

• No allowance for independent work before, during, or after school

Page 52: School Library Facilities Plan

Mobile Lab• Intended use

at time of acquisition – 6th-12th grades

Page 53: School Library Facilities Plan

Mobile Lab• Intended use

at time of acquisition – 6th-12th grades

• Requires sign up

Page 54: School Library Facilities Plan

Mobile Lab• Intended use

at time of acquisition – 6th-12th grades

• Requires sign up

• Requires two IT specialists to move

Page 55: School Library Facilities Plan

Mobile Lab• Cart

– Earthwalk – $4,000

• Printer – Brother Wireless

Laser – $250

• Laptops – Dell Vostro – Paragon Micro – $900 x 25 =

$22,500

Page 56: School Library Facilities Plan

IT Office / Mainframe

Page 57: School Library Facilities Plan

IT Office / Mainframe

Page 58: School Library Facilities Plan

IT Office / Mainframe

• Mainframe and storage

Page 59: School Library Facilities Plan

IT Office / Mainframe

• Mainframe and storage

• IT department located in adjacent building

Page 60: School Library Facilities Plan

Workroom

Page 61: School Library Facilities Plan

Workroom

Page 62: School Library Facilities Plan

Workroom

• Basic cabinetry and countertop

Page 63: School Library Facilities Plan

Workroom

• Basic cabinetry and countertop

• Additional custom-made shelving unit

Page 64: School Library Facilities Plan

Workroom

• Basic cabinetry and countertop

• Additional custom-made shelving unit

• Book processing in workroom not realistic

Page 65: School Library Facilities Plan

Workroom

• Basic cabinetry and countertop

• Additional custom-made shelving unit

• Book processing in workroom not realistic

• No computer in workroom

Page 66: School Library Facilities Plan

Workroom

• Basic cabinetry and countertop

• Additional custom-made shelving unit

• Book processing in workroom not realistic

• No computer in workroom• Back wall could become production / green screen

backdrop

Page 67: School Library Facilities Plan

Circulation Desk

Page 68: School Library Facilities Plan

Circulation Desk

Page 69: School Library Facilities Plan

Circulation Desk

• Inviting entrance

Page 70: School Library Facilities Plan

Circulation Desk

• Inviting entrance• Book drop as part of circulation desk

Page 71: School Library Facilities Plan

Circulation Desk

• Inviting entrance• Book drop as part of circulation desk• Reference area in desk

Page 72: School Library Facilities Plan

Circulation Desk

• Inviting entrance• Book drop as part of circulation desk• Reference area in desk• Perhaps 3-4 feet of wasted space

Page 73: School Library Facilities Plan

Circulation Desk

• Inviting entrance• Book drop as part of circulation

desk• Perhaps 3-4 feet of wasted space• Moving desk towards entrance

would widen passageway between wall and side of desk

Page 74: School Library Facilities Plan

Circulation Desk

• Inviting entrance• Book drop as part of circulation

desk• Perhaps 3-4 feet of wasted space• Moving desk towards entrance

would widen passageway between wall and side of desk

• Limited space behind desk

Page 75: School Library Facilities Plan

Circulation Desk

• Inviting entrance• Book drop as part of circulation

desk• Perhaps 3-4 feet of wasted space• Moving desk towards entrance

would widen passageway between wall and side of desk

• Limited space behind desk• Only one person fits

comfortably at a time

Page 76: School Library Facilities Plan

Circulation Desk

• Space at chair height is cramped at 45”w x 16 ½” deep

Page 77: School Library Facilities Plan

Circulation Desk

• Space at chair height is cramped at 45”w x 16 ½” deep

• Desk has become the work area for all daily tasks

Page 78: School Library Facilities Plan

Circulation Desk

• Although there are windows, line of sight / range of hearing is limited

Page 79: School Library Facilities Plan

Circulation Desk

• Although there are windows, line of sight / range of hearing is limited

• Cannot monitor OPAC computers

Page 80: School Library Facilities Plan

Circulation Desk

• Although there are windows, line of sight / range of hearing is limited

• Cannot monitor OPAC computers

• Netbook, scanner, A/V cart provided for remote circulation within student area

Page 81: School Library Facilities Plan

Story Area

Page 82: School Library Facilities Plan

Story Area

• Original design called for sunken story area

Page 83: School Library Facilities Plan

Story Area

• Original design called for sunken story area

• Not ADA – friendly, so design was changed

Page 84: School Library Facilities Plan

Story Area

• Story area can accommodate only one class comfortably

Page 85: School Library Facilities Plan

Story Area

• Story area can accommodate only one class comfortably

• Additional risers would necessitate central handrails

Page 86: School Library Facilities Plan

Story Area

• Story area can accommodate only one class comfortably

• Additional risers would necessitate central handrails

• High side wall blocks corner student view

Page 87: School Library Facilities Plan

Story Area

• Story area can accommodate only one class comfortably

• Additional risers would necessitate central handrails

• High side wall blocks corner student view

• Inflexible concrete wall

Page 88: School Library Facilities Plan

Story Area

• Entrance to story area 29” – width of wheelchair 26”

Page 89: School Library Facilities Plan

Story Area

• Space behind midline of circle unusable for instruction• Lack of visibility• Lack of proximity

Page 90: School Library Facilities Plan

Story Area

• Space behind midline of circle unusable for instruction• Lack of visibility• Lack of proximity

• Created storage space by flipping former puppet theater to design ‘fireplace’ for

housing reading pillows

Page 91: School Library Facilities Plan

Story Area

• Pull down screen

Page 92: School Library Facilities Plan

Story Area

• Pull down screen• High side wall of sitting area

blocks corner student view of screen

Page 93: School Library Facilities Plan

Story Area

• Projector connected to A/V input housed in IT workroom on opposite side of library

Page 94: School Library Facilities Plan

Story Area

• Projector connected to A/V input housed in IT workroom on opposite side of library

• Remote control range from story area to IT workroom insufficient

Page 95: School Library Facilities Plan

Story Area

• Projector connected to A/V input housed in IT workroom on opposite side of library

• Remote control range from story area to IT workroom insufficient

• No instructional presentations requiring

computer input

Page 96: School Library Facilities Plan

Story Area

• Projector connected to A/V input housed in IT workroom on opposite side of library

• Remote control range from story area to IT workroom insufficient

• No instructional presentations requiring

computer input • Half wall too high for

seated screen viewing outside of story area

Page 97: School Library Facilities Plan

Story Area

• Direct connection with A/V adaptor and cord installed

Page 98: School Library Facilities Plan

Story Area

• Direct connection with A/V adaptor and cord installed

• Cord to be secured against ceiling and behind clock

Page 99: School Library Facilities Plan

Story Area

• Direct connection with A/V adaptor and cord installed

• Cord to be secured against ceiling and behind clock

• Laptop for instruction available

Page 100: School Library Facilities Plan

OPAC

Page 101: School Library Facilities Plan

OPAC

Removed tall OPAC carrels from center of the library

Page 102: School Library Facilities Plan

OPAC

Carrels placed against workroom wall, under windows

Page 103: School Library Facilities Plan

OPAC

Carrels cut down to seated height of 27” (ADA-approved)

Page 104: School Library Facilities Plan

Instruction/Independent Work

Page 105: School Library Facilities Plan

Instruction/Independent Work

Original table placement too congested

Page 106: School Library Facilities Plan

Instruction/Independent Work

• Tables spread out• ADA-approved distance

between tables, chairs, and bookcases

Page 107: School Library Facilities Plan

Instruction/Independent Work

Page 108: School Library Facilities Plan

Instruction/Independent Work

Page 109: School Library Facilities Plan

Collection

• Bookcases created a limited line of sight• Space between cases smaller than the 5’ ADA recommendation

Page 110: School Library Facilities Plan

Collection

• Block of bookcases removed

Page 111: School Library Facilities Plan

Collection

• Bookcases moved to the perimeter of the library

Page 112: School Library Facilities Plan

Collection

• Door opening between library and computer lab still within fire code requirement of 36”

Page 113: School Library Facilities Plan

Collection

• Bookcases moved to the perimeter of the story area wall

Page 114: School Library Facilities Plan

Collection

• Replaced bookcases with flexible shelving for picture books • Wooden browsing carts

• Wooden Furnishings• $1,500 (factory seconds, $750)

Page 115: School Library Facilities Plan

Functional Regions CritiqueWeaknesses Strengths

Page 116: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Page 117: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Page 118: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Page 119: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Page 120: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Page 121: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Page 122: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25

Page 123: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 Secluded

Page 124: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 SecludedStationary bookcases limit visibility and flexibility

Adequate shelving

Page 125: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 SecludedStationary bookcases limit visibility and flexibility

Adequate shelving

Instruction area too crowded

Page 126: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 SecludedStationary bookcases limit visibility and flexibility

Adequate shelving

Instruction area too crowded Enough seating for one full class

Page 127: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 SecludedStationary bookcases limit visibility and flexibility

Adequate shelving

Instruction area too crowded Enough seating for one full class

Limited staffing

Page 128: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 SecludedStationary bookcases limit visibility and flexibility

Adequate shelving

Instruction area too crowded Enough seating for one full class

Limited staffing Volunteerism

Page 129: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsComputer lab separate from library

Full-time computer specialist

Workroom doesn’t lend itself to working

Adequate storage; could be used for production projects

Circulation desk became a too-small multi-use desk

Has drop slot and spring-loaded book bin

Story area limited to 25 SecludedStationary bookcases limit visibility and flexibility

Adequate shelving

Instruction area too crowded Enough seating for one full class

Limited staffing VolunteerismLimited visibility from circulation desk

Page 130: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsProjector and screen limited to story area; multimedia instruction unwieldy

Page 131: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsProjector and screen limited to story area; multimedia instruction unwieldy Physical space is lacking multiple, flexible spaces that accommodate a variety of learning tasks AASL, 2009, p. 34

Page 132: School Library Facilities Plan

Functional Regions CritiqueWeaknesses StrengthsProjector and screen limited to story area; multimedia instruction unwieldy Physical space is lacking multiple, flexible spaces that accommodate a variety of learning tasks AASL, 2009, p. 34

Administrator not yet open to resource-based instruction and learning, flexible scheduling, and the need to simultaneously accommodate both small and large groups at the same time

Page 133: School Library Facilities Plan

ACTION POINTSFacility Design and Functional Regions

Page 134: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Page 135: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Page 136: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Story area can accommodate only one class at a time

Page 137: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Story area can accommodate only one class at a time

Movable furniture for flexibility in large group space acquiredCost: $750 for book browsers

Page 138: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Story area can accommodate only one class at a time

Movable furniture for flexibility in large group space acquiredCost: $750 for book browsers

Limited line of sight within room

Page 139: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Story area can accommodate only one class at a time

Movable furniture for flexibility in large group space acquiredCost: $750 for book browsers

Limited line of sight within room

Netbook and scanner used for mobility during checkoutCost: $250

Page 140: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Story area can accommodate only one class at a time

Movable furniture for flexibility in large group space acquiredCost: $750 for book browsers

Limited line of sight within room

Netbook and scanner used for mobility during checkoutCost: $250

Projector and screen limited to story area; multimedia instruction unwieldy

Page 141: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Limited program vision;Form could not follow function as there was no mission / goal

Program mission statement, philosophy, policies, and procedures written and published to school website and orientation materialsCost: $0

Story area can accommodate only one class at a time

Movable furniture for flexibility in large group space acquiredCost: $750 for book browsers

Limited line of sight within room

Netbook and scanner used for mobility during checkoutCost: $250

Projector and screen limited to story area; multimedia instruction unwieldy

Mobile projector, screen, and laptop availableCost: $0

Page 142: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Physical space is lacking multiple, flexible spaces that accommodate a variety of learning tasks

Page 143: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Physical space is lacking multiple, flexible spaces that accommodate a variety of learning tasks

Floor space reworkedCost: $0Mobile book browsers acquiredCost: $750 (half price for company “seconds”)

Page 144: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Physical space is lacking multiple, flexible spaces that accommodate a variety of learning tasks

Floor space reworkedCost: $0Mobile book browsers acquiredCost: $750 (half price for company “seconds”)

Story area projector and screen limited to input from IT workroom, making instruction through use of computer applications unrealistic

Page 145: School Library Facilities Plan

Action Points - CompletedActionable items Action taken

Physical space is lacking multiple, flexible spaces that accommodate a variety of learning tasks

Floor space reworkedCost: $0Mobile book browsers acquiredCost: $750 (half price for company “seconds”)

Story area projector and screen limited to input from IT workroom, making instruction through use of computer applications unrealistic

Adaptor cord connected to projector; wiring secured to ceiling and wall; laptop availableCost: $10

Page 146: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately

Page 147: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

Page 148: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population to be accommodated at any one time

Page 149: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population to be accommodated at any one time

Consultation with media specialist during future building and remodelingCost: $0

Page 150: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population to be accommodated at any one time

Consultation with media specialist during future building and remodelingCost: $0

Limited staffing

Page 151: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population to be accommodated at any one time

Consultation with media specialist during future building and remodelingCost: $0

Limited staffing Part-time assistantCost: $7.50/hr x 10 hrs/wk x 40wks/yr = $3,000

Page 152: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population to be accommodated at any one time

Consultation with media specialist during future building and remodelingCost: $0

Limited staffing Part-time assistantCost: $7.50/hr x 10 hrs/wk x 40wks/yr = $3,000

Stationary bookcases limit visibility and flexibility

Page 153: School Library Facilities Plan

Action Points - PendingActionable items Action needed

Elements exist separately Coordination / collaboration Cost: $0

840 sq. ft. less than the 30 sq. ft. per student required for 15% of the school population to be accommodated at any one time

Consultation with media specialist during future building and remodelingCost: $0

Limited staffing Part-time assistantCost: $7.50/hr x 10 hrs/wk x 40wks/yr = $3,000

Stationary bookcases limit visibility and flexibility

Bookcase bases reworked to accommodate wheelsCost: $150 ($25 x 6)

Page 154: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Page 155: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Second mobile labCost: $27,000

Page 156: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Second mobile labCost: $27,000

Circulation desk area cramped

Page 157: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Second mobile labCost: $27,000

Circulation desk area cramped

Desk movedReplace seated area with longer desk moduleCost: $400

Page 158: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Second mobile labCost: $27,000

Circulation desk area cramped

Desk movedReplace seated area with longer desk moduleCost: $400

IMMEDIATE COST $ 550 Furniture

Page 159: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Second mobile labCost: $27,000

Circulation desk area cramped

Desk movedReplace seated area with longer desk moduleCost: $400

IMMEDIATE COST $ 550 FurnitureLONG-TERM COST $27,000 Computers

Page 160: School Library Facilities Plan

Action Points - PendingActionable items Action neededComputer lab separate from library

Second mobile labCost: $27,000

Circulation desk area cramped

Desk movedReplace seated area with longer desk moduleCost: $400

IMMEDIATE COST $ 550 FurnitureLONG-TERM COST $27,000 ComputersONGOING COST $ 3,000/year Employee

Page 161: School Library Facilities Plan

• AASL. (2009). Empowering learners. Chicago: ALA.• Erikson, R. & Markuson, C. (2009). Designing a school

library media center for the future. 2nd ed. Chicago: ALA. • Morris, B. J. (2010). Administering the school library media

center. 5th ed. Santa Barbara, CA: Libraries Unlimited.• NC DPI, ITD. (2008). IMPACT: Guidelines for North

Carolina Media and Technology Programs. Raleigh, NC.• Woolls, B. (2008). The school library media manager. 4th

ed. Westport, CT: Libraries Unlimited.